Capital Expenditure Forecast (CEF09-1)

Size: px
Start display at page:

Download "Capital Expenditure Forecast (CEF09-1)"

Transcription

1 November 2009 Capital Expenditure Forecast (CEF09-1) 2009/ /20 Corporate Controller Division Finance & Administration

2

3 Foreword The Capital Expenditure Forecast (CEF09-1) is a projection of Manitoba Hydro s capital expenditures for new and replacement facilities to meet the electricity and natural gas service requirements in the Province of Manitoba as well as expenditures required to meet firm sale commitments outside the province. Expenditures included in the Capital Expenditure Forecast will provide for an ongoing safe and reliable supply of energy in the most efficient and environmentally sensitive manner. The Capital Expenditure Forecast is comprised of a number of specifically identified large projects or major items as well as numerous unspecified smaller projects referred to as domestic items. Major items are normally over $2 million in total cost and the construction period on each major item usually extends beyond one year. Domestic items typically represent the ongoing and recurring capital requirements to meet electricity and natural gas service replacements and expansions throughout the province. All major and domestic capital projects are subjected to a rigorous review and approval process before being included in the Capital Expenditure Forecast. In constructing and maintaining its capital facilities, Manitoba Hydro adheres to the principles of sustainable development. For example, the Corporation is committed to reduce the net emissions from its own facilities and to contribute towards global emission reductions through the export of renewable electricity. Manitoba Hydro exceeded its past voluntary commitment to reduce its average net greenhouse gas (GHG) emissions from 1991 to 2007 to 6% below 1990 levels. Manitoba Hydro also has a separate contractual commitment under its participation in the Chicago Climate Exchange (CCX) to progressively reduce its generation related emissions until The Corporation is in full compliance with the CCX target. Manitoba Hydro has one of the most aggressive Demand Side Management (DSM) programs in North America. The target to be achieved by 2025 is for electrical savings of 915 MW and 3,271 GWh, and natural gas savings of 172 million cubic meters. In total, Manitoba Hydro s DSM programs are expected to result in greenhouse gas emission reductions of nearly 2.5 million tonnes annually by 2025.

4

5 Manitoba Hydro Table of Contents 1.0 Overview Capital Expenditure Forecast Summary....1 Comparison to CEF-08 1 Capital Expenditure Forecast Summary Table Project Summaries ELECTRIC OPERATIONS: MAJOR NEW GENERATION & TRANSMISSION:... 8 Wuskwatim - Generation... 8 Wuskwatim - Transmission... 8 Herblet Lake - The Pas 230 kv Transmission... 9 Keeyask - Generation... 9 Conawapa - Generation Kelsey Improvements & Upgrades Kettle Improvements & Upgrades Pointe du Bois Improvements & Upgrades Pointe du Bois - Transmission Bipole Riel 230/500 kv Station Firm Import Upgrades Dorsey - US Border New 500kV Transmission Line Brandon Combustion Turbine Pipeline Upgrade Demand Side Management Planning Study Costs NEW HEAD OFFICE: CORPORATE RELATIONS: Waterways Management Program POWER SUPPLY: HVDC Facilities: Converter Transformer Bushing Replacement Bipole 1 & 2 Electrode Line Monitoring Dorsey Synchronous Condenser Refurbishment HVDC Bipole 1 Roof Replacement HVDC System Transformer & Reactor Fire Protection & Prevention HVDC AC Filter PCB Capacitor Replacement HVDC Transformer Replacement Program Dorsey 230 kv Relay Building Upgrade HVDC Stations Ground Grid Refurbishment HVDC Bipole kv HLR Circuit Breaker Replacement HVDC Bipole 1 Pole Differential Protection HVDC Bipole 1 By-Pass Vacuum Switch Removal HVDC Bipole 2 Refrigerant Condenser Replacement HVDC Bipole 1 Smoothing Reactor Replacement HVDC Bipole 1 Converter Station, P1 & P2 Battery Bank Separation... 24

6 Manitoba Hydro HVDC Bipole 1 DCCT Transductor Replacement HVDC BP1 & BP2 DC Converter Transformer Bushing Replacements HVDC Bipole 2 Valve Hall Wall Bushing Replacements HVDC Bipole 1 CQ Disconnect Replacement HVDC Bipole 2 Thyristor Module Cooling Refurbishment HVDC Bipole 2 Smoothing Reactor Replacement HVDC Bipole 1 Transformer Marshalling Kiosk Replacement Hydraulic Rehabilitation: Pine Falls Rehabilitation Jenpeg Unit Overhauls Power Supply Dam Safety Upgrades Winnipeg River Riverbank Protection Program Power Supply Hydraulic Controls Slave Falls Rehabilitation Great Falls Unit 4 Overhaul Great Falls 115 kv Indoor Station Safety Improvements Generation South Transformer Refurbish & Spares Water Licenses & Renewals Generation South PCB Regulation Compliance Kettle Transformer Overhaul Program Generation South Breaker Replacements Seven Sisters Upgrades Generation South Excitation Upgrades Thermal Rehabilitation: Brandon Unit 5 License Review Selkirk Enhancements Other Power Supply: Laurie River/CRD Communications and Annunciation Upgrades Notigi Marine Vessel Replacement & Infrastructure Improvements Fire Protection Projects - HVDC Halon Replacement Project Power Supply Fall Protection Program Oil Containment Power Supply Grand Rapids Townsite House Renovations Grand Rapids Fish Hatchery Generation Townsite Infrastructure Site Remediation of Contaminated Corporate Facilities High Voltage Test Facility Power Supply Security Installations / Upgrades Power Supply Sewer & Domestic Water System Install and Upgrade Power Supply Domestic TRANSMISSION: Winnipeg - Brandon Transmission System Improvements Transcona East kv Station Neepawa kv Station Pine Falls Bloodvein 115 kv Transmission Line Transmission Line Re-Rating St Vital - Steinbach 230 kv Transmission Rosser Station kv Bank 3 Replacement Rosser - Inkster 115 kv Transmission... 47

7 Manitoba Hydro Transcona Station 66 kv Breaker Replacement Transcona & Ridgeway Stations 66 kv Bus Upgrades Dorsey 500 kv R502 Breaker Replacement kV Shunt Reactor Replacements Birtle South - Rossburn 66 kv Line Stanley Station kv Transformer Addition Stanley Station kv Hot Standby Installation Ashern Station 230 kv Shunt Reactor Replacement Tadoule Lake DGS Diesel Tank Farm Upgrade Interlake Digital Microwave Replacement Communication System - Southern MB (Great Plains) Communications Upgrade Winnipeg Area Pilot Wire Replacement Transmission Line Protection & Teleprotection Replacement Winnipeg Central Protection Wireline Replacement Mobile Radio System Modernization Cyber Security Systems Site Remediation Oil Containment Station Battery Bank Capacity & System Reliability Increase Red River Floodway Expansion Project Waverley Service Centre Oil Tank Farm Replacement Transmission Domestic CUSTOMER SERVICE & DISTRIBUTION: Winnipeg Distribution Infrastructure Requirements Defective RINJ Cable Replacement Brereton Lake Station Area Stony Mountain New kv Station Rover Substation Replace 4 kv Switchgear Martin New Outdoor Station Frobisher Station Upgrade Burrows New 66 kv-12 kv Station Winnipeg Central District Oil Switch Project William New 66 kv-12 kv Station Waverley West Sub Division Supply - Stage St. James 24 kv System Refurbishment Shoal Lake New kv DSC York Station Cromer Station Capacity and Reston RE kv Conversion Brandon Crocus Plains kv Bank Addition Winkler Market Feeder M25-13 Conversion Neepawa North Feeder NN12-2 & Line 57 Rebuild Perimeter South Station Distribution Supply Centre Installation Niverville Station kv Bank Replacements Winnipeg Central District Underground Network Asbestos Removal Gas SCADA Replacement Customer Service & Distribution Domestic... 71

8 Manitoba Hydro CUSTOMER CARE & MARKETING: Advanced Metering Infrastructure Customer Care & Marketing Domestic FINANCE & ADMINISTRATION: Corporate Buildings Workforce Management (Phase 1 to 4) Fleet Finance & Administration Domestic CUSTOMER SERVICE & DISTRIBUTION: Customer Service & Distribution Domestic CUSTOMER CARE & MARKETING: Advanced Metering Infrastructure Demand Side Management Customer Care & Marketing Domestic... 77

9 Section 1 Overview Capital Expenditure Forecast Summary Comparison to CEF-08 Capital Expenditure Forecast Summary Table

10

11 Manitoba Hydro Overview Capital Expenditure Forecast Summary This totals $ million for the 11 year period to 2019/20. Expenditures for Major New Generation & Transmission and the New Head Office total $ million, with the balance of $4 717 million comprised of expenditures for infrastructure renewal, system safety and security, new and increasing load requirements, and efficiency improvements. Comparison to CEF08 The Capital Expenditure Forecast (CEF09) for the ten year period ending 2018/19 totals $ million compared to $ million for the same ten year period included in last year s Capital Expenditure Forecast (CEF08) Year Total CEF Increase (Decrease) (144) (42) (99) (107) (18) (74) (287) (169) CEF The decrease of $169 million in capital expenditures over the ten year forecast period is comprised of the following: 10 Year Increase Keeyask Generating Station $ 792 Demand Side Management - Electric kv Shunt Reactor Replacements System Refurbishment and Other Projects (224) Conawapa Generating Station Pointe du Bois Improvements & Upgrades (500) Target Adjustment (511) $ (169)

12 Manitoba Hydro 2 New energy resources are required to meet forecasted domestic requirements by 2022/23. Some of the key assumptions underlying future spending on new generation and transmission include: The in-service date (ISD) of the Wuskwatim Generating Station will be September Kelsey generating station to be upgraded by 77 MW by 2012/13. Bipole 3 is assumed to follow a route west of the Interlake and this route will require MW of converters to operate, with an in-service date of October Manitoba Hydro has signed term sheets with Northern States Power (NSP) for 375/500 MW starting in 2015, Wisconsin Public Service (WPS) for 500 MW starting in 2018, and Minnesota Power (MP) for 250 MW starting in 2022 (for firm power). Keeyask and Conawapa are necessary to meet domestic load requirements and export sales commitments and have first power in-service dates of December 2018 and May 2022, respectively. Projected Consolidated Capital Expenditures millions of dollars IFF08-1 IFF09-1 $2 400 $2 000 $1 600 $1 200 $800 $400 $ Fiscal Year Ending The following table provides a listing of each capital project with a forecast of expenditures for each year to 2019/20. The subsequent section provides high-level descriptions of each capital project with brief justifications and comparisons to the previously approved capital expenditure forecast.

13 Manitoba Hydro 3

14 Manitoba Hydro 4

15 Manitoba Hydro 5

16 Manitoba Hydro 6

17 Manitoba Hydro 7

18

19 Section 2 Project Summaries Electric Major New Generation & Transmission New Head Office Corporate Relations Power Supply Transmission Customer Service & Distribution Customer Care & Marketing Finance & Administration Gas Customer Service & Distribution Customer Care & Marketing

20

21 Manitoba Hydro 8 ELECTRIC OPERATIONS: MAJOR NEW GENERATION & TRANSMISSION: Wuskwatim - Generation Design and build the new Wuskwatim Generating Station with three generators and installed capacity of approximately 200 MW on the Burntwood River upstream of Thompson. This project increases generation for both export power purposes and domestic load requirements. First power September Previously Approved $ $ $ $ $ 20.8 $ - $ - Increase (Decrease) (21.7) (8.7) - - Revised Forecast $ $ $ $ $ 12.1 $ - $ - Wuskwatim - Transmission Design and build the associated transmission facilities necessary to integrate the Wuskwatim Generation Station into the Manitoba Hydro 230 kv transmission network. The existing 230 kv transission system in Northern Manitoba does not have sufficient capacity to accommodate the additional output of the Wuskwatim Generating Station. This project will increase the ability of the transmission system to carry the full output of Wuskwatim to load anywhere in Manitoba. September Previously Approved $ $ 52.5 $ 32.2 $ 15.5 $ 0.9 $ - $ - Increase (Decrease) (1.7) 3.4 (0.9) - - Revised Forecast $ $ 90.1 $ 30.5 $ 18.9 $ - $ - $ -

22 Manitoba Hydro 9 Herblet Lake - The Pas 230 kv Transmission Perform environmental assessments and route selection, design and construct transmission and terminal facilities to provide firm supply to Flin Flon Cliff Lake and The Pas Ralls Island as follows: Transmission: 230 kv line 160 km from Herblet Lake to The Pas Ralls Island. Terminations: Extend 230 kv facilities at Herblet Lake and The Pas Ralls Island stations. Communications: Upgrade and co-ordinate with existing Herblet Lake and The Pas facilities. The line is required to provide firm supply and voltage support for increasing Flin Flon and The Pas area loads. In addition, this line facilitates the transmission of power from the Wuskwatim Generating Station. September Previously Approved $ 93.2 $ 39.3 $ 29.0 $ 4.2 $ - $ - $ - Increase (Decrease) Revised Forecast $ 93.2 $ 41.9 $ 30.4 $ 7.2 $ 1.9 $ - $ - Keeyask - Generation Design and build the Keeyask Generating Station with seven generators and installed capacity of approximately 630 MW on the Nelson River downstream of Thompson. Project costs include activities necessary to obtain approval and community support to proceed with the construction of the future generating station. The estimate is comprised of costs associated with extensive First Nations and other community consultations, pre-project training, joint venture business developments, environmental studies, impact statement preparations, submissions, regulatory review processes, detailed pre-engineering requirements, acquiring all necessary licensing, the design and construction of associated transmission facilities, and improvements to access roadways. This project increases generation for export power purposes and ultimately domestic load requirements. First power December Estimate updated to reflect the acquisition of all necessary licensing, the design and construction of associated transmission facilities, and improvements to access roadways. Previously Approved $ $ 25.9 $ 33.1 $ 36.1 $ 64.3 $ $ Increase (Decrease) (38.0) Revised Forecast $ $ 67.7 $ 85.0 $ $ $ $

23 Manitoba Hydro 10 Conawapa - Generation Design and build the Conawapa Generating Station with ten generators and installed capacity of approximately 1,300 MW on the Nelson River downstream from Thompson. Project costs include activities associated with extensive First Nations and other community consultations, pre-project training, environmental studies, impact statement preparations, submissions, regulatory review processes, acquiring all necessary licensing, improvements to access roadways, and detailed pre-engineering required to obtain a license and all necessary approvals to construct the Conawapa Generating Station. This project increases generation for both export power purposes and domestic load requirements. First power May Estimate updated to reflect current market conditions along with the addition of access roadway improvements. Previously Approved $ $ 60.5 $ 60.7 $ 57.7 $ 62.3 $ 67.7 $ Increase (Decrease) (0.1) (0.3) (634.3) Revised Forecast $ $ 60.4 $ 60.4 $ 75.0 $ $ $ Kelsey Improvements & Upgrades Overhaul and uprate all Kelsey generating station units (1-7) including the replacement of turbine runners, bottom rings, discharge rings or weld overlays, transformers, generator windings and exciters. Perform model testing to refine runner design, perform unit 1 to 7 draft tube modifications, perform unit 1 to 5 intake gate rehabilitation, and upgrade rail spur and overhead crane. Upgrade transmission facilities necessary to integrate the additional Kelsey generation into the Manitoba Hydro system network. Rerunnering presents the best economic solution for increasing efficiency at the Kelsey Generating Station and for adding system capacity without flooding or requiring a new water power license. Overhauling the units will improve the unit output by up to 11 MW per unit. The transmission upgrade of a portion of the Kelsey 138 and 230 kv buses and the revisions to the Northern AC Cross Trip scheme are required to accommodate the 77 MW of additional Kelsey output. March Previously Approved $ $ 45.8 $ 7.4 $ 0.3 $ - $ - $ - Increase (Decrease) - (0.7) (0.6) Revised Forecast $ $ 45.1 $ 6.8 $ 0.5 $ - $ - $ -

24 Manitoba Hydro 11 Kettle Improvements & Upgrades Rewind stator for units 5-12, and install a new stator frame, core and winding for unit 4. The stator windings at Kettle are polyester bonded mica which is prone to internal degradation as a result of thermal and electrical stresses. There has been a much higher failure rate for stator coils at Kettle than in any of our other generators installed since Analysis of the internal conditions of the insulation system is ongoing. Re-wedging units at Kettle is an opportunity to repair isolated cases of severe slot discharge, necessary to avoid deterioration. Unit 4 requires repairs due to an incident that occurred in August 2006, where a top clamping finger on the unit broke off and fell into the air gap causing extensive damage to the windings and core. October Previously Approved $ 75.6 $ 7.0 $ 7.3 $ 6.4 $ 6.0 $ 3.8 $ 28.0 Increase (Decrease) (28.0) Revised Forecast $ 75.6 $ 11.1 $ 18.4 $ 6.6 $ 20.1 $ 18.6 $ - Pointe du Bois Improvements & Upgrades Design and build a spillway and earth fill dam to replace the existing spillway structures. Includes engineering and environmental studies, community consultation, obtaining regulatory approval, construction and de-commissioning the existing spillway. Pointe du Bois does not currently meet Dam Safety guidelines with respect to spillway capacity. A new spillway is required to meet these guidelines. October Project estimate decreased $500.0 million to reflect scope change to exclude the construction of a new four unit powerhouse, and in-service date advanced three years from October Previously Approved $ $ 13.8 $ 14.8 $ 15.5 $ 91.5 $ $ Increase (Decrease) (500.0) (38.5) (58.0) (403.8) Revised Forecast $ $ 13.8 $ 14.8 $ 15.5 $ 53.0 $ 83.1 $ 110.7

25 Manitoba Hydro 12 Pointe du Bois - Transmission Install 17 kms of single circuit 115 kv transmission line with 795 ACSR conductor between Rover and the intersection of GT1/ST2 and the transmission right-of-way near the floodway. Install 43 kms of single circuit 115 kv transmission line with 795 ACSR conductor between Pointe du Bois and GT1/ST2 transmission line south of Lac du Bonnet. The estimate is based on the utilization of the previously vacated transmission line corridor from Pointe du Bois to GT1-ST2 transmission line south of Lac du Bonnet and from Ridgeway station to Rover station. Install a second communications link from Pointe and Slave to the System Control Center. To address aging infrastructure concerns with the existing 66 kv P Lines, provide adequate outlet transmission for future Pointe du Bois generating station expansion, and to integrate the Winnipeg Central System into the Manitoba Hydro System. May Previously Approved $ 85.9 $ 19.1 $ 12.5 $ 13.2 $ 16.4 $ 13.0 $ 2.8 Increase (Decrease) - (10.1) 13.8 (2.8) Revised Forecast $ 85.9 $ 9.0 $ 26.3 $ 10.4 $ 20.6 $ 13.9 $ 3.1 Bipole 3 Design and build a transmission line (west of Lakes Winnipegosis & Manitoba), conduct environmental impact assessments, select route, acquire property for right of way, and obtain licensing for Riel Station, a +/- 500 kv DC transmission line from proposed line paralleling site near Radisson and proposed Riel Station, and a 230 kv AC line from Riel Station to Dorsey Station (normally operated at +/- 500 kv DC). Design and build an HVDC transmission line from Riel Converter Station (CS) to Conawapa CS; a converter station with 2000 MW of converters at Conawapa; six AC transmission lines approximately 30 kms long to connect the Conawapa converter station to the Henday converter station; and a converter station with 2000 MW of converters at Riel, including three synchronous compensators. Provides increased reliability to the Manitoba Hydro system due to the critical risk to the Province and the Corporation of not mitigating an Interlake (Bipole 1 and 2) corridor outage or a Dorsey station common mode outage. In normal steady state operation, it will also provide an increase in southern power at full load, due to decreased line losses (approximately 78 MW). October Previously Approved $ $ 16.6 $ 21.4 $ 36.7 $ $ $ Increase (Decrease) (8.7) Revised Forecast $ $ 16.6 $ 21.4 $ 36.7 $ $ $

26 Manitoba Hydro 13 Riel 230/500 kv Station Sectionalize Dorsey to the United States 500 kv transmission line D602F at Riel (on the southeast side of Winnipeg), and establish a station including a 230 and 500 kv ring bus, the installation of a 230/ 500 kv transformer bank, and line reactors salvaged from Dorsey 500 kv Station. The sectionalization of the 500 kv line allows power to be imported during a catastrophic Dorsey outage, as well as an alternate path for power export during a Dorsey transformer outage. May Previously Approved $ $ 30.7 $ 68.8 $ 75.7 $ 43.5 $ 36.4 $ 4.7 Increase (Decrease) (10.4) (0.1) Revised Forecast $ $ 36.1 $ 58.4 $ 79.6 $ 45.1 $ 38.2 $ 4.6 Firm Import Upgrades Reconductor and resag transmission lines R23R, WT34, HS5 and SM26, and replace risers and current transformers for stations at Rosser, Ridgeway, Great Falls, Transcona, Mercy St., and Parkdale. This project will improve Manitoba Hydro s firm import capability during periods when we are expected to be energy deficient. March Previously Approved $ 4.8 $ 0.4 $ 2.1 $ 2.1 $ - $ - $ - Increase (Decrease) Revised Forecast $ 4.8 $ 0.6 $ 2.1 $ 2.1 $ - $ - $ -

27 Manitoba Hydro 14 Dorsey - US Border New 500kV Transmission Line Design and build a 63 KM 500 kv transmission line between Riel station and Dorsey station, and a 125 KM 500 kv transmission line between Dorsey station and the U.S. border. Acquire property for right-of-way, conduct environmental impact assessment, conduct community consultations, obtain licensing and perform environmental monitoring for all facilities. Manitoba Hydro has received transmission service requests for more than 750 MW of new import and export service between the U.S. and Manitoba. Term sheets have been signed for a potential 500 MW power sale to Wisconsin and a 250 MW power sale to Minnesota. These additional power sales require the construction of a new high voltage tieline between Manitoba and the U.S. May Previously Approved $ $ - $ - $ 0.8 $ 1.8 $ 10.7 $ Increase (Decrease) (14.9) Revised Forecast $ $ - $ 0.5 $ 1.9 $ 8.2 $ 17.6 $ Brandon Combustion Turbine Pipeline Upgrade Install 11,403 meters of 12 steel transmission pressure pipeline and one control point valve assembly to assist in supplying the Brandon thermal generating station natural gas turbines. In order to meet Manitoba Hydro s contractual obligation to KOCH Fertilizer Canada Ltd., as well as the firm service agreement with the Brandon thermal generating station, it is necessary to construct an additional 11,403 meters of 12 pipeline for supply to the Brandon thermal generating station natural gas turbines. October Previously Approved $ 5.5 $ 5.2 $ - $ - $ - $ - $ - Increase (Decrease) (0.1) Revised Forecast $ 5.4 $ 5.4 $ - $ - $ - $ - $ -

28 Manitoba Hydro 15 Demand Side Management Design, implement and deliver incentive based PowerSmart conservation programs to reduce electricity consumption in Manitoba. When combined with savings realized to-date, total electricity savings of 915 MW and 3,271 GWh are expected to be achieved by The electricity Demand Side Management plan is cost effective as a resource option and is included in Manitoba Hydro s Power Resource Plan. Provides customers with exceptional value through the implementation of costeffective energy conservation programs that are designed to minimize the total cost of energy services to customers, position the Corporation as a national leader in implementing cost-effective energy conservation and alternative energy programs, and by protecting the environment and promoting sustainable energy supply and service. Ongoing. The increase in total expenditures is primarily due to the addition of the Industrial Emergency Preparedness Program, revisions to the Performance Optimization and BioEnergy Optimization Programs resulting in higher program costs, an increase in contingency dollars and the inclusion of another year of expenditures in 2019/20. Previously Approved NA $ 34.6 $ 33.3 $ 31.8 $ 29.4 $ 26.0 $ Increase (Decrease) Revised Forecast $ 40.3 $ 43.0 $ 42.5 $ 38.4 $ 33.9 $ Planning Study Costs Perform assessments, create conceptual designs and planning studies of potential supply options and associated transmission facilities. Areas of study include establishment of design parameters, structure layouts, support facilities, hydraulic model testing, exploration, data collection, environmental assessments and public input, schedules, and cost estimates. To plan for the orderly development of new sources of generation and related transmission facilities, and to explore supply-side efficiency improvements. Ongoing. Ongoing. Previously Approved NA $ 5.9 $ 4.7 $ - $ - $ - $ - Increase (Decrease) (0.2) Revised Forecast $ 5.7 $ 8.0 $ 1.9 $ - $ - $ -

29 Manitoba Hydro 16 NEW HEAD OFFICE: Construction of a 695,742 square foot 22 storey Head Office in downtown Winnipeg. A new Head Office location is required to consolidate approximately 2,000 staff including management and administrative functions of Manitoba Hydro in a modern, centralized location. May Previously Approved $ $ - $ - $ - $ - $ - $ - Increase (Decrease) Revised Forecast $ $ 14.8 $ - $ - $ - $ - $ - CORPORATE RELATIONS: Waterways Management Program Waterways management at Grand Rapids and Lake Winnipeg Regulation / Churchill River Diversion. The Waterways Management Program (WMP) includes activities related to boat patrols, debris clearing, and supplementary works and is required to ensure ongoing safety and environmental management of waterways. Ongoing. Previously Approved NA $ 5.3 $ 5.5 $ - $ - $ - $ - Increase (Decrease) - (0.1) Revised Forecast $ 5.3 $ 5.4 $ - $ - $ - $ -

30 Manitoba Hydro 17 POWER SUPPLY: Converter Transformer Bushing Replacement Replace converter transformer bushings with NGK bushings, and purchase spares as follows: at Dorsey replace six 230 kv AC, and six 25 kv tertiary bushings; and at Radisson/ Henday replace five 138 kv, two 150 kv, four 230 kv, and three 15 kv tertiary bushings, and purchase two 300 kv and two 450 kv spares. The bushing replacement program was undertaken due to failure of a 230 kv bushing in Dorsey T21 A-phase converter transformer that resulted in costly repairs to the transformer, and loss of revenue due to the outage. Also during the repair of the Dorsey T31S converter transformer in Pauwel's Canada plant, two out of two 230 kv bushings that were tested failed at far below the full test voltage. The manufacturer s expected service life is 25 years. These bushings have all been in-service more than 19 years. Replacement cost is justified when compared to transformer damage due to an in-service failure. October Cost flow revision, and in-service date deferred 12 months from October Previously Approved $ 5.9 $ 1.3 $ 1.0 $ - $ - $ - $ - Increase (Decrease) - (1.2) (0.6) Revised Forecast $ 5.9 $ 0.1 $ 0.4 $ 1.9 $ - $ - $ - Bipole 1 & 2 Electrode Line Monitoring Install a Siemens pulse-echo electrode line fault detection system on Dorsey Bipole 1 and 2, Radisson Bipole 1, and Henday Bipole 2 Electrode lines. There is a need for detection of open circuit, faulted, or partially down electrode line conductors based on public safety concerns, possible damage to equipment, and the security of Bipole 1 and 2. September Cost flow revision, and in-service date deferred 24 months from September Previously Approved $ 1.7 $ 1.5 $ 0.1 $ - $ - $ - $ - Increase (Decrease) - (1.5) (0.1) Revised Forecast $ 1.7 $ - $ - $ 1.6 $ - $ - $ -

31 Manitoba Hydro 18 Dorsey Synchronous Condenser Refurbishment Major inspection, re-wedging and overhaul of synchronous condensers SC7Y, SC8Y, SC9Y, SC21Y, and SC23Y. Replace coolers to restore original thermal performance on SC21Y, and SC23Y. Repair corrosion problems and replace GEM80 PLC on SC7Y, SC8Y and SC9Y. Modify the 600 V transfer scheme for SC8Y, SC7Y & SC9Y. Synchronous condensers are required for proper operation of the HVDC system, voltage regulation of the southern AC system and to provide reactive power for power export to the United States. A major inspection and overhaul of each machine is necessary to prevent catastrophic failure, involving the rotors and rotor bolts as indicated by the failures of SC12Y in 1987 and SC11Y in The cost of repairing a failure when combined with the inability to export power will well exceed the cost of major inspection and overhaul. March Previously Approved $ 32.3 $ 4.5 $ 2.8 $ 3.8 $ 2.6 $ 2.7 $ 3.4 Increase (Decrease) - (1.5) (0.3) (0.2) (0.1) (0.1) (0.6) Revised Forecast $ 32.3 $ 3.0 $ 2.5 $ 3.6 $ 2.5 $ 2.6 $ 2.8 HVDC Bipole 1 Roof Replacement Remove existing roofs over Bipole 1, valve groups 11, 12, 13, 21, 22, and 23 at Dorsey and Radisson stations. Design, supply, install and test replacement roofs, simultaneously, and during pre-planned outages. The new roofs are to be two-ply modified bitumen membrane with R20 insulating values, and meeting FM Global fire spread and wind uplift requirements. The existing asphalt roofs were installed in 1970, and with maintenance have exceeded their life expectancy of 15 years. Damage to equipment due to water leaks, fire spread within a roof system, or high wind uplift and/or possible lost export sales could be very costly. Each of the six valve halls contains equipment valued at $7.0 M. June In-service date advanced four months from October Previously Approved $ 5.9 $ 0.7 $ - $ - $ - $ - $ - Increase (Decrease) Revised Forecast $ 5.9 $ 0.7 $ - $ - $ - $ - $ -

32 Manitoba Hydro 19 HVDC System Transformer & Reactor Fire Protection & Prevention The supply and installation of fire protection upgrades on 33 converter transformers and eight smoothing reactors. The re-design and replacement of the deluge system on the Dorsey converter building south wall and the Henday converter building north east wall, and the construction of a fire response building in a safe location at Dorsey converter station. To minimize the high risk of fire spread and catastrophic damage throughout the AC and DC switchyards, and a potential transformer and revenue loss of an estimated $30 to $50 million. To provide adequate fire protection for personnel in accordance with National Fire Protection Association (NFPA) Life Safety Code 101. December Cost flow revision, and in-service date deferred 14 months from October Previously Approved $ 10.4 $ 1.1 $ 0.6 $ - $ - $ - $ - Increase (Decrease) - (0.8) Revised Forecast $ 10.4 $ 0.3 $ 1.3 $ 0.3 $ - $ - $ - HVDC AC Filter PCB Capacitor Replacement Replace all Bipole 1 & 2 AC PCB filled high power capacitors at the Dorsey, Radisson, and Henday Converter Stations, with non-pcb replacement capacitors. Numerous PCB filled capacitor failures at HVDC converter stations have resulted in requests for outages via the System Control Centre to allow for repairs. The catastrophic failure of a capacitor in an AC filter bank of B2 would result in a pole outage. Manitoba Hydro is committed to being PCB free as outlined in corporate policy statement CP486B. The capacitors will be 27 years old and are approaching the end of their usable life. November Cost flow revision, and in-service date deferred 18 months from May Previously Approved $ 34.5 $ 3.0 $ 4.7 $ - $ - $ - $ - Increase (Decrease) - (0.6) Revised Forecast $ 34.5 $ 2.4 $ 6.0 $ - $ - $ - $ -

33 Manitoba Hydro 20 HVDC Transformer Replacement Program Maintain an inventory of eight spare converter transformers for use at Radisson, Henday and Dorsey converter stations. Maintenance of an inventory of spare converter transformers will limit outage durations and outage costs in the event of converter transformer failures. October Cost flow revision, and in-service date deferred 19 months from March Previously Approved $ $ 4.5 $ 10.0 $ (0.2) $ 0.3 $ - $ - Increase (Decrease) - (3.5) (8.9) Revised Forecast $ $ 1.0 $ 1.1 $ 7.3 $ 5.3 $ 1.1 $ - Dorsey 230 kv Relay Building Upgrade Upgrade the 230 kv relay building at Dorsey and provide mobile protection and control trailers. Upgrades to the building will reduce the risk of damage from weather related perils and limit the consequence of a Bipole failure due to fire related perils. Mobile protection and control trailers will facilitate the quick restoration of service in the case of a catastrophic event to this or other relay buildings. March Cost flow revision, and in-service date deferred seven months from August Previously Approved $ 73.8 $ 2.8 $ 3.5 $ 1.7 $ 15.8 $ 32.9 $ 15.8 Increase (Decrease) - (1.7) (1.6) (0.8) 1.1 Revised Forecast $ 73.8 $ 1.1 $ 1.9 $ 4.0 $ 16.4 $ 32.1 $ 16.9

34 Manitoba Hydro 21 HVDC Stations Ground Grid Refurbishment Upgrade the existing ground grid systems at Dorsey, Radisson and Henday Stations. These upgrades improve the safety of employees and contractors working in and around the HVDC converter stations, by ensuring that touch and step potential are within safe levels. October Cost flow revision, and in-service date deferred seven months from March Previously Approved $ 4.3 $ 0.4 $ 0.3 $ 0.4 $ 0.5 $ - $ - Increase (Decrease) Revised Forecast $ 4.3 $ 0.6 $ 0.5 $ 0.6 $ 0.6 $ - $ - HVDC Bipole kv HLR Circuit Breaker Replacement Replace the existing 34 HLR operating mechanisms with new operating mechanisms, evaluate five HLR breaker and drive mechanisms, purchase one spare HLR operating mechanism, rebuild 126 AHMA drives, purchase six AHMA drives, remove V arc chutes and rebuild the associated 600V breakers, and the replacement of all 600V breaker hydraulic overloads with electronic overloads. System reliability will be improved. BLG1002A breaker operating mechanisms are designed to handle the frequent switching experienced by these 16 breakers, reduce repair and maintenance frequency, and reduce the risk of failure. A breaker failure results in a bus outage and single contingency of the 230 kv bus. There is a Bipole outage risk, if bus B1 or B2 at Dorsey is out of service for any reason. December Previously Approved $ 9.4 $ 1.3 $ 0.8 $ 0.3 $ - $ - $ - Increase (Decrease) (0.4) (0.3) Revised Forecast $ 9.4 $ 2.7 $ 0.4 $ - $ - $ - $ -

35 Manitoba Hydro 22 HVDC Bipole 1 Pole Differential Protection Prepare an engineering report to determine all possible options, scope of work, cost analysis, and detailed cost estimate. Implement the preferred option at both Dorsey and Radisson stations. Upgrading Bipole 1 pole differential protection is necessary to eliminate healthy pole blocks, thus reducing outages and increasing availability. December Cost flow revision, and in-service date deferred 24 months from December Previously Approved $ 3.3 $ 3.3 $ - $ - $ - $ - $ - Increase (Decrease) - (3.3) Revised Forecast $ 3.3 $ - $ 1.0 $ 2.3 $ - $ - $ - HVDC Bipole 1 By-Pass Vacuum Switch Removal Remove the existing By-Pass Vacuum Switch (BPVS) and By-Pass Switch (BPS) and replace both with a single BPS at Dorsey and Radisson stations (Bipole 1 valve halls). In addition, Radisson will have its AC line switch (ACCQ) removed. The equipment is nearing the end of its service life and requires substantial maintenance. By-pass vacuum switches were part of the replaced mercury arc valves switching scheme. The new thyristor valves may be more reliably served by other types of switches, thus reducing the forced outage rate. March Cost flow revision, and in-service date deferred one year from March Previously Approved $ 20.4 $ 4.7 $ 5.4 $ 4.4 $ 5.8 $ - $ - Increase (Decrease) - (4.2) (0.8) 3.8 (0.2) Revised Forecast $ 20.4 $ 0.5 $ 4.6 $ 8.2 $ 5.6 $ 1.2 $ -

36 Manitoba Hydro 23 HVDC Bipole 2 Refrigerant Condenser Replacement Remove and replace existing air conditioning systems in the Bipole 2 valve halls, maintenance blocks and administration areas at both Dorsey and Henday converter stations. The present systems are nearing the end of their service life. Maintenance is increasing, along with the likelihood of costly valve outages. In addition, the present systems contain R-22 (an ozone depleting substance). April Cost flow revision, and in-service date deferred one year from April Previously Approved $ 11.0 $ - $ 2.9 $ 7.2 $ 0.9 $ - $ - Increase (Decrease) - - (2.9) (4.4) Revised Forecast $ 11.0 $ - $ - $ 2.8 $ 7.2 $ 1.0 $ - HVDC Bipole 1 Smoothing Reactor Replacement Remove existing oil-filled Bipole 1 smoothing reactors at Dorsey and Radisson, and replace with new air core reactors. Existing Bipole 1 smoothing reactors are approaching the end of their service life. Replacement will ensure continued availability and reliable operation of the HVDC system. Removal of oil filled reactors will reduce the risk of oil spills and fires within the work place. October Cost flow revision, and in-service date deferred six years from October Previously Approved $ 31.8 $ 3.1 $ 10.5 $ 12.8 $ 5.1 $ - $ - Increase (Decrease) - (3.1) (10.4) (12.7) (5.0) Revised Forecast $ 31.8 $ - $ 0.1 $ 0.1 $ 0.1 $ 4.0 $ 27.7

37 Manitoba Hydro 24 HVDC Bipole 1 Converter Station, P1 & P2 Battery Bank Separation Separate Pole 1 & Pole 2 battery banks at Dorsey and Radisson converter stations. Upgrade the battery banks and charger ratings to comply with current Manitoba Hydro design criteria. Pole 1 & Pole 2 battery banks have to be physically separated in order to provide a reliable first grade supply to the HVDC controls and protection and communication system. February Cost flow revision, and in-service date deferred one year from February Previously Approved $ 3.2 $ - $ 1.0 $ 2.2 $ - $ - $ - Increase (Decrease) - - (1.0) (1.2) Revised Forecast $ 3.2 $ - $ - $ 1.0 $ 2.2 $ - $ - HVDC Bipole 1 DCCT Transductor Replacement Replace existing oil-filled DC transductors with optical transductors at Dorsey and Radisson stations. Existing BP1 DCCT transductors are reaching the end of service life and spares are no longer available. Failure of a transductor to transmit a required signal to protective and controls equipment at Dorsey and Radisson stations can cause a lengthy pole outage. A fire in the existing oil-filled transductors could result in irreparable damage to adjacent equipment and a lengthy pole outage. Replacement will contribute to reliable operation of the HVDC system. Removal of the oil-filled transductors will reduce the risk of oil spills and fires within the workplace. October Cost flow revision, and in-service date deferred two years from October Previously Approved $ 11.7 $ 2.5 $ 1.2 $ 3.5 $ 1.3 $ 1.8 $ 0.7 Increase (Decrease) - (2.5) (0.6) (0.7) (0.5) Revised Forecast $ 11.7 $ - $ 0.6 $ 2.8 $ 0.8 $ 3.9 $ 3.5

38 Manitoba Hydro 25 HVDC BP1 & BP2 DC Converter Transformer Bushing Replacements Remove and replace transformer bushings on all converter transformers over 25 years old. Bushings on converter transformers over 25 years old are reaching the end of their service life. A bushing failure while in-service would cause a costly valve group outage to repair or replace the bushing and could cause irreparable damage to a converter transformer. March Cost flow revision, and in-service date deferred 18 months from September Previously Approved $ 8.7 $ 0.5 $ 1.0 $ 1.6 $ 5.1 $ 0.5 $ - Increase (Decrease) - (0.5) (1.0) (1.1) (4.1) Revised Forecast $ 8.7 $ - $ - $ 0.5 $ 1.0 $ 1.7 $ 5.4 HVDC Bipole 2 Valve Hall Wall Bushing Replacements Replace all oil-filled wall bushings in the Bipole 2 valve halls with new solid core bushings or SF6 filled bushings. Existing wall bushings in the Bipole 2 valve halls are over 20 years old and are reaching the end of their service life. The risk of bushing failure and fire in a valve hall increases as the bushings age. Replacing the bushings will ensure reliable operation of the valve group well into the future, and provide a safer working environment for employees at the converter stations. June Cost flow revision, and in-service date deferred two years from June Previously Approved $ 19.2 $ 3.4 $ 4.6 $ 4.7 $ 4.8 $ 1.8 $ - Increase (Decrease) - (3.4) (4.5) (1.4) (0.3) Revised Forecast $ 19.2 $ - $ 0.1 $ 3.3 $ 4.5 $ 4.6 $ 6.7

39 Manitoba Hydro 26 HVDC Bipole 1 CQ Disconnect Replacement Replace the existing Radisson and Dorsey DC disconnects, and Dorsey AC disconnects with new disconnects. Major failures of CQ disconnects cause costly pole outages, and these disconnects are reaching the end of their service life. They have been in-service for 36 years, their failure rate is increasing, and spare parts are no longer available. April Previously Approved $ 5.2 $ - $ 1.2 $ 1.6 $ 0.9 $ 1.1 $ 0.3 Increase (Decrease) - - (1.2) (0.5) 0.6 (0.2) 1.3 Revised Forecast $ 5.2 $ - $ - $ 1.1 $ 1.5 $ 0.9 $ 1.6 HVDC Bipole 2 Thyristor Module Cooling Refurbishment Refurbish thyristor module cooling components in Bipole 2 by replacing the manifolds, connectors and cooling tubes. The cooling components are reaching the end of their life, and are starting to leak, resulting in forced outages. Refurbishing the module cooling components will improve the reliability of the cooling system and extend its life until the replacement of the Bipole 2 system equipment, which is in approximately years. March Previously Approved $ 4.7 $ 1.8 $ 1.8 $ 0.8 $ - $ - $ - Increase (Decrease) - - (0.1) Revised Forecast $ 4.7 $ 1.8 $ 1.7 $ 0.8 $ - $ - $ -

40 Manitoba Hydro 27 HVDC Bipole 2 Smoothing Reactor Replacement Replace four existing oil-filled Bipole 2 smoothing reactors with air core smoothing reactors at Dorsey and Henday. The smoothing reactors have already exceeded their estimated useful life of 25 years. Each DC line fault and AC system fault in the southern AC system results in sudden current surges in the smoothing reactors resulting in physical shaking and contraction of the windings. As a result, the blockings in the winding become loose and have to be retightened. The reactors have been subject to these faults for many years. When the reactors do eventually fail, the units will be replaced with air core reactors. Replacing them with an air core reactor now would alleviate the environmental and fire concerns, and provide a reliable system for the future and reduce maintenance and protection systems requirements. September Cost flow revision, and in-service date advanced one year from September Previously Approved $ 17.1 $ - $ - $ 7.0 $ 6.5 $ 3.0 $ 0.6 Increase (Decrease) (3.8) (0.8) 0.8 (0.6) Revised Forecast $ 17.1 $ 0.8 $ 3.5 $ 3.2 $ 5.7 $ 3.8 $ - HVDC Bipole 1 Transformer Marshalling Kiosk Replacement Replace nine Bipole 1 transformer marshalling kiosks with insulated Programmable Logic Controllers (PLC) monitoring marshalling kiosks, and upgrade 19 control boxes at the transformer with a quick disconnect system. The new control boxes will remove the 600V from the controls and monitoring section of the panel which will eliminate the present safety concerns that site workers face while performing maintenance or trouble shooting.l November 2014 New item. Previously Approved $ - $ - $ - $ - $ - $ - $ - Increase (Decrease) Revised Forecast $ 6.8 $ 1.0 $ 1.0 $ 1.6 $ 1.6 $ 1.1 $ 0.5

41 Manitoba Hydro 28 Pine Falls Rehabilitation Rehabilitation, replacement of and addition to various electrical and mechanical equipment and systems such as spillway mechanical components, station service upgrade, station lighting, 11 kv cable replacement, spillway electrical distribution, water system, air system, transformer lightning arrestors, and station drawings. Replace unit 1 and 2 turbine runners with more efficient new design runners, rebuild existing servomotors for increased wicket gate opening allowing more discharge, and rewind the generator stators utilizing modern insulating materials. Conduct a model test and up-rate study. Replace potential transformers, synchronizers, annunciators, generator breakers, excitation and governor systems, step-up transformers and electrical back-up systems. Assessment of the electrical and mechanical systems has identified concerns in terms of obsolete equipment, safety, fire risk and adaptability to present day operating conditions and standards. Upgrading is necessary to ensure reliable safe and economical operation. Pine Falls consistently spills more water than the other Winnipeg River plants. Additional generation can be obtained (approximately 17%) with increased discharge capability. Tests have confirmed that the two stator windings are in danger of failure at any time. March Previously Approved $ 56.2 $ 4.6 $ 24.5 $ 5.2 $ 3.8 $ 3.2 $ 6.6 Increase (Decrease) - (1.8) (20.3) (1.1) 4.3 Revised Forecast $ 56.2 $ 2.8 $ 4.2 $ 17.4 $ 12.2 $ 2.1 $ 10.9 Jenpeg Unit Overhauls Major overhaul of all generating units (1-6) to inspect, repair, modify, and replace components of the turbine/ generator. Areas of concern include journal bearings, thrust bearings, turbine seals, servo motors, wicket gate seals and bushings, waterhead and oil head, stator and rotor, and auxiliary systems. A complete overhaul is required to ensure reliable operation of the units when maximum power requirements on the system are essential. December Previously Approved $ $ - $ - $ - $ - $ - $ 49.2 Increase (Decrease) Revised Forecast $ $ - $ - $ - $ - $ - $ 73.1

42 Manitoba Hydro 29 Power Supply Dam Safety Upgrades Perform necessary engineering design and remedial construction to upgrade generating stations to present day dam safety standards: 1) Kettle generating station upgrade main and saddle dams for freeboard; 2) Kelsey generating station armour plating at spillway rollways, erection of heated hoist housing, insulating of spillway gates, upgrading of dikes, upgrading of spillway feeders and electrical systems at the spillway, and upgrading of the station service transformers due to increased loading; and 3) southern generating stations - capital works identified in the dam safety certification process or identified through observation and discussion with staff. Work is required to correct deficiencies to all the plants, in order to operate in a safe and reliable manner. March Previously Approved $ 34.0 $ 3.5 $ 1.2 $ 1.2 $ 1.2 $ 1.3 $ 3.2 Increase (Decrease) (1.2) (1.2) (1.3) (3.2) Revised Forecast $ 34.0 $ 9.7 $ 1.7 $ - $ - $ - $ - Winnipeg River Riverbank Protection Program Placement of rock protection and construction of slope stabilization to reduce the erosion of riverbanks along the Winnipeg River. The work includes inspection, design, mapping, land acquisition, and remedial construction at priority locations along reaches of the Winnipeg River affected by Manitoba Hydro hydraulic operations. Provision of riverbank protection and stabilization work along the Winnipeg River between Seven Sisters forebay and Manitou rapids to protect private property from erosion partially due to hydraulic operations. March Previously Approved $ 19.7 $ 1.1 $ 1.2 $ 1.2 $ 1.2 $ 1.3 $ 4.0 Increase (Decrease) Revised Forecast $ 19.7 $ 1.3 $ 1.2 $ 1.2 $ 1.3 $ 1.3 $ 4.1

43 Manitoba Hydro 30 Power Supply Hydraulic Controls Install an optimization system to run all 39 units at Kelsey, Kettle, Long Spruce, and Limestone at their most efficient gate opening. Install a Decision Support System (DSS) to provide accurate short-term Hydro scheduling (water resource management) and feedback information. Install required automation, remote control, and protective devices for unmanned operation. By increasing unit efficiency, the Corporation can reduce or delay the need for capital expenditures for new plant, increase export net revenues, improve financial strength, and protect the environment. March Cost flow revision, and in-sevice date deferred 63 months from December Previously Approved $ 16.0 $ 1.8 $ 0.9 $ 2.5 $ 2.4 $ 0.9 $ 1.0 Increase (Decrease) (1.3) (2.4) (0.9) 4.6 Revised Forecast $ 16.0 $ 3.1 $ 1.9 $ 1.2 $ - $ - $ 5.6 Slave Falls Rehabilitation Perform major overhaul for all eight units at Slave Falls Generating Station, including spillway improvements/ replacements, excitation upgrades, and the addition of a Unit Control and Monitoring System (UCMS) Framework. Many safety, reliability, environmental, efficiency, operational & dam safety issues have been identified relating to the Slave Falls infrastructure. Extensive repairs, modifications and/or replacements will be required to ensure the serviceability of the plant and spillway infrastructure. Economics of this work may suggest that a new spillway be constructed to replace existing spill infrastructure. Current operating procedures include ice load reduction activites at the spilling structures to ensure structural stability. A dam safety concern has been identified with respect to the minimal remote spilling capability at Slave Falls. December Previously Approved $ $ 13.7 $ 10.4 $ 8.9 $ 23.6 $ 29.9 $ 96.5 Increase (Decrease) - (0.7) (6.4) (7.8) (7.3) (18.1) 44.6 Revised Forecast $ $ 13.0 $ 4.0 $ 1.1 $ 16.3 $ 11.8 $ 141.1

Capital Expenditure Forecast (CEF08-1)

Capital Expenditure Forecast (CEF08-1) November 2008 Capital Expenditure Forecast (CEF08-1) Corporate Controller Division Finance & Administration 2008/09-2018/19 Foreword The Capital Expenditure Forecast (CEF08-1) is a projection of Manitoba

More information

2012/13 Power Resource Development Plan The Sales Package

2012/13 Power Resource Development Plan The Sales Package MANITOBA HYDRO 2012/13 POWER RESOURCE PLAN Date: September 30, 2012 The purpose of the 2012/13 Power Resource Plan is to provide plans for the long-term power resource development plan for Manitoba Hydro

More information

LONG-TERM DEVELOPMENT PLAN for Manitoba Hydro's Electrical Transmission System

LONG-TERM DEVELOPMENT PLAN for Manitoba Hydro's Electrical Transmission System LONG-TERM DEVELOPMENT PLAN 2013 for Manitoba Hydro's Electrical Transmission System Manitoba Hydro s Existing Generating Stations and Transmission System Missi Falls Laurie River #2 Laurie River #1 Notigi

More information

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 As per the Manitoba Hydro Open Access Interconnection Tariff, the Transmission Owner has contracted TransGrid Solutions

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection B. Bagen, D. Jacobson, G. Lane and H. M. Turanli Manitoba

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Pump Station 7 Improvements

Pump Station 7 Improvements Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following

More information

EMERGING REQUIREMENTS

EMERGING REQUIREMENTS EB-00-0 Exhibit D Schedule Page of EMERGING REQUIREMENTS 0 EQUIPMENT STANDARDIZATION THESL plans, designs and constructs distribution system assets in accordance with approved standards. The standards

More information

WINNIPEG HYDRO QUICK FACTS

WINNIPEG HYDRO QUICK FACTS THE OFFER Manitoba Hydro makes the following payments and commitments: Years 1-5 $25 million per annum 6 9 $20 million per annum 10 TH in perpetuity $16 million per annum PLUS $1 million per annum in services*

More information

Annex A-4 DIESEL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BALANCE OF PLANT GENERATOR DIESEL ENGINE

Annex A-4 DIESEL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BALANCE OF PLANT GENERATOR DIESEL ENGINE Annex A-4 DIESEL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES Electrical 3600-3690 Power Station Switchyard 3700-3730 Generator 4500-4580 Exciter 4600-4609 Cooling System 4610-4650 Controls 4700-4750 Miscellaneous

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR #

Service Requested 150 MW, Firm. Table ES.1: Summary Details for TSR # Executive Summary Firm point to point transmission service has been requested by Transmission Service Request (TSR) #75669514, under the SaskPower Open Access Transmission Tariff (OATT). The TSR consists

More information

An Asset Management Plan for Transit And Access Transit Fleet

An Asset Management Plan for Transit And Access Transit Fleet Header Title ATTACHMENT 1 Building Better Transit: An Asset Management Plan for Transit And Access Transit Fleet 2 June 2016 Transit & Access Transit Fleet INTRODUCTION The Saskatoon Transit fleet is currently

More information

Building a 21 st Century Electric Grid. February 23, 2018

Building a 21 st Century Electric Grid. February 23, 2018 Building a 21 st Century Electric Grid February 23, 2018 1 DTE strives to provide customers with a 21 st century electric grid that is safe, highly reliable, affordable and accessible 2 Our investment

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

Yukon s Independent Power Production Policy

Yukon s Independent Power Production Policy Yukon s Independent Power Production Policy Updated October 2018 BACKGROUND The Government of Yukon (YG) released the Energy Strategy for Yukon in January 2009. The strategy sets out YG s energy priorities,

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

LEAP - Life Expectancy Analysis Program For Electrical Rotating Machines. Marcio Gennari ABB Brazil Automation Products Machines Service Osasco

LEAP - Life Expectancy Analysis Program For Electrical Rotating Machines. Marcio Gennari ABB Brazil Automation Products Machines Service Osasco LEAP - Life Expectancy Analysis Program For Electrical Rotating Machines Marcio Gennari ABB Brazil Automation Products Machines Service Osasco LEAP - Introduction ABB India (excellence center in insulation

More information

III. Substation Bus Configurations & Substation Design Recommendations

III. Substation Bus Configurations & Substation Design Recommendations III. Substation Bus Configurations & Substation Design Recommendations 1.0 Introduction Pre-existing conditions, electrical arrangements or the criticality of the existing facility may limit this flexibility,

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

3 Existing National Grid

3 Existing National Grid 3 Existing National Grid 3.1 Introduction 3.2 Load and generation 3.1 Introduction This chapter provides an overview of New Zealand s existing National Grid as at 28 February 2012 with respect to load

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

2016 Load & Capacity Data Report

2016 Load & Capacity Data Report Caution and Disclaimer The contents of these materials are for information purposes and are provided as is without representation or warranty of any kind, including without limitation, accuracy, completeness

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out

More information

The Energy Queensland Group Notice of no non-network options

The Energy Queensland Group Notice of no non-network options The Energy Queensland Group Notice of no non-network options 24 September 2018 MCE Mount Crosby East Establish new substation to replace Mount Crosby Substation (SSMTC) Page 1 of 1 DISCLAIMER While care

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2015 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., SGC

More information

Designated Entity Pre-Qualification Materials. Exelon Corporation

Designated Entity Pre-Qualification Materials. Exelon Corporation Designated Entity Pre-Qualification Materials By Exelon Corporation On behalf of its affiliates Baltimore Gas and Electric Company, Commonwealth Edison Company, PECO Energy Company and Exelon Transmission

More information

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including:

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including: Public Report To: From: Report Number: Community Services Committee Ron Diskey, Commissioner, Community Services Department CS-17-18 Date of Report: March 24, 2017 Date of Meeting: March 30, 2017 Subject:

More information

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Executive Summary Interconnection Feasibility Study Report Request # GI-2016-6 Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado Public Service Company of Colorado Transmission

More information

Transit Vehicle (Trolley) Technology Review

Transit Vehicle (Trolley) Technology Review Transit Vehicle (Trolley) Technology Review Recommendation: 1. That the trolley system be phased out in 2009 and 2010. 2. That the purchase of 47 new hybrid buses to be received in 2010 be approved with

More information

Appendix D Black Hills Project Summary

Appendix D Black Hills Project Summary Page 1 of 28 Appendix D Black Hills Project Summary Table of Contents Black Hills Project Summary... D-1 Boone-Nyberg 115 kv Project... D-3 Rattlesnake Butte 115 kv Substation Terminal... D-6 Fountain

More information

Functional Specification Revision History

Functional Specification Revision History Functional Specification Revision History Revision Description of Revision Author Date B0 For comments Yale Zhou January 26, 2016 B1 Updated as per comments Yale Zhou February 1, 2016 Final issuance Yale

More information

2015 WDC Disturbance and Protection Standards Overview

2015 WDC Disturbance and Protection Standards Overview NERC Update 2015 WDC Disturbance and Protection Standards Overview Rich Bauer Senior Manager Reliability Risk Management / Event Analysis IEEE PSRC meeting Denver, Co May 12, 2016 2 System Protection and

More information

This page is intentionally left blank.

This page is intentionally left blank. This page is intentionally left blank. Bipole III Southern Ground Electrode Line Route Selection Introduction Manitoba Hydro has recently selected a route for the southern ground electrode line (Map 1).

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION

ENERGY STRATEGY FOR YUKON. Net Metering Policy DRAFT FOR CONSULTATION ENERGY STRATEGY FOR YUKON Net Metering Policy DRAFT FOR CONSULTATION February 2011 Page 1 of 4 BACKGROUND The Yukon government released the Energy Strategy for Yukon in January 2009. The Energy Strategy

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY

SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY SUPPLEMENTARY EVIDENCE FROM SCOTTISH AND SOUTHERN ENERGY Scottish Parliament - Economy, Energy & Tourism Committee National Planning Framework - Evidence Session 14 th January 2009 SHETL Response 1. Key

More information

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES: TransWest Express Transmission Project TABLE OF CONTENTS 7.0 DESIGN OPTIONS... 7-1 7.1 OVERVIEW OF DESIGN OPTIONS... 7-1 7.2 DESIGN OPTIONS PURPOSE AND NEED AND DESIGN CHARACTERISTICS... 7-4 7.2.1 Design

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

Sub Regional RTEP Committee Western Region ATSI

Sub Regional RTEP Committee Western Region ATSI Sub Regional RTEP Committee Western Region ATSI February 20, 2019 1 ATSI Needs Stakeholders must submit any comments within 10 days of this meeting in order to provide time necessary to consider these

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

Longevity of Power Electronic Solutions in the Macro Grid historical perspective of AC (FACTS) and DC (HVDC) installations

Longevity of Power Electronic Solutions in the Macro Grid historical perspective of AC (FACTS) and DC (HVDC) installations Longevity of Power Electronic Solutions in the Macro Grid historical perspective of AC (FACTS) and DC (HVDC) installations Reginald Mendis and Neil Kirby ALSTOM Grid, Philadelphia, PA Univeristy of Pittsburgh

More information

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation

Transmission Improvements Plan for 575 MW Network Service Request Wansley CC 7 Generation Facility (OASIS # ) Georgia Transmission Corporation Transmission Improvements Plan for 575 MW Network Service Request CC 7 Generation Facility (OASIS # 143556) Georgia Transmission Corporation November 11, 2010 CC7 TIP 11-11-2010 (2).docx PROBLEM STATEMENT

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Page 72 of 96 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

ADVISE DESIGN IMPLEMENT FOR ELECTROTECHNICAL EXCELLENCE

ADVISE DESIGN IMPLEMENT FOR ELECTROTECHNICAL EXCELLENCE ADVISE DESIGN FOR ELECTROTECHNICAL EXCELLENCE IMPLEMENT ADVISE DESIGN FOR ELECTROTECHNICAL EXCELLENCE Gemitech was founded in 1990 and, in just a few short years, grew to be recognized as medium and IMPLEMENT

More information

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION Summary Abhay Kumar Mata Prasad R C Maheshwari Asea Brown Boveri Ltd. 4th Floor, 71 Nehru Place, New Delhi

More information

The Upgrade of the Northern Terminal of the Pacific NW-SW HVdc Intertie Celilo Converter Station

The Upgrade of the Northern Terminal of the Pacific NW-SW HVdc Intertie Celilo Converter Station The Upgrade of the Northern Terminal of the Pacific NW-SW HVdc Intertie Celilo Converter Station Dan Kell Karl Mitsch Mark Reynolds TransGrid Solution US-DOE BPA Power Engineers Canada USA USA Introduction

More information

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, 2006 SUBJECT: Scarborough Rt Strategic Plan RECOMMENDATIONS It is recommended that the Commission: 1. Endorse

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Vehicle Replacement Policy - Toronto Police Service

Vehicle Replacement Policy - Toronto Police Service STAFF REPORT June 21, 2000 To: From: Subject: Policy and Finance Committee Chairman, Toronto Police Services Board and City Auditor Vehicle Replacement Policy - Toronto Police Service Purpose: The purpose

More information

Rocky Reach Bridge Crane Repair. Commission Presentation February 1, 2016

Rocky Reach Bridge Crane Repair. Commission Presentation February 1, 2016 Rocky Reach Bridge Crane Repair Commission Presentation February 1, 2016 Overview Rocky Reach Bridge Crane Rehab Main Hoist Drum Inspections Impacts to Projects and Plant Operations Alternatives Considered

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 27, 2012 SUBJECT: NOTICE OF AWARD PROCUREMENT AUTHORIZATION - ARTICULATED BUSES INFORMATION ITEM RECOMMENDATION

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

McNary Northshore Fishway Hydro Project. History & Lessons Learned

McNary Northshore Fishway Hydro Project. History & Lessons Learned McNary Northshore Fishway Hydro Project History & Lessons Learned May 6, 2017 21 th Annual TECHNICAL SEMINAR Machines, Maintenance, and Management: Keeping Hydro Facilities Up and Running History & Lessons

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN SPN High Value Project PO Route RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN Document History Version Date Details Originator V0.1 20/06/2013 Initial version Chris Winch V0.2

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document Decision 2013-127 Alberta Electric System Operator Saleski Transmission Project Needs Identification Document ATCO Electric Ltd. Saleski 901S Substation and 144-kV Transmission Line 7L142 Facility Application

More information

Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks

Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks Guidelines for Modernizing Existing Electrical Switchgear in LV and MV Networks by Georges Barbarin Executive summary Aging electrical switchgear infrastructure is a threat to the reliability of power

More information

Seabrook Substation Reliability Improvement Project

Seabrook Substation Reliability Improvement Project New England Division Seabrook Substation Reliability Improvement Project 1. Project Summary Description Seabrook Substation is critical to ISO-New England as a Pool Transmission Facility, to grid availability

More information

IEEE-PES Smart Grid Super Session

IEEE-PES Smart Grid Super Session IEEE-PES Smart Grid Super Session Drivers for Change Internal Drivers Workforce aging Cost of assets Drive to control costs (Capital and O&M) Assets stranded by movement of industry and population to green

More information

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution

A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical.1_ UFSS#p A:_. DAVID/ IC, L re Mechanical Civil Protection & Control an LAND& 4^ Transmission & Distribution Telecontrol System Planning

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

The IAEA does not normally maintain stocks of reports in this series.

The IAEA does not normally maintain stocks of reports in this series. IAEA-TECDOC- The IAEA does not normally maintain stocks of reports in this series. However, microfiche copies SAFETY ASPECTS OF STATION BLACKOUT AT NUCLEAR POWER PLANTS IAEA, VIENNA, 1985 IAEA-TECDOC-332

More information

Service and Rehabilitation Electrical Power Systems

Service and Rehabilitation Electrical Power Systems Service and Rehabilitation Electrical Power Systems From water to wire 3 ANDRITZ HYDRO Electrical Power System Modernization and rehabilitation International technology group ANDRITZ is a globally leading

More information

ATTACHMENT - DFO STATEMENT OF NEED

ATTACHMENT - DFO STATEMENT OF NEED ATTACHMENT - DFO STATEMENT OF NEED Table of Contents Executive Summary... 3 1. Description of the Area... 5 1.1 Geographic Study Area... 5 1.2 Current System Configuration... 7 1.3 Distributed Generation...

More information

Net Metering Policy Framework. July 2015

Net Metering Policy Framework. July 2015 Net Metering Policy Framework July 2015 Table of Contents 1.0 BACKGROUND... 2 2.0 POLICY OBJECTIVE... 2 3.1 Eligibility... 3 3.1.1 Renewable Generation... 3 3.1.2 Customer Class... 3 3.1.3 Size of Generation...

More information

Energy Technical Memorandum

Energy Technical Memorandum Southeast Extension Project Lincoln Station to RidgeGate Parkway Prepared for: Federal Transit Administration Prepared by: Denver Regional Transportation District May 2014 Table of Contents Page No. Chapter

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

Generator Rebuild and Unit Refurbishment for the Wells Hydroelectric Project. NWHA Spokane October 30, 2014

Generator Rebuild and Unit Refurbishment for the Wells Hydroelectric Project. NWHA Spokane October 30, 2014 Generator Rebuild and Unit Refurbishment for the Wells Hydroelectric Project NWHA Spokane October 30, 2014 0 The Wells Project WELLS Chief Joseph Rocky Reach East Wenatchee Wells Dam Location Columbia

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC OCTOBER 17, 2018 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC

More information

Western Alberta Transmission Line (WATL) HVDC Project

Western Alberta Transmission Line (WATL) HVDC Project Submission for the ACEC Canada Canadian Consulting Engineering Awards 2016 Western Alberta Transmission Line (WATL) HVDC Project Submitted by Teshmont Consultants LP as a Consultant to AltaLink Attachment

More information

Bohn to Kettle River Transmission Project

Bohn to Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D

More information

Derrick Boltt Southern Region Hydro Generation Eskom South Africa

Derrick Boltt Southern Region Hydro Generation Eskom South Africa Derrick Boltt Southern Region Hydro Generation Eskom South Africa Hydro Power in the S/Region. History of Hydro in the S/Region. In 198 the former Transkei government financed the development of Hydro

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic July 26, 2016 Reliability Analysis Update MetEd Transmission Zone N-1 First Energy Planning Criteria (FERC Form 715): The North Boyertown West Boyertown 69 kv is

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE September 7, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE PURPOSE To update Council on Kamloops

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: BETWEEN $1,000,000 TO $5,000,000 FOR THE PERIOD AUGUST 1, 2009 TO SEPTEMBER 30, 2009 INFORMATION

More information

welcome to the BC Hydro community open house

welcome to the BC Hydro community open house welcome to the BC Hydro community open house Dawson Creek/ Chetwynd Area Transmission ProjecT Open House welcome Dawson Creek/Chetwynd Area Transmission Project (DCAT) The purpose of this open house is

More information