1 Transport for London London Underground Access Protecting Workers on the Track Train Movements Learning information booklet Effective April 2014 Issue 1 MAYOR OF LONDON

2

3 Contents Section page 1 Introduction 4 2 Roles and responsibilities 5 3 Engineering vehicles 10 4 Specified area 14 5 Specified area limits 18 6 Setting up a specified area 22 7 Positioning a lookout 25 8 Working an engineer s train or mechanised vehicle 26 9 Unrelated work in a specified area On completion of the work Engineer s current area Setting up an engineer s current area Worksites within possessions When things go wrong References 45

4 section 1 Introduction 1 Introduction This learning information booklet has been produced for individuals who will be Protecting Workers on the Track - Train Movements (PWT-TM). This could be within a Specified Area (SA), Engineer s Current Area (ECA) and within a possession worksite. A PWT-TM must be appointed when an engineer s train, test train, mechanised vehicle or On Track Plant (OTP) is planned to work either: in a SA in an ECA within a possession worksite under the direction of an engineer (electrical), (track) or (signals). To carry out the activities of a PWT-TM you must: have a valid PWT-TM certificate have a valid PWT-EH or Protection Master Engineering Hours (PMEH) certificate be site familiar be identified by a Train Movements armband worn on the left arm above the elbow. If an engineer s train is to uncouple and both portions are to work independently, a PWT-TM must be appointed for each portion. PWT-TM s that are required to work on Lines fitted with Transmission Based Train Control (TBTC) signalling system, must attend the TBTC training course. 4

5 Roles and responsibilities Introduction 2 section 2 Roles and responsibilities 2.1 Protecting Workers on the Track - Train Movements A person certificated by London Underground (LU), who is responsible for: supervising and controlling an engineer s train, test train, mechanised vehicle and OTP working within a worksite the safety of staff needing to work on or about the track within a worksite when engineer s trains and mechanised vehicles are moving those involved with the operation of engineer s trains, test trains, mechanised vehicles and OTP. The PWT-TM is identified by a Train Movements armband worn on the left arm above the elbow. All staff working on or about the track when trains and mechanised vehicles are moving, or when the traction current is on, must have, as a minimum, a valid Basic Track Awareness (BTA) or Track Accustomed (TA) certificate. 2.2 Protecting Workers on the Track - Possession Worksite A person certificated by LU to safely manage: the demarcation of a possession worksite the possession worksite and control the movement of engineer s trains and mechanised vehicles into, within and out of the possession worksite the handing back of the possession worksite to the Protection Support Manager (POSM). The PWT-PW is identified with a Possession Worksite armband worn on the left arm above the elbow. 5

6 section 2 Roles and responsibilities 2.3 Engineer s Train Operator A person certificated by LU to drive an electric, battery or diesel train or locomotive. 2.4 Track Access Controller Licensed by LU to control the Line Clear and Line Safe procedures during Engineering Hours. 2.5 Controller A suitably competent person, in overall control of the train service on a line, normally acting from the line s control room. 6

7 Roles and responsibilities 2 section 2.6 Signaller Any suitably competent person operating signal control equipment. 2.7 Vehicle Control Centre Operator Monitors, controls and maintains the Vehicle Control Centre. 2.8 Lookout A person certificated by LU to warn staff who might be exposed to danger from moving trains or vehicles. They are identified by a lookout armband worn on the left arm above the elbow. 7

8 section 2 Roles and responsibilities 2.9 Possession Master A person certificated by LU to take control of a possession. They are identified by a Possession Master armband worn on the left arm above the elbow. If acting as the POSM they must have the competence to: establish and manage the worksite protection arrangements correctly give up the worksite in a controlled, safe and effective manner ensure the safe movement of trains within the possession including into and out of the worksite Engineer (track, electrical, signals) A person trained and certificated in the relevant discipline, and authorised to undertake specific procedures. An engineer (track) must accompany a long welded rail train conveying long welded rails, a travelling crane when in train formation or a mechanised vehicle travelling on its own wheels in a train formation. 8

9 Roles and responsibilities 2 section 2.11 Support staff Individuals who are trained and certificated by LU to carry out the following activities: forward, rear and intermediate limit defining checking the status of traction current securing and unsecuring points lookout (if required). The PWT-TM can carry out the activities of a limit definer if the train is published to start and finish at the same station. 9

10 section 3 Engineering vehicles 3 Engineering vehicles 3.1 Engineer s train An engineer s train is any train that is used for engineering purposes or similar work. For example: ballast train passenger stock tunnel cleaning train weed killing train. 3.2 Test train A test train is any train that: must be used only for test purposes will normally have test equipment fitted to or within it. When test equipment is not fitted, a train designated as a test train must have a competent engineer on board to monitor the performance of test equipment which is undergoing test. 10

11 Engineering vehicles 3 section 3.3 Mechanised vehicle Any vehicle or combination of vehicles (excluding track trolleys) certificated to run on LU track by the Rolling Stock Engineer (LU) and approved by the Chief Operating Officer, which: are self propelled are used for engineering purposes only might be able to on/off track at designated sites are only allowed on the running line or signalled sidings within a SA or possession cannot be classified as a train. 3.4 On track plant These are self propelled mechanical plant that are rail-mounted and used during construction and maintenance of railway infrastructure. 11

12 section 3 Engineering vehicles 3.5 When and where trains and vehicles can work Engineer s train, test trains, mechanised vehicles and OTP can work during Engineering Hours within: a SA an ECA a possession worksite, with current on or off. When an engineer s train or mechanised vehicle is required to work with traction current off during Engineering Hours, it must do so only in a SA or a possession. Engineer s train, test trains, mechanised vehicles and OTP can work during Traffic Hours in: traffic within a possession worksite, with traction current on or off. If required to work with traction current off during Traffic Hours, or partly in Traffic Hours, it must do so only within a possession. When an engineer s train is required to work with traction current on, a possession: need not be taken if the train will not be uncoupled and it will operate only in the normal direction of traffic using signalled moves, or if the train will operate within the limits of an ECA must be taken if the train will be uncoupled and will operate to and fro, and are not carried out in an ECA. 12

13 Engineering vehicles 3 section 3.6 Additional equipment and publications required As a PWT-TM you will require the following additional equipment and publications: Train Movements armband worn on the left arm above the elbow access to the engineering notice and for worksites in possessions, Engineer s Train and Mechanised Vehicles Working Plan an approved method of communicating with the Engineer s Train Operator (ETO) equipment for securing points (if applicable) lamps and detonators. 13

14 section 4 Specified area 4 Specified area A SA is a defined area of track in the Line Clear or Line Safe area within which an engineer s train or mechanised vehicle can work with traction current switched off during Engineering Hours. Although the details of the location of a SA are published on the Nightly Engineering Protection Arrangements (NEPA), more detailed information is published in the engineering notice. 4.1 Engineering Notice The Engineering Notice is a publication produced and circulated within LU detailing the nightly engineering work and similar activities. 4.2 Lamps The limits of a SA are defined by a suitably certificated person placing: 14 a double red aspect lamp, secured to the running rail furthest from the positive conductor rail

15 Specified area 4 section three detonators placed 20 metres apart,outside of the SA, on the crown of the running rail furthest from the positive conductor rail. Dual aspect red/yellow lamps are still in circulation and if used they must be secured with the red aspect facing into the SA and the detonators secured outside of the SA, on the yellow aspect side. 4.3 Detonators The detonators used by LU: are day glow yellow disc approximately two inches in diameter are embossed with the date of manufacture each have a life expectancy of five years, after which they must be withdrawn and returned to the stores. 15

16 section 4 Specified area Pre-use checks The person placing detonators must inspect the detonator for visible signs of damage or defect. DO NOT USE a detonator if: they are more than five years old or have reached their expiry date the clips have become detached show any signs of: - rust - damage - defect - leakage. If the detonator appears to be damaged or defective, a replacement must be obtained. 4.4 Placing a detonator 16 When placing a detonator they must be: placed on the running rail furthest from the positive conductor rail and away from any components, e.g. insulated block joints secured by bending the clips round the crown of the running rail.

17 Specified area 4 section Staff placing detonators must make sure the detonators are positioned at a sufficient distance, and in a position to prevent injury to other person(s) in the area. 4.5 Storage and control of detonators Detonators must be stored: in a sealed metal container provided by the manufacturer, and labelled with the explosive symbol in a secure, dry place, away from any chemicals, inflammable materials or sources of heat with no more than 24 at a site (other than the main stores). 4.6 Transportation of detonators Detonators must be transported: in the manufacturer s sealed metal container no more than 20 at a time (in two containers) secured so they cannot move during transit by distribution services if more than 20 need to be carried. 17

18 section 5 Specified area limits 5 Specified area limits 5.1 Line Clear areas The limits of a SA within single bore tunnels in Line Clear areas must be defined from one station to another (including disused stations) and, unless otherwise published, the entire length of any platforms at the extremities of the SA must be included. This will provide access to leave the tunnel in an emergency. This requirement also applies to all reductions in the length of the SA within Line Clear areas. 5.2 Line Safe areas The limits of a SA within Line Safe areas and double track Line Clear sections must only be defined from the following locations: station platforms (when including the entire platform length) station starter fixed signals (when not including the entire length platform length) other fixed signals tunnel mouths or bridges current rail substation gaps junctions, (the limits of a SA defined at points or crossovers must always include the whole set unless otherwise stated). Where a SA splits into two or more separate branches, the SA must be defined on each branch. 5.3 Crossovers When a SA incorporates a crossover the PWT-TM is responsible for ensuring the crossover is secured within the SA which might allow: 18 the engineer s train or mechanised vehicle to leave the area onto an adjacent track staff working with a track trolley on an adjacent track to enter the SA.

19 Specified area limits 5 section The PWT-TM must make sure a lamp with a double red flashing aspect is placed on the crossover between the tracks concerned. It is not necessary to place detonators in these circumstances. 5.4 Specified area on the adjacent track When there is a SA on an adjacent track, you must: make sure that the points of the crossovers are secured to prevent either train from running into the other SA place a double red aspect flashing lamp on the crossover between the tracks concerned. Detonators are not required in these circumstances reach an agreement with the other PWT-TM which of you will be responsible for placing and removing the red flashing lamp for the SA s. If there is a train working on the adjacent track, additional protection is required, for example: a physical barrier must be erected at the worksite between the tracks if a physical barrier cannot be erected, a lookout is required. 5.5 Securing points When any engineer s train or mechanised vehicle which conforms to the definition of a train, is working in a possession, SA or an ECA which have points involved, it must be decided by the project manager at the planning meeting whether they need to be secured for movement over them. Whenever movement is required of a mechanised vehicle which does not conform to the definition of a train or is not included in the formation of a train, the PWT-TM must make sure all points are secured by scotch and clip in the appropriate position for all movements over them. 19

20 section 5 Specified area limits If any points within a possession, SA or ECA can be operated by the signaller, any movement of these points must be made by the signaller, but only when the PWT-TM has requested the signaller to do so. Where the signaller cannot operate the points, the PWT- TM can request an engineer (signal and control) to do this after informing the signaller. Securing points refers to fixing points or moveable angles so they cannot move by the use of a scotch and clip. Most points on LU are self normalising, in that if the points are reversed then they will return to normal after a passage of a train. A person can scotch and clip only if they have been trained and are deemed competent to do so. When securing points and moveable angles, a person must: have permission to secure points or moveable angles from the person controlling the points arrange their own protection if necessary, as a first priority use the correct scotch and clip for the points or moveable angles which are to be secured always secure the clip with a padlock if it is being used for protection inform the person controlling the points or moveable angles when they have been secured. The hazards associated with securing points are: equipment could move at any time slipping and tripping live traction current rails. 20

21 Specified area limits 5 section 5.6 Unsecuring points When unsecuring points and moveable angles, you must: inform the person controlling the points check for obstructions and remove with a point scraper, if applicable remove the padlock hold the clip in position by the handle and pull to release it, lift the scotch clear of the points move to a place of safety inform the person controlling the points (as they may need to be tested). 5.7 Reducing the limits of a specified area The original limits of a SA can be reduced to smaller than published only if: permission is granted from the Track Access Controller (TAC) incident desk it is within reasonable time before the normal TAC s office desks open for protection staff to book on the request is feasible and physically possible all staff involved with the work are made aware of, and understand, the amended arrangements. The limits of a SA cannot be extended. 21

22 section 6 Setting up a specified area 6 Setting up a specified area 6.1 Planning meeting The planning meeting could take place at your base or depot. If you are not carrying out the dual activities then the planning meeting must take place when you meet the PWT/SPC on site. The purpose of the planning meeting is to: discuss the working requirements of the engineer s train or mechanised vehicle decide the detailed roles and responsibilities of everyone involved in the working of the engineer s train or mechanised vehicle set up a safe system of work and agree all protection arrangements for the engineer s train or mechanised vehicle, including the staff agree the method of communication for the working of the engineer s train or mechanised vehicle and emergencies. It is acceptable for two or more trains or mechanised vehicles to work within a SA, provided it is published and a site-based and task-based risk assessment has been completed to determine any necessary additional operational and engineering controls, which will ensure safety is maintained at all times. 6.2 Stations with platform edge doors 22 If within the limits of the SA it involves stations fitted with platform edge doors, the PWT-TM must arrange for a PWT- EH or PMEH to be present on the platforms, and they must: sign the station log book and take responsibility of the RKL220 key remain on the platform to ensure that staff not working with the train do not pass through the platform edge doors when the work is complete, contact the station supervisor who will resume responsibility of the RKL220 key.

23 Setting up a specified area 6 section 6.3 Briefings All support staff, engineer s train or mechanised vehicle operators and the work group, must be briefed and: agree the communication details and the use of cab telephones or hand held radios (or both) they must be suitably certificated. Any additional PWT-TM s must also be briefed. 6.4 Arrival on site When you arrive at the station the train is booked to run to, you must: book on with the station supervisor contact the controller, identify yourself by name, status, company and business unit and give any safety critical information, and a contact number book the SA with the appropriate TAC if you have not already done so confirm with the limit definers that they have booked their own protection, if required. The forward and rear limit definers will book their own protection. Where there are intermediate limit definers, individuals who test for traction current and anyone securing points will come under your protection. When the engineer s train or mechanised vehicle has arrived on site, the PWT-TM must: 23

24 section 6 Setting up a specified area tell the ETO to secure the engineer s train and switch to battery power (if applicable) and wait for further instructions contact the controller and tell them that the train is on site and traction current is no longer required wait for confirmation that traction current has been switched off. The status of traction current can be confirmed by: placing a Current Rail Indicator Device (CRID) in front of the engineer s train checking the status of the Permanent-Current Rail Indicator Device (P-CRID) receiving confirmation from support staff. Contacting the controller to inform them that traction current is no longer required should be carried out as soon as possible otherwise it is delaying other users who require access to the same traction current section(s) When traction current has been switched off When the CRID/P-CRID indicates that traction current has been switched off and it is at or after the published off time: remove the CRID from the track tell the ETO not to move the train until instructed contact the limit definers and tell them to carry out their activities, as briefed, and to confirm when completed when it has been confirmed that all traction current sections involved are off and the SA has been defined, sign your log book and the engineer s train or mechanised vehicle s operating journal as appropriate. If more than one traction current section is involved the PWT-TM must designate and confirm with a suitably certificated person(s), that the current is off on all the traction current sections within the SA, before signing the declaration in the log book.

25 Setting Positioning up a specified a lookout area 7 section 7 Positioning a lookout The factors that must be considered when positioning lookouts, the PWT-TM must: ensure the lookout(s) attend the planning meeting, and are briefed and fully understand their duties check that the lookout has all the required certification and equipment consider the direction of approaching trains or mechanised vehicles agree the method of warning to be used agree the warning codes agree the required sighting time consider the location of the worksite and location of the places of safety agree who will indicate to the work group that it is safe for them to continue working after the passage of a train. 25

26 section 8 Working an engineer s train or mechanised vehicle 8 Working an engineer s train or mechanised vehicle When the PWT-TM has defined the SA and work is ready to commence, they can, if applicable, instruct the engineer s train or mechanised vehicle operator to enter from an adjacent possession, or published on-tracking point. The engineer s train or mechanised vehicle can then move as required within the SA. 8.1 Working with the train or vehicle operators As the PWT-TM you are responsible for: briefing the train or vehicle operator on the workings of the train or mechanised vehicle agreeing the system of signals that will be used making sure all staff are in a safe place before allowing the engineer s train or mechanised vehicle to move supervising and controlling the movement of the engineer s train or mechanised vehicle. 8.2 On track plant operator briefing OTP operators and associated banksmen/slingers (where provided), must be given a more detailed pre-worksite briefing, as they may not be experienced in working in the track environment. The PWT- TM briefings must include: the limits and scope of the work to be undertaken at the worksite the emergency, safety and first aid procedures for the worksite what plant and equipment will be in operation at the worksite and the processes that will be undertaken the PWT-TM appointed to control the OTP at the worksite 26

27 Working an engineer s train or mechanised vehicle 8 section signals they will encounter, how to respond to them and the signals they must use before moving how to recognise points and what action to take before moving over them what action to take if the OTP goes over a detonator(stop) the location where the OTP might be on/off-tracked and stabled any other relevant safety information. When using phones or radios to communicate, the phonetic alphabet must be used. The PWT-TM must request and get permission from the TAC for any train movements outside the limits of a SA or ECA. 8.3 Uncoupling and securing vehicles Engineer s trains, test trains, OTP, mechanised vehicles and any combination of these (including individual wagons and carriages), which are to be left unattended for any period of time and in any location, must be secured to prevent them from moving. Vehicles must not be uncoupled from trains on the running line, except within the limits of a SA, ECA or a possession, as directed by a competent person. 8.4 Personnel travelling on wagons If personnel are to travel on a wagon on an engineer s train: the train must be working in a possession or a SA traction current must be off at all times there must be sufficient room within the train the train loads must be properly secured 27

28 section 8 Working an engineer s train or mechanised vehicle there must be protection from falling off the wagon by either handrails or wagon sides communication with the ETO must not be adversely affected. Before allowing personnel to travel on the engineer s train the PWT-TM must give them an additional safety briefing. They must: position themselves so they will not come into contact with any structure which could cause them injury not get on or off while the engineer s train is moving not get on or off until the PWT-TM confirms that it is safe to do so board and alight from the engineer s train either from a station platform or via the approved wagon steps or handrail. When personnel are travelling on the engineer s train, it is the responsibility of the PWT-TM to ensure that the engineer s train is driven slowly. While the engineer s train is moving the PWT-TM must ensure that everyone observes all the safety procedures. 8.5 Loading and unloading It is the PWT/SPC s responsibility for ensuring a competent person supervises the loading of an engineer s train, ensures any materials on the train are secured and in gauge, before allowing an engineer s train or mechanised vehicle to depart the worksite. The ETO has the final decision on the load safety of a train. 28

29 Working an engineer s train or mechanised vehicle 8 section 8.6 Tamping machines A tamping machine can only work in sub-surface sections if gas monitoring equipment is provided and operated by competent and qualified staff. A tamping machine must run in a train formation when any part of the journey involves travelling through tube tunnels. The only exception to this is when travelling through short tunnels. 8.7 Propelling trains The propelling of engineer s trains is also known as back shunting or blind shunting and it can be: authorised by a notice issued by the Chief Operating Officer (or equivalent) within the limits of a SA or ECA, but must be authorised by the PWT-TM within the limits of a possession, but must be authorised by a Possession Master - Train Movements (POM-TM). 29

30 section 9 Unrelated work in a specified area 9 Unrelated work in a specified area Unrelated work in a SA can only be permitted in an emergency, when there is urgent work that is critical to the operation of traffic the next day. Unrelated work in a SA is not permitted if: an engineer s train is scheduled to uncouple in the course of the work there is more than one engineer s train working in the SA. The PWT-TM must meet with the person providing protection for carrying out the unrelated work to agree the: nature and location of the work to be carried out, and the number of staff involved movements of the train protection arrangements to be applied by the person providing the protection working and communication arrangements to be used on site time by which work must finish. Two copies of the Specified Area Agreement form, available online from the Network Improvement SharePoint site, must be completed by the person providing the protection. Both parties must sign both forms. The completed forms must be retained by the PWT-TM and the person providing the protection for a minimum of 28 days. 30

31 Unrelated work in a specified area 9 section The PWT-TM must now contact the TAC and tell them: of the agreement to the unrelated work the reference number on the Specified Area Agreement form the number of additional staff that are being protected. The PWT-TM must now tell: all personnel under their protection of the unrelated work the ETO(s) of the arrangements and the additional protection agreed with the person providing the protection of the unrelated work. If the Specified Area Agreement form does not have a printed reference number, the person providing the protection for the works can allocate a number. 31

32 section 10 On completion of the work 10 On completion of the work On completion of the work the PWT/SPC accountable for the work (if applicable) will inform the PWT-TM that the: work is complete SA can be given up. When the work is finished, the PWT-TM must make sure that: all personnel are clear of the track the track is safe for trains to run, before clearing with the TAC. Where unrelated work has taken place the PWT-TM must receive confirmation from the person providing protection for the unrelated work that: all personnel are clear of the track the track is safe for trains to run, before clearing with the TAC Removing the specified area Discuss and explain that when the work has finished and the SA is no longer required, mechanised vehicles which do not conform to the definition of a train can now either be off-tracked or moved into an adjacent possession. The PWT-TM must tell the ETO to drive the engineer s train to the published finishing point and secure the train. The PWT-TM must: 32 place the CRID on the traction current rails inspect the train with the ETO and the PWT/SPC (if applicable) arrange for the limit definers to remove the limits of the SA and, if required, unsecure points, and wait for confirmation ensure the log book is signed to confirm the track is safe for trains to run

33 On completion of the work 10 section book off with the TAC inform any support staff that had to book their own protection to clear with the appropriate TAC. When the traction current has been switched on the PWT-TM must: remove the CRID sign the operating journal as appropriate instruct the ETO to proceed to the booked stabling point as published. 33

34 section 11 Engineer s current area 11 Engineer s current area An ECA is a defined area of track running from one nominated station to another nominated station in the Line Clear area and/or Line Safe area where an engineer s train is working with traction current on during Engineering Hours. The ECA consists of three parts: Engineer s current area: The area over which the train will be working, using traction current. The limits are defined by a PWT-TM using double red aspect flashing lamps, and three detonators, 20 metres apart outside the limits of the ECA Active traction current sections: These are the traction current sections, from substation gap to substation gap, that have traction current switched on for the movement of the train. Allied traction current sections: These are the traction current sections that protect the ECA and are switched off. They include all traction current sections where it is physically possible for a train to gain access to the active traction current section. 34 If an adjoining traction current section cannot be switched off, for example, it forms part of a depot; an ECA must not be used. In this circumstance, a possession must be taken.

35 Engineer s current area 11 section ECA was originally designed for the tunnel cleaning train to work only in single bore tunnel sections. Due to the composition of this train and the location of its worksites, it was not possible to either walk through the train or alongside it. Escape in an emergency from the ECA was therefore only possible via a station and it was for this reason the ECA limits were always defined from station to station, and the rules written accordingly. ECA s are now used for other types of train. While the normal situation will remain for ECA limits to be defined at stations and the rules imply this will continue to be the case, in some circumstances it might be possible for ECA limits to be defined at locations other than stations. This will be possible only when, during the planning stages, a risk assessment is carried out to consider the following: the location concerned, including whether it will be possible to walk alongside the train to leave the ECA in emergency the type of train and any equipment to be used, including whether it will be possible to walk through the train to leave the ECA in emergency if it becomes necessary to leave the ECA in emergency, a reliable form of communication will be available. If this assessment of risk identifies that it will be safe to define either or both of the ECA limits at locations other than stations, then this is acceptable. In these circumstances, the ECA limits can be defined at any of the following additional locations: disused stations, provided they have an available exit route fixed signals tunnel mouths or bridges current rail section gaps junctions, where the ECA must include the whole set of points and crossovers, unless otherwise stated buffer stops or train arrestors, provided they have a fixed red light facing on-coming traffic. 35

36 section 11 Engineer s current area 11.1 Crossovers When an ECA incorporates a crossover the PWT-TM is responsible for ensuring the crossover is secured within the ECA which might allow: the engineers train or mechanised vehicle to leave the area onto an adjacent track staff working with a track trolley on an adjacent track to enter the ECA. The PWT-TM must make sure a lamp with a flashing red aspect is placed on the crossover between the tracks concerned. It is not necessary to place detonators in these circumstances Trains working on the adjacent track The PWT-TM is responsible for: ensuring that the points of the crossovers are secured to prevent either train from running into the SA a double red aspect flashing lamp is placed on the crossover between the tracks concerned. Detonators are not required in these circumstances an agreement with the other PWT-TM, which of you will be responsible for placing and removing the red flashing lamp. Whenever possible and where access can be gained, the working of an engineer s train within an ECA, which is on an adjacent track to a SA, should be avoided. It is not necessary to place a lamp and detonators on the track where buffer stops or train arrestors are used as an ECA limit. 36

37 Setting up an Engineer s engineer s current area 12 section 12 Setting up an engineer s current area 12.1 Planning meeting The planning meeting could take place at your base or depot. If you are not carrying out the dual activities, then the planning meeting must take place when you meet the PWT/SPC on site. The purpose of the planning meeting is to: discuss the working requirements of the engineer s train decide the detailed roles and responsibilities of everyone involved in the working of the engineer s train set up a safe system of work and agree all protection arrangements for the engineer s train and the staff agree the method of communications for the workings of the engineer s train and emergencies Briefings All support staff, PWT-TM s, engineer s train or mechanised vehicle operators and work groups, must be briefed and: agree the communication details and the use of cab telephones or hand held radios (or both) be suitably certificated Arriving on site Discuss and explain that on arrival at the station that the engineer s train is booked to run to, and after booking on with the station supervisor: contact the controller, identify yourself by name, status, company and business unit and give any safety critical information, and a contact number if you have not already done so, book on with the appropriate TAC, the ECA. 37

38 section 12 Setting up an engineer s current area If the engineer s train is not already on site, when it arrives the PWT-TM must: tell the ETO not to move the engineer s train, and take the ETO s key contact the controller, tell them their name, company, status, engineer s train number and that the engineer s train is on site and ask the controller to confirm when traction has been switched off from the allied section(s) behind the engineer s train when the allied current section(s) is confirmed off, place the double red aspect lamp at the rear limits of the ECA, and three detonators 20 metres apart outside of the ECA limit return the ETO s key and tell the ETO to move the engineer s train to the forward limit Setting up an engineer s current area When the engineer s train arrives at the forward limit the PWT-TM must: tell the ETO not to move the engineer s train, and take the ETO s key contact the controller and ask them to confirm when traction current has been switched off from the allied section(s) in front of the engineer s train when the forward allied current section(s) is confirmed off, place a double red aspect lamp at the forward limit of the ECA and three detonators 20 metres apart on the outside of the ECA limit return the ETO s key and tell them to move the engineer s train as required within the limits of the ECA. 38 If the rear or forward limit of an ECA is defined within 80 metres of a substation gap, the adjoining traction current section must be an active traction current section.

39 Setting up an engineer s current area 12 section 12.5 Removing the limits of an engineer s current area When work with the engineer s train is complete, the PWT-TM must: tell the ETO to move the engineer s train to the rear limits of the ECA tell the ETO not to move the engineer s train, and take the ETO s key remove, the lamp and detonators defining the rear limits remove, any scotches and clips from points that were secured return the ETO s key and tell the ETO to move the engineer s train to the forward limit tell the ETO not to move the engineer s train, and take the ETO s key and place the CRID on the traction current rails remove the lamp and detonators defining the forward limits tell the controller that work has finished and that traction current can be switched off from all the active traction current sections. Traction current must be switched off from the active section(s) when work has finished. This is to prevent the engineer s train from inadvertently moving on current into an allied traction current section where staff could still be working before the completion of Engineering Hours. When the CRID indicates that traction current has been switched off from the active section(s) the PWT-TM must: inform the TAC that work has finished confirm to the TAC the time you requested the controller to arrange for traction current to be switched off from the active sections when all staff under your control are either clear or are suitably protected, book off with the relevant TAC 39

40 section 12 Setting up an engineer s current area when has been switched on, tell the ETO to proceed to the booked stabling point as published. When the CRID indicates that traction current has been switched on the PWT-TM must: remove the CRID tell the ETO to proceed to the booked stabling point as published. 40

41 Setting Worksites up an engineer s within possessions current area 13 section 13 Worksites within possessions As a PWT-TM they could be involved in controlling and supervising the movements of an engineer s train or mechanised vehicle in a worksite within a possession under the instructions of a person acting as the PWT-PW/SPC. In these circumstances a PWT-TM must be on board an engineer s train before it enters a worksite within a possession. A planning meeting will take place on the day or night of the possession before the possession is taken. The engineer in charge must brief all staff on their respective activities Mechanised vehicles entering or leaving a Possession Mechanised vehicles that do not conform to the definition of a train can only enter or leave a possession: by means of a level access adjacent on-or-off-tracking point by being craned in from, or off from an adjacent location from or into an adjacent SA by other means not involving movement on the operational railway. Arrangements for allowing mechanised vehicles to on-or-off-track into or out of a possession must be covered in the possession plan and possession works guide. If a mechanised vehicle can operate on traction current which is switched on within the possession and the PWT-TM is assigned to the mechanised vehicle; they must get confirmation from the vehicle operator that the isolation arrangements on the mechanised vehicle have been carried out, before allowing it to cross from or into the SA. 41

42 section 13 Worksites within possessions 13.2 Movement outside the possession worksite All train movements outside a possession worksite must be controlled by the POSM. The POSM will instruct the ETO s via the connect radio system to move the engineer s train. As a PWT-TM you are not responsible for these movements. 42

43 Worksites When within things possessions go wrong 14 section 14 When things go wrong 14.1 Overrun of work If the work is likely to overrun in a SA or ECA, the PWT-TM must request Late Surrender Protection (LSP) in accordance with Rule Book 16 Going on the track in Engineering Hours. In addition the PWT-TM must ensure all support staff, as appropriate, are: made aware of the overrun and to maintain the protection instructed to arrange their own LSP. The PWT-TM must consider the safety of all staff when requesting LSP Emergencies 14.3 Failure of an engineer s train or mechanised vehicle If an engineer s train or mechanised vehicle fails the operator must contact the controller. Defects on mechanised vehicles can be classified as: minor defects which can be rectified by the mechanised vehicle operator a defect which cannot be rectified on site and requires the hauling of the mechanised vehicle from the running line a defect requiring the attention of the Emergency Response Unit. If the PWT-TM has already booked on with the TAC they must: tell the TAC at the earliest opportunity tell the TAC if the assistance of an additional train is required give an approximate time the track will be made safe for trains 43

44 section 14 When things go wrong pass a Site Clear/Site Safe message to the TAC when the track is safe for trains to run Persons falling from an engineer s train Where there is clear evidence, or it is suspected, that someone has fallen from an engineer s train: traction current must be switched off in the area all train movements must be stopped. Traction current must not be switched back on and train movements restored until the person is found or the area is proved to be clear Detonator exploding under an engineer s train or mechanised vehicle If a detonator explodes under an engineer s train or mechanised vehicle in a SA, ECA or a worksite within a possession, the operator must stop immediately and the PWT-TM must be informed. The PWT-TM must in a: SA or an ECA,inform the TAC incident desk and wait for further instructions worksite in a possession Inform the POSM. 44

45 When things References go wrong 15 section 15 References Rule Book 01 Communications Rule Book 04 Moving a stalled train and authorised detrainments Rule Book 15 Possessions protection methods Rule Book 16 Going on the track in Engineering Hours Rule Book 18 Engineer s trains, vehicles and trolleys Rule Book 20 Engineering staff-traffic Hours protection Leaflet 01 Scotching and clipping Leaflet 05 Detonators 45

46 Notes 46

47 Notes 47

48

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3. GE/RT8000/DC Rule Book Module DC DC electrified lines Issue 3 March 2014 Comes into force 07 June 2014 Conventions used in the Rule Book Example A black line in the margin indicates a change to that rule

More information

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2.

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2. GE/RT8000/T11 Rule Book Module T11 Movement of engineering trains and on-track plant under T3 arrangements Issue 2 January 2007 Comes into force 02 June 2007 Issue Date Comments Comes into force 1 June

More information

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015 GE/RT8000/T3 Rule Book Module T3 Possession of a running line for engineering work Issue 6 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document

More information

Terminology. Glossary of Railway. Glossary of Railway Terminology

Terminology. Glossary of Railway. Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Issue 1 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved

More information

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB12 Iss 2 published on 01/09/2012

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB12 Iss 2 published on 01/09/2012 GE/RT8000/HB12 Rule Book Handbook 12 Handbook 12 Duties of the engineering supervisor (ES) Issue 1 Valid from June 2011 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY. Contents

More information

Uncontrolled When Printed Document comes into force 06/12/2014 Supersedes GERT8000-T10 Iss 3 on 06/12/2014

Uncontrolled When Printed Document comes into force 06/12/2014 Supersedes GERT8000-T10 Iss 3 on 06/12/2014 GE/RT8000/T10 Rule Book Module T10 Duties of a designated person () and people working on rail vehicles Issue 4 September 2014 Comes into force 06 December 2014 Published by: RSSB Block 2 Angel Square

More information

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book GERT8000-HB11 Rule Book Duties of the person in charge of the possession (PICOP) Issue 6 September 2017 Comes into force 02 December 2017 Handbook 11 Uncontrolled when printed Published by: RSSB The authoritative

More information

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012 GE/RT8000/HB15 Rule Book Handbook 15 Duties of the machine controller (MC) and on-track plant operator Handbook 15 Issue 1 Valid from June 2011 Published by: RSSB Block 2 Angel Square 1 Torrens Street

More information

Module DC. DC electrified lines

Module DC. DC electrified lines GE/RT8000/DC Rule Book Module DC DC electrified lines Issue 1 October 2006 Comes into force 02 December 2006 Issue Date Comments Comes into force 1 October 2006 Initial issue 02 December 2006 Copyright

More information

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book GERT8000-HB15 Rule Book Duties of the machine controller (MC) and ontrack plant operator Handbook 15 Issue 5 September 2017 Comes into force 02 December 2017 Published by: RSSB The authoritative version

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

Module AC. AC electrified lines

Module AC. AC electrified lines GE/RT8000/AC Rule Book Module AC AC electrified lines Issue 1 April 2009 Comes into force 06 June 2009 Published by: Rail Safety & Standards Board Block 2 Angel Square 1 Torrens Street London EC1V 1NY

More information

Working of Trains - Rules 1 to 45

Working of Trains - Rules 1 to 45 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This

More information

Preparation and movement of trains

Preparation and movement of trains GERT8000-TW1 Rule Book Uncontrolled When Printed Preparation and movement of trains Issue 11 Module TW1 September 2016 Comes into force 03 December 2016 Published by: RSSB The authoritative version of

More information

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 5 Glossary of Railway Terminology December 2018 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

Diesel Locomotive Train Driver. Lesson Plan and WorkBook

Diesel Locomotive Train Driver. Lesson Plan and WorkBook Diesel Locomotive Train Driver Lesson Plan and WorkBook (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed by

More information

Centralised Traffic Control System - Rules 1 to 17

Centralised Traffic Control System - Rules 1 to 17 Centralised Traffic Control System - Rules 1 to 17 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 2 13 May 2012 0 04 October 2015 Australian Rail

More information

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 4 Glossary of Railway Terminology December 2017 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Setting Back or Propelling on Running Lines Rule Number: 4015 Version 1.0, 31 March 2016 Setting Back or Propelling on Running Lines Rule Number: 4015 Document

More information

WORKING NEAR OR ADJACENT TO A DC CONDUCTOR RAIL (DCCR)

WORKING NEAR OR ADJACENT TO A DC CONDUCTOR RAIL (DCCR) KEYPOINTS WORKING NEAR OR ADJACENT TO A DC CONDUCTOR RAIL (DCCR) Issue two valid from July 2017 CERTIFICATION REQUIRED: CURRENT SENTINEL CARD ENDORSED WITH PTS COMPETENCY Sentinel Cards and Track Visitor

More information

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003 GE/RT8000 - M4 Rule Book Module M4 Floods and snow Issue 1 June 2003 Comes into force 6 December 2003 Issue Date Comments Comes into force 1 June 2003 Initial issue 6 December 2003 Copyright 2003 Railway

More information

Control, Safe Use and Operation of Road-Rail Plant

Control, Safe Use and Operation of Road-Rail Plant Control, Safe Use and Operation of Page 1 of 13 Part A Synopsis A Standard detailing the requirements for the control, safe use and operation of road-rail plant in the railway environment. Approval and

More information

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7 GERT8000-TW5 Rule Book Module TW5 Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7 September 2016 Comes into force 03 December 2016 Published by: RSSB The

More information

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Page 1 of 14 Part A Synopsis A standard detailing the requirements for the control, safe use and operation of excavators,

More information

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book GERT8000-TW5 Rule Book Preparation and movement of trains: Defective or isolated vehicles and on-train equipment Issue 8 Module TW5 September 2017 Comes into force 02 December 2017 Conventions used in

More information

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook Train Examination (Braking System) Addendum Lesson Plan and WorkBook (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates

More information

TA20 ARTC Code of Practice for the Victorian Main Line Operations

TA20 ARTC Code of Practice for the Victorian Main Line Operations TA20 ARTC Code of Practice for the Victorian Main Line Operations Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1.2 07 August 2011. 2.0 04 October

More information

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04

More information

Document Control Identification. Document History. Authorisation

Document Control Identification. Document History. Authorisation Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail 1 October 2016 Table of Contents Glossary for this Rule... 4... 9... 9... 9... 10... 11... 12... 13...

More information

Risk Management of Rail Vehicle Axle Bearings

Risk Management of Rail Vehicle Axle Bearings Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle

More information

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS (revised July 2005) (amended April 2012) REFERENCE DOCUMENTS These Regulations should be read in conjunction with the following

More information

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book GERT8000-TW5 Rule Book Preparation and movement of trains: Defective or isolated vehicles and on-train equipment Issue 9 Module TW5 September 2018 Comes into force 01 December 2018 Conventions used in

More information

AEROBRIDGE PRACTICAL TRAINING RECORD APRON DRIVE AEROBRIDGE BAY 1 & 5

AEROBRIDGE PRACTICAL TRAINING RECORD APRON DRIVE AEROBRIDGE BAY 1 & 5 AEROBRIDGE PRACTICAL TRAINING RECORD APRON DRIVE AEROBRIDGE BAY 1 & 5 Name: ASIC Number and Expiry: Company: Operators of the Bay 1 & 5 Apron Drive Aerobridge must be certified to be able to operate the

More information

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1. SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

WORKING SAFELY NEXT TO WEST MIDLANDS METRO WORKING SAFELY NEXT TO WEST MIDLANDS METRO GUIDELINES FOR BUSINESSES, CONTRACTORS, EVENT ORGANISERS & OTHERS WORKING ON OR NEAR TO WEST MIDLANDS METRO. If you own, occupy a building or other assets near

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Handsignals and Verbal Commands Rule Number: 2003 Version 1.0, 31 March 2016 Handsignals and Verbal Commands Rule Number: 2003 Document Control Identification Document

More information

Port of Oulu Ltd. 8 Dec PERIOD OF VALIDITY AND INFORMING OF CHANGES RAIL NETWORK... 2

Port of Oulu Ltd. 8 Dec PERIOD OF VALIDITY AND INFORMING OF CHANGES RAIL NETWORK... 2 1 NETWORK STATEMENT for the 2019 timetable period (Link to Finnish version) Contents 1 PERIOD OF VALIDITY AND INFORMING OF CHANGES... 2 1.1 INFORMING OF CHANGES... 2 2 RAIL NETWORK... 2 2.1 DESCRIPTION,

More information

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015 GE/RT8000/SP Rule Book Module SP Speeds Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk/rgsonline Contents

More information

Train Order System - Rules 1 to 37

Train Order System - Rules 1 to 37 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 1 01 July 2018 Australian Rail Track Corporation Limited (ARTC)

More information

TMV OPERATING MANUAL. A - Rev 1 SM SOP May Introduction:

TMV OPERATING MANUAL. A - Rev 1 SM SOP May Introduction: PO Box 299 Oberon NSW 2787 ABN 98 107 506 208 Version Author Reviewed Reference A - Rev 1 SM SOP-009 25 May 2012 TMV OPERATING MANUAL Introduction: The operation of Track Maintenance Vehicles (TMVs) is

More information

Index (part 1) covering all modules except the train signalling modules. Withdrawn Document Uncontrolled When Printed. Rule Book Index.

Index (part 1) covering all modules except the train signalling modules. Withdrawn Document Uncontrolled When Printed. Rule Book Index. index (part 1).qxd 23/5/03 12:05 pm Page 1 Rule Book Index Index (part 1) Index (part 1) covering all modules except the train signalling modules Issue 1 June 2003 Comes into force 6 December 2003 index

More information

Interface between Rail Vehicle Weights and Underline Bridges

Interface between Rail Vehicle Weights and Underline Bridges Interface between Rail Vehicle Weights and Synopsis This document sets out the requirements for managing the risk of overloading of underline bridges by rail vehicles Submitted by Signatures removed from

More information

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32 Rule Book Briefing Leaflet Issue 32 December 2018 The following modules and handbooks will be reissued and come into force on 01 December 2018: Glossary Glossary of Railway Terminology Handbook 8 IWA,

More information

Control, Safe Use and Operation of Forklift Trucks and Sideloaders

Control, Safe Use and Operation of Forklift Trucks and Sideloaders Control, Safe Use and Operation of Forklift Trucks and Sideloaders British Railways Board Page 1 of 12 Part A Synopsis A standard detailing the requirements for control, safe use and operation of forklift

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Working around Electrical Rule Number: 2017 Version 1.0, 31 March 2016 Working around Electrical Rule Number: 2017 Document Control Identification Document title

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and HIGH VOLTAGE METAL CLAD SWITCHGEAR WITH SPOUTS Copyright National Grid plc 2014, all rights reserved. No part of this publication

More information

Driving at Work Policy September 2016

Driving at Work Policy September 2016 Driving at Work Policy September 2016 Signed by the Chair of the Management Board.. Review Date: September 2018 CONTENTS 1. PURPOSE 2. DEFINITION 3. POLICY STATEMENT 4. RISK ASSESSMENT 5. PROCEDURES 6.

More information

Rule Book Index. Rule Book Index. covering all modules. Document Withdrawn as of December 2008 Uncontrolled When Printed. Rule Book Index.

Rule Book Index. Rule Book Index. covering all modules. Document Withdrawn as of December 2008 Uncontrolled When Printed. Rule Book Index. Rule Book Index Document Withdrawn as of December 2008 Rule Book Index covering all modules Rule Book Index Issue 7 April 2008 Comes into force 07 June 2008 Issue Date Comments Comes into force 1 June

More information

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2

RSC-G-004-B Guidelines For The Design Of Section 3 3 ELECTRIC TRACTION SYSTEMS 2 3 ELECTRIC TRACTION SYSTEMS 2 3.1. SAFE FOR PEOPLE 2 3.1.1. Electric Traction System 2 3.1.2. Protection against unwanted access 2 3.1.3. Fencing 2 3.1.4. On bridges and other structures 2 3.1.5. At level

More information

Signal passed at danger near Ketton, Rutland 24 March 2016

Signal passed at danger near Ketton, Rutland 24 March 2016 Independent report Signal passed at danger near Ketton, Rutland 24 March 2016 1. Important safety messages To ensure the safe movement of trains, it is essential that drivers carry out a full brake test

More information

Track Circuit Assister Configuration for Rail Vehicles

Track Circuit Assister Configuration for Rail Vehicles Track Circuit Assister Configuration for Rail Synopsis This Standard mandates where TCAs shall be fitted onto a vehicle and how they shall be set up. It also contains the requirements for testing a TCA.

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures s Rule Number: 3025 Version 1.0, 31 March 2016 Temporary Speed Restrictions Rule Number: 3025 Document Control Identification Document title Number Version Date

More information

Presented By: Tymothy Smith Early Care and Education Training and Consulting (214)

Presented By: Tymothy Smith Early Care and Education Training and Consulting (214) Presented By: Tymothy Smith Early Care and Education Training and Consulting (214) 796-1220 Qualifications for Drivers: Must be at least 21-years of age Must have a valid Texas drivers license Must be

More information

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 E1 Authorised Vehicles E2 E2 Loads for which Special E3 Conditions have to be Applied E3 Vehicles Equipped with E6 Changeover

More information

Port of Oulu Ltd. 9 Dec 2016

Port of Oulu Ltd. 9 Dec 2016 1 NETWORK STATEMENT Replaces the safety instruction for rail network traffic and rail work of the that entered into force on 1 June 2016. Contents 1 PERIOD OF VALIDITY AND INFORMING OF CHANGES... 2 1.1

More information

General Instructions and Inspection Instructions for Crane

General Instructions and Inspection Instructions for Crane General Instructions General Instructions and Inspection Instructions for Crane Distributed by Ergonomic Partners Sales@ErgonomicPartners.com www.ergonomicpartners.com Tel: 314-884-8884 EN R_(EN)/1 --

More information

Note: it is a criminal offence to give false information in this application.

Note: it is a criminal offence to give false information in this application. Note: it is a criminal offence to give false information in this application. Section 1 - Your contact details (Please read Guidance Note 1) 1a) Please give full details of the person that can be contacted

More information

Kenosha H.O.G. Chapter Road Captain & Assistant Road Captain Rules and Requirements

Kenosha H.O.G. Chapter Road Captain & Assistant Road Captain Rules and Requirements Kenosha H.O.G. Chapter Road Captain & Assistant Road Captain Rules and Requirements 1. General: These rules and requirements are set in place for the Road Captains (RC's) and Assistant Road Captains (ARC's)

More information

The West Lancashire Light Railway OPERATING RULE BOOK

The West Lancashire Light Railway OPERATING RULE BOOK The West Lancashire Light Railway OPERATING RULE BOOK Revision 4-5th November 2008 This supersedes any previous versions of the Rule Book CONTENTS 1 Definitions and Abbreviations 2 Method of Operation

More information

Annex A. to Technical Specification "Operations and traffic management" adopted by

Annex A. to Technical Specification Operations and traffic management adopted by Document version : 1 Annex A to Technical Specification "Operations and traffic management" adopted by Commission Decision 2008/231/EC of 1 st February 2008 concerning the technical specification of interoperability

More information

Code of Practice. For works on, near or adjacent to the Luas Tramway

Code of Practice. For works on, near or adjacent to the Luas Tramway Code of Practice For works on, near or adjacent to the Luas Tramway Overhead power cables and any support cables should be treated as "live" at all times. Before attempting to carry out works close to

More information

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015 Engineering Procedure Electrical Distribution Unit PR D 78500 Electrical s Version 1.0 Date in Force: 4 November 2015 Procedure UNCONTROLLED COPY WHEN PRINTED Approved by: Sean Budge Manager Electrical

More information

Title: Lifting Operations Involving Crane or Gantry Offshore

Title: Lifting Operations Involving Crane or Gantry Offshore PTW CHECKLIST - NO. 30 Title: Lifting Operations Involving Crane or Gantry Offshore Owner: Capability Coordinator Approver: Capability Coordinator Permit No.: Max Validity Period: 5 yrs Date: Latest Rev

More information

Controlling the Speed of Tilting Trains Through Curves

Controlling the Speed of Tilting Trains Through Curves Controlling the Speed of Tilting Trains Through Curves Synopsis This document mandates the means by which Tilting Trains may be operated at higher speeds than nontilting trains around curves. Signatures

More information

BRISTOL SOCIETY OF MODEL & EXPERIMENTAL ENGINEERS ASHTON COURT ESTATE MINIATURE RAILWAY

BRISTOL SOCIETY OF MODEL & EXPERIMENTAL ENGINEERS ASHTON COURT ESTATE MINIATURE RAILWAY BRISTOL SOCIETY OF MODEL & EXPERIMENTAL ENGINEERS ASHTON COURT ESTATE MINIATURE RAILWAY Miniature Locomotive Driver Training and Authorisation Issue 3 March 2016 Before commencing training, please ensure

More information

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK R A I L T R A C K Safety and Standards Directorate RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK Railtrack, Safety and Standards Directorate Railtrack House DP01 Euston Square LONDON NW1 2EE 08/1999

More information

Operating Procedures Working of Trains - Procedures 1 to 23

Operating Procedures Working of Trains - Procedures 1 to 23 Operating Procedures Working of Trains - Procedures 1 to 23 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 Australian

More information

MINIBUS AND TRANSPORT POLICY

MINIBUS AND TRANSPORT POLICY MINIBUS AND TRANSPORT POLICY Date last reviewed: 06/12/17 Review date: Autumn 2018 Responsible Committee : FGB Person Responsible: Transport Manager The policy applies to: All minibuses with up to 16 passenger

More information

Shunting and Marshalling

Shunting and Marshalling Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 2.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Diesel Locomotive Train Driver. Mentor s Q&A

Diesel Locomotive Train Driver. Mentor s Q&A Diesel Locomotive Train Driver Mentor s Q&A (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed by the Association

More information

Date of occurrence Location name Holland Park station Local time 18:35 Latitude 51:30:26 North

Date of occurrence Location name Holland Park station Local time 18:35 Latitude 51:30:26 North Occurrence Summary What Location Date of occurrence 25-08-13 Location name Holland Park station Local time 18:35 Latitude 51:30:26 North Event type Rolling stock events Fire in RS Longitude 0:12:21 West

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance WASHING HIGH VOLTAGE INSULATORS USING PORTABLE WASHING EQUIPMENT Copyright National Grid plc 2014, all rights reserved.

More information

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS Title: Cranes - Inspection and Maintenance PROCEDURE Procedure No: P314.422 Issue: 1 Revision: 0 Operative Date: 22/12/2016 Department: HSEC Sect./Classification: Safety / Gear & Equipment Author: D Steel

More information

Tram Driver. Mentor s Q&A

Tram Driver. Mentor s Q&A Tram Driver Mentor s Q&A (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed as guides for heritage tramway operators

More information

GORT3056 WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS

GORT3056 WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS Document supersedes Iss 4 and comes into force on 02/12/2017 RSSB WORKING MANUAL FOR RAIL STAFF FREIGHT TRAIN OPERATIONS Working Manual for Rail Staff Freight Train Operations Page 1 Document supersedes

More information

Vehicle Operation Procedure HSE

Vehicle Operation Procedure HSE 1 Purpose and Scope The Purpose of this Procedure is to prevent injury to personnel and damage to property through the safe operation of vehicles. This Vehicle Operation Procedure provides mandatory requirements

More information

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION

PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Engineering Standard Track Vehicles Version: 8 Issued: December 2016 Owner: Chief Engineer Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST

More information

Train Examination (Braking System) Addendum

Train Examination (Braking System) Addendum Train Examination (Braking System) Addendum Mentor s Q&A (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed by

More information

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013 Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 December 03 E1 Authorised Vehicles E3 December 03 E2 E3 E4 E5 Movement of Defective Vehicles Special Movement Conditions Vehicles

More information

UNDER VEHICLE ACCESS SAFETY

UNDER VEHICLE ACCESS SAFETY UNDER VEHICLE ACCESS SAFETY Crushing incidents involving the movement or collapse of vehicles under repair result in serious injuries and deaths per year. Whenever a worker enters the space beneath a vehicle

More information

Powered Industrial Trucks

Powered Industrial Trucks INDIANA UNIVERSITY-PURDUE UNIVERSITY at INDIANAPOLIS IUPUI Department of Environmental Health and Safety 620 Union Drive, Room 043, Indianapolis, Indiana 46202 Powered Industrial Trucks Purpose and Background

More information

National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES

National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES National Aluminium Company Limited TRAFFIC RULES AND PROCEDURES INTRODUCTION The following rules are designed for safe operation of vehicles in and around the mine. Operators of vehicles shall observe

More information

Aerodrome Operating Procedures

Aerodrome Operating Procedures Airside Driving Permit Scheme 1 Policy 1.1 Jersey Airport has a responsibility to regulate the management and control of surface vehicles operating on, or in the vicinity of the airside area of Jersey

More information

Full time Bus Driver Job Description

Full time Bus Driver Job Description Full time Bus Driver Job Description Purpose of the Role A bus driver is responsible for driving a passenger carrying vehicle (PCV), providing good customer service and a safe and comfortable journey throughout

More information

Contents. Port of Hanko Ltd. NETWORK STATEMENT for the timetable period of Change on section 7, agreement on the use of rail network

Contents. Port of Hanko Ltd. NETWORK STATEMENT for the timetable period of Change on section 7, agreement on the use of rail network Sivu 1 / 7 Port of Hanko Ltd NETWORK STATEMENT for the timetable period of 2019 Change on section 7, agreement on the use of rail network Contents 1 Validity and informing of changes... 2 2 Rail network...

More information

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

Guidelines for Safety Training of Overhead Crane Operators and Supervisors Guidelines for Safety Training of Overhead Crane Operators and Supervisors Purpose These guidelines present minimum recommended safety requirements for ensuring the safe and efficient operation of overhead

More information

Morwell. (88 miles 75 chains 47 links, km)

Morwell. (88 miles 75 chains 47 links, km) Morwell (88 miles 75 chains 47 links, 144.372 km) 01.06.1877 Opened with line between Morwell and Sale. Staff and Ticket not provided initially. (VR to 62, Leo Harrigan, WTT) (01.04.1878) By this date,

More information

GENERIC RISK ASSESSMENT - TRAVEL BY COACH

GENERIC RISK ASSESSMENT - TRAVEL BY COACH THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1999 GENERIC RISK ASSESSMENT - TRAVEL BY COACH DATE OF ASSESSMENT March 017 DATE OF REVIEW March 018 NEXT REVIEW DATE March 019 1 Risk Assessment

More information

Guidance on safe procedures for staff and students in respect of road traffic incidents and breakdowns

Guidance on safe procedures for staff and students in respect of road traffic incidents and breakdowns Guidance on safe procedures for staff and students in respect of road traffic incidents and breakdowns If your vehicle breaks down, think first of all of other road users and; Get the vehicle safely off

More information

VALIDITY AND INFORMING OF CHANGES...

VALIDITY AND INFORMING OF CHANGES... 1/7 NETWORK STATEMENT Replaces the safety instruction for shunting work and rail work in the rail network of Port of HaminaKotka Ltd, which entered into force on 1 September 2016. Contents 1 VALIDITY AND

More information

BOTHWELL CASTLE GOLF CLUB BUGGY POLICY

BOTHWELL CASTLE GOLF CLUB BUGGY POLICY BOTHWELL CASTLE GOLF CLUB BUGGY POLICY Introduction The purpose of this document is to establish a standard for the safe operation of all ride- on buggies operated on the course at Bothwell Castle Golf

More information

RESPONSE TO THE DEPARTMENT FOR TRANSPORT AND DRIVER AND VEHICLE STANDARDS AGENCY S CONSULTATION PAPER

RESPONSE TO THE DEPARTMENT FOR TRANSPORT AND DRIVER AND VEHICLE STANDARDS AGENCY S CONSULTATION PAPER RESPONSE TO THE DEPARTMENT FOR TRANSPORT AND DRIVER AND VEHICLE STANDARDS AGENCY S CONSULTATION PAPER MODERNISING COMPULSORY BASIC TRAINING COURSES FOR MOTORCYCLISTS 17 APRIL 2015 Introduction The Royal

More information

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001 Train Safety Systems Synopsis This document defines the requirements for train safety systems to enable safe operation of trains on Railtrack controlled infrastructure. Signatures removed from electronic

More information

Procedure PR D Definitions and Conventions for Electrical Safety. Engineering Procedure Electrical Distribution Unit. Version 1.

Procedure PR D Definitions and Conventions for Electrical Safety. Engineering Procedure Electrical Distribution Unit. Version 1. Engineering Procedure Electrical Distribution Unit PR D 78100 Definitions and Conventions for Electrical Safety Version 1.0 Date in Force: 26 February 2016 Procedure UNCONTROLLED COPY WHEN PRINTED Approved

More information

The Vehicle Identity Check (VIC) Scheme

The Vehicle Identity Check (VIC) Scheme INF133 The Vehicle Identity Check (VIC) Scheme Vehicle Identity and Crime Vehicle crime is a serious problem. It costs the economy an estimated 3 billion a year and it affects motorists directly by raising

More information

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE TROLLEY WIRE INSPECTION PROCEDURE JUNE 2014 1. Document Details: Name: SYDNEY TRAMWAY MUSEUM Document Control Record Number STM 6029 Version Number: 15 TrolleyWire Inspection Procedure Document Status:

More information

Guidelines when working near TasNetworks electrical assets

Guidelines when working near TasNetworks electrical assets Guidelines when working near TasNetworks electrical assets About TasNetworks Tasmanian Networks Pty Ltd (ACN 167 357 299) ( TasNetworks ) is the owner and operator of the regulated electricity network

More information

LOG CHOP. Hydraulic Wood Guillotine. Owners Illustrated Instruction Book & Parts List

LOG CHOP. Hydraulic Wood Guillotine. Owners Illustrated Instruction Book & Parts List LOG CHOP Hydraulic Wood Guillotine Owners Illustrated Instruction Book & Parts List Grovebury Road, Leighton Buzzard, Bedfordshire. LU7 4UX. UK. Tel:01525 375157. Fax:01525 385222. Email: enquires@brownsagricultural.co.uk

More information