DREXEL UNIVERSITY RESEARCH LAB AND CORE FACILITY MASTER PLAN STATUS REPORT MEETING OCTOBER 10, 2013

Size: px
Start display at page:

Download "DREXEL UNIVERSITY RESEARCH LAB AND CORE FACILITY MASTER PLAN STATUS REPORT MEETING OCTOBER 10, 2013"

Transcription

1 DREXEL UNIVERSITY RESEARCH LAB AND CORE FACILITY MASTER PLAN STATUS REPORT MEETING OCTOBER 10, 2013

2 Fume Hood Capacity Study in Bossone, CAT and LeBow Just ge(ng started. Review available documenta7on to become more familiar with the 3 buildings. Working with JVE on reviewing mechanical systems capacity. Survey the exis7ng condi7ons to determine lab usage. Iden7fy areas that have infrastructure to support lab ac7vi7es. Review poten7al lab layouts. Iden7fy phasing implica7ons on current building occupants.

3 3101 Market Street: Phasing Basement Level 1 Mezzanine Level 2 Phase GSF Program Occ. Date Phase 1 16,000 Eng. Shops 2013 Phase 2 48,000 IExE 2015 Phase 3 85,000 TBD / Wet Labs??/Lease Phase 4 69,000 TBD / Core Fac.?/Lease Total 218,000

4 3101 Market Street: Vibratory Study* Basement Level Mezzanine Level 2 LocaJon µ- in/sec** LocaJon µ- in/sec** 1 N/A 5 7,259 2 N/A , , , *Based on a preliminary study completed by Keast & Hood/Vibra- Tech 10/4/13 ** µ- in/sec based on a ver7cal Max 8- Sec RMS

5 3101 Market Street: Vibratory Study* Lower Garage Level: The lower level of the garage is the best place to have vibra7on sensi7ve equipment. Because it is founded on grade, it will meet a more stringent criterion than 2,000 micro- inches per second. It currently meets a range of micro- inches per second. Upper Garage Level: The 2 nd floor of the garage is the most suscep7ble to walking and exterior (train & truck) vibra7on, and as such will most likely need structural interven7ons if this area is to be used for sensi7ve equipment. It currently meets a range of 1,943 7,259 micro- inches per second. 2 nd Floor Infill: The 2 nd floor por7on of 3101 to the south of the corridor does not meet the 2,000 micro- inches per second but is close. Because of this, structural modifica7ons may not be needed but localized vibra7on buffering of equipment or specialty air tables may be the solu7on. It currently meets a range of 1,341 1,591 micro- inches per second. *Based on a preliminary study completed by Keast & Hood/Vibra- Tech 10/4/13

6 3101 Market Street: EM Interference* 2 Basement Level 1 1 Mezzanine Level 2 LocaJon AC (Powerlines) DC (Trains/Elev/Cars) mg mg Unacceptable mg mg Unacceptable Field cancella7on and shielding will be required (field cancella7on = $25,000; shielding = $100,000 to $250,000) *Study completed by JEOL 6/7/13

7 3101 Parking Garage Test Fit Level 1

8 3101 Parking Garage Test Fit Level 2

9 3101 Parking Garage Test Fit Roof

10 3101 Parking Garage Test Fit Lab Modules Standard Biochem Lab (1,271 NSF) Heavy Chemistry Lab (1,271 NSF) Bio- organic Lab (1,271 NSF) Engineering Lab (1,271 NSF)

11 3101 Parking Garage Test Fit West Eleva7on

12 3101 Parking Garage Test Fit North Eleva7on

13 3101 Parking Garage Test Fit South Eleva7on

14 3101 Parking Garage Test Fit Exterior

15 3101 Parking Garage Test Fit North- South / Market St. JFK Blvd

16 3101 Parking Garage Test Fit Perspec7val Atrium Sec7on 1 The Hive

17 3101 Parking Garage Test Fit Interior

18 3101 Parking Garage Test Fit Perspec7val Atrium Sec7on 2 The Hive

19 3101 Market Street Parking Garage Test Fit: Program Level 1 (SF) Level 2 (SF) Total (SF) Office 714 1,071 1,785 Desk Room 1,326 1,989 3,315 Research Lab 8,771 11,809 20,580 Research Lab Support 1, ,562 Computer Lab Conference Room Lounge Net Assignable 13,331 16,352 29,683 Building Support 4, ,298 Gross 23,175 21,713 44,888

20

21

22

23

24

25 Engineering & Chemistry Common Ground Discussion 1. Where is the loca7on of the Faculty Offices? Are they in 3101 or not? 2. What is the rela7onship of the office to the lab and the grad- students? 3. Are there opportuni7es for sharing under the umbrella for IExE? 4. Would you ever pursue joint grant applica7ons? 5. What Core Facili7es are required? 6. Are some of the labs generic to allow for the swing from Engineering to Chemistry? 7. Do we make some labs Wet- Generic Labs? 8. Is this Lab- Hoteling or dedicated labs to individuals? 9. Ins7tute Model vs. Individual Model?

26 2013/2014 Milestones and ObjecJves 1. Fume Hood Capacity Study in Bossone, CAT and LeBow (Added on 9/27/13) a. Engineering Study 10/13 b. Architectural Study - 10/13 c. Cost Es7ma7ng - 11/ Parking Garage Test Fit a. Architectural Study 9/13 b. Engineering Study (need a beper understanding of fume hood count) 10/13 c. Cost Es7ma7ng - 11/13 3. Drexel Decision Phase a. Drexel to decide which project to proceed with 12/13 b. Drexel to determine which researchers will be in the project - 1/14 4. Project Delivery Method a. Design- Build b. Design/Bid/Build 5. Design DocumentaJon Schedule (either opjon)

First Responder System Identification Quiz. Presented by the NY-SUN PV Trainers Network

First Responder System Identification Quiz. Presented by the NY-SUN PV Trainers Network First Responder System Identification Quiz Presented by the NY-SUN PV Trainers Network SYSTEM 1 Questions: 1) Is there a solar electric system at the site? 2) What is your next step? SYSTEM 1 3) Given

More information

Southern California Edison (SCE) PRP Solar Si?ng Survey Overview

Southern California Edison (SCE) PRP Solar Si?ng Survey Overview Southern California Edison (SCE) PRP Solar Si?ng Survey Overview These documents and the analysis and conclusions contained in them are exclusively the work of Clean Coali?on, who bears sole responsibility

More information

Updated 10/16/2018. BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs

Updated 10/16/2018. BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs BUILDING 2100: Academic Support and Offices New Sq. Ft Existing Location Existing Area Classrooms/Labs Classrooms (11 @ 1,000 ASF) 11,000 408A, 408B, 403, 402,101,102, 103, 104 6467 English Staff Work

More information

±25,934 SF C-3 ZONED PAD

±25,934 SF C-3 ZONED PAD ±25,934 SF C-3 ZONED PAD SOUTH 5TH AVENUE, TUCSON, ARIZONA CONTACT US DAVE VOLK Vice President +1 520 323 5102 david.volk@cbre.com BRUCE SUPPES Vice President +1 520 323 5155 bruce.suppes@cbre.com PROPERTY

More information

Campus Computing Sites Printers B254 B A B745 B727 B735 B737 B250. Printer Locations. Handicap Access RAMP CHURCH STREET

Campus Computing Sites Printers B254 B A B745 B727 B735 B737 B250. Printer Locations. Handicap Access RAMP CHURCH STREET asement 069 860 Gateway Testing Math Lab Spaces Side of East Hall 7 70 67A 67 7 860M 860I 760A 67 67 67A 65 68 67 6 66 68H 68 67C 7A 64 7 7 80A 7C 468 470 470 464 470A 464A 464 Math Lab 860 860J 860K 760

More information

charging station installation in multi-family building

charging station installation in multi-family building charging station installation in multi-family building Summary of charging solutions to be implemented in apartments and condos to ensure that all co-owners have the availability of an electric vehicle

More information

Project Summary. Evanston Water Treatment Plant Upgrade. Install new water filtration equipment

Project Summary. Evanston Water Treatment Plant Upgrade. Install new water filtration equipment Project Summary *The Campus Construction Map PDF is linked to each map identification number, click the number on the map to view the corresponding project summary. Map Identification No: 1 Evanston Water

More information

OFFICE/R&D CAMPUS REPRESENTING ±395,335 SQUARE FEET FOR LEASE

OFFICE/R&D CAMPUS REPRESENTING ±395,335 SQUARE FEET FOR LEASE /R&D CAMPUS REPRESENTING ±395,335 SQUARE FEET FOR LEASE CA RE License #00935379 CA RE License #00902221 UNIQUE FEATURES PROPERTY HIGHLIGHTS POWER 21,000 amps RETAIL AMENITIES with >200 shops & restaurants

More information

KME RESCUES LIKE NO OTHER

KME RESCUES LIKE NO OTHER KME RESCUES LIKE NO OTHER KME Works for You. As a privately held family company since 1946, KME is truly an American success story. We ve experienced six decades of steady growth because we ve worked hard

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 H DATE: August 10, 2017 ****************************************************************************** SUBJECT: SDSU Pugsley Center Renovation

More information

Michigan Tech. HEV and Mobile Lab Program Update Advanced Power Systems Research Center

Michigan Tech. HEV and Mobile Lab Program Update Advanced Power Systems Research Center 1 Michigan Tech HEV and Mobile Lab Program Update Advanced Power Systems Research Center Jeffrey D. Naber Center Director Tel: 906.487.1938 jnaber@mtu.edu Summary HEV Curriculum Development 2 1. Seven

More information

Electricity Distribution and Underground Networks

Electricity Distribution and Underground Networks Electricity Distribution and Underground Networks Alain DOULET Consultant Distribution networks: a key infrastructure component Distribu#on cons#tutes a local infrastructure system that is determinant

More information

ConocoPhillips Alaska: NPR-A Update

ConocoPhillips Alaska: NPR-A Update ConocoPhillips Alaska: NPR-A Update April 21, 2016 Nick Olds, VP North Slope Opera;ons & Development Cau8onary Statement & Safe Harbor The following presenta8on includes forward-looking statements. These

More information

Gateway Business Park 2001 Gandy Blvd N Build to Suit Price per S F. Special Features/Amenities. Clear Height Fire Sprinkler Yes Buildings 3

Gateway Business Park 2001 Gandy Blvd N Build to Suit Price per S F. Special Features/Amenities. Clear Height Fire Sprinkler Yes Buildings 3 Industrial Flex Office Gateway Business Park 2001 Gandy Blvd N Coming Soon New Office Building Build to Suit Total S F 200,000 TBD Fiber Optic, Verizon Smart Park I275 & Gandy Blvd visability, Traffic Count

More information

Geary Corridor Bus Rapid Transit

Geary Corridor Bus Rapid Transit Geary Corridor Bus Rapid Transit Institute of Transportation Engineers Luncheon Meeting October 17, 2013 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Geary

More information

Securing critical loads in a PV-based microgrid with a multi-agent system. Taesic Kim 03/04/2013

Securing critical loads in a PV-based microgrid with a multi-agent system. Taesic Kim 03/04/2013 Securing critical loads in a PV-based microgrid with a multi-agent system Taesic Kim 03/04/2013 1 Reference M. Pipa0anasomporn, H. Feroze, S. Rahman, Securing cri

More information

Hya$sville Volunteer Fire Department Training. Elevator Rescue Module

Hya$sville Volunteer Fire Department Training. Elevator Rescue Module Hya$sville Volunteer Fire Department Training Elevator Types Cable Elevators Hydraulic Elevators Drum Type Trac9on Type Cable Elevator A typical cable elevator consists of an elevator shac for the car

More information

Moving to Zero at Scale Residen3al & Commercial. Mindy Craig, Principal, BluePoint Planning

Moving to Zero at Scale Residen3al & Commercial. Mindy Craig, Principal, BluePoint Planning Moving to Zero at Scale Residen3al & Commercial Mindy Craig, Principal, BluePoint Planning Mindy Craig, Principal BluePoint Planning New ZNE Residen3al Ac3on Plan ZNE Commercial Ac3on Plan update Exis3ng

More information

Downtown Lee s Summit Parking Study

Downtown Lee s Summit Parking Study Downtown Lee s Summit Parking Study As part of the Downtown Lee s Summit Master Plan, a downtown parking and traffic study was completed by TranSystems Corporation in November 2003. The parking analysis

More information

FOR SALE OR LEASE EBERHARDT & BARRY INC.

FOR SALE OR LEASE EBERHARDT & BARRY INC. FOR SALE OR LEASE Property Video: https://vimeo.com/215049252/1384e4fcbe 500,000± SF Manufacturing / Distribution Facility - 25.48± Acres Formerly 1888 Mills 904 N. Hightower Street Thomaston, Upson County,

More information

Station 1 OASIS RAIL TRANSIT OVERVIEW

Station 1 OASIS RAIL TRANSIT OVERVIEW Station 1 OASIS RAIL TRANSIT OVERVIEW Oasis Rail Transit Project At A Glance What is Oasis Rail Transit? Oasis provides a new transporta/on alterna/ve for the Eastern Corridor region. It will transport

More information

4.2 Series Station Option Description

4.2 Series Station Option Description 4.2 Series Station Option Description The series station proposal features a new set of side platforms constructed approximately 250 feet north of the existing platforms. The two new platforms would extend

More information

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN INTRODUCTION This report includes a summary of several key components of the Rapid City Downtown Parking Study and Strategic Plan, including: Current Conditions Analysis (Inventory and Occupancy and Length

More information

STUDY AND EVALUATION SCHEME FOR DIPLOMA PROGRAMME UNIVERSITY POLYTECHNIC, A.M.U., ALIGARH

STUDY AND EVALUATION SCHEME FOR DIPLOMA PROGRAMME UNIVERSITY POLYTECHNIC, A.M.U., ALIGARH UNIVERSITY POLYTECHNIC, A.M.U., ALIGARH Name of the Branch- Interior Design Semester :- First Title L P Hrs. 1 BMA-101 Applied Maths-I 5 0 3 10 15 75 100 2 BPH-101 Applied Physics-I 2 0 2 5 10 35 50 3

More information

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1

Table 1 - Land Use Comparisons - Proposed King s Wharf Development. Retail (SF) Office (SF) 354 6,000 10, Land Uses 1 Ref. No. 171-6694 Phase 2 November 23, 217 Mr. David Quilichini, Vice President Fares & Co. Developments Inc. 31 Place Keelson Sales Centre DARTMOUTH NS B2Y C1 Sent Via Email to David@faresinc.com RE:

More information

Physiological Changes Associated with Live Haul: Maintaining Healthy Fish. Termina(on Report October, 2010

Physiological Changes Associated with Live Haul: Maintaining Healthy Fish. Termina(on Report October, 2010 Physiological Changes Associated with Live Haul: Maintaining Healthy Fish Termina(on Report October, 2010 Repor(ng period & budget: $87,156 05 06 $81,856 06 07 $86,299 07 08 $77,645 08 09 $332,956 No cost

More information

An energy revolution is needed to achieve our energy security and climate goals

An energy revolution is needed to achieve our energy security and climate goals An energy revolution is needed to achieve our energy security and climate goals Gt CO 2 60 55 Baseline emissions 57 Gt CCS 19% 50 Renewables 17% 45 40 Nuclear 6% 35 30 Power generation efficiency and fuel

More information

Terminal Alternatives

Terminal Alternatives Chapter 5 Terminal Alternatives Missoula International Airport Master Plan Update Prepared for Missoula County Airport Authority OCTOBER 2008 Contents Section Page 5 Terminal Alternatives...5-1 5.1 Terminal

More information

East Allen County Schools Facilities History Calendar Years October 5, 2015

East Allen County Schools Facilities History Calendar Years October 5, 2015 East Allen County Schools Facilities History Calendar Years 2007 2015 October 5, 2015 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and

More information

Trip Generation and Parking Study New Californian Apartments, Berkeley

Trip Generation and Parking Study New Californian Apartments, Berkeley Trip Generation and Parking Study New Californian Apartments, Berkeley Institute of Transportation Engineers University of California, Berkeley Student Chapter Spring 2012 Background The ITE Student Chapter

More information

Plattsburgh Downtown Parking Study

Plattsburgh Downtown Parking Study Plattsburgh Downtown Parking Study Study Update October 2017 Powered by Purpose of Study Engage Community in Parking Discussion Assess Current Conditions Parking Demand Patron Service Levels Administration

More information

The Pennsylvania State University NECA Student Chapter Green Energy Challenge

The Pennsylvania State University NECA Student Chapter Green Energy Challenge The Pennsylvania State University NECA Student Chapter 2015 Green Energy Challenge Our Team Nicholas Kolesar Project Manager, Energy Analyst Haley Bendis Gabrielle Reese Kevin Clement Jiye Choi Lighting

More information

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)

More information

Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station

Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Trip Generation and Parking Utilization Data Collection at Mini-Mart with Gas Station Final Report 2013 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter at

More information

Ocean Class AGOR Update. FIC Mee4ng March, 2015 J.M. Prince

Ocean Class AGOR Update. FIC Mee4ng March, 2015 J.M. Prince Ocean Class AGOR Update FIC Mee4ng March, 2015 J.M. Prince Status on Test, Trials and Delivery R/V Neil Armstrong (AGOR 27) Undergoing Builder s Sea Trials Last Week Vendor Grooming, power runs, maneuvering

More information

BOR-ROOM INVENTORY EDIT BY BUILDING LOUISIANA DELTA COMMUNITY COLLEGE FALL DATA 2013 BRANCH RUN DATE 11/20/ :16:39 PARISH PAGE NUMBER 1

BOR-ROOM INVENTORY EDIT BY BUILDING LOUISIANA DELTA COMMUNITY COLLEGE FALL DATA 2013 BRANCH RUN DATE 11/20/ :16:39 PARISH PAGE NUMBER 1 PAGE NUMBER 1 RELATION OTHER 0001 0001E 75 00 020 0001 0001S 229 00 020 0001 0002E 75 00 020 0001 0002S 298 00 020 0001 0003S 294 00 020 0001 0004S 300 00 020 0001 0005S 369 00 020 0001 0006S 294 00 020

More information

Electric Multiple Unit Procurement Update

Electric Multiple Unit Procurement Update Electric Multiple Unit Procurement Update Board of Directors August 7, 2014 Context* * The proposed project is not yet approved pending environmental clearance. 2 1 Status April 2014 - JPB update on EMU

More information

Table 1. Air Sampling Results (ng/m 3 ) for Building D (100 and 200, Mako Shark) at MHS Malibu High School Malibu, California

Table 1. Air Sampling Results (ng/m 3 ) for Building D (100 and 200, Mako Shark) at MHS Malibu High School Malibu, California Table 1. Air Results (ng/m 3 ) for Building D (100 and 200, Mako Shark) at MHS Placard ID (August Lights Off Lights On (December 28, Summer 2015 Summer 2016 Summer 2017 101A 101 (west) 101B 101 (east)

More information

Mercer Island Center for the Arts Parking Management Plan

Mercer Island Center for the Arts Parking Management Plan Parking Stalls Mercer Island Center for the Arts Parking Management Plan June 15, 2016 This Parking Management Plan (P) covers all tenants at the Mercer Island Center for the Arts (MICA) campus, including

More information

ETSU Solar Array. Suggestions for a potential solar array on campus. Scott Finney

ETSU Solar Array. Suggestions for a potential solar array on campus. Scott Finney ETSU Solar Array Suggestions for a potential solar array on campus Scott Finney May 11 th, 2014 Background: East Tennessee State University has an extremely active department of sustainability. This department

More information

CODE ANALYSIS BUILDING AREA STORIES 2 BUILDING HEIGHT 25'

CODE ANALYSIS BUILDING AREA STORIES 2 BUILDING HEIGHT 25' CODE ANALYSIS APPLICABLE CODES (*- w/ local amendments) BUILDING CODE IBC 2006 * PLUMBING CODE IPC 2006* MECHANICAL CODE IMC 2006* ELECTRICAL CODE NFPA 70 (NEC) 2008* ENERGY CONSERVATION CODE IECC 2006

More information

MOTOR SURVEY. Solutions for Industry

MOTOR SURVEY. Solutions for Industry In the United States, motors consume almost of 70 percent of the electricity used by industry, which translates to more than $30 billion in annual cost. This is why implementing even small improvements

More information

University of New Brunswick Fall Full-Time Enrolment by Faculty and Year in Program (Head Count)

University of New Brunswick Fall Full-Time Enrolment by Faculty and Year in Program (Head Count) Fall Full-Time Enrolment by Faculty and Year in Program () Fredericton Continuing Education YR1 1 1 1 YR2 1 1 1 1 1 1 1 1 1 YR3 1 1 2 2 1 1 2 2 2 2 YR4 1 1 1 2 3 2 1 2 2 2 Total 1 1 2 3 3 4 4 3 2 6 5 4

More information

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014

Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Trip Generation & Parking Occupancy Data Collection: Grocery Stores Student Chapter of Institute of Transportation Engineers at UCLA Spring 2014 Page 1 Introduction The UCLA Institute of Transportation

More information

Downtown Parking/Wayfinding Study. Review of Recommendations to City Council: January 16, 2018

Downtown Parking/Wayfinding Study. Review of Recommendations to City Council: January 16, 2018 Downtown Parking/Wayfinding Study Review of Recommendations to City Council: January 16, 2018 Tonight s Focus Objectives & Timeline Recap Study Findings Present Staff Recommendations 2018 Action items

More information

Building Blocks of the Smart Grid

Building Blocks of the Smart Grid Role of the Smart Grid in Managing the Integration of Wind and Solar Power Generation Invited Lecture at Istanbul Technical University 26 November 2010 Istanbul, Turkey Prof. Saifur Rahman Building Blocks

More information

RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST

RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST RISD WHITE ROCK TRAIL PROPOSED ELEMENTARY SCHOOL AUGUST 01. 2016 DESIGN SCHEME COMPARISONS SCHEME A: 2-Story building and parking garage, no code variance required. SCHEME B: 5-Story building(3 school

More information

Schneider Electric Powering the U.S. Department of Energy Solar Decathlon 2011

Schneider Electric Powering the U.S. Department of Energy Solar Decathlon 2011 Schneider Electric Powering the U.S. Department of Energy Solar Decathlon 2011 Washington D.C., U.S.A. Make the most of your energy sm Schneider Electric: Proud sustaining sponsor of the U.S. Department

More information

ARTICLE 501 OFF-STREET PARKING AND LOADING

ARTICLE 501 OFF-STREET PARKING AND LOADING ARTICLE 501 OFF-STREET PARKING AND LOADING Sec. 501.01 Applicability. (a) Zoning districts. These requirements for adequate off-street parking, and loading shall be provided in all zoning districts. Such

More information

Master Calendar Subject To Change. Sunday Monday Tuesday Wednesday Thursday Friday Saturday Rehearsals. LP AO, Time TBD, LT

Master Calendar Subject To Change. Sunday Monday Tuesday Wednesday Thursday Friday Saturday Rehearsals. LP AO, Time TBD, LT August 2017 1 2 3 4 5 6 Begin LP 7 8 9 10 11 12 Rehearsals LP AO, Time TBD, LT 13 14 15 16 17 18 19 1 2 Welcome Back BBQ Lake Merced Picnic Area 1Harding Rd. SF 12p - 3p LP AO, Time TBD, LT 20 21 22 23

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

FSITE. November 3, Hillsborough County Aviation Authority

FSITE. November 3, Hillsborough County Aviation Authority FSITE November 3, 2015 FY2016 Passenger Projection Tampa International Airport is projected to handle 18,871,526 passengers in FY2016, a 2.7% increase over FY2015. 21 Passengers (Millions) 20 19 19.3 18.7

More information

Re: Cyrville Road Car Dealership

Re: Cyrville Road Car Dealership 1223 Michael Street, Suite 100, Ottawa, ON K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com February 25, 2013 OUR REF: TO3098TOE Mark Motors of Ottawa 611 Montreal Road Ottawa, ON K1K 0T8 Attention:

More information

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015 1. Provide Storm Shelters at Maize High School - Grades 9-12 - 1,800 students + staff New Construction - North End (6,000 @ $190/SF) $ 1,140,000 - Expand athletic lobby - Concessions/Kitchen - Multipurpose

More information

2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018

2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018 Transportation @ UC San Diego 2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018 Agenda UC San Diego Transportation Services Organizational Overview Current State Parking,

More information

AMERICA S CENTER. America s. Center

AMERICA S CENTER. America s. Center AMERICA S CENTER America s Center America s Center 502,000 sq. ft. of contiguous exhibit space 340,000 sq. ft. of exhibit space with contiguous ceiling height of 40 ft., air wall track is 34 ft. and utilities

More information

WEWORK LARGE OFFICES // AUSTIN, TX FEBRUARY 2018

WEWORK LARGE OFFICES // AUSTIN, TX FEBRUARY 2018 WEWORK LARGE OFFICES // AUSTIN, TX FEBRUARY 08 INTRODUCING: WEWORK LARGE OFFICES DATADRIVEN SPACE, TAILORED FOR ENTERPRISE We is evolving to meet the needs of mature members with datadriven environments,

More information

Overview of Cer+fica+on, Organisa+ons and Databases in Australia. Peter Hart Chairman ARTSA

Overview of Cer+fica+on, Organisa+ons and Databases in Australia. Peter Hart Chairman ARTSA Overview of Cer+fica+on, Organisa+ons and Databases in Australia Peter Hart Chairman ARTSA Split of Government Responsibilities ADRs, Import controls, ACCC (recalls), Interna+onal trade policy (WTO), Harmoniza+on

More information

Public Level 2 Charging: NREL and Clean Ci*es Resources

Public Level 2 Charging: NREL and Clean Ci*es Resources Public Level 2 Charging: NREL and Clean Ci*es Resources Andrew P. Hudgins Na*onal Renewable Energy Laboratory July 29, 2015 NREL is a na*onal laboratory of the U.S. Department of Energy, Office of Energy

More information

7 Habits of Highly Effec3ve Product Development

7 Habits of Highly Effec3ve Product Development 7 Habits of Highly Effec3ve Product Development September 5, 2014 ASTR 2014, Sep 10-12, St. Paul, MN 1 John Lenss John has over 18 years of experience in performing HALT. He has produced excellent results

More information

ARTICLE VI. PARKING AND LOADING REQUIREMENTS

ARTICLE VI. PARKING AND LOADING REQUIREMENTS Sec. 130-201. Purpose. ARTICLE VI. PARKING AND LOADING REQUIREMENTS The purpose of this article is to ensure efficient traffic flow and to reduce hazards to public safety by establishing standards for

More information

Chapter CALIFORNIA GREEN BUILDING STANDARDS CODE. Palo Alto Municipal Code

Chapter CALIFORNIA GREEN BUILDING STANDARDS CODE. Palo Alto Municipal Code 511/2017 I Print I Chapter 16.14 CALIFORNIA GREEN BUILDING STANDARDS CODE Palo Alto Municipal Code Agenda Item H6 Staff Handout 16.14.150 Section A4.106.8 Electric vehicle (EV) charging for new construction.

More information

FACILITY NAME, SIZE, AND RENTAL RATES - Effective - July 2017

FACILITY NAME, SIZE, AND RENTAL RATES - Effective - July 2017 FACILITY NAME, SIZE, AND - Effective - July 2017 ROOM TYPE / General Classroom Space 15-35 45 65 25 35-60 60 90 25 60-125 75 110 25 125-200 110 145 25 200 + 145 180 50 Art Gallery North Gallery 1,800 s/f

More information

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune 2016 TRB Managed Lanes Conference May 5th, Session 6 Presentation Background Outline Metro ExpressLanes

More information

INNOVATION POWERING SAFRAN

INNOVATION POWERING SAFRAN INNOVATION POWERING SAFRAN Stéphane CUEILLE, Chief Technology Officer 106 Safran - Capital Markets Day / November 29, Technology, key to our competitiveness R&T plan BUSINESSES PROPULSION EQUIPMENT INTERIORS

More information

FUTURE OF POWERTRAIN TECHNOLOGY

FUTURE OF POWERTRAIN TECHNOLOGY Craig Balis July 31, 2018 FUTURE OF POWERTRAIN TECHNOLOGY C.A.R. Management Briefing Conference 2 HONEYWELL OVERVIEW $40.5B in sales for 2017 54% of sales outside the U.S. 23,000 engineers worldwide 11,000

More information

Positive Train Control (PTC)

Positive Train Control (PTC) Positive Train Control (PTC) PTC at a glance FasTracks systems have Positive Train Control (PTC) technology called I-ETMS. This is a complex GPS-and-communications-based system that reduces the risk of

More information

Sketch Plans. for the Addition and Renovation of. BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario. September 26, 2018

Sketch Plans. for the Addition and Renovation of. BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario. September 26, 2018 Sketch Plans for the Addition and Renovation of BISHOP REDING CATHOLIC SECONDARY SCHOOL Milton, Ontario September 26, 2018 Table of Contents 1.0 Building Program...1 2.0 Site Plan...4 3.0 Floor Plans...5

More information

OMSHR. Dust Suppression Hoppers Reduce Airborne Respirable Dust During Bulk Loading. Office of Mine Safety and Health Research

OMSHR. Dust Suppression Hoppers Reduce Airborne Respirable Dust During Bulk Loading. Office of Mine Safety and Health Research OMSHR Office of Mine Safety and Health Research Dust Suppression Hoppers Reduce Airborne Respirable Dust During Bulk Loading Jay Colinet, Andy Cecala, Jim Noll - NIOSH Jamie Robinson Unimin CorporaDon

More information

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School McNICOLL BUS GARAGE Public Open House June 12, 2017 Mary Ward Catholic School THE NEED FOR A NEW BUS GARAGE riders Increased ridership means buses Need for new buses garage And a new bus facility Garages

More information

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out October 24, 218 Mr. Justin D. Bridges, AIA, LEED AP Davidson A+E 431 Indian Creek Parkway Overland Park, KS 6627 RE: Dear Mr. Bridges, Trip Generation Overland Park, Kansas As requested, Priority Engineers,

More information

Automotive Forum&Expo AUTOMOTIVE FORUM: AUTOMOTIVE CONFERENCE AUTOMOTIVE MEETINGS AUTOMOTIVE CARRIER DAYS AUTOMOTIVE EXPO AUTOMOTIVE FUTURE

Automotive Forum&Expo AUTOMOTIVE FORUM: AUTOMOTIVE CONFERENCE AUTOMOTIVE MEETINGS AUTOMOTIVE CARRIER DAYS AUTOMOTIVE EXPO AUTOMOTIVE FUTURE Automotive Forum&Expo Sofia 2018 AUTOMOTIVE FORUM: AUTOMOTIVE CONFERENCE AUTOMOTIVE MEETINGS AUTOMOTIVE CARRIER DAYS AUTOMOTIVE EXPO AUTOMOTIVE FUTURE 01 Automotive Forum & Expo Sofia 2018 Automotive Forum

More information

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair

Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Trip and Parking Generation Data Collection at Grocery Store with Gas Station and Auto Repair Final Report 2011 ITE District 6 - Data Collection Project Institute of Transportation Engineers Student Chapter

More information

UNCLASSIFIED: Dist A. Approved for public release. GVPM Energy Storage Overview Mr. David Skalny & Dr. Laurence Toomey 10 August 2011

UNCLASSIFIED: Dist A. Approved for public release. GVPM Energy Storage Overview Mr. David Skalny & Dr. Laurence Toomey 10 August 2011 UNCLASSIFIED: Dist A. Approved for public release GVPM Energy Storage Overview Mr. David Skalny & Dr. Laurence Toomey 10 August 2011 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting

More information

Sustainable Transportation Award Winner. UC/CSU Sustainability Conference Santa Barbara, 2006

Sustainable Transportation Award Winner. UC/CSU Sustainability Conference Santa Barbara, 2006 Sustainable Transportation Award Winner UC/CSU Sustainability Conference Santa Barbara, 2006 Translocator (Transit Locator) San Jose State University CSU: Transportation Demand Management Eyedin Zonobi,

More information

Technical Information

Technical Information Technical Information CCC Total Gross Square Footage: 2,200,000 square feet. Elevations for Each Level: Lower Level: 5,197 6 Street Level: 5,214 Upper Level: 5,241 6 (It is 16 6 from the Lower Level floor

More information

Metrorail Line Load Application

Metrorail Line Load Application Metrorail Line Load Application Presented to Travel Demand Forecasting Subcommittee Wendy Jia & Tom Harrington, WMATA Bassel Younan & Jeff Bruggeman, AECOM November 20, 2009 Metrorail Line Load Application

More information

Overcoming Barriers to Electric- Vehicle Deployment

Overcoming Barriers to Electric- Vehicle Deployment WATER SCIENCE AND TECHNOLOGY BOARD Overcoming Barriers to Electric- Vehicle Deployment Commi9ee on Overcoming Barriers to Electric- Vehicle Deployment Board on Energy and Environmental Systems Division

More information

FPS Project Backlog Projected Completion

FPS Project Backlog Projected Completion FPS Project Backlog - 2016 Projected Completion Project Number KUCC-0101 FAC2012-143 FR2012-123 FAC2012-063 FR2012-137 FAC2012-079 Project Description University Stadium - Replace Synthetic Turf Projected

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q2 Quarterly Update #13 October 1 December 31, 2017 JPB Board Meeting February 1, 2018 Agenda Item # 8b Electrification - Infrastructure Progression of

More information

11004 CHAPEL HILL ROAD PRE-LEASING SHOPS ±1,200 SF TO 20,000 SF MORRISVILLE, NC PROVIDENCE PLACE NEW WAKE TECH CAMPUS (UNDER CONSTRUCTION)

11004 CHAPEL HILL ROAD PRE-LEASING SHOPS ±1,200 SF TO 20,000 SF MORRISVILLE, NC PROVIDENCE PLACE NEW WAKE TECH CAMPUS (UNDER CONSTRUCTION) SOUTH MIAMI BOULEVARD 45,000 VPD PARAMOUNT PARKWAY PROVIDENCE PLACE 18,000 VPD MARRIOTT TOWNE PLACE SUITES NEW WAKE TECH CAMPUS (UNDER CONSTRUCTION) MORRISVILLE, NC PRE-LEASING SHOPS ±1,200 SF TO 20,000

More information

Watauga County Schools Capital Improvement Plan 2015

Watauga County Schools Capital Improvement Plan 2015 Watauga County Schools Capital Improvement Plan 2015 WATAUGA COUNTY SCHOOLS CAPITAL IMPROVEMENT PLAN 2015 In an effort to meet the standards of the North Carolina Building Code and North Carolina Public

More information

vision42

vision42 vision42 www.vision42.org vision42 auto-free light rail boulevard for 42nd Street Roxanne Warren, AIA, Chair George Haikalis, ASCE, Co-Chair Institute for Rational Urban Mobility,Inc. www.vision42.org

More information

1100 Wilson Boulevard Approximately 4,000 USF. Restaurant. mondayre.com

1100 Wilson Boulevard Approximately 4,000 USF. Restaurant. mondayre.com Restaurant Opportunity mondayre.com THE PERECT LOCATION» Prime streetfront location on the ground floor of a landmark 1 million SF office complex, with 10 million SF of office space in walking distance»

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (7B) Submitting Agency: Fairfax County Basic Project Information Project Title: South Van Dorn Street and Franconia Road Interchange 7B Project Type (check one): Roadway

More information

SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING

SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING 2 Site Plan Modifications From SPRC #1 &2 3 Current 4.1 Submission

More information

Getting Innovative Vehicles on the Road Experience from Ontario. John R. Billing

Getting Innovative Vehicles on the Road Experience from Ontario. John R. Billing Getting Innovative Vehicles on the Road Experience from Ontario John R. Billing Trucking is Important in Ontario 38% of Canada s popula0on live in Ontario 50% of truck trips in Canada travel in Ontario

More information

VelociRFTA BRT/CNG Project. West Slope CNG Collabora;ve Workshop April 13, 2012

VelociRFTA BRT/CNG Project. West Slope CNG Collabora;ve Workshop April 13, 2012 VelociRFTA BRT/CNG Project West Slope CNG Collabora;ve Workshop April 13, 2012 Agenda RFTA Background VelociRFTA Bus Rapid Transit (BRT) RFTA CNG Due Diligence Effort RFTA CNG Decision RFTA Es;mated CNG

More information

Co-Optimization of Fuels and Engines

Co-Optimization of Fuels and Engines Co-Optimization of Fuels and Engines Michael Berube, Director, DOE Vehicle Technologies Office Petroleum Equipment Institute Convention October 19, 2016 Goal: better fuels and better vehicles sooner Fuel

More information

RIDER NM NET METERING

RIDER NM NET METERING d/b/a Ameren Illinois 5 th Revised Sheet No. 24 Electric Service Schedule Ill. C. C. No. 1 (Canceling 4 th Revised Sheet No. 24) PURPOSE * The purpose of this tariff is to establish an offering of net

More information

Cooperative Research Centre for Advanced Automotive Technology

Cooperative Research Centre for Advanced Automotive Technology Cooperative Research Centre for Advanced Automotive Technology Sustainable Vehicle Technologies - Outcomes from Automotive Australia 2020 Technology Roadmap Barry Comben 5 October 2010 What is Technology

More information

Water side Economizer WC chiller

Water side Economizer WC chiller Appendices Water side Economizer WC chiller Power Loading Lighting Load W/ft^2 Area (ft^2) W kw 3.5 48152 168532 Water Cooled Chiller kw/ton 0.7 UA Supply Fan BHP kw wall 1069 58 43 window 3642 roof 295

More information

La Caserne. 103 Dalhousie Québec (Québec) Canada, G1K 4B9. Telephone : (418) Fax : (418) Telephone : (418)

La Caserne. 103 Dalhousie Québec (Québec) Canada, G1K 4B9. Telephone : (418) Fax : (418) Telephone : (418) La Caserne 103 Dalhousie Québec (Québec) Canada, G1K 4B9 Telephone : (418) 692-5323 Fax : (418) 692-2390 Internet : www.exmachina.qc.ca Technical director : Patrick Durnin Telephone : (418) 692-5353 Email

More information

Natural Gas Vehicles for the Chippewa County Highway Department Cost/Benefit Analysis

Natural Gas Vehicles for the Chippewa County Highway Department Cost/Benefit Analysis Natural Gas Vehicles for the Chippewa County Highway Department Cost/Benefit Analysis Prepared for: Chippewa County Highway Department Presented by: Luis Galimber%, Jeremy Hall, Lingqiao Qin, Daniel Reichl

More information

REFINERY PROCESS AND PETROLEUM PRODUCTS

REFINERY PROCESS AND PETROLEUM PRODUCTS Training Title REFINERY PROCESS AND PETROLEUM PRODUCTS Training Duration 5 days Training Date Refinery Process & Petroleum Products 5 15-19 Mar $4,250 Dubai, UAE In any of the 5 star hotels. The exact

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Presentation A Blue Slides 1-5.

Presentation A Blue Slides 1-5. Presentation A Blue Slides 1-5. 1 Presentation A Blue Slides 1-5. 2 Presentation A Blue Slides 1-5. 3 Presentation A Blue Slides 1-5. 4 Presentation A Blue Slides 1-5. 5 Transit Service right. service

More information

Natasha Stratton, MS Interim Director, Industrial Hygiene, Occupational Safety and Training

Natasha Stratton, MS Interim Director, Industrial Hygiene, Occupational Safety and Training October 20, 2016 (Revised October 21, 2016) Whitney Fields Director of Safety & Risk Management SAN BERNARDINO COMMUNITY COLLEGE DISTRICT 114 South Del Rosa Drive, San Bernardino, California 92408 Re:

More information

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2

RE: Taggart Retail Site Plan: Kanata West Proposal for Traffic Impact Study: Addendum #2 1223 Michael Street, Suite 100, Ottawa, Ontario K1J 7T2 Tel: 613.738.4160 Fax: 613.739.7105 www.delcan.com July 9, 2014 OUR REF: TO3073TOK00 BY EMAIL: jparkes@taggart.ca/aturner@taggart.ca Taggart Commercial

More information