B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015
|
|
- Bertha Logan
- 5 years ago
- Views:
Transcription
1 1 B Line Update RTD FasTracks Citizens Advisory Committee Sept. 16, 2015
2 Northwest Rail (B) Line 6.2 miles electric commuter rail Downtown to Westminster at the 71 st /Lowell Station 11-minute travel time to Westminster Opens in From Westminster to end of line in Longmont (green line on map) is future construction; additional funding is still needed to build out that rail corridor
3 Northwest Rail Westminster Segment BNSF is shifting its track to make room for commuter rail track installation 64th Avenue bridge construction started on the Northwest Rail corridor and is progressing well Westminster Station pedestrian underpass is complete and station platform work continues Overhead wiring installation to occur in the coming months Rendering of Westminster Station with TOD and park areas 3
4 Westminster Station Parking Garage The City of Westminster hosted a ground breaking for the parking garage at the Westminster Station The City is paying for the 600-space structure that RTD passengers can use Transit-oriented development and a regional park is slated to open in the area when the B Line opens to Westminster in summer 2016 Henry Stopplecamp, Dave Genova, Director Lorraine Anderson and Director Larry Hoy attend the City of Westminster s ground breaking of the parking garage. 4
5 Commuter Rail Vehicles 40 commuter rail vehicles are in Denver 8 are out on alignment for testing There are enough vehicles currently in Denver for revenue service The last six of the total 66 will arrive by the first quarter of 2016 Commuter rail cars are being delivered four at a time from Philadelphia and are undergoing static testing at the CRMF. 5
6 Commuter Rail Vehicle 201 passenger capacity per car (91 seated, 110 standing) 79 mph maximum operating speed 85 feet long, 10 feet wide, 15 feet tall Stainless steel exterior Two doors on each side of car Clear passage on each door is 50 in width ADA-compliant level boarding (no steps, roll-on/roll-off) Increased safety features Positive train control Vehicle monitoring systems Improved security with video surveillance 6
7 Construction Progress Early construction in 2014 on pedestrian underpass at Westminster Station shows shoring, steel piling and foundation wall excavation 7
8 Construction Progress Completion of north portion of pedestrian underpass shows the graded alignment for the relocated BNSF Railway freight track 8
9 Construction Progress Support pier in foreground and abutment pilings in the distance outline the 64th Avenue Bridge over BNSF and the Northwest Rail alignment 9
10 Construction Progress Workers place precast concrete panels for Mechanically Stabilized Earth wall on 64th Avenue Bridge west approach 10
11 Construction Progress View from southwest corner shows the west approach wall of the new 64th Avenue Bridge the only road bridge on the entire commuter rail project 11
12 Construction Progress Clear Creek Bridge arches over the 100- year floodway in this view looking south toward the Interstate 76 overpass 12
13 Construction Progress Closer view of the Clear Creek commuter rail bridge showing multiple spans to clear the flood plain 13
14 Construction Progress Looking northwest from Pecos Junction under I-76 toward the Clear Creek bridge, shows the BNSF Railway track; Northwest Rail will be on the left 14
15 Construction Progress Work crews put finishing touches on the concrete retaining wall under I-76; Northwest Rail will pass through the portal on the left 15
16 Construction Progress Pecos Junction Station, with concrete piers for stairs, elevator and pedestrian bridge, is just south of the split between Northwest Rail and Gold Line, seen in the distance 16
17 Construction Progress Looking south, the shared Northwest Rail/Gold Line alignment passes below the Union Pacific Belt Line bridge, next to BNSF track 17
18 Construction Progress Utah Junction Flyover carries the Northwest Rail/Gold Line tracks over the rail yards 18
19 Construction Progress On top of the Utah Junction Flyover, looking south to downtown Denver, shows a good view of the super-elevation of track to allow higher speeds through the curve 19
20 Construction Progress Utah Junction Flyover returns to ground near the commuter rail maintenance facility, but allows truck access to the BNSF intermodal yard 20
21 Safety Outreach Program Safety outreach has picked back up for the East Rail Line schools and Operation Lifesaver - RTD safety training lesson plans will be presented to schools Outreach to the Gold Line and Northwest Rail Westminster schools is underway; posters and handouts to be distributed in the coming weeks ADA community has requested familiarity safety training at atgrade crossings, platforms and on trains; RTD is working with DTP to schedule those First responders undergoing DTP safety training at CRMF; a drill is scheduled for spring 21 A young child learns how to safely cross an at-grade crossing by using RTD s mock crossing, available for events as an interactive teaching tool
22 Stay Safe Around Trains East Rail Line will start a year-long testing program in late spring Pay attention to signs, gate arms and flashing lights before crossing any train track Never trespass on any train track it is illegal and can result in serious injury or death Commuter rail vehicles and trains always have the right of way drivers and pedestrians must pay attention to avoid collisions Trains and commuter rail vehicles cannot swerve to avoid trespassers and although they can stop, it can take up to a mile to reach a full stop 22
23 Electrification Commuter Rail Commuter rail vehicles are powered by overhead electrical lines The wires carry 25,000 volts of electricity and are deadly to anyone who gets too close to them Follow at-grade crossing safety signage and stay away from the power lines Do not touch, climb toward, throw anything or try to reach any of the power lines If the wires are up, they are LIVE! 23
24 Quiet Zones In Quiet Zones, commuter rail and freight trains will not blow horns at crossings except in an emergency The East Rail Line and Gold Line are planned to be full Quiet Zones All vehicle and pedestrian crossings have safety measures in place so you ll know when a train is coming even if it doesn t blow their horn Always pay attention to safety signage Cross the tracks only at designated crosswalks when it is safe to do so 24
25 Positive Train Control & Amtrak Crash "Based on what we know right now, we feel that had such a system been installed in this section of track, this accident would not have occurred. National Transportation Safety Board member Robert Sumwalt Train was going 100 m.p.h. in a 50 m.p.h speed zone; PTC would have automatically stopped or slowed down the train 25 Emergency workers look through the remains of a derailed Amtrak train in Philadelphia, Pennsylvania May 13, Photo courtesy of Reuters.
26 26 How does PTC work?
27 DBE/SBE/WIN DTP has hired a total of 50 project employees through the RTD Workforce Initiative Now (WIN) program DBE/SBE commitments have exceeded goals (see chart) DTP has paid out $260 million to disadvantaged and small design and construction firms and has contracts for remaining work that will push construction payouts over the project goals Disadvantaged and Small Business Enterprises Through April 2015 In Millions Design DBE Design SBE Construction DBE Goal $17.2 $3.2 $184.3 $43.7 Committed $19.9 $7.6 $220.6 $66.5 Paid $19.2 $7.4 $186.8 $46.7 Construction SBE Paid % of Goal 116% 237% 120% 152% 27
28 Eagle P3 Project Economic Impacts Through August 2015, the RTD Eagle P3 Project added more than $1,301 million to the local economy ü DTP Wages Paid $213 million ü Equipment, Services and Supplies $532 million ü Subcontractors $556 million DTP currently has more than 1,180 employees, with a total of 6,820 employees working on the project to date DTP has subcontracted to more than 625 firms who employ crews and purchase supplies from local distributors DTP directly contracts with local certified Disadvantaged Business Enterprises (DBEs)/Small Business Enterprises (SBEs) currently have exceeded our 20% commitment to both DBEs/SBEs 28
29 Questions? For more information on RTD s Eagle P3 Project: 29
East Rail Line Update RTD FasTracks Citizens Advisory Committee March 18, 2015
1 East Rail Line Update RTD FasTracks Citizens Advisory Committee March 18, 2015 Today s Agenda Safety Eagle P3 Project Commuter rail vehicle East Rail Line Economic impacts DBE/SBE/WIN status Progress
More informationTrain Cars Are On The Move! Trains are rolling on the Eagle P3 Project.
In This Issue Page 2 Transit-Oriented Development Good for Communities Page 3 Eagle P3 Public Tours are Back! Denver Stands Up for Transportation Page 4 $1.19 Billion: Eagle P3 Project Builds Local Economy
More informationRTD Commuter Rail System APTA Rail Conference June 23, 2015
RTD Commuter Rail System APTA Rail Conference June 23, 2015 RTD Eagle & North Metro Commuter Rail System Today s Presentation Eagle Design, Construction, Systems Commuter Rail Vehicles and CRMF/OCC EC
More informationGold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014
Gold Line Status Report FasTracks Citizens Advisory Committee March 19, 2014 RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;
More informationEagle P3 Project Update FasTracks Monitoring Committee Sept. 3, 2013
Construction of Peña Bridge - March 2013 South Platte River Bridge Eagle P3 Project Update FasTracks Monitoring Committee Sept. 3, 2013 Today s Agenda Project background Schedule Design Systems Rail cars
More informationElected Officials Briefing North Metro Rail Line Update. November 10, 2016
Elected Officials Briefing North Metro Rail Line Update November 10, 2016 Dave Genova, RTD General Manager and CEO Five lines opening in 2016 Flatiron Flyer, Jan. 3 University of Colorado A Line, April
More informationRegional Transportation District. Dave Genova Interim General Manager and CEO August 21, 2015
Regional Transportation District Dave Genova Interim General Manager and CEO August 21, 2015 About RTD Created in 1969 Eight-county service area Service area: 2,340 square miles 2.8 million population
More informationPositive Train Control (PTC)
Positive Train Control (PTC) PTC at a glance FasTracks systems have Positive Train Control (PTC) technology called I-ETMS. This is a complex GPS-and-communications-based system that reduces the risk of
More informationAurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014
Aurora Line/I-225 Rail Project Update Public Meeting June 4, 2014 FasTracks and I-225 Rail Line Update Danielle Smith I-225 Rail Line Design/Build Coordination Manager 2 The RTD FasTracks Plan 122 miles
More informationElected Officials Briefing. North Metro Rail Line Update. February 9, 2017
Elected Officials Briefing North Metro Rail Line Update February 9, 2017 Dave Genova, RTD General Manager and CEO Openings 2016-2017 Flatiron Flyer, Jan. 3, 2016 University of Colorado A Line, April 22,
More information8/18/2014. Peoria Station Meeting. August 14, Project Update. Tina Jaquez RTD Aurora Line/I-225 Rail Public Information Manager
Peoria Station Meeting August 14, 2014 1 Project Update Tina Jaquez RTD Aurora Line/I-225 Rail Public Information Manager 2 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles
More informationFasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016
July 29, 2013 Welcome to Inside RTD FasTracks a monthly e- update to keep you informed about the progress of the Regional Transportation District's FasTracks program. FasTracks News RTD s Eagle P3 Transit
More informationI-225 Rail Line 2 nd /Abilene Station Design Public Meeting
I-225 Rail Line 2 nd /Abilene Station Design Public Meeting Jan. 29, 2014 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager 2 The RTD FasTracks Plan 122 miles of rail 18
More informationThe Southeast Rail Line extension is officially moving forward
November 2015 Welcome to Inside FasTracks -- your monthly update about FasTracks news, progress and people FasTracks News The Southeast Rail Line extension is officially moving forward Lone Tree Mayor
More informationCommunity Meeting Station Elements
Community Meeting Station Elements North Metro Rail Line September 25, 2014 1 RRP Shawn Plichta Design Build Coordination Manager 2 RTD Jane Donovan Deputy Project Manager 3 The RTD FasTracks Plan 122
More informationALAMEDA CORRIDOR. A A Project of National Significance. TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002
ALAMEDA CORRIDOR A A Project of National Significance TRB Summer Conference MTS as a Component of the Nation s Transportation System June 25, 2002 Top U.S. Container Ports (2001) LOS ANGELES 5.18 LONG
More informationI-225 Rail Line. 13 th Avenue Station Information Meeting. July 25, 2013
I-225 Rail Line 13 th Avenue Station Information Meeting July 25, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager 2 The RTD FasTracks Plan 122 miles of rail 18 miles
More informationDenver Metro Association of Realtors
Denver Metro Association of Realtors North Metro Rail Line October 2, 2014 1 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) service 31 new Park-n-Rides;
More informationIn the Interest of Safety
Operation Lifesaver Presents: In the Interest of Safety Andy Blenko 1 It Happens Every Day. 2 United States Highway Rail Crossing Incidents 2500 2280 2096 2000 1500 2013 2014 1000 Ohio Ranking No. 8 of
More informationWelcome to Inside FasTracks - - your monthly update about FasTracks news, progress and people
December 2014 Welcome to Inside FasTracks - - your monthly update about FasTracks news, progress and people FasTracks News I hear the train a- comin RTD s first electric commuter rail cars arrive in Denver
More informationConstruction Review Council. Sept. 13, 2011
Construction Review Council Sept. 13, 2011 Introduction Rick Clarke, Assistant General Manager, Capital Programs FasTracks Program Update and Schedule Del Walker, Deputy Assistant General Manager, Capital
More informationMobility Management: Caltrain
Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review
More informationNorthern Indiana Commuter Transportation District VENDOR OPEN HOUSE APRIL 17, 2019
Northern Indiana Commuter Transportation District VENDOR OPEN HOUSE APRIL 17, 2019 VENDOR OPEN HOUSE AGENDA Welcome and Introductions Safety Briefing NICTD Website and Plan Room Upcoming Projects Disadvantaged
More informationI-225 Rail Line Iliff and Florida Stations Information Meeting
I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project
More informationCorridor Management Committee. March 7, 2012
Corridor Management Committee March 7, 2012 2 Today s Topics SWLRT Project Office Update Engineering Services Procurement Update Legislative Leadership Tour Annual New Starts Report Update on Proposed
More informationQUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N
QUALITY OF LIFE EXECUTIVE SUMMARY REPORT UN I O N S TAT I O N T R AV E L by TR A I N Published September 2017 2015 PROGRESS MAP This document reports FasTracks progress through 2015 BACKGROUND RTD The
More informationGreen Line opens June 14
Winter 2014 Green Line opens June 14 To-do list for METRO Green Line s grand opening Yours: Study safety tips at www.centralcorridor.org/safety Learn about planned Metro Transit bus service changes on
More informationThis corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.
Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be
More information9/24/2015. BNSF Railway Company. It Happens Every Day. h o t o. Phillip Foster Regional Manager Field Safety Support
BNSF Railway Company h o t o Phillip Foster Regional Manager Field Safety Support Operation Lifesaver Presents: In the Interest of Safety 2 It Happens Every Day. 23 1 Any Time is Train Time As you approach
More informationNorth Metro Rail Line Elected Officials Briefing. August 10, 2017
North Metro Rail Line Elected Officials Briefing August 10, 2017 Henry Stopplecamp, RTD Assistant General Manager, Capital Programs University of Colo. A Line, B Line & G Line: Update RTD met with Federal
More informationWARES. October, 2018
WARES October, 2018 1 Project Overview A new 16 mile east-west light rail line between Bethesda in Montgomery County and New Carrollton in Prince George s County Operates mostly on the surface with 21
More informationCommittee Report. Transportation Committee. Business Item No
Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope
More informationPeninsula Corridor Electrification Update Meeting
Peninsula Corridor Electrification Update Meeting Brisbane City Council September 6, 2018 Agenda Caltrain System Overview Project Overview Electric Multiple Unit (EMU) Design Brisbane Construction Activities
More informationUtility work, road construction substantially done on Fourth Street
November 2010 Fourth Street in downtown is reopen to vehicle traffic between Minnesota and Broadway streets. Utility relocation and road construction are substantially complete there. Utility work, road
More informationExposition Light Rail Transit Project
Exposition Light Rail Transit Project Project Status Update Meeting West End Corridor Segment C Culver City Senior Center May 27, 2010 Phase 1 Project Description 8.6 mile corridor from Downtown Los Angeles
More informationPurple Line Light Rail P3 Project
Purple Line Light Rail P3 Project TPB Meeting May 18, 2016 1 Topics General Project Overview The P3 Contract Details on The Successful Proposal 2 Recap of Purple Line P3 Events In November 2013 MTA initiated
More informationOVERCOMING THE CHALLENGES OF ADA ACCESSIBILITY AT OLDER RAIL STATIONS SEPTA's ADAPTIVE APPROACH
OVERCOMING THE CHALLENGES OF ADA ACCESSIBILITY AT OLDER RAIL STATIONS SEPTA's ADAPTIVE APPROACH Jeffrey D. Knueppel, P.E. Southeastern Pennsylvania Transportation Authority AGM/Chief Engineer Philadelphia,
More informationElected Officials Briefing North Metro Rail Line Update. August 11, 2016
Elected Officials Briefing North Metro Rail Line Update August 11, 2016 1 Christina Henderson, Suncor Director of Energy Pipelines U.S. 2 August 11, 2016 RTD Update Christina Henderson Director, Suncor
More informationSAN FRANCISCO TO SAN JOSE PROJECT SECTION
SAN FRANCISCO TO SAN JOSE PROJECT SECTION Local Policy Maker Group Thursday, February 23, 2017 San Carlos, California INTRODUCTIONS 1 CALIFORNIA HIGH-SPEED RAIL PROGRAM UPDATE Jeff Morales, CEO HIGH-SPEED
More informationHarlem Avenue between 63 rd and 65 th
Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap
More informationCONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY
CONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY IH 30 in Texarkana Introduction Video Texarkana Two cities Two states One MPO Texarkana IH 30 U.S. Post Office and Court House IH 30 Corridor IH 30 constructed
More informationIntroducing the Solution to LA s Airport Congestion Problem
Presentation by Roger J. Rudick Introducing the solution to the County s airport congestion problem Introducing the Solution to LA s Airport Congestion Problem Existing infrastructure, off-the-shelf technology,
More informationPomona Rotary December 19, 2017
Pomona Rotary December 19, 2017 Los Angeles County s population will grow by 5.9% to 10.7 million by 2024 During that same period, the San Gabriel Valley will grow by 7.6% to more than 1.5 million; taking
More informationStaff Contact: Carlos de Melo, Community Development Director, (650)
Meeting Date: April 10, 2018 STAFF REPORT Agency: City of Belmont Staff Contact: Carlos de Melo, Community Development Director, (650) 595-7440 cdemelo@belmont.gov Agenda Title: Agenda Action(s): Caltrain
More informationCommuter Rail Vehicle Technology Analysis
Commuter Rail Vehicle Technology Analysis May, 2007 Commuter Rail Vehicle Technology Analysis 1 Purpose: To present the results of the, and double deck ( dd) analysis Including: Description of the Vehicles
More informationNEWSLETTER CONSTRUCTION PROGRESS IN THIS ISSUE:
Issue 4 Fall 2016 IN THIS ISSUE: Construction Progress Western Stations Downtown Stations Queen and Rideau Streetscaping Eastern Stations Where We ve Been Where We re Going Stage 2 Update CONSTRUCTION
More informationFASTRACKS SYSTEM MAP: ALL CORRIDORS
FASTRACKS SYSTEM MAP: ALL CORRIDORS SOURCE: RTD NMC - 1403-09/06 FASTRACKS SYSTEM MAP: NORTHWEST RAIL CORRIDOR Current FasTracks Plan for Northwest Rail Corridor Final alignment, technology, and stations
More informationTHE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014
THE PARTNERSHIP OF RAIL & COAL MOVING AHEAD 2014 RMCMI ANNUAL MEETING SEPTEMBER 19, 2014 1 BNSF is a Leading U.S. Railroad A Berkshire Hathaway company 32,500 route miles in 28 states and two Canadian
More informationCommuter Rail Vehicle Technology Analysis
Commuter Rail Vehicle Technology Analysis May, 2007 Commuter Rail Vehicle Technology Analysis 1 Purpose: To present the results of the EMU, DMU and DMU double deck (DMU dd) analysis Including: Description
More informationValley Metro Overview. ITE/IMSA Spring Conference March 6, 2014
Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and
More informationCentral Loop Bus Rapid Transit
Central Loop Bus Rapid Transit Transportation Goals of the Chicago Central Area ACTION Plan, page 2-6 Central Area Plan Improve Transit in Central Area Improve Pedestrian Environment Manage Traffic Circulation
More informationDevelopment of the Preferred Option and Implementation Plan
Presentation To RMRA Peer Panel Day #1 Preferred Option and Risk Assessment August 25, 2009 TEMS, Inc. / Quandel Consultants, LLC 0 Development of the Preferred Option and Implementation Plan 1 1 Results
More informationCTA Capital Construction Update December 12, 2006
Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction
More informationProposed Downtown Miami Link
March 30, 2016 Proposed Downtown Miami Link A PUBLIC PRIVATE PARTNERSHIP Presented to: Secretary Boxold, FDOT Presented by: Jack Stephens, Executive Director, SFRTA March 30, 2016 Downtown Miami Link Costs
More informationThis corridor section will carry commuter trains from Wilsonville to Portland and Portland to Longview/Kelso.
Alignment is double tracked for 80 mph commuter trains, 110 mph CHSR speeds between Bridgeport OR and 78 th Street in Vancouver WA. New alignment for freight trains will allow speeds up to 40 mph over
More informationExpo Light Rail Line. Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015
Expo Line Community Meeting Final Phase 2 Construction Update Santa Monica June 2015 Meeting Purpose and Format Meeting Purpose and Format The purpose of tonight s meeting is to: Provide a final update
More informationChicago St. Louis High-Speed Rail. Braidwood Construction Public Meeting. August 7, 2014
Chicago St. Louis High-Speed Rail Braidwood Construction Public Meeting August 7, 2014 1 Chicago-St. Louis Corridor Goals and Benefits» Reduction in travel time by about an hour» Enhanced reliability»
More informationExtending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process
Extending TRACKS Issue 5 Spring 2014 Preliminary design plan review underway Public comment and approval process in May & June Residents and businesses along the Southwest LRT (METRO Green Line Extension)
More informationHSR Vancouver WA to Camas Commuter Des, by R.N.
This plan will show the new route for the Portland-Vancouver Junction Railroad. Remove the existing Portland-Vancouver Junction Railroad leg from the Northeast Hazel Dell Avenue curve to the Burlington
More informationRailyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY
Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)
More informationBART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010
BART Silicon Valley Berryessa Extension Project Community Update October 27, 2010 1 Agenda Welcome and Introductions Program and Project Background Project Status Project and Station Details Current and
More informationNORTHWEST HIGHWAY S-CURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY. Northwest Highway (US 14) From Seegers Road to Western Avenue
NORTHWEST HIGHWAY SCURVE PEDESTRIAN/BICYCLE ACCESS FEASIBILITY STUDY Northwest Highway (US 14) From Seegers Road to Western Avenue Northwest Highway SCurve Pedestrian/Bicycle Access Feasibility Study City
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationExpanding Capacity for the Northeast Corridor The Gateway Program
Expanding Capacity for the Northeast Corridor The Gateway Program Petra Todorovich Messick March 4, 2013 Raritan Valley Rail Coalition Somerville, NJ The Northeast Corridor Mainline and Branches 899 Route-miles
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationMOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project
MOTION NO. M2014 64 Preferred Alternative for the Puyallup Station Access Improvement Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/14/14 8/28/14 Recommendation
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate
More informationMARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018
MARTA s blueprint for the future COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 TODAY S AGENDA About MARTA Economic development/local impact More MARTA Atlanta program Program summary/timeline
More informationPORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting
PORTS-TO-PLAINS Corridor Planning Stakeholder Workshop - Agenda 1 Purpose of Stakeholder Workshops 3 2 Rural Transportation System Overview 4 3 Ports-to-Plains 8 4 5 6 7 I-27 Expansion Key Considerations
More informationDART Blue Line Extension. Garland to Rowlett. June 7, 2012
DART Blue Line Extension Design Build Project Garland to Rowlett Garland Construction Update June 7, 2012 Dawn Dorman DART Ruben Landa Austin Bridge & Road, L.P. Project Schedule Design & Construction
More informationIliff and Florida Stations Meeting Q&A What is the elevation of the Iliff Station? How was it decided which direction of lanes Abilene loses?
Iliff and Florida Stations Meeting Q&A RTD FasTracks I-225 Rail Line Iliff and Florida Stations Information Meeting Q & A May 15, 2013, 5:30 p.m. Aurora Association of Realtors Office 14201 E. Evans Avenue,
More informationNorthwest Rail Environmental Evaluation. Governments Team. September 13, 2007
Northwest Rail Environmental Evaluation Governments Team September 13, 2007 1 Agenda Welcome and introductions Commuter rail technology discussion History Technology review Technology evaluation criteria
More informationDART Priorities Overview
City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee
More informationEast Link Extension. September 16, Bel-Red Conclusion to Final Design Open House Public Involvement Summary
East Link Extension September 16, 2014 Bel-Red Conclusion to Final Design Open House Public Involvement Summary Table of contents 1 Background 2 Overview 2 Notification 3 Open House Overview 4 Comment
More informationHighway 18 BNSF Railroad Overpass Feasibility Study Craighead County. Executive Summary
Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Highway 18 BNSF Railroad Overpass Feasibility Study Craighead County Executive Summary October 2014 Prepared
More informationFasTracks News. January/February 2015
January/February 2015 Welcome to Inside FasTracks - - your monthly update about FasTracks news, progress and people FasTracks News Top 10 Milestones of 2014 The Regional Transportation District s FasTracks
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The
More informationPublic Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development
Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation
More informationConceptual renderings subject to change
Conceptual renderings subject to change OCTA Special Needs Committee Presentation Tuesday, Project Presenter Jamie Lai, P.E. Transit Manager, City of Anaheim The ARTIC Project Manager 2 The ARTIC Project
More informationKendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What
More informationThe Jack A. Markell Trail Delaware s Bicycle Highway New England Bike- Walk Summit
The Jack A. Markell Trail Delaware s Bicycle Highway 2018 New England Bike- Walk Summit The Jack A. Markell Trail Sometimes a very difficult project, including significant investment and perseverance,
More informationExtending TRACKS. Conference set for mid-november for contractors interested in bidding to build SWLRT. Closing Excelsior Blvd, increasing
November 2017 Issue 18 www.swlrt.org Extending TRACKS Conference set for mid-november for contractors interested in bidding to build SWLRT Contractors interested in bidding to build the Southwest LRT line
More informationCar Sharing at a. with great results.
Car Sharing at a Denver tweaks its parking system with great results. By Robert Ferrin L aunched earlier this year, Denver s car sharing program is a fee-based service that provides a shared vehicle fleet
More informationInaugural appearance. April-May The first time a light rail vehicle (LRV) appeared
April-May 2013 Inaugural appearance The first time a light rail vehicle (LRV) appeared on the Central Corridor LRT (Green Line) was April 28. A railcar mover towed the LRV from to to verify width clearances
More informationI-405 Sepulveda Pass Improvements Project. Community Advisory Committee July 28, 2011
I-405 Sepulveda Pass Improvements Project Community Advisory Committee July 28, 2011 1 Wilshire Segment 2 Wilshire Segment (National to Waterford) Ramp and Wall Construction at Sepulveda/Wilshire Intersection
More informationRavenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, Ravenswood Avenue Railroad Crossing Project
Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, 2017 1 Presentation Outline Project Background Review Current Alternatives City Council Requests Council Direction
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay
More informationSTH 60 Northern Reliever Route Feasibility Study Report
#233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development
More informationJeffrey D. Knueppel, P.E. Deputy General Manager And Robert L. Lund Jr. P.E. Assistant General Manager March 25, 2014
Cobbs Creek Viaduct (4.79) Built in 1891 Jeffrey D. Knueppel, P.E. Deputy General Manager And Robert L. Lund Jr. P.E. Assistant General Manager March 25, 2014 What Will Happen Without Additional Funding
More informationWestland No. 1 Mine (Bob Ciminel 2012)
Westland No. 1 Mine (Bob Ciminel 2012) Westland Mine No. 1 was owned by the Pittsburgh Coal Company and located at the eastern (timetable) end of the Montour Railroad s Midland Spur/Westland Branch, just
More informationDelta Kappa Gamma January 22, 2018
Delta Kappa Gamma January 22, 2018 Los Angeles County s population will grow by 5.9% to 10.7 million by 2024 During that same period, the San Gabriel Valley will grow by 7.6% to more than 1.5 million;
More informationIN YOUR COMMUNITY. Answers to some of the common questions we receive from the communities in which we operate.
IN YOUR COMMUNITY Answers to some of the common questions we receive from the communities in which we operate. 2TRAIN SPEED BLOCKED 1CROSSINGS Canadian Railway Operating Rules (CROR) establish that any
More informationMetro Gold Line Eastside Extension Review Advisory Committee March 12, 2009
Review Advisory Committee March 12, 2009 6 Mile Alignment 1.7 Miles of Tunnel 8 Stations (6 At-grade & 2 Underground) Park & Ride Facility Direct Connection to the Pasadena Metro $898.8 million On-Time/Within
More informationFederal Way Link Extension
Federal Way Link Extension Draft EIS Summary Route & station alternatives and impacts Link Light Rail System Map Lynnwood Mountlake Terrace Lynnwood Link Extension Shoreline 14th Northgate 40 Northgate
More informationPAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS. Paul Mak, PE, SE HDR Inc
PAPER FOR AREMA 2006 ANNUAL CONFERENCE LOS ANGELES UNION STATION RUN-THROUGH TRACKS UNION STATION TERMINAL IMPROVEMENTS Paul Mak, PE, SE HDR Inc 801 S. Grand Ave. Suite 500, Los Angeles, CA 90017. Tel
More informationS.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program. Transportation and Trinity River Project Committee May 23, 2016
635 S.M. Wright Project (I-45, US 175, SH 310) and Road to Work Opportunity Program Transportation and Trinity River Project Committee May 23, 2016 Project Scope Increase safety by removing the existing
More informationTechnical Advisory Committee
Technical Advisory Committee 1 Agenda Call to Order Pledge of Allegiance Confirmation of Quorum Agenda Review Tawny Olore, P.E. Agenda Review Adoption of meeting minutes Chairman s Report Phase 1 Project
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)
More informationAmtrak Signal and Train Control Systems PRACTICAL PTC. On Amtrak Owned Property. November 20, 2008
Amtrak Signal and Train Control Systems PRACTICAL PTC On Amtrak Owned Property November 20, 2008 PRACTICAL POSITIVE TRAIN CONTROL on Amtrak ACSES / ATC in the Northeast Corridor + ITCS for the Emerging
More informationExpo Light Rail Line. Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles April 2014
Expo Line Community Meeting Quarterly Phase 2 Construction Update Los Angeles April 2014 Meeting Agenda Phase 2 Construction Update Meeting Meeting Purpose and Format Construction Update Expo Bikeway Update
More information