1 OVERCOMING THE CHALLENGES OF ADA ACCESSIBILITY AT OLDER RAIL STATIONS SEPTA's ADAPTIVE APPROACH Jeffrey D. Knueppel, P.E. Southeastern Pennsylvania Transportation Authority AGM/Chief Engineer Philadelphia, Pennsylvania 1

2 Southeastern Pennsylvania Transportation Authority (SEPTA) One of two transit operators in the country to operate five major modes of transportation: buses, light rail (trolleys), heavy rail (subway and elevated lines), commuter rail and paratransit services. Service area encompasses approximately 2,202 square miles. Serves over one million weekday riders and provides approximately 325 million passenger trips annually. Rail operations include 8 Trolley (Light Rail) Lines, 2 SubwayElevated (Heavy Rail) Lines, 1 Inter-Urban High Speed (Heavy Rail) Line and 13 Regional Railroad (Commuter Rail) Lines. Between 1964 and 1983, SEPTA assumed ownership of various bankrupt transportation companies, including a commuter rail system from Conrail that was originally constructed by the Pennsylvania and Reading Railroads. Currently completing our 100th Fully Accessible Station. 2

3 SEPTA's COMMUTER RAIL SYSTEM Total of 142 Regional Rail Stations Owned or Leased by SEPTA. 61 Stations are ADA Accessible. 4 Stations are Under Construction including ADA Accessibility. 3 Stations are scheduled for ADA Improvements. 3

4 ACCESSIBILITY AND SEPTA COMMUTER RAIL CHALLENGES OLD/HISTORIC STATIONS SITE CONSTRAINTS/DIFFICULT ACCESS FREIGHT TRAFFIC RELIABILITY/DURABILITY/COST EFFECTIVENESS CUSTOMER SATISFACTION 4

5 OLD/HISTORIC STATIONS NORTH WALES Before Original Station Building Built Circa

6 OLD/HISTORIC STATIONS WAYNE STATION Before Original Station Building Built Circa

7 OLD/HISTORIC STATIONS WAYNE JUNCTION STATION 7 Original Station Building Built Circa 1901

8 SITE CONSTRAINTS/DIFFICULT ACCESS ALLEN LANE STATION Before Original Station Building Built Circa

9 9 SITE CONSTRAINTS/DIFFICULT ACCESS WAYNE JUNCTION STATION

10 FREIGHT TRAFFIC IN AMTRAK OWNED TERRITORY Amtrak negotiated an agreement with NS, CSX, Conrail Shared Assets and SEPTA for high level platforms at all current station locations except Bristol, Marcus Hook and Thorndale. Each of these stations have one direction which will need to be addressed with a unique solution. Croydon Station 10 Wayne Station

11 FREIGHT TRAFFIC IN SEPTA OWNED TERRITORY Original solution was to construct mini-high level platforms. Steady progress on negotiating with freight carriers for the construction of high-level platforms has been made by SEPTA and currently only high-level platforms are being installed. Crestmont Station Currently there are 30 mini-high level stations. Melrose Park Station Currently there are 31 high level stations. 11 SEPTA/CSX Fox Chase Line Separation Project

12 RELIABILITY/DURABILITY/COST EFFECTIVENESS ACCELERATED RAILROAD STATION CONSTRUCTION USING PRE-FABRICATED COMPONENTS "HYBRID APPROACH" TO STATION CONSTRUCTION: Matches SEPTA in-house work with pre-fabricated elements made by outside entities. Utilizes third party contractors where appropriate. Leverages outside expertise with the strengths of internal resources. Increases overall productivity and cost effectiveness. Increases component durability. Reduces on-site work adjacent to active tracks (faster construction). Lowers life-cycle costs. 12

13 RELIABILITY/DURABILITY/COST EFFECTIVENESS Pre-Cast Foundations at Fabricator's Yard Installed Foundation Units at Ambler Station Setting Pre-Cast Platform Panels at Primos Station 13

14 RELIABILITY/DURABILITY/COST EFFECTIVENESS Fort Washington Station Modular Station Building Being Installed at Night Completed Interior of Station 14

15 RELIABILITY/DURABILITY/COST EFFECTIVENESS Pre-Cast ADA Ramp at Ambler Station Typical Shelter at Ambler Station 15 Ambler Station Building Interior Ambler Station Exterior View

16 CUSTOMER SATISFACTION RYERS STATION Before Provide Equal Facilitation Reduce Train Dwell Times Create Attractive Design Solutions 16

17 BROAD STREET SUBWAY STATIONS Total of 25 Stations on Broad Street Subway/Broad Ridge Spur. 11 Stations are ADA Accessible. 1 Station in Design to Provide ADA Accessibility (Race/Vine). 17 Olney Station

18 BROAD STREET SUBWAY STATIONS LESSONS LEARNED NORTH PHILADELPHIA STATION Excavating Through the Street SPRING GARDEN STATION Ramping on Mezzanine with Low Head-Room Elevator 18

19 MARKET-FRANKFORD LINE Total of 28 Stations on the Market-Frankford Subway/ /Elevated. 22 Stations ADA Accessible. 1 Station Under Construction to Provide Accessibility (15 th Street). 1 Station Designed for Accessibility but Construction Deferred Due to Lack of Funding rd Street Station

20 MARKET-FRANKFORD LINE 15 th STREET STATION SEPTA's CITY HALL STATION EARLY ACTION PHASE ELEVATOR LOCATIONS CUT-AWAY VIEW JUNE

21 21 CITY HALL AREA ELEVATION MAP COMPLETE ELEVATOR BUILD OUT PLAN

22 SEPTA ACCESSIBILITY: ACCESSIBLE TRAVEL CENTER Supported by $140,000 in FTA New Freedom Funds. Encourages use of regular fixed route service. Helps identify candidates for independent travel during eligibility determination and afterward. Offers a range of travel training opportunities to residents of SEPTA's five county service area. Provides a transition space for safe, non-pressure practice to gain skills and information before boarding vehicles in revenue service. 22

23 SEPTA ACCESSIBILITY: ACCESSIBLE TRAVEL CENTER Teaches riders to: Learn to Board using a Ramp. Master the Tactile Platform Edge. Master the Crossing Gap. BUS MOCK-UP 23

24 24 THANK YOU

Southeastern Pennsylvania Transportation Authority

Southeastern Pennsylvania Transportation Authority Southeastern Pennsylvania Transportation Authority Overview of Transit Services, Capital Improvement Plans and Challenges in Chester County April 10, 2013 Public Transportation Provides mobility for work,

More information

At-A-Glance MEDIA INFORMATION GUIDE

At-A-Glance MEDIA INFORMATION GUIDE At-A-Glance MEDIA INFORMATION GUIDE THEN & NOW HISTORY On February 18, 1964, the Pennsylvania General Assembly established the Southeastern Pennsylvania Transportation Authority (SEPTA) to provide public

More information

Develop ground transportation improvements to make the Airport a multi-modal regional

Develop ground transportation improvements to make the Airport a multi-modal regional Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use

More information

Westchester County Department of Public Works and Transportation First and Last Mile Connections TNC Partnership Study

Westchester County Department of Public Works and Transportation First and Last Mile Connections TNC Partnership Study Westchester County Department of Public Works and Transportation First and Last Mile Connections TNC Partnership Study Mobility Advisory Forum December 11, 2018 Naomi Klein, Director of Planning Craig

More information

PUBLIC TRANSPORTATION

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION An Overview of the Industry, Key Federal Programs, and Legislative Processes American Public Transportation Association 1 The Public Transportation Industry: What is "public transportation"?

More information

Jeffrey D. Knueppel, P.E. Deputy General Manager And Robert L. Lund Jr. P.E. Assistant General Manager March 25, 2014

Jeffrey D. Knueppel, P.E. Deputy General Manager And Robert L. Lund Jr. P.E. Assistant General Manager March 25, 2014 Cobbs Creek Viaduct (4.79) Built in 1891 Jeffrey D. Knueppel, P.E. Deputy General Manager And Robert L. Lund Jr. P.E. Assistant General Manager March 25, 2014 What Will Happen Without Additional Funding

More information

Metropolitan Council Budget Overview SFY

Metropolitan Council Budget Overview SFY Metropolitan Council Budget Overview SFY 2016-2017 H T t ti C itt House Transportation Committee February 4, 2015 Transit connects us to the places that matter Transportation Needs Grow as the Region Grows

More information

All Electric Buses for Transit - Overview and Discussion

All Electric Buses for Transit - Overview and Discussion All Electric Buses for Transit - Overview and Discussion ** Sierra Club Niagara Group ** June 8, 2017 Judah Aber EB START Consulting Agenda Why Switch to Electric Buses? Market & Technology Overview Funding

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

UPGRADING THE AMTRAK KEYSTONE CORRIDOR

UPGRADING THE AMTRAK KEYSTONE CORRIDOR UPGRADING THE AMTRAK KEYSTONE CORRIDOR Mark A. Wurpel Director Project Initiation & Development Amtrak 2005 AREMA Conference & Exposition Chicago, Illinois ABSTRACT: Upgrading the Amtrak Keystone Corridor

More information

ACT 89: THE FOUNDATION TO REBUILD SEPTA FOR THE FUTURE JOSEPH M. CASEY GENERAL MANAGER

ACT 89: THE FOUNDATION TO REBUILD SEPTA FOR THE FUTURE JOSEPH M. CASEY GENERAL MANAGER ACT 89: THE FOUNDATION TO REBUILD SEPTA FOR THE FUTURE JOSEPH M. CASEY GENERAL MANAGER MARCH 12, 2015 CAPITAL BUDGET TREND HISTORIC FUNDING SHORTFALLS $350 $300 PA ACT 26 (1991) $312 PA ACT 44 (2007) $293

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

SEPTA Public Open House. FY 2019 Capital Budget Development January 24, 2018

SEPTA Public Open House. FY 2019 Capital Budget Development January 24, 2018 SEPTA Public Open House FY 2019 Capital Budget Development January 24, 2018 SEPTA Public Open House FY 2019 Capital Budget Development January 24, 2018 FY 2018 Capital Budget and 12-Year Capital Program

More information

The Implications of Automated Vehicles for the Public Transit Industry

The Implications of Automated Vehicles for the Public Transit Industry The Implications of Automated Vehicles for the Public Transit Industry June 22, 2016 Presentation to I-95 Corridor Coalition Jerome M. Lutin, Ph.D., P.E. Senior Director of Statewide & Regional Planning

More information

Roma McKenzie-Campbell Amtrak, Project Manager. Caroline Ducas VHB, Senior Transit Planner. Boston, Massachusetts

Roma McKenzie-Campbell Amtrak, Project Manager. Caroline Ducas VHB, Senior Transit Planner. Boston, Massachusetts DMU Implementation on Existing Commuter Rail Corridors: Opportunities, Challenges and Lessons Learned Roma McKenzie-Campbell Amtrak, Project Manager Caroline Ducas VHB, Senior Transit Planner Boston, Massachusetts

More information

PARTIAL PROGRAM OF PROJECTS FFY

PARTIAL PROGRAM OF PROJECTS FFY PARTIAL PROGRAM OF PROJECTS FFY 2016-17 The proposed Partial Program of Projects for FFY 2016-17 is attached. The proposed Partial Program of Projects was introduced at the SCTA Board at its meeting on

More information

TriMet is your ticket to freedom and independence

TriMet is your ticket to freedom and independence TriMet is your ticket to freedom and independence TriMet is accessible to everyone: all vehicles, services, facilities and information are readily used by all people, including those with special needs.

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

Understanding Public Transportation. A Workshop To Help You Make The Most Of Public Transportation

Understanding Public Transportation. A Workshop To Help You Make The Most Of Public Transportation Understanding Public Transportation A Workshop To Help You Make The Most Of Public Transportation 1 The types of public transportation available and how public transportation is funded The accessibility

More information

Service Quality: Higher Ridership: Very Affordable: Image:

Service Quality: Higher Ridership: Very Affordable: Image: Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to

More information

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY FISCAL YEAR 2008 CAPITAL BUDGET FISCAL YEARS CAPITAL PROGRAM AND COMPREHENSIVE PLAN

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY FISCAL YEAR 2008 CAPITAL BUDGET FISCAL YEARS CAPITAL PROGRAM AND COMPREHENSIVE PLAN SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY FISCAL YEAR 2008 CAPITAL BUDGET FISCAL YEARS 2008-2019 CAPITAL PROGRAM AND COMPREHENSIVE PLAN APPROVED BY THE SEPTA BOARD MAY 24, 2007 Table of Contents

More information

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org Capital Metro Plans & Projects Update NASWC July 27, 2017 1 Capital Metro at a Glance Established in 1985 535 square mile service area 1,079,995 population 7 Member Cities Austin Leander Manor Lago Vista

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY THIS PAGE LEFT BLANK INTENTIONALLY SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY FISCAL YEAR 2007 CAPITAL BUDGET FISCAL YEARS 2007-2018 CAPITAL PROGRAM AND COMPREHENSIVE PLAN APPROVED BY THE SEPTA

More information

Kenosha-Racine-Milwaukee (KRM)

Kenosha-Racine-Milwaukee (KRM) Kenosha-Racine-Milwaukee (KRM) Commuter Rail #147925 November 6, 2009 1 Guidance of KRM Commuter Rail Studies Intergovernmental Partnership Technical Steering Committee Temporary and Limited Authority

More information

Green Line Long-Term Investments

Green Line Long-Term Investments Enhancements Short-term improvements to keep Austin moving. Investments Long-term projects to support our future. Mobility Hubs MetroRapid MetroRail MetroExpress Connectors Circulators Project Connect

More information

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at Overview Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at www.garail.com Commuter rail service between Lovejoy and Atlanta is ready for implementation:

More information

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St East Bay Bus Rapid Transit Project 1 AC Transit at a Glance EAST BAY AREA S LARGEST PUBLIC TRANSIT PROVIDER RIDERSHIP Daily (weekday) 178,851* Annual 54,987,132 Paratransit (daily) 1,994 ** * Includes

More information

Bus Rapid Transit: Basic Design for Non-Transit Planners

Bus Rapid Transit: Basic Design for Non-Transit Planners Bus Rapid Transit: Basic Design for Non-Transit Planners Paul Bignardi, AICP - Principal Planner San Francisco Municipal Transportation Agency Graham Carey, PE Principal careybrt Consulting Peter Gabancho,

More information

PHILADELPHIA SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL)

PHILADELPHIA SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL) PHILADELPHIA SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL) October 2003 The Philadelphia commuter rail service area consists of 5.1 million people, spread over 1,800 square miles at an average population

More information

Leadership NC. November 8, 2018

Leadership NC. November 8, 2018 v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the

More information

Federal Gas Tax Program. Transportation Committee May 7, 2014

Federal Gas Tax Program. Transportation Committee May 7, 2014 5.2 Federal Gas Tax Program Transportation Committee May 7, 2014 Federal Gas Tax Transfer Program Original head agreement signed in 2005 (Canada-BC-UBCM) Purpose: provide local governments with stable,

More information

Chicago Milwaukee Intercity Passenger Rail Corridor

Chicago Milwaukee Intercity Passenger Rail Corridor Chicago Milwaukee Intercity Passenger Rail Corridor Past, Present, and Future Arun Rao, Passenger Rail Manager Wisconsin Department of Transportation Elliot Ramos, Passenger Rail Engineer Illinois Department

More information

The Latest on Joint Development Policy Guidance

The Latest on Joint Development Policy Guidance Panelists The Latest on Joint Development Policy Guidance Moderator: Jonathan Davis Deputy General Manager and Chief Financial Officer Massachusetts Bay Transportation Authority James Blakesley, Attorney-Advisor,

More information

DART Capital Program Update

DART Capital Program Update DART Capital Program Update CMAA North Texas April 30, 2015 David Ehrlicher Assistant Vice President, Program Delivery Overview of DART System Multimodal System: 120 + bus routes 90 miles of Light Rail

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Passenger Rail Solar Electrification: A Primer. Oregon Department of Transportation Rail Division. June 2009

Passenger Rail Solar Electrification: A Primer. Oregon Department of Transportation Rail Division. June 2009 Passenger Rail Solar Electrification: A Primer Oregon Department of Transportation Rail Division June 2009 Betsy Imholt ODOT Rail Division 503.986.4077 phone betsy.imholt@odot.state.or.us Executive Summary

More information

Swift Green Line April 11, 2019

Swift Green Line April 11, 2019 Swift Green Line April 11, 2019 Overview Swift BRT Overview Swift Green Line Project Snohomish County Partnership Early Results Swift Washington s first BRT Overlay BRT Stations approx. 3/4-1 mile apart

More information

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta Overview Commuter rail service between Lovejoy and Atlanta is ready for implementation: $87.08 Million is in

More information

Electric Multiple Unit Procurement Update

Electric Multiple Unit Procurement Update Electric Multiple Unit Procurement Update Public Meetings September 2014 Caltrain Today 2 1 Key Facts Diesel commuter rail system SF to SJ area 77 mile corridor, 32 stations 92 trains / weekday Ridership:

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

Sand loader. Source: Southwestern Planning Commission

Sand loader. Source: Southwestern Planning Commission Sand loader Source: Southwestern Planning Commission SEPTA bridge construction in progress Source: SEPTA This chapter of the 2015 Pennsylvania State Rail Plan presents a summary of 230 proposed passenger

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT

2 VALUE PROPOSITION VALUE PROPOSITION DEVELOPMENT 2 VALUE PROPOSITION The purpose of the Value Proposition is to define a number of metrics or interesting facts that clearly demonstrate the value of the existing Xpress system to external audiences including

More information

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS

Status of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS Status of Plans March 2011 Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS Transit project update Project rationale The system New Britain Hartford Busway New Haven/Hartford/ Springfield Passenger Rail

More information

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N QUALITY OF LIFE EXECUTIVE SUMMARY REPORT UN I O N S TAT I O N T R AV E L by TR A I N Published September 2017 2015 PROGRESS MAP This document reports FasTracks progress through 2015 BACKGROUND RTD The

More information

Vanpooling and Transit Agencies. Module 3: Benefits to Incorporating Vanpools. into a Transit Agency s Services

Vanpooling and Transit Agencies. Module 3: Benefits to Incorporating Vanpools. into a Transit Agency s Services Vanpooling and Transit Agencies Module 3: Benefits to Incorporating Vanpools into a Transit Agency s Services A common theme we heard among the reasons why the transit agencies described in Module 2 began

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Click to edit Master title style

Click to edit Master title style Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment

More information

The Engineering Department recommends Council receive this report for information.

The Engineering Department recommends Council receive this report for information. CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision

More information

Cobbs Creek Viaduct (4.79) Built in 1891

Cobbs Creek Viaduct (4.79) Built in 1891 Cobbs Creek Viaduct (4.79) Built in 1891 Plan Approach: Work to reduce SEPTA S $5 Billion SGR backlog Model after SEPTA s successful Stimulus Program Provide outreach to DBE firms Report on jobs created/retained

More information

Transit Hub Case Study: Owings Mills Metro Station. By: Kathleen Cary Rose, J. Luke Byrne and Catherine Buhler

Transit Hub Case Study: Owings Mills Metro Station. By: Kathleen Cary Rose, J. Luke Byrne and Catherine Buhler Executive Summary Transit Hub Case Study: Owings Mills Metro Station By: Kathleen Cary Rose, J. Luke Byrne and Catherine Buhler The purpose of the Transit Hub Case Study is to identify and evaluate the

More information

Streetcar Level Boarding Background Memo

Streetcar Level Boarding Background Memo Level Boarding Background Memo Introduction This memo has been prepared by the and the Community Coalition to facilitate industry discussion on the application of level boarding concepts to US modern streetcar

More information

Proposed Downtown Miami Link

Proposed Downtown Miami Link March 30, 2016 Proposed Downtown Miami Link A PUBLIC PRIVATE PARTNERSHIP Presented to: Secretary Boxold, FDOT Presented by: Jack Stephens, Executive Director, SFRTA March 30, 2016 Downtown Miami Link Costs

More information

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit

The Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,

More information

Electric Multiple Unit Procurement Update

Electric Multiple Unit Procurement Update Electric Multiple Unit Procurement Update Board of Directors August 7, 2014 Context* * The proposed project is not yet approved pending environmental clearance. 2 1 Status April 2014 - JPB update on EMU

More information

ADA CHANGES TO METRO'S BUS SERVICE

ADA CHANGES TO METRO'S BUS SERVICE Los Angeles County Metropolitan Transportation Authority ADA CHANGES TO METRO'S BUS SERVICE PRESENTED TO: TECHNICAL ADVISORY COMMITTEE March 2, 2011 1 Daily Metro: Operates over 2,600 buses 191 different

More information

MIDDAY STORAGE. VRE has temporarily used Ivy City Coach Yard since 1992 Insufficient today Restricts further growth

MIDDAY STORAGE. VRE has temporarily used Ivy City Coach Yard since 1992 Insufficient today Restricts further growth MIDDAY STORAGE VRE has temporarily used Ivy City Coach Yard since 1992 Insufficient today Restricts further growth Will diminish to zero Agreement allows reduction in VRE storage starting July 2018 Washington

More information

Introducing the Solution to LA s Airport Congestion Problem

Introducing the Solution to LA s Airport Congestion Problem Presentation by Roger J. Rudick Introducing the solution to the County s airport congestion problem Introducing the Solution to LA s Airport Congestion Problem Existing infrastructure, off-the-shelf technology,

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

Pathways to the Zero-Emission Bus CTA s 51 st Annual Fall Conference & Expo

Pathways to the Zero-Emission Bus CTA s 51 st Annual Fall Conference & Expo Pathways to the Zero-Emission Bus CTA s 51 st Annual Fall Conference & Expo Today s Transit for Tomorrow s World SunLine s Zero Emission Bus Program Commercializing zero emissions bus technology for the

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

Toolbox Transit Presentation Professors Joseph DiJohn and Siim Sööt University of Illinois at Chicago

Toolbox Transit Presentation Professors Joseph DiJohn and Siim Sööt University of Illinois at Chicago Toolbox Transit Presentation Professors Joseph DiJohn and Siim Sööt University of Illinois at Chicago Brief History of the RTA Early years Private operators CTA formed in 1946 1974 Referendum to create

More information

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017

Elected Officials Briefing. North Metro Rail Line Update. February 9, 2017 Elected Officials Briefing North Metro Rail Line Update February 9, 2017 Dave Genova, RTD General Manager and CEO Openings 2016-2017 Flatiron Flyer, Jan. 3, 2016 University of Colorado A Line, April 22,

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015

B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015 1 B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015 Northwest Rail (B) Line 6.2 miles electric commuter rail Downtown to Westminster at the 71 st /Lowell Station 11-minute travel time

More information

PSTA as a Mobility Manager

PSTA as a Mobility Manager PSTA as a Mobility Manager CTA Annual Conference Riverside, CA Bonnie Epstein, Transit Planner November 8, 2017 Pinellas Suncoast Transit Authority (PSTA) St. Petersburg, Florida Introduction 1 PSTA and

More information

Conceptual renderings subject to change

Conceptual renderings subject to change Conceptual renderings subject to change OCTA Special Needs Committee Presentation Tuesday, Project Presenter Jamie Lai, P.E. Transit Manager, City of Anaheim The ARTIC Project Manager 2 The ARTIC Project

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

CNG Strategy/Overview

CNG Strategy/Overview CNG Strategy/Overview JACKSONVILLE TRANSPORTATION Future of Transit AUTHORITY Managing Mobility Brad Thoburn Vice President, Planning, Development and Innovation CNG State Strategy/Overview of the Industry

More information

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000.

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000. Urban Transit Agencies SEPTA - Philadelphia Elwyn-Wawa Service Restoration Project $7,300,000 SEPTA - Philadelphia Construction of New Signage $4,792,000 SEPTA - Philadelphia New Tunnel Lighting $2,044,800

More information

Chapter 6 - Capital Improvement Program

Chapter 6 - Capital Improvement Program Chapter 6 - INTRODUCTION This chapter outlines the capital infrastructure projects needed to implement the service recommendations described in Chapter 5. The (CIP) provides the basis for CSPDC s requests

More information

Istanbul METROBUS BRT. Adapted from Presentations by World Resources Institute/EMBARQ s Sibel Koyluoglu and Dario Hidalgo

Istanbul METROBUS BRT. Adapted from Presentations by World Resources Institute/EMBARQ s Sibel Koyluoglu and Dario Hidalgo Istanbul METROBUS BRT Adapted from Presentations by World Resources Institute/EMBARQ s Sibel Koyluoglu and Dario Hidalgo Historic Istanbul Modern Istanbul Istanbul Among World s most historic and rapidly

More information

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study Feasibility Study Community Meeting March, 2017 1 Agenda 1. Welcome / Introductions 2. Background / Meeting Purpose 3. Progress to Date Options Evaluated Capital/Operating Costs Ridership 4. Financial

More information

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016

FasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016 July 29, 2013 Welcome to Inside RTD FasTracks a monthly e- update to keep you informed about the progress of the Regional Transportation District's FasTracks program. FasTracks News RTD s Eagle P3 Transit

More information

NEW YORK SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL)

NEW YORK SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL) NEW YORK SUBURBAN RAIL SUMMARY (COMMUTER RAIL, REGIONAL RAIL) October 2003 New York: The New York commuter rail service area consists of 20.3 million people, spread over 4,700 square miles at an average

More information

Commuter Transit Service Feasibility

Commuter Transit Service Feasibility Commuter Transit Service Feasibility West Michigan Transit Linkages Study Submitted to: Ottawa County, Michigan Submitted by: MP2PLANNING, LLC AUGUST 2012 Table of Contents 1. Introduction... 2 2. Overall

More information

Keeping Seattle Moving Seattle City Council February 2013

Keeping Seattle Moving Seattle City Council February 2013 Keeping Seattle Moving Seattle City Council February 2013 Seattle City Council February 2013 1 Mobility Challenges Ahead Viaduct mitigation expires June 2014 Potential system-wide service cuts begin in

More information

Greater Cleveland Regional Transit Authority

Greater Cleveland Regional Transit Authority Greater Cleveland Regional Transit Authority Summary of Proposed Award Vanpool Program Presented to: Operations Committee August 2, 2016 What is a Vanpool? A vanpool is a group of people (larger than 5)

More information

Corridor Management Committee. March 7, 2012

Corridor Management Committee. March 7, 2012 Corridor Management Committee March 7, 2012 2 Today s Topics SWLRT Project Office Update Engineering Services Procurement Update Legislative Leadership Tour Annual New Starts Report Update on Proposed

More information

D2 - CBD Second Alignment

D2 - CBD Second Alignment D2 - CBD Second Alignment Joint Meeting of DART Board of Directors/City of Dallas Transportation and Trinity River Project Council Committee 28 October 2013 Steve Salin, AICP Vice President, Rail Planning

More information

New Headhouse Street Entrance at Glenwood Avenue. Hybrid (Diesel/Electric) Bus. New Guideway between 62nd and 63rd Streets

New Headhouse Street Entrance at Glenwood Avenue. Hybrid (Diesel/Electric) Bus. New Guideway between 62nd and 63rd Streets SEPTA Capital Improvements in the City of Philadelphia December 2008 North Philadelphia Transportation Center New Headhouse Street Entrance at Glenwood Avenue Construction of new Fairmount Substation Hybrid

More information

Chapter 4 : THEME 2. Transportation

Chapter 4 : THEME 2. Transportation Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,

More information

Accessible Transit Service

Accessible Transit Service Accessible Transit Service Independence Through Accessibility 520-792-9222 TDD 520-628-1565 www.suntran.com SUN TRAN Independence through Accessibility Sun Tran is the Tucson region s fixed-route public

More information

Caltrain Modernization EMU Procurement

Caltrain Modernization EMU Procurement Caltrain Modernization EMU Procurement Boarding Height CAC Meeting May 20, 2015 Context 2 1 Riders (Boardings) Average Weekday Ridership Since 2004 143% increase 60,000 55,000 50,000 45,000 40,000 35,000

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005

Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005 Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005 Public Transit District Utah Transit Authority Linear Geographic Area - 130 miles by

More information

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who

More information

Tarrant County Projected Population Growth

Tarrant County Projected Population Growth Based on the information provided in the preceding chapters, it is apparent that there are a number of issues that must be addressed as The T works to develop an excellent transit system for Fort Worth

More information

Sustainable Transportation Award Winner. UC/CSU Sustainability Conference Santa Barbara, 2006

Sustainable Transportation Award Winner. UC/CSU Sustainability Conference Santa Barbara, 2006 Sustainable Transportation Award Winner UC/CSU Sustainability Conference Santa Barbara, 2006 Translocator (Transit Locator) San Jose State University CSU: Transportation Demand Management Eyedin Zonobi,

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

#4.. DOCKLESS MOBILITY. Packet page: 2

#4.. DOCKLESS MOBILITY. Packet page: 2 DOCKLESS MOBILITY Packet page: 2 1 BIKE AND SCOOTER SHARE HISTORY 2018- E-scooters Deployed in Dozens of U.S. Cities by Multiple Providers, Bird reports over 10 million rides in 1 year August 2017- Bird

More information

Bedford/Franklin Regional Rail Initiative (BFRRI) Rationale for a Bedford Amtrak Station June 30, 2015

Bedford/Franklin Regional Rail Initiative (BFRRI) Rationale for a Bedford Amtrak Station June 30, 2015 Bedford/Franklin Regional Rail Initiative (BFRRI) Rationale for a Bedford Amtrak Station June 30, 2015 SUBJECT: Bedford Amtrak Station Why an Amtrak station in Bedford makes sense. I. BACKGROUND: In January

More information

KANSAS CITY STREETCAR

KANSAS CITY STREETCAR KANSAS CITY STREETCAR KAREN CLAWSON MID-AMERICA REGIONAL COUNCIL KANSAS CITY STREETCAR Regional Context Alternatives Analysis Kansas City Streetcar Project KANSAS CITY REGION KANSAS CITY REGION KANSAS

More information

Utah Transit Authority Rideshare. CTAA Conference June 12, 2014

Utah Transit Authority Rideshare. CTAA Conference June 12, 2014 Utah Transit Authority Rideshare CTAA Conference June 12, 2014 UTA Statistics and Info A Public Transit Agency Six counties, about 1600 square miles Within this area is 80% of the state s population, an

More information

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Presentation Outline Transit System Facts Economic Challenges in the Truckee Meadows RTC Transit

More information

Getting around the future Paris-Saclay urban campus

Getting around the future Paris-Saclay urban campus Getting around the future Paris-Saclay urban campus Ten years from now, the creation of Paris-Saclay s urban campus will multiply by three the trips made on campus. In general, access to the Plateau is

More information