1 Future plans for Railway Power Supply Energy Plan, Nils Grønneberg
2 Infrastructure Energy Planning (Engineering) The engineering section is one of two sections in the Planning (Engineering) and Project department 12 employees specialising in electricity/energy 2
3 Infrastructure Energy Plan Investigation of need for Railway Power Supply, nationally Simulation and load analyses based on: traffic information (current and future wagon-routing tables) infrastructure information (gradient, tunnel, catenary, etc.) stock information (train types, composition, freight loads, characteristics) converter data (equipment, types, performance, characteristics, etc.) converter failure scenarios. Technical-financial analysis with recommended measures Advisor assistance through framework agreements 3
4 Infrastructure Energy Plan Concept designs for relevant converter stations Define location, concept and dimensioning. Stakeholder analyses and environmental impact. Technical-financial pilot project with recommended solution, forming the basis for detailed planning, approval and potential tendering. 4
5 Infrastructure Energy Plan Professional support: Provide technical expertise for the projects Specify technical requirements Evaluate tenders Follow up technical deliveries 5
6 Infrastructure Energy Plan Framework conditions National Transport Plan (NTP) Expansion and development of railway sections Amendment of traffic and equipment Refurbishment of CL installation (AT) Technical Regulations (TRV) Regulations, etc. Allocation order from Jernbane Directorate 6
7 Investigation areas, Energy Supply Ofoten Line (2018) Dovre Line (2012) Bergen Line (2012) with Flåm Line Sørlandet Line (2017) etc. Oslo region (2018) Eastern Norway 7
8 Investigation areas, Energy Supply Oslo area, scope: Dovre Line (Lillehammer) Gjøvik Line Kongsvinger Line Main Line and Gardermoen Line Østfold Line, East/West, Follo Line Drammen Line and Asker Line Ringerike Line Vestfold Line Sørlandet Line (Nordagutu) etc. 8
9 Plans in the Oslo area New central converter station Oslo East Concept design, part 1 (location): Concept design, part 2 (dimensioning): Initiated Åsland (Follo Line) Provisional plan: Static converters, 4 x 40 MVA Turnkey contract: Closure of Alnabru and Holmlia converter stations 9
10 Plans in the Oslo area Temporary converter station in Vestfold Linked to new double track Nykirke - Barkåker (UNB) Concept design work has not commenced Land earmarked at new Skoppum station Provisional plan: Install mobile static converter (existing) Use existing converter 15 MVA Remaining until Drammen converter is operational Turnkey contract: Closure of Skoppum and Larvik converter station (relocation of mobile static converter) 10
11 Plans in the Oslo area New converter station in Hønefoss Linked to construction of the new Ringerike Line Concept design work to commence in 2020 Land suggested at new stabling area in Hønefoss Provisional plan: Establish new converter station 4 static converters Power requirement 60 MVA Turnkey contract: Closure of existing converter station 11
12 Plans in the Oslo area Upgrading of Jessheim converter station Necessary increase in performance for increasing Intercity traffic This measure will also facilitate regeneration New static converter in existing or new building Turnkey contract:
13 Plans in the Oslo area New converter station at Drammen Recommended in the long term, before investment needs in Asker Planning work not commenced Possible location slightly west of Gulskogen/Drammen Requires AT system Oslo-Drammen Indication: New static converter station Power requirement 60 MVA Turnkey contract: Asker can be closed when Drammen and Hønefoss converters are operational 13
14 Plans in the Oslo area New converter station at Hamar Necessary increase in performance on Dovre Line south Linked to new double track plots south of Hamar (Kleverud Sørli/Åkersvika) Concept design work completed. Location is determined The project is in the detailed planning phase (more info in next entry) Closure of Tangen converter station (losing track access) Closure and relocation of mobile converter station at Rudshøgda (Used elsewhere, e.g. on the Bergen Line) 14
15 Plans for the Sørlandet Line Refurbishment/upgrading of Kjelland converter station Necessary increase in performance on Sørlandet Line Concept design work has commenced Provisional plan: New static converters Power requirement 30 MVA Turnkey contract:
16 Plans for the Sørlandet Line Refurbishment/upgrading of Nelaug converter station The concept design work will commence in 2018 Concept development for modernisation of station in or outside existing rock caverns Implementation: Increased performance in Leivoll converter station Planning work to commence in 2024 Preparations at the station and replacement of rotary converters Implementation: Closure of Sira and Krossen converter stations Can be implemented when the two previous measures have been implemented 16
17 Plans for the Dovre Line Upgrading of Dombås converter station Necessary increase in performance south of Dovre Replacement of rotary converters to 2x10 MVA Implementation: Possible provisionally increased performance at Oppdal converter station Poss. replacement of rotary converters 17
18 Plans for the Dovre Line New converter station at Berkåk Necessary increase in performance at Dovre Line north / electrification of Røros Line Planning work not commenced. Possible reuse of rotary converters (typically 2x10 MVA) Requires at least a new building and switchgear installation. Implementation: or later: Closure of Oppdal/Lundamo/Stavne converter station To be assessed when Berkåk is operational Also to be viewed in conjunction with the establishment of Hell converter station (ETM project) 18
19 Plans for the Dovre Line New converter station at Fåvang Refurbishments and rationalisation on the Dovre Line Planning work not commenced, but requires at least a new building and coupling installation. Possible reuse of rotary converters (typically 2x10 MVA) Implementation: or later: Closure of Fåberg converter station Can be implemented when Fåvang is operational Closure of Fron converter station Can be implemented when Fåvang is operational 19
20 Plans for the Bergen Line Capacity increase at Haugastøl and Nesbyen converter stations. Necessary increase in performance at Bergen Line, Reuse of rotary converters Implementation: or later: 20
21 Plans for the Bergen Line New converter station at Voss To be assessed in connection with capacity increase on double track to Voss Planning work not commenced needs must be assessed in greater detail Implementation: or later: Closure of Dale converter station May possibly be implemented when Voss is operational 21
22 Plans for the Ofoten Line New converter station at Narvik Necessary increase in performance and reduction of risk on the Ofoten Line Concept design work, part 1 is completed Plot at Sildvik is secured Capacity-related survey being carried out now Static converters, estimated power requirement 60 MVA Implementation: Closure of Rombak converter station Can be implemented when the new Narvik converter station is operational 22
23 Transfer capacity at CL Upgrading to AT system or other reinforcement of CL: - necessary for a number of our measures - necessary to allow use of installed power - necessary to achieve sufficient redundancy Plans are in place for a number of the sections Input for the action programme from Energy Supply 23
TECHNICAL REPORT. Power supply, OCL Design S20 and S25 Verification of conformity with TSIs
TECHNICAL REPORT TECHNICAL REPORT Power supply, OCL Design S20 and S25 Verification of conformity with TSIs 000 Document created 2.3.2016 AMBSAR BIOL TELTOR Rev. Revisjonen gjelder Dato Utarb. av Kontr.
More informationRonnie van Eeden. Senior Mining Engineer. Overview
Senior Mining Engineer Overview is a qualified Mining Engineer with other commercial qualifications. He has 46 years of experience in the coal industry working for mining houses, the smaller coal industry,
More informationBusiness Area Power Supply
Business Area Power Supply 1 Our competence areas Alternating current supply for Main line railways Feeder stations (16.7 Hz, 25 Hz and 50 Hz) Transformer stations Substations Sectioning stations Switchgear
More informationIntroduction of High Speed trains in Poland and Rail Baltica
Ministry of Infrastructure Introduction of High Speed trains in Poland and Rail Baltica Conference Rail Baltica current development and business perspectives Riga, March 24, 2011 Ministry of Infrastructure
More informationElectromobility for Heavy-Duty Vehicles. Long Beach Convention Center, May 15-17, 2012 ACT Expo 2012
Electromobility for Heavy-Duty Vehicles Long Beach Convention Center, May 15-17, 2012 ACT Expo 2012 Siemens AG 2012. All Siemens rights reserved. AG 2010 Forecast: The demand for mobility keeps rising
More informationInteroperability TSIs applicable to Railway vehicles. Innotrans, September, 2010
Interoperability TSIs applicable to Railway vehicles Innotrans, 21-24 September, 2010 1. Purpose of the presentation 2. Geographical scope (Directives and TSIs) 3. Technical scope of TSIs 4. TSIs applicable
More informationPROJECTS $500K AND OVER FOR 2012
EB-0-0 Page of PROJECTS $00K AND OVER FOR 0 EXTERNALLY INITIATED PLANT RELOCATIONS PORTFOLIO Table : Externally Initiated Plant Relocations Projects Estimate Estimated Cost Project Title Number ($ Millions)
More informationOverview of Railway Noise Control in Europe
Overview of Railway Noise Control in Europe J. Oertli Swiss Federal Railways, Schanzenstrasse 5, 3000 Bern, Switzerland jakob.oertli@sbb.ch 1789 European and national legislation, increasing freight traffic,
More informationAdvantages of ERTMS for Sweden
Advantages of ERTMS for Sweden Reduced investment cost (>30%) Reduced maintenance costs for infrastructure (>20%) Increased competition between suppliers Advantages of ERTMS (2) Better traffic flow Increased
More informationThe ECORailS Guidelines in use Examples from the pilot application Berlin-Brandenburg Technology Innovation Agency Berlin (TSB)
The ECORailS Guidelines in use Examples from the pilot application Berlin-Brandenburg Technology Innovation Agency Berlin (TSB) 1 Content 1. Test site 2. Typical Dimensions for Awarding 3. Site Stakeholder
More informationReliable, economical and safe siemens.com/rail-electrification
AC Traction Power Supply Reliable, economical and safe siemens.com/rail-electrification More people, new challenges, one solution: Integrated mobility. Demographic change, urbanization and climate change:
More informationModernising the Great Western railway
Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western
More information4.0 TIER 2 ALTERNATIVES
4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation
More informationEIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE
EIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE0000343 Background: To support the SSC in assessing the results of the macroeconomic analysis and reaching consensus on the three
More informationFeeder systems. A schematic diagram. for renewable energies
Competence... With over 60 employees the department Energy distribution and infrastructure has an experienced core of installers, foremen and engineers for the realisation of the most diverse customer
More informationIntermediate results
Intermediate results 11th UIC Sustainability Conference Madrid June 17th 2010 17.06.2010 1 Mads Bergendorff Macroplan Consulting Presentation overview Latest results of the project Simulation and evaluation
More informationFrom vision to reality
OFFER From vision to reality TABLE OF CONTENTS About us 03 Railway construction industry 05 ABOUT US Railway construction industry Catenary system 07 Railway construction industry Engineering objects 09
More informationIn the report various scenario s are presented, which have been investigated. The figure below shows the scope of the three (main) senario s:
National Implementation Plan of ERTMS in The Netherlands 1. Decision making process April 2014: Preference decision In April 2014 the Dutch Parliament agreed with the Dutch Government to implement its
More informationScope of Services January 26, Project Development and Conceptual Engineering for City of Lake Forest Amtrak Station
203 North LaSalle Street, Suite 2100 Chicago, IL 60601 (312) 558-1345 Fax: (312) 346-9603 E-Mail: cquandel@quandelconsultants.com www.quandel.com Scope of Services January 26, 2010 Project Development
More informationAnalysis of options for the future allocation of PV farms in South Africa
Analysis of options for the future allocation of PV farms in South Africa M.P.E. GmbH International Engineering and Consulting company with offices in Germany (Tübingen) and U.K. (London). Services: Grid
More informationCity of Palo Alto (ID # 6416) City Council Staff Report
City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building
More informationRea Vaya Bus Rapid Transit (BRT) Project
Rea Vaya Bus Rapid Transit (BRT) Project Presentation to ITS SA 30th May 2008 Contents Background Phased implementation Work streams Operator business model Infrastructure contracts Stations Fleet ITS
More informationThe criteria of choice for new High Speed fleet
Amsterdam, March 17-19th, 2008 The criteria of choice for new High Speed fleet Emilio Maestrini CONTENTS 1. DRIVERS 2. MAIN FACTORS ON HIGH SPEED MARKET 3. EVOLUTION OF HIGH SPEED SYSTEM 4. INTEROPERABILITY
More informationPeninsula Corridor Electrification Project (PCEP)
Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract
More informationBROCHURE. End-to-end microgrid solutions From consulting and advisory services to design and implementation
BROCHURE End-to-end microgrid solutions From consulting and advisory services to design and implementation 2 B R O C H U R E E N D -TO - E N D M I C R O G R I D S O LU T I O N S Global trends in grid transformation
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS
More informationThis document is a preview generated by EVS
TECHNICAL SPECIFICATION CLC/TS 50591 SPÉCIFICATION TECHNIQUE TECHNISCHE SPEZIFIKATION November 2013 ICS 45.060.10 English version Specification and verification of energy consumption for railway rolling
More informationEurailspeed Parallel Session F.1. Michael Schemmer Chairman UNIFE WG Transport and Environment Bombardier Transportation
Eurailspeed Parallel Session F.1 Michael Schemmer Chairman UNIFE WG Transport and Environment Bombardier Transportation 1 High-speed rail, the environmentally friendly solution for mobility Dr. Michael
More informationPROBLEMS ENCOUNTERED IN MAINTENANCE AND REPAIR WORKS OF RAILWAYS
PROBLEMS ENCOUNTERED IN MAINTENANCE AND REPAIR WORKS OF RAILWAYS 27.04.2015 PERMANENT WAY DEPARTMENT Selahattin SİVRİKAYA Head of Department 1 1. LENGHT OF THE EXISTING LINES 2. SINGLE-TRACK LINE OPERATIONS
More informationThe Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee
The Regional Municipality of Halton Report To: From: Chair and Members of the Planning and Public Works Committee Jim Harnum, Commissioner, Public Works Date: October 5, 2016 Report No. - Re: PW-36-16
More informationTHEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 ENERGY
THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 25 ENERGY Away from the mainline, there could be additional lower-spec energy options alongside AC electrification, including battery-power
More informationAgenda. Introduction to PRASA. Funding Allocation and Spending Performance. Strategic Plan. Rail Modernization. Challenges
Agenda A Introduction to PRASA B Funding Allocation and Spending Performance C Strategic Plan D Rail Modernization E Challenges 0 Rail Modernisation 1 Rolling Stock Fleet Renewal Programme Modern Fleet
More informationWP 2 ELIPTIC Use Cases Upgrading and/or regenerating electric public transport systems (flywheel, reversible substations)
WP 2 ELIPTIC Use Cases B Upgrading and/or regenerating electric public transport systems (flywheel, reversible substations) Daniela Carbone Head of Innovation technological department Veronica Usai Rail
More informationSYSTEM INTEGRATION. Railway and urban transport electrification Energy-efficient and reliable solutions
SYSTEM INTEGRATION Railway and urban transport electrification Energy-efficient and reliable solutions 2 R A I LWAY & U R B A N T R A N S P O R T E L E C T R I F I C AT I O N S O L U T I O N S ABB s substation
More informationHigh Speed Rail Conference
High Speed Rail Conference Denver, October 23, 2012 FAST START PROJECT FOR PENINSULA HIGH-SPEED RAIL Kern Jacobson InfraConsult LLC Objective Evaluate incremental approach to expedite high-speed rail to
More informationThe Generator Company 3MVA Bespoke Generator
The Generator Company 3MVA Bespoke Generator System for New UK Distribution Centre Nearing the end of 2016 we were contacted by a regular client to design and install a back-up generator power system to
More informationNew Mexico Transmission Expansion Concepts For Wind Resources
New Mexico Transmission Expansion Concepts For Wind Resources May 2008 Update Electric Services Transmission Operations FOREWORD This document contains PNM s latest concepts for expanding the transmission
More informationStudy on Economic Partnership Projects. in Developing Countries in FY2010. Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY.
Study on Economic Partnership Projects in Developing Countries in FY2010 Study on the Kiev Metro Line 4 in Kiev City, Ukraine SUMMARY March 2011 第 1 章 第 2 章 The Ministry of Economy, Trade and Industry
More informationELIPTIC. Planning a charging infrastructure for electric vehicles using Barcelona s rail network Eliptic Project. April EBERSWALDE LONDRES
ELIPTIC Planning a charging infrastructure for electric vehicles using Barcelona s rail network Eliptic Project LONDRES BRUSEL LES BREMEN OBERHAUSEN EBERSWALDE GDYINIA (2) LEIPZIG VARSOVIA SZEGED BARCELONA
More informationThe Signalling Programme
The Signalling Programme Jan Schneider-Tilli, Programme Director 1. June 2016 - DTU 1 Agenda 1. Background to the Signalling Programme 2. ERTMS 3. Way ahead 4. Programme Management, Collaboration & MSP
More informationInnovation and Transformation of Urban Mobility Role of Smart Demand Responsive Transport (DRT) service
Innovation and Transformation of Urban Mobility Role of Smart Demand Responsive Transport (DRT) service Eng. Mohammed Abubaker Al Hashimi Director of Planning & Business Development, Public Transport Agency
More informationSTU in Lapland. Table 1
STU in Lapland String Transport of Unitsky (STU) is a transportation system of the second level in which a track structure is elevated above the ground on the supports. Its closest analogues include: a
More informationSEPULVEDA PASS CORRIDOR
SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000
More informationCITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6
2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY
More informationINNOVATION in ROAD TECHNOLOGIES CHALLENGES AND SOLUTIONS FOR ELECTRIFICATION OF LONG DISTANCE ROAD FREIGHT TRANSPORT ON HIGHWAYS
INNOVATION in ROAD TECHNOLOGIES CHALLENGES AND SOLUTIONS FOR ELECTRIFICATION OF LONG DISTANCE ROAD FREIGHT TRANSPORT ON HIGHWAYS Bernard Jacob Deputy Scientific Director, IFSTTAR bernard.jacob@ifsttar.fr
More informationRecommended Vision for the Downtown Rapid Transit Network
Recommended Vision for the Downtown Rapid Transit Network April 2008 Presentation Overview Context Transit options Assessment of options Recommended network Building the network 2 1 Rapid Our Vision Reliable
More informationLess car dependent cities Planning for low carbon in Oslo
Less car dependent cities Planning for low carbon in Oslo Aud Tennøy, PhD Urban and Regional Planning Chief Researcher Sustainable Urban Development and Mobility Institute of Transport Economics (TOI)
More information2013/2014 Strategic Priorities Fund Application Overview
2013/2014 Strategic Priorities Fund Application Overview Bob Paddon, Executive Vice President Strategic Planning and Public Affairs TransLink 3 December 2013 Strategic Priorities Fund Application Context
More informationABFC2016 ADVANCED BIOECONOMY FEEDSTOCK CONFERENCE FOUR SEASONS HOTEL, MIAMI, FL JUNE 6-8, 2016
ABFC2016 ADVANCED BIOECONOMY FEEDSTOCK CONFERENCE FOUR SEASONS HOTEL, MIAMI, FL JUNE 6-8, 2016 Leveraging Supply Chain Investments Prepared by: John R. Kirkwood, Partner Faegre Baker Daniels LLP 600 East
More informationInterconnection System Impact Study Report Request # GI
Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010
More informationHow our experience could serve your ambitions Lessons learnt
London Sept 11, 2014 How our experience could serve your ambitions Lessons learnt Pierre-Etienne Gautier, VP Innovation, SYSTRA 1. hs2 Challenges HS2 project sets ambitious targets V360 70 M.ton/year in
More informationFeasibility Study for Promotion of International Infrastructure Projects in FY2011
Feasibility Study for Promotion of International Infrastructure Projects in FY2011 STUDY ON THE EXPANSION OF RAIL TRANSPORT CAPACITY FOR ROCK PHOSPHATE, THE KINGDOM OF MOROCCO FINAL REPORT SUMMARY November
More informationThe train-path pricing system. Who pays how much to rail infrastructure?
The train-path pricing system. Who pays how much to rail infrastructure? SBB Infrastructure, July 2015 The train-path price covers 40 percent of infrastructure costs. SBB Infrastructure receives CHF 1.1
More informationHyLAW. HyDrail Rail Applications Assessment. Main Author(s): [Dainis Bošs, Latvian Hydrogen association] Contributor(s):
HyLAW HyDrail Rail Applications Assessment Main Author(s): [Dainis Bošs, Latvian Hydrogen association] Contributor(s): Status: [V1] Dissemination level: [public] 1 Acknowledgments: The HyLAW project has
More informationQUESTION / CLARIFICATION
QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES INTEROPERABILITY DIRECTIVE AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-RST-020 Issue 02 Date:
More informationTHE UK RAIL MARKET 2015
THE UK RAIL MARKET 2015 image: Ken Harris B R O O K S M A R K E T I N T E L L I G E N C E R E P O R T S THE UK RAIL MARKET 2015 Brooks Events Ltd 2015. All rights reserved. A Brooks Reports Publication
More informationKopernikus-Project ENSURE
Prof. Dr.-Ing. Thomas Leibfried, Karlsruhe Institute of Technology (KIT) 1 ENSURE s main goals Mission Holistic, systemic approach für new network structures 1. Goal System design with centralised and
More informationTRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA
TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA 20 March 2014 Report prepared by: Corli Havenga Transportation Engineers
More informationControlling the Speed of Tilting Trains Through Curves
Controlling the Speed of Tilting Trains Through Curves Synopsis This document mandates the means by which Tilting Trains may be operated at higher speeds than nontilting trains around curves. Signatures
More informationRailyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY
Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)
More informationSan Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors
Transportation Committee November 17, 2016 Agenda Item No. 5, Update on the San Rafael Transit Center Relocation San Rafael Transit Center Relocation Study Update 11/17/16 Golden Gate Bridge, Highway &
More informationVIADUCT LOCATION STUDY. October 19, 2009
VIADUCT LOCATION STUDY October 19, 2009 Background Information Traffic Study Alternative Evaluation Public Involvement Preferred Concept Next Steps Evaluate alternatives for the location of a viaduct to
More informationRISK AND SAFETY ASSESSMENT
RISK AND SAFETY ASSESSMENT Hermann Gitzelman, Pöyry Infra Gmbh Kersten Bleibohm, Kilian Pai, Interfleet Technology Gmbh Johan Nimmermark, Lars Rosen, Sweco Karin Johansson, Interfleet Technology AS Norwegian
More informationRapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998
Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the
More informationExpanding Capacity for the Northeast Corridor The Gateway Program
Expanding Capacity for the Northeast Corridor The Gateway Program Petra Todorovich Messick March 4, 2013 Raritan Valley Rail Coalition Somerville, NJ The Northeast Corridor Mainline and Branches 899 Route-miles
More informationPresentation: Mobihubs in Flanders
Presentation: Mobihubs in Flanders WHAT S A MOBIHUB A mobihub (mobipunt in Dutch) is a transport hub based at a neighbourhood level, where different sustainable and shared transport modes are linked. It
More informationScarborough Subway Extension. Stakeholder Advisory Meeting February 28, 2017
Scarborough Subway Extension Stakeholder Advisory Meeting February 28, 2017 City Council Direction The Scarborough Subway Extension (SSE) project and budget were approved by City Council in 2013, prior
More informationCOMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT
MINISTRY OF ENERGY AND MINERAL DEVELOPMENT COMMERCIALISATION OF UGANDA S OIL AND GAS SECTOR: REFINERY AND ATTENDANT INFRASTRUCTURE DEVELOPMENT Dr. Stephen Robert Isabalija PERMANENT SECRETARY 13 th -15
More informationABB in Norway. The pioneering technology leader
ABB in Norway The pioneering technology leader ABB: the pioneering technology leader What (Offering) Pioneering technology Products 58 % Systems 24 % Services & software 18 % For whom (Customers) Utilities
More informationTRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING
TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL - TRANSFORMING RAIL TRAVEL TRANSFORMING RAIL
More informationfor TECHNICAL ADVICE OF THE EUROPEAN UNION AGENCY FOR RAILWAYS THE EUROPEAN COMMISSION regarding ERA/AD V/ running gear - design of structural
EUROPEAN UNION AGENCY FOR RAILWAYS Making the railway system work better for society. TECHNICAL ADVICE ERA/AD V/201 72 OF THE for THE EUROPEAN COMMISSION regarding Interoperability Constituent bogie frame
More informationURBAN FUTURE SOME LEADS FOR LEEDS. Véronique Ramadi, Leeds,
URBAN FUTURE SOME LEADS FOR LEEDS Véronique Ramadi, Leeds, 12.12.2016 STRUCTURE OF PRESENTATION 1. Overview Stadler Rail Group 2. Sustainable city development 3. Project examples Some leads for Leeds Véronique
More informationViriato/OpenTrack Conference 2005 Zürich, Switzerland. ir. Jeroen Michels the Netherlands
Viriato/OpenTrack Conference 2005 Zürich, Switzerland ir. Jeroen Michels the Netherlands Presentation contents Introduction of Holland Railconsult Use of OpenTrack in projects by Holland Railconsult Successful
More informationScarborough Transit Planning
Scarborough Transit Planning April 23, 2016 Transportation Planning Section City Planning Division Overview 1. Developing Toronto s Transit Network Plan 2. Scarborough Transit Planning 1. Minutes of last
More informationCREATING CONNECTIONS IN WATERLOO REGION
CREATING CONNECTIONS IN WATERLOO REGION GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE CHRIS BURKE, DIRECTOR, SERVICE PLANNING ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX
More informationElectrical Energy Engineering Program EEE
Faculty of Engineering Cairo University Credit Hours System Electrical Energy Engineering Program EEE June 2018 Electrical Engineers: What they do? Electrical engineers specify, design and supervise the
More informationMEMORANDUM OF UNDERSTANDING Between Colorado, Idaho, Montana, Nevada, New Mexico, Utah and Wyoming Regional Electric Vehicle Plan for the West
MEMORANDUM OF UNDERSTANDING Between Colorado, Idaho, Montana, Nevada, New Mexico, Utah and Wyoming Regional Electric Vehicle Plan for the West THIS MEMORANDUM OF UNDERSTANDING (Memorandum) is made on this
More informationReview and Procurement of Replacement Road Traffic Collision Rescue Tools (Ultra Heavy)
Review and Procurement of Replacement Road Traffic Collision Rescue Tools (Ultra Heavy) Subject: Procurement Report Date: 5 th February 2019 Reference: HWFRS/62 (DS212-17) Background Hereford & Worcester
More informationJapanese ODA Loan. Ex-ante Evaluation
Japanese ODA Loan Ex-ante Evaluation 1.Name of the Project Country:Republic of the Philippines Project:Capacity Enhancement of Mass Transit Systems in Metro Manila Project Loan Agreement:27 March 2013
More informationELECTRO MECHANICAL INNOVATION IN Rail
ELECTRO MECHANICAL INNOVATION IN Rail Since contract award, Houghton International has delivered the contract as agreed, mobilising within the agreed time period and supplying the product as per the agreed
More informationThe DLR Project Next Generation Train (NGT)
> UIC Energy Efficiency Workshop, Rome > Holger Dittus The DLR Project Next Generation Train (NGT) > 04/10/2017 DLR.de Chart 1 The DLR Project Next Generation Train (NGT) Holger Dittus UIC Energy Efficiency
More informationDeveloping Toronto s Transit Network Plan to 2031
RE:EX16.1 Developing Toronto s Transit Network Plan to 2031 Executive Committee Meeting June 28, 2016 March 2016 City Council Direction SmartTrack: Approved SmartTrack/GO Regional Express Rail (RER) Integration
More informationTechnological Viability Evaluation. Results from the SWOT Analysis Diego Salzillo Arriaga, Siemens
Technological Viability Evaluation Results from the SWOT Analysis Diego Salzillo Arriaga, Siemens 26.04.2018 Agenda Study Objectives and Scope SWOT Analysis Methodology Cluster 4 Results Cross-Cluster
More informationAkku4Future. (Acronym: Akku4Future Dis)
Akku4Future (Acronym: Akku4Future Dis) E-Mobility Strategy Outline of the Akku4future project region A summary of potentials and strategies of South Tyrol (I) Veneto (I) Carinthia (A) Akku4Future (Acronym:
More informationProposed Downtown Miami Link
March 30, 2016 Proposed Downtown Miami Link A PUBLIC PRIVATE PARTNERSHIP Presented to: Secretary Boxold, FDOT Presented by: Jack Stephens, Executive Director, SFRTA March 30, 2016 Downtown Miami Link Costs
More informationCase Study STREAMS SMART MOTORWAYS
Case Study STREAMS SMART MOTORWAYS One of the key challenges facing road agencies today is maximising road network efficiency while reducing impacts on the community. Increasingly, road agencies are turning
More informationAssessment of Fuel Oil Availability. Jasper Faber, The Hague, 3 October 2016
Assessment of Fuel Oil Availability Jasper Faber, The Hague, 3 October 2016 Presentation outline Context of the Fuel Availability Assessment Aim and scope and of the Assessment Methods, data and models
More informationEBRD Transport & Energy in Serbia
EBRD Transport & Energy in Serbia April, 2013 Aleksandar Nikcevic, Principal Banker 1 The European Bank for Reconstruction and Development An international financial institution promoting transition to
More informationWentzville Parkway South Phase 2 & 2A
Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total
More information(Text with EEA relevance)
L 150/10 COMMISSION REGULATION (EU) 2015/924 of 8 June 2015 amending Regulation (EU) No 321/2013 concerning the technical specification for interoperability relating to the rolling stock freight wagons
More information4. Transportation Plan
The sizes of the most suitable sites are indicated in Table 4.3.6.2. Table 4.3.6.2: Site Sizes and Potential Development Area Potential Development Site Site Size (m 2 ) Area m 2 (3 Floors) D1 29,000 87,000
More informationExecutive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1
Executive Summary Introduction The Eastside Transit Corridor Phase 2 Project is a vital public transit infrastructure investment that would provide a transit connection to the existing Metro Gold Line
More informationFinancing Public Transport Projects by EBRD
SPUNIC Regional Conference 3 rd Working Group Meeting Financing Public Transport Projects by EBRD Guido Bruggeman Urban Transport Specialist former Employee European Bank for Reconstruction and Development
More informationBrief Description, Overall Objective and Project Objectives with Indicators
Bangladesh: Supply with Main-Line Locomotives Ex-post evaluation OECD sector 21030 / Railway sector BMZ project ID 1988 66 345 Project-executing agency Consultant Bangladesh Railway DE-Consult Year of
More informationBuilding a Hydrogen Refueling Network in Scandinavia by 2015
Building a Hydrogen Refueling Network in Scandinavia by 2015 26 th September 2011, F-Cell Conference About H2 Logic A/S Established 2003 37 employees + 4 PhD students Ownership by four founders (~85%)
More informationDNV GL Energy Transition Outlook 2018 and our services related to electric mobility
DNV GL Energy Transition Outlook 2018 and our services related to electric mobility Jeremy Parkes Business Lead Electric Vehicles 1 DNV GL 2018 10 September 2018 SAFER, SMARTER, GREENER DNV GL a quality
More informationReconstruction and Electrification of Trolley Track. City of Kingston, New York November 8, 2007
Reconstruction and Electrification of Trolley Track City of Kingston, New York November 8, 2007 Trolley Museum of New York Founded in 1955 Moved to Kingston in 1983 Operates Over City-Owned Former Ulster
More informationGuide for the application of the CR ENE TSI
European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1.00 Date: 26 August 2011 Document prepared by Document type:
More informationEconomic and Social Council
United Nations Economic and Social Council Distr.: General 6 September 2016 Original: English Economic Commission for Europe Inland Transport Committee World Forum for Harmonization of Vehicle Regulations
More informationRisk Management of Rail Vehicle Axle Bearings
Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle
More information