1 County of Santa Cruz 0217 THOMAS L. BOLCH D RECTOR OF PUBLC WORKS 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA (631) FAX (931) TDD (831) AGENDA: FEBRUARY 13,200l February 1,200l SANTA CRUZ COUNTY BOARD OF SUPERVSORS 701 Ocean Street Santa Cruz, California SUBJECT: NORTH RODEO GULCH STORM DAMAGE REPAR PROJECT, P.M CONTRACT NUMBER CO02247, PUBLC WORKS JOB NUMBERS 70799, 70308,70310,70314,70346,70348,70822,70823,70817 NOTCE OF COMPLETON Members of the Board: The subject project was completed on January 4, The contractor was J. Randolph, nc., of Aptos. The original bid price was $217, Total construction cost is $252, The additional costs were due to Contract Change Order No. 1, which was approved by the County Administrative Offrce and ratified by your Board. A summary of final costs is attached for your information. t is therefore recommended that the Board of Supervisors take the following action: 1. Accept the improvements and approve the final cost. 2. Authorize the Clerk of the Board to file the Notice of Completion, a copy of which is attached.
2 SANTA CRUZ COUNTY BOARD OF SUPERVSORS Page Direct the County Recorder to return the original Notice of Completion to the Clerk of the Board. Yours truly, Director of Public Works DJH:mg Attachments RECOMMENDED FOR APPROVAL: County Administrative Officer copy to: Recorder s Office Public Works J. Randolph, nc. 41 NOCLET.DOC/NRTHM
3 COUNTY OF SANTA CRUZ STATE OF CALFORNA FNAL PAYMENT CONTRACT: NORTH RODEO GULCH ROAD, STORM DAMAGE REPAR, FNAL SUMMARES OF ALL STES PM CONTRACTOR: PUBLC WORKS JOB NO. VAROUS J. RANDOLPH NC PLEASANT VALLEY ROAD, CONTRACT AMOUNT $ 217,460.OO APTOS, CA ORGNAL FNAL COST COST DFFERENCE JC. STE DESCRPTON BD AMOUNTS AMOUNTS 1 PM 0.17, DSR NO $26, $26, PM 1.00, DSR NO. 032 $64, $89, $25, PM 1.22, DSR NO.033 $25, $25, $ PM 3.80, DSR NO. 035 $12, $13, $ PM 3.85, DSR NO. 036 $14, $14, ($274.60; 2 PM 3.87, DSR NO. 037 $9, $10, $1, PM 4.35, DSR NC $19, $22, $2, PM 4.82, DSR NO $13, $15, $1, PM 4.80, DSR NO $30, $35, $4, TOTAL $217, $252, $35, PP25NRODGUL3bTESTFN.xls
4 STATE OF CAUFORNiA NORTH RODEO GULCH ROAD, STORM DAMAGE REPAR, PM L.W. V.-v ; CLEARNG AND GRUBBNG 1.oo L.S $1,ooo.oo $1,ooo.oo $ ROCK SLOPE PROTECTON (l/4 TO TONN 0.00 $ $8, $ ROCK SLOPE PROTECTON (l/2 TO oo TONN 0.00 $ $3, $ (F) EARTHWORK M $38.38 $3, $0.00 P CDAC~~ rnhrdnl e ~c\~lzr- md 1 1.oo L.S $ $ $ TONN. _._._ $ $ So.00 TONN M M n nn T-A.,., 11 L L.UU UNN E12 REBULD EXSTNG NLET 1.OOl EA $ Rebuild Existing CMP Outfal/ Construe EA $ ROCK ENERGY DSPATOR $0.00 EY--DA \AlnRK = ORGNAL STE BD: $26, CHANGES: $0.00 FNAL STE COST: $26,
5 STATE OF CALFORNA NORTH RODEO GULCH ROAD, STORM DAMAGE REPAR, PM 1.00 i, ; ARNC! ANll CR RRNC L.S v. (...-- nnn nn % 7.,-- nnr ROCK SLOPE PROTECTON (l/4 TO 20; TONN 1 1 oo.ool $ $30, $1 o,ooo.oo 4 ROCK SLOPE PROTECTON (l/2 TO 20s?A? nnl TAhlhl 191; lo.58 $37, $14, (F) EARTHWORK 20 LYY.,.., $5, EROSON CONTROL & REVEG. (TYP L.S. 1 $ $ AGGREGATE BASE CLASS _^ WNN 1 $ $83! TONN 1 $ $2, ASPHALT CONCRETE DKE (TYPE A) M 1 $60.00 $1, PMCTP DDE D\/P /4&n MAhA\ M $A Q n ry. am fin zian v.. m 11 clavv-, _ \.b,.-lb m-m, ,.- \-a TONN 1 $ $1, ROCK ENERGY DSPATOR 11 1.OOl EA 1 $l! $ EXTRA WORK L.S. $2, $2, CCo#l 15 NCREASE LNE TEM NO.3 $1 o,ooo.oo 16 NCREASE LNE TEM No.4 $14, TOTAL $89, $25, ORGNAL STE BD: $64,040.77J CHANGES: v $25, FNAL STE COST: $89, N N N
6 STGTE OF CAitFORNlk NORTH RODEO GULCH ROAD. STORM DAMAGE REPAR. PM 1.22 CONTRACT NO. Co CLEARNG Ah, w, \vwwom.w L.S. $ $ ROCK SLOPE PROTECTON (l/4 TO TONN 0.99 $ $6, $ EqCK SLOPE PROTECTON (l/2 TO TONN $ $4, (F) EARTHWORK M3 $44.44 $3, EROSON CONTROL & REVEG. (TYP L.S. $ $ Ar-CDECATF DA-= * A-- -?ll A nc Tnhlhl,,-,YY,\LVT\ L DMDC clm33 L L, -r.w,.,., WV., VY 7., \~-w-...., 6 ASPHA T CONCRFTF (TYPF R,._,,, , TONN sRmR7., 7-w-.-., 27 T-, nn 07, $ T ACDUA T PnNf-RF--F nlkf fl-vpf A\ inl innnl M ac*nn awin nn l-tvr T\L V..LLY\L-\ b.., WV. V. 1; PLASTC PPE PVC (150 MM) ii M 2.50 $40.00 $ $ , CLASS 2 PERMEABLE MATERAL (BL TONN 1.50 $ $ $ ROCK ENERGY DSPATOR EA $ $ EXTRA WORK L.S. $1,000. ocl $1,ooo.oo A $ S lb w ORGNAL STE BD: $25, CHANGES: $ FNAL STE COST: $25, ] 0 N PO W
7 STA7E OF CAMORNA NORTH RODEO GULCH ROAD. STORM DAMAGE REPAR, PM TRAFFC CONTROL SYSTEM $3, $3, CLEARNG AND GRUBBNG $ $ ROCK SLOPE PROTECTON (l/4 TO TONN 5.49 $100.0~ $ $ A. n * - FARTHWORK M3 $55.56 $11: EROSON CONTROL & REVEG. (TYP L.S. $ $ AGGREGATE BASE CLASS TONN 1.75 $71.43 $ $ ASPHALT CONCRETE (WPE B) 6 Rnn Tt?NN ZG-2 22 = PLASTC PPE PVC (150 MM) 14,..., -.-- T.-.-. $ $ CLASS 2 PERMEABLE MATERAL (BL rnhlht n ~31. -._._ -.-- ClRR R $ n DfiPl/ Ck,CD,? nlcldatad 3 nn c7c nn /c7* nm n tax L, Lr\ u lrt\ \. EA -1.oo $75.00 \ay V., L.S. $ $ iy (EXTRA WORK 4r) ;; TAT A Cl? R37 AA C7R7 %A ORGNAL STE BD: $12, CHANGES: $ FNAL STE COST: $13, ]
8 STATE OF CALEFORNilA NORTH RODEO GULCH ROAD, STORM DAMAGE REPAR. PM 3.85 TROL & REVEG., , --, , M3 $ $1, L.S...J.3v L \YL, 7.62 TONN 0.62 $ ROCK ENERGY DSPATOR ; 1.00 E/4-1.oo $ LJ, TOTAL $14, ($274.60) ORGNAL STE BD: $14, CHANGES: FNAL STE COST:
9 STATE OF CAL~FORN~A NORTH RODEO GULCH ROAD, STORM DAMAGE REPAR, PM CLEARNG AND GRUBBNG L.S. $ $ ROCK SLOPE PROTECTON (l/4 TO TONN 5.30 $ $2, $ (F) EARTHWORK M J fi33.33 Q AGGREGATE BASE CLASS TONN $ , ; j $ EROSON CONTROL & REVEG. (TYP L.S. $ ASPHALT CONCRETE (TYPE B) TONN L 0.33, $ $ $ ASPHALT CONCRETE DKE (TYPE A) M 1! $ x PLASTC PPE PVC (150 MM) M 1.75 $41.43 $ $ CLASS 2 PERMEABLE MATERAL (BL TONN $ $1, $ ROCK ENERGY DSPATOR EA S150.OQ r;l EXTRA WORK lx $ ; j ;; ORGNAL STE BD: $9, CHANGES: $1, FNAL STE COST: L $10,
10 STATE OF CALFORNA NORTH RODEO GULCH ROAD, STORM DAMAGE REPAR, PM TOTAl $ $ ORGNAL STE BD: $19, L CHANGES: $2, FNAL STE COST: $22, h.3 N 4
11 STATE OF CALlFORNlA NORTH RODEO GULCH ROAD, STORM DAMAGE REPAR, PM 4.62 ORGNAL STE BD: $13, * CHANGES: $1, FNAL STE COST: $ f
12 STATE OF CALFORNA NORTH RODEO GULCH ROAD, STORM DAMAGE REPAR, PM 4.80 _.-- - l-f fl-vpf R\ R TONN 1 $ $ O.001 M $67.50 $675.00, *.--.-., _--_ TONN $ $2-.$50.00 i $ ORGNAL STE BD: $30, CHANGES: $4, v FNAL STE COST: $35,085.08
County of Santa Cruz 0579
County of Santa Cruz 0579 701 OCEAN STREET, ROOM 410, SANTA CRUZ, CA 95060-4070 (831) 454-2160 FAX (831) 454-2385 TOO (831) 454-2123 DIRECTOR OF PUBLIC WORKS SANTA CRUZ COUNTY BOARD OF SUPERVISORS 701
More informationPALM BEACH COUNTY DEPARTMENT OF ENGINEERING AND PUBLIC WORKS ROADWAY PRODUCTION PALM BEACH COUNTY THOROUGHFARE ROADS TYPICAL SECTIONS
SHEET NO NDEX NEW CONSTRUCTON SHEET DESCRPTON PALM BEACH COUNTY DEPARTMENT OF ENGNEERNG AND PUBLC WKS 1 KEY SHEET 2 STANDARD RGHTOFWAY (NEW CONSTRUCTON): 5 ROADWAY 2 AND 3 ROADWAY 3 STANDARD RGHTOFWAY
More informationTamil Nadu Public Service Commission
ASSISTANT CONSERVATOR OF FORESTS DOE :02.12.2014 TO 09.12.2014 _ Subjcct:AGRICULTURE ~ Codc:ACFAG ~........ B X 41 AX 81 DX 121 o A 161 c l< 2 cy 42 CY' 82 Dy 122 13 x 162 B ~ J ox 4J c \ 83 D..( 123 c
More information365, , , A Total of Schedule I and II 530, , A 702, A
BID ABSTRACT COUNTY OF VENTURA - PUBLIC WORKS AGENCY Page 1 of 3 Bids opened on April 2, 2019 ENGINEER'S ESTIMATE LOW BIDDER 2nd Bidder Project Name Piru Stormwater Capture For Groundwater Recharge Project
More informationPRODUCT GUIDE LANDSCAPE LIGHTING. fxl.com. A Hunter Industries Company
PRODUCT GUIDE LANDSCAPE LIGHTING A Hunter Industries Company fxl.com FINISHES Metals Powder coat Standard Powder coat Specialty s AB on copper AB on brass AT on copper AT on brass CU BS SS NP BZ DG WI
More information2, total unit $ total unit $ total unit $ total $
BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;
More informationCity of Grand Island Tuesday, February 13, 2018 Council Session
City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff
More informationCANTON COMMUNITY REQUEST FOR BOARD ACTION
CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: April 11, 2017 AGENDA ITEM #G-6 ITEM: Consider Approval of a Budget Amendment & Award of a Contract to J. Ranck Electric Inc. for the Pedestrian
More informationCITY of NOVI CITY COUNCIL
CTY of NOV CTY COUNCL Agenda tem E March 23, 2015 cityofnovi.org SUBJECT: Approval of Change Order No. 1 to Great Lakes Power and Lighting for the 2014 Sanitary Lift Station project in the amount of $68,800
More informationCERTIFICATE OF COMPLIANCE
FM Approvals 1151 Boston Providence Turnpike P.O. Box 9102 Norwood, MA 02062 USA T: 781 762 4300 F: 781-762-9375 www.fmapprovals.com CERTIFICATE OF COMPLIANCE HAZARDOUS (CLASSIFIED) LOCATION ELECTRICAL
More informationCITY OF SIMI VALLEY MEMORANDUM
CITY OF SIMI VALLEY MEMORANDUM AGENDA ITEM NO. Consent (3) January 29, 2018 TO: FROM: City Council Police Department SUBJECT: AUTHORIZATION TO PURCHASE SIX FORD POLICE UTILITY INTERCEPTORS FROM FOLSOM
More informationPROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.
LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE
More informationT31 Series. Composite Curves. T31 SERIES (60 Hz ODP Service Factor Motor Horsepower Selections*) 3450 RPM MTH PUMPS T31 SERIES PUMPS
MH PUMPS 3 Series Section -3 Capacities to GPM Heads to 3 Feet Low PSH equirements Horizontal Close Coupled Flex Coupled 3 SS Composite Curves 3 3 SS (6 Hz DP Service Factor Motor Horsepower Selections*)
More informationTECHNICAL BULLETIN LTB00693NAS1 19 DEC 2014
TECHNICAL BULLETIN LTB00693NAS1 19 DEC 2014 Jaguar Land Rover North America, LLC NOTE: The information in Technical Bulletins is intended for use by trained, professional Technicians with the knowledge,
More information2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00
1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron
More information35 One Gateway Plaza Los Angeles, CA
35 One Gateway Plaza Los Angeles, CA 90012-2952 2 13-9 2 2.2000 Tel metro. net SYSTEM SAFETY AND OPERATIONS COMMITTEE FEBRUARY 21, 2013 SUBJECT: ACTION: TURBOCHARGERS APPROVE CONTRACT AWARDS RECOMMENDATION
More informationCONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO
Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,
More informationCounty of Sonoma Agenda Item Summary Report
Revision No. 20170501-1 County of Sonoma Agenda Item Summary Report Agenda Item Number: 29 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA
More informationDRL RELAY CIRCUIT CIRCUIT DESCRIPTION
051562 DIAGNOSTICS 05ETR02 DRL RELAY CIRCUIT CIRCUIT DESCRIPTION The multiplex network body ECU controls DRL No.2, No. and No.4 relays. The headlamp (High) is connected in serial when the daytime running
More informationRiverside County Transportation Department Summary of Bids
County Estimate Adame Landscape, Inc. Murrieta, CA 92562 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 1,000.00 1,000.00
More informationAGENDA STAFF REPORT FISCAL YEAR FLEET REPLACEMENT
rfof( AGENDA STAFF REPORT e~ti E4 Ai Q DATE: February 27, 2017 TO: THRU: FROM: Honorable Mayor and City Council Jill R. Ingram, City Manager Steve Myrter, P. E., Director of Public Works SUBJECT: FISCAL
More informationCERTIFICATE OF COMPLIANCE
FM Approvals 1151 Boston Providence Turnpike P.O. Box 9102 Norwood, MA 02062 USA T: 781 762 4300 F: 781-762-9375 www.fmapprovals.com CERTIFICATE OF COMPLIANCE HAZARDOUS (CLASSIFIED) LOCATION ELECTRICAL
More informationGROUP SIX Mficoticari Emoteq Division MF Series Torque Motors - Thin Ring Design - Direct Drive eliminates backlash - Extremely low cogging torque Con
GRUP SIX Mficoticari Emoteq Division MF Series Torque Motors - Thin Ring Design - Direct Drive eliminates backlash - Extremely low cogging torque Contact Us! Email Purchase Source: GRUP SIX () Te,4,2t
More informationCity of Grand Island Tuesday, June 26, 2018 Council Session
City of Grand Island Tuesday, June 26, 2018 Council Session Item G-21 #2018-188 - Approving Change Order No. 3 for Sanitary Sewer Collection System Rehabilitation Various Locations; Project No. 2017-S-2A
More informationRiverside County Transportation Department Summary of Bids
Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00
More informationCity of Grand Island Tuesday, October 10, 2017 Council Session
City of Grand Island Tuesday, October 10, 2017 Council Session Item G-12 #2017-276 - Approving Change Order No. 1 for Lift Station No. 20 Upgrade and Force Main Rehabilitation & Lift Station No. 14 Abandonment;
More informationCONTRA COSTA COMMUNITY COLLEGE DISTRICT
ADDENDUM #1 CONTRA COSTA COMMUNITY COLLEGE DISTRICT Date: 11/15/2018 D 4014 Warehouse Demolition Project Diablo Valley College 321 Golf Club Road, Pleasant Hill, CA 94523 NOTICE TO ALL CONTRACTORS: You
More informationCERTIFICATE OF COMPLIANCE
FM Approvals 1151 Boston Providence Turnpike P.O. Box 9102 Norwood, MA 02062 USA T: 781 762 4300 F: 781-762-9375 www.fmapprovals.com CERTIFICATE OF COMPLIANCE HAZARDOUS (CLASSIFIED) LOCATION ELECTRICAL
More information. l. TITLE OF DOCUMENT: An Ordinance Regarding Establishment of Speed Limits on a portion of Lake Whatcom Boulevard.
WHATCOM COUNTY COUNCL AGENDA BLL NO. 2017-323 CLEARANCES nitial Date Date Received in Council Office Agenda Date Assigned to: Council- Originator: JPR 1012412017 ll/8/2017 ntroduction JPR 1012412017 fl
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.
201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal
More informationRiverside County Transportation Department Summary of Bids
1 COUNTY'S ESTIMATE R-JS General Construction Riverside, CA 92509 ITEM NO. ITEM CODE CONTRACT ITEM UNITS QUANTITY UNIT PRICE ENG ESTIMATE BID UNIT PRICE BID ESTIMATE 1 066102 DUST ABATEMENT LS 1 3,000.00
More informationLos Angeles County One Gateway Plaza q.200n Tpl Metropolitan Transportation Authority Los Angeles, CA metro.4 I
Los Angeles County One Gateway Plaza 213.92q.200n Tpl Metropolitan Transportation Authority Los Angeles, CA 90012-2952 metro.4 I Metro 1 I 48 I I SYSTEM SAFETY AND OPERATIONS COMMITTEE MARCH 15,2012 SUBJECT:
More information[Agreement - TEGSCO, LLC, dba San Francisco AutoReturn - Towing and Storage of Abandoned and Illegally-Parked Vehicles - Not to Exceed $65,400,000]
FLE NO. 01 RESOLUTON NO. - 1 [Agreement - TEGSCO, LLC, dba San Francisco AutoReturn - Towing and Storage of Abandoned and llegally-parked Vehicles - Not to Exceed $,00,000] Resolution approving the Agreement
More informationSTREET IMPROVEMENTS PROPOSAL BID ITEMS
STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove
More informationMobility Corridor Updates. Transit & Active Transportation Projects
Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate
More informationv Deborah Flint - Chief ecutive e, ficer
Date 6/30/2017 6/30/2017: 6/26/2017: Approval EY MY By RW AE MT BY...jil 0.'1 1 Los Angeles World Airports REPORT TO THE B A - e OF AIRPORT COMMISSIONERS Meeting Date:, A irdro, /. Approved : aiph -,...
More informationMeasuring Accessibility. Andrew Owen Director, Accessibility Observatory May 17, 2017
Measuring Accessibility Andrew Owen Director, Accessibility Observatory May 17, 2017 1. Overview 2. Methodology 3. Reporting Accessibility 4. Policy Implications 1. Overview What is Accessibility? Accessibility
More informationPatton Hill Road (Four Inch Main), Project No
Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)
More informationSPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT
SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,
More informationPRODUCT GUIDE LANDSCAPE LIGHTING
PRODUCT GUIDE LANDSCAPE LIGHTING North America fxl.com FINISHES Metals AB Antique Bronze on Powder coat Standard AB Antique Bronze on Brass AT Antique Tumbled on AT Antique Tumbled on Brass CU BS Natural
More informationHonorable Mayor and Members of the City Council
12/1/2015 GS TO: FROM : DATE: SUBJECT: Honorable Mayor and Members of the City Council Thom Coughran, P.E., Interim Public Works and Utilities Director~ b Prepared by: George Alvarez P.E., T.E., City Engineer/
More informationCity Council Report. Mayor and City Council
City Council Report To: From: Mayor and City Council City Council Meeting: February 23, 2016 Agenda Item: 3.J Edward King, Director, Big Blue Bus, Transit Services Department Subject: Custodial and Maintenance
More informationRoadway. Sub Total 570, , , , , I. Correction ofbidders ExtensionsfTotal
BD TABULATON Bid : 7026 City Wide Curb Replacement Project : 10040-110 Engineering & Capital mprovements Department, City of St. Petersburg, Florida Bid date: July 27, 2010 tem Description Quantity Engineer's
More informationCity of Grand Island Tuesday, January 22, 2013 Council Session
City of Grand Island Tuesday, January 22, 2013 Council Session Item G10 #2013-24 - Approving Bid Award for Two (2) Storm Water Pumps for the Solid Waste Division Staff Contact: Terry Brown, Interim Public
More informationDivision of Purchasing Jason T. Garnar, County Executive Tyler B. West, Director
Division of Purchasing Jason T. Garnar, County Executive Tyler B. West, Director November 9, 2017 Notice of Bid Renewal To Whom It May Concern, This letter shall serve notice that the Board of Acquisition
More informationJOB LOSSES BY STATE, State Industry US total AK AL AR AZ CA CO CT Agriculture, forestry, fisheries -15, ,
State US total AK AL AR AZ CA CO CT -15,597-35 -272-248 -232-3,163-132 -46-3,858-68 4-19 -291-303 -116-11 -3,318-9 -55-32 -73-314 -66-35 -554,750-194 -14,113-7,789-4,781-55,255-4,453-6,836-9,326-13 -190-282
More informationPISMO BEACH COUNCIL AGENDA REPORT
PISMO BEACH COUNCIL AGENDA REPORT Agenda Item #5.F SUBJECT/TITLE: VEHICLE REPLACEMENT FOR FIRE DEPARTMENT LIFEGUARD TRUCK RECOMMENDATION: Waive the reading of, and adopt, a Resolution authorizing the purchase
More informationCity of Grand Island
City of Grand Island Tuesday, May 25, 2010 Council Session Item G10 #2010-139 - Approving Bid Award for Substation Power Transformers Staff Contact: Gary R. Mader City of Grand Island City Council Council
More informationDate: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:
DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project
More informationPublic Works Department
Public Works Department SUBJECT: Consideration of a Resolution authorizing a contract extension from July 6, 2018 through July 5, 2019 with Gas Depot Oil Company of Morton Grove, IL, to supply fuel for
More informationJune 27, In Reply Refer To: HSSD/B-176
June 27, 2008 1200 New Jersey Avenue, SE. Washington, DC 20590 In Reply Refer To: HSSD/B-176 Mr. John Addy Hill & Smith Springvale Business and Industrial Park Bliston, Wolverhampton, West Midlands, UK,
More informationCUSTOM ADD-ONS FOR ENGLISH UNITS
Spindles Flange Piloted Slot Collet Jacobs Taper Morse Taper See note on next page for location in the Specification Code No. Description A B C AA Flange 2.625 3.619/3.621 5.313 AB Piloted Slot 2.3125
More informationNational Routing Number Administration p-ani Activity and Projected Exhaust Report
National Routing Number Administration 2016 p-ani Activity and Projected Exhaust Report The ATIS Industry Numbering Committee developed the P-ANI Administration Guidelines, which contain the following
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:
47,635.79 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 161 3 CONTRACT ID: 092106270 PROJECT: STP 2014(101)TE CONTRACT: 02163244 AWARD : $899,908.10 PROJECTED : $905,908.10 ADJ. PROJECTED : $953,543.89
More informationStaff Report. (925)
5.g Staff Report Date: September 13, 2016 To: From: Reviewed by: Prepared by: Subject: City Council Valerie J. Barone, City Manager Justin Ezell, Director of Public Works Jeff Rogers Jeff.rogers@cityofconcord.org
More informationPLANE COORDINATE PROJECTION TABLES HAWAIIAN ISLANDS
U. S. Department of Commerce Sinclair Weeks, Secretory Coast and Geodetic Survey Robert F. A. Studd., Director Special Publication No. 32 PLANE COORDINATE PROJECTION TABLES I UNITED STATES GOVERNMENT PRINTING
More informationCITY OF STANDARD SPECIFICATIONS
CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12
More informationMetro. Board Report. SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE MAY 21, 2015 SUBJECT: PURCHASE OF MID-SIZE SUVs
34 Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA File #: 2015-0290, SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE
More informationJuly 17, In Reply Refer To: HSSD/B-176A
July 17, 2008 1200 New Jersey Avenue, SE. Washington, DC 20590 In Reply Refer To: HSSD/B-176A Mr. John Addy Hill & Smith Springvale Business and Industrial Park Bliston, Wolverhampton, West Midlands, UK,
More information$6, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 -30, PROJECT: STP 2013(839) GRAYSON
-30,219.83 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 291 CONTRACT ID: 051002028 PROJECT: STP 2013(839) CONTRACT: 07133220 AWARD : $4,317,753.44 PROJECTED : $4,394,254.44 ADJ. PROJECTED : $4,364,034.61
More informationWHITE OAK RIDGE PROJECT NO. 53B2384 D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION CITY OF MADISON
WHITE OAK RIDGE D-1 DETAIL STANDARD NOTES AND TYPICAL SECTION ORIGINATOR:, STREETS DIVISION REV. DATE: PLOT NAME: PLOT SCALE: THE LOCATION AND INFORMATION FOR PROPOSED NEW TREES, IN THE PUBLIC RIGHT OF
More informationReport Number: COD Resolution: GG
Corporate Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: General Government Committee Date of
More informationDistrict-Wide Prop 39, Interior LED Lighting Upgrades Pre-Conference Meeting Re-Bid No January 9 at 10:00 AM Las Positas College
January 9 at 10:00 AM Las Positas College AGENDA I. Welcome & Introduction II. Project Overview III. Site, Constraints & Challenges IV. Bid Document Summary V. Bid Schedule II. Project Overview A. Project
More information2/1/2018. February 1, Item #1 CITIZENS PARTICIPATION
February 1, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments
More informationSUMMARY OF BIDDERS THE CORPORATION OF THE CITY OF BRAMPTON REQUEST FOR PROPOSAL NO. RFP
SUMMARY OF BIDDERS THE CORPORATION OF THE CITY OF BRAMPTON REQUEST FOR PROPOSAL NO. RFP2013-023 PREQUALIFICATION OF GENERAL CONTRACTORS FOR THE CONSTRUCTION OF A NEW TWO STOREY ADMINISTRATION FACILITY
More informationCity of La Palma Agenda Item No. 11
City of La Palma Agenda Item No. 11 MEETING DATE: July 7, 2015 TO: FROM: SUBMITTED BY: CITY COUNCIL CITY MANAGER Eric R. Nuñez, Police Chief AGENDA TITLE: Civil Penalties for Street Sweeping Fines RECOMMENDED
More informationTHE CORPORATION OF THE DISTRICT OF SUMMERLAND BYLAW NUMBER
THE CORPORATION OF THE DISTRICT OF SUMMERLAND BYLAW NUMBER 92-47 A BYLAW OF THE CORPORATION OF THE DISTRICT OF SUMMERLAND TO ESTABLISH REGULATIONS FOR THE CONSTRUCTION OF DRIVEWAYS AND ACCESSES TO AND
More informationCLEARANCES Initial Date Date Received in Council Office Agenda Date Assigned to: II Council- Introduction H ~~~ II:»
WHATCOM COUNTY COUNCL AGENDA BLL NO. 2017-323 CLEARANCES nitial Date Date Received in Council Office Agenda Date Assigned to: Originator: JPR 1012412017 ll/8/2017 Council- ntroduction Division Head: JPR
More informationMAC VALVES, INC. Rev. T
REVISION LEVEL DATE RELEASED CHANGE DESCRIPTION ECN NUMBER P.E. APPROVAL P.D APPROVAL A 5-11-95 ENGINEERING RELEASE 12727 EPJ B 1-15-96 ADDED 35 SERIES 13228 EPJ ADDED MOD 2938 TO 6500 SERIES, MODS 2910
More informationthe Boards su port for ap ealing subdivision B of the California
*** DATABASE: COFB DOCUMENT: REC= 1 PAGE 0071 mfe;:opj; ;;;;;1 AGENDATE: 041701 INVENUM : 48806 RESOLUTN: ;;;;FWI;;: 4613. CONTINUE: 042401 INDEX -Letter of County Administrative Office dated April 13,
More informationSPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES
9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54
More informationCONSTRUCTION SPECIFICATION FOR WATERMAIN AND WATER SERVICE TRACER WIRE INDEX. SUBMISSION AND DESIGN REQUIREMENTS Not Used...2
CITY OF TORONTO TORONTO WATER STANDARD CONSTRUCTION SPECIFICATIONS TS 7.40 February 2006 TS 7.40.01 CONSTRUCTION SPECIFICATION FOR WATERMAIN AND WATER SERVICE TRACER WIRE INDEX GENERAL...2 TS 7.40.01.01
More informationAGENDA ITEM C3. RECOMMENDATION: Approve Contract No with Lavandera Electrical
AGENDA ITEM C3 DATE: June 1, 2014 TO: FROM: SUBJECT: Matt Jordan, General Manager Charles H. Carden, Chief Operating Officer Section 21 Wellfield Electrical Components - Project No. 07530 Award Construction
More informationKansas Department of Transportation DISTRICT 2. Project(s): Min: Max:
Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE
More informationTHE BOARD OF SUPERVISORS OF THE COUNTY OF STANISLAUS ~- _,_; ACTION AGENDA SUMMARY DEP~lic Works BOARD AGENDA #_*C_-_4 Urgent 0 Routine [!:] AGENDA DATE March 3, 2015 CEO Concurs with Recommendation YES
More informationL,r+6phar : iifrr,(v)
Plese keep wriften mteril within the bx t mke phtcpying esier iffiti"j M Use BAGK ink nly Indicte whether "bkwrk" () l,m (prese number"".n.1sj E r m ft ^6c:r/-)-tl/+&-rV^)J }c)-w-, (t ttl 20 fr ech 2,r+6phr
More informationAPPROVE CONTRACT MODIFICATION AWARD
5 One Gateway Plaza Los Angeles, CA 9 012.2952 213.922.2000 Tel metro. net SYSTEM SAFETY AND OPERATIONS COMMITTEE SEPTEMBER 20, 2012 SUBJECT: ACTION: ENGINE REBUILD KITS APPROVE CONTRACT MODIFICATION AWARD
More informationOpen Session Item. Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications, Contract No.
Board of County Commissioners of Washington County, Maryland Agenda Report Form Open Session Item SUBJECT: Construction Bid Award Pavement Maintenance & Rehabilitation Program FY 16 Chip Seal Applications,
More informationCANTON COMMUNITY REQUEST FOR BOARD ACTION. ITEM: Consider Approving the Purchase of Three Fire Apparatus Vehicles
CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: February 14, 2017 AGENDA ITEM #G-10 ITEM: Consider Approving the Purchase of Three Fire Apparatus Vehicles PRESENTER: Joshua Meier, Public Safety
More informationFOOTBRIDGE ELEVATION SCALE 1:100
OVERALL BRIDGE LENGTH 20000 DAIRY FLAT HIGHWAY END STEEL HANDRAIL BOTH SIDES 20 CURTAIN WALL 1900 20 CURTAIN WALL D1 RL.m A 2 B E1 RL.7m E 1% LONGITUDINAL GRADE E12 E11 E1 STEEL HANDRAIL BOTH SIDES 4 E14
More information~'~'~,~~!~.. ~,.'L- ~~411.~. wr:m/,.~'-" ?",,-~. tp. Me\ ~ ~-.:~... ~"'-':i. "ll;j{;fi\)\~'
BoardDocs Pro Page 1 of2 ~'~'~,~~!~.. ~,.'L- ~~411.~. wr:m/,.~'-" «::::>,;. "'k j... f!.., I;Jffi ',,.-~?",,-~. tp. Me\ ~ ~-.:~... ~"'-':i "ll;j{;fi\)\~' A.s.enda Item Details Meeting Category Subject
More informationSteese Rd - Curb & Sidewalk Improvement
REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00
More informationPRIMARY. Ergon Asphalt & Emulsions, Inc. Austin, TX HUB - No. Extended. Extended Item Description Est. Qty Unit Price
Section One: Less Than Transport Loads: FOB Origin - Provider Storage, Pick-Up Within Tarrant County: Item Description Est. Qty Unit Unit Unit 1 Emulsions - CRS-2/CRS-2H 27,000 GL 1.38 37,260.00 2 Emulsions
More informationOtsego County Road Commission
Otsego County Road Commission William T. Holewinski, Jr., Commissioner Troy W. Huff, Commissioner David C. Matelski, Commissioner Jason T. Melancon, Manager Thomas A. Deans, Engineer Rebecca L. Jerry,
More informationTahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.
Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station
More information1 [Building Code - Electric Vehicle Charging Stations - Expedited Permit Process]
FILE NO. 180090 SUBSTITUTED 11/13/2018 ORDINANCE NO. 003-19 1 [Building Code - Electric Vehicle Charging Stations - Expedited Permit Process] 2 3 Ordinance amending the Building Code to enact an expedited
More informationLivestock Operations Summary. April United States Department of Agriculture. National Agricultural Statistics Service.
United s Department of Agriculture National Agricultural Statistics Service 3 Summary April 4 Mt An -2 (04) a Update Alert Page 2, Added Table, "Milk Cows: Number of Operations, Percent of Inventory and
More informationMarch 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents
Akbar Jazayeri Director of Revenue and Tariffs March 30, 2005 ADVICE 1881-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: 1% Franchise Surcharge for City of
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60
More informationSUBJECT: CONTRACT C080S, HOIST REPLACEMENT AT BUS MAINTENANCE DIVISIONS 3, 5, 9, 10, AND 18, PETERSON HYDRAULICS AND ROTARY LIFT, A JOINT VENTURE
æ Metro Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 9 012-2952 3~ 213-922.2000 Tel metro. net OPERATIONS COMMITTEE NOVEMBER 15, 2007 SUBJECT: CONTRACT C080S, HOIST REPLACEMENT
More informationT r0(1 Jn11 ttull ~O,
CONSTRUCTION DIVISION : 134,107,514.00 ADVERTISED DATE: FEBRUARY 19, 2008 BID OPENING DATE: AUGUST 14, 2008 ITEM 1 CONSTRUCTION ITEM 2 TIMBER PILE REMOVAL 35,500,000.00 Each Approx. Qty. = /ea 650.00 520,000.00
More informationBID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT
BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT The County of Hancock, Maine is seeking bids from qualified firms for the purchase and installation of at least a 20KW backup generator
More informationPage 1 of 12 BATTERY CHARGE WARNING LAMP ON WITH DTC B11DB-87 STORED TECHNICAL SERVICE BULLETIN Reference Number(s): LTB00643NAS1, Date of Issue: February 25, 2014 2010 Onwards LR4 (LA); 2010-2012 Range
More informationThe Economic Downturn Lessons on the Correlation between Economic Growth and Energy
The Economic Downturn Lessons on the Correlation between Economic Growth and Energy Demand presented to Indiana State Bar Association Utility Law Spring Seminar April 9, 2010 presented by Doug Gotham State
More informationAPPENDIX A Instruction Set. Op Code. T states Flags Main Effects. Instructions
APPENDIX A 8085 Instruction Set Instructions ACI byte CE 7 ALL A A + CY + byte ADC A 8F 4 ALL A A + A + CY ADC B 88 4 ALL A A + B + CY ADC C 89 4 ALL A A + C + CY ADC D 8A 4 ALL A A + D + CY ADC E 8B 4
More informationACURA L 91 ILX HYBRID LEA F.I. S.O.H.C RW0-004 SWH30479
U.S. APPLICATIONS PISTON RINGS 2017 NPR of America, Inc. RED = NEW INFORMATION ENGINE MODEL YEAR C ENGINE F.I. O.H.V. RING NOA SIZE NAME Y CODE CARB S.O.H.C. REFERENCE PISTON cc L ci L NUMBER DIESEL D.O.H.C.
More informationAPPLICATION FOR FY Dumpster Program RETURN AT LEAST SIX WEEKS PRIOR TO REQUESTED DATE OF DELIVERY
Application for Dumpster Program January 2014 Page 1 of 3 APPLICATION FOR FY2013-2014 Dumpster Program RETURN AT LEAST SIX WEEKS PRIOR TO REQUESTED DATE OF DELIVERY IN AN EFFORT TO INCREASE COMMUNITY PARTICIPATION
More informationTABLE OF CONTENTS PAGE SCHOOL BUS BID # ORDERING INSTRUCTIONS
Pricing and Ordering Guide for School Buses 2016-2017 TABLE OF CONTENTS PAGE SCHOOL BUS BID #2016-01 ORDERING INSTRUCTIONS... 4-7 PRICES FOR TYPE A SCHOOL BUSES AND OPTIONAL EQUIPMENT... 8-9 PRICES FOR
More informationADDRESS PO BOX MAIN STREET 175 DRIFT ROAD 100 BILBY ROAD
RES#2018-146 CONTRACT TERM: JUNE 22,2018-JUNE 21,2019 BID RESULTS CK09MERCER2017-02 ROAD MATERIALS FOR THE COUNTY OF MERCER AND THE MERCER COUNTY COOPERATIVE CONTRACT PURCHASING SYSTEM FOR A PERIOD OF
More information