1 DMU Implementation on Existing Commuter Rail Corridors: Opportunities, Challenges and Lessons Learned Roma McKenzie-Campbell Amtrak, Project Manager Caroline Ducas VHB, Senior Transit Planner Boston, Massachusetts

2 Key Presentation Take-Aways Understand challenges of adding DMUs on an existing system shared with traditional commuter rail and freight service Determine service goals and objectives early Conduct a thorough Needs Assessment to determine operational and infrastructure requirements and costs Understand requirements of integrating a new technology into an older system

3 Overview Introduction Objectives/Opportunities of DMUs Summary of Studies Challenges Lessons Learned

4 Introduction Introduction Objectives/Opportunities of DMUs Summary of Studies Challenges with an Existing System Lessons Learned

5 5th largest transit agency in US (by unlinked passenger trips) Operates the following services: Commuter Rail (contracted) Commuter Ferry (contracted) Heavy Rail/Subway Light Rail Bus Rapid Transit (BRT) Bus & Trackless Trolley Introduction The MBTA

6 Introduction Commuter Rail at a Glance 14 Commuter Rail Routes 388 Route Miles 138 Stations 129,075 Weekday Boardings 3 Maintenance Facilities 14 Layover/Storage Facilities 90 Locomotives 410 Coaches Source: MBTA Ridership and Service Statistics, Revenue Fleet info based on Draft FY Commuter Rail Fleet Management Plan.

7 Introduction Commuter Rail/Subway Coverage Area

8 Objectives/Opportunities of DMUs Introduction Objectives/Opportunities of DMUs Summary of Studies Challenges with an Existing System Lessons Learned

9 Objectives/Opportunities of DMUs Self-propelled, single unit passenger vehicle powered by diesel engines Operated in 2-car to 6-car trainset configurations (MBTA) Service on short and medium distance, non-electrified railroad lines

10 Objectives/Opportunities of DMUs Introduce the Urban Rail Concept Utilize existing infrastructure for additional core service Provide more frequent service, particularly off-peak when capacity is available Benefit Suburban commuters with reduced travel times

11 Summary of Studies Introduction Objectives/Opportunities of DMUs Summary of Studies Challenges with an Existing System Lessons Learned

12 Summary of Studies Fairmount Line South Station to Readville Worcester Line South Station to Riverside Worcester Line Fairmount Line

13 Overview: Fairmount Line Corridor Implementation Plan 9.7 Miles of Track 0.6 Miles of Single Track 9.1 Miles of Double Track 9 Stations 6 (+ 1 Planned) with High Level Platforms 2 with Low Level Platforms and Mini-Highs Study Goal: To determine all infrastructure and operational needs, costs, and timeline for implementation of DMU service on the MBTA Fairmount Line

14 Overview: Worcester Line Corridor Operations Analysis 11 Miles of Primarily Double Track 9 Stations 2 (+2 Planned) with High Level Platforms 3 with Low Level, Single Side Platforms 1 with Low Level Platform and Mini-High 1 New Station at Riverside Study Goal: To conduct an initial operational assessment of DMU service on the MBTA Worcester Line from a new station at Riverside to South Station

15 Study Goals & Objectives Service Goals & Objectives 15 minute peak period headways; 30 minute off-peak period headways Single, dedicated DMU platform at South Station Minimal/no impact to other commuter rail, intercity rail and freight operations Infrastructure Objectives Achieve service goals with operational reliability Accommodate DMU vehicles Comply with accessibility/code requirements

16 Study Baseline Assumptions DMUs operated and maintained by MBTA s commuter rail contractor On board fare collection Base 3-car trainset configuration (with 2-car to 6-car trainsets possible)

17 Challenges Introduction Objectives/Opportunities of DMUs Summary of Studies Challenges Lessons Learned

18 Challenge #1: Integration into an Existing System - Operations Ability to achieve headway goals is challenging Fairmount Line 79% DMU OTP with 15 minute peak headways 95% OTP achievable with 20 minute peak headways Worcester Line 60 minute headways best fit Impact of revenue and non-revenue moves and location of layover is critical Turn movements at terminal stations, preferably off the mainline, needs consideration

19 Challenge #1: Integration into an Existing System - Infrastructure High level platforms required at all stations Track & signal improvements needed for additional capacity and reliability Additional clearances required for high and wide freight routes (Worcester Line) Adequacy of structures for DMU tractive and braking forces 19

20 Challenge #2: Introduction of New Technology into Existing System Existing MBTA layover facilities not adequate to accommodate new DMU fleet Dedicated DMU layover/maintenance facilities required (based on initial 30 car DMU procurement) Midday storage for 5, 3-car trainsets Overnight storage for base DMU fleet of 10, 3-car trainsets 255 long tracks for 3-car trainset base configuration Parking for staff and visitors

21 Challenge #2: Introduction of New Technology into Existing System 53-person maintenance staff needed at dedicated facility Service & Inspection / Maintenance - Similar to existing locomotives and coaches (with a few exceptions)

22 Challenge #3: Understanding the Costs Capital Costs Vehicles Stations Track/Signals Support Facilities Operations/Maintenance Operating crew labor, fuel Maintenance staff labor Maintenance materials Other Soft Costs Administrative Design, Permitting, Procurement Order of Magnitude Capital Cost Estimate Fairmount Line DMU Vehicle Procurement (Programmed Cost, Used for Planning Purposes Only) Infrastructure Improvements Approx. Cost $ 239M $ 163M $ 13M Corridor Signals Stations and Track & Signals $ 65M Improvements Layover/ Maintenance $ 85M Facilities Total Capital Costs (Mid-point of $ 402M construction, 2020 dollars) Estimated Annual O&M Costs* $12M *Does not account for reductions attributed to changes in commuter rail service or additional generated fare box revenue

23 Challenge #4: Understanding the Schedule Planning/Feasibility Fleet procurement Add to existing order (if possible) vs. develop agency-specific RFP Design, permit and construct infrastructure improvements Phasing of project elements Timing of DMU delivery and vehicle acceptance Location for support facilities Key Implementation Steps Fairmount Line Planning/Feasibility Phase Environmental/Preliminary Engineering Design Phase Final Design and Permitting Phase Construction Phase DMU Vehicle Procurement Estimated Duration 6 months 21 months 18 months 36 months ~ 6 years Layover 6 years + Implementation of DMUs into an existing system is a multi-year process and takes careful planning and consideration.

24 Challenges of Integrating DMUs into an Existing System Introduction Objectives/Opportunities of DMUs Summary of Studies Challenges Lessons Learned

25 Lessons Learned Establish a preliminary program/standard Service Delivery Policy Service Goals & Objectives Systemwide or Phased Approach Conduct a thorough Needs Assessment Operations Infrastructure Understand the Realities Time Financial Commitment by Agencies

26 Thank You

Portland Area Mainline Needs Assessment DRAFT. Alternative 4 Public Transportation: New or Improved Interstate Bus Service

Portland Area Mainline Needs Assessment DRAFT. Alternative 4 Public Transportation: New or Improved Interstate Bus Service Portland Area Mainline Needs Assessment DRAFT Alternative 4 Public Transportation: New or Improved Interstate Bus Service HNTB Corporation April 2018 Table of Contents 4.1 Overview... 4-1 4.2 Key Assumptions...

More information

Appendix. Statistical Profile

Appendix. Statistical Profile Appendix Statistical Profile MBTA Service and Infrastructure Profile March 2006 MBTA SERVICE DISTRICT ANNUAL RIDERSHIP (FY 2006) Cities and Towns 75 UNLINKED TRIPS BY MODE Size in Square Miles Population

More information

Appendix. Statistical Profile

Appendix. Statistical Profile Appendix Statistical Profile MBTA Service and Infrastructure Profile August 200 MBTA SERVICE DISTRICT ANNUAL RIDERSHIP (FY 200) Cities and Towns 75 UNLINKED TRIPS BY MODE Size in Square Miles 3,2 Bus (includes

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

MBTA RAILROAD OPERATIONS Commuter Rail. MBTA/MassDOT

MBTA RAILROAD OPERATIONS Commuter Rail. MBTA/MassDOT MBTA RAILROAD OPERATIONS Commuter Rail New England Railroad Club November 1, 2018 Ryan D. Coholan Chief Railroad Officer MBTA/MassDOT 1 Topics for Discussion State of the System Existing Conditions Ridership

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

Strategic Plan Performance Metrics & Targets

Strategic Plan Performance Metrics & Targets San Francisco Municipal Transportation Agency Strategic Plan Performance Metrics & Targets Fiscal Year 2019 Fiscal Year 2020 April 3, 2018 SAFETY Goal 1: Create a safer transportation experience for everyone.

More information

Electric Multiple Unit Procurement Update

Electric Multiple Unit Procurement Update Electric Multiple Unit Procurement Update Board of Directors August 7, 2014 Context* * The proposed project is not yet approved pending environmental clearance. 2 1 Status April 2014 - JPB update on EMU

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

Commuter Rail Vehicle Technology Analysis

Commuter Rail Vehicle Technology Analysis Commuter Rail Vehicle Technology Analysis May, 2007 Commuter Rail Vehicle Technology Analysis 1 Purpose: To present the results of the EMU, DMU and DMU double deck (DMU dd) analysis Including: Description

More information

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018 UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Presentation Outline Transit System Facts Economic Challenges in the Truckee Meadows RTC Transit

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

High-Speed Intercity Passenger Rail

High-Speed Intercity Passenger Rail September 13, 2011 LTRC Seminar Series: Congestion Management Baton Rouge New Orleans High-Speed Intercity Passenger Rail AGENDA LTRC Seminar Series: Congestion Management Baton Rouge, Louisiana Project

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

An Overview of High Speed Rail. David Randall Peterman Congressional Research Service

An Overview of High Speed Rail. David Randall Peterman Congressional Research Service An Overview of High Speed Rail David Randall Peterman Congressional Research Service 1 Defining High Speed Rail in the U.S. What is High Speed Rail? Allusions to world-class European and Asian systems

More information

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Page 72 of 96 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

Contents. Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5

Contents. Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5 Contents Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5 Project Benefits...6 Economic Growth...7 Infrastructure Improvements...9 Quality of Life... 11 Next Steps... 12

More information

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who

More information

Caltrain Modernization EMU Procurement

Caltrain Modernization EMU Procurement Caltrain Modernization EMU Procurement Boarding Height CAC Meeting May 20, 2015 Context 2 1 Riders (Boardings) Average Weekday Ridership Since 2004 143% increase 60,000 55,000 50,000 45,000 40,000 35,000

More information

Leadership NC. November 8, 2018

Leadership NC. November 8, 2018 v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

Commuter Rail Vehicle Technology Analysis

Commuter Rail Vehicle Technology Analysis Commuter Rail Vehicle Technology Analysis May, 2007 Commuter Rail Vehicle Technology Analysis 1 Purpose: To present the results of the, and double deck ( dd) analysis Including: Description of the Vehicles

More information

Transitioning to a Zero-Emission Fleet: King County Metro Transit

Transitioning to a Zero-Emission Fleet: King County Metro Transit Transitioning to a Zero-Emission Fleet: King County Metro Transit Lisa Shafer, King County Metro and Joe Iacobucci, Sam Schwartz Consulting King County Metro Transit Seattle, Washington Agenda Why zero-emissions?

More information

PUBLIC TRANSPORTATION

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION An Overview of the Industry, Key Federal Programs, and Legislative Processes American Public Transportation Association 1 The Public Transportation Industry: What is "public transportation"?

More information

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs

Memorandum. 1 Introduction. 2 O&M Cost Elements. 2.1 Service O&M Costs To Barrow Emerson, SamTrans Melissa Reggiardo, SamTrans Date 9/13/2014 Copies Reference number From Subject Corey Wong, Arup Steve Crosley, Fehr + Peers ECR BRT Phasing Plan File reference 1 Introduction

More information

October 22, Dear Focus40 Project Team:

October 22, Dear Focus40 Project Team: October 22, 2018 Dear Focus40 Project Team: On behalf of our over 130,000 members and supporters across the Commonwealth, the Sierra Club Massachusetts Chapter provides these comments on the Focus40 Plan

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

Halifax Commuter Rail Feasibility Study

Halifax Commuter Rail Feasibility Study Halifax Commuter Rail Feasibility Study Open House Halifax Regional Municipality February 26, 2015 Study Team The team is led by CPCS: A global management consulting firm (formerly the consulting arm of

More information

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018 I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station

More information

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only

METRONext. Vision & Moving Forward Plans. Board Workshop. December 11, DRAFT For Preliminary Discussion Only METRONext Vision & Moving Forward Plans Board Workshop December 11, 2018 Disclaimer This presentation is being provided solely for discussion purposes by the Board of Directors of the Metropolitan Transit

More information

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org Capital Metro Plans & Projects Update NASWC July 27, 2017 1 Capital Metro at a Glance Established in 1985 535 square mile service area 1,079,995 population 7 Member Cities Austin Leander Manor Lago Vista

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

A Transit Plan for the Future. Draft Network Plan

A Transit Plan for the Future. Draft Network Plan A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland

The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland The Northeast Corridor Master Plan Amtrak s Next Generation High-Speed Rail and Northeastern Maryland Chesapeake Science & Security Corridor Regional Rail Committee Meeting October 20, 2010 Drew Galloway

More information

Amtrak Fleet Strategy

Amtrak Fleet Strategy Amtrak Fleet Strategy Section 305 Executive Committee Ken Uznanski March 10, 2010 Amtrak Fleet Plan Intercity Passenger Rail in United States has unprecedented opportunity that must be addressed Amtrak,

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

Peninsula Corridor Electrification Project Cost / Schedule Update

Peninsula Corridor Electrification Project Cost / Schedule Update Peninsula Corridor Electrification Project Cost / Schedule Update LPMG Meeting November 20, 2014 Context Caltrain/high-speed rail blended system - Primarily 2 track system - Minimize impacts - Shared system

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

Future of FrontRunner Final Report

Future of FrontRunner Final Report Future of FrontRunner Final Report Prepared for UTA by LTK Engineering Services In association with Fehr & Peers Jacobs Engineering Document Number: LTK.C5016.02 September 2018 Table of Contents Future

More information

Commuter Rail Update. October 25, 2018

Commuter Rail Update. October 25, 2018 Commuter Rail Update October 25, 2018 2 page page 3 State of Commuter Rail Network, July 2014 The 2014 Commuter Rail network had multiple issues and a history of neglect & under-investment FIRST UP? UPGRADES

More information

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:

More information

Kenosha-Racine-Milwaukee (KRM)

Kenosha-Racine-Milwaukee (KRM) Kenosha-Racine-Milwaukee (KRM) Commuter Rail #147925 November 6, 2009 1 Guidance of KRM Commuter Rail Studies Intergovernmental Partnership Technical Steering Committee Temporary and Limited Authority

More information

Blue Ribbon Committee

Blue Ribbon Committee Blue Ribbon Committee February 26, 2015 Kick-off Meeting Blue Ribbon Committee 1 2,228 Metro CNG Buses 170 Bus Routes 18 are Contract Lines Metro Statistics 2 Transitway Lines (Orange/Silver Lines) 20

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

Electric Multiple Unit Procurement Update

Electric Multiple Unit Procurement Update Electric Multiple Unit Procurement Update Public Meetings September 2014 Caltrain Today 2 1 Key Facts Diesel commuter rail system SF to SJ area 77 mile corridor, 32 stations 92 trains / weekday Ridership:

More information

GO Transit s deliverable: the 2020 Service Plan

GO Transit s deliverable: the 2020 Service Plan GO Transit s deliverable: the 2020 Service Plan GO Transit s 2020 Service Plan describes GO s commitment to customers, existing and new, to provide a dramatically expanded interregional transit option

More information

SamTrans Business Plan Update May 2018

SamTrans Business Plan Update May 2018 SamTrans Business Plan Update May 2018 SamTrans Business Plan Core Principles: 1. Sustain and enhance services for the transit-dependent 2. Expand and innovate mobility services 3. Promote programs that

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Executive Summary: Metrobus Network Evaluation and Future Fleet Needs Presented to: Washington Metropolitan Area Transit Authority Submitted by: In Association with P 2 D Joint Venture Introduction Metrobus

More information

Kendall Drive Premium Transit PD&E Study

Kendall Drive Premium Transit PD&E Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study From

More information

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs Peter Brown Project Manager, Long Range Planning Sustainable Streets Division 10 17 2011 Lake Arrowhead, California Outline of

More information

AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph)

AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph) FOR IMMEDIATE RELEASE September 28, 2010 ATK-10-130a Contact: Media Relations 202 906.3860 AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph)

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa Annual growth rate is 3.8% By 2020 population growth would

More information

is being pushed by the locomotive, which reduces the number of seats in that car.

is being pushed by the locomotive, which reduces the number of seats in that car. Commuter rail is passenger rail service that is designed to transport large volumes of passengers over long distances in a fast and comfortable manner. The primary market for commuter rail service is usually

More information

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION October 6, 2016 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 WELCOME 2 Item #4 TRAC ROADWAY RECOMMENDATIONS UPDATE Item #4 Completed Jurisdiction Presentations Boulder City August

More information

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013 East San Fernando Valley Transit Corridor TAC Briefing December 4, 2013 Overview Measure R Project Long Range Transportation Plan Reserves $170.1 Million 2018 Revenue Operations Date Coordination with

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

CalMod Program EMU Procurement Update

CalMod Program EMU Procurement Update CalMod Program EMU Procurement Update Board of Directors May 7, 2015 Agenda Item 7a Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service

More information

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based

More information

EMU Procurement Seats/Standees/Bikes/Bathroom

EMU Procurement Seats/Standees/Bikes/Bathroom EMU Procurement Seats/Standees/Bikes/Bathroom LPMG May 28, 2015 Purpose Seats / standees / bikes / bathroom balance Develop framework for Draft EMU RFP Feedback on car configuration and range of increased

More information

DART Capital Program Update

DART Capital Program Update DART Capital Program Update CMAA North Texas April 30, 2015 David Ehrlicher Assistant Vice President, Program Delivery Overview of DART System Multimodal System: 120 + bus routes 90 miles of Light Rail

More information

Chicago Milwaukee Intercity Passenger Rail Corridor

Chicago Milwaukee Intercity Passenger Rail Corridor Chicago Milwaukee Intercity Passenger Rail Corridor Past, Present, and Future Arun Rao, Passenger Rail Manager Wisconsin Department of Transportation Elliot Ramos, Passenger Rail Engineer Illinois Department

More information

ConnectGreaterWashington: Can the Region Grow Differently?

ConnectGreaterWashington: Can the Region Grow Differently? Washington Metropolitan Area Transit Authority ConnectGreaterWashington: Can the Region Grow Differently? Transportation Planning Board (TPB) Travel Forecasting Subcommittee July 17, 2015 1 Alternatives

More information

Hillsborough County MPO Transit Study. Transit Concept for 2050 October 17, 2007

Hillsborough County MPO Transit Study. Transit Concept for 2050 October 17, 2007 Hillsborough County MPO Transit Study Transit Concept for 2050 October 17, 2007 Transit Technologies Technologies Considered Bus Light Rail Commuter Rail Bus Standard or articulated high-capacity vehicles

More information

I-26 Fixed Guideway Alternatives Analysis

I-26 Fixed Guideway Alternatives Analysis I-26 Fixed Guideway Alternatives Analysis Steering & Technical Advisory Committees Joint Meeting January 15, 2016 @ 10:00 AM SC/TAC Meeting Winter 2016 Agenda I. Welcome & Introductions II. III. Project

More information

Greater Cleveland Regional Transit Authority

Greater Cleveland Regional Transit Authority Greater Cleveland Regional Transit Authority Summary of Proposed Award Vanpool Program Presented to: Operations Committee August 2, 2016 What is a Vanpool? A vanpool is a group of people (larger than 5)

More information

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018 TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County February 26, 2018 Agenda Review Committee Purpose Review Project Map Discuss Service Alternatives Capital Costs (Stations, Track,

More information

Time (secs) Distance (feet) Accel (mphps) , , , , ,388 0.

Time (secs) Distance (feet) Accel (mphps) , , , , ,388 0. EQUIPMENT Locomotive Hauled vs. Diesel Multiple Units Ohio Rail Development Commission November 19, 2009 Presentation Outline Typical Characteristics Locomotive-hauled equipment DMU Performance Performance

More information

PUBLIC TRANSPORT MODAL CAPACITIES AND COSTS

PUBLIC TRANSPORT MODAL CAPACITIES AND COSTS PUBLIC TRANSPORT MODAL CAPACITIES AND COSTS Outline 1. Modal Characteristics (cont d) -- Simple Capacity Analysis 2. World-Wide Status of Urban Rail Systems 3. Capital Costs 4. Operating Costs Nigel Wilson

More information

Sustainability SFMTA Path to Platinum

Sustainability SFMTA Path to Platinum Sustainability SFMTA Path to Platinum Ed Reiskin San Francisco Municipal Transportation Agency, Director of Transportation San Francisco, CA Timothy Papandreou Deputy Director Strategic Planning & Policy

More information

The Denver Model. Miller Hudson

The Denver Model. Miller Hudson The Denver Model Miller Hudson The Regional Transportation District Created in 1969 Eight county service area 40 municipalities Service area: 2,410 square miles 2.5 million population 15 elected Board

More information

Chapter 6 - Capital Improvement Program

Chapter 6 - Capital Improvement Program Chapter 6 - INTRODUCTION This chapter outlines the capital infrastructure projects needed to implement the service recommendations described in Chapter 5. The (CIP) provides the basis for CSPDC s requests

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 27, 2012 SUBJECT: NOTICE OF AWARD PROCUREMENT AUTHORIZATION - ARTICULATED BUSES INFORMATION ITEM RECOMMENDATION

More information

The Latest on Joint Development Policy Guidance

The Latest on Joint Development Policy Guidance Panelists The Latest on Joint Development Policy Guidance Moderator: Jonathan Davis Deputy General Manager and Chief Financial Officer Massachusetts Bay Transportation Authority James Blakesley, Attorney-Advisor,

More information

Strategic Planning for Metro s Transition to Zero Emission Buses. October 2017

Strategic Planning for Metro s Transition to Zero Emission Buses. October 2017 Strategic Planning for Metro s Transition to Zero Emission Buses October 2017 Requirements and Guidelines/Guiding Principles Continue to replace Aging Bus Fleet (~200 Buses per Year) Upgrade current CNG

More information

PAWG Meeting #3a Tier 1 Evaluation

PAWG Meeting #3a Tier 1 Evaluation PAWG Meeting #3a Tier 1 Evaluation August 2, 2017 LYNX Central Station Open Area 1 Modes Screening 2 Trunk vs Feeder Trunk Modes High peak capacity Direct routes Feeder Modes Routing may be flexible Serve

More information

CalMod Program EMU Procurement Update. TJPA Board May 14, 2015

CalMod Program EMU Procurement Update. TJPA Board May 14, 2015 CalMod Program EMU Procurement Update TJPA Board May 14, 2015 Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service (with level boarding)

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

Bus Rapid Transit. Jennifer Flynn and Cheryl Thole Senior Research Associates Commuter Choice Workshop January 2012 Tampa, FL

Bus Rapid Transit. Jennifer Flynn and Cheryl Thole Senior Research Associates Commuter Choice Workshop January 2012 Tampa, FL Bus Rapid Transit Jennifer Flynn and Cheryl Thole Senior Research Associates Commuter Choice Workshop January 2012 Tampa, FL What is Bus Rapid Transit? BRT is an enhanced bus system that operates on bus

More information

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017

Point A Point B Point C Point D. Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Fulton County Board of Commissioners and Mayors Meeting December 14, 2017 Master Plan Overview Phase 1 Community Vision and Existing Transit Conditions Phase 2 Scenario Development Phase 3 Transit Master

More information

The $600 Million Rebirth of San Diego Trolley

The $600 Million Rebirth of San Diego Trolley The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and

More information

MTA Long Island Rail Road (LIRR) and MTA Metro-North Railroad (MNR) System-wide Service Standards

MTA Long Island Rail Road (LIRR) and MTA Metro-North Railroad (MNR) System-wide Service Standards MTA Long Island Rail Road (LIRR) and MTA (MNR) System-wide Service Standards The following system-wide service standards apply to LIRR and MNR operations. 1. Service Availability Service Availability is

More information

SEPULVEDA PASS CORRIDOR

SEPULVEDA PASS CORRIDOR SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000

More information

Metro Reimagined. Project Overview October 2017

Metro Reimagined. Project Overview October 2017 Metro Reimagined Project Overview October 2017 Reimagining Metro Transit Continuing our Commitment to: Provide mobility based on existing and future needs Value the role of personal mobility in the quality

More information

The Case for. Business. investment. in Public Transportation

The Case for. Business. investment. in Public Transportation The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend

More information

Travel Forecasting Methodology

Travel Forecasting Methodology Travel Forecasting Methodology Introduction This technical memorandum documents the travel demand forecasting methodology used for the SH7 BRT Study. This memorandum includes discussion of the following:

More information

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at Overview Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at www.garail.com Commuter rail service between Lovejoy and Atlanta is ready for implementation:

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Report by Planning, Development & Real Estate Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Planning, Development & Real Estate Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Planning, Development & Real Estate Committee (B) 06-26-08 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 100027 Resolution: Yes

More information

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St East Bay Bus Rapid Transit Project 1 AC Transit at a Glance EAST BAY AREA S LARGEST PUBLIC TRANSIT PROVIDER RIDERSHIP Daily (weekday) 178,851* Annual 54,987,132 Paratransit (daily) 1,994 ** * Includes

More information