1 October 22, 2018 Dear Focus40 Project Team: On behalf of our over 130,000 members and supporters across the Commonwealth, the Sierra Club Massachusetts Chapter provides these comments on the Focus40 Plan for the MBTA. Our population and economy are growing but our transportation system is not keeping up. The current system is heavily based on fossil fuels that generate harmful air pollution and emit greenhouse gases. Transportation is the largest source of carbon emissions in the Commonwealth, and this outsize share will grow as Massachusetts continues to reduce electric sector emissions through programs like the Regional Greenhouse Gas Initiative (RGGI). The Massachusetts Sierra Club recommends that we rapidly de-carbonize our transportation sector while also reducing vehicle miles traveled. The MBTA is the most important statewide component for reducing vehicle miles traveled and relieving traffic congestion. We generally agree with Focus40 in program areas like resiliency, reliability and capacity. State of good repair of the existing system is absolutely necessary, but it is not sufficient and it is not happening fast enough. So we are also strongly advocating for expanding the T by increasing reach, frequency, and connectivity. We believe that the plan must be more holistic so that trolleys and buses are always considered together with rail and ferries -- our comments reflect this approach. Increasing transit use benefits everyone in the state and should be reflected in the split between state funding and passenger revenue. Fares should be kept to an absolute minimum to increase ridership. The goal is to attract people away from choices that generally weaken the public system while increasing congestion and pollution such as private vehicles and ride sharing services. Finally, we need to prioritize environmental justice in all our decisions. We need to adequately serve large populations that depend on transit because of income, choice or limited mobility. Below is a list of projects organized into categories. Many are sample projects that can stimulate further thinking.
2 Major Projects - Greening Existing service We must commit to electrifying the T s buses and rail. Electrified vehicles have superior performance, are cheaper to fuel and maintain, and generate far less pollution and noise. The MBTA is the only commuter rail system on the Northeast Corridor without any electric service. Focus40 should include a phased plan to transition a 100% electric bus fleet. We are pleased that MBTA is carrying out an electric bus feasibility study and pilot, but the Focus40 draft plan shows no electric bus procurements in commitments through In that time, the MBTA will add 194 hybrid buses with an additional 460, 40-ft buses scheduled for delivery by This means that a significant percentage of MBTA s bus fleet will remain tied to fossil fuels for well over a decade. The MBTA needs to invest in electric buses now while continuing to assess in-performance data to inform decisions about transitioning to a fully electric bus fleet. The transition of the bus fleet should focus on environmental justice communities with the most significant air pollution. Replacing the Cambridge trolleybuses should be the last priority for replacement if ever, as they already do not have any tailpipe emissions. Trackless trolleys are (1) lightweight and require less energy; and (2) do not need charging or periodic battery replacement, which increases time in service. They could even be restored to the trolley lines they once were. Mid-sized Projects - Improving Capacity and Redundancy We need more modal equity between rail and highway. Some of these will restore rail service that was sacrificed for highways such as the Pike and I-93. Some examples: Reducing bottlenecks and increasing redundancy such as the junction of the Old Colony lines with the Red Line, and the Green lines in Kenmore Square and Park Street with additional tracks and switches (e.g., so either eastbound track can continue at Park). Every rail station should have separate platforms for each direction (e.g., Newton). Straighten out alignments such as the curves at Boylston Streets and Government Center to improve speed and reduce noise. This will also allow the purchase of more standardized cars. Maintain state of good repair on Mattapan light rail line
3 Major Projects - Increasing existing service Frequency includes extending daily service hours, and weekend and seasonal service. Continue to innovate around late night and early morning service (we commend the recent bus pilots). Year-round weekend service: Every T service should have minimum service on the weekends (2-3 times daily each way) throughout the year. Some examples: Hull and Hingham commuter boat on the weekend. Cape Flyer weekend service throughout the year (until year-round daily commuter service is achieved). Indigo Line: Using rail lines inside Boston as transit while preserving commuter service: The Fairmount Line (with EMUs now if not eventually) with more frequent service. West Station should be in phase 1 of the I-90 MassPike Allston Interchange project. Grand Junction line - double-tracked. From West Station to Kendall, etc. This service would also serve as a component of the Urban Ring. Major Projects - Integrating Existing service Red and Blue Line Subway Connector at Charles/MGH. (We also support the pedestrian tunnel connection from State Street to Downtown Crossing but this is a complement not a substitute for the subway connector.) The North South Rail Link (NSRL) instead of South Station Expansion to fill the gap in the Northeast Corridor and Commuter Rail system. Among its many benefits, the NSRL will (1) connect Gateway Cities across the Commonwealth; (2) remove people from the overcrowded subway connections; (3) significantly reduce midday idling of diesel trains and need for layover yards; (4) free up the
4 Grand Junction by eliminating non-revenue north-side transfers. This was a high-priority project of the 2003 Program for Mass Transportation. Connect the Riverside Line and the E Line at Brookline Village to link Newton to east section of Longwood. Connect the Riverside D and Cleveland Circle stations directly. Major Projects - Improving and Expanding service In general, we believe the system needs more light rail, which in many cases would be restoring historic routes that created much of the urban density one can still see today. Bus rapid transit (BRT) can be a significant improvement while assessing light rail. BRT needs its own system-wide plan. Key bus routes are obvious candidates (such as the 39 bus where the trolley was only recently decommissioned). One overarching goal should be creation of the Urban Ring. Green Line Extension Phase 2 to Medford should be in the Priorities through 2040 category in line with earlier state commitments (e.g., the EIS). We support extending the Orange Line South to Roslindale High-level platforms on the Riverside Line Extend the underground portion of the E Line south under Huntington Avenue. Consider extending the Blue Line from Charles/MGH to Kenmore and/or Kendall Square, Cambridge (perhaps using the Volpe Center). Convert the underground portion of the "Silver Line" to light rail and connect it into the Green Line near Arlington Station to create more seamless transit service to the Seaport. Rebuild the "Silver Line" on Washington Street as a light rail branch of the Green Line and extend it from Dudley Square to Mattapan Square--as was proposed in the 1972 Boston Transportation Planning Review Minor Projects: Entrances and Ramps These projects save commuters time at low cost and do not require equipment: Allow Silver Line Buses to use the Silver Line Way Ramp onto Interstate 90 as originally intended. Braintree pedestrian connection improvements like the two pedestrian bridge concepts studied by the Central Transportation Planning Staff of the Boston Region Metropolitan Planning Organization as well as Metropolitan Area Planning Council (MAPC) pedestrian bridges from the MBTA Red Line/Commuter Rail Station to Union Place. Also a pedestrian bridge could be
5 built along the North side of Union Street to the Commuter Rail Platform and then to the MBTA Red Line Station. Reopen the Hynes entrance to Boylston Street and the Berkeley Street entrance to Arlington station. Add entrances where there are exits such as at Clarendon Street at Back Bay Station; and at Ruggles Station up to Ruggles Street on the Orange Line. Economic Justice and Fares Low fares especially in lower-income urban areas. Preserve cash payments. Many riders are unbanked. More free and reduced transfer opportunities between stations (e.g., Orange Mass. Ave. and E Symphony), and between bus and light rail. We look forward to working with the state to implement this vision of transportation in the Boston region for present and future generations. Respectfully, Deb Pasternak Mass. Sierra Club, Interim Chapter Director deb.pasternak@sierraclub.org
5. OPPORTUNITIES AND NEXT STEPS
5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours
More informationThe Latest on Joint Development Policy Guidance
Panelists The Latest on Joint Development Policy Guidance Moderator: Jonathan Davis Deputy General Manager and Chief Financial Officer Massachusetts Bay Transportation Authority James Blakesley, Attorney-Advisor,
More informationFREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program
More informationRoma McKenzie-Campbell Amtrak, Project Manager. Caroline Ducas VHB, Senior Transit Planner. Boston, Massachusetts
DMU Implementation on Existing Commuter Rail Corridors: Opportunities, Challenges and Lessons Learned Roma McKenzie-Campbell Amtrak, Project Manager Caroline Ducas VHB, Senior Transit Planner Boston, Massachusetts
More informationChapter 4 : THEME 2. Transportation
Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,
More informationAMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph)
FOR IMMEDIATE RELEASE September 28, 2010 ATK-10-130a Contact: Media Relations 202 906.3860 AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph)
More informationAppendix. Statistical Profile
Appendix Statistical Profile MBTA Service and Infrastructure Profile August 200 MBTA SERVICE DISTRICT ANNUAL RIDERSHIP (FY 200) Cities and Towns 75 UNLINKED TRIPS BY MODE Size in Square Miles 3,2 Bus (includes
More informationREPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES
TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who
More informationAppendix. Statistical Profile
Appendix Statistical Profile MBTA Service and Infrastructure Profile March 2006 MBTA SERVICE DISTRICT ANNUAL RIDERSHIP (FY 2006) Cities and Towns 75 UNLINKED TRIPS BY MODE Size in Square Miles Population
More informationFFYs Transportation Improvement Program
For Public Review Table 2: Draft Amendment One Summary: Five-Year MBTA Programming Overall Changes in Funding in TIP Project Proposed Change Explanation Section/Funding Source From To Difference Five Year
More informationGO Transit s deliverable: the 2020 Service Plan
GO Transit s deliverable: the 2020 Service Plan GO Transit s 2020 Service Plan describes GO s commitment to customers, existing and new, to provide a dramatically expanded interregional transit option
More informationCEDAR AVENUE TRANSITWAY Implementation Plan Update
CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,
More informationBi-County Transitway/ Bethesda Station Access Demand Analysis
Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction
More informationFINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit
Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper
More informationProposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1
Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation
More informationCapital Needs Assessment Riders Advisory Council July2, 2008
Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS
More informationLeadership NC. November 8, 2018
v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the
More informationDowntown Transit Connector. Making Transit Work for Rhode Island
Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project
More informationMaryland Gets to Work
I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast
More informationSystem-Wide Accessibility and The Design Guide to Access. Transportation Agencies Liaison Committee Wednesday, June 20 th, 2018
System-Wide Accessibility and The Design Guide to Access Transportation Agencies Liaison Committee Wednesday, June 20 th, 2018 System-Wide Accessibility: Who is presenting today? Laura Brelsford Assistant
More informationMadison BRT Transit Corridor Study Proposed BRT Operations Plans
Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is
More informationThe Future of Transportation on the Caltrain Corridor
The Future of Transportation on the Caltrain Corridor 11.30.16 1 2 Today What is happening Vision Recommendations What is costs How to pay for it 3 The Caltrain Corridor is home to the world s innovation
More informationNeeds and Community Characteristics
Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by
More informationUTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018
UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms
More informationExecutive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1
Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line
More informationPROJECT BACKGROUND 3
AGENDA 1. Welcome & Introductions 2. Project Background 3. Project Approach & Schedule 4. Draft Long List of Options 5. Evaluation Process 6. Next Steps 2 PROJECT BACKGROUND 3 OUR RAPID TRANSIT NETWORK
More informationA Transit Plan for the Future. Draft Network Plan
A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year
More informationCREATING CONNECTIONS IN WATERLOO REGION
CREATING CONNECTIONS IN WATERLOO REGION GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE CHRIS BURKE, DIRECTOR, SERVICE PLANNING ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX
More informationMetropolitan Council Budget Overview SFY
Metropolitan Council Budget Overview SFY 2016-2017 H T t ti C itt House Transportation Committee February 4, 2015 Transit connects us to the places that matter Transportation Needs Grow as the Region Grows
More informationDRAFT Evaluation Scores. Transit
DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per
More informationThe City of Toronto s Transportation Strategy July 2007
The City of Toronto s Transportation Strategy July 2007 Presentation Outline Transportation Statistics Transportation Building Blocks Toronto s Official Plan Transportation and City Building Vision Projects
More informationThe Preferred Alternative: a Vision for Growth on the Northeast Corridor
A Long-Term Vision is Needed The Preferred Alternative: a Vision for Growth on the Northeast Corridor The Federal Railroad Administration (FRA) has released the Tier 1 Final Environmental Impact Statement
More informationI-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018
I-405 and SR 522/NE 145th Bus Rapid Transit Elected Leadership Groups Meeting November 30, 2018 Agenda Welcome and Introductions Public Comment BRT Connection in Bothell Common Elements: Bus base, Station
More informationCustomer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan
Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Page 72 of 96 Washington Metropolitan Area Transit Authority Board Action/Information Summary
More information2.1 TRANSIT VISION 2040 FROM VISION TO ACTION. Expand regional rapid transit networks STRATEGIC DIRECTION
TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,
More informationI-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager
I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives
More informationWould you say you approve or disapprove of how Governor Charlie Baker is dealing with the transportation system in your area?
The Barr Foundation Transportation Poll Topline Results Statewide Survey of 709 Massachusetts Registered Voters Field Dates: December 19, 2017 January 9, 2018 Do you have a favorable or unfavorable view
More informationThe Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix
The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project
More informationKendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What
More informationCalgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit
Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit 1. Plan It Calgary the new Municipal Development Plan and Calgary
More informationState Avenue Corridor Bus Rapid Transit (BRT)
State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!
More informationFunding Scenario Descriptions & Performance
Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion
More informationMetropolitan Freeway System 2013 Congestion Report
Metropolitan Freeway System 2013 Congestion Report Metro District Office of Operations and Maintenance Regional Transportation Management Center May 2014 Table of Contents PURPOSE AND NEED... 1 INTRODUCTION...
More informationPublic Meeting. June 15, :30 7:30 p.m.
Public Meeting June 15, 2017 5:30 7:30 p.m. Welcome 2015 Naval Station Norfolk Transit Extension Study 2015 Naval Station Norfolk Transit Extension Study 2017 Norfolk Westside Transit Study HRT and the
More informationConverting BRT to LRT in the Nation s Capital Ottawa, Canada. John Manconi City of Ottawa Ottawa, Canada
Converting BRT to LRT in the Nation s Capital Ottawa, Canada John Manconi City of Ottawa Ottawa, Canada 1 The Challenge *Mackenzie King Bridge Ottawa, AM peak period 2 The Challenge Ottawa s population
More informationTHE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES. Prepared By: Jacki Murdock Transportation and Environmental Planner
THE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES Prepared By: Jacki Murdock Transportation and Environmental Planner December 13 th, 2012 Overview Characteristics of Wilshire Boulevard Overview of the
More informationEUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT
EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING
More informationGreater Cleveland Regional Transit Authority. Joe Calabrese - General Manager
Greater Cleveland Regional Transit Authority Joe Calabrese - General Manager RTA Ridership by Mode! 500 Buses - 75 %! 60 Heavy Rail Vehicles - 10%! 24 RTV s (BRT) - 8%! 48 Light Rail Vehicles - 6%! Paratransit
More informationStatus of Plans March Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS
Status of Plans March 2011 Presented by CAPITOL REGION COUNCIL OF GOVERNMENTS Transit project update Project rationale The system New Britain Hartford Busway New Haven/Hartford/ Springfield Passenger Rail
More informationAir. Goals: Improve statewide air quality Reduce greenhouse gas emissions 9 DRAFT DRAFT
Air Goals: Improve statewide air quality Reduce greenhouse gas emissions MassClean Diesel, Revere MassClean Diesel installed retrofits on more than 2,000 dieselpowered school buses, at no expense to bus
More informationTroost Corridor Transit Study
Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit
More informationTransitioning to a Zero-Emission Fleet: King County Metro Transit
Transitioning to a Zero-Emission Fleet: King County Metro Transit Lisa Shafer, King County Metro and Joe Iacobucci, Sam Schwartz Consulting King County Metro Transit Seattle, Washington Agenda Why zero-emissions?
More information2016 Congestion Report
2016 Congestion Report Metropolitan Freeway System May 2017 2016 Congestion Report 1 Table of Contents Purpose and Need...3 Introduction...3 Methodology...4 2016 Results...5 Explanation of Percentage Miles
More informationMass Transit in Charlotte and San Antonio. Keith T. Parker, AICP
Mass Transit in Charlotte and San Antonio Keith T. Parker, AICP President/CEO Presentation Overview Charlotte Agency and Customer Profile San Antonio Agency and Customer Profile Attracting New Customers
More informationSequence, Synergy, and Subsidy
San Francisco 2008 Sequence, Synergy, and Subsidy Multi-Modal Train Stations as Anchors of Downtown Revitalization Alden S. Raine, PhD AECOM Transportation Downtown Multi-Modal Hubs: the Anti-Silos Downtown
More informationAVs in BOSTON Shared rides, Seagulls, & Streets. Kris Carter Mayor s Office of New Urban Mechanics City of Boston
AVs in BOSTON Shared rides, Seagulls, & Streets Kris Carter Mayor s Office of New Urban Mechanics City of Boston 6.13.18 1 What is motivating Boston? 2 What do our testing efforts look like? 3 What is
More informationSEPULVEDA PASS CORRIDOR
SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000
More informationSeoul. (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%)
Seoul (Area=605, 10mill. 23.5%) Capital Region (Area=11,730, 25mill. 49.4%) . Major changes of recent decades in Korea Korea s Pathways at a glance 1950s 1960s 1970s 1980s 1990s 2000s Economic Development
More informationCTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016
CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis
More informationMetropolitan Council Transit Capital Improvement Plan. September 23, 2009
1 Metropolitan Council 2010-2015 Transit Capital Improvement Plan September 23, 2009 2 Current Situation Capital facilities require longer range view Recent infusion of UPA, CTIB, and State funds have
More informationGreater Cleveland Regional Transit Authority. Joe Calabrese CEO/General Manager
Greater Cleveland Regional Transit Authority Joe Calabrese CEO/General Manager Greater Cleveland RTA Overview Service Area Population of 1.5 million Customers Served 200,000 on a typical weekday 1.6 million
More informationThe Screening and Selection of Regionally Significant Projects
The Screening and Selection of Regionally Significant Projects UTC 2018 Seminar Series March 15, 2018 Claire Bozic Martin Menninger ON TO 2050 CMAP is the Region s MPO, seven county region Land use and
More informationKing County Metro. Sustainably and equitably achieving a zero-emission fleet
King County Metro Sustainably and equitably achieving a zero-emission fleet Agenda Background Purpose Service area Fleet size Climate goals Process Stakeholder engagement Analyses Service Equity Final
More informationMetro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner
Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning
More informationSnelling Bus Rapid Transit. May 13, 2013 Technical Advisory Committee Meeting #1
Snelling Bus Rapid Transit May 13, 2013 Technical Advisory Committee Meeting #1 1 Today s meeting TAC Introductions Project Overview Arterial BRT Concept Background Snelling Corridor Plan, Funding & Schedule
More informationFleet Strategy. Board Briefing December 13, Doug Kelsey Chief Operating Officer
Fleet Strategy Board Briefing December 13, 2017 Doug Kelsey Chief Operating Officer 1 HB2017 From Bill to Implementation Key Fleet Considerations Appropriate mix of service and capital service types diesel
More informationMetropolitan Freeway System 2007 Congestion Report
Metropolitan Freeway System 2007 Congestion Report Minnesota Department of Transportation Office of Traffic, Safety and Operations Freeway Operations Section Regional Transportation Management Center March
More informationRE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation Trust
May 24, 2018 Oklahoma Department of Environmental Quality Air Quality Division P.O. Box 1677 Oklahoma City, OK 73101-1677 RE: Comments on Proposed Mitigation Plan for the Volkswagen Environmental Mitigation
More informationStrategies to keep people and goods moving in and through Seattle
Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 DON Information Session Department of Transportation Delridge Community Center November
More informationTRAIN, BUS & TRANSIT
TRAIN, BUS & TRANSIT Input Metra 1 Metra does not want to add parking because of space; maxed out on number of cars per train. Developments on Rt. 59 will affect. 2 Should do studies regarding what the
More informationCREATING CONNECTIONS IN THE CITY OF WATERLOO
CREATING CONNECTIONS IN THE CITY OF WATERLOO GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE METROLINX ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX METROLINX PRESENTATION TO
More information9. Downtown Transit Plan
CORRADINO 9. Downtown Transit Plan KAT Transit Development Plan As part of the planning process for the TDP, an examination of downtown transit operations was conducted. The Downtown Transit Plan 1 is
More informationRecommended Vision for the Downtown Rapid Transit Network
Recommended Vision for the Downtown Rapid Transit Network April 2008 Presentation Overview Context Transit options Assessment of options Recommended network Building the network 2 1 Rapid Our Vision Reliable
More informationSUBMISSION TO METROLINK PUBLIC CONSULTATION. From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018
SUBMISSION TO METROLINK PUBLIC CONSULTATION From: Eamon Ryan TD Dáil Éireann, Kildare Street, Dublin 2 Date: 8th May 2018 Suggested Route Map including stations Rathmines, Terenure, Rathfarnham INTRODUCTION
More informationNEW HAVEN HARTFORD SPRINGFIELD RAIL PROGRAM
NEW HAVEN HARTFORD SPRINGFIELD RAIL PROGRAM Hartford Rail Alternatives Analysis www.nhhsrail.com What Is This Study About? The Connecticut Department of Transportation (CTDOT) conducted an Alternatives
More informationSustainability SFMTA Path to Platinum
Sustainability SFMTA Path to Platinum Ed Reiskin San Francisco Municipal Transportation Agency, Director of Transportation San Francisco, CA Timothy Papandreou Deputy Director Strategic Planning & Policy
More informationPublic Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development
Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation
More informationBack ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa
Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa Annual growth rate is 3.8% By 2020 population growth would
More informationCITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6
2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY
More informationShared-Use Mobility: First & Last Mile Solution. Sarah Nemecek Project Manager
Shared-Use Mobility: First & Last Mile Solution Sarah Nemecek Project Manager SHARED-USE MOBILITY CENTER CONNECT PUBLIC AGENCIES AND TRANSIT, COMMUNITY & PRIVATE SECTORS TO SCALE BENEFITS OF SHARED MOBILITY
More informationKendall Drive Premium Transit PD&E Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study From
More informationExecutive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.
Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections
More informationDenver Metro Association of Realtors
Denver Metro Association of Realtors North Metro Rail Line October 2, 2014 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;
More informationRegional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner
Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Presentation Outline Transit System Facts Economic Challenges in the Truckee Meadows RTC Transit
More informationBackground Information about the Metrobus 29 Lines Study
Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and
More informationPUBLIC TRANSPORT IMPROVEMENT, PLANNING AND OPERATIONS.
PUBLIC TRANSPORT IMPROVEMENT, PLANNING AND OPERATIONS. Email: mohamed.kuganda@udagroup.co.tz Mobile: +255754 810570 Presentation by: Eng. Mohamed Kuganda Chief Operations Officer UDART Plc - TANZANIA PRESENTATION
More informationBIRMINGHAM CONNECTED Anne Shaw Tuesday 20 January 2015
BIRMINGHAM CONNECTED Anne Shaw Tuesday 20 January 2015 www.birmingham.gov.uk/connected Birmingham Connected Setting the context challenges in Birmingham The need for action The EU the SUMP process Strategy
More informationProposed FY2015 Budget and Fare Increase
Washington Metropolitan Area Transit Authority Proposed FY2015 Budget and Fare Increase Riders Advisory Council January 8, 2014 1 Washington Metropolitan Area Transit Authority What will riders see from
More informationSoutheastern Pennsylvania Transportation Authority
Southeastern Pennsylvania Transportation Authority Overview of Transit Services, Capital Improvement Plans and Challenges in Chester County April 10, 2013 Public Transportation Provides mobility for work,
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationOrganization. SDOT Date and Commute Seattle. Dave Sowers, Deputy Program Administrator
Organization SDOT Date and Commute Seattle Dave Sowers, Deputy Program Administrator October 22, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel Removal, decommissioning, surface
More informationPROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES
Chair Cabinet Economic Growth and Infrastructure Committee Office of the Minister of Transport Office of the Minister of Energy and Resources PROMOTING THE UPTAKE OF ELECTRIC AND OTHER LOW EMISSION VEHICLES
More informationPaid Parking at Park & Ride Lots: Framing the Issues. Capital Programs Committee May 2014
Paid Parking at Park & Ride Lots: Framing the Issues Capital Programs Committee May 2014 Outline Current Status Industry Review DART Case Study Issues Alternatives Mechanics 2 Current Status: All Lots
More information1 Downtown LRT Connector: Draft Concept
Downtown LRT Connector: Draft Concept Plan November 2010 We re moving forward. Get involved. On June 21, 2010, City Council approved a street-level downtown LRT route, including a connector for the future
More informationEast Turnaround. Access to Ayreswood Avenue would be restricted to right-in/rightout movements under the proposed Rapid Transit plan.
East Turnaround Options at Fanshawe College Ayreswood Access Access to Ayreswood Avenue would be restricted to right-in/rightout movements under the proposed Rapid Transit plan. To mitigate the impacts
More information2.4 TRANSIT VISION 2040 FROM VISION TO ACTION. Support the revitalization of urban cores STRATEGIC DIRECTION
TRANSIT VISION 2040 FROM VISION TO ACTION TRANSIT VISION 2040 defines a future in which public transit maximizes its contribution to quality of life with benefits that support a vibrant and equitable society,
More informationMore than $9 Million coming to Central Valley for transportation
More than $9 Million coming to Central Valley for transportation From free bus service to electric buses Part of overall $97 Million awarded to public transportation projects A total of 152 local public
More informationWAKE TRANSIT PLAN Summer 2018
WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.
More informationMETRO Orange Line BRT American Boulevard Station Options
METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN
More information