WEEKLY OPERATING NOTICE

Size: px
Start display at page:

Download "WEEKLY OPERATING NOTICE"

Transcription

1 PRIVATE AND NOT FOR PUBLICATION B R / 1 British Rail N S E A S T E R N REGION 3 8 WEEKLY OPERATING NOTICE CONTAINING TEMPORARY SPEED RE S TRI CTI ONS TEMPORARY ENGINEERING W O R K S SIGNALLING A N D PERMANENT W A Y ALTE RATI ONS GENERAL INSTRUCTIONS A N D NOTI CE S SATURDAY 18 SEPTEMBER TO FRIDAY 24 SEPTEMBER 1982 INCLUSIVE Trainmen must pay particular attention to works contained in this notice and keep a good look-out for handsignals which may be exhibited in accordance with the Rules and Regulations. Work at places other than those mentioned may be in progress and Drivers must be on the look-out and be prepared to stop or run at reduced speed when, and where, handsignals may be exhibited.

2 SECTION A NS-2 TEMPORARY SPEED RESTRICTIONS (Until further notice unless otherwise specified) Warning Boards and Indicators provided unless otherwise shown. t Indicates that the Warning Boards and Indicators will be moved as the work progresses. Where two speeds are shown for a restriction e.g. 20, the Rule Book, Section T, clause 21.2 applies. - Location Mileage Lines a t or between Re s tr i c ti on affected M. C h. Ni. C h. m. p. h. Remarks DONCASTER BLACK CARR M. TO SKELTON BRIDGE 1Potteric Carr sin Trackwork. and Decoy North Jn. Fast ( 8 2 / 3 7 ) Until Sunday 19 September. 2 Potteric Carr In Trackwork. and Decoy North in. Fast F r o m Sunday 19 September. Warning Board situated at 159m. 35ch. on the applies only to trains proceeding towards Askern. SHAFTHOLME JINI. TO FERRYBRIDGE NORTH 3 Shaftholme and Norton L.C. 4 No rto n LC and Shaftholme Jn Trackwork. (82/25) Up Trackwork. (82/35) Until Wednesday 22 September. Warning Board located at Signal No.K386 (on the line) applies only to trains towards Pontefract. YORK TO SCARBOROUGH 5 Falsgrave and Seamer East Up Main Tra ckwo rk. (82/37) DONCASTER MARSHGATE JN. TO LEEDS WEST M. 6 A d wic k Jn. and South Elmsall Station U p Subsidence. (82/8)

3 NS-3 SECTION A TEMPORARY SPEED RESTRICTIONS continued Mileage Lines a t or between Re s tr i c ti on Location a f f e c t e d M. Ch. M. Ch. m.p.h. Remarks DONCASTER MARSHGATE M. TO LEEDS WEST M. continued 7 South Kirkby Jn. f U p Trackwork (82/38) 8 South Kirkby Jr). U p Trackwork 9 South Kirkby sin Trackwork. and Fitzwilliam M a i n ʻ 3 2 / 3 3 ) Station STAINFORMI JN. TO SKELLOW ADWICK JN. 10 Bramvvith StnIC and Do wn U p Thorpe Road LC B rid g e wo rk. EASTWOOD L.M.R. TO NORMANTON GOOSE HILL M. 11 E l land Tunnel Tra ckwo rk (82/37) Until Tuesday 21 September. DIGGLE Al. LMR TO HEALEY MILLS HEATON LODGE JN. 11A Diggle sin. and D o w n U p Trackwork. Standedge Tunnel Main M a i n ( L M ) Goods F r o m Loop T h u r s d a y 23 September. 12 Marsden D o w n U p Trackwork Main M a i n ( 8 2 / 3 3 ) 13 Springwood Jn. U p Trackwork and Marsden 14 Springwood and Marsden U p Trackwork. (82/36) THORNHILL LNW JN. TO LEEDS HOLBECK EAST JN. 15 Dewsbury Station D o w n U p and Batley Co n d it io n of viaduct (Dewsbury).

4 NS-4 SECTION A TEMPORARY SPEED RESTRICTIONS continued Lines Location a f f e c t e d HORBURY STATION M. TO CRIGGLESTONE JN. Mileage at or between R e s t r i c t i o n M. C h. M. C h. m. p. h. Remar ks 16 Ho rb u ry Station Jn. S i n g l e and Crigglestone Jn Tra c k wo rk. (82/23) BARNSLEY STATION JN. TO HORBURY JN. 17 Barnsley Station In. Do wn and Woolley Coal U p Siding 18 Woolley Coal Siding Do wn U p and Woolley Tunnels 19 Woolley Tunnels U p and Horbury Jr). 20 Barnsley Station Jn. Do wn U p and Darton Station Track work. (82/37) S u b s (82/21) Trackwork. (82/19) Earthwork. (82/38) From Saturday 18 September. ALDWARKE NORTH JN. (MID) TO LEEDS NORTH JN. Warning Board at 11m. 47ch (on line) applies only to trains towards South Kirkby In. 21 Swinton Jri. and Aldwarke Up Pontefract Tra ckwo rk. 22 Swinton Jr). and D o w n Cudworth Station Jr). Ma in Up Main Subsid e n ce. (80/28) 23 Swinton Jn. and Cudworth Stn. Jri. 24 Royston Jr). and Cudworth North Jr). 25 Oakenshaw and Goose Hill In. U p Main M a i n U p Up Main Subsid e n ce. (78/4) C o n d i t i o n of track.(82/36) Subsid e n ce. (82/29) NORMANTON ALTOFTS JN. TO YORK CHALONERS WHIN JN. 26 Copmanthorpe and Bolton Percy Up Normanton Tra ckwo rk I (82/35) CASTLEFORD WEST JN. TO PONTEFRACT WEST JN. 27 Cutsyke Jn. and U p Prince of Wales C o n d i t i o n of track. (82/12)

5 NS-5 SECTION A TEMPORARY SPEED RESTRICTIONS continued Lines Location a f f e c t e d CASTLEFORD EAST JN. TO ALLERTON MAIN BOVP:tiS Mileage at or between Ch. M. Ch. AST Restriction m.p.h. Remarks 28 Castleford East Jn. and Ledston Station Single Subsidence, (81/50) WAKEFIELD KIRKGATE WEST TO GOOLE POTTERS GRANGE JN. 29 Featherstone LC and Red Lane LC 30 Red Lane LC and Featherstone LC Main Up C ondi ti on of track. (81/6) Condition Dl track. 31 Featherstone LC and Red Lane LC 32 Featherstone LC and Pontefract West Jn. 33 Knottingley West Jn. and Pontefract Goods Jn, 34 Gowdall Lane LC and Hensall Jn. 35 Snaith Station LC and Hensall Up Trackwork. (82/26) Condition of track. (81/49) Up Trackwork 82/23) Up Trackwork. From Sunday 19 September. Up Trackwork From Sunday 19 September, DRAX POWER STATION BRANCH 36 Hensa II Jn. and D o w n Jacky Duff in Wood LC Tra c k wo rk. (82/31) ALDWARKE NORTH JN. (MID) TO BURTON SALMON 37 Swinton Jn. and Aldwarke Jn. Up Pontefract Trackwork. (82/37) 38 Hickleton and Up Trackwork. Bolton-on-Deame (82/38) Station From Sunday 19 September.

6 N S b SECTION A TEMPORARY SPEED RESTRICTIONS continued Lines Location a f f e c t e d Mileage at or between M. C h. M. Ch. Restriction m.p.h. Remarks ALDWARKE NORTH JN. (MID) TO BURTON SALMON continued 39 Moorthorpe Station D o w n Up Subsidence. Jn. and Pontefract (82/31) Baghi I I Station 40 Pontefract Baghill Up Trackwork. Station and (82/37) Moorthorpe Station Jn. 41 Moorthorpe Station Jn. and Pontefract Baghill Station Trackwork. (82/29) 42 Ferrybridge Power I n g o i n g Trackwork. Station L i n e LEEDS WHITEHALL M. TO BRADFORD EXCHANGE 43 New Pudsey Stn. and Up Trackwork. Arrnley Moor C.F. (82/38) From Sunday 19 September. MOORTHORPE STATION M. TO SOUTH KIRKBY M. 44 Moorthorpe Station D o w n Jn. and South U p Kirkby Jn Tra c k wo rk. (82/31) APPERLEY M. TO ILKLEY STATION 45 Apperley Lane Tunnel and Springs Tunnel T ra c k wo rk. (82/21) LEEDS TO SKIPTON STATION SOUTH LMR 46 Thackley Tunnel and Thackley Jn. 20 T ra c k wo rk. (82/37) LEEDS TO HULL PARAGON 47 Gascoigne Wood U p Trackwork. (82/24)

7 Location NS-7 SECTION A TEMPORARY SPEED RESTRICTIONS continued STAINFORTH M. TO SKELLOW ADWICK JN. Mileage Lines a t or between Restriction affected M. Ch. M. Ch. m.p.h. Remarks 48 Bramwith Station LC U p Bridgework. and Thorpe Road LC ( 8 2 / 3 3 ) THORNE JN. TO GILBERDYKE 49 Goole LC and D o w n Bridgework. Goole Bridge F r o m Wednesday 22 September. HULL PARAGON STATION TO SEAMER WEST 50 Arram Station U p Condition of LC and Beverley t r a c k. (82/25) North LC

8 SECTION B NS-8 TEMPORARY ENGINEERING WORKS At or between Lines affected Remarks DONCASTER BLACK CARR JN. TO SKELTON BRIDGE 51 B la c k Carr Jn, and A l l Decoy North Jn, 52 Doncaster North A l l Jn, and Marshgate Jr]. Continuously. Earthwork and bridgework (BR. No.323E) 153m. 78ch. and 154m. 05ch. Crane and mechanical equipment in use. ( 8 1 / 3 2 ) to 17 00, Earthworks 156m, 18ch. and 156m. 23ch. ( 8 2 / 9 ) 53 Shaftholme Jn. and Selby Canal Jn. and Up to 20 00, Earthwork, 169 and 169'Am.p. Cranes and mechanical equipment in use. (80/24) 54 Y o rk Station A l l 55 York and A l l Skelton B e t w e e n Trains Repairing station roof 188m. 06ch. and 188m. 11cl to Bridgework lm Mechanical equipment in use. ( 8 2 / 3 3 ) SATURDAY/SUNDAY 18/ 19 SEPTEMBER 56 Loversall Jn. and Fast Decoy North Jo. B L O C K E D Up Fast to to ) Rebal lasting, 154m. ) 04ch. and 154m. loch. ) Crane and mechanical ) equipment in use., Trains to travel via Slow lines. 57 Doncaster South Yorkshire Jn. and Doncaster North Jn. 58 Doncaster North Jo. and Doncaster South Yks. Jo. 59 Shaftholme Jn. and Selby South Jn, 60 Shaftholme Jo, and Selby South Jn, 61 Barlb y North Jn. and Chaloners Whin 3,4,5,6,7,8 All Platform Roads Platforms 1 and 2 Carriage Sdgs. and Old Yard Up Up and Up to Track maintenance, 155m. 60ch. and 156m. loch. Mechanical equipment in use. Possession to be given up for passage of trains to Track renewal, 155m. 70ch. and 156m. 04ch. Crane and mechanical equipment in use to ) Track maintenance and ) earthworks, 160m. 16ch to ) and 174m. 4ch, Cranes ) and mechanical equipment in use. Trains diverted via Askern to ) Track maintenance and ) earthwork, 160m. 16ch to10 15 ) and 174m. ()Lich. Cranes ) and mechanical equipment in use. Trains diverted via Askern to Track maintenance, 178m. 24ch. and 184m. 25ch. 'Trains diverted via Askem and Church Fenton.,

9 NS-9 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected Remarks DONCASTER BLACK CARR Mk TO SKELTON BRIDGE continued SUNDAY 19 SEPTEMBER 62 York Station Platform 11 Platform 10 Platform 10 Platform York and and Up Main Skelton 64 Skelton Fast and and Up Slow 65 Skelton and Up Fast and Tollerton Up Slow Fast and Slow MONDAY 20 to WEDNESDAY 22 SEPTEMBER 66 Doncaster North Jn. Platform No.1 & and Sth. Yorks Jn. O l d Yard to to to to Repairs to station roof 188m. 06ch. and 188m. 11 cho Restricted clearance to In connection with Bridgework between York Yard North and Skelton. Cranes and mechanical equipment in use. Possession to be given up for passage of trains to Track maintenance lm 35ch and lm 65ch. Mechanical equipment in use. Possession to be given up for passage of trains to to ) Track maintenance ) 3 and 3 ) Mechanical equipment ) in use Mon to Wed. Track renewal 156m 04ch and 155m 04ch. Crane in use. SHAFTHOLME M. TO FERRYBRIDGE NORTH M. 67 No rto n L.C. and U p Shaftholme Jn. B e t w e e n Trains 68 Shaftholme Jn. D o w n and Up and Norton LC B e t w e e n Trains to Earthwork 68m. 30ch. and 68%m.p. Crane and mechanical equipment in use. (82/24) to Earthwork, 66m. 63ch. Cranes and mechanical equipment in use. ( 8 2 / 3 3 ) YORK HOLGATE JN. TO SKELTON 69 Ho lg a te Jn. and D o w n Goods York Yard South B e t w e e n Trains SUNDAY/MONDAY 19/20 SEPTEMBER 70 York Yard North A l and Skelton B L O C K E D to Track renewal Om.p. and Om. 25ch. Mechanical equipment in use. ( 8 2 / 6 ) Sun to Mon. Bridgework lm 05ch. Mechanical equipment in use.

10 NS-10 SECTION B - TEMPORARY ENGINEERING WORKS.- continued At or between L i n e s affected Remarks YORK TO SCARBOROUGH SATURDAY/SUNDAY 18/19 and SUNDAY 19 SEPTEMBER 71 Seamer West and Falsgrave and Up and Up Sat to t o ll 00 Sun ) Track renewal 41m. ) 30ch. and 41m, 42ch. ) Cranes and mechanical ) in use. WEDNESDAY 22 to FRIDAY 24 SEPTEMBER 72 Seamer West D o w n and Up and Falsgrave B L O C K E D Wed and Thu to Thu and Fri. Track maintenance 41m. 30ch. and 41m. 55ch. Mechanical equipment in use. YORK SKELTON TO HARROGATE 73 Starbeck and D o w n Harrogate B e t w e e n Trains SATURDAY/SUNDAY 18/19 SEPTEMBER 74 Skelton and D o w n and Up Poppleton B L O C K E D MONDAY 20 to FRIDAY 24 SEPTEMBER 75 Ca tta l Station S i n g l e / D o w n and Up and Knaresborough to Track maintenance 19m. 51ch. and 19m. 72ch. Crane and mechanical equipment in use. ( 8 2 / 9 ) to Track maintenance lm. 50ch. and 2m. 70ch. Mechanical equipment in use Mon to Thu to Tue to Fri. Track maintenance 101/2 and 1 6 equipment in use. DONCASTER MARSHGATE M. TO LEDS WEST sin. 76 UNTIL FURTHER D o NOTICE w HareParksin. n and Up and Wakefield Westgate South Jn. 77 Wakefield Westgate Station 78 Ge ld e rd Road..1n. All All to Erecting and dismantling scaffolding and safety nets for renewal of overhead power lines 173m. 43ch. ( 8 2 / 3 3 ) to Bridgework (BR. No.5) 175m. 63ch. Restricted clearance. ( 8 2 / 1 1 ) to Earthwork, 184m. 22ch. Crane in use. ( 8 2 / 1 2 ) 79 L e e d s West Jn. 80 Ha re Park in. and Wakefield Westgate South Jr1.1 All to Signalling work to Earthwork, 174m. 30ch. and 174m. 38ch. Crane in use. ( 8 2 / 3 7 ) SATURDAY/SUNDAY 18/19 SEPTEMBER 81 Bentley LC and Carcroft and Up to Reballasting 158m. 05ch. and 158m. 35ch. Mechanical equipment in use. Trains diverted via Askern.

11 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected DONCASTER MARSHGATE JN. TO LEEDS WEST M. continued SATURDAY/SUNDAY, 18/19 SEPTEMBER --' continued 82 Wakefield Westgate Station and Gelderd Road Jo. and Up SATURDAY/SUNDAY 18/19 and SUNDAY 19 NS-11 Remarks to Drainage 177m. 58ch. and 180m. 55ch. Cranes in use. Possession to be given up for passage of 1L22, Kings Cross to Bradferd Exchange over line and 1D57, Leeds to Doncaster over Up line. SEPTEMBER 83 South Kirkby Jn. A l l South Kirkby Jn. and U p Main Hare Park Jo. B L O C K E D Main Up Main Main SUNDAY 19 SEPTEMBER Sat to Sun Sat to Sat to to Sun to Sun Track renewal, 185m. 75ch. and 167 imp. and signalling work. Cranes and mechanical equipment in use Sat to Trains diverted via Askern to Sun. trains diverted via Askern. (See Section 'C'). 84 Wakefield Westgate U p Station and Wakefield Westgate South Jn. 85 Wakefield Westgate D o w n and Up Station MONDAY 20 to FRIDAY 24 SEPTEMBER 86 South Kirkby Jn. A l l 87 Wakefield Westgate D o w n Station and Gelderd Road Jn. WEDNESDAY 22 SEPTEMBER 88 Bentley LC and Castle Hills South Jn, Up 89 Gelderd Road Jr,. D o w n and Leeds West Jri to In connection with engineering work between Wakefield Westgate South Jn. and Wakefield Kirkgate West Jn. Possession to be given up for passage of trains to Track maintenance, 175m. 75ch. and 176m. 05ch to daily. Signalling work to daily. Earthwork, 183m. 25ch. and 183m. 30ch. Crane in use to Track renewal 158m. 05ch. and 158m. 35ch. Mechanical equipment in use. Possession to be given up for passage of MGR and local trip trains. Other Up trains diverted via Askern to Track maintenance /4 m.p. trains to travel via Whitehall STAINFORTH M. TO SKELLOW ADWICK JN. 90 Stainforth Rd. and D o w n and Up Thorpe Road LC Continuously. Bridgework (BR.7 and 8), 164m. 53ch. and 164m. 44ch. ( 8 2 / 2 9 )

12 NS-12 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected Remarks STAINFORTH sin. TO SKELLOW ADWICK JN. continued THURSDAY 23 SEPTEMBER 91 Stainforth Jn. D o w n and Up and Skellow Jn. B L O C K E D to Track renewal 164 and Mechanical equipment in use. Possession to be given up for passage of trains. WAKERELD WESTGATE SOUTH M. TO WAKEFIELD KIRKGATE WEST JN. somata 19 SEPTEMBER 92 Wakefield Westgate S i n g l e South Jn. and B L O C K E D Wakefield Kirkgate West Jn, to Track renewal, 0 m.o. and Om. 26ch. Possession to be given up for passage of trains. LEEDS GELDERD ROAD M. TO LEEDS HOLBECK WEST JINI. 93 Gelderd Road Jn. All to Earthworks 184m. 22ch. Crane in use. ( 8 2 / 1 2 ) EASTWOOD LNIR TO NORMANTON GOOSE HILL M. 94 Elland and A l l Bradley Wood Jri. B e t w e e n Trains 95 Wakefield Kirkgate P la t f o rms 1, 2 and 3 Station B e t w e e n Trains 96 Mirfi e ld Station D o w n and Up Slow 97 Hebden Bridge and Up SATURDAY/SUNDAY 18/19 SEPTEMBER 98 Wakefield Kirkgate P la t f o rm 1/ West Jn. and M a i n and Up Main Turners Lane Jn. P l a t f o r m to Erecting and dismantling scaffolding and safety nets for overhead power line maintenance 32m. 113ch. ( 8 2 / 3 2 ) to Platform work, 47m. 55ch. and 47m. 70ch. Mechanical equipment in use. (See Section 'D') to Platform work, 38m.132ch. Mechanical equipment in use. isee Section D' to Signalling work to Drainage, 1 Cranes in use. Possession to be given up for passage of trains. Wakefield Kirkgate Through line

13 NS-13 SECTION B TEMPORARY ENGINEERING WORK continued At or between Lines affected Remarks EASTWOOD LMR TO NORMANTON GOCSE HILL M. continued SUNDAY 19 SEPTEMBER 99 Sovverby Bridge D o w n and Up West and Milner B L O C K E D Royd Greetland and Eland Horbury Station in. and Midland in. Mirfield Up Sidings G.F. Wakefield Kirkgate West in. and Wakefield Kirkgate East in. 104 Horbury Jn. A l l Up Fast Up Fast Slow and Fast SUNDAY 19 to FRIDAY 24 SEPTEMBER to Bridgework (Sowerby Bridge Viaduct) 28m. 30ch. Crane in use to Track maintenance 31 and to Track maintenance 44m. 05ch. and 43m. 70ch. Up trains to travel over Up Slow line to Signalling work. (See Section 'C') to In connection with engineering work between Wakefield Westgate South in. and Wakefield Kirkgate West in to Single line working over Up Slow for trains between Horbury Jn. and Wakefield Kirkgate West in. Possession to be given up for passage of 2L57, Doncaster to Leeds (Diverted) to Possession to be given up for passage of trains to daily. Signalling work. MONDAY 20 and TUESDAY 21 SEPTEMBER 185 Bradley Wood Jo. D o w n and Up and Heaton Lodge B L O CK E D 106 WEDNESDAY/THURSDAY 22/23 SEPTEMBER Wakefield Kirkgate P la t f o rm 2 (Up L & V) East in. and B L O C K E D Wakefield Kirkgate West in to daily. Track renewal to be given up for passage of trains to Track renewal, 47m. 68ch. and 47m. 53ch. Trains to travel over Through line. WEDNESDAY 22 to FRIDAY 24 SEPTEMBER 107 Heaton Lodge in. D o w n Slow and Thornhill B L O C K E D LNW in Wed and Thu to thu and Fri. Track renewal, 37 in use. trains to travel over Fast line. SOWERBY BRIDGE MILNER ROYD JN. TO BRADFORD MILL LANE JN. 108 Mill Lane sin. A l! 109 Ha lif a x and D o w n and Up Mill Lane Jo. B L O C K E D to Signalling work. ( 8 2 / 1 9 ) to Loading rails, 32'Am.p. and 33m. 13ch. Cranes in use. Possession to be given up for passage of 1E31, Manchester Victoria Bradford Exchange over line.

14 NS-14 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected Remarks GREETLAND TO DRYCLOUGH SUNDAY 19 to TUESDAY 21 SEPTEMBER 110 Gre e tland and D o w n and Up Dryclough Jn. B L O C K E D Sun and Mon to Mon and lue. Bridgework (No.6), lm. 06ch. Crane in use. Possession to be given up for passage of 1L28, Doncaster to Halifax over line. DIGGLE JN. LMR TO HEALEY MILLS HEATON LODGE M. 111 Marsden and Gledholt 112 Gledholt Jn. and Huddersfield Springvvood in. and Marsden and Up Fast and Slow Up Main to Bridgework (Nos.62, 65 and 79). Construction work, 21m. 18ch. and 24m. 15ch. Crane and mechanical equipment in use. (81/48) to Bridgework (No.85), 25m 03ch. Crane and mechanical equipment in use. From Sunday 19 September. SUNDAY 19 SEPTEMBER 113 Dig g le Jn. and Marsden Up to to to ) Signalling work and ) tunnelwork (Standedge ) Tunnel) 15m 1 lch and ) 18m 14ch. Mechanical ) equipment in use. Trains diverted via Hebden Bridge. 114 Marsden and Gledholt Jn. Springwood Jn. and Marsden Up Main SUNDAY 19 to FRIDAY 24 SEPTEMBER to ) Track renewal and ) bridgework (No.85) ) 20m 37ch and 25m to ) 03ch. Cranes and ) mechanical equipment in use. Trains diverted via Hebden Bridge. 115 Marsden All to daily. Signalling work. 116 Huddersfield MONDAY 20 to FRIDAY Gledholt Jn. and Huddersfield TUESDAY 21 SEPTEMBER 118 Springwood Jn. and Marsden All SEPTEMBER Slow Up to daily. Signalling work to daily. Drainage 25m 04ch and 25m 08ch. Cranes in use. trains to travel over Fast line to Track renewal and track maintenance 25',/4 rn.p. and 21m 70ch. Mechanical equipment in use. Up trains diverted via Hebden Bridge.

15 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected R e m a r k s THORNHILL L.N.W. JN. TO LEEDS HOLBECK EAST JN. SUNDAY 19 SEPTEMBER NS Ravensthorpe G.F. and Up to Signalling work. (See Section 'C'). SATURDAY/SUNDAY 18/19 and SUNDAY 19 SEPTEMBER 120 Batley and D o w n Sat to D r a i n a g e 36m. 18ch. Morley B e t w e e n Trains a n d 38m. 16ch. Cranes Up Sat to i n use to Sun TUESDAY 21 to THURSDAY 23 SEPTEMBER 121 Dews bury Wellington Do wn and Up Road GF and Batley B L O CK E D Tue and Wed to Wed and Thu. Bridgework (No.19). 33m. 76ch. and 34m. 05ch. Crane in use. Possession to be given up for passage of trains. BARNSLEY STATION JN. TO HORBURY JN. 122 B a r n s l e y Station Jn. D o w n and Up to Track maintenance, 48Y4 and and Horbury Jn. B L O C K E D 4 7 SATURDAY/SUNDAY 18/19 and SUNDAY 19 SEPTEMBER 123 Dart on Station and D o w n Woolley Coal Siding Up SUNDAY 19 SEPTEMBER Sat to Sat to to Sun Earthwork and track renewal 52n.p. and 48m. 54ch. Cranes and mechanical equipment in use to Sun. Single line working over line. 124 Wo o l l e y Coal Siding D o w n and Up to Tunnelwork (Woolley Tunnels), and Crigglestone Jn. 4 7 m. 33ch. Restricted clearance.. SUNDAY 19 to FRIDAY 24 SEPTEMBER 125 Woolley Coal Sdg. D o w n and Up to daily. Signalling work. 126 Horbury Jn. A l l to daily. Signalling work. ALDWARKE NORTH JN. (MID) TO LEEDS NORTH JN. 127 Swint on sin. and Main to Earthwork, 174 Cudworth Station Jn. Bet ween Trains Crane in use. ( 8 2 / 3 7 )

16 NS-16 SECTION B TEMPORARY ENGINEERING WORKS continued At or between L i n e s affected ALDVVARKE NORTH M. IMID) TO LEEDS NORTH JN. Remarks continued continued 128 Royston Jn. and D o w n and Up Oakenshaw South B e t w e e n Trains Jo. 129 Stourton Jn and A l l Leeds North Jo to Earthwork, slip treatment and track renewal, 178m. 77ch. and 179m. 35ch. Cranes and mechanical equipment in use. ( 8 1 / 5 0 ) to Signalling work. SUNDAY 19 to FRIDAY 24 SEPTEMBER 130 Dearne Valley A l l North In. and Cudworth Station to daily. Signalling work. OAKENSHAW SOUTH M. TO OAKENSHAW JN. 131 Oakenshaw South Jo. and Up and Oakenshaw Jn. Betwe e n Trains to Erecting/dismantling scaffolding and safety nets for overhead power line renewal. 49m. 02ch. ( 8 2 / 3 4 ) NORMANTON ALTOFTS M. TO YORK CHALONERS WHIN 132 Whitwood and Castieford Station 133 Fryston and Burton Salmon 134 Chaloners Whin Jo. and Church Fenton SUNDAY 19 SEPTEMBER and Up and Up Up Normanton to Signalling work to Bridgework (No.43) 18m. 09ch. Crane and mechanical equipment in use. (82/31) to Earthwork 5 and BEND. Cranes and mechanical equipment in use. ( 8 1 / 8 ) 135 Fryston Main to Signalling work. 136 Sherburn-in-Elmet South All to Signalling work. 137 Church Fenton North Jri. and Chaloners Whin Jo. and Up Leeds ; Norman ton to Construction work 4m. 35ch. and 4m. 16ch. Cranes and mechanical equipment in use. Trains to travel over Normanton lines. MONDAY 20 to FRIDAY 24 SEPTBVIBER 138 Cha loners Whin Jn. and Church Fenton North Jo. Up Normanton to daily. Track renewal 5 6 m.p. Crane in use.

17 NS-17 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected Remarks CASTLEFORD WEST M. TO PONTEFRACT WEST JN. 139 Castleford West D o w n and Up Jn. and Prince of Wales to Signalling work. SUNDAY 19 SEPTEMBER 140 Cutsyke Jn. and D o w n Prince of Wales B L O C K E D to Track maintenance 58 and 5 7 Possession to be given up for passage of MGR trains. SHERBURN-IN-ELMET SOUTH TO GASCOIGNE WOOD SUNDAY 19 SEPTEMBER 141 Sherburn-in-Elmet A l South to Signalling work. WAKEFIELD KIRKGATE WEST JN. TO GOOLE POTTERS GRANGE AL 142 Oakenshaw Jn. and Crofton West Jn. and Up 143 Wakefield (K) Station Platforms 1, 2 & to Erecting/dismantling scaffolding and safety nets for overhead power line renewal 49m. 02ch. ( 8 2 / 3 4 ) to Platform work 47m. 55ch. and 47m. 70ch. Mechanical equipment in use. (See Section D). ( 8 1 / 4 6 ) 144 Knottingley SUNDAY 19 SEPTEMBER All to Signalling work. 145 Hensall sin. and D o w n and Up Goole Engine B L O C K E D Shed Jn. 146 Wakefield Kirkgate West Jn. and Calder Bridge Jn to Track renewal and drainage, 66m. 37ch. and 72m. 25ch. Cranes and mechanical equipment in use to Earthwork, 47m. 64ch. and 47m. 75ch. Crane in use. Possession to be given up for passage of trains. SUNDAY 19 to FRIDAY 24 SEPTEMBER 147 Oakenshaw Jn. and A l l Featherstone LC to daily. Signalling work. WEDNESDAY 22 SEPTEMBER 148 Featherstone LC D o w n and Up and Pontefract B L O C K E D West Jn to Track renewal, 55m. 45ch. and 55m. 65ch Mechanical equipment in use. Possession to be given up for passage of trains.

18 NS-18 SECTION B - TEMPORARY ENGINEERING WORKS - continued At or between Lines affected Remarks FERRYBRIDGE BRANCH SATURDAY/SUNDAY 18/ 19 SEPTEMBER 149 Pontefract Goods Jn. and Ferrybridge South Jn. Single to Track maintenance, 3 and 2 ALDWARKE NORTH M. (MID) TO BURTON SALMON 150 Hickleton A and l l Moorthorpe Station 151 Hickleton and Ferrybridge All to Earthwork, 11m. 65ch. and 11m. 35ch. Crane and mechanical equipment in use. (82/31) to Signalling work. ( 8 2 / 3 0 ) 152 Moorthorpe Station to Platform work. Mechanical equipment in use. (See Section 'D'). (8 2 / 2 7 ) 153 Moorthorpe Station Jn. and Pontefract Baghi II Station and Up to Bridgework (No.43) and earthwork 10m. 69ch. and 9m. 21ch. Crane and mechanical equipment in use. Restricted clearance.(82/25) 154 Moorthorpe Stn. In. and Ferrybridge South Jn. Up to to to ) Track maintenance, ) 5'A and 41/4m.p. ) Mechanical equipment ) in use. ( 8 2 / 2 9 ) 155 Moorthorpe Station Jn. and Ferrybridge South Jn. and Up to Bridgework (No.26), 5 rn.p. (82/1) SATURDAY/SUNDAY 18/ 19 SEPTEMBER 156 Hickleton and D o w n and Up Main Moorthorpe Station Jn. 157 Moorthorpe Station Jn. and Ferrybridge South Jn. and Up to Earthwork and track maintenance, 12m. 45ch. and 11m. 50ch to Track renewal, 8m. 05ch. and 7m. 45ch. Cranes and mechanical equipment in use. 158 Dearne Jn. and Hickleton SUNDAY 19 SEPTEMBER 159 Ferrybridge Power Station Branch 160 Moorthorpe Station and Moorthorpe Stn. Jn. and Up and Up and Up to Track maintenance, 15m. 17ch. and 15m. loch. Crane in use to Track renewal, Om. 19ch. and Om. 45ch. Crane in use to Earthworks, 11m. 45ch.

19 NS-19 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected Remarks ALDWARKE NORTH AL (MID) TO BURTON SALMON continued THURSDAY/FRIDAY 23/ 24 SEPTEMBER 161 Moorthorpe Station Jn. and Ferrybridge South Jn. 162 Aldwarke Jn. and Swinton Jn. Up and Up Pontefract Up Pontefract to Track renewal, 8m. 05ch. and 7m. 45ch. Mechanical equipment in use. Possession to be given up for passage of MGR and local trip trains. Other Up trains diverted via Cudworth to ) ) to ) ) Track renewal, 164m 58ch. and 164 Cranes and mechanical equipment in use. MOORTHORPE STATION M. TO SOUTH KIRKBY AL SATURDAY/SUNDAY, 18/19 and SUNDAY 19 SEPTEMBER 163 Moorthorpe Station Jn. and South Kirkby Jn. and Up and Up MONDAY 20 to FRIDAY 24 SEPTEMBER 164 So u th Kirkby Jn. A l l Sat to ) Signalling work and ) in connection with to Sun. ) engineering work ) between South Kirkby Jn. and Hare Park Jn..(See Section 'C') to daily. Signalling work. LEEDS WHITEHALL M. TO BRADFORD EXCHANGE 165 Whitehall Jn. and Hammerton Street 166 M i l l Lane Jn, SUNDAY 19 SEPTEMBER 167 A r m ley Moor G.F. and Hammetron Street and Up All Up to Signalling work. ( 8 2 / 1 9 ) to Signalling work. ( 8 2 / 1 9 ) to T r a c k maintenance, 2m. 38ch. and to m. 43ch. Crane in use. Possession t o to b e given up for passage of 5L69, Bradford Exchange to Leeds and OLOO, Bradford Exchange to Holbeck over Up line. LEEDS TO SKIPTON STATION SOUTH LMR 168 Leeds West Jr). A l l 169 Whitehall Jn. and Kirkstall Jn. All to Signalling work to Signalling work, ( 8 2 / 1 9 )

20 NS-20 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected Remarks LEEDS TO SKIPTON STATION SOUTH LMR continued continued 170 Kirkstall Jn. 171 K irkst a ll Jri. and Apperley Up Goods Loop and Up to 15 00, Earthwork 197m. 45ch. and 198m.p. Mechanical equipment in use. (82/10) to Bridgework (Nos24 and 33) 198m. loch. and 201m. 45ch. Restricted clearance. (82/32) 172 Apperley Jn. and Thackley Jn, 173 Keighley Station Jn. and Cononley 174 Cononley LC and Skipton Station South 175 Bin g ley Station 176 SATURDAY/SUNDAY 18/19 Shipley Bingley Jn. and Keighley Station Jn. and Up and Up and Up and Up SEPTEMBER and Up to Tunnelwork (Thackley Tunnel) 203m. 42ch. and 204m. 32ch. Mechanical equipment in use. ( 8 1 / 3 0 ) to Signalling work. Bridgework (No.86A), 2201/4 and 2201/4 m.p. Crane and mechanical equipment in use. ( 8 2 / 3 4 ) to Platform work 208m. 68ch. Mechanical equipment in use. (See Section 'D'). From Sunday 19 September. ( 8 2 / 3 8 ) to Track maintenance 209 and 209'1/4 m.o. Possession to be given up for passage of trains. SUNDAY 19 SEPTEMBER 177 Apperley Jn. and Guiseley Jn. Batley Jn. and Guiseley Jn, Up Main Main Up Main Loop to to to to working to Up line. Track renewal 204m. 35ch. and 204m. 66ch. Cranes and mechanical equipment in use to Possession to be given up for passage of 2M71, Leeds to Morecambe over Up line under Single line Single line working over 178 K ild wick and Up SUNDAY 19 to FRIDAY 24 SEPTEMBER to Loading materials 2161/4 and up for passage of trains. 179 G u ise ley Jn. and Shipley Bingley Jn. and Up to Signalling work. LEEDS WORTLEY sin. TO HARROGATE 180 Wortley Jn. and Horsforth and Up to Signalling work.

21 NS-21 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected Remarks LEEDS WORTLEY M. TO HARROGATE continued 181 continued Horsforth and Weeton Stn. and Up SATURDAY/SUNDAY 18/10 SEPTEMBER to Demolition work 8 30ch. ( 8 2 / 3 0 ) 182 Horsforth and Rigton and Up to Tunnelwork (Bramhope Tunnel) 5m. 65ch. and 7m. 77ch. Mechanical equipment in use. APPERLEY M. TO ILKLEY STATION 183 Apperley in. and Burley Jn. and Up 184 Esh o lt Jn. and and Up Guiseley Station B e t w e e n Trains 185 I lk le y Station P l a t f o r m 1 SUNDAY 19 SEPTEMBER 186 I lk le y Station A l l to Construction work 204 and 205 (82/35) to Tunnelwork (Greenbottom Tunnel), 204m. 62ch. and 204m. 68ch. Restricted clearance. (82/27) to Platform work 211m. 23ch. Mechanical equipment in use. (See Section 'D'). From Sunday 19 September. ( B 2 / 3 8 ) to Building work 211m. 23ch. Restricted clearance. SUNDAY 10 to FRIDAY 24 SEPTEMBER 187 G u ise ley Station D o w n and Up WEDNESDAY/THURSDAY 22/23 SEPTEMBER 188 E sh o lt Jn. and D o w n and Up Ilkley Jn. B L O C K E D to daily. Signalling work to Track renewal m. 30ch. Mechanical equipment in use. GUISELEY M. TO ESHOLT 180 Guiseley Jn. and Esholt Jn. and Up to Construction work 3m 38ch and 0 m.p. Crane and mechanical equipment in use. SHIPLEY LEEDS JN. TO BRADFORD FORSTER SQUARE SUNDAY 19 to FRIDAY 24 SEPTEMBER 190 L e e d s Jn. and Shipley Bradford sin. and Up to daily. Signalling work.

22 NS-22 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected Remarks SHIPLEY BRADFORD M. TO SHIPLEY BINGLEY SUNDAY 19 to FRIDAY 24 SEPTEMBER 191 S h ip le y Bradford Jn. S in g le and Shipley Bingley Jn to daily. Signalling work. LEEDS TO HULL PARAGON 192 Leeds East Jn. and Marsh Lane Jn. 193 L e e d s East Jn. and Micklefield Stn. Jn. 194 Gascoigne Wood and Selby West In. SUNDAY 19 SEPTEMBER 195 Peckfield and Neville Hill East Jn, and Up All and Up Main Up to Bridgework (Marsh Lane Viaduct) 20m. 25ch. and 1 9 equipment in use. ( 8 2 / 1 8 ) to Signalling work to Demolition work, earthwork and bridgework, 6m.p. and 2m. 48ch. Cranes and mechanical equipment in use. ( 8 0 / 2 1 ) to Track maintenance and track renewal, 11m. 30ch. land 14m. 55ch. 196 Broomfleet Stn. IC and Brough East LC and Up SUNDAY 19 to FRIDAY 24 SEPTEMBER to Bridgework, 10m. 42ch. Ladders in use. Possession to be given up for passage of trains. 197 Crossgates Station and Peckfield and Up to daily. 5 ignalling work.1 MONDAY 20 to FRIDAY 24 SEPTEMBER 198 Selby LC and Gascoigne Wood Up THURSDAY/FRIDAY 23/24 SEPTEMBER to daily. In connection with engineering work. Possession to be given up or passage of trains. 199 Wressle Station LC and Howden Stn, LC to Track maintenance, 25 m.p. and 22m. 30ch. Mechanical equipment in use. Possession to be given up for passage of trains. THORNE JN. TO GILBERDYKE 200 Potters Grange Jn. A l l and Goole LC MONDAY/TUESDAY 20/21 SEPTEMBER to Bridgework and earthwork, 7m. 20ch. and 6m. 65ch. Mechanical equipment in use. ( 8 1 / 2 3 ) 201 Thorne In. and Thorne Moorends Main to Reballasting, 8m. 05ch. and 9m. 74ch. Mechanical equipment in use.

23 NS-23 SECTION B TEMPORARY ENGINEERING WORKS continued At or between Lines affected R e m a r k s THORNE JN. TO GILBERDYKE JN. continued MONDAY 20 to FRIDAY 24 SEPTEMBER 202 Thorne Jn. and Thorne North WEDNESDAY 22 SEPTEMBER and Up to Burning scrub, 8m. 51ch. and 9m. 20ch. 203 Thorne Moorends U p Main and Thorne Jn. B L O C K E D to Reballasting, 9m. 74ch. and 8m. 05ch. Mechanical equipment in use. HULL PARAGON STATION TO SEAMER WEST MONDAY 20 to WEDNESDAY 22 SEPTEMBER 204 Bridlington Quay LC S in g le Mon and Tue to Tue and Wed. Track and Hunmanby B L O C K E D m a i n t e n a n c e, 32 and 3 0 Station LC e q u i p m e n t in use. TUESDAY/WEDNESDAY 21/22 SEPTEMBER 205 Gristhorpe LC and D o w n Seamer West Jn. B L O C K E D WEDNESDAY 22 to FRIDAY 24 SEPTEMBER to Track maintenance, 46'A and 50m.p. Mechanical equipment in use. 206 Lowthorpe LC and D o w n Wed and Thu to Thu and Fri. Track Bridlington South B L O C K E D m a i n t e n a n c e, 23 eauipment in use. HESSLE HAVEN TO DAIRYCOATES WEST VIA HULL YARD 207 He s s le Haven and D o w n and Up to Track renewal, lm. 62ch. and Dairycoates West B e t w e e n Trains 2 m. 2ch. Crane in use. ( 8 2 / 1 8 ) DAIRYCOATES WEST TO NEPTUNE STREET 208 D a irycoates West D o w n and Up and Neptune Street B e t we e n Trains to Track abandonment, lm. 69ch. and l'am.p. Cranes and mechanical equipment in use. ( 8 2 / 1 6 )

24 SECTION C NS-24 SIGNALLING AND PERMANENT WAY ALTERATIONS Items marked thus w i l l not appear in future issues and a note must be taken of them by al l concerned With effect from Monday 13 September the 20m.p.h. and Up speed restrictions between Royston Jn. and Oakenshaw South Jn. (179m. 25ch. and 179m. 40ch.) will become differential restrictions of 20 over 40 in accordance with Section 1 clause 10 on page 1.57 of the General Appendix. (40) SUNDAY 19 SEPTEMBER MIRFIELD DETAILS OF WORK REFRIED TO IN SECTION B The points leading to the Up Sidings will be secured out of use in the normal position pending removal. ( 4 1 ) SUNDAY 19 SEPTEMBER SOUTH KIRKBY JUNCTION The facing lead from the Main into South Kirkby Colliery will be restored to its former position. The trailing crossover between the and Up Main lines will be re-positioned 30 yards nearer to South Elmsall. Signe King Alterations Main ground position light signal (L647) will be re-positioned in the Main cess 80 yards further south. A 2-way stencil-type route indicator will be provided, and the following indications will apply : Indication D e s t i n a t i o n M U p Main L656 signal Up Branch M28 signal A new ground position light signal L651 will be provided in the Up Main cess at the Up Main end of the Main to Main trailing crossover. A 3-way stencil-type route indicator will be provided and the following indications will apply : Indi cation Destination Bunker line to B Bunker line to A Main L645 signal THURSDAY 23 SEPTEMBER BETWEEN LEEDS AND GARFORTH The following catch points in the line will be secured out of use pending removal and replacement by plain line: 17m. 52ch. 655 yards before reaching Leeds L791 signal 17m. 20ch. 830 yards before reaching L793 signal 16m. 42ch yards before reaching L795 signal 15m. 74ch. 510 yards before reaching L797 signal 15m. 26ch. 600 yards before reaching L799 signal

25 NS-25 SECTION C SIGNALLING AND PERMANENT WAY ALTERATIONS continued DETAILS OF WORK REFERRED TO IN SECTION 8 continued THURSDAY 23 SEPTEMBER BETWEEN THORNHILL LNYV JUNCTION (RAVENSTHORPE) AND LEEDS HOLBECK EAST JUNCTION (MORLEY TUNNEL) The following catch points in the line will be secured out of use pending removal and replacement by plain line: 32m. 76ch. 700 yards before reaching Batley signal No.15 33m. 39ch. 630 yards before reaching Batley signal No.14 34m. loch. 530 yards before reaching Batley signal No.13 34m. 45ch. 720 yards before reaching Batley signal No.12 35m. 17ch. 595 yards before reaching Batley signal No.11 35m. 60ch. 840 yards before reaching Batley signal No.10 DETAILS OF WORK ALREADY CARRIED OUT MOORHOUSE JUNCTION Up Main signal L.662 has been converted to an Automatic signal. The left-hand off-set subsidiary on Main L.669 signal has been abolished. The trailing Main to Main crossover has been secured out of use pending removal together with associated signalling. (40) * SOUTH KIRKBY The trailing crossover between the and Up Main lines and the facing lead from Main into the South Kirkby Colliery lines has been taken out of use pending relaying. Signals Abolished: Ground disc Up Main to Main or to Bunker lines Ground disc Main to Up Main; to Branch; or to Marshalling Loop. (38) * *DONCASTER Additional flashing aspects have been fitted to Up Main signals D.812 and D.814. The new aspect sequence reading from Up Main to Up Slow (D.292) via the facing connection at 156m. 42ch. will be: SIGNAL D.300 D.812 D.814 D.822 ASPECT Yellow (wit h position 1 indicator) Flashing y ellow Flashing double y ellow Green WAKEFIELD KIRKGATE Rail access to Whithams Top Yard from the Up Goods line has been terminated and the sidings have been secured out of use pending removal. ( N e w Item) (41)

26 NS-26 SECTION C SIGNALLING AND PERMANENT WAY ALTERATIONS conti nued DETAILS OF WORK ALREADY CARRIED OUT conti nued MARSDEN The new mains c ros ov er has been brought into use 100 yards east of its former position. The,issociated ground disc signal applying Main to Up Main has been replaced by a ground position light signal (No.14). The new 2-way route indicator will have the following indications: Main to Up Main X Set back along Main to NEW LIMIT OF SHUNT Indicator at the Digqle end of the Platform (east face of Bridge No.45). The ground disc signal applying Up Main to Main has been replaced by a ground position light signal (No.17). ( N e w item) (41) PECKFIELD The catch points in the Up Main line at 11m. 38ch. have been removed and replaced by plain line(39) *AATFIELD SIDINGS The connection at 81/4 m.p. leading from the Hull line to the Shunt Spur and the trailing connection at 8 m.o. leading from Hatfield Sidings to the Up Scunthorpe Slow line have been clamped out of use pending removal. The Shunt Spur at Hatfield Sidings has been abandoned. Associated s i Ta l D.632 together with Ground Position Light signals 1107, 1108 and 1109 has been abolished GPL Signal. The route into the shunt spur will be dispensed with. ( A m e n d e d Item) (38) SOUTH KIRKBY JUNCTION TO MOORTHORPE STATION JUNCTION : RE-MODELLING OF SOUTH KIRKBY JUNCTION South Kirkby Junction The Junction between the and Up Branch and the and Up Main lines has been relayed in a modified form 100 yards further south. The and Up Branch lines have been realigned accordingly. The positions of the new and altered signals in relation to the re-modelled junction are as shown on the diagram included in this notice. Between South Kirkby Junction and Moorthorpe Station Junction The trailing crossover between the and Up Branch lines has been repositioned 200 yards nearer to Moorthorpe. The Marshalling Loop has been extended 200 yards towards Moorthorpe. Description of Signals: Signal Line Route Indication Application to or towards (Stencil) L652 Marshalling M28 Up Branch Loop L654 Up Branch L645 Main (Via Branch Crossover) Bunker Line 'A' Bunker Line 'B' "c L649 Marshalling Loop L666 Up Branch L645 Main ( A m e n d e d Item)

27 EX 1ST ING S 1C,NA LLING, ' r DS 1 173,0 Ds 043 L i t t e 4 FRom 5wEFFIEL0 MZS N K.R JO N C, L ) TELE (. A r E L E. E x I S 511. iinalo N TELE. T I-G52 DOWN BRANC4 LIP BR O.N C H SOUTH k BY JUNCTION REMODELLING CSUNDANr ZIT AUGUST 51GALNoPREFIMS.- L - LEEDS5 B M- MOORTHORPESOUrk be) EXISTING SIGNALLING JN-TOCOLLIERN Posers PADLOCKED CRIP P u t b i 7 +/- L,NE (3 T o I & l o N o s 1 SouTi- R p IEA ZOLL)E RY SUNKE10 ʻ4 UP M A I N vezotst LG4b - - * - E *IGNALLIP44, L 6 4, slirq 0 l a E Z.A. ) 0 G _ * K O C I D E X IS TING 1-65C, r4-1250x1,5 S IGNA LLING' - I (VOIDS 1 4, 1 ( ) N C 5 L.G53 PAW D O w N MAIN NICASTER i.._1 4,Jto MAIN A A ; 5 0 X I L50 1 I 5 IGNIA1-, N4 G

28 NS-28 SECTION D GENERAL INSTRUCTIONS AND NOTICES A thick ver ticle line denotes new or amended items Items marked thus w i l l not appear in future issues and a note must be taken of them by al l concerned INSTRUCTIONS TO STAFF DEALING WITH M.G.R. TRAINS AND BUNKER/RAPID LOADING COLLIERIES B.R.30059/5 Page 18 (1) and (2) PRINCE OF WALES COLLIERY Delete instructions and substitute: 1. Wh e n signal 1 is cleared, the arriving train must proceed to the marker board for the locomotive to be detached. 2. W h e n the train is ready for tare weighing and part loading, the Guard must advise the Bunker Operator accordingly. 3. T h e train must be propelled for tare weighing and part loading under the control of the laoding signals at 1 m.p.h. 4. Wh e n the wagons next to the locomotive have been part loaded the Bunker Operator will advise the Guard that the direction of the train for loading will be reversed and the Guard must advise the Driver accordingly. 5. T h e train must then be hauled through the bunker under control of the loading signals at 1m.p.h. for completion of loading and for gross weighing. Crippled Wagons 6. T h e Guard must advise the Bunker Operator when a wagon requires to be detached in the cripple siding. 7. W h e n a movement is ready to return via the Bunker line to the approach side of signal 1, the Guard must inform the Bunker Operator. 8 W h e n a train is re-formed after detaching operations have been completed, the Guard must advise the Bunker Operator it is ready to return to the approach side of signal 1, ( 4 0 D ) Page 22 WOOLLEY COAL SIDINGS Delete all instructions and substitute: WOOLLEY COAL SIDING 1. A l l trains must be propelled into the siding from the Main line. 2. W h e n a train is propelled into the sidings, it must be stopped with the locomotive in rear of the colliery outlet signal, where the Driver must await further instructions.

29 KIS- 29 SECTION D GENERAL INSTRUCTIONS AND NOTICES continued Running Lines and Signalling System Page 111 ERSECTIONAL APPENDIX (NORTHERN AREA) TABLE "A" DETAILS OF RUNNING LINES Loops and Refuge Sidings Location M Ch, Permanent Speed Restrictions U p m p h. At or Between ALDWAPRE NORTH JN. (MID) TO LEEDS NORTH..IN. Between Royston Jn. and Oakenshaw South Jn, Amend: m. 25ch. and m. 40ch. Catch, Spring and unworked trailing points (w.e.f Monday 13 September) (ND40D) Page 156 LEEDS TO HULL PARAGON Between St. Georges Road LC and Anlaby Road Jn, Amend: lm. Och. and Om. 40ch. Between Anlaby Road Jn. and Hull Paragon Delete: (w.e.f Monday 13 September) O m. 40ch. and Om. 48ch. (w.e.f Monday 13 September) (ND40D) LOCAL INSTRUCTIONS Page 372 F E R R Y B R I D G E 'C' POWER STATION Add C.E.G.13. Level Crossing The instructions in the General Appendix headed "Automatic Open Crossings, Locally monitored (AOCL) At crossings where trains are required to stop" apply at this crossing. If it becomes necessary for a set-back movement to take place over the crossing, the Guard must be stationed at the Crossing to stop road traffic, before such movement commences. "Incoming" Open Level Crossing The instructions in the General Appendix headed "Open Crossings" apply at this crossing. If it becomes necessary for a set back movement to be made over the crossing, a member of the C.E.G.B. staff will be stationed at the crossing and no movement over the crossing must be made without his authority. ( 4 0 D ) Pontefract Baghill TABLE Z LINE S EQUIPPED WITH THE AUTOMATIC WARNING SYSTEM From T o L i n e R e m a r k s Page 271 (Page 127 Supp. Optg. Insts) ALDWARKE NORTH JR1.111/11D) TO BURION SALMON Delete : Moorthorpe B u r t o n and Up Add : Aldwarke North In. H i c k l e t o n Burton Salmon and Up and Up (40D)

30 NS-30 SECTION D GENERAL INSTRUCTIONS AND NOTICES continued MISCELLANEOUS NOTICES BIN GLEY STATION Commencing Sunday 19 September from to daily, drivers of trains stopping at Bingley Station to observe instructions of Handsignalman and/or warning notices during repairs to platform areas. ILKLEY STATION Commencing Sunday 19 September from to daily, drivers of trains stopping at No.1 platform to observe instructions of Handsignalman and/or warning notices during repairs to platform areas. DON CASTER STATION Due to track renewal Up Platform (No.1) drivers of trains booked to call at Platform 3A must bring their trains to a stand at D282 Signal. Until Further Notice. WAKEFIELD KIRKGATE STATION Drivers of trains required to stop at Wakefield Kirkgate Station to observe instructions of handsignalmen and/or warning notices during repairs to platforms. MIRFIELD STATION Until further notice, between to daily. Drivers of trains stopping at Mirfield to observe instructions of Handsignalman and/or warning notices during resurfacing of platform area. MOORTHORPE STATION Until Further Notice From to daily, drivers of trains stopping in the Platform to observe instructions of Handsignalman and/or warning notices during repairs to platform copings. MP.32/NS G. GRAHAM York C h i e f Operating Manager 6 SEPTEMBER, 1982

31 KIS- 29 SECTION D GENERAL INSTRUCTIONS AND NOTICES continued Running Lines and Signalling System Page 111 ERSECTIONAL APPENDIX (NORTHERN AREA) TABLE "A" DETAILS OF RUNNING LINES Loops and Refuge Sidings Location M Ch, Permanent Speed Restrictions U p m p h. At or Between ALDWAPRE NORTH JN. (MID) TO LEEDS NORTH..IN. Between Royston Jn. and Oakenshaw South Jn, Amend: m. 25ch. and m. 40ch. Catch, Spring and unworked trailing points (w.e.f Monday 13 September) (ND40D) Page 156 LEEDS TO HULL PARAGON Between St. Georges Road LC and Anlaby Road Jn, Amend: lm. Och. and Om. 40ch. Between Anlaby Road Jn. and Hull Paragon Delete: (w.e.f Monday 13 September) O m. 40ch. and Om. 48ch. (w.e.f Monday 13 September) (ND40D) LOCAL INSTRUCTIONS Page 372 F E R R Y B R I D G E 'C' POWER STATION Add C.E.G.13. Level Crossing The instructions in the General Appendix headed "Automatic Open Crossings, Locally monitored (AOCL) At crossings where trains are required to stop" apply at this crossing. If it becomes necessary for a set-back movement to take place over the crossing, the Guard must be stationed at the Crossing to stop road traffic, before such movement commences. "Incoming" Open Level Crossing The instructions in the General Appendix headed "Open Crossings" apply at this crossing. If it becomes necessary for a set back movement to be made over the crossing, a member of the C.E.G.B. staff will be stationed at the crossing and no movement over the crossing must be made without his authority. ( 4 0 D ) Pontefract Baghill TABLE Z LINE S EQUIPPED WITH THE AUTOMATIC WARNING SYSTEM From T o L i n e R e m a r k s Page 271 (Page 127 Supp. Optg. Insts) ALDWARKE NORTH JR1.111/11D) TO BURION SALMON Delete : Moorthorpe B u r t o n and Up Add : Aldwarke North In. H i c k l e t o n Burton Salmon and Up and Up (40D)

WEEKLY OPERATING NOTICE

WEEKLY OPERATING NOTICE PRIVATE AND NOT FOR PUBLICATION B. R.31262/1 British Rail N S E A S T E R N REGION 3 9 WEEKLY OPERATING NOTICE CONTAINING TEMPORARY SPEED RESTRICTIONS TEMPORARY ENGINEERING WO RKS SIGNALLING AND PERMANENT

More information

West Yorkshire - Timetable Notes.

West Yorkshire - Timetable Notes. West Yorkshire - Timetable Notes. Introduction. This timetable covers the period July 1991 to May 1992. This timetable is a heavy freight orientated timetable where the passenger trains are outnumbered

More information

British Rail PERIODICAL OPERATING NOTICE

British Rail PERIODICAL OPERATING NOTICE PRIVATE AND NOT FOR PUBLICATION BR.31262/D British Rail ND EASTERN REGION (Northern Area) 32D PERIODICAL OPERATING NOTICE CONTAINING GENERAL INSTRUCTIONS AND NOTICES SATURDAY 4 AUGUST 1984 TO FRIDAY 5

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY FRIDAY 4 JUNE 1911

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY FRIDAY 4 JUNE 1911 FOR THE INFORMATION OF RAILWAY STAFF ONLY British Rail EASTERN REGION B.R.31262/D No. 19D (NORTHERN AREA) GENERAL INSTRUCTIONS AND NOTICES SATURDAY 8 MAY (4 WEEKLY PERIOD) TO FRIDAY 4 JUNE 1911 INCLUSIVE

More information

East Coast Berwick to Alnmouth

East Coast Berwick to Alnmouth East Coast Berwick to Alnmouth NW 0 Scottish Border Berwick Station Scremerston Tweedmouth Goswick Beal Crossovers Crag Mill Chathill Station Belford Fallodon & Christon Bank Little Mill Crosovers Alnmouth

More information

NATIONAL PASSENGER SURVEY - WAVE 23 Autumn 2010 REPORT FOR WEST YORKSHIRE PTE

NATIONAL PASSENGER SURVEY - WAVE 23 Autumn 2010 REPORT FOR WEST YORKSHIRE PTE NATIONAL PASSENGER SURVEY - WAVE 23 REPORT FOR Contacts David Greeno Passenger Focus 1 Drummond Gate London, SW1V 2QQ Tel: 00 123 0837 Email: david.greeno@passengerfocus.org.uk David Chilvers Continental

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER FRIDAY 23 OCTOBER 1970

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER FRIDAY 23 OCTOBER 1970 1 B.R.31262/D ND British Rail EASTERN REGION (NORTHERN AREA) No. 39D GENERAL INSTRUCTIONS AND NOTICES SATURDAY 26 SEPTEMBER (4 WEEKLY PERIOD) 10 FRIDAY 23 OCTOBER 1970 INCLUSIVE For additional items during

More information

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979

GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979 PRIVATE AND NOT FOR PUBLICATION B.R. 31262/ a) ND British Rail EASTERN REGION 48D (Northern Area) GENERAL INSTRUCTIONS AND NOTICES SATURDAY 1 DECEMBER 1979 TO FRIDAY 1 FEBRUARY 1980 INCLUSIVE For additional

More information

WORKING TIMETABLE MANDATORY TRAIN SERVICES

WORKING TIMETABLE MANDATORY TRAIN SERVICES (C) Swanage Railway Co. Ltd. 016 SECTION WG (SWANAGE BRANCH) WORKING TIMETABLE OF MANDATORY TRAIN SERVICES WORGRET JCN TO SWANAGE DIESEL GALA 016 6 MAY 014 to 8 MAY 016 (including preview day May) When

More information

Morwell. (88 miles 75 chains 47 links, km)

Morwell. (88 miles 75 chains 47 links, km) Morwell (88 miles 75 chains 47 links, 144.372 km) 01.06.1877 Opened with line between Morwell and Sale. Staff and Ticket not provided initially. (VR to 62, Leo Harrigan, WTT) (01.04.1878) By this date,

More information

WORKING TIMETABLE MANDATORY TRAIN SERVICES

WORKING TIMETABLE MANDATORY TRAIN SERVICES SECTION WG ( BRANCH) WORKING TIMETABLE OF MANDATORY TRAIN SERVICES WORGRET JCN TO DIESEL GALA 14 9 MAY 14 to 11 MAY 14 When trains are running late, drivers must endeavour to make up time with due regard

More information

Ouyen - Pinnaroo GALAH (298 MILES)

Ouyen - Pinnaroo GALAH (298 MILES) Ouyen - Pinnaroo TIEGA (295 1/4 MILES) (19.12.1910) Opened for goods not requiring shed accommodation or crane power. Traffic handled by Construction Branch. (WN 51) 25.06.1912 Line opened. No-one-in-charge.

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 2018 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday 2 nd, Friday 3 rd, Saturday

More information

Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH)

Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) Warrenheip WARRENHEIP (69 MILES 56 CHAINS 80 LINKS VIA BACCHUS MARSH) 01.02.1873 Open for passengers on Geelong - Ballarat line (Chronological Index) (31.12.1878) By this date, open for general goods (Commissioners

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 08 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday nd, Friday 3 rd, Saturday 4 th

More information

Warragul. (61 miles 20 chains 0 links, km)

Warragul. (61 miles 20 chains 0 links, km) Warragul (61 miles 20 chains 0 links, 96.766 km) GALLAGHERS LANE (60 MILES 37 CHAINS) 30.10.1945 Flashing lights provided. Work automatically for all trains. (WN 45, AGST 16/298/2) 80.09.1971 Provision

More information

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2.

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2. GE/RT8000/T11 Rule Book Module T11 Movement of engineering trains and on-track plant under T3 arrangements Issue 2 January 2007 Comes into force 02 June 2007 Issue Date Comments Comes into force 1 June

More information

List of Permanent Way Drawings at the National Railway Museum, York Last updated 13 November 2015

List of Permanent Way Drawings at the National Railway Museum, York Last updated 13 November 2015 List of Permanent Drawings at the National Railway Museum, York Last updated 1 November 015 Introduction This is oldpway s list of drawings of permanent way that are at the National Railway Museum in York.

More information

The West Lancashire Light Railway OPERATING RULE BOOK

The West Lancashire Light Railway OPERATING RULE BOOK The West Lancashire Light Railway OPERATING RULE BOOK Revision 4-5th November 2008 This supersedes any previous versions of the Rule Book CONTENTS 1 Definitions and Abbreviations 2 Method of Operation

More information

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015 GE/RT8000/T3 Rule Book Module T3 Possession of a running line for engineering work Issue 6 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document

More information

Lane Closure Manual. Route Report Index: US12-A US12-03 (WB) US12-01 (EB WB) US12-02 (EB)

Lane Closure Manual. Route Report Index: US12-A US12-03 (WB) US12-01 (EB WB) US12-02 (EB) Route Report Index: US1-A?A@ 15 %&'( 94?A@ 5?A@?A@ 95 +, 16 9?A@?A@ 47 %&'( 95 5?A@ 65 +, 8 +, 1 5 %&'( 94 %&'( 69 4 %&'( 5 W %&'( 5 E +, 61?A@ 95 %&'( %&'( 69 4 9 4 %&'( 94 %&'( 49 4 NOTE: Lane closures

More information

Somerton SOMERTON (13 MILES 42 CHAINS)

Somerton SOMERTON (13 MILES 42 CHAINS) Somerton SOMERTON (13 MILES 42 CHAINS) Somerton has had four phases of existence. The first, from 1881 to 1889, was as a simple passenger platform which served the village of Somerton on Sydney Road. Between

More information

STATISTICS FOR MISSION Circuit Attendance Statistics Summary October 2010

STATISTICS FOR MISSION Circuit Attendance Statistics Summary October 2010 2 Huddersfield (Pennine) CROSLAND HILL 44 47 40 45 42 46 38 42 2 6 2 6 1 1 1 1 GLEDHOLT 64 74 59 65 58 66 53 58 4 7 4 7 3 5 3 5 GOLCAR 34 43 34 43 31 37 30 37 3 6 3 6 0 0 0 0 HUDDERSFIELD MISSION 52 95

More information

TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER FRIDAY 25 OCTOBER 1974

TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER FRIDAY 25 OCTOBER 1974 PRIVATE AND NOT FOR PUBLICATION B. R. 3 1 2 6 2 British Rail' NN EASTERN REGION No.42 TEMPORARY SPEED RESTRICTIONS PERMANENT WAY OPERATIONS SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 19 OCTOBER

More information

Broadmeadows BROADMEADOWS (10 1/2 MILES)

Broadmeadows BROADMEADOWS (10 1/2 MILES) Broadmeadows BROADMEADOWS (10 1/2 MILES) Broadmeadows is situated at the top of the long climb out of the Moonee Ponds Creek valley. It served the established communities of Keilor (to the west) and Campbellfield

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 2017 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday 3 rd, Friday 4 th, Saturday

More information

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book GERT8000-HB11 Rule Book Duties of the person in charge of the possession (PICOP) Issue 6 September 2017 Comes into force 02 December 2017 Handbook 11 Uncontrolled when printed Published by: RSSB The authoritative

More information

No. 38D GENERAL INSTRUCTIONS AND NOTICES

No. 38D GENERAL INSTRUCTIONS AND NOTICES PRIVATE AND NOT FOR PUBLICATION BR.31262/3D LM British Rail (EASTERN REGION) No. 38D GENERAL INSTRUCTIONS AND NOTICES AFFECTING EASTERN REGION TRAINMEN WORKING OVER THE LONDON MIDLAND REGION (Excluding

More information

DRIVING AND OFF-DUTY TIME

DRIVING AND OFF-DUTY TIME FACT SHEET DRIVING AND OFF-DUTY TIME for Heavy Vehicle Drivers 4 PREVIOUS DAYS RULE To drive, you are required to have taken at least 24 consecutive hours of off-duty time during the 4 previous days. In

More information

WEEKLY OPERATING NOTICE

WEEKLY OPERATING NOTICE PRIVATE AND NOT FOR PUBLICATION B.R.31262/3 British Rail L M E A S T E R N REGION 3 9 WEEKLY OPERATING NOTICE CONTAIN ING TEMPORARY SPEED RESTRI CTI ONS TEMPORARY ENGINEERING W O R K S SIGNALLING A N D

More information

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1. SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into

More information

ASHPRINGTON ROAD Part 1

ASHPRINGTON ROAD Part 1 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD Part 1 By Graham Plowman Photographed by Paul Plowman 2 MODEL RAILWAYS ON-LINE ASHPRINGTON ROAD A 00 layout based on the Western Region Main Line between Exeter

More information

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book GERT8000-HB15 Rule Book Duties of the machine controller (MC) and ontrack plant operator Handbook 15 Issue 5 September 2017 Comes into force 02 December 2017 Published by: RSSB The authoritative version

More information

Wollaston Dudley. Monday to Friday. Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End Stourbridge Interchange Website Page 1

Wollaston Dudley. Monday to Friday. Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End Stourbridge Interchange Website Page 1 7 Wollaston Dudley Via Stourbridge, Pedmore, Lye, Merry Hill Centre and Darby End. Monday to Friday Wollaston, Traffic Island.. 0635 0655 0710 0730 0750 0815 0835 0900 0920 0940 1000 1020 Norton, Shenstone

More information

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012 GE/RT8000/HB15 Rule Book Handbook 15 Duties of the machine controller (MC) and on-track plant operator Handbook 15 Issue 1 Valid from June 2011 Published by: RSSB Block 2 Angel Square 1 Torrens Street

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

NHS Rotherham Pharmacy Opening Hours

NHS Rotherham Pharmacy Opening Hours NHS Opening Hours Address Mon Tue Wed Thu Fri Sat Sun Asda Asda Superstore Aldwarke Lane 08:00-12:30 08:00-12:30 08:00-12:30 08:00-12:30 08:00-12:30 08:00-12:30 10:00-12:30 14:30-22:00 14:30-22:00 14:30-22:00

More information

Terminology. Glossary of Railway. Glossary of Railway Terminology

Terminology. Glossary of Railway. Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Issue 1 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved

More information

Making Rail Accessible

Making Rail Accessible LNER.co.uk Making Rail Accessible Helping older and disabled customers August 2018 1 Contents 1 Policy Summary 3 2 Assistance for Customers 4 3 Alternative Accessible Transport 6 4 Customer Information

More information

Activity. Briefing: The activity commences shortly after the arrival of W93 at Mt Victoria (11 55).

Activity. Briefing: The activity commences shortly after the arrival of W93 at Mt Victoria (11 55). Activity Title: W93 Down Local Passenger Service Wednesday only Day / Time: Wednesday only, 11 55am Season & Weather: Summer & Clear Difficulty: Medium Time to complete: 1.5 hours Description: Activity

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 2017 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday 3 rd, Friday 4 th, Saturday

More information

TA20 ARTC Code of Practice for the Victorian Main Line Operations

TA20 ARTC Code of Practice for the Victorian Main Line Operations TA20 ARTC Code of Practice for the Victorian Main Line Operations Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1.2 07 August 2011. 2.0 04 October

More information

Working of Trains - Rules 1 to 45

Working of Trains - Rules 1 to 45 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This

More information

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013

Uncontrolled When Printed Document to be superseded as of 01/06/2013 To be superseded by GORT3056-E Iss 3 published on 02/03/2013 Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 December 03 E1 Authorised Vehicles E3 December 03 E2 E3 E4 E5 Movement of Defective Vehicles Special Movement Conditions Vehicles

More information

Document Control Identification. Document History. Authorisation

Document Control Identification. Document History. Authorisation Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail 1 October 2016 Table of Contents Glossary for this Rule... 4... 9... 9... 9... 10... 11... 12... 13...

More information

Wallan WALLAN (29 MILES 40 CHAINS)

Wallan WALLAN (29 MILES 40 CHAINS) Wallan WALLAN (29 MILES 40 CHAINS) Like most of the other stations on the line to Seymour the township of Wallan is located on the Hume Highway and is some 2 kilometres west of the station. The station

More information

TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC.

TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. PRIVATE AND NOT FOR PUBLICATION B.R.31262 British Rail S TEMPORARY SPEED RESTRICTIONS - c SIGNAL ALTERATIONS APPENDIX INSTRUCTIONS, ETC. SATURDAY 10 AUGUST TO FRIDAY 16 AUGUST 1974 Trainmen must pay particular

More information

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 5 Glossary of Railway Terminology December 2018 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

SKEENA SUBDIVISION. Mile TERRACE Y 0.0 AMSBURY 9.6 EXSTEW SALVUS KWINITSA SKEENA 58.5 TYEE SOCKEYE 78.

SKEENA SUBDIVISION. Mile TERRACE Y 0.0 AMSBURY 9.6 EXSTEW SALVUS KWINITSA SKEENA 58.5 TYEE SOCKEYE 78. [107 ] Method of Control W SKEENA SUBDIVISION E Mile Siding Capacity In Feet DOB / TGBO SWITCHING ZONES Hot Box and Dragging Equipment Detectors RTC Radio Channel, Tones and DTMF Codes TERRACE Y 0.0 0.0

More information

Diesel Traction in Action Volume 3

Diesel Traction in Action Volume 3 Diesel Traction in Action Volume 3 1 D345 s main line return on a railtour to Holyhead, "The Christmas Cracker". It launches its train out of Birmingham N. S. (30th November 2002). 2 In heavy rain one

More information

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK R A I L T R A C K Safety and Standards Directorate RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK Railtrack, Safety and Standards Directorate Railtrack House DP01 Euston Square LONDON NW1 2EE 08/1999

More information

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 4 Glossary of Railway Terminology December 2017 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

TOC Waiver. ARTC website

TOC Waiver. ARTC website TOC Waiver Reference Number 12475 Distributed To: ARTC website Distribution Date: 05/06/2014 Requested By: Subject: Effective Period: ARTC RAS Manual Stage 1 implementation for the ARTC in New South Wales

More information

Overview of FMCSA s Proposed Hours of Service Rules For Truck Drivers. Rob Abbott Vice President of Safety Policy American Trucking Associations

Overview of FMCSA s Proposed Hours of Service Rules For Truck Drivers. Rob Abbott Vice President of Safety Policy American Trucking Associations Overview of FMCSA s Proposed Hours of Service Rules For Truck Drivers Rob Abbott Vice President of Safety Policy American Trucking Associations Background 2003 Final Rule 2003 Legal Challenge 2005 New

More information

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11

Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Operating Procedures Overhead and Electrical Equipment - Procedures 1 to 11 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04

More information

SUPPLEMENTARY OPERATING INSTRUCTIONS

SUPPLEMENTARY OPERATING INSTRUCTIONS For the information of Railway Staff only BR 31293 British Rail EASTERN REGION (NORTHERN AREA) SUPPLEMENTARY OPERATING INSTRUCTIONS COMMENCING 8 FEBRUARY 1975, UNTIL FURTHER NOTICE Miscellaneous Notices

More information

newspapers_ xls

newspapers_ xls NRS datasets in 2017 are a blend of NRS and AMP print data. Due to the different methodologies, the PAMCo Board have mandated that NRS and AMP data should not be compared for commercial or marketing purposes.

More information

Customer Profile Report for PLOUGH INN, GOOLE (Punch Outlet Number: ) SHEARBURN TERRACE, GOOLE, DN14 9JJ (DN14 9JJ)

Customer Profile Report for PLOUGH INN, GOOLE (Punch Outlet Number: ) SHEARBURN TERRACE, GOOLE, DN14 9JJ (DN14 9JJ) Customer Profile Report for PLOUGH INN, GOOLE (Punch Outlet Number: 200126) SHEARBURN TERRACE, GOOLE, DN14 9JJ (DN14 9JJ) Age Data Table Count: Index: 0.5 1.5 3.0 5.0 0.5 1.5 3.0 5.0 0-15 479 928 1,809

More information

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO

THE CORNERSTONE APARTMENTS TRAFFIC IMPACT STUDY R&M PROJECT NO THE CORNERSTONE APARTMENTS SITUATED AT N/E/C OF STAUDERMAN AVENUE AND FOREST AVENUE VILLAGE OF LYNBROOK NASSAU COUNTY, NEW YORK TRAFFIC IMPACT STUDY R&M PROJECT NO. 2018-089 September 2018 50 Elm Street,

More information

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

WORKING SAFELY NEXT TO WEST MIDLANDS METRO WORKING SAFELY NEXT TO WEST MIDLANDS METRO GUIDELINES FOR BUSINESSES, CONTRACTORS, EVENT ORGANISERS & OTHERS WORKING ON OR NEAR TO WEST MIDLANDS METRO. If you own, occupy a building or other assets near

More information

SCHEDULE OF DIMENSNSION. BY S.K.Bansal SPP/IRICEN

SCHEDULE OF DIMENSNSION. BY S.K.Bansal SPP/IRICEN SCHEDULE OF DIMENSNSION BY S.K.Bansal SPP/IRICEN Schedule of dimension is nothing but a schedule, which lays down :- Limiting values, recommended values, and infringement to limiting values, which can

More information

Your guide to public transport during the Sea Odyssey event in Liverpool April 2012

Your guide to public transport during the Sea Odyssey event in Liverpool April 2012 Your guide to public transport during the Sea Odyssey event in Liverpool 20-22 April 2012 The Sea Odyssey, Liverpool Changes to public transport On 20, 21 and 22 April 2012, the routes of many bus services

More information

CAMPUS CONNECTOR MONDAY - THURSDAY. bold italicized times denote p.m. Monday - Thursday continued on next page. Effective August 29th, 2016

CAMPUS CONNECTOR MONDAY - THURSDAY. bold italicized times denote p.m. Monday - Thursday continued on next page. Effective August 29th, 2016 50 ( only) CAMPUS CONNECTOR Bayberry North Shuttle & 48 North & South Shuttles 531 539 543 546 549 552 607 601 609 613 616 619 622 637 613 621 625 628 631 634 649 625 633 637 640 643 646 701 637 645 649

More information

Kippax & District Motor Company Ltd. - History Kippax & District Motor Company Ltd. - Bus Fleet List

Kippax & District Motor Company Ltd. - History Kippax & District Motor Company Ltd. - Bus Fleet List CONTENTS Kippax & District Motor Company Ltd. - History 1920-1968 Kippax & District Motor Company Ltd. - Bus Fleet List 1920-1968. Page 3 Page 7 Cover Illustration: No. 15 (GWX824) was a 1948 Leyland PD2/1

More information

Kirklees Pharmaceutical List June 2014

Kirklees Pharmaceutical List June 2014 NHS England West Yorkshire Area Team Primary Care Support 2-8 Brunswic Court, Bridge Street LEEDS, LS2 7RJ Email address - enquires@wycsa.nhs.uk Telephone Number - 0113 2952500 Fax Number - 0113 2952555

More information

The Picton/Mittagong line was opened in March 1867 as part of the Main South line.

The Picton/Mittagong line was opened in March 1867 as part of the Main South line. Read below as Bob Newham, Loco Division Passenger Organiser, explores some of the incredible history behind rail in New South Wales. As you will discover, the month of March has many stories to tell March

More information

INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS

INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS (PRIVATE and not for Publication) F.S. 101/2 fastline simulation AGES OF THE TRAIN 01 ECML FREIGHT 1973-1986 INSTRUCTIONS FOR INSTALLATION AND USE OF A SCENARIO PACK FOR RAILWORKS This book is for the

More information

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be

More information

LONDON BUSES - ROUTE DESCRIPTION

LONDON BUSES - ROUTE DESCRIPTION LONDON BUSES - ROUTE DESCRIPTION Printed On: 26 October 2011 16:30:05 ROUTE 8: Bow - Oxford Circus Date of Structural Change: 20 September 2011. Date of Service Change: 20 September 2011. Reason for Issue:

More information

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS

Photography BGORUG NEWS RELEASE RAIL DISRUPTION TO CONTINUE AS ELECTRIFICATION PROJECT OVERRUNS BARKING GOSPEL OAK RAIL USER GROUP F O U N D E D 1 9 6 4 Chair: Graham Larkbey Secretary: Glenn Wallis (020) 8529 2361; 07789 791224 www.barking-gospeloak.org.uk info@barking-gospeloak.org.uk @RidingtheGoblin

More information

Preparation works for Junior Great North Run changes in week prior to the main event Monday 4 to Friday 8 September 2017.

Preparation works for Junior Great North Run changes in week prior to the main event Monday 4 to Friday 8 September 2017. Preparation works for Junior Great North Run changes in week prior to the main event Monday 4 to Friday 8 September 2017. (Friday Only) Buses will be unable to serve South Shore Road between Mill Road

More information

Class 142 Diesel Multiple Unit

Class 142 Diesel Multiple Unit Class 142 Diesel Multiple Unit Contents How to install... 2 Technical information... 3 Liveries... 4 Cab guide... 12 Keyboard controls... 13 Features... 14 Manual destination blind... 15 Electronic destination

More information

A Guide to Key Railroad Terminology for the Northeast Corridor

A Guide to Key Railroad Terminology for the Northeast Corridor A Guide to Key Railroad Terminology for the Northeast Corridor Index of terms Approach signal, 8 Diverging route, 5 Ladder, 6 Section break, 12, 13 Tie replacement, 7 Ballast, 3, 4, 7 Double slip switch,

More information

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment APPENDIX Q SUBWAY OPERATIONS REPORT Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

More information

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES 903-1. General definitions. 903-2. Specific definitions 903-3. Interpretation. 903-4. Use and display of permit. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES ARTICLE I On-Street and Off-Street Parking

More information

Northwich - grouting using 1,000,000 tonnes of conditioned PFA from Drax Power Station

Northwich - grouting using 1,000,000 tonnes of conditioned PFA from Drax Power Station 2007 World of Coal Ash (WOCA), May 7-10, 2007, Northern Kentucky, USA http://www.flyash.info Northwich - grouting using 1,000,000 tonnes of conditioned PFA from Drax Power Station Peter Brennan Hargreaves

More information

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS (revised July 2005) (amended April 2012) REFERENCE DOCUMENTS These Regulations should be read in conjunction with the following

More information

Day of Open Evening 2018

Day of Open Evening 2018 Day of Open Evening 2018 University Website link Thursday 26th April Aberystwyth University Online Open Day https://www.ucas.com/events/aberystwyth university online open day 332771 Tuesday 10th July Aberystwyth

More information

MODEL RAILWAYS ON-LINE STAFFORD. Constructed by Harry Howell. Photographed and described by Paul Plowman

MODEL RAILWAYS ON-LINE STAFFORD. Constructed by Harry Howell. Photographed and described by Paul Plowman MODEL RAILWAYS ON-LINE STAFFORD Constructed by Harry Howell Photographed and described by Paul Plowman 2 MODEL RAILWAYS ON-LINE STAFFORD A large 00 gauge layout based on the West Coast Main Line This magnificent

More information

BUS SERVICES IN CHAMBERLAYNE ROAD NW10

BUS SERVICES IN CHAMBERLAYNE ROAD NW10 INTRODUCTION BUS SERVICES IN CHAMBERLAYNE ROAD NW10 1 LONDON BUSES 1. This note reviews the issues in Chamberlayne Road, Kensal Rise. It covers the range of bus routes in the area, their characteristics

More information

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue

Section E MOVEMENT OF FREIGHT TRAINS. Contents. Latest Issue Section E MOVEMENT OF FREIGHT TRAINS Contents Page Latest Issue Contents E1 E1 Authorised Vehicles E2 E2 Loads for which Special E3 Conditions have to be Applied E3 Vehicles Equipped with E6 Changeover

More information

TECHNICAL MEMORANDUM. Part A: Introduction

TECHNICAL MEMORANDUM. Part A: Introduction TECHNICAL MEMORANDUM To: David J. Decker Decker Properties, Inc. 5950 Seminole Centre Ct. Suite 200 Madison, Wisconsin 53711 608-663-1218 Fax: 608-663-1226 www.klengineering.com From: Mike Scarmon, P.E.,

More information

Day of Open Evening 2018 Monday 3rd April Kendal College Open Day Event college open day event

Day of Open Evening 2018 Monday 3rd April Kendal College Open Day Event   college open day event Day of Open Evening 2018 University Website link Monday 3rd April Kendal College Open Day Event https://www.ucas.com/events/kendal college open day event 332936 Wednesday 25th April Sparsholt College Hampshire

More information

M60/M62 smart motorways

M60/M62 smart motorways Public information exhibition Highways England creative N150128 Welcome We re improving the M60 between junction 8 (Carrington Spur) and M62 junction 20 (Rochdale and Oldham). The M60 and M62 are vital

More information

LOUIS BERGER POWER JANUARY - DECEMBER 2016

LOUIS BERGER POWER JANUARY - DECEMBER 2016 LOUIS BERGER POWER JANUARY - DECEMBER 2016 Solutions for a better world power.louisberger.com RAPID AND RELIABLE TURNKEY POWER SOLUTIONS WORLDWIDE Liberia Electricity Corporation 10 MW power plant. February

More information

Preparation and movement of trains

Preparation and movement of trains GERT8000-TW1 Rule Book Uncontrolled When Printed Preparation and movement of trains Issue 11 Module TW1 September 2016 Comes into force 03 December 2016 Published by: RSSB The authoritative version of

More information

Bankstown to Panania & East Hills

Bankstown to Panania & East Hills Bus Route Numbers 923 924 Bankstown to Panania via Revesby and Picnic Point Services operates seven days a week Bankstown to East Hills via Revesby and Panania Services operates seven days a week Look

More information

CITY OF HAMILTON BY-LAW NO To Amend By-law No , as amended, Being a By-law To Regulate On-Street Parking

CITY OF HAMILTON BY-LAW NO To Amend By-law No , as amended, Being a By-law To Regulate On-Street Parking Authority: Item 14, Committee of the Whole Report 01-003 (FCS01007) CM: February 6, 2001 Wards: 1, 2, 3, 4, 6, 7, 8, 10, 11, 12, 13, 15 Bill No. 007 CITY OF HAMILTON BY-LAW NO. 18-007 To Amend By-law No.

More information

Train Order System - Rules 1 to 37

Train Order System - Rules 1 to 37 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 1 01 July 2018 Australian Rail Track Corporation Limited (ARTC)

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

Arts House/ Victoria Theatre/ Victoria Concert Hall/ Asian Civilisations Museum GENERAL ROAD CLOSURE AND TRAFFIC DIVERSION PLANS

Arts House/ Victoria Theatre/ Victoria Concert Hall/ Asian Civilisations Museum GENERAL ROAD CLOSURE AND TRAFFIC DIVERSION PLANS Arts House/ Victoria Theatre/ Victoria Concert Hall/ Asian Civilisations Museum GENERAL ROAD CLOSURE AND TRAFFIC DIVERSION PLANS 1) General road closure and traffic diversion plan (Coleman Street, Supreme

More information

The Belt Railway Company of Chicago CORA Guide Revision

The Belt Railway Company of Chicago CORA Guide Revision BRC CORA Guide Revision No. 4 July 19, 2013 Page 1 of 14 The Belt Railway Company of Chicago CORA Guide Revision BRC CORA Guide Revision No. 4 Date: July 21, 2013 Belt Railway Company of Chicago CORA Guide

More information

Rule Book, Section 1 Revised June 26, 2011

Rule Book, Section 1 Revised June 26, 2011 February 2012 Rule Book, Section 1 Revised June 26, 2011 UTA TRAX Pre-Test Study Guide TRAX personnel must be able to communicate clearly in English and understand the specialized language of our business.

More information

Connecticut PHONE: (860) :00 A.M.-12:30 P.M. 1:00 A.M.- 3:15 P.M. EASTERN TIME. Legal Limits. Connecticut

Connecticut PHONE: (860) :00 A.M.-12:30 P.M. 1:00 A.M.- 3:15 P.M. EASTERN TIME. Legal Limits. Connecticut CT Connecticut Connecticut Bureau of Highway Operations Oversize/Overweight Permits P.O. Box 317546 Newington, Connecticut 06131-7546 PHONE: (860) 594-2880 HOURS: 8:00 A.M.-12:30 P.M. 1:00 A.M.- 3:15 P.M.

More information

BETHLEHEM MISSIONS TRUST CAMPUS

BETHLEHEM MISSIONS TRUST CAMPUS BETHLEHEM MISSIONS TRUST CAMPUS Prepared For: Prepared By: Wasley Knell Consultants PO Box 5015, Mount Maunganui, 3150 BruceWRobinson@msn.com/(027) 4515685 Table of Contents Introduction... 3 Site Vicinity...

More information

Scooter Policy A guide to accessing our trains with a mobility scooter

Scooter Policy A guide to accessing our trains with a mobility scooter A guide to accessing our trains with a mobility scooter Introduction TransPennine Express (TPE) is operated by FirstGroup PLC. We provide Intercity rail services connecting key Northern cities and towns

More information

Shepparton - Katamatite

Shepparton - Katamatite Shepparton - Katamatite KIA ORA INDUSTRIES (CAMPBELL S SOUP) SIDING (115 MILES 51 CHAINS) 23.11.1961 Siding opened for traffic for Kia Ora Industries (Campbell s Soups (Aust) Pty Ltd). Siding situated

More information

Ballast Usually stone chippings, or similar material, which support the sleepers and hold them in place on the ground.

Ballast Usually stone chippings, or similar material, which support the sleepers and hold them in place on the ground. Model Rail Terminology Alternating Current/AC The electric current that flows alternately through each wire in a rapid sequence called a cycle. The normal mains electricity supply is powered by Alternating

More information

Series published by Wild Swan Publications Ltd., 1-3 Hagbourne Road, Didcot, Oxon, OX11 8DP Tel:

Series published by Wild Swan Publications Ltd., 1-3 Hagbourne Road, Didcot, Oxon, OX11 8DP Tel: LMS JOURNAL INDEX for issues 0-4 (first five issues) Series published by Wild Swan Publications Ltd., 1-3 Hagbourne Road, Didcot, Oxon, OX11 8DP Tel: 01235 816478 No. ISBN Ref. Date Pub. Notes Cover colour

More information

A route for Train Simulator 2012

A route for Train Simulator 2012 A route for Train Simulator 2012 Contents 2. Details of the route and how it will progress. 3. A Brief history of the route. 3. Route requirements 4. Scenarios The Pilot Episode Alternative Arrangements

More information