1 TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County February 26, 2018

2 Agenda Review Committee Purpose Review Project Map Discuss Service Alternatives Capital Costs (Stations, Track, Trains) Capital Fund Sources (FTA, State, Local) Operating Costs (Stations, Track, Service) Operating Fund Sources (fares, existing taxes, new sources) Next Steps 2

3 Committee Purpose Determine preferred service alternative Develop a viable capital and operations funding strategy Define the access fee and conditions to use the private Florida East Coast (FEC) rail corridor for the project 3

4 Project Map Northern Layover Facility Northwood Crossover 4

5 Capital Costs - Stations Concrete platforms with canopy Benches, bike racks, trash receptacles Ticket vending machines Dynamic messaging signs, wayfinding Lighting, communications, and security elements Landscaping, sidewalk connectivity On-site parking as noted Does not include overhead pedestrian bridge Source: 2014 Preliminary Project Development Report New Tri-Rail Pompano Station 5

6 Capital Costs - Stations Location Parking Spaces Size (ac) ROW Cost Const. Cost 45 th Street Station $500K $7.2M 13 th Street Station $300K $6.9M Park Avenue Station $0 $7.0M PGA Blvd Station $4.0M $7.3M Toney Penna Drive Station $8.0M $7.1M Sources: 2014 Preliminary Project Development Report, inflated to 2018 dollars assuming 3.5% annual inflation factor for construction unit costs; TPA Estimates for parking, acreage, right-of-way. 6

7 Capital Costs - Track Mainline Rails Rails, ties, and ballast rock Siding tracks at stations Crossovers Grade crossings modifications Utility impacts / relocations Systems and Communications Positive Train Control, Signals 7

8 Capital Costs - Track Location Length (mi) Const. Cost Northwood Crossover to 45 th Street 1.1 $5.6M 45 th Street to 13 th Street 1.4 $7.1M 13 th Street to Park Avenue 1.8 $9.1M Park Avenue to PGA Blvd 3.5 $17.7M PGA Blvd Station to Toney Penna Drive 5.6 $19.2M Sources: 2014 Preliminary Project Development Report, inflated to 2018 dollars assuming 3.5% annual inflation factor for construction unit costs; TPA Estimates for parking, acreage, right-of-way. 8

9 Capital Costs - Trains Locomotive $8 million Passenger Cars $3.0 to $3.5 million Trainset (Locomotive & 3 Passenger Cars) $17.0 to $18.5 million Source: SFRTA 9

10 Capital Costs - Total Stations $48.3M Track $58.7M Trains $0 Total $107M Sources: 2014 Preliminary Project Development Report, inflated to 2018 dollars assuming 3.5% annual inflation factor for construction unit costs; TPA Estimates for parking at stations. 10

11 Capital Funding Florida US Average Future? Local 25% Federal 20% Federal 50% Local 42% Federal 44% Local 40% State 25% State 14% State 40% Source: APTA, 2016; Cambridge Systematics 11

12 Capital Fund Sources Funding Source Revenue Yield Potential FEDERAL USDOT Discretionary TIGER Grants FTA Discretionary Section 5309 Capital Investment Grants - Small Starts <$300M project STATE FDOT New Starts Program LOCAL / Other Moderate Max $10M High Max 80%, < $100M High 50% Non-Fed Share Low Moderate High Joint Development Low? Special Assessment High? Tax Increment Finance District High? Tax Sales, Property High? 12

13 Transit Capital Funding Requires Local Match SunRail (Orlando) 25% Local (County general funds) 25% State 50% Federal Wave Streetcar (Fort Lauderdale) 31% Local (County, City, DDA) 27% State (FDOT) 42% Federal (TIGER IV, Small Starts, MPO) 13

14 Transit Capital Funding Requires Local Match Miami-Dade Tax Increment Finance District Adopted February 6, 2018 Half-mile to each side of 6 SMART rail corridors ~ 55 mi Includes approximately 1/3 of County property Diverts incremental tax over base growth to transit $1.8 B over 30 years forecast 14

15 Existing Tri-Rail Service Weekday Service Southbound trains depart Mangonia Park from 4:00 am to 8:40 pm minute headways during peak 60-minute headways during off-peak 50 trains per day, both directions Weekend Service Southbound trains depart Mangonia Park from 5:50 am to 9:00 pm 60-minute headways all day 30 trains per day, both directions 15

16 FEC Corridor Service Alternatives Existing Tri-Rail Service Option 1 Mangonia Park Mainline Toney Penna Station Option 2 Jupiter Mainline Toney Penna Station Option 3 Split Mainline Service Toney Penna Station PGA Blvd Station PGA Blvd Station PGA Blvd Station Park Ave Station Park Ave Station Park Ave Station 13 th St Station 13 th St Station 13 th St Station Mangonia Park Station 45 th St Station Mangonia Park Station 45 th St Station Mangonia Park Station 45 th St Station Mangonia Park Station WPB Station WPB Station WPB Station WPB Station 16

17 Operating Cost Components Stations Maintenance, Security, Utilities, Revenue Collection, Signage and Messaging Boards Track Maintenance of Way Service Operating Contract, Train Maintenance, Security, Train Fuel Contract, Dispatch, Corridor Utilities, Revenue Collection 17

18 Operating Costs Fully Burdened Cost per Vehicle Revenue Hour: $720 Source: National Transit Database 2016 Agency Profile Includes station costs, track costs, and service costs Service Alternative Additional Revenue Hrs. Cost Option 1 Mangonia Park Mainline 23,600 $17M Option 2 Jupiter Mainline 26,400 $19M Option 3 Split Mainline Service 16,700 $12M Calculations of revenue hours are rough order of magnitude based on extrapolation of current train travel times. 18

19 FEC Corridor Service Alternatives Existing Tri-Rail Service Option 1 Mangonia Park Mainline Toney Penna Station Option 2 Jupiter Mainline Toney Penna Station Option 3 Split Mainline Service Toney Penna Station PGA Blvd Station PGA Blvd Station PGA Blvd Station Park Ave Station Park Ave Station Park Ave Station 13 th St Station 13 th St Station 13 th St Station Mangonia Park Station 45 th St Station Mangonia Park Station 45 th St Station Mangonia Park Station 45 th St Station Mangonia Park Station WPB Station WPB Station WPB Station WPB Station Annual Operating Cost $17M $19M $12M 19

20 Operating Funding Florida Local 11% US Average Federal 9% Federal 29% State 25% Local 66% State 60% Source: APTA, 2016; Cambridge Systematics 20

21 Operating Fund Sources Revenue Sources Revenue Yield Stability Viability Ease of Administration TOD TIF Districts Moderate High High Low Transportation Reinvestment Zone Moderate High High Moderate Sales Tax (Transportation Surtax) High Moderate Low High Property Tax High High Low High Utility Fees Moderate High Low High Farebox Revenues Moderate Moderate Moderate High Parking Benefit District Moderate High Moderate Low Joint Development Low High High High 21

22 Development Potential No-Build Scenario Add l with Tri-Rail Service Station Area Res. (DU) Comm. (SF) Res. (DU) Comm. (SF) Property Value Increase Due to Tri-Rail Service Ad Valorem Tax Increase 45 th Street Station , th Street Station , ,000 $5,244,000 $72,000 Park Avenue Station , ,000 $7,505,000 $100,000 PGA Blvd Station 30 1,641, ,000 $58,065,000 $333,000 Toney Penna Drive Station , ,000 $78,756,000 $575,000 $1,080,000 Source: Tri-Rail Coastal Link Station Area Market and Economic Analysis, May

23 Next Steps Review Service Alternatives to Refine Cost Determine Viable Funding Strategy Local share of capital Pursue Federal Funding? Local Funding source for operations & maintenance costs 23

Proposed Downtown Miami Link

Proposed Downtown Miami Link March 30, 2016 Proposed Downtown Miami Link A PUBLIC PRIVATE PARTNERSHIP Presented to: Secretary Boxold, FDOT Presented by: Jack Stephens, Executive Director, SFRTA March 30, 2016 Downtown Miami Link Costs

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Community Outreach Meetings

Community Outreach Meetings Community Outreach Meetings BCT At A Glance 410 square miles service area More than 41.5 million annual trips 327 fixed-route buses 44 bus routes 78 Community Buses in 19 Municipalities BCT At A Glance

More information

Kendall Drive Premium Transit PD&E Study

Kendall Drive Premium Transit PD&E Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study From

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study Feasibility Study Community Meeting March, 2017 1 Agenda 1. Welcome / Introductions 2. Background / Meeting Purpose 3. Progress to Date Options Evaluated Capital/Operating Costs Ridership 4. Financial

More information

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study

Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What

More information

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional

More information

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014

Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing. July 24, 2014 Central City Line Locally Preferred Alternative (LPA) Amendment Public Hearing July 24, 2014 Project Description The Central City Line is a High Performance Transit project that will extend from Browne

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Why Peachtree? Why Now? I. THE CONTEXT High Level View of Phasing Discussion Potential Ridership Segment 3 Ease

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009 HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1 Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding

More information

Technical Training Workshop: Quiet Zones

Technical Training Workshop: Quiet Zones Technical Training Workshop: Quiet Zones August 27 & 28, 2013 For Handouts: Please email admin@tcrpc.org Subject: FRA handouts How Will We Move? Passenger Rail Update for Southeast Florida TREASURE COAST

More information

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014

TBARTA USF to Wesley Chapel Express Bus Service Operating Plan. Draft 3/25/2014 TBARTA USF to Wesley Chapel Express Bus Service Operating Plan Draft 3/25/2014 March 2014 Table of Contents 1.0 Introduction... 1 2.0 Study Area... 1 3.0 Existing Available Service... 3 4.0 Proposed Service...

More information

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at Overview Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at www.garail.com Commuter rail service between Lovejoy and Atlanta is ready for implementation:

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

DRAFT Subject to modifications

DRAFT Subject to modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The

More information

City of Pacific Grove

City of Pacific Grove Regional Study Utilizing Caltrans Intersection Evaluation Section 7: City of Pacific Grove s: FIRST STREET AT CENTRAL AVENUE Transportation Agency for Monterey County Prepared by Transportation Agency

More information

Parking & TOD around BART Stations. Jessica ter Schure November 1, 2009 Rail~Volution 2009 Boston, Massachusetts

Parking & TOD around BART Stations. Jessica ter Schure November 1, 2009 Rail~Volution 2009 Boston, Massachusetts Parking & TOD around BART Stations Jessica ter Schure November 1, 2009 Rail~Volution 2009 Boston, Massachusetts Outline Background Replacement Parking Policy South Hayward BART MacArthur BART Parking Privatization

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized

More information

Miami Streetcar Efficient Transportation. A Discussion on Future Transportation Opportunities

Miami Streetcar Efficient Transportation. A Discussion on Future Transportation Opportunities Miami Streetcar Efficient Transportation A Discussion on Future Transportation Opportunities Discussion Item City Commission Meeting September 29 th, 2014 Miami Streetcar has been supported through the

More information

SWLRT Business Advisory Committee. October 10, 2012

SWLRT Business Advisory Committee. October 10, 2012 SWLRT Business Advisory Committee October 10, 2012 2 Today s Topics Approval of Meeting Minutes SWLRT 101 LRT 101 Guides to Commenting on the DEIS Future Topics of Interest Member/Committee Reports Public

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta Overview Commuter rail service between Lovejoy and Atlanta is ready for implementation: $87.08 Million is in

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

PUBLIC TRANSPORTATION

PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION An Overview of the Industry, Key Federal Programs, and Legislative Processes American Public Transportation Association 1 The Public Transportation Industry: What is "public transportation"?

More information

SEPULVEDA PASS CORRIDOR

SEPULVEDA PASS CORRIDOR SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000

More information

August 2, 2010 Public Meeting

August 2, 2010 Public Meeting Public Meeting LYMMO Expansion Alternatives Analysis Study Purpose of study is to provide a fresh look at potential LYMMO expansion, following Federal Transit Administration (FTA) Alternatives Analysis

More information

Tempe Streetcar. March 2, 2016

Tempe Streetcar. March 2, 2016 Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use

More information

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010 BART Silicon Valley Berryessa Extension Project Community Update October 27, 2010 1 Agenda Welcome and Introductions Program and Project Background Project Status Project and Station Details Current and

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

HRTPO Strategic Campaign. Passenger Rail. Agenda Item #11. Presentation To. May 19, Presentation By

HRTPO Strategic Campaign. Passenger Rail. Agenda Item #11. Presentation To. May 19, Presentation By Presentation To HRTPO Board Meeting Agenda Item #11 HRTPO Strategic Campaign and Vision Plan for Passenger Rail Presentation By May 19, 2010 Transportation Economics & Management Systems, Inc. Study Timeline

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

High-Speed Intercity Passenger Rail

High-Speed Intercity Passenger Rail September 13, 2011 LTRC Seminar Series: Congestion Management Baton Rouge New Orleans High-Speed Intercity Passenger Rail AGENDA LTRC Seminar Series: Congestion Management Baton Rouge, Louisiana Project

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT

COMMUNITY REPORT FISCAL YEAR We are making progress, are you on board? GOLD COAST TRANSIT DISTRICT FISCAL YEAR 178 GOLD COAST TRANSIT DISTRICT COMMUNITY REPORT We are making progress, are you on board? OJAI OXNARD PORT HUENEME VENTURA COUNTY OF VENTURA GENERAL MANAGER S MESSAGE STEVEN P. BROWN DEAR

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

Operating and Maintenance Cost Methodology Report. Durham Orange Light Rail Transit Project

Operating and Maintenance Cost Methodology Report. Durham Orange Light Rail Transit Project Operating and Maintenance Cost Methodology Report Durham Orange Light Rail Transit Project September 2012 TABLE OF CONTENTS 1. Project Background... 1 1 2. Project Alternatives... 2 1 2.1. NO BUILD ALTERNATIVE...

More information

Program Overview. February 2018

Program Overview. February 2018 Program Overview February 2018 Nashville is growing 2 and traffic is getting worse 5 Nashville spoke; we listened Transit Improvement Program Frequent Transit Bus AccessRide and Mobility on Demand Neighborhood

More information

Roma McKenzie-Campbell Amtrak, Project Manager. Caroline Ducas VHB, Senior Transit Planner. Boston, Massachusetts

Roma McKenzie-Campbell Amtrak, Project Manager. Caroline Ducas VHB, Senior Transit Planner. Boston, Massachusetts DMU Implementation on Existing Commuter Rail Corridors: Opportunities, Challenges and Lessons Learned Roma McKenzie-Campbell Amtrak, Project Manager Caroline Ducas VHB, Senior Transit Planner Boston, Massachusetts

More information

The Case for. Business. investment. in Public Transportation

The Case for. Business. investment. in Public Transportation The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend

More information

Valley Metro: Past, Present and Future. September 11, 2014

Valley Metro: Past, Present and Future. September 11, 2014 Valley Metro: Past, Present and Future September 11, 2014 Valley Metro Who are We? Two Boards of Directors Regional Public Transportation Authority Fund and operate regional transit services Valley Metro

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

Colorado Association of Ski Towns August 26, 2016

Colorado Association of Ski Towns August 26, 2016 Colorado Association of Ski Towns August 26, 2016 1 Presentation RFTA Overview Long Range Forecast Integrated Transportation System Plan Questions Roaring Fork Transportation Authority (RFTA) RFTA Overview

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

Increase Rail Service to the Mid City Green Line Stations

Increase Rail Service to the Mid City Green Line Stations Washington Metropolitan Area Transit Authority Increase Rail Service to the Mid City Green Line Stations P D E C Presented to the Board of Directors: Planning and Development Committee by Planning, Development,

More information

Philip Schaffner & Jason Junge Minnesota Department of Transportation

Philip Schaffner & Jason Junge Minnesota Department of Transportation Philip Schaffner & Jason Junge Minnesota Department of Transportation 100% 80% 60% 40% 20% 0% 9% 33% 9% 21% 29% Trunk Highways $1.3B 14% 16% 19% 33% 17% Greater Minnesota Transit $55.7M 25% 27% 36% Note:

More information

CITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL

CITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL CITY COUNCIL STUDY SESSION UPDATE ON SMART January 19, 2017 CITY OF SAN RAFAEL SONOMA MARIN AREA RAIL TRANSIT UPDATE OUTLINE BACKGROUND INITIAL OPERATION SYSTEM (IOS1) CIVIC CENTER AREA LARKSPUR EXTENSION

More information

Needs and Community Characteristics

Needs and Community Characteristics Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by

More information

PAG Environmental Planning Advisory Committee Sun Link Streetcar Update May 1, 2015

PAG Environmental Planning Advisory Committee Sun Link Streetcar Update May 1, 2015 PAG Environmental Planning Advisory Committee Sun Link Streetcar Update May 1, 2015 Project Facts 4-mile route, 23 stops 8 made in USA modern streetcars All electric and green Voter-approved project Connects

More information

Husky Stadium: TMP Modernization Project

Husky Stadium: TMP Modernization Project Husky Stadium: TMP Modernization Project 1 Husky Stadium: TMP History 2 Husky Stadium TMP History 1986-1987 Husky Stadium adds the north upper deck. City of Seattle and UW agree on a plan (TMP) to mitigate

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

I-26 Fixed Guideway Alternatives Analysis

I-26 Fixed Guideway Alternatives Analysis I-26 Fixed Guideway Alternatives Analysis Public Meetings: North Charleston, January 25, 2016 Charleston: January 26, 2016 Summerville: January 28, 2016 Agenda I. Project Update II. III. IV. Screen Two

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors Transportation Committee November 17, 2016 Agenda Item No. 5, Update on the San Rafael Transit Center Relocation San Rafael Transit Center Relocation Study Update 11/17/16 Golden Gate Bridge, Highway &

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

Bella Vista Bypass Benefit Cost Analysis

Bella Vista Bypass Benefit Cost Analysis Bella Vista Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Peninsula Corridor Electrification Project Cost / Schedule Update

Peninsula Corridor Electrification Project Cost / Schedule Update Peninsula Corridor Electrification Project Cost / Schedule Update LPMG Meeting November 20, 2014 Context Caltrain/high-speed rail blended system - Primarily 2 track system - Minimize impacts - Shared system

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs Peter Brown Project Manager, Long Range Planning Sustainable Streets Division 10 17 2011 Lake Arrowhead, California Outline of

More information

USDOT CMAQ Program. Southeast Diesel Collaborative Annual Conference September, 2017

USDOT CMAQ Program. Southeast Diesel Collaborative Annual Conference September, 2017 USDOT CMAQ Program Southeast Diesel Collaborative Annual Conference September, 2017 1 CMAQ & Title 23: What and Why? Section 149: The CMAQ program is established for transportation projects that contribute

More information

Action 6A: HRTAC FY2018 FY2023 Funding Plan

Action 6A: HRTAC FY2018 FY2023 Funding Plan Action 6A: HRTAC 2018 2023 Funding Plan Presentation to: HRTAC Finance Committee Kevin Page, HRTAC Liang Shan, PFM June 5, 2017 PFM Financial Advisors LLC 300 S. Orange Avenue Ste 1170 Orlando, Florida

More information

I-26 Fixed Guideway Alternatives Analysis

I-26 Fixed Guideway Alternatives Analysis I-26 Fixed Guideway Alternatives Analysis Steering & Technical Advisory Committees Joint Meeting January 15, 2016 @ 10:00 AM SC/TAC Meeting Winter 2016 Agenda I. Welcome & Introductions II. III. Project

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

Troost Corridor Transit Study

Troost Corridor Transit Study Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express

More information

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT April 2016 I. COST-EFFECTIVENESS ANALYSIS A Benefit-Cost Analysis (BCA) was conducted in conformance

More information

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: City of Marina Study Intersections: RESERVATION ROAD AT BEACH ROAD RESERVATION ROAD AT DEFOREST ROAD CARDOZA AVENUE

More information

A Presentation to: Project Advisory Group Meeting #10

A Presentation to: Project Advisory Group Meeting #10 A Presentation to: Project Advisory Group Meeting #10 October 21, 2015 Agenda Introductions Action Items From Last PAG Meeting (August 26, 2015) Recent Agency Involvement Update on Refined Alternative

More information

Overview of Transit Funding and Planning in the PACTS Region

Overview of Transit Funding and Planning in the PACTS Region Overview of Transit Funding and Planning in the PACTS Region Presentation to PACTS Transit Committee and Federal Transit Administration Representatives February 8, 2018 Transit Agencies Agency Communities

More information

Transit Implementation Strategy. Presentation for the Atlanta City Council

Transit Implementation Strategy. Presentation for the Atlanta City Council Transit Implementation Strategy Presentation for the Atlanta City Council March 7, 2011 This Legislation authorizes the IGA and New Vehicle Purchase There are two parts to this legislation: 1. IGA between

More information

Attachment C: Benefit-Cost Analysis Spreadsheet

Attachment C: Benefit-Cost Analysis Spreadsheet Attachment C: Benefit-Cost Analysis Spreadsheet TIGER VII Application Collier Blvd. Corridor Improvements June 5 th, 2015 Collier Blvd BCA Summary The Collier Boulevard Benefit Cost Analysis (BCA) has

More information

Planning of the HSR Network

Planning of the HSR Network Engineering Services Department A Global Solution in Public Works Project China s High Speed Rail Network Susan Pan, P.E., Manager of Engineering County of Ventura, Planning of the HSR Network Planning

More information

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT

EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING

More information

Treasure Island Mobility Management Program

Treasure Island Mobility Management Program Treasure Island Mobility Management Program Preliminary Toll Policy Recommendations For Buildout Year (2030) Draft TIDA CAB June 2, 2015 About the Treasure Island Mobility Management Program 2003 2008

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

Technical Advisory Committee

Technical Advisory Committee Technical Advisory Committee 1 Agenda Call to Order Pledge of Allegiance Confirmation of Quorum Agenda Review Tawny Olore, P.E. Agenda Review Adoption of meeting minutes Chairman s Report Phase 1 Project

More information

2/1/2018. February 1, Item #1 CITIZENS PARTICIPATION

2/1/2018. February 1, Item #1 CITIZENS PARTICIPATION February 1, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Starting and Growing Rural Vanpool Programs: From Financing to Vehicle Procurement

Starting and Growing Rural Vanpool Programs: From Financing to Vehicle Procurement Starting and Growing Rural Vanpool Programs: From Financing to Vehicle Procurement Starting and Growing Rural Vanpool Programs From Financing to Vehicle Procurement March 23, 2010 1 Presenter: Jon Martz

More information

CNG Does it Work for Your Collection Operation? Monica Bramble City of North Port Solid Waste

CNG Does it Work for Your Collection Operation? Monica Bramble City of North Port Solid Waste CNG Does it Work for Your Collection Operation? Monica Bramble City of North Port Solid Waste CNG Considerations Benefits Truck Applications Infrastructure Options Bottom Line Clean Abundant American Benefits

More information

TEXAS DEPARTMENT OF TRANSPORTATION

TEXAS DEPARTMENT OF TRANSPORTATION TEXAS DEPARTMENT OF TRANSPORTATION November 2013 PROJECT ID: 1 (Shown as orange, undotted line on map on page 2) PROJECT: Add Kyle Loop (West) to the Illustrative List as a four lane major divided

More information

More than $9 Million coming to Central Valley for transportation

More than $9 Million coming to Central Valley for transportation More than $9 Million coming to Central Valley for transportation From free bus service to electric buses Part of overall $97 Million awarded to public transportation projects A total of 152 local public

More information

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014 Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and

More information

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009 Background As the Treasure Valley continues to grow, high-quality transportation connections

More information

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes

May 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes May 23, 2011 APTA Bus & Paratransit Conference Metro ExpressLanes Program Overview > Conversion of HOV lanes to HOT lanes on I-10 and I-110 > Multi-modal Integrated Corridor Emphasis > 1 of 6 Nationwide

More information

Swift Green Line April 11, 2019

Swift Green Line April 11, 2019 Swift Green Line April 11, 2019 Overview Swift BRT Overview Swift Green Line Project Snohomish County Partnership Early Results Swift Washington s first BRT Overlay BRT Stations approx. 3/4-1 mile apart

More information

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting

More information

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner

Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Regional Transportation Commission, Washoe County Lee Gibson, Executive Director Roger Hanson, Senior Planner Presentation Outline Transit System Facts Economic Challenges in the Truckee Meadows RTC Transit

More information

DART Priorities Overview

DART Priorities Overview City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee

More information

Transportation 2040: Plan Performance. Transportation Policy Board September 14, 2017

Transportation 2040: Plan Performance. Transportation Policy Board September 14, 2017 Transportation 2040: Plan Performance Transportation Policy Board September 14, 2017 Today Background Plan Performance Today s Meeting Background Board and Committee Direction 2016-2017 Transportation

More information

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion Project Number SYS-LRT Subareas All Primary Mode Impacted Link Facility Type Link Service Version Number 4.0 Date Last Modified 7/24/2008 Project Locator Map Short Project Description Construct new light

More information

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update. Issue Paper S.1: Tacoma Link Integration with Central Link. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.1: Tacoma Link Integration with Central Link Prepared for: Sound Transit Prepared by: Quade & Douglas, Inc. FINAL March 2005 Foreword This issue paper

More information

FY 2018 Recommended Wake Transit Work Plan

FY 2018 Recommended Wake Transit Work Plan FY 2018 Recommended Wake Transit Work Plan FY 2018 Capital Budget & Multi-Year Capital Improvement Program 49 GOTRIANGLE FISCAL YEAR 2018 TRIANGLE TAX DISTRICT -- WAKE CAPITAL FUND ORDINANCE 2018 000X

More information