MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

Size: px
Start display at page:

Download "MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL"

Transcription

1 City AIRDRIE Accepted Amount Rehabilitate several roads. $2,874,640 Rehabilitate several roads, including underground utilities. $13,888,000 BROOKS Upgrade a portion of Cassils Road. $2,325,000 Upgrade several roads and sidewalks. $389,204 Rehabilitate a portion of roads. $74,344 CALGARY Purchase public transit buses. $4,406,000 Upgrade public transit buildings. $2,124,000 Upgrade 1 Street Southwest pedestrian underpass. $6,304,000 Construct roadway connections along the Southwest ring road. $4,795,000 Construct an interchange at the Trans-Canada Highway and Bowfort Road. $26,438,500 Construct a transit plaza and boulevard along 61 Avenue South. $8,635,000 Replace the 12 Street Southeast bridge. $12,003,000 Redevelop the interchange at Crowchild Trail and Flanders Avenue. $20,000,000 Upgrade several roadways and intersections. $17,598,000 Widen and upgrade a portion of 16 Avenue North. $1,391,300 Rehabilitate several light rail transit vehicles. $12,856,000 Construct a portion of 96 Avenue North. $5,849,000 Upgrade the public transit maintenance facilities. $35,733,771 Rehabilitate several roads, including landscaping and sidewalks. $29,000,000 Contribute funding to the Bowness Community Association to upgrade the Bowness Community Hall. Contribute funds to the Calgary Minor Soccer Association to upgrade the Calgary West Soccer Centre. $196,044 $294,752 Rehabilitate the pedway system. $22,964,417 CAMROSE Rehabilitate several roads. $2,090,000 CHESTERMERE Construct soccer fields. $255,000 Page 1

2 CHESTERMERE Design and construct a park. $593,000 Purchase public works trucks and attachments. $600,000 Purchase emergency vehicles and equipment. $340,000 Design and construct a waterfront park. $850,000 Construct a park and ride facility. $346,667 Construct broadband fibre optic infrastructure. $1,377,079 COLD LAKE Rehabilitate several roads and sidewalks. $1,031,000 Upgrade several roads and sidewalks. $1,031,140 Construct a recreational field, including a grandstand. $4,000,000 EDMONTON Upgrade the Kennedale East Parkland Building to Leadership in Energy and Environmental Design (LEED) silver standards. $2,717,100 Upgrade the river valley trail and park system. $7,537,199 Upgrade the City Hall fountain and surrounding park space. $11,635,000 Rehabilitate the Century Place office tower, including electrical and mechanical systems. $10,500,000 Purchase public works vehicles and equipment. $2,600,000 Purchase and rehabilitate a building. $14,400,000 Construct a bicycle network. $3,778,000 Purchase public transit buses. $9,424,372 Prepare design and engineering plans to expand the light rail transit system. Construct the Heritage Valley Transit Centre, including the purchase of buses. $18,182,222 $5,438,645 Upgrade the light rail transit stations. $3,958,612 Upgrade the light rail transit crossings and power distribution system. $2,861,764 Design and upgrade the light rail transit facilities. $7,024,768 Replace and upgrade public transit vehicles, including the installation of security cameras. $8,632,932 Upgrade the Stanley A. Milner Library. $16,420,000 Construct an access ramp at 135 Street from the Anthony Henday Drive. $12,520,000 Page 2

3 FORT SASKATCHEWAN Rehabilitate a portion of highway. $301,708 Expand the Harbour Pool to include a universal change room. $1,500,000 Rehabilitate a portion of roads. $1,196,684 Upgrade underground utilities. $1,160,000 GRANDE PRAIRIE Replace a portion of sidewalks and trails. $1,675,000 Rehabilitate several roads. $6,550,000 Rehabilitate a portion of roads. $6,823,353 Install a public transit vehicle location system. $1,000,000 Upgrade the storm water system. $1,000,000 LACOMBE Upgrade roads, streetlights, sidewalks and underground utilities. $4,049,841 Upgrade the sportsplex. $671,100 Extend several trails. $475,445 LEDUC Upgrade water reservoirs. $399,600 Construct trails around Telford Lake. $1,450,000 Enhance the downtown core, including roads, signage and landscaping. $2,190,500 Rehabilitate local and collector roads in the Caledonia community. $500,000 Rehabilitate several arterial roads. $1,924,000 Reconstruct several arterial roads. $1,837,500 Rehabilitate 47 Street and 47 Avenue. $1,800,000 Reconstruct and overlay several roads in the Caledonia community. $1,600,000 LETHBRIDGE Rehabilitate several roadways and construct barrier free pedestrian access ramps. $2,091,000 Rehabilitate the Whoop-Up bridges. $5,000,000 Replace the 43 Street North bridge. $1,000,000 Upgrade Legacy Park, including the construction of a community pavilion and entrance plaza. $4,050,000 LLOYDMINSTER Purchase a peace officer vehicle and equipment. $325,000 Page 3

4 LLOYDMINSTER Construct tennis courts at the Bud Miller All Seasons Park. $300,000 Prepare a design plan for 25 Street extension. $250,000 Upgrade water meters. $1,800,000 Construct a solid waste landfill cell and collection system. $1,106,526 MEDICINE HAT Expand the parks and recreation administration building. $700,000 Upgrade the Esplanade Arts and Heritage Centre. $2,300,000 Upgrade several park buildings. $1,120,000 Replace street lighting with energy efficient fixtures. $2,300,000 Rehabilitate several roads. $3,178,453 Purchase an infrastructure management system. $1,600,000 Upgrade the storm water system. $2,900,000 Rehabilitate the airport runway. $4,250,000 Upgrade city hall, including the electrical and mechanical systems. $780,000 Upgrade the parks and recreation infrastructure. $3,580,000 Install electronic public transit fare and security systems. $680,000 RED DEER Upgrade roads in College Park, including underground utilities. $5,446,750 Reconstruct several roads. $6,941,000 Resurface several roads. $7,156,000 SPRUCE GROVE Upgrade Jubilee Park. $2,901,000 Design and construct an outdoor skating rink, leisure skating surface, baseball diamond, and skateboard park. $3,219,000 ST. ALBERT Rehabilitate several roads. $2,421,252 Reconstruct several roads, including sidewalks, curbs and gutters. $1,710,400 Repave several roads. $3,809,900 Upgrade and extend sidewalks. $1,100,000 Reconstruct several lanes, including sidewalks. $1,350,000 Purchase public transit buses. $1,000,600 Upgrade the Art Gallery of St Albert's Banque D Hochelaga building accessibility. $1,088,600 Page 4

5 ST. ALBERT Construct a sand storage facility. $2,663,900 Upgrade Heritage Park, including utilities and landscaping. $1,328,300 Rehabilitate the storm water infrastructure. $1,784,300 Upgrade the storm water drainage system. $947,100 Rehabilitate wastewater mains. $1,053,400 Upgrade water mains. $1,633,400 WETASKIWIN Rehabilitate the storm water infrastructure. $393,000 Rehabilitate the wastewater treatment facility. $209,000 Specialized Municipality CROWSNEST PASS, Municipality of Accepted Amount Purchase public works vehicles and equipment. $210,000 Replace sanding trucks. $400,000 Upgrade information technology equipment, including the network server and software. $150,000 Rehabilitate the fire halls in Blairmore, Bellevue and Hillcrest. $110,000 Replace several roads in Coleman, including underground utilities. $2,590,000 Install a secure data management and control system. $250,000 JASPER, Municipality of Replace firefighting equipment, including self-contained breathing apparatus. $250,000 Prepare an asset management study. $115,000 Replace the administration building roof. $295,000 Prepare a transportation study. $100,000 Upgrade the Jasper Activity Centre. $75,641 Reconstruct an intersection, including sidewalks. $330,000 STRATHCONA COUNTY Design and purchase land for the construction of a multi-use agricultural facility. $6,300,000 Upgrade the emergency radio system. $2,514,600 Rehabilitate roads and sidewalks. $4,522,866 Prepare design and engineering plans to upgrade 17 Street. $1,205,100 Page 5

6 STRATHCONA COUNTY Rehabilitate several community and leisure centres, including roof replacements. Prepare design plans for a public service yard office and redesign existing office space. Construct several trails between Petroleum Way and Strathcona Science Park. $1,980,000 $1,825,312 $2,500,000 Upgrade several roads, including road widening and traffic signals. $3,637,223 Overlay several roads. $6,708,503 Rehabilitate several arterial roads. $3,562,069 WOOD BUFFALO, Regional Municipality of Design and construct water and wastewater systems in several communities. $13,184,286 Reconstruct several roads, including underground utilities. $18,000,000 Rehabilitate several roads, including underground utilities. $24,704,458 Municipal District ACADIA NO. 34, M.D. OF Accepted Amount Purchase a grader. $410,000 ATHABASCA COUNTY Rehabilitate several county roads. $800,000 Reconstruct a portion of roads. $1,400,000 Replace a fire pumper truck. $290,000 Construct a fire hall in the Hamlet of Rochester. $350,000 Purchase public works equipment. $1,815,500 BARRHEAD NO. 11, COUNTY OF Rehabilitate gravel roads. $531,226 Upgrade Range Road 22 between Highway 651 and Township Road 570. $2,700,000 BEAVER COUNTY Purchase a water truck and public works vehicle. $320,000 Rehabilitate several roads. $1,420,535 Prepare design plans and rehabilitate bridges. $400,000 Purchase gravel and rehabilitate gravel roads. $598,558 BIG LAKES COUNTY Expand the fire hall in the Hamlet of Joussard. $364,986 Page 6

7 BIG LAKES COUNTY Replace a bridge along the South Heart River. $333,080 Purchase graders. $727,600 Purchase public works vehicles. $253,000 Rehabilitate roads in the Hamlet of Joussard. $1,198,581 BIRCH HILLS COUNTY Purchase public works equipment. $1,138,000 Purchase and haul gravel for road rehabilitation. $1,400,000 BONNYVILLE NO. 87, M.D. OF Pave Gurneyville Road. $5,281,084 BRAZEAU COUNTY Rehabilitate Sardine Lake Road. $600,000 Replace bridge culvert on road 068A. $830,000 Replace bridge culvert on road 068B. $780,000 Rehabilitate a portion of Range Road 73. $1,400,294 Replace waterlines in the Hamlet of Cynthia. $814,380 Replace wastewater lines in the Hamlet of Cynthia. $955,136 CAMROSE COUNTY Rehabilitate the wastewater lagoon in the Hamlet of New Norway. $457,500 Upgrade a portion of roads in the hamlets of Round Hill and Kingman. $732,676 Rehabilitate a portion of Township Road 480. $2,805,023 Rehabilitate a portion of roads. $700,366 CARDSTON COUNTY Rehabilitate several bridges. $357,000 Purchase a water truck. $90,000 Purchase graders. $960,000 Purchase a truck scale. $100,000 Upgrade the drainage system in the Hamlet of Woolford. $80,000 Rehabilitate the storm water system in North Magrath. $80,000 Rehabilitate Home Seekers Avenue and Cemetery Road. $108,000 Rehabilitate Standoff Road. $104,611 Crush gravel for road rehabilitation. $700,000 Page 7

8 CARDSTON COUNTY Rebuild Welch Road. $250,000 CYPRESS COUNTY Rehabilitate several roads. $1,250,000 Rehabilitate several roads, including water and wastewater lines, in the Hamlet of Irvine. $4,517,241 FLAGSTAFF COUNTY Rehabilitate the water and wastewater infrastructure in the Hamlet of Strome. Upgrade the water and wastewater infrastructure in the Hamlet of Galahad. $316,186 $282,370 Reconstruct and upgrade a portion of Township Road 435. $299,393 Rehabilitate and replace bridges. $341,388 FOOTHILLS NO. 31, M.D. OF Purchase a grader. $435,000 Purchase public works equipment. $580,000 Pave several roads. $1,630,350 Rehabilitate a portion of roads. $660,000 Crush gravel for road rehabilitation. $685,000 Upgrade the radio communications system. $1,355,255 Purchase a fire tender vehicle for the Hamlet of Cayley. $380,000 GRANDE PRAIRIE NO. 1, COUNTY OF Rehabilitate gravel roads. $1,020,976 Rehabilitate and replace several bridges. $1,000,000 Rehabilitate several roads. $2,700,000 GREENVIEW NO. 16, M.D. OF Rehabilitate a portion of Road Range 230. $4,339,930 Replace fire tankers. $900,000 Replace public works maintenance equipment. $1,100,000 KNEEHILL COUNTY Purchase gravel. $2,900,000 LAC STE. ANNE COUNTY Replace graders. $675,000 Pave a portion of Township Road 572. $204,500 Page 8

9 LAC STE. ANNE COUNTY Pave a portion of Range Road 84. $204,500 Rehabilitate a portion of Township Road 541A. $913,995 Rehabilitate several roads. $689,580 Rehabilitate a portion of Township Road 570. $215,000 LACOMBE COUNTY Crush gravel for road rehabilitation. $558,520 Replace several bridges. $1,862,851 LAMONT COUNTY Replace graders. $674,340 Purchase public works equipment. $100,000 Replace a gravel truck. $182,500 Purchase a tractor. $160,000 Purchase and replace public works equipment. $157,184 LEDUC COUNTY Purchase fire rescue and pumper trucks. $690,000 Rehabilitate several roads. $2,840,400 Purchase gravel for road rehabilitation. $997,174 Upgrade a portion of Range Road 15 and Airport Road. $3,400,000 LETHBRIDGE COUNTY Reconstruct a local road. $605,000 Rehabilitate several gravel and paved roads. $547,420 Rehabilitate gravel roads. $1,000,000 Pave Duncan Industrial Park. $360,000 Upgrade roadways, wastewater, and waterlines in the Hamlet of Shaughnessy. $450,000 Prepare a storm water drainage plan. $235,000 MINBURN NO. 27, COUNTY OF Rehabilitate gravel roads. $543,980 Purchase gravel for road rehabilitation. $1,371,368 Purchase gravel for work on county roads. $1,711,049 MOUNTAIN VIEW COUNTY Rehabilitate portions of roads. $1,400,000 Page 9

10 MOUNTAIN VIEW COUNTY Rehabilitate the roads in Westfolk Estates. $420,000 Replace a bridge and upgrade a portion of Range Road 52. $3,600,000 Rehabilitate bridges. $1,788,385 Pave the Lil Shaver and West Sundre industrial subdivisions. $1,315,000 NORTHERN LIGHTS, COUNTY OF Repave the county office parking lot. $120,000 Pave a portion of Township Road 915. $781,000 Upgrade the radio and geographic information systems. $171,500 Crush gravel for road rehabilitation. $1,960,000 NORTHERN SUNRISE COUNTY Design and construct a wastewater treatment facility in the Hamlet of Little Buffalo. $2,400,000 OPPORTUNITY NO. 17, M.D. OF Construct a rodeo and recreational facility, including a race track, in the Hamlet of Wabasca. $1,591,109 Upgrade several playgrounds in the Hamlet of Calling Lake. $205,318 Upgrade the Red Earth Creek Arena, and purchase lockers for the Calling Lake Arena. $127,980 Reconstruct Industrial Drive North. $1,670,000 Expand the fire hall. $670,000 PAINTEARTH NO. 18, COUNTY OF Replace motor graders. $1,163,500 PARKLAND COUNTY Rehabilitate several roads. $1,105,000 Extend Township Road 532A. $1,500,000 PEACE NO. 135, M.D. OF Regravel several roads. $200,000 Replace a bridge. $200,000 Extend the Shaftesbury Trail waterline. $300,000 PINCHER CREEK NO. 9, M.D. OF Purchase a loader. $261,000 PONOKA COUNTY Upgrade a portion of Range Road 12. $320,000 Page 10

11 PONOKA COUNTY Reconstruct several roads. $3,056,742 PROVOST NO. 52, M.D. OF Rehabilitate a portion of Township Road 402 and Township Road 74. $2,131,141 RANCHLAND NO. 66, M.D. OF Rehabilitate gravel roads. $66,270 Purchase a loader. $255,000 Purchase public works equipment, including a sprayer. $20,000 RED DEER COUNTY Reconstruct Range Road 284. $1,277,157 Pave a portion of the C & E Trail. $1,788,619 Extend Laura Avenue and upgrade underground utilities. $2,880,261 Replace several bridges and culverts. $1,241,387 ROCKY VIEW COUNTY Develop a recreation area in the Hamlet of Langdon, including roads and underground utilities. $2,200,000 Widen Bearspaw Road. $1,000,000 SMOKY LAKE COUNTY Purchase a grader. $300,600 Rehabilitate several roads. $438,000 Reconstruct a portion of Township Road 604 between Range Road 182 and Range Road 191A. $80,000 Rehabilitate and stabilize several roads. $473,250 Rehabilitate several gravel roads. $798,400 SMOKY RIVER NO. 130, M.D. OF Reconstruct a portion of roads. $757,318 Gravel several roads. $230,000 Rehabilitate a portion of Township Road 800. $180,000 Reconstruct Range Road 220 between Township Road 792 and Township Road 794. $200,000 Upgrade portions of Range Road 202 and Range Road 211. $188,199 Rehabilitate Range Road 203. $175,000 Upgrade a portion of Township Road 770. $225,000 Replace several bridge culverts. $150,000 Page 11

12 SPIRIT RIVER NO. 133, M.D. OF Rehabilitate gravel roads, including dust abatement. $506,043 Replace mowers. $32,000 Replace a public works trailer. $45,000 Replace graders. $790,000 ST. PAUL NO. 19, COUNTY OF Purchase public works equipment. $1,540,000 Reconstruct a portion of Range Road 80. $130,000 Rehabilitate a portion of Owlseye Road. $259,048 STARLAND COUNTY Construct a water filling station. $187,484 STURGEON COUNTY Reconstruct a portion of Cardiff Road. $659,000 Reconstruct a portion of Range Road 241. $3,533,500 TABER, M.D. OF Regravel several roads. $647,971 Purchase graders. $1,067,519 Construct a public works shop. $3,599,856 Rehabilitate roads in the Hamlet of Hays. $555,075 THORHILD COUNTY Purchase graders. $1,117,300 Expand the wastewater lagoon. $415,000 Rehabilitate a portion of Township Road 600A. $142,478 Regravel roads. $1,482,567 Rehabilitate several roads. $424,515 TWO HILLS NO. 21, COUNTY OF Purchase public works equipment. $380,441 Rehabilitate roads. $389,036 Rehabilitate portions of roads. $826,737 VERMILION RIVER, COUNTY OF Rehabilitate gravel roads. $903,137 Rehabilitate a portion of Township Road 522. $1,516,300 Page 12

13 VERMILION RIVER, COUNTY OF Prepare design and engineering plans for the construction of an administration building. $500,000 VULCAN COUNTY Replace public works equipment. $649,400 Purchase a water tanker truck. $268,300 Reconstruct bridges and culverts. $1,406,095 WAINWRIGHT NO. 61, M.D. OF Pave Hogan Hill Road. $2,584,078 WARNER NO. 5, COUNTY OF Crush gravel and rehabilitate roads, including dust abatement. $693,000 WESTLOCK COUNTY Purchase a fire engine. $365,128 Purchase graders. $280,000 Rehabilitate a portion of Range Road 252. $160,000 Rehabilitate a portion of Township Road 590. $180,000 Replace a bridge. $390,000 Rehabilitate gravel roads. $1,600,000 WETASKIWIN NO. 10, COUNTY OF Contribute funding to the Lakedell Agricultural Society to conduct an infrastructure feasibility study. Contribute funding to the Lakedell Agricultural Society to upgrade the outdoor riding arena. Contribute funding to the Lakedell Agricultural Society to upgrade the security system. Contribute funding to the Pigeon Lake Athletic Cultural and Educational Society to construct a storage building. Contribute funding to the Winfield and District Agricultural Society to upgrade the drainage system. Contribute funding to the Pigeon Lake Athletic Cultural and Educational Society to upgrade the arena. Contribute funding to the Mulhurst Bay Community League to upgrade the community hall roof. Contribute funding to the Winfield and District Agricultural Society to upgrade the agriplex. $30,000 $15,051 $24,825 $30,000 $115,500 $15,719 $75,000 $51,508 Construct wastewater lines in the Hamlet of Alder Flats. $625,000 Upgrade roads in the Hamlet of Buck Lake. $2,000,000 Page 13

14 WETASKIWIN NO. 10, COUNTY OF Rehabilitate portions of roads in the Hamlet of Winfield. $800,000 Upgrade a portion of Township Road 472 and Range Road 242. $5,000,000 Purchase a garbage truck. $450,000 Rehabilitate roads in the Hamlet of Mulhurst Bay. $900,000 Rehabilitate Rose Creek Road. $1,000,000 Purchase asset management software. $281,000 WHEATLAND COUNTY Pave a portion of Range Road 183. $2,600,000 Expand the public works shop. $2,625,000 WILLOW CREEK NO. 26, M.D. OF Rehabilitate several roads. $678,575 Purchase public works equipment. $1,615,000 Purchase radios for the first responders radio communication system. $300,000 YELLOWHEAD COUNTY Pave a portion of Tom Hill Tower Road. $6,068,009 Town ATHABASCA Accepted Amount Construct an access road to the school. $375,000 Replace the sidewalk along the Union Hotel. $250,000 Replace several sidewalks. $50,000 Pave an alley. $81,000 Replace the water pump system in the Rupert Reservoir. $312,000 Extend the reservoir fill line. $65,000 Extend a water main on 50 Street. $100,000 Upgrade various parks, including playground equipment. $232,000 Purchase firefighting breathing apparatus. $100,000 Construct a storage shed at the multiplex centre. $47,000 Rehabilitate a portion of wastewater line. $397,000 Purchase public works maintenance equipment. $51,500 Pave 49 Street and 47 Avenue. $214,976 Page 14

15 BARRHEAD Upgrade the storm water drainage around the arena and aquatic centres, including landscaping. $230,000 Install solar panels at the aquatic centre. $326,000 BASSANO Replace a portion of the storm water drainage system. $70,000 Construct waterlines. $385,914 BEAUMONT Upgrade the Ken Nichol Regional Recreation Centre. $500,000 Upgrade several roads and sidewalks. $1,441,600 BEAVERLODGE Reconstruct a portion of roads and sidewalks. $850,000 Upgrade the community hall, including the purchase of kitchen equipment and furniture. $100,000 Rehabilitate several roads and sidewalks. $100,000 Replace the public works garage roof. $120,000 Upgrade the water treatment plant. $775,842 BENTLEY Upgrade a portion of 50 Avenue. $107,343 BLACK DIAMOND Replace a waterline along the lane between 2 Street and 3 Street. $225,000 Rehabilitate Parkview Place and Parkview Crescent wastewater infrastructure. $733,158 Upgrade 5 Avenue, including wastewater and storm waterlines. $178,415 Replace the 2 Avenue lift station. $319,000 BLACKFALDS Expand the community hall. $1,505,761 BON ACCORD Rehabilitate 48 Avenue. $413,849 Reconstruct a portion of 49 Avenue. $20,621 BONNYVILLE Replace a portion of roads, including sidewalks. $415,260 BOWDEN Design and replace a wastewater lift station. $520,000 Page 15

16 BOWDEN Rehabilitate wastewater manholes. $280,000 BRUDERHEIM Upgrade the campground registration centre. $25,000 Reconstruct several roads and replace sidewalks. $860,772 Upgrade the electrical system in the campground. $20,000 Upgrade the arena, including the ice plant and roof. $361,523 Replace water meter readers. $22,025 CALMAR Rehabilitate a portion of 52 Street, including sidewalks. $186,359 Upgrade the Mike Karbonik Arena. $262,755 CANMORE Replace a fire truck. $750,000 Replace a grader. $375,000 Rehabilitate the Canmore Recreation Centre. $5,000,000 Purchase a street sweeper. $300,000 Replace a gravel truck. $350,000 Upgrade Spring Creek Drive. $900,000 CARDSTON Purchase public works equipment and upgrade the shop. $286,000 Rehabilitate a portion of roads, sidewalks, and trails. $165,000 Replace water mains. $215,000 CARSTAIRS Rehabilitate and replace a portion of roads and sidewalks. $345,494 Purchase public works equipment. $268,500 CASTOR Purchase a backhoe. $60,196 Replace a portion of the water and wastewater lines along 51 Street. $169,716 CLARESHOLM Upgrade the arena. $81,000 Purchase a wastewater flushing truck. $280,000 Upgrade 5 Street West, including the storm waterline. $256,000 Page 16

17 CLARESHOLM Rehabilitate 4 Street West wastewater line. $213,000 Purchase lawn mowers. $46,500 Prepare an engineering plan to upgrade Alberta Road. $63,186 COALDALE Jointly upgrade the Kate Andrews High School sports field with the school board. $150,000 COALHURST Purchase a community announcement sign. $60,000 Upgrade a portion of 53 Avenue and 51 Avenue. $160,000 Purchase water system equipment. $37,150 COCHRANE Rehabilitate several roads. $1,965,000 CORONATION Rehabilitate several roads. $100,000 Extend a portion of waterline. $192,640 CROSSFIELD Rehabilitate a portion of Osler Avenue, including underground utilities. $350,159 DIDSBURY Extend a wastewater line and install a lift station. $248,038 DRAYTON VALLEY Construct walking trails and upgrade roads. $400,000 Upgrade parks and playground equipment. $150,000 DRUMHELLER Rehabilitate several roads. $2,400,000 Purchase a loader. $225,000 Purchase a water truck. $150,000 Purchase a fire pumper truck. $1,000,000 ECKVILLE Rehabilitate roads and sidewalks. $193,412 Replace public works equipment, including a utility vehicle. $46,600 EDSON Construct several trails. $200,000 Page 17

18 EDSON Construct a park and playground. $300,000 Upgrade several roads, including sidewalks and underground utilities. $1,527,648 ELK POINT FAIRVIEW Replace waterlines. $444,871 Rehabilitate a portion of 102 Avenue, including underground utilities. $1,500,100 FALHER Rehabilitate Main Street, including sidewalks. $726,815 FORT MACLEOD Rehabilitate the town office. $1,100,000 Purchase wastewater system maintenance equipment. $96,750 Reline several wastewater mains. $180,000 Replace a public works storage building. $345,000 GIBBONS Reconstruct a portion of gravel roads. $300,000 GRANDE CACHE Upgrade the water treatment plant. $2,493,644 GRANUM Upgrade the water treatment plant. $526,415 GRIMSHAW Rehabilitate roads and sidewalks. $512,347 HANNA Reline a portion of wastewater line along 3 Street West. $78,230 Upgrade a portion of 3 Street West, including underground utilities. $122,639 HARDISTY Prepare an assessment study and rehabilitate the wastewater lagoon. $355,000 Rehabilitate several roads and install a storm water conduit. $381,350 HIGH LEVEL Replace the arena condenser. $160,000 Upgrade Centennial Park. $130,375 Page 18

19 HIGH LEVEL Upgrade the water treatment plant. $119,952 Replace a loader. $265,000 Replace a fire pumper truck. $245,000 HIGH PRAIRIE Replace a wastewater lift station. $700,000 Rehabilitate a wastewater lagoon. $142,500 Rehabilitate a water treatment plant. $275,000 Upgrade a portion of 52 Avenue, including waterlines, curbs and gutters. $400,000 Rehabilitate the wastewater lagoon inlets. $125,000 HIGH RIVER Purchase an asset management system. $150,000 Rehabilitate the Bob Snodgrass Recreation Centre. $1,000,000 Replace specialized firefighting equipment, including a personnel carrier. $150,000 HINTON Replace a sanding truck. $390,000 Replace a garbage truck. $300,000 Replace a portion of Meadow Drive, including sidewalks and underground utilities. $4,500,000 Construct pedestrian bridges along the Beaver Boardwalk. $400,000 IRRICANA Upgrade several roads, including underground utilities. $835,167 Rehabilitate the community hall. $75,257 Upgrade the fire hall, including the boiler and lighting. $31,250 Purchase a mower and attachments. $25,144 Construct a pathway. $78,752 Replace fire hydrants. $39,630 Resurface the outdoor skating rink. $27,500 Upgrade the splash park. $165,193 KILLAM Rehabilitate 46 Street. $42,039 Install walking trail lighting. $21,500 Page 19

20 KILLAM Purchase a tractor and attachments. $45,000 Rehabilitate a portion of sidewalks. $30,000 Purchase computers, including software. $25,000 Replace a portion of sidewalks. $30,000 Replace a public works truck. $35,000 Rehabilitate a portion of roads. $170,000 LAMONT Upgrade the lift station. $334,750 Rehabilitate a portion of 50 Avenue and 50A Street. $572,000 LEGAL Rehabilitate a portion of 52 Avenue. $70,000 Replace a hydro-vacuum truck. $160,000 Replace portions of sidewalks. $135,000 MAGRATH Contribute funding to the Westwind School Division to construct a Career Technology Studies Centre. $1,175,000 Upgrade the sidewalks, curbs, and gutters. $120,000 Install a storm water conduit. $300,000 Rehabilitate the Galt Canal trail system. $100,000 MANNING Construct a gas line station and extend a portion of gas line. $44,060 Replace several fire hydrants. $40,000 Upgrade the water treatment plant and reservoir. $95,540 Replace a portion of waterline and wastewater line. $650,000 MAYERTHORPE Pave a portion of roads. $238,018 Rehabilitate a portion of waterline. $108,520 Replace the sidewalk along 50 Street. $22,964 MCLENNAN Purchase public works equipment. $80,000 Upgrade a portion of 1 Avenue, including sidewalks. $1,100,000 Page 20

21 MILK RIVER Install a pool deck. $18,578 Purchase an air compressor for the water treatment plant. $20,840 Purchase several garbage bins. $42,718 Rehabilitate a portion of 8 Avenue, including storm water drainage. $324,270 MILLET Rehabilitate road, wastewater and storm water infrastructure. $985,620 Replace the Agriplex floor and install energy efficient lighting. $50,000 Rehabilitate the wastewater lagoon. $155,000 MORINVILLE Replace public works equipment and vehicles. $271,500 Rehabilitate several roads, including sidewalks, curbs and gutters. $765,000 NANTON Purchase waste and recycling collection bins. $155,000 NOBLEFORD Replace a portion of wastewater line along Railway Avenue. $86,410 OKOTOKS Upgrade the cemetery, including a memorial garden and landscaping. $327,000 Purchase waste carts. $390,000 Upgrade several roads and underground utilities. $850,000 OLDS Prepare a storm water management plan. $126,000 Rehabilitate and construct trails. $150,000 Rehabilitate several roads, including underground utilities. $1,394,900 Upgrade Centennial Park, including the installation of solar $160,253 Upgrade the sports fields, including the installation of solar lighting. $115,000 Upgrade the corner of 46 Street and 65 Avenue, including the installation of solar lighting. $115,500 ONOWAY Replace a hydrant. $25,000 Upgrade a portion of storm water drainage on Yeoman Close and Yeoman Drive. $439,725 Page 21

22 PEACE RIVER Purchase public works equipment. $225,227 Rehabilitate several roads, including sidewalks and underground utilities. $2,400,000 Replace water and wastewater lines along 86 Avenue. $1,200,000 PENHOLD Construct a water reservoir. $513,380 Pave a portion of Robinson Street and Lee Street. $170,520 PINCHER CREEK Install a portion of wastewater line. $570,000 Rehabilitate a portion of roads and sidewalks. $237,000 Rehabilitate a portion of East Avenue. $150,000 Install a waterline. $286,382 Construct a walking trail. $150,000 PONOKA Upgrade the RCMP facility. $145,000 Upgrade the Aquaplex mechanical system. $90,000 Upgrade ice plant and refrigeration room system. $130,000 PROVOST Upgrade Main Street. $654,193 RAINBOW LAKE Upgrade the arena ice system. $40,000 Prepare engineering plans for the paving of several roads. $50,000 Purchase a loader blade attachment. $25,000 Upgrade the fire department radio system. $20,000 Purchase asset management software. $30,000 REDCLIFF Rehabilitate Riverview Road. $450,000 Stabilize coulee slopes. $100,000 Rehabilitate 4 Street Northwest. $296,000 Rehabilitate 3 Street Northwest. $264,000 Rehabilitate the Rec-Tangle ice arena, including the furnace and energy efficiency lighting. $90,000 Page 22

23 REDWATER Reline several wastewater mains. $100,000 Gravel several roads. $55,000 Replace several sidewalks and ramps. $197,820 Upgrade the outdoor pool. $80,147 Rehabilitate a portion of 49 Street. $61,883 Replace a portion of 45 Street. $79,993 RIMBEY Prepare a storm water master plan, and construct a runoff retention pond. $81,900 Rehabilitate several roads. $417,376 SEDGEWICK Upgrade the recreation centre, including the heating, ventilation and air conditioning systems. $68,000 SEXSMITH Upgrade a portion of sidewalks, trails, and storm water conduit. $685,092 SMOKY LAKE Replace a water main. $362,819 Purchase a loader. $120,000 Rehabilitate a wastewater lagoon. $52,900 Purchase lawn mowers. $44,000 Install automatic gas meters. $100,000 Rehabilitate a portion of roads, including dust abatement and gravelling. $50,000 SPIRIT RIVER Replace a portion of road, including sidewalks and underground utilities. $965,037 ST. PAUL Purchase a sanding truck. $200,000 Purchase roadway maintenance equipment. $90,000 Purchase a street sweeper. $310,000 Purchase a bucket truck. $139,000 Rehabilitate a portion of roads. $100,000 Rehabilitate sidewalks. $500,000 Rehabilitate several roads. $500,000 Page 23

24 ST. PAUL Prepare design and engineering plans for the extension of 43 Street. $80,000 Rehabilitate 46A Street. $172,297 Replace the arena roof. $163,189 STAVELY Replace a tractor. $20,000 Upgrade the town office. $30,000 Develop an industrial subdivision, including the installation of roads and underground utilities. $381,000 Upgrade a water well. $14,000 STETTLER Purchase a loader. $297,500 Replace water and wastewater mains along 51 Avenue. $660,108 Upgrade the water and wastewater main along the back alley of 56 Street. $500,000 STONY PLAIN Rehabilitate roads and sidewalks, including underground utilities. $2,055,191 Reconstruct several back alleys. $887,595 Install a fibre optic network. $600,000 STRATHMORE Rehabilitate the town office roof. $180,000 Replace firefighting breathing apparatus and other specialized equipment. $203,739 Rehabilitate a lift station. $765,000 Construct baseball diamonds and replace playground equipment. $359,000 Upgrade the arena. $730,475 Upgrade the aquatic centre. $367,730 Construct a pavilion at Kinsmen Park. $175,000 Construct a storm water retention pond on 2 Avenue. $650,000 SUNDRE Rehabilitate Centre Street between 6 Avenue and 12 Avenue, including sidewalks and underground utilities. Pave 5 Avenue between Centre Street and 2 Street, replace a waterline, and construct a new wastewater line. $715,000 $600,000 Page 24

25 SWAN HILLS Construct an emergency management building. $150,000 Repave several roads. $38,886 Purchase a tar machine. $30,000 Rehabilitate the swimming pool. $45,000 Design and construct a splash park. $150,000 SYLVAN LAKE Upgrade 50A Street. $400,000 Extend Cuendet Industrial Way. $400,000 Install traffic signals. $400,000 Rehabilitate a portion of roads. $1,120,000 Upgrade several trails and parks. $410,000 Purchase equipment for the NexSource Centre, including benches and kitchen equipment. $170,000 TABER Upgrade the arena refrigeration system. $1,930,598 Replace several telephone systems. $165,000 Purchase public works equipment. $108,834 THREE HILLS Purchase an administration building. $310,000 Relocate and upgrade the library. $160,000 Construct roads in the Sunrise subdivision, including underground utilities. $900,000 TOFIELD Pave Seed Plant Road. $307,942 Contribute funding to the Tofield Agricultural Society for the replacement of the arena roof. $40,000 Purchase public works vehicles and equipment. $284,000 Upgrade the cemetery landscaping. $130,000 Construct a concession booth at the Tofield fairgrounds. $255,000 TURNER VALLEY Purchase signage and crosswalk lights. $32,000 Purchase a water truck. $75,000 Purchase firefighting equipment. $32,000 Page 25

26 TURNER VALLEY Upgrade the fire and emergency services radio systems. $85,000 Purchase a skid steer and tandem dump truck. $160,000 Purchase a tractor and attachments. $62,000 Replace a portion of wastewater line. $612,000 Replace a portion of alleys, including water main valves. $60,000 TWO HILLS Rehabilitate several roads. $152,691 Replace a portion of sidewalks. $52,580 Purchase public works equipment. $30,000 VALLEYVIEW Construct an administration building to passive house standards. $1,031,431 VAUXHALL Pave a portion of 4 Street. $205,000 Replace the arena refrigeration system. $100,000 VEGREVILLE Replace garbage trucks. $295,000 Purchase a landfill compactor. $220,000 Reconstruct a portion of 49 Avenue and 43 Street East. $439,372 Upgrade a portion of 50 Street, including sidewalks, fire hydrants and water valves. $646,961 Construct a portion of 75 Street, including curbs and gutters. $207,273 VERMILION Upgrade the recreation centre, including energy efficient lighting. $62,500 Upgrade parks and purchase playground equipment. $170,000 Install a storm water conduit. $60,000 Demolish a wastewater treatment plant and construct a replacement facility. $1,000,000 VULCAN Replace the water and wastewater lines along 4 Street. $523,934 Replace street lighting with energy efficiency fixtures. $73,000 WEMBLEY Purchase public works equipment. $138,800 Install water main valves. $350,000 Page 26

27 WEMBLEY Rehabilitate the fire department storage yard. $53,125 Rehabilitate a portion of roads. $325,027 WESTLOCK Rehabilitate a portion of 104 Avenue, including sidewalks and storm water infrastructure. $806,811 Rehabilitate portions of 104 Street, including underground utilities. $1,161,755 WHITECOURT Replace a backhoe. $144,000 Rehabilitate a portion of roads. $490,440 Village ACME Accepted Amount Rehabilitate a portion of roads and sidewalks. $72,050 Purchase and install a water system pump. $38,000 ALBERTA BEACH Rehabilitate several manholes. $100,000 Pave several roads. $230,000 Upgrade culverts, including the purchase of gravel. $17,300 Rehabilitate roads, including dust abatement. $60,000 Replace and construct sidewalks along 50 Street. $21,200 Rehabilitate a portion of 47 Street, including sidewalks and manholes. $330,000 ALIX Upgrade a lift station. $621,711 ALLIANCE Upgrade the public works shop. $25,000 Replace the recreation centre roof. $15,000 Upgrade the village office building, including painting. $10,000 Purchase a public works vehicle. $40,000 Rehabilitate the water treatment plant. $25,000 Rehabilitate roads, including dust abatement. $17,214 ANDREW Reclaim a water well. $37,799 Page 27

28 ANDREW Reclaim several water wells and construct a park. $70,800 ARROWWOOD Rehabilitate and relocate the municipal library and upgrade the administration building. $35,000 BARNWELL Construct a fire hall. $228,800 Upgrade 3 Street East. $59,921 Upgrade a railway crossing. $100,000 BARONS Purchase a backhoe. $60,000 Rehabilitate a portion of roads. $65,000 Renovate the fire hall and purchase specialized firefighting equipment. $23,000 Purchase gravel for road rehabilitation. $15,000 BAWLF Expand the fire hall to include public works storage. $250,000 Upgrade waterlines, fire hydrants, curbs and gutters. $570,000 BEISEKER Upgrade the pump house. $62,000 Replace sidewalks. $50,000 Upgrade 1 Avenue. $28,000 Resurface 7 Street and replace wastewater mains. $245,000 BERWYN Upgrade the water reservoir and pump house. $139,000 Upgrade the public works shop. $13,450 Rehabilitate a portion of roads. $50,000 BIG VALLEY Replace the public works facility roof. $30,000 Replace a portion of sidewalk along 1 Avenue South. $20,500 Upgrade a portion of 1 Street South and 2 Street South. $175,000 BITTERN LAKE Replace a water meter reader. $15,000 Upgrade the administration building. $133,090 Page 28

29 BITTERN LAKE Upgrade the community hall. $50,000 Replace public works equipment. $195,000 Upgrade the public works building and install security equipment. $95,000 Replace signs and benches. $12,000 Upgrade the administration building security. $16,500 Upgrade the playground. $12,000 BRETON Upgrade the water treatment plant. $250,000 CAROLINE Upgrade and extend 48 Street and 51 Avenue, including underground utilities. $750,000 Rehabilitate the library roof. $20,000 Replace the water treatment plant roof. $11,998 CHAMPION Purchase a skid steer and attachments. $34,000 Upgrade the water distribution plant. $29,280 Replace several sidewalks. $64,455 Rehabilitate the community hall entrance. $29,500 Replace the wastewater lines. $200,000 Construct an outdoor skating rink and basketball court. $123,100 Upgrade the wastewater lines. $65,000 CHAUVIN Purchase a public works vehicle. $79,144 Upgrade the water plant. $173,000 CHIPMAN Replace sidewalks and curbs. $66,000 Upgrade the fire hall. $48,500 Expand the Chipman National Hall. $43,267 CLIVE Upgrade a portion of 49 Avenue and 52 Street, including sidewalks and underground utilities. $698,699 CLYDE Upgrade the waterlines. $396,749 Page 29

30 COUTTS Replace a fire hydrant. $12,000 Purchase a dump trailer. $12,000 Replace water main valves. $60,000 COWLEY Replace wastewater lines. $325,000 CREMONA Pave a portion of Centre Street, including the installation of storm water drainage. $379,982 CZAR Upgrade the recreational vehicle park, including the installation of water and wastewater lines. $27,840 DELBURNE Purchase a public works building. $315,051 DONNELLY Upgrade a lift station. $18,842 Construct a campground kiosk. $9,648 Upgrade hydrants. $65,445 Contribute funding to the Guy Donnelly Sportex Society to upgrade the pump. $17,725 Rehabilitate a wastewater main and lagoon. $11,717 DUCHESS Construct an administration building. $500,000 EDBERG Replace a portion of water and wastewater lines along Railway Avenue. $273,546 EMPRESS Replace a water pump station. $259,180 Purchase fire protection equipment. $13,500 FERINTOSH Conduct a water assessment study and rehabilitate the waterlines. $42,292 Replace water and wastewater lines. $154,173 Upgrade the town office roof. $11,714 Page 30

31 FOREMOST Purchase firefighting breathing apparatus and other specialized equipment. $16,000 Upgrade the baseball diamonds and concession stand. $22,500 Rehabilitate the Foremost and District Civic Centre, including the lobby and locker rooms. $78,000 Rehabilitate a portion of roads and sidewalks. $142,672 FORESTBURG Reconstruct a portion of 46 Avenue, including underground utilities. $237,500 GIROUXVILLE Purchase public works equipment. $51,744 Upgrade the waterline along 48 Street, including hydrants. $45,000 GLENDON Upgrade the administration office, including furnaces. $28,107 Purchase an asset management system. $16,400 Prepare a storm water infrastructure study. $25,000 Replace a portion of 52 and 53 Street, including underground utilities. $158,405 Purchase public works equipment. $76,064 Upgrade the water treatment plant. $34,222 GLENWOOD Upgrade the community hall. $85,000 Upgrade the spray park. $20,000 Upgrade the water treatment plant. $40,000 Upgrade the storm water drainage system. $40,000 Rehabilitate the public works shop. $8,500 Upgrade the water irrigation system. $10,000 Rehabilitate waterlines, including a wellhead. $12,000 HALKIRK Prepare a water main engineering study. $31,000 Prepare a storm water drainage study. $34,000 HEISLER Replace a public works truck. $25,000 Upgrade the storm water system. $50,000 Page 31

32 HEISLER Replace a portion of wastewater line. $193,168 HILL SPRING Contribute funding to the Hill Spring Recreation Board to upgrade the ball diamond concession stand. $7,500 HOLDEN Purchase several security cameras. $10,937 Rehabilitate a portion of roads. $19,500 Rehabilitate a portion of 50 Avenue. $400,000 HUSSAR Upgrade 2 Avenue East, including underground utilities. $280,000 HYTHE Rehabilitate several roads. $74,000 Purchase a public works vehicle. $16,000 Upgrade the municipal office and library, including the heating, ventilation and air conditioning system. $15,000 IRMA Upgrade the water treatment plant. $75,000 Rehabilitate a portion of roads. $120,000 Upgrade the storm water drainage system. $250,000 KITSCOTY Contribute funding to the Alberta Central East Water Corporation to construct a regional waterline. $453,485 LOMOND Purchase a tractor and attachments. $63,000 Purchase a global positioning system. $9,000 Upgrade several sidewalks. $55,736 Construct an addition to the public works shop. $74,000 Purchase a skid steer. $63,000 Purchase a mower. $7,222 LONGVIEW Purchase a peace officer vehicle. $55,000 Install water meters. $20,000 Page 32

33 LOUGHEED Upgrade the water treatment plant. $387,000 MANNVILLE Rehabilitate the Riverview Golf Course kitchen. $57,542 Replace the administration building roof. $70,000 Purchase a mobile water meter reader. $17,000 NAMPA Rehabilitate a portion of roads. $115,750 Replace the waterline to the Hamlet of St. Isadore. $94,500 Replace a portion of sidewalk. $22,000 ROSALIND Contribute funding to the Rosalind Fire Department to rehabilitate the fire hall. Contribute funding to the Rosalind Agricultural Society to rehabilitate the community hall. $10,000 $20,000 ROSEMARY Rehabilitate a portion of wastewater line. $80,000 RYCROFT Upgrade culverts. $13,624 Upgrade roads and boulevards, including landscaping. $28,373 RYLEY Pave 50 Avenue. $406,463 SPRING LAKE Purchase a public works vehicle and attachments. $60,000 Rehabilitate Spring Lake Drive. $125,000 STIRLING Purchase public works equipment. $75,000 Rehabilitate roads and extend 2 Street. $80,000 VETERAN Upgrade the wastewater line along a portion of Delhi Street. $37,130 Upgrade the wastewater line along Coronation Avenue. $25,991 Upgrade the wastewater line along Waterloo Street. $38,368 Purchase fire rescue equipment. $25,000 Page 33

34 VETERAN Upgrade the wastewater line along Delhi Street, from Loyalist Avenue to Coronation Avenue. $25,500 VILNA Purchase a lawn mower and attachments. $40,000 Purchase a skid steer. $60,000 Purchase lawn mowers. $25,000 Upgrade the municipal shop heating system. $13,291 Reconstruct 52 Street South. $21,458 WARNER Pave 3 Street and 5 Street. $132,000 YOUNGSTOWN Extend the community hall. $10,000 Summer Village BIRCH COVE Accepted Amount Upgrade Main Park. $70,000 BIRCHCLIFF Prepare design and engineering plans for a pathway system. $150,000 BONNYVILLE BEACH Purchase a traffic control sign. $12,500 CASTLE ISLAND Contribute funding to the Village of Alberta Beach to upgrade Beachwave Park. $5,000 ITASKA BEACH Reconstruct the boat launch. $52,100 Rehabilitate a portion of road, including dust abatement. $5,200 KAPASIWIN Construct walking trails. $65,000 Upgrade the tennis courts. $80,000 LAKEVIEW Construct a portion of road. $104,650 NAKAMUN PARK Purchase a wood chipper, a water pump station, and a trailer. $30,000 Page 34

35 NAKAMUN PARK Upgrade TED Park, including electrical system, fencing, and equipment shed. $30,000 Construct a public works shop. $261,779 NORGLENWOLD Rehabilitate Last Chance Way, Honeymoon Drive and Grand Avenue. $67,434 PARKLAND BEACH Rehabilitate Parkland Street and Parkland Way. $107,278 SEBA BEACH Upgrade the administration building. $18,200 Rehabilitate a portion of 3 Street. $52,900 Rehabilitate a portion of roads. $251,153 SILVER SANDS Rehabilitate Township Road 540. $244,076 SOUTH VIEW Upgrade the solid waste stations. $25,000 SUNBREAKER COVE Upgrade a water pump. $6,500 Prepare design and engineering plans for the trail system. $42,000 SUNRISE BEACH Rehabilitate roads. $167,675 SUNSET BEACH Upgrade several roads. $200,000 SUNSET POINT Purchase and install flagpoles at Klinkhammer Park. $16,262 Rehabilitate Sunset Drive, including signage. $335,300 VAL QUENTIN Upgrade the storm water drainage system. $464,600 WAIPAROUS Extend the trail system. $70,000 WEST BAPTISTE Rehabilitate Baptiste Drive. $411,700 Page 35

36 WEST COVE Upgrade the storm water drainage system. $162,450 WHITE SANDS Purchase public works equipment, including boat and trailer for public safety. $7,500 Improvement District I.D. NO. 13 (ELK ISLAND) Contribute funding to Parks Canada for the purchase of a snowplow. Contribute funding to Parks Canada to replace the operation and administration building roofs. I.D. NO. 25 (WILLMORE WILDERNESS) Contribute funding to the Willmore Wilderness Foundation to rehabilitate the campground and trail system. KANANASKIS IMPROVEMENT DISTRICT Special Area Replace self-contained breathing apparatus for the fire department. SPECIAL AREAS BOARD Accepted Amount $220,000 $170,000 $129,755 $185,111 Accepted Amount Purchase graders. $1,311,699 Rehabilitate a portion of Highway 876. $6,950,330 Metis Settlement BUFFALO LAKE METIS SETTLEMENT Accepted Amount Renovate the recreation centre to accommodate a fitness room. $125,000 Construct a trades training facility. $250,000 Install solar panels on the administration office and the recreational building. Upgrade the recreational facility, including the purchase of fitness equipment. $166,362 $30,000 Replace a grader. $99,000 ELIZABETH METIS SETTLEMENT Purchase a grader. $106,000 Rehabilitate roads. $285,000 GIFT LAKE METIS SETTLEMENT Upgrade the arena, including roof and waterlines. $742,500 Page 36

37 KIKINO METIS SETTLEMENT Upgrade the water treatment plant generator and pump system. $245,900 Purchase a tractor. $50,000 Rehabilitate a roadway. $297,559 PADDLE PRAIRIE METIS SETTLEMENT Purchase and install several solar panels. $95,617 Other TOWNSITE OF REDWOOD MEADOWS ADMIN SOC Accepted Amount Upgrade parks. $35,500 Rehabilitate the skating rink. $55,000 Purchase firefighting equipment, including radios. $29,000 Upgrade the community centre. $52,000 Install water valves. $40,000 Install wastewater meters. $20,000 Upgrade the Redwood House Community Centre flooring. $26,000 Page 37

FORTISALBERTA INC. RATES, OPTIONS, AND RIDERS SCHEDULES January 1, 2018 Rates Residential Rate 11 Residential Service... 2

FORTISALBERTA INC. RATES, OPTIONS, AND RIDERS SCHEDULES January 1, 2018 Rates Residential Rate 11 Residential Service... 2 FORTISALBERTA INC. RATES, OPTIONS, AND RIDERS SCHEDULES January 1, 2018 Rates Residential Rate 11 Residential Service... 2 Farm Rate 21 FortisAlberta Farm Service... 3 Rate 23 FortisAlberta Grain Drying

More information

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL City AIRDRIE Accepted Amount Renovate the Plainsmen Arena. $3,476,667 Purchase and upgrade a facility for the RCMP detachment. $6,623,000 Construct a sound wall along Yankee Valley Boulevard. $1,214,562

More information

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL City AIRDRIE Accepted Amount Construct a snow melt site, including the purchase of land. $4,802,400 Rehabilitate several roads. $3,076,316 BROOKS Rehabilitate roads and parking lots. $930,666 CALGARY Contribute

More information

2013 Core Need Income Thresholds (CNIT) (Listed by Municipality) 2 BDRM $ 1 BDRM $

2013 Core Need Income Thresholds (CNIT) (Listed by Municipality) 2 BDRM $ 1 BDRM $ 2013 Core Need Income Thresholds (CNIT) (Listed by Municipality) MUNICIPALITY ACME 26,500 32,500 38,500 41,500 46,500 49,500 AIRDRIE 32,000 39,000 48,000 53,000 57,500 60,500 ALIX 26,500 32,500 38,500

More information

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL City AIRDRIE Accepted Amount CALGARY Rehabilitate the Burt Church Theatre. $2,718,000 Contribute funding to the Acadia Community Association for the rehabilitation of the Acadia Recreation Complex arena.

More information

FORTISALBERTA INC. DECISION D RATES, OPTIONS, AND RIDERS SCHEDULES October 2, 2018 Rates Residential Rate 11 Residential Service...

FORTISALBERTA INC. DECISION D RATES, OPTIONS, AND RIDERS SCHEDULES October 2, 2018 Rates Residential Rate 11 Residential Service... FORTISALBERTA INC. DECISION 23259-D01-2018 RATES, OPTIONS, AND RIDERS SCHEDULES October 2, 2018 Rates Residential Rate 11 Residential Service... 2 Farm Rate 21 FortisAlberta Farm Service... 3 Rate 23 FortisAlberta

More information

2017 Income Thresholds

2017 Income Thresholds Description The Community Housing program provides subsidized rental housing to low-income families, seniors, and individuals with special needs, as applicable, who cannot afford private sector accommodations.

More information

(Q.5) Resulting Capital Asset Guide

(Q.5) Resulting Capital Asset Guide (Q.5) Resulting Capital Asset Guide The guide below is intended to assist municipalities in selecting the most appropriate asset type, classification, and unit of measure under Question 5 of the MSI capital

More information

ATCO GAS AND PIPELINES LTD. ATCO GAS SOUTH RATE SCHEDULES. May 1, 2017

ATCO GAS AND PIPELINES LTD. ATCO GAS SOUTH RATE SCHEDULES. May 1, 2017 ATCO GAS AND PIPELINES LTD. ATCO GAS SOUTH RATE SCHEDULES May 1, 2017 Effective May 1, 2017 Conditions RATE SCHEDULES INDEX Page General Conditions... 3 Riders Rider "A" Municipal Franchise Fee... 4 Rider

More information

Custom Rates Survey. Field Operations Fall Report 2007

Custom Rates Survey. Field Operations Fall Report 2007 Custom Rates Survey Field Operations Fall Report 2007 PREFACE The Custom Rate Surveys are conducted for Alberta Agriculture and Food, Economics and Competitiveness Division, Statistics and Data Development

More information

Energy Opportunities Anaerobic Digestion: Methane Production for Alberta

Energy Opportunities Anaerobic Digestion: Methane Production for Alberta December 2013 Anaerobic Digestion: Methane Production for Alberta Biogas technology has become an attractive treatment option for agricultural, food processing and municipal organic wastes for pollution

More information

Facilities List Alberta Facilities that Accept Hydrovac Waste

Facilities List Alberta Facilities that Accept Hydrovac Waste Facilities List Alberta Facilities that Accept Hydrovac Waste Land Policy Information in this document may change. Please contact the facility directly for the most up to date information. Facilities with

More information

2012 Performance-Based Regulation Compliance Filings

2012 Performance-Based Regulation Compliance Filings Decision 2012-347 2012 Performance-Based Regulation Compliance Filings January 1, 2013 Interim Rates for each of AltaGas Utilities Inc. and December 21, 2012 The Alberta Utilities Commission Decision 2012-347:

More information

PROCUREMENT PLAN 50/70 SCHOOLS New, Modernizations and Replacements - Direct Delivered and Grant Funded. Project Type Grades

PROCUREMENT PLAN 50/70 SCHOOLS New, Modernizations and Replacements - Direct Delivered and Grant Funded. Project Type Grades Method New, Modernizations and s - Direct Delivered and Airdrie Rocky View No. 41 - West Airdrie New K-4 600 600 DB Summer/ Fall Airdrie Rocky View No. 41 - East Airdrie New K-5 750 900 DB Summer/ Fall

More information

List of Circuits (R6.1 PRC-023-AB-2)

List of Circuits (R6.1 PRC-023-AB-2) (R6.1 PRC-023-AB-2) The list of circuits that the Alberta Electric System Operator ( AESO ) must maintain pursuant to requirement R6.1 of Alberta Reliability Standard PRC-023-AB-2 Transmission Relay Loadability,

More information

Schools Program Since 2011 October 8, 2014

Schools Program Since 2011 October 8, 2014 s Program Since 2011 October 8, 2014 Start Airdrie Phase One - 2011 Announcement Ecole francophone d'airdrie / Southern Francophone Region No. 4 K-12 400 400 12.4 N/A Sep-14 Occupied Airdrie (Airdrie)

More information

GRAIN COMBINING AND HAULING TO BIN 2004

GRAIN COMBINING AND HAULING TO BIN 2004 S Foothills MD 31 $18.00/acre SP con John Deere 9500 combine, tandem truck Hauling up to 1 mile; combining at ~8 acres/hour S Foothills MD 31 $21.00/acre SP con Massey Ferguson 8680 combine, tandem truck

More information

Appendix C. Cost Estimates

Appendix C. Cost Estimates O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master

More information

CITY OF BELLEVILLE 2017 Capital Budget

CITY OF BELLEVILLE 2017 Capital Budget CITY OF BELLEVILLE 2017 Capital Budget Proposed Financing COMBINED SERVICES 1.001 Bridge St W Coleman to Highland Design EDS 73 300.0 150.0 150.0 1.002 University Ave McFarland Dr to Tice Cres EDS 65 1,900.0

More information

Electric system improvements near you

Electric system improvements near you Electric system improvements near you Red Deer Area Transmission Development Stage 1 substation upgrades April 2011 Volume 1 Did you know? The average four-person family in Alberta today has 20 instant-on

More information

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement

More information

City of Fernandina Beach, Florida Annual Budget

City of Fernandina Beach, Florida Annual Budget General Fund (001) Finance KRONOS PAYROLL SOFTWARE 100% 50,000 50,000 X Human Resources KRONOS HR MODULE 100% 50,000 50,000 X NEW PHONE SYSTEM-VARIOUS GENERAL FUND DEPARTMENTS Non-Departmental 100% 125,000

More information

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested AMOUNT SOURCE General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 0 155 MIS Technology Infrastructure 300,000 300,000 Tax Levy 300,000 300,000

More information

LAND CLEARING OPERATIONS 2006

LAND CLEARING OPERATIONS 2006 S All Counties $260.00/hour Brush & Mulch S Vulcan Brush Mowing Rotary mower 15' wide $325.00/day or 210.00/half day Rental only, no operator or tractor S Vulcan Brush Mowing Rotary mower 26' wide $495.00/day

More information

LOCATED IN THE EAST CENTRAL REGION OF ALBERTA (SE of EDMONTON) 8,458 RESIDENTS 10 COUNTY HAMLETS: 7 NEIGHBOURING COUNTIES

LOCATED IN THE EAST CENTRAL REGION OF ALBERTA (SE of EDMONTON) 8,458 RESIDENTS 10 COUNTY HAMLETS: 7 NEIGHBOURING COUNTIES LOCATED IN THE EAST CENTRAL REGION OF ALBERTA (SE of EDMONTON) 8,458 RESIDENTS 10 COUNTY HAMLETS: ARMENA DUHAMEL KELSEY KINGMAN PELICAN POINT MEETING CREEK NEW NORWAY OHATON ROUND HILL TILLICUM 7 NEIGHBOURING

More information

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance

More information

AER APPROVED THIRD PARTY OILFIELD WASTE MANAGEMENT FACILITIES Updated: May 25, 2017

AER APPROVED THIRD PARTY OILFIELD WASTE MANAGEMENT FACILITIES Updated: May 25, 2017 Company Facility Name Location Approval Amendments 1367290 Alberta Ltd. (Rig Rentals) Whitecourt Area (TS) 03-34-059-12 W5M WM 145 N/A Box 1805 Whitecourt AB T7S 1P5 780-778-5455 1977715 Alberta Ltd. Whitecourt

More information

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions Drainage Southshore Lagoon Dredging $525,000 74 Prepare drawings and design deepening or removal of sediment from lagoons. Marina Village Park $580,500 70 Resolve the drainage issue in the Marina Village

More information

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan

Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Valley Line West LRT Concept Plan Recommended Amendments Lewis Farms LRT Terminus Site Location Concept Plan Amendment Recommendation Approved 2011 Concept Plan Lewis Farms LRT terminus site, 87 Avenue/West

More information

City of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

City of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT City of Monroe, Wisconsin Capital Improvement Plan FY '13 FY '17 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority Administration Replace Computer AD-15-01 3 Administration Administration

More information

2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE

2019 FUNDING SOURCE Gas 2020 FUNDING SOURCE TO CAPITAL REQUESTS SUMMARY Recomm ended /Grants/ Debt nded /Grants/ Debt GENERAL GOVERNMENT Server hardware replacement Server software replacement General Government Totals FIRE & EMERGENCY Erin Exhaust

More information

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY BACKGROUND Mobility and Accessibility Working Committee Broad representation Transit, Transportation, Planning and Development, Facility

More information

Transportation Infrastructure Investment Program moving

Transportation Infrastructure Investment Program moving moving CALGARY What is TIIP? Ten Year Transportation Capital Program Last approved by Council in 2005 Defines: Major infrastructure projects Lifecycle programs What is TIIP? Represents current planned

More information

Capital Improvement Plan

Capital Improvement Plan Capital Improvement Plan 2019 2023 City of Kaukauna December 17, 2018 Prepared By: John W. Sundelius, P.E., M.P.A. Director of Public Works/City Engineer Projects and items that appear in the CIP are not

More information

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description 2017 CAPITAL BUDGET FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153 - WINTER RECOVER/SNOW

More information

Port of Grays Harbor Capital Improvement Plan

Port of Grays Harbor Capital Improvement Plan Marine Terminals Communication Equipment VHF Radio 3,000 3,000 3,000 3,000 3,000 Deeper Draft Deeper Draft Phase 2 4,713,000 1,172,000 Jet Array Jet Array Renovation 200,000 200,000 200,000 200,000 200,000

More information

FY Projects

FY Projects FY 2009-2010 Projects Project # 1 1037 Light Emitting Diode (LED) Signal Lamps Upgrading Program Replace Light Emitting Diode indications in traffic signal heads. $50,000 2 1103 City Government Channel

More information

Claremont Capital Improvement Program Summary Matrix

Claremont Capital Improvement Program Summary Matrix ASSESSING (Y-1, N- Improvement (Y- (Y-2, N- 1, N- 414-01 Assessing City Wide Revaluation 7/1/2019 5 GENERAL FACILITIES State required every 5 yrs to be 100%. Annual cyclical review allowed $100,000 25

More information

FY-15 FY-16 FY-17 CIP - CATEGORY/DESCRIPTION

FY-15 FY-16 FY-17 CIP - CATEGORY/DESCRIPTION Killington Capital Improvement Plan FY12-17 (Budget Year Plus Five) FY-11 FY-11 FY-12 FY-13 FY-14 FY-15 FY-16 FY-17 HIGHWAY DEPARTMENT EQUIPMENT Balance Forward 54,297 54,297 88,970 87,510 128,550 120,590

More information

THE WAY WE MOVE LRT FOR EVERYONE

THE WAY WE MOVE LRT FOR EVERYONE THE WAY WE MOVE LRT FOR EVERYONE 2 LRT for Everyone LRT FOR EVERYONE Light rail is about more than transit; it s about transforming Edmonton. As the city grows, so do its transportation needs. LRT is an

More information

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete.

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete. CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM CITY PROPERTY DOWNTOWN (General Fund) 2010 2012 2010 PROJECTS 1) Replace bricked areas of sidewalks with stamped concrete. $ 10,000 SIDEWALK CONSTRCTION

More information

Presented to Council November 7, :30 p.m. More images

Presented to Council November 7, :30 p.m. More images Presented to Council November 7, 2016 3:30 p.m. More images 1 1. Capital Projects - 25 Year Forecast 2. Public Works 3. Emergency Services 4. Library 5. Community Centre s 6. Parks & Recreation 7. Administration

More information

Township of Scugog 2017 Capital Budget; Capital Projects for Consideration in Future Budgets

Township of Scugog 2017 Capital Budget; Capital Projects for Consideration in Future Budgets Roads / Sidewalks A -1 2 Old Simcoe - Queen St to Hwy 7A - Design Comm S. 2 22,000 22,000 A -2 1 Williams Point Road and Jack Rabbit Run Comm S. 4 50,000 250,000 250,000 550,000 A -3 2 Aldred Drive - Phases

More information

Burlington Capital Improvement Plan: FY FY 2023

Burlington Capital Improvement Plan: FY FY 2023 General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 145 Treasurer/Collector Printer Replacement 155 MIS Software Upgrade Information Systems

More information

PROCUREMENT PLAN 50/70 SCHOOLS New, Modernizations and Replacements - Direct Delivered and Grant Funded. Project Type Grades

PROCUREMENT PLAN 50/70 SCHOOLS New, Modernizations and Replacements - Direct Delivered and Grant Funded. Project Type Grades Method New, Modernizations and s - Direct Delivered and Airdrie Rocky View No. 41 - West Airdrie New K-4 600 600 DB Summer/ Fall TAFF Architect Ltd. Fall Airdrie Rocky View No. 41 - East Airdrie New K-5

More information

Fixed Asset Allocations by Budget Unit for FY

Fixed Asset Allocations by Budget Unit for FY 1100 112 Treasurer-Tax Collector Upgrading current business license program for greater Business License Software & Services 8965 Computer Software 1 10,900 10,900 10,900 efficiency for citizens and staff

More information

LAND BREAKING OPERATIONS 2013

LAND BREAKING OPERATIONS 2013 S Vulcan RK Rental Pt rock rake $375.00/day or $275.00/half day Rental only; no operator, tractor or fuel S Vulcan Rental Pt conveyor-type rock picker $375.00/day or $275.00/half day Rental only; no operator,

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Electoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001

Electoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001 Electoral Division of Olds-Didsbury-Three Hills Statement of Official Results - March 12, 2001 POLL NUMBER NAME OF POLL NAMES ON LIST BRENDA L. DYCK NDP RICHARD MARZ PC GAYLEEN ROELFSEMA LIB NICHOLAS SEMMLER

More information

CAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment

CAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment CAPITAL OUTLAY Capital Outlay Item expenditures for fixed assets such as equipment, remodeling, minor building improvements, and vehicles may be funded from the operating budget or shortterm financing.

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Manatee County Government Proposed Half Cent Infrastructure Sales Tax. Transportation Sidewalks

Manatee County Government Proposed Half Cent Infrastructure Sales Tax. Transportation Sidewalks Transportation Sidewalks Sidewalks Total Transportation (65% of Revenue Per Committee Recommendations) Sidewalks $1,219,575 5.3% $18,293,625 Neighborhood sidewalks and sidewalks to schools To improve pedestrian

More information

Town of Yarmouth Capital Improvement Plan FY FY2025

Town of Yarmouth Capital Improvement Plan FY FY2025 Town of Yarmouth Capital Improvement Plan FY2016 - FY2025 CONTENTS PAGE Narrative Overview 1 Recommendations for 2015 Annual Town Meeting 3 Facility Plan: Big Ticket Items FY2016 - FY2025 7 Capital Improvement

More information

SCHEDULE OF CAPITAL PROJECTS BY FUND

SCHEDULE OF CAPITAL PROJECTS BY FUND CIP Project Funding Summary 5 7 8 9 10 11 Streets & Highways Fund 3,950,541 2,148,259 1,250,000 1,290,000 1,250,000 9,888,800 Prop C Fund 20,936,435 700,000 700,000 700,000 700,000 23,736,435 Measure R

More information

Summary of Approved Funding Sources

Summary of Approved Funding Sources GENERAL SOURCES General Revenue 91213 - Major Fire Apparatus Refurbishment 90,000 117,000 110,000 138,000 147,800 150,000 752,800 91221 - EMS Capital Equipment 7,200 11,200 15,000 18,000 51,400 91229 -

More information

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION REPORT NO. TS-07-15 MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION TO: Mayor and Members of Council FROM: Mike LeBlanc, Director of Operations DATE: March 23, 2015 SUBJECT:

More information

WAYNE COUNTY CAPITAL PLAN SUMMARY

WAYNE COUNTY CAPITAL PLAN SUMMARY WAYNE COUNTY CAPITAL PLAN SUMMARY 2019-2023 7/10/2018 TOTAL PROJECT TOTAL NON-LOCAL TOTAL COUNTY COUNTY DEPARTMENT COSTS FUNDING COSTS Buildings and Grounds 7,065,000 0 7,065,000 Highway (Equipment) 395,000

More information

2019 CAPITAL BUDGET HIGH LEVEL RECAP

2019 CAPITAL BUDGET HIGH LEVEL RECAP HIGH LEVEL RECAP 209 PROPOSED Jan 5th 209 March th Report TAX BASED 208 209 PROPOSED DRAFT 209 DRAFT FINAL REMOVE PROJECTS CONTINGENT ON SPECIAL FUNDING 208 PROPOSED excluding projects contingent on funding

More information

Electoral Division of Stony Plain Statement of Official Results - March 12, 2001

Electoral Division of Stony Plain Statement of Official Results - March 12, 2001 Electoral Division of Stony Plain Statement of Official Results - March 12, 21 POLL NUMBER NAME OF POLL NAMES ON LIST MONIKA CAPPIS LIB STEPHEN LINDOP NDP STAN WOLOSHYN PC V S D R % VOTER TURNOUT 1 Entwistle

More information

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015 1. Provide Storm Shelters at Maize High School - Grades 9-12 - 1,800 students + staff New Construction - North End (6,000 @ $190/SF) $ 1,140,000 - Expand athletic lobby - Concessions/Kitchen - Multipurpose

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

FLAMAN RENTALS RENTAL CATALOGUE

FLAMAN RENTALS RENTAL CATALOGUE FLAMAN RENTALS RENTAL CATALOGUE 2018 1 FLAMAN RENTALS 2 JOIN OUR TEAM FLAMAN RENTALS Looking to expand your business? Join our growing team of over 75 rental dealers in Western Canada! With over 20 years

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

TAB Capital Budget & Six Year Capital Plan

TAB Capital Budget & Six Year Capital Plan The Corporation of the Township of Springwater TAB 15 2016 Capital Budget & Six Year Capital Plan 2016 Budget (Draft) 2016 CAPITAL BUDGET (DRAFT) SOURCES OF FUNDING Project # DEPARTMENT AND PROJECT/ITEM

More information

East Allen County Schools Facilities History Calendar Years October 5, 2015

East Allen County Schools Facilities History Calendar Years October 5, 2015 East Allen County Schools Facilities History Calendar Years 2007 2015 October 5, 2015 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and

More information

Attached Conditions for the Operation of Long Combination Vehicles

Attached Conditions for the Operation of Long Combination Vehicles Attached Conditions for the Operation If a Permit has been issued pursuant to Section 62 of the Traffic Safety Act authorizing the movement (LCV s), any and all of the following conditions shall apply

More information

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year

More information

1 Downtown LRT Connector: Draft Concept

1 Downtown LRT Connector: Draft Concept Downtown LRT Connector: Draft Concept Plan November 2010 We re moving forward. Get involved. On June 21, 2010, City Council approved a street-level downtown LRT route, including a connector for the future

More information

CITY OF EDEN PRAIRIE CAPITAL IMPROVEMENT PLAN

CITY OF EDEN PRAIRIE CAPITAL IMPROVEMENT PLAN 2017 2026 CITY OF EDEN PRAIRIE CAPITAL IMPROVEMENT PLAN City of Eden Prairie 2017-2026 Capital Improvement Plan Table of Contents CAPITAL IMPROVEMENT PLAN & REPORTS Capital Improvement Plan Introduction...

More information

West LRT Lewis Estates to Downtown Concept Plan

West LRT Lewis Estates to Downtown Concept Plan West LRT Lewis Estates to Downtown Concept Plan March 2011 We re moving forward. Learn more. On January 19, 2011, City Council approved the West LRT Concept Plan, with a modification to use Meadowlark

More information

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update Los Angeles Community College District PROGRAM MANAGEMENT SERVICES College Strategic Execution Plan Update District Citizens Oversight Committee October 9, 205 Los Angeles City College Strategic Execution

More information

CAPITAL IMPROVEMENT PROGRAM COMMITTEE RECOMMENDATION

CAPITAL IMPROVEMENT PROGRAM COMMITTEE RECOMMENDATION CAPITAL IMPROVEMENT PROGRAM COMMITTEE 2013-2014 RECOMMENDATION March 7, 2013 CIP Committee Members 2 Mal Leichter (Chairman) Anne Fitzpatrick (Vice-Chairman) Lorraine Davey Amy Lynch-Gracias Loreta McDonnell

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is

More information

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation Capital Improvements Update April 2014: Pl dp j t Planned Projects through 2019 - $ 102,233,755 Available Funding through 2019 $ 149,764,558 pp p,, Un-appropriated - $ 47,530,803 Staff s Recommendation

More information

Supplementary Estimates

Supplementary Estimates TABLED DOCUMENT 193-18(3) TABLED ON MAY 29, 2018 Estimates (Infrastructure Expenditures), No. 2 2018-2019 3rd Session 18th Assembly Government of Northwest Territories SUMMARY OF APPROPRIATIONS VOTED FOR

More information

TOWN OF FORESTBURGH COMMERCIAL INVENTORY AND VALID SALES ASSESSMENTS ARE AT MARKET VALUE COMMERCIAL SALES FROM JANUARY 1, 2014 TO DECEMBER 31, 2018

TOWN OF FORESTBURGH COMMERCIAL INVENTORY AND VALID SALES ASSESSMENTS ARE AT MARKET VALUE COMMERCIAL SALES FROM JANUARY 1, 2014 TO DECEMBER 31, 2018 TOWN OF FORESTBURGH COMMERCIAL INVENTORY AND VALID SALES ASSESSMENTS ARE AT MARKET VALUE COMMERCIAL SALES FROM JANUARY 1, 2014 TO DECEMBER 31, 2018 The information included in this report was printed as

More information

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM Board of Commissioners 229 Rehoboth Avenue P.O. Box 1163 Rehoboth Beach, Delaware 19971 City of Rehoboth Beach Telephone 302-227-6181 www.cityofrehoboth.com THE COMMISSIONERS OF REHOBOTH BEACH Special

More information

Park Name Project Amount

Park Name Project Amount Park Name Project Amount 4 Ann Herman Park Fitness Equipment $ 50,000 Playground/Surfacing/Shade $ 300,000 Site Furnishings $ 15,000 ADA Improvements $ 70,000 Total $ 435,000 2 Annie Beck Park Sea Wall

More information

Electoral Division of Grande Prairie-Smoky Statement of Official Results - March 12, 2001

Electoral Division of Grande Prairie-Smoky Statement of Official Results - March 12, 2001 Electoral Division of Grande Prairie-Smoky Statement of Official Results - March 12, 2001 POLL NUMBER NAME OF POLL NAMES ON LIST MEL KNIGHT PC LEON PENDLETON NDP BARRY ROBINSON LIB DENNIS YOUNG IND V S

More information

2015 Capital Improvement Plan

2015 Capital Improvement Plan 2015 Capital Improvement Plan 15 Unallocated 2014 s Grants/ Donations Prior Year Special Assessment New 48" Intake Improvement and Zebra Mussel Control 690,000 690,000 690,000 - Alley Paving 980,000 280,000

More information

City of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

City of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT City of Lawrence, Kansas Proposed Capital Improvement Plan 2019 2023 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project # City Manager's Office Affordable Housing General Fund Transfer CI05

More information

Capital Improvement Program Overview

Capital Improvement Program Overview Capital Improvement Program Overview A Capital Improvement Plan (CIP) is a multiyear plan that provides a planned and programmed approach to utilizing the City s financial resources in the most efficient

More information

Infrastructure Capital Improvement Plan (ICIP)

Infrastructure Capital Improvement Plan (ICIP) 1 Infrastructure Capital Improvement Plan (ICIP) Lea County Board of County Commissioners Meeting September 7, 2017 LCBCC Regular Meeting 09-07-2017 Agenda Item 02.04.01 Lea County s Infrastructure Capital

More information

Electoral Division of Banff-Cochrane General Election Statement of Official Results - November 22, 2004

Electoral Division of Banff-Cochrane General Election Statement of Official Results - November 22, 2004 POLL NUMBER Electoral Division of Banff-Cochrane General Election Statement of Official Results - November 22, 2004 NAME POLL NAMES ON LIST BOB ARGENT AA MELISSA CAMBRIDGE NDP CHRIS FOOTE AG IAN MCDOUGALL

More information

BY-ELECTION SIGN GUIDELINES

BY-ELECTION SIGN GUIDELINES BY-ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING BY-ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Election Sign Definition: An election sign is a temporary sign announcing

More information

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit

Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit Calgary Transit and the Calgary Transportation Plan Chris Jordan, M.Sc., P.Eng. Coordinator, Strategic Transit Planning, Calgary Transit 1. Plan It Calgary the new Municipal Development Plan and Calgary

More information

ORD-3535 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA:

ORD-3535 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA BEACH, VIRGINIA: ORD-3535 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 AN ORDINANCE TO AMEND SECTIONS 6-12, 7-1, 7-59, 7-59.1, 7-59.2, 7-59.3,

More information

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others...

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others... 2018 Proposed Budget Table of Contents Appropriation Act. 1 Budget by Fund. 2 Michigan Transportation Funds.. 3 Work Performed for Others.... 4 Construction and Preservation... 5 Primary Construction......

More information

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT Town of Middletown, RI Capital Improvement Program FY '4 FY '8 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 0 - School Department FY '4 FY '5 FY '6 FY '7 FY '8 Floor Strippers/Burnishers

More information

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012 Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

DistrictPark Name Project Amount

DistrictPark Name Project Amount DistrictPark Name Project Amount 4 Ann Herman Park Fitness Equipment $ 50,000 Playground/Surfacing/Shade $ 300,000 Site Furnishings $ 15,000 ADA Improvements $ 70,000 Total $ 435,000 2 Annie Beck Park

More information

City of Red Wing, MN

City of Red Wing, MN EXHIBIT B. City of Red Wing, MN Active Capital Improvement Program Detail Summary 09 thm 0 PROJECTS BY FUNDING SOURCE Source Project# Priority 09 00 0 0 0 Total Ambulance Fund Ambulance Refurbish/ Replace,

More information

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants West LRT Alignment Update and Costing Report 2006 May Calgary Transit Transportation Planning Clifton ND Lea Consultants West LRT Update Background The service area for West LRT is generally described

More information

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020 CFS SUMMARY Updated: 01/18/2011 CATEGORY / PROJECT NAME FY10-11 FY11-12 FY12-13 FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-20 LOCAL OPTION SALES TAX SUMMARY LOCAL OPTION SALES TAX 6,700,000 6,834,000

More information

TOTAL CAPITAL EQUIPMENT REPLACEMENT PLAN 1,907, B1801 WSA TAX & SPECIAL BENEFITING LEVY 1,403, B1802 2,484,000.

TOTAL CAPITAL EQUIPMENT REPLACEMENT PLAN 1,907, B1801 WSA TAX & SPECIAL BENEFITING LEVY 1,403, B1802 2,484,000. Amount Grants s Grant / TOTAL NET OPERATING BEFORE COMMITTED (8,043,226.17) (8,043,226.17) CAPITAL EQUIPMENT PLAN CONTRIBUTION 1,907,621.83 (This is the annual funding contribution - new upfront purchases

More information