Port Hacking cable crossing project Community engagement and feedback summary August 2016

Size: px
Start display at page:

Download "Port Hacking cable crossing project Community engagement and feedback summary August 2016"

Transcription

1 Port Hacking cable crossing project Community engagement and feedback summary August 2016 For period from April 2016 to 12 August

2 Contents Contents Project background Project options Further investigations Community engagement overview Key objective of Ausgrid s engagement with the community Overview of engagement activities Feedback summary Pole options Presented pole options...error! Bookmark not defined. Three pole option... 7 Single pole option Feedback on the options... 8 Three pole option... 8 Single pole option... 8 Other feedback Issues and questions raised during the engagement process Project need Vegetation Submarine cable or under bore option Lightning strikes Operational Noise High winds Positioning of street pole lighting Construction timing and duration Power outages during pole and cable installation and cable Next Steps... 11

3 1 Project background The suburbs of Bundeena and Maianbar are located adjacent to the Royal National Park on the southern side of the Port Hacking River and have approximately 1,300 customers. These suburbs are normally supplied by two 11,000 Volt feeders from Cronulla zone substation as follows: 11,000 Volt underground submarine cables (approximately 1.18km) to Bundeena 11,000 Volt single span overhead power lines (approximately 800 metres) from Burraneer to Maianbar. The overhead power lines cross from Rutherford Reserve at the bottom of Woolooware Road, Burraneer and Ausgrid-owned land at 47 Pacific Crescent East, Maianbar. In 2010, Ausgrid s overhead crossing was surveyed from its lowest point at 13 metres above the maximum high water level. In January 2011, a yacht s mast made contact with the 11,000 Volt overhead power line crossing the Port Hacking River between Maianbar and Burraneer. NSW Roads and Maritime Services (RMS) has advised Ausgrid that the height of the largest vessel seen in the area has been a yacht with a 22 metre mast. Consequently, an independent risk assessment has been completed. The study concluded that the crossing has a risk rating of extreme (code rated as intolerable), as it spans a popular waterway that is used for recreational and commercial purposes, attracting many different vessel types. Additionally, there are no bridges or other structures that restrict tall vessels from entering this section of the waterway and coming into contact with the power line. Due to this high risk rating, a number of options have been developed to address this risk. Interim recommendations made to alleviate this risk included installation of new warning signage and retaining the existing marker balls. However, as this is a wide river crossing, signage is difficult to see from the middle of the crossing. As such, alternative options have been investigated to mitigate the potential for future risk. These are detailed below in section Project options Ausgrid started to plan option on how to address the risk of the current water crossing. The following options were initially considered by Ausgrid: Option 1: Install new underground 11,000 Volt cables by underground bore (known as horizontal directional drilling) between Burraneer and Maianbar. Option 2: Install new 11,000 Volt submarine cables between Burraneer and Maianbar. Option 3: Replace the poles at Burraneer and Maianbar with larger or additional poles and retension the existing cables to achieve a 26 metre minimum clearance across the river. New poles would be installed into structural slabs and the existing timber power poles replaced. Option 4: Turn off the 11,000 Volt overhead supply and leave available for emergency service only. Option 5: Install a generator. Option 6: Install new signage only. Option 1 was examined closely, but ruled out on environmental, cost and construction grounds associated with an underground bore of this length. Option 2 was also ruled out as submarine cables due to potential environmental risks. 3

4 Option 4 was ruled out for network security reasons as Ausgrid would be unable to provide reliable supply to the surrounding areas. Option 5 was considered to not be feasible for operational reasons. Option 6 was discounted as signs are not always visible from the middle of the channel and so not a viable option to address the risk. From this study, Option 3 was determined by Ausgrid to be the preferred approach. 1.2 Further investigations Ausgrid carried out a preliminary environmental assessment in November 2013 on the preferred option. The objective of the preliminary assessment was to investigate the environmental impact of an increase in the span height across the Port Hacking River to ensure the crossing would be compliant with the Code for Electricity Crossings of NSW Navigable Waters for assets crossing waterways. In July 2014, site investigations were completed as part of the assessment of the technical feasibility of raising the span to comply with the Code. Letters were delivered in advance of this work to residents and businesses. The notification letters also provided information about our plans and the need for the project. The notification advised that the proposed new poles would be required to be taller than those in the existing crossing. Figure 1 Location photo showing existing power lines from the Maianbar side

5 2 Community engagement overview 2.1 Key objectives The objectives of early engagement on the proposed works were to: outline the need for the project to the community. receive local input as part of the project planning process. use community feedback as part of the process to select a preferred option minimise impacts on surrounding community during construction by receiving local information and working to resolve any issues before the project is finalised provide opportunities for the community to get involved, receive information and to raise issues during all project stages. 2.2 Overview of engagement activities Ausgrid established a project page on Ausgrid s web site, completed door knocks, delivered letters, made phone calls and held meetings and community information sessions as part of the initial community engagement. Ausgrid consulted with local residents and businesses on both sides of the river (Burraneer and Maianbar) between 12 May 2016 and 12 August Two options were presented to the community and are described in sections 2.2 and 2.3. As the change in pole and conductor height would change the view from some homes on either side of the river, two options were developed for the pole upgrade. Ausgrid was also keen to understand from the community whether there were other options or issues that needed to be considered. A summary of the community engagement activity is set out below. 12 May members of the project team door knocked and delivered letters to 65 Maianbar homes and businesses along Pacific Crescent, east of Bargo Street. 13 May members of the project team door knocked and delivered letters to 68 Burraneer homes along Woolooware Road, Loch Lomond Crescent and Rutherford Avenue (that are adjacent to or look towards Rutherford Reserve). Ausgrid asked interested residents to register their contact details and were surveyed to determine the most suitable day and time for community information sessions. 13 July a newsletter describing the crossing options was delivered to the same homes and businesses in Burraneer and Maianbar. The newsletter provided details of the project background and need, the options that were being considered, community information session dates and times, along with contact details for the community team. A copy of the newsletter was provided to the Maianbar Happenings community newsletter and details of which were included in the July 2016 issue, posted on the front door of the Maianbar Beach café and sent to Sutherland Shire Council bush care group responsible for the Rutherford Reserve in Burraneer for information. The project web page was updated with project details and a link to the newsletter. 1 August a community information session was held at Rutherford Reserve, Burraneer with six residents in attendance. 2 August a community information session was held at outside Maianbar Beach Cafe, Maianbar Reserve, Burraneer with four residents in attendance. 5

6 2.3 Feedback summary Feedback was received from residents at community information sessions and afterwards via phone, community feedback forms, s and letters. Individual stakeholder briefings were also carried out with interested residents and the editor of the Maianbar Happenings community newsletter during the feedback period. Key points about the community engagement: 24% of residents and businesses who were door knocked and/or received the newsletter registered for further information (from 135 residences and businesses). Almost 40% of registrants provided further feedback during the consultation period. One resident objected to the project..although the attendance numbers were low, other people contacted the community team directly to provide feedback or did so when the project team completed door knocks. Over twenty residences and businesses from the Maianbar area and twelve residences from Burraneer registered their interest and/or provided feedback. Key community feedback was largely based around project need, the visual impact of the new poles and the duration and impact of construction. All issues and questions raised and Ausgrid s responses are detailed in the next section. Ausgrid has reviewed the community feedback received during this consultation process along with other factors as part of preparing a preferred option. Following community feedback, Ausgrid started further planning on the single pole option. The presented options can be seen below.

7 3 Pole options 3.1 Three pole option This option involves installing three 33 metre steel poles (embedded 3 metres into the ground) at Burraneer and Maianbar. The new conductors (required electrical equipment that you generally see on power poles) would be installed and connected to new poles in the same horizontal orientation as the current installation. Key points considered: Figure 2 Photo montage view from Burraneer 30 metres above ground level Three pole configuration Larger construction footprint More complex construction Potentially more road closures during construction Higher environmental impact Shorter and thinner poles. Figure 3 Photo montage view from Maianbar 3.2 Single pole option This option involves installing a single 36 metre pole (embedded 4 metres into the ground) at Burraneer and one at Maianbar. With a single pole, the three conductors would be attached in a vertical orientation. The lowest conductor will be at the same height as the conductors in the three pole option, with the other two conductors attached above. These poles would be two metres higher than the three pole option to achieve the required clearance over the water (as there is required spacing between the conductors). Key points considered: Figure 4 Photo montage view from Burraneer 32 metres above ground level Single pole configuration Smaller construction footprint Visually less bulky Fewer road closures during construction More cost-effective Taller and thicker pole Figure 5 Photo montage view from Maianbar 7

8 4 Feedback on the options Please find below details on the feedback provided on the presented pole options Three pole option Two residents from Burraneer thought that due to the greater visible bulk; the three pole installation could be safer for passing aircraft. This was raised as a potential benefit. Ausgrid advised that it is a Civil Aviation Safety Authority (CASA) requirement that aircraft operators must be fully aware of the location of all cable crossings and their height before flying in a particular area. Ausgrid would continue to consult with CASA regarding its requirements for this crossing. Single pole option The option to install a single 36 metre pole (embedded 4 metres into the ground) at Burraneer and Maianbar received the majority of community support. All residents and business owners who expressed an opinion about the new pole options supported these options. Other feedback One response was received from a Maianbar resident who objected to the pole proposals. Issues raised were that the proposal would create a possible health hazard, would have a major visual impact and that the proposed single pole would resemble a tower. He was also concerned that telecommunications equipment may be added. The resident who objected had a preference for a submarine cable crossing. The project team provided feedback to this resident while this option which had already been considered but was not pursued due to environmental, cost and construction reasons.

9 4.1 Issues and questions raised during the engagement process Issue or question Community feedback Ausgrid response Project need A Maianbar resident questioned the project need, maintaining that there were fewer water craft seen in the Port Hacking area as the channel has become narrower and shallower Vegetation Neighbouring residents in the immediate vicinity of the existing Burraneer and Maianbar pole structures raised concerns about how the bush area below the poles would be affected, restored and maintained in the future. A question about how established trees and planted screening at the base of the Maianbar poles was also raised. Ausgrid pointed out that although the risk of future collisions is low, the consequence of a collision would be catastrophic and that it was a Roads and Maritime Services (RMS) requirement that Ausgrid addresses the risk profile of the crossing accordingly. Ausgrid advised that this matter would be addressed as part of the Environmental Impact Assessment to be carried out when the design is completed and that residents would be consulted as part of this process. Ausgrid would work to minimise any impacts on surrounding vegetation as much as possible Submarine cable or under bore option Two Maianbar residents questioned whether a submarine or under-bored cable had been considered. As mentioned in Section 2 submarine cables were considered but due to potential environmental risk were not pursued. The exclusion of the Horizontal Directional Drill (HDD) option was based on the fact that the construction period would be longer and more disruptive to local residents and businesses. There would be greater impacts on the Maianbar car park and potentially on the Maianbar bus service. The cost to construct an HDD cable route would be considerably more expensive i.e. up to eight times the cost of an overhead solution. Additionally, constructing an HDD under a waterway comes with its own construction risks such with potential environmental impacts. 9

10 Issue or question Community feedback Ausgrid response Lightning strikes Concerns were raised from the Burraneer session regarding a history of lightning strikes to power poles in the area Operational Noise Burraneer residents in the immediate vicinity of the existing pole structures on the Burraneer side reported that a noticeable humming sound can be heard coming from the cables particularly at night when the background noise levels are lower High winds A Maianbar resident raised the concern of the effect of high winds causing power spikes, surges and failures. Ausgrid has noted this feedback and would examine the risk and effect of further occurrences in the future. Ausgrid responded that this is likely to be natural resonance from the conductor cables and suppressors could be fitted to the new installation if this issue persisted. Ausgrid advised that it operates a number of higher overhead installations in high wind conditions (particularly in the Hunter and Central Coast areas). It is likely that the noted effects were the result of other network incidents associated with high wind periods Positioning of street pole lighting A Burraneer resident requested the repositioning of a street light near their home. Unless the power pole hosting the street light has to be moved or replaced as part of the construction, then this request is more likely to be a matter for the local council Construction timing and duration A number of residents were keen to understand the timing and duration of the construction work. Detailed design and the Environmental Impact Assessment have yet to be carried out. After these steps have been completed procurement of the new power poles will mean that construction is unlikely to start before early The project will take approximately 6-12 months to complete Power outages during pole and cable installation and cable A Maianbar resident questioned whether the construction would impact electricity service to the area. Parts of Maianbar will require a temporary electricity supply during critical stages of the construction. Switching to and from that temporary supply may require short interruption to service, however, residents and businesses will be notified in advance of these outages.

11 5 Next Steps From the community information sessions and subsequent feedback received there was a general understanding that the current crossing needs to be upgraded for safety reasons, and that the single pole option provides the optimum solution to address that need. As a result, Ausgrid is proceeding with the project planning based on the single pole option. An environmental assessment is currently being prepared. The environmental assessment will investigate any potential environmental impacts associated with the construction, operation and maintenance of the proposed pole and the project overall. It will also recommend mitigation measures to ensure any impacts are minimised, where possible. Residents and businesses in the area will receive further information regarding the start of work once the environmental assessment and the detailed design is complete and the project is approved for construction. Subject to this approval, work is expected to start in Ausgrid will maintain ongoing community engagement with residents and businesses near the respective pole locations as the project progresses. 11

Powering Sydney s Future

Powering Sydney s Future Powering Sydney s Future Frequently Asked Questions December 2017 Project background Q: Why is this project needed? A: Inner Sydney is one of the most critical parts of the NSW electricity network. However,

More information

Proposed Dounreay - Mybster 275 kv / 132 kv

Proposed Dounreay - Mybster 275 kv / 132 kv Background Scottish Hydro-Electric Transmission Ltd (SHETL) is proposing a new 275 kilovolt (kv) (1 kilovolt = 1000volts) double circuit overhead line (OHL) between the Dounreay sub station and the new

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN

SPN High Value Project PO Route. RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN SPN High Value Project PO Route RIIO-ED1 Investment Justification Reinforcement for PO Route Network: SPN Document History Version Date Details Originator V0.1 20/06/2013 Initial version Chris Winch V0.2

More information

Chirmorie Wind Farm Grid Connection

Chirmorie Wind Farm Grid Connection Chirmorie Wind Farm Grid Connection Welcome Welcome to this public exhibition regarding our proposals to construct a new 132 kilovolt (kv) overhead line (OHL) supported by wood poles to connect the proposed

More information

What We Heard Report - Metro Line NW LRT

What We Heard Report - Metro Line NW LRT What We Heard Report - Metro Line NW LRT by Metro Line NW LRT Project Team LRT Projects City of Edmonton April 11, 2018 Project / Initiative Background Name Date Location Metro Line Northwest Light Rail

More information

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue. January 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Electric Vehicle Charging Stations New Park Board Locations RECOMMENDATION

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation

Alberta Electric System Operator Needs Identification Document Application. Mowat 2033S Substation Decision 21781-D01-2016 Alberta Electric System Operator Needs Identification Document Application Facility Applications September 7, 2016 Alberta Utilities Commission Decision 21781-D01-2016: Alberta

More information

Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, Ravenswood Avenue Railroad Crossing Project

Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, Ravenswood Avenue Railroad Crossing Project Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, 2017 1 Presentation Outline Project Background Review Current Alternatives City Council Requests Council Direction

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

JCP&L Verbatim Response to Middletown Township s Questions

JCP&L Verbatim Response to Middletown Township s Questions JCP&L Verbatim Response to Middletown Township s Questions Township officials sent 13 questions about the proposed Monmouth County Reliability Project to JCP&L on June 10 th. JCP&L provided direct responses

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L82 Decision 21447-D01-2016 August 23, 2016 Decision 21447-D01-2016 Proceeding 21447 Application 21447-A001 August 23, 2016 Published by the: Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary,

More information

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016

Decision D ATCO Electric Ltd. Decommissioning of Transmission Line 6L79. October 18, 2016 Decision 21481-D01-2016 October 18, 2016 Alberta Utilities Commission Decision 21481-D01-2016 Proceeding 21481 Application 21481-A001 October 18, 2016 Published by the: Alberta Utilities Commission Fifth

More information

Evaluating Stakeholder Engagement

Evaluating Stakeholder Engagement Evaluating Stakeholder Engagement Peace River October 17, 2014 Stakeholder Engagement: The Panel recognizes that although significant stakeholder engagement initiatives have occurred, these efforts were

More information

NOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION

More information

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations

More information

Appendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach

Appendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach Appendix I Draft Transmission Towers and Lines Relocation Options at the Port of Long Beach Transmission Towers & Lines Relocation Options at the Port of Long Beach December 2008 Prepared by Parsons 2201

More information

Included in this Stakeholder Information Package:

Included in this Stakeholder Information Package: Who can you contact for more information? Yellowhead Area Transmission Reinforcement: TERA Environmental Consultants Dave Sare Phone: 403-538-5734 Email: dsare@teraenv.com Drayton Valley Area AltaLink

More information

Western Alberta Transmission Line (WATL) HVDC Project

Western Alberta Transmission Line (WATL) HVDC Project Submission for the ACEC Canada Canadian Consulting Engineering Awards 2016 Western Alberta Transmission Line (WATL) HVDC Project Submitted by Teshmont Consultants LP as a Consultant to AltaLink Attachment

More information

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

WORKING SAFELY NEXT TO WEST MIDLANDS METRO WORKING SAFELY NEXT TO WEST MIDLANDS METRO GUIDELINES FOR BUSINESSES, CONTRACTORS, EVENT ORGANISERS & OTHERS WORKING ON OR NEAR TO WEST MIDLANDS METRO. If you own, occupy a building or other assets near

More information

The Grid Link Project. Summary of the Report for the Independent Expert Panel

The Grid Link Project. Summary of the Report for the Independent Expert Panel The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in

More information

Bohn to Kettle River Transmission Project

Bohn to Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

PRIVATELYOWNED POWER POLES AND POWERLINES

PRIVATELYOWNED POWER POLES AND POWERLINES PRIVATELYOWNED POWER POLES AND POWERLINES Privately-owned power poles and powerlines Privately-owned power poles and overhead powerlines must be properly maintained to ensure that they do not pose a serious

More information

BORAL CONCRETE GLENORIE

BORAL CONCRETE GLENORIE BORAL CONCRETE GLENORIE > Glenorie Progress Association meeting 14 March 2018 Glenorie RSL Club Glenorie A recap of our last discussion (Oct 2017)... Who are we? Boral Concrete (NSW/ACT) is part of the

More information

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET

CREATING CONNECTIONS IN THE TOWN OF NEWMARKET CREATING CONNECTIONS IN THE TOWN OF NEWMARKET NICK SPENSIERI, DIRECTOR, CORRIDOR INFRASTRUCTURE METROLINX ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX APRIL 10, 2017 GRIDLOCK

More information

South Gloucestershire Challenge Fund and Cycle Ambition Fund

South Gloucestershire Challenge Fund and Cycle Ambition Fund South Gloucestershire Challenge Fund and Cycle Ambition Fund The Challenge Fund A4174 scheme is coordinated and delivered by South Gloucestershire Council who were awarded 14 million pounds from the Department

More information

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington

Submission on the Wellington Town Belt Bill. Local Government and Environment Select Committee Parliament Buildings Wellington Wellington Electricity Lines Ltd 2 Submission on the Wellington Town Belt Bill To: Name: Local Government and Environment Select Committee Parliament Buildings Wellington Wellington Electricity Lines Limited

More information

welcome to the BC Hydro community open house

welcome to the BC Hydro community open house welcome to the BC Hydro community open house Dawson Creek/ Chetwynd Area Transmission ProjecT Open House welcome Dawson Creek/Chetwynd Area Transmission Project (DCAT) The purpose of this open house is

More information

AVIATION INVESTIGATION REPORT A07C0148 COLLISION WITH POWER LINE TOWER

AVIATION INVESTIGATION REPORT A07C0148 COLLISION WITH POWER LINE TOWER AVIATION INVESTIGATION REPORT A07C0148 COLLISION WITH POWER LINE TOWER CUSTOM HELICOPTERS LTD. BELL 206L-3 C-GCHG CRANBERRY PORTAGE, MANITOBA 09 AUGUST 2007 The Transportation Safety Board of Canada (TSB)

More information

Schedule Based on the City of Los Angeles, the District should be formed by April 2016 to allow the design and construction to be complete by 2019.

Schedule Based on the City of Los Angeles, the District should be formed by April 2016 to allow the design and construction to be complete by 2019. EXECUTIVE SUMMARY PURPOSE To report the findings of the Feasibility Study for an Underground Utility District along Segment C of the proposed Park to Playa Trail. BACKGROUND The City of Los Angeles Department

More information

THORNTON SUBSTATION. Why is the substation needed? How were the three potential sites identified?

THORNTON SUBSTATION. Why is the substation needed? How were the three potential sites identified? THORNTON SUBSTATION Xcel Energy has been working for seven years to identify a new site on which to build a new electrical power substation. If approved by City Council, this will be the first substation

More information

The Capital Grid Project:

The Capital Grid Project: The Capital Grid Project: Building Tomorrow s Energy Grid Today Lamond- Riggs Citizens Association October 2, 2017 Agenda Welcome How Safe, Clean, and Affordable Energy is Delivered Our Current System

More information

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board.

E) That the General Manager be authorized to execute and deliver such documentation on behalf of the Park Board. Date: May 30, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Electric Vehicle Charging Stations and Cellular Infrastructure in English Bay Parks RECOMMENDATION

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

PROPOSED TRAFFIC RESOLUTION

PROPOSED TRAFFIC RESOLUTION Reference Number: TR 50-18 Location:, Brooklyn Bus Hub - Brooklyn Proposal: Information: To provide new bus stops to create a Bus hub location on Cleveland Street, Brooklyn, as part of Wellington s new

More information

The Narragansett Electric Company. d/b/a National Grid (Interstate Reliability Project) RIPUC Dkt. No Testimony of. David M. Campilii, P.E.

The Narragansett Electric Company. d/b/a National Grid (Interstate Reliability Project) RIPUC Dkt. No Testimony of. David M. Campilii, P.E. (Interstate Reliability Project) RIPUC Dkt. No. 0 Testimony of David M. Campilii, P.E. November, 0 -v RIPUC Dkt. No. 0 PREFILED TESTIMONY OF DAVID M. CAMPILII 0 0 INTRODUCTION Q. Please state your name

More information

Dallas CBD Second Light Rail Alignment (D2)

Dallas CBD Second Light Rail Alignment (D2) Dallas CBD Second Light Rail Alignment (D2) Subway Project Refinement Stakeholder Meeting December 7, 2016 Discussion Items Background Schedule Public/Stakeholder Involvement Comments/Questions from Audience

More information

Guidelines when working near TasNetworks electrical assets

Guidelines when working near TasNetworks electrical assets Guidelines when working near TasNetworks electrical assets About TasNetworks Tasmanian Networks Pty Ltd (ACN 167 357 299) ( TasNetworks ) is the owner and operator of the regulated electricity network

More information

Welcome to Open House #5 Scarborough Rapid Transit

Welcome to Open House #5 Scarborough Rapid Transit Welcome to Open House #5 Scarborough Rapid Transit Welcome to the Scarborough Rapid Transit (SRT) Conversion and Extension Study, including Kennedy Station improvements. Tonight s event provides details

More information

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal

Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal Worker Crushed by Vessel Date of Incident: August 3, 2007 Type of Incident: Fatal TABLE OF CONTENTS SECTION TITLE PAGE 1.0 DATE AND TIME OF INCIDENT 4 2.0 NAME & ADDRESS OF PRINCIPAL PARTIES 4 2.1 Employer

More information

Currant Lake Transmission Project

Currant Lake Transmission Project Currant Lake Transmission Project September 2010 Why are you receiving this project information package? New transmission facilities are needed in the Monitor area of southeastern Alberta. ATCO Electric

More information

Vantage to Pomona Heights Transmission Project Frequently asked questions

Vantage to Pomona Heights Transmission Project Frequently asked questions Vantage to Pomona Heights Transmission Project Frequently asked questions These are some frequently asked questions regarding the proposed Vantage to Pomona Heights transmission line project. General What

More information

Community Involvement Group North. Meeting 13

Community Involvement Group North. Meeting 13 Community Involvement Group North: Meeting 13 Meeting: Community Involvement Group North Date: Monday, 4 June 2018 Time: Location: Arrive at 6.15pm for 6.30pm IBM Building 55 Coonara Road West Pennant

More information

CREATING CONNECTIONS IN WATERLOO REGION

CREATING CONNECTIONS IN WATERLOO REGION CREATING CONNECTIONS IN WATERLOO REGION GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE CHRIS BURKE, DIRECTOR, SERVICE PLANNING ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract

More information

environment briefing02

environment briefing02 The Voice of the Networks environment briefing02 transporting electricity Overhead Lines or Underground Cables Introduction The Electricity Act 1989 requires electricity companies both to maintain an efficient

More information

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017 REVIEWABLE OPERATING INCIDENT REPORT UNDER THE NATIONAL ELECTRICITY RULES Published: 3 August 2017 INCIDENT CLASSIFICATIONS

More information

PROPOSED TRAFFIC RESOLUTION

PROPOSED TRAFFIC RESOLUTION Reference Number: TR 52-18 Location: Frobisher Street and Severn Street - Island Bay Proposal: Information: To provide two new bus stop locations on Frobisher Street, and change the time restriction on

More information

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee 05.28.09 09 Bridge Type - Cost Vertical Clearance Bicycle Pedestrian Path Width Bridge Type - Cost WRBAC

More information

Engineering Considerations. Glenn Stapleton - Senior Electrical Design Engineer Lines

Engineering Considerations. Glenn Stapleton - Senior Electrical Design Engineer Lines Engineering Considerations Glenn Stapleton - Senior Electrical Design Engineer Lines Overview Transmission line terminology and concepts Types of clearances Electrical safety considerations in co-use Underground

More information

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document

Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document APPENDIX C AESO PIP Grizzly Bear Creek Wind Power Plant Connection Needs Identification Document 1.0 Participant Involvement Program (PIP) From December 2015 to May 2016, the AESO conducted a Participant

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Electrical industry update

Electrical industry update Electrical industry update December 2017 In this issue enotice Kalgoorlie Storms EnergySafety Industry Briefing Switchboard Bonding AS/NZS 3000:2007 defect analysis enotice enotice is an online facility

More information

Kettle River Transmission Project

Kettle River Transmission Project April 2012 Why are you receiving this project information package? New transmission facilities are needed in the Fort McMurray area. ATCO Electric has been directed by the Alberta Electric System Operator

More information

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014

Solar and Smart Meter Update. 1 April 2014 to 30 June 2014 Released July 2014 Solar and Smart Meter Update 1 April 2014 to 30 June 2014 Released July 2014 2 CONTENTS 1. Solar and Smart Meter Cases... 3 2. SMART METER UPDATE... 4 2.1. EWOV Smart Meter Cases Increase by 36%... 4 2.2.

More information

Report for Action. Wilson Bus Garage - Upgrades. Summary. Date: March 20, 2018 To: TTC Board From: Chief Capital Officer

Report for Action. Wilson Bus Garage - Upgrades. Summary. Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Report for Action Wilson Bus Garage - Upgrades Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary The purpose of this report is to obtain authorization for the award of Contract No.

More information

EMERGING REQUIREMENTS

EMERGING REQUIREMENTS EB-00-0 Exhibit D Schedule Page of EMERGING REQUIREMENTS 0 EQUIPMENT STANDARDIZATION THESL plans, designs and constructs distribution system assets in accordance with approved standards. The standards

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

June 8, Prepared by Urban Systems Ltd.

June 8, Prepared by Urban Systems Ltd. June 8, 2017 Prepared by Urban Systems Ltd. Prepared by : 304-1353 Ellis Street, Kelowna, BC V1Y 1Z9 T: 250.762.251704 June 8, 2017 urbansystems.ca File No. 1961.0384.02 1.1 Community Engagement Goals...

More information

Harrow Station Bishop Grandin Transmission Project. Welcome

Harrow Station Bishop Grandin Transmission Project. Welcome Harrow Station Bishop Grandin Transmission Project Welcome Project Background This project will: relocate and upgrade the transmission lines between Harrow Station and Bishop Grandin Boulevard; address

More information

FEASIBILITY LAND TRANSPORTATION VENTUS ENERGY. from. covering WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE. for.

FEASIBILITY LAND TRANSPORTATION VENTUS ENERGY. from. covering WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE. for. FEASIBILITY from covering LAND TRANSPORTATION Of WIND TURBINE EQUIPMENT PORT OF MOUNT MAUNGANUI TO KAIMAI RANGE SITE for VENTUS ENERGY September 2018 TABLE OF CONTENTS 1. PURPOSE AND SCOPE... 1 1.1. Purpose...

More information

Landfall and Converter Station Site Selection Report Non-Technical Summary

Landfall and Converter Station Site Selection Report Non-Technical Summary Landfall and Converter Station Site Selection Report Non-Technical Summary Date: Intentionally blank Contents 1.Introduction 4 1.1 What is Viking Link 5 1.2 Purpose of report 6 2. Approach to site selection

More information

Southeast Louisiana 115kV Transmission Upgrades. Westwego, LA

Southeast Louisiana 115kV Transmission Upgrades. Westwego, LA Southeast Louisiana 115kV Transmission Upgrades Westwego, LA Safety & Diversity 1 Safety is the cornerstone of Entergy s culture. We start every work day with a safety focus to create and sustain a safe,

More information

MMP Investigation of Arthur Kill 2 and 3

MMP Investigation of Arthur Kill 2 and 3 MMP Investigation of Arthur Kill 2 and 3 Requestor Consolidated Edison Company of New York, Inc. Facility Name Arthur Kill 2 and 3 Date of Request January 27, 2003 Type of Facility NG Generator Topic of

More information

AVIATION INVESTIGATION REPORT A02P0010 CABIN ENTERTAINMENT SYSTEM FIRE

AVIATION INVESTIGATION REPORT A02P0010 CABIN ENTERTAINMENT SYSTEM FIRE AVIATION INVESTIGATION REPORT A02P0010 CABIN ENTERTAINMENT SYSTEM FIRE AIR CANADA AIRBUS A-330-300 C-GFAF VANCOUVER INTERNATIONAL AIRPORT, BRITISH COLUMBIA 17 JANUARY 2002 The Transportation Safety Board

More information

AVIATION INVESTIGATION REPORT A07F0101

AVIATION INVESTIGATION REPORT A07F0101 AVIATION INVESTIGATION REPORT A07F0101 HYDRAULIC PUMP FAILURE BOMBARDIER BD-100-1A10, C-GFHR GENEVA, SWITZERLAND 25 JUNE 2007 The Transportation Safety Board of Canada (TSB) investigated this occurrence

More information

2015 AER Survey of Albertans and Stakeholders. Executive Summary

2015 AER Survey of Albertans and Stakeholders. Executive Summary 2015 AER Survey of Albertans and Stakeholders Executive Summary 2015 AER Survey of Albertans: Executive Summary July 2015 Published by Alberta Energy Regulator Suite 1000, 250 5 Street SW Calgary, Alberta

More information

CREATING CONNECTIONS IN EAST GWILLIMBURY

CREATING CONNECTIONS IN EAST GWILLIMBURY CREATING CONNECTIONS IN EAST GWILLIMBURY NICK SPENSIERI, DIRECTOR, CORRIDOR INFRASTRUCTURE METROLINX ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX APRIL 4, 2017 Page 8 of 146 GRIDLOCK

More information

ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM

ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM REQUEST FOR INTEREST ELECTRIC VEHICLE, PLUG-IN HYBRID ELECTRIC VEHICLE, ELECTRIC VEHICLE SUPPLY EQUIPMENT, AND ELECTRIC BIKE GROUP DISCOUNT PROGRAM ( Electric Car Discount Program ) SUBMITTAL DUE DATE

More information

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment APPENDIX Q SUBWAY OPERATIONS REPORT Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

More information

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982 Subject MINISTERIAL BRIEFING NOTE Rapid Transit in Auckland Date 1 November 2017 Briefing number BRI-1133 Contact(s) for telephone discussion (if required) Name Position Direct line Cell phone 1 st contact

More information

Appendix 3. DRAFT Policy on Vehicle Activated Signs

Appendix 3. DRAFT Policy on Vehicle Activated Signs Appendix 3 DRAFT Policy on Vehicle Activated Signs Ealing Council has been installing vehicle activated signs for around three years and there are now 45 across the borough. These signs help to reduce

More information

Ottawa LRT Stage 2. McKellar Park Information Session

Ottawa LRT Stage 2. McKellar Park Information Session Ottawa LRT Stage 2 McKellar Park Information Session Stage 2 Background Approved unanimously by Ottawa City Council in July 2015 East to Place d Orléans, west to Bayshore and Baseline, and south to Bowesville

More information

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document

Alberta Electric System Operator Saleski Transmission Project Needs Identification Document Decision 2013-127 Alberta Electric System Operator Saleski Transmission Project Needs Identification Document ATCO Electric Ltd. Saleski 901S Substation and 144-kV Transmission Line 7L142 Facility Application

More information

EA Closing Report Page 1 of 9

EA Closing Report Page 1 of 9 EA06-002 Closing Report Page 1 of 9 SUBJECT: Rear coil spring fracture ENGINEERING ANALYSIS CLOSING REPORT EA No: EA06-002 DATE OPENED: 24-Jan-2006 DATE CLOSED: 05-Feb-2007 SUBJECT VEHICLES: Model Year

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

Smart EV Managed Charging

Smart EV Managed Charging Smart EV Managed Charging Temporary management of the low voltage network Bob Hopkins, SSEN Daniel Hollingworth, EA Technology SSEN overview Scottish and Southern Electricity Networks owns: two electricity

More information

Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd

Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd Renewable Generation Electrical Infrastructure and Grid Connection Services Provided by Power Systems Project and Consultancy Services (PCS) Ltd Power Systems Project and Consultancy Services (PCS) Ltd

More information

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015

Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 Chairperson and Committee Members REGULATORY MANAGEMENT COMMITTEE 3 SEPTEMBER 2015 SPEED LIMIT CHANGE ON KĀPITI ROAD PURPOSE OF REPORT Meeting Status: Public Purpose of Report: For Decision 1 The purpose

More information

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008

Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 Electricity Industry Code Minimum Service Standards & Guaranteed Service Levels Quarterly Report July September 2008 2 Table of Contents Administrative Data...3 Network Performance...3 Reliability Measures

More information

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007

High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM ) Interconnection Facility Study. Final Report November 2, 2007 High Lonesome Mesa 100 MW Wind Generation Project (OASIS #IA-PNM-2006-02) Interconnection Facility Study Final Report November 2, 2007 Prepared by: Public Service Company of New Mexico Electric Services

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

2019 SpaceX Hyperloop Pod Competition

2019 SpaceX Hyperloop Pod Competition 2019 SpaceX Hyperloop Pod Competition Rules and Requirements August 23, 2018 CONTENTS 1 Introduction... 2 2 General Information... 3 3 Schedule... 4 4 Intent to Compete... 4 5 Preliminary Design Briefing...

More information

Out of Sight Out of Mind Revisited. EEI Transmission, Distribution, & Metering Conference October 14, 2009 Ken Hall Hall Energy Consulting

Out of Sight Out of Mind Revisited. EEI Transmission, Distribution, & Metering Conference October 14, 2009 Ken Hall Hall Energy Consulting Out of Sight Out of Mind Revisited EEI Transmission, Distribution, & Metering Conference October 14, 2009 Ken Hall Hall Energy Consulting 1 Presentation Outline Customer Expectations Storms and Outages:

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

APPENDIX E: ELECTRIC AND MAGNETIC FIELDS MANAGEMENT PLAN

APPENDIX E: ELECTRIC AND MAGNETIC FIELDS MANAGEMENT PLAN APPENDIX E: Final EIS/EIR E-1 FINAL ENVIRONMENTAL IMPACT STATEMENT/ENVIRONMENTAL IMPACT REPORT APPENDIX E: THIS PAGE INTENTIONALLY LEFT BLANK E-2 May 2011 LOS ANGELES DEPARTMENT OF WATER AND POWER Barren

More information

STATE OF NEW HAMPSHIRE Inter-Department Communication

STATE OF NEW HAMPSHIRE Inter-Department Communication STATE OF NEW HAMPSHIRE Inter-Department Communication DATE: February 11, 2010 AT (OFFICE): NHPUC FROM: Torn Frantz Director, Electric Division SUBJECT: DE 09-277: Petition by Public Service Company of

More information

Planning Commission Staff Report Ordinance Amendment Hearing Date: November 14, 2018

Planning Commission Staff Report Ordinance Amendment Hearing Date: November 14, 2018 Planning Commission Staff Report Ordinance Amendment Hearing Date: November 14, 2018 ITEM # 1* Western Community Crossroads LC requests an Ordinance Text amendment to Section 14.34.350 Recreational Vehicle

More information

This page is intentionally left blank.

This page is intentionally left blank. This page is intentionally left blank. Bipole III Southern Ground Electrode Line Route Selection Introduction Manitoba Hydro has recently selected a route for the southern ground electrode line (Map 1).

More information

ELECTRICAL SAFET Y FOR CONTRACTORS

ELECTRICAL SAFET Y FOR CONTRACTORS ELECTRICAL SAFET Y FOR CONTRACTORS TABLE OF CONTENTS Electricity Demands Respect... 2 Before Starting to Work Let Us Help You...2 Basic Rules for Electrical Safety...2 Common Dangers for Contractors...3

More information

Public Meeting. March 21, 2013 Mimosa Elementary School

Public Meeting. March 21, 2013 Mimosa Elementary School Public Meeting March 21, 2013 Mimosa Elementary School Today s Meeting Purpose 2 Where We Are The Process What We ve Heard and Findings Transit Technologies Station Types Break-out Session Where We Are

More information

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station.

Decision (Errata) Access Pipeline Inc. Errata to Decision Temporary Generation at Smoky Lake Pump Station. Decision 2011-424 (Errata) Access Pipeline Inc. Errata to Decision 2011-424 Temporary Generation at Smoky Lake Pump Station January 4, 2012 The Alberta Utilities Commission Decision 2011-424 (Errata):

More information

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision

Weight Allowance Reduction for Quad-Axle Trailers. CVSE Director Decision Weight Allowance Reduction for Quad-Axle Trailers CVSE Director Decision Brian Murray February 2014 Contents SYNOPSIS...2 INTRODUCTION...2 HISTORY...3 DISCUSSION...3 SAFETY...4 VEHICLE DYNAMICS...4 LEGISLATION...5

More information

Investigation Report Worker Fatally Injured Struck by Motor Coach December 9, 2015

Investigation Report Worker Fatally Injured Struck by Motor Coach December 9, 2015 Investigation Report Worker Fatally Injured Struck by Motor Coach December 9, 2015 Report No-F-OHS-098342-4D1EC October 2016 Page 1 of 6 The contents of this report This document reports s investigation

More information

SERVICE CLASSIFICATION NO. 6 PRIVATE OVERHEAD LIGHTING SERVICE

SERVICE CLASSIFICATION NO. 6 PRIVATE OVERHEAD LIGHTING SERVICE Original Leaf No. 112 PRIVATE OVERHEAD LIGHTING SERVICE APPLICABLE TO USE OF SERVICE FOR Sales and delivery of electric power supply provided by the Company or delivery of electric power supply provided

More information

Attachment D Environmental Justice and Outreach

Attachment D Environmental Justice and Outreach Attachment D Environmental Justice and Outreach ATTACHMENT D Environmental Justice and Outreach Indicate whether the project will have disproportionately high and adverse impacts on minority or low income

More information

Heavy Truck Conflicts at Expressway On-Ramps Part 1

Heavy Truck Conflicts at Expressway On-Ramps Part 1 Heavy Truck Conflicts at Expressway On-Ramps Part 1 Posting Date: 7-Dec-2016; Revised 14-Dec-2016 Figure 1: Every day vast numbers of large and long trucks must enter smoothly into high speed truck traffic

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED nsert TTC logo here STAFF REPORT ACTION REQUIRED Gap Between Subway Trains and Platforms Date: November 13, 2017 To: From: TTC Board Chief Executive Officer Summary This report is in response to an October

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information