JURONG ROCK CAVERNS. Workshop on the Optimisation of Shaft Design 4 June 2013

Size: px
Start display at page:

Download "JURONG ROCK CAVERNS. Workshop on the Optimisation of Shaft Design 4 June 2013"

Transcription

1 JURONG ROCK CAVERNS Development of Underground Rock Caverns for Hydrocarbon Storage on Jurong sland Workshop on the Optimisation of Shaft Design 4 June 2013

2 The Flow Journey of Jurong Rock Caverns Access Shaft Project Details JRC Video

3 JRC is located below the sea-bed at Banyan Basin, Jurong sland Jurong sland Banyan Basin

4 Benefits Underground Rock Caverns for Oil Storage Above-ground land used for production; underground land used for storage Storage in aboveground tanks 60 Ha of Surface land freed up for petroleum & chemical industry Saving surface land Creating a competitive advantage mproved security mproved health & safety Storage in underground rock caverns

5 Overall Development of JRC 3.2 ha AS3 JURONG SLAND AS1 Phase 1 & 2 = 30 Ha Multi-purpose Product Jetty Ph Cavern Notation Product Cavern Storage Volume (m 3 ) 1 C1-1 Liquid 1 x 150,000 1 C1-2 to C1-5 Liquid 4 x 330,000 2 C2-1 to C2-4 Liquid 4 x 165,000 2 C2-5 to C2-6 Liquid 2 x 330,000 Total Storage Volume (m 3 ) 2,790,000 5

6 Storage Caverns are 150m deep under Banyan Basin

7 PHASE 1 JRC CONTRACTS Access Shaft Start Up Tunnel Start Up Tunnel

8 DESGN & CONSTRUCTON OF ACCESS SHAFTS AND START-UP TUNNELS Basic Engineering Design Consultant - Geostock Design and Build Contractor - Sato Kogyo Contract completed in Sept 09

9 View from the Top

10

11 131m 32m 2m 3.72m 4m 4m 28m 4m 4m 4.7m DEPTH N-VALUE BLOWS/30CM TCR SCR RQD WG & F F 23.9m 21.5m m % % % 41 CLAYEY SLT (JURONG (Residual 46 Jurong FORMATON) 100/ V V V < < < to < <1 RECLAMED SAND Reclaimed Sand FNE TO COARSE SAND Fine to Coarse Sand Clayey Silt Formation) EXTG. Ground Level RL = RL = ACD +5.0m ACD m 400mm Skin Wall by others 20.55m CL 33 CL 33 CL 33 CL 33 CL 34 CL 34 CL 34 CL 34 ACD-55m CL 35 CL 35 CL 35 CL 35 SLTSTONE AND SANDSTONE (JURONG 10.7m 10.7m FORMATON) 18.3m 34.4m ACD m Section D DAPHGRAM WALL t=1.0m ACD-21m ACD-23m Section E ACD-48m CL 1 CL CL 2 CL CL 3 CL CL 4 CL CL 5 CL CL 6 CL CL 7 CL CL 8 CL CL 9 CL CL 10 CL 10 CL 11 CL 11 CL 12 CL 12 CL 13 CL 13 CL 14 CL 14 CL 15 CL 15 CL 16 CL 16 CL 17 CL 17 CL 18 CL 18 CL 19 CL 19 CL 20 CL 20 CL 21 CL 21 CL 22 CL 22 CL 23 CL 23 CL 24 CL 24 CL 25 CL 25 CL 26 CL 26 CL 27 CL 27 CL 28 CL 28 CL 29 CL 29 CL 30 CL 30 CL 31 CL 31 CL 32 CL 32 CL 1 CL CL 2 CL CL 3 CL CL 4 CL CL 5 CL CL 6 CL CL 7 CL CL 8 CL CL 9 CL CL 10 CL 10 CL 11 CL 11 CL 12 CL 12 CL 13 CL 13 CL 14 CL 14 CL 15 CL 15 CL 16 CL 16 CL 17 CL 17 CL 18 CL 18 CL 19 CL 19 CL 20 CL 20 CL 21 CL 21 CL 22 CL 22 CL 23 CL 23 CL 24 CL 24 CL 25 CL 25 CL 26 CL 26 CL 27 CL 27 CL 28 CL 28 CL 29 CL 29 CL 30 CL 30 CL 31 CL 31 CL 32 CL 32 CAPPNG BEAM RC RNG BEAM 1.0mx1.0m RC RNG BEAM 1.0mx1.5m ACD m ACD m 9400 Diaphragm Wall Typical Technical Measurements 1m thick Diaphragm sand interface 1m x 1.5m Ring 4m c/c Section F Typical Cross Section

12 Construction of diaphragm wall

13 Capping Beam Construction

14 Diaphragm Wall & Ring Beam Construction

15 Diaphragm Wall & Ring Beams

16 Shaft Sinking and Mucking out of Soil / Rock

17 DEPTH N-VALUE BLOWS/30CM TCR SCR RQD WG & F F 4.7m 3.72m 4m 4m 4m 4m m 4m 4m 4m 4m CL 1 CL 2 CL 3 CL 4 CL 5 CL 6 CL 7 CL 8 CL 9 CL 10 CL 11 CL 12 CL 13 CL 14 CL 15 CL 16 CL 17 CL 18 CL 19 CL 20 CL 21 CL 22 CL 23 CL 24 CL 25 CL 26 CL CL 1 CL 27 CL CL 2 28 CL 3 CL CL 29 CL 4 CL CL 30 CL 5 CL CL 31 CL 6 CL CL 32 CL 7 CL 33 CL 8 CL 34 CL 9 CL 35 CL CL 10 CL 10 CL CL CL 12 CL 12 CL 13 CL 13 CL 14 CL 14 CL 15 CL 15 CL 16 CL 16 CL 17 CL 17 CL 18 CL 18 CL 19 CL 19 CL 20 CL 20 CL 21 CL 21 CL 22 CL 22 CL 23 CL 23 CL 24 CL 24 CL 25 CL 25 CL 26 CL 26 CL 27 CL 27 CL 28 CL 28 CL 29 CL 29 CL 30 CL 30 CL 31 CL 31 CL 32 CL 32 CL 33 CL 33 CL 34 CL 34 CL 35 CL 35 CL 35 CL 9 CL CL 35 CL 35 CL 1 CL 2 CL 3 CL 4 CL 5 CL 6 CL 7 CL 8 CL 9 CL 10 CL 11 CL 12 CL 13 CL 14 CL 15 CL 16 CL 17 CL 18 CL 19 CL 20 CL 21 CL 22 CL 23 CL 24 CL 25 CL 26 CL CL 1 27 CL 2 28 CL 3 CL 29 CL 4 CL 30 CL 5 CL CL 31 CL 6 CL CL 32 CL 7 CL 33 CL 8 CL CL 10 CL 10 CL CL CL 12 CL 12 CL 13 CL 13 CL 14 CL 14 CL 15 CL 15 CL 16 CL 16 CL 17 CL 17 CL 18 CL 18 CL 19 CL 19 CL 20 CL 20 CL 21 CL 21 CL 22 CL 22 CL 23 CL 23 CL 24 CL 24 CL 25 CL 25 CL 26 CL 26 CL 27 CL 27 CL 28 CL 28 CL 29 CL 29 CL 30 CL 30 CL 31 CL 31 CL 32 CL 32 CL 33 CL 33 2m 2m 28m 32m 28m 32m 131m 131m m 21.5m 100/ EXTG. Ground Level RL = RL = ACD +5.0m m % % % ACD m ACD-21m V RECLAMED ACD-23m SAND Reclaimed Sand V Section D 400mm Skin Wall by others V FNE TO COARSE SAND DAPHGRAM WALL Section E Fine to 15Coarse t=1.0m Sand CLAYEY Clayey Silt SLT (JURONG (Residual FORMATON) Jurong / Formation) m V ACD-21m ACD-48m ACD-23m V V CL ACD-55m Section E SLTSTONE AND Siltstone and <1 SANDSTONE 10.7m 10.7m (JURONG Sandstone FORMATON) <1 (Jurong 18.3m Formation) < m ACD-48m CL CL 34 ACD-55m m SLTSTONE AND <1 SANDSTONE ACD m 10.7m 10.7m (JURONG to2 FORMATON) < <1 18.3m < < m Section F ACD m to < <1 FNE TO COARSE SAND CLAYEY SLT (JURONG FORMATON) Section D DAPHGRAM WALL t=1.0m 400mm Skin Wall by others RC RNG BEAM 1.0mx1.0m RC RNG BEAM 1.0mx1.5m CAPPNG BEAM ACD m RC RNG BEAM 1.0mx1.0m RC RNG BEAM 1.0mx1.5m ACD m ACD m ACD m ACD m Diaphragm Wall Concrete Lining Typical Technical Measurements 1m high SFRC concrete linings 0.85m -1.4m thick Section F Typical Cross Section ACD m

18 Concrete Lining

19 Continue Shaft Excavation & Shaft Sinking

20

21 Grouting

22 Post Grouting

23 DEPTH N-VALUE BLOWS/30CM TCR SCR RQD WG & F F 4.7m 3.72m 4m 4m 4m 4m CL 1 CL CL 2 CL CL 3 CL CL 4 CL CL 5 CL CL 6 CL CL 7 CL CL 8 CL CL 9 CL CL 10 CL 10 CL 11 CL 11 CL 12 CL 12 CL 13 CL 13 CL 14 CL 14 CL 15 CL 15 CL 16 CL 16 CL 17 CL 17 CL 18 CL 18 CL 19 CL 19 CL 20 CL 20 CL 21 CL 21 CL 22 CL 22 CL 23 CL 23 CL 24 CL 24 CL 25 CL 25 CL 26 CL 26 CL 27 CL 27 CL 28 CL 28 CL 29 CL 29 CL 30 CL 30 CL 31 CL 31 CL 32 CL 32 CL 33 CL 33 CL 34 CL 34 CL 35 CL 35 CL 35 CL 35 CL 1 CL CL 2 CL CL 3 CL CL 4 CL CL 5 CL CL 6 CL CL 7 CL CL 8 CL CL 9 CL CL 10 CL 10 CL 11 CL 11 CL 12 CL 12 CL 13 CL 13 CL 14 CL 14 CL 15 CL 15 CL 16 CL 16 CL 17 CL 17 CL 18 CL 18 CL 19 CL 19 CL 20 CL 20 CL 21 CL 21 CL 22 CL 22 CL 23 CL 23 CL 24 CL 24 CL 25 CL 25 CL 26 CL 26 CL 27 CL 27 CL 28 CL 28 CL 29 CL 29 CL 30 CL 30 CL 31 CL 31 CL 32 CL 32 CL 33 CL 33 2m 28m 32m 131m 23.9m 21.5m Typical Technical Measurements m % % % RECLAMED SAND Reclaimed Sand FNE TO -9.0 COARSE SAND Fine 9 to Coarse Sand Clayey Silt 41 CLAYEY SLT (JURONG FORMATON) (Residual Jurong 100/ Formation) V V V Siltstone and Sandstone (Jurong Formation) SLTSTONE 2 AND <1 SANDSTONE (JURONG FORMATON) < <1 EXTG. Ground Level RL = RL = ACD +5.0m ACD m Section D DAPHGRAM WALL t=1.0m ACD-21m ACD-23m Section E ACD-48m 400mm Skin Wall by others 20.55m CL 34 ACD-55m CL m 10.7m 18.3m CAPPNG BEAM RC RNG BEAM 1.0mx1.0m RC RNG BEAM 1.0mx1.5m Q-System Rock bolts 4 6m Shotcrete mm Siltstone and Sandstone (Jurong Formation) to < <1 ACD m 34.4m 9400 ACD m ACD m Shotcrete & Rockbolts Section F ACD m Typical Cross Section

24

25 Excavation using Drill & Blast Cycle

26 Drilling Charging Blasting Surveying Rock Bolting Tunnel Cycle Ventilation Mucking Out Shotcreting Scaling

27 Tunnelling equipment / drilling of charging holes

28 Blasting Preparations

29 Specialised Tunnelling Equipment

30 Rock Mapping

31 Shotcreting

32

33 JTC N BREF

34 Start up tunnels

35 JTC N BREF

36

37 Thank You

Jurong Rock Caverns. 9 November Teo Tiong Yong JTC Corporation

Jurong Rock Caverns. 9 November Teo Tiong Yong JTC Corporation Jurong Rock Caverns 9 November 2017 Teo Tiong Yong JTC Corporation Presentation of Jurong Rock Caverns (JRC) Development of JRC Project Details and mplementation Project Specifics Planning Project Management

More information

Alternative Delivery as a Form of Risk Mitigation

Alternative Delivery as a Form of Risk Mitigation Alternative Delivery as a Form of Risk Mitigation Erika P. Moonin, P.E. Lake Mead Intake No. 3 Access Shaft - 400 Low feet Lake deep Level Pumping Station November 29, 2017 Outline Project Background -

More information

GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES TUNNEL AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES

GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES TUNNEL AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES / LEAD CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR SCREEN ON OPENING THIS FILE CLICK

More information

WATER RESOURCES DEPARTMENT SCHEDULE OF RATES TUNNEL AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA RATES

WATER RESOURCES DEPARTMENT SCHEDULE OF RATES TUNNEL AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA RATES d ÀA À ÀÆä E ÁS WATER RESOURCES DEPARTMENT SCHEDULE OF RATES FOR THE YEAR : 2011-12 CONTENTS PAGES REFERENCE DATA 3 -- 5 NOTES ON BASIC RATES 6 -- 6 DATA RATES 7 -- 111 ANNEXURES 67--82 zàgà ÀnÖ À«Äw ÄAzÀ

More information

A&A CONSULTANTS, INC Pine Hollow Road McKees Rocks, PA 15136

A&A CONSULTANTS, INC Pine Hollow Road McKees Rocks, PA 15136 A&A CONSULTANTS, INC. 1800 Pine Hollow Road McKees Rocks, PA 15136 Telephone: (412) 323-2200 Fax: (412) 323-2202 Civil, Geotechnical & Structural Engineers Ms. Lisa L. Cessna, Executive Director Washington

More information

Overburden drilling catalogue

Overburden drilling catalogue Atlas Copco Ground Engineering Products Overburden catalogue Symmetrix overburden systems Overburden Drilling Catalogue Atlas Copco Overburden Drilling System... 3 The Symmetrix System... 4 Drilling overburden...

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 6 SCHEDULE OF RATES TUNNEL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 6 SCHEDULE OF RATES TUNNEL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 6 SCHEDULE OF RATES TUNNEL AND ALLIED WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA 1 -- 3 NOTES ON BASIC RATES 4 -- 4 DATA RATES

More information

Drilling Workshop. Roy Rathner and Arne Lislerud

Drilling Workshop. Roy Rathner and Arne Lislerud Drilling Workshop Roy Rathner and Arne Lislerud Optimisation of quarrying Pit-to-Product Mine-to-Mill Mine-to-Metal => requires a overview of operations, technology and markets Overview of basic topics

More information

presented by Y. C. Lam & Tim Leung 21 May 2005

presented by Y. C. Lam & Tim Leung 21 May 2005 Ground Investigation by Horizontal Directional Drilling presented by Y. C. Lam & Tim Leung 21 May 2005 2 Horizontal Directional Drilling (HDD) Working Principle Construction Procedure Recent Application

More information

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013. WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP 50-6-113 As of March 1, 2013 Class Code Sort CODE DESCRIPTION 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY

More information

ABC Anchors & Autoguide Equipment product information

ABC Anchors & Autoguide Equipment product information ABC Anchors & Autoguide Equipment product information www.autoguide.co.uk www.abcanchors.co.uk ABC Anchors Stockley Road Heddington Wiltshire SN11 0PS ENGLAND +44 (0) 1380 850 885 ABC Anchors & Autoguide

More information

The ultimate solution to your

The ultimate solution to your The ultimate solution to your solids handling problems ALL PUMPS WERE NOT CREATED EQUAL PRESENTING THE TOYO PUMP Moving slurries using pumps is a well known technology; using pumps to transfer low density

More information

0 Issued for Information SHS 10/06/16 JAL 10/10/16 JCP 10/10/16

0 Issued for Information SHS 10/06/16 JAL 10/10/16 JCP 10/10/16 Project/Plant: Unit(s): Plant Gorgas Gypsum Pond Units 6-7 Title/Subject: Slope Stability Analysis of Plant Gorgas Gypsum Pond Dam Purpose/Objective: Analyze slope stability of the Plant Gorgas Gypsum

More information

: Anandro Amellonado. Alternatives of Dredging Method Based on Interpretation of Soil Investigation in The North Kalibaru Project

: Anandro Amellonado. Alternatives of Dredging Method Based on Interpretation of Soil Investigation in The North Kalibaru Project Author Site Supervisor School Supervisors Reader : Anandro Amellonado : Jan Willem Markvoort : Michiel Parlevliet, Dyah Iriani : Eric Boer Alternatives of Dredging Method Based on Interpretation of Soil

More information

Multi Mode TBMs. OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling

Multi Mode TBMs. OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling Multi Mode TBMs Shawn Hourtovenko Herrenknecht Tunnelling Systems Canada, Inc. October 5 th, 2015 Tunnelling

More information

Dragflow srl Via Pasubio, Vil afranca (VR) Italy tel fax products catalogue

Dragflow srl Via Pasubio, Vil afranca (VR) Italy tel fax products catalogue Dragflow srl Via Pasubio, 40 37069 Villafranca (VR) Italy tel. +39.045.6304521 fax +39.045.6335758 info@dragflow.it www.dragflow.it products catalogue History Dragflow S.r.l. was born at the end of the

More information

GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA

GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES / LEAD CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR SCREEN ON OPENING THIS FILE CLICK

More information

FOOTBRIDGE ELEVATION SCALE 1:100

FOOTBRIDGE ELEVATION SCALE 1:100 OVERALL BRIDGE LENGTH 20000 DAIRY FLAT HIGHWAY END STEEL HANDRAIL BOTH SIDES 20 CURTAIN WALL 1900 20 CURTAIN WALL D1 RL.m A 2 B E1 RL.7m E 1% LONGITUDINAL GRADE E12 E11 E1 STEEL HANDRAIL BOTH SIDES 4 E14

More information

The Confederation Line Ottawa LRT Project

The Confederation Line Ottawa LRT Project The Confederation Line Ottawa LRT Project Tom Middlebrook, P.Eng Senior Vice President, Business Development Canada Dragados Canada Project Stakeholders Sponsors Project Co Equity Developers Design Build

More information

An innovative solution for water and sewer installation AXIS. Guided Boring System

An innovative solution for water and sewer installation AXIS. Guided Boring System An innovative solution for water and sewer installation AXIS TM Guided Boring System A need for new installation options A growing number of water and sewer projects are required to be placed precisely

More information

8. The backhoe or Dipper dredger

8. The backhoe or Dipper dredger 8. The backhoe or Dipper dredger Figure 8. 1 BHD IJZEREN HEIN, 8. The backhoe or Dipper dredger...1 8.1. General considerations...1 8.2. Working method...2 8.3. Area of application...4 8.4. Main Layout...5

More information

SupAnchor Rock Reinforcement Strategy Self-drilling hollow anchor systems

SupAnchor Rock Reinforcement Strategy Self-drilling hollow anchor systems SupAnchor Rock Reinforcement Strategy Self-drilling hollow anchor systems The SupAnchor Self-Drilling Hollow Anchor is a unique anchoring system and is today s answer to the increasing demands of the tunnelling

More information

INSTALLATION GUIDELINES

INSTALLATION GUIDELINES SUMP TANKS INSTALLATION GUIDELINES Thank you for purchasing a quality SumpTank. In order to gain the maximum benefit from your purchase, we have outlined the following instructions for the installation

More information

STATE OF OKLAHOMA DEPARTMENT OF TRANSPORTATION GEOTECHNICAL SPECIFICATIONS FOR ROADWAY DESIGN. June 29, 2011

STATE OF OKLAHOMA DEPARTMENT OF TRANSPORTATION GEOTECHNICAL SPECIFICATIONS FOR ROADWAY DESIGN. June 29, 2011 STATE OF OKLAHOMA DEPARTMENT OF TRANSPORTATION GEOTECHNICAL SPECIFICATIONS FOR ROADWAY DESIGN June 29, 2011 APPENDIX 5. STANDARD FORMS FOR REPORTING GEOTECHNICAL INFORMATION In order to insure uniformity

More information

RENTAL PILING RETURN GUIDE

RENTAL PILING RETURN GUIDE RENTAL PILING RETURN GUIDE Version 2.0 2018 2 L.B. Foster wants each rental customer to have the best experience they can. We take pride in the quality and service we offer with our rental program. Every

More information

1

1 http://www.msha.gov 1 Summary of Deaths 15 Fatals January through August 3 5 Fatals in past 30 days 3 Fatals on August 3 alone Not seen 3 deaths in one day since 2002 2 MNM Fatal Accidents 2015 Mine Type

More information

Could also be a Near Hit

Could also be a Near Hit A near miss is an unplanned event that did not result in a fatal injury but had the potential to do so. Only a fortunate break in the chain of events prevented an injury, fatality or damage; in other words,

More information

PD Thrust Restraint Design Equations and Tables

PD Thrust Restraint Design Equations and Tables Thrust Restraint Design Equations and Tables PD-6 5-95 These equations and tables are an effort to provide the piping system designer with conservative techniques and parameters for the design of underground

More information

CODE DESCRIPTION QUANTITY. ANNEX AGRI / 14 - IRRIGATION ANNEX AGRI / 14 A - Sustainable Ground Water Use for Irrigation Purposes and Animal Watering

CODE DESCRIPTION QUANTITY. ANNEX AGRI / 14 - IRRIGATION ANNEX AGRI / 14 A - Sustainable Ground Water Use for Irrigation Purposes and Animal Watering ANNEX AGRI / 14 A - Sustainable Ground Water Use for Irrigation Purposes and Animal Watering 05-14-00001 Deep well vertical turbine pumping set complete 300 Pcs 05-14-00002A Truck with Loading Crane 12

More information

ECO 250 CUTTER SUCTION DREDGER

ECO 250 CUTTER SUCTION DREDGER ECO 250 CUTTER SUCTION DREDGER RELIABLE BRANDS REPLACEABLE AUGER KNIVES OPTIMIZED PRODUCTION Dredge Yard +31 85 3035 866 www.dredgeyard.com MULTI-PURPOSE DREDGERS QUALITY FROM START TO FINISH Dredge Yard

More information

CATALOGUE SEWAGE MANHOLES

CATALOGUE SEWAGE MANHOLES CATALOGUE SC SEWAGE MANHOLES Table of contents TABLE OF CONTENTS Introduction 4 Inspection chamber, type 315 7 Inspection chamber, type 400 10 Inspection chamber, type 425 14 Assembly instruction 19 Catch

More information

Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage

Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage Fact Sheet #4 Reducing the Risk of Groundwater Contamination by Improving Petroleum Product Storage N E W M E X I C O FARM A SYST Farmstead Assessment System Fact Sheet #4 Reducing the Risk of Groundwater

More information

OIL & GAS TECHNOLOGY

OIL & GAS TECHNOLOGY OIL & GAS TECHNOLOGY Chapter 1: Introduction to Oil and Gas Industry by Siti Noraishah Ismail Faculty of Chemical & Natural Resources Engineering (FKKSA) snoraishah@ump.edu.my Chapter Description Aims

More information

UPP Polyethylene Dispenser Sump

UPP Polyethylene Dispenser Sump UPP Polyethylene Dispenser Sump For Standard and Ribbed sump models DS2111, 4111, 3017, 4417, 3617 and 3915 Installation Guide Franklin Fueling Systems 3760 Marsh Rd. Madison, WI 53718 USA Tel: +1 608

More information

Northern Line Extension Project

Northern Line Extension Project 1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer 2 Northern Line Extension Battersea 2020 - part of the wider Northern Line story 3 Contents Project Background

More information

Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ

Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ Tel: 01342 893806 Fax: 01342 893158 www.blockadeservices.co.uk Steve Burrows started as a sole trader

More information

Operator Qualification (OQ) Report

Operator Qualification (OQ) Report AOCF 66102/67107 Abnormal Operating Conditions Field for Natural Gas and Hazardous Liquids 5/15/2014 5/15/2017 AOCG 67107 Abnormal Operating Conditions for Natural Gas 5/16/2014 5/16/2017 TM001 66101 02

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

22 Tonne Excavator.

22 Tonne Excavator. 22 Tonne Excavator www.premiairhire.com.au CAB COMFORT & VISABILITY All-around visibility and an excellent operator environment are at the centre of Volvo s cab design. The EC220D features new Volvo styling.

More information

Arizona Tank Closure, Assessment and Response

Arizona Tank Closure, Assessment and Response Arizona Tank Closure, Assessment and Response By: Phillip A. Schneider, P.E. August 1, 2013 Agenda > Closure > Assessment > Response Exceptions to the UST State and Federal Regulations > USTs storing heating

More information

Shale Oil & Gas. Overview of Shale HC Potential in Onshore East Malaysia. May PETROLIAM NASIONAL BERHAD (PETRONAS)

Shale Oil & Gas. Overview of Shale HC Potential in Onshore East Malaysia. May PETROLIAM NASIONAL BERHAD (PETRONAS) Shale Oil & Gas Overview of Shale HC Potential in Onshore East Malaysia May 2016 2015 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval

More information

Innovative solutions creating complete drilling systems

Innovative solutions creating complete drilling systems Innovative solutions creating complete drilling systems 6000-4 DP ROTARY TOP DRIVE 2013 6000-4 DP ROTARY TOP DRIVE Holte Rotary Top Drives are available with one to four hydraulic motors giving you a full

More information

Sandvik DT series All-around performance

Sandvik DT series All-around performance Sandvik DT series All-around performance Focus on absolute excellence RESPONDING TO YOUR TUNNELING CHALLENGES A tunneling project is a race against time and costs. You have to get the project right and

More information

AEM-Based Hydrogeological Frameworks in the Central Valley of California

AEM-Based Hydrogeological Frameworks in the Central Valley of California AEM-Based Hydrogeological Frameworks in the Central Valley of California Ted Asch, PhD., P.Gp., P.G. Jared Abraham, MSc., P.Gp., P.G. James Cannia, P.G. Aqua Geo Frameworks, LLC March 21, 2017 21 March

More information

Galvanized quick connection pipes

Galvanized quick connection pipes Galvanized quick connection pipes - for best overall economy A complete system which facilitates planning, procurement and assembly Economical Alvenius pipe systems result in lower costs for temporary

More information

DOOFOR INC. THE COMPANY DOOFOR INC. PRODUCTS FROM NOKIA, FINLAND WITH DEDICATION. Enhance your solutions with efficient and versatile rock drilling

DOOFOR INC. THE COMPANY DOOFOR INC. PRODUCTS FROM NOKIA, FINLAND WITH DEDICATION. Enhance your solutions with efficient and versatile rock drilling DOOFOR INC. THE COMPANY Enhance your solutions with efficient and versatile rock drilling Your partner from product development to end-user service Doofor Inc. produces always reliable and powerful rock

More information

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for ADDENDUM #1 The Plymouth Airport Commission is committed to fulfilling the New Fuel Farm Facility project within the scope of the permit, not exceeding our funding and to satisfy the time constraint associated

More information

The Undisputed Heavyweight in Postdrivers

The Undisputed Heavyweight in Postdrivers The Undisputed Heavyweight in Postdrivers Series I, II and III Kinghitter Postdrivers & Accessories 20 10 20 10 Floats Like a Butterfly, Stings Like a Bee Testimonial A good Postdriver that is simple to

More information

ASMI 2015 Year in Review

ASMI 2015 Year in Review ASMI 2015 Year in Review Safety Share During recent firefighting operations the 2000 A SES exploded blowing the panel doors over 150 feet. One of the panel doors struck a fire truck causing damage. One

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

Welcome to Natural Gas 101 Overview of Oil and Gas Industry by Michael Rozic ECI. Remote Automation Solutions 1

Welcome to Natural Gas 101 Overview of Oil and Gas Industry by Michael Rozic ECI. Remote Automation Solutions 1 Welcome to Natural Gas 101 Overview of Oil and Gas Industry by Michael Rozic ECI Remote Automation Solutions 1 from Well Head to Burner Tip or as they say in the industry Upstream Midstream Downstream

More information

Underground Gas Polyethylene (PE) Piping

Underground Gas Polyethylene (PE) Piping Underground Gas Polyethylene (PE) Piping Installation Guide February, 2011 Featuring the Con-Stab I.D. Seal Fittings from Continental Industries, Inc. ASSEMBLY INSTRUCTIONS: I.D. SEAL CON-STAB STEP 1 Verify

More information

Steel Products. 8M Series

Steel Products. 8M Series 8M Series Steel Products This trench shield is engineered to the realities of profitable pipe laying. With high tensile steel, non-rigid design and strategic reinforcements, the GME 8M Series trench shield

More information

QA Mobile Crushing & Screening. Stu Gamble - Sandvik

QA Mobile Crushing & Screening. Stu Gamble - Sandvik QA 200 - Mobile Crushing & Screening Stu Gamble - Sandvik Presentation Overview This is a presentation on the functionality and role that mobile plants may play within the construction and mining industries.

More information

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.

PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9. LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE

More information

SALE PROPOSAL ROBBINS TBM UG1B-JAIPUR

SALE PROPOSAL ROBBINS TBM UG1B-JAIPUR SALE PROPOSAL ROBBINS TBM UG1B-JAIPUR INDEX Sl No Description Remarks 1 Index 2 Specification of TBM- Robbins 3 List of Rolling Stock attached to TBM & Other Equipments SPECIFICATION OF TBM ROBBINS f 6550

More information

PROMOTING POSITIVE ENVIRONMENTAL BEHAVIOUR CHANGE AT CROSSRAIL THE GREEN LINE RECOGNITION SCHEME. Cathy Myatt, Lorna Mellings & Kenny Hills

PROMOTING POSITIVE ENVIRONMENTAL BEHAVIOUR CHANGE AT CROSSRAIL THE GREEN LINE RECOGNITION SCHEME. Cathy Myatt, Lorna Mellings & Kenny Hills PROMOTING POSITIVE ENVIRONMENTAL BEHAVIOUR CHANGE AT CROSSRAIL THE GREEN LINE RECOGNITION SCHEME Cathy Myatt, Lorna Mellings & Kenny Hills Discussion Points Introduction to the scheme and concept Operating

More information

Figure 1. New Mill Creek 3&4 Watershed Map. Subcatchments. Aerial 2009 Commonwealth of Virginia. See GIS for Complete Details. Legend.

Figure 1. New Mill Creek 3&4 Watershed Map. Subcatchments. Aerial 2009 Commonwealth of Virginia. See GIS for Complete Details. Legend. Legend Subcatchments 0 875 1,750 3,500 Figure 1. Mill Creek 3&4 Watershed Map Aerial Imagery @ 2009 Commonwealth of Virginia. 12 URS Nos. 11657980 37 20 Dragston Tomotley complex, 0 to 2 percent slopes

More information

IADC CODES IADC CODES

IADC CODES IADC CODES IADC CODES IADC CODES IADC CODES IADC CODES International Association of Drilling Contractors Codes for every formation bearing design and any other design features (SHIRT TAIL, LEG, SECTION, CUTTER) History

More information

ADDRESS PO BOX MAIN STREET 175 DRIFT ROAD 100 BILBY ROAD

ADDRESS PO BOX MAIN STREET 175 DRIFT ROAD 100 BILBY ROAD RES#2018-146 CONTRACT TERM: JUNE 22,2018-JUNE 21,2019 BID RESULTS CK09MERCER2017-02 ROAD MATERIALS FOR THE COUNTY OF MERCER AND THE MERCER COUNTY COOPERATIVE CONTRACT PURCHASING SYSTEM FOR A PERIOD OF

More information

GB-35. Submittal Specifications Installation Application Specific Details. PART #: XX DWG BY: C. O'Boyle DATE: 10/08/2015 REV: 0 / /201_ ECO:

GB-35. Submittal Specifications Installation Application Specific Details. PART #: XX DWG BY: C. O'Boyle DATE: 10/08/2015 REV: 0 / /201_ ECO: GREASE INTERCEPTOR TECHNICAL DATA Submittal Specifications Installation Application Specific Details 33" (83.8 cm) 10" (25.4 cm) (63.5 cm) 15" (38.1 cm) (63.5 cm) SUBMITTAL STANDARD: 3" plain end inlet/outlet

More information

Appendix H: Construction Impacts H-3 Air Quality

Appendix H: Construction Impacts H-3 Air Quality Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263

More information

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

PERMANENT RESIDENTIAL UNDERGROUND SERVICE CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide

More information

Delivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD

Delivering the North West Rail Link. Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD Delivering the North West Rail Link Colin Rudd, Deputy Project Director, NWRL David Polkinghorne, Design Team Leader, TJHD November 26, 2013 The starting point Project overview $8.3 billion budget Open

More information

Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells

Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells Frequently Asked Questions Directive 079: Surface Development in Proximity to Abandoned Wells July 2018 General Q1. How can I determine if a well is abandoned? A1. A third party can see if it is abandoned

More information

TYPICAL SPECIFICATION ECP Steel Pier PPB-300 Utility Bracket System

TYPICAL SPECIFICATION ECP Steel Pier PPB-300 Utility Bracket System 1.01 Typical Installation Scope TYPICAL SPECIFICATION ECP Steel Pier PPB-300 Utility Bracket System Section 1- General Furnish labor, equipment, tools and material to install the PPB-300 Steel Piers as

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES

PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES 3rd EDITION - 01/2006 Foreword This publication, together with the

More information

Demolition Range. Rotary cutters for Carriers from 2.5 to 50 tons CUT. Worldwide Expert in Hydraulic Equipment MPR HSS GSB RSB RPU FPU HGR

Demolition Range. Rotary cutters for Carriers from 2.5 to 50 tons CUT. Worldwide Expert in Hydraulic Equipment MPR HSS GSB RSB RPU FPU HGR Worldwide Expert in Hydraulic Equipment Demolition Range MPR HSS GSB RSB RPU FPU HGR CUT Rotary cutters for Carriers from 2.5 to 50 tons The perfect tool when excavation systems are weak and percussion

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

ASMI 2016 Year in Review

ASMI 2016 Year in Review ASMI 2016 Year in Review ASMI 2016 in Review During the calendar year of 2016, the ASMI inspection team performed 658 health and safety inspections, which identified 438 violations of the mining code for

More information

Soil Stabilization FIELD REPORT WILL FERGUSON. TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102

Soil Stabilization FIELD REPORT WILL FERGUSON. TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102 2016 Soil Stabilization FIELD REPORT WILL FERGUSON TINDOL CONSTRUCTION 2335 Viggo Road Beeville, Texas 78102 TABLE OF CONTENTS SOIL STABILIZATION FIELD REPORT Overview Page 2 Test Pads Specs of Construction

More information

GL0098P Beta+ Septic Tanks Installation & Operation Guidelines

GL0098P Beta+ Septic Tanks Installation & Operation Guidelines 000535 GL0098P Beta+ Septic Tanks Installation & Operation Guidelines Kingspan Environmental Service Contact Numbers: UK: 0844 846 0500 NI: 028 3025 4077 IRL: 048 3025 4077 Enclosed Documents DS1151P Beta+

More information

Storage resource assessment for offshore CO 2 -EOR in Norway

Storage resource assessment for offshore CO 2 -EOR in Norway Storage resource assessment for offshore CO 2 -EOR in Norway 3rd International Workshop on Offshore Geologic CO 2 Storage, Oslo May 3-4 2018 Eva Halland, Project Director, Norwegian Petroleum Directorate

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

ENGINEERING SERVICES

ENGINEERING SERVICES ENGINEERING SERVICES 1300 474 246 engineering@richmondau.com ENGINEERING SERVICES At Richmond we can offer so much more than our standard range. For decades we have specialised in working with our customers

More information

Rotavator / Rotalabour 500 / 600 / 700

Rotavator / Rotalabour 500 / 600 / 700 Rotavator / Rotalabour 500 / 600 / 700 Howard Rotavator / Rotalabour Rotavator: A highly effective machine for intensive tillage The Rotavator is one of the most efficient tillage systems when looking

More information

Australia s First Fully Automated Metro Opportunities & Solutions. Oliver Fried Technical Director, Sydney Metro

Australia s First Fully Automated Metro Opportunities & Solutions. Oliver Fried Technical Director, Sydney Metro Australia s First Fully Automated Metro Opportunities & Solutions Oliver Fried Technical Director, Sydney Metro Overview Sydney s rail future - Opportunities for metro Project features & performance Fully

More information

ROCK EXCAVATION. Taking Care. of Customers. Worldwide. with Better. Solutions

ROCK EXCAVATION. Taking Care. of Customers. Worldwide. with Better. Solutions ROCK EXCAVATION T E C H N O L O G Y Taking Care of Customers Worldwide with Better Solutions Productive Solutions for Tough Jobs. The innovative Vermeer T1255 Terrain Leveler surface excavation machine

More information

2460 / 2472 / Series Simplex Grinder Systems

2460 / 2472 / Series Simplex Grinder Systems Installation Manual 5651000I 2460 / 2472 / 2484 - Series Simplex Grinder Systems Features: LSG or LSGX Series 2HP Grinder Pump 24 dia. Basin available in 60, 72, or 84 depths Guide Rail System Preassembled

More information

PROVIDING SOLUTIONS FOR DEEP FOUNDATION NEEDS

PROVIDING SOLUTIONS FOR DEEP FOUNDATION NEEDS www.ahbeck.com 1932-20 20 PROVIDING SOLUTIONS FOR DEEP FOUNDATION NEEDS A. A. H. H. BECK FOUNDATION CO. CO. A. It H. is Beck rare Foundation that a company s Co., Inc. is heritage, a specialty regardless

More information

Instruction Manual Model 1610

Instruction Manual Model 1610 Instruction Manual Model 1610 Geokon/Ealey Tape Extensometer Office: Jl. Radin Inten II No. 62 Duren Sawit, Jakarta 13440 - Indonesia Workshop: Jl. Pahlawan Revolusi No. 22B, Jakarta 13430 - Indonesia

More information

Penetrator ALTERNATIVE TO CONCRETE FOOTINGS at half the cost* *Based on customer feedback

Penetrator ALTERNATIVE TO CONCRETE FOOTINGS at half the cost* *Based on customer feedback 2016 8 0 Solar Arrays The best screw you will have in the dirt TM ANCHOR APPPLICATIONS We saved around $2,000 in concrete and a week of time. We would have had to bore the holes, set up the posts, pour

More information

Access Riser Fits PRO370 and PRO380 Series

Access Riser Fits PRO370 and PRO380 Series Installation Manual 7171000D Access Riser Fits PRO370 and PRO380 Series Contents 1.) General Information 2.) Installation 3.) Optional 2 Installation Kits 4.) Typical Installation Diagram 5.) Junction

More information

Midwest Roadside Safety Facility

Midwest Roadside Safety Facility 60960 10 9 7* 6* 5* 4* 3* 2 1 Elevation View Bridge Pit 3214.3 6197.6 A 304. A 1300.2 25 TRAFFIC SIDE Sections 1 and 10 only anchored into concrete pad with 9 A36 25.4 x 394mm long unthreaded steel rods

More information

EN TRA ENGINEERING AND TRADING SRL

EN TRA ENGINEERING AND TRADING SRL Foundation Equipment Grabs for diaphragm wall and piling Hydraulic Casing oscillators Power Packs Casing joints Stop-end pipes Water stop elements Hydraulic extractors Piling tools and accessories MADE

More information

Michigan City Department of Water Works West Intake Extension. Presented By: Stanley S. Diamond Ohio Section AWWA September 28, 2017

Michigan City Department of Water Works West Intake Extension. Presented By: Stanley S. Diamond Ohio Section AWWA September 28, 2017 Michigan City Department of Water Works West Intake Extension Presented By: Stanley S. Diamond Ohio Section AWWA September 28, 2017 Michigan City s Intakes - 2003 West Intake & Crib N Abandoned Intake

More information

VOLVO EXCAVATORS UTILITIES/PIPING

VOLVO EXCAVATORS UTILITIES/PIPING VOLVO EXCAVATORS UTILITIES/PIPING FROM CUT AND COVER TO LIFT AND PLACE, VOLVO KNOWS UTILITIES AND PIPING. Power, water, sewer, gas, fiber optics the infrastructure that brings the conveniences of life

More information

CRUSHER Professional quality in technology and durability

CRUSHER Professional quality in technology and durability CRUSHER Professional quality in technology and durability www.pthproducts.com Breaks even the hardest rocks Simple attachment Robust design 2 Austrian quality approved worldwide Used worldwide under the

More information

The school consists of technical articles, intended to help pump users with common matters in pumping with submersible pumps.

The school consists of technical articles, intended to help pump users with common matters in pumping with submersible pumps. Grindex Pump School Grindex Pump School The school consists of technical articles, intended to help pump users with common matters in pumping with submersible pumps. Part 1: Choosing the right pump type

More information

Removal of Underground Storage Tanks (UST) Encountered during Construction

Removal of Underground Storage Tanks (UST) Encountered during Construction Removal of Underground Storage Tanks (UST) Encountered during Construction Technical Guide Environmental Affairs Division TxDOT Environmental Affairs Division Release Date: 2/2014 510.06.GUI Version 1

More information

Installation and Operation Instruction Manual INSMAN-201. Industrial Multi Media Single Tank

Installation and Operation Instruction Manual INSMAN-201. Industrial Multi Media Single Tank Installation and Operation Instruction Manual INSMAN-201 Industrial Multi Media Single Tank Phone: 951.656.6716 Toll-Free: 800.854.4788 www.yardneyfilters.com 1 Yardney Water Management Systems, Inc. 6666

More information

Aircraft cleaning systems. Professional cleaning solutions applicable in the development and operation of aircrafts. Cleaning prototypes

Aircraft cleaning systems. Professional cleaning solutions applicable in the development and operation of aircrafts. Cleaning prototypes Aircraft cleaning systems Professional cleaning solutions applicable in the development and operation of aircrafts Cleaning prototypes Cleaning machines for the aircraft industry From passenger airplanes

More information

AxeBlade. Ridged diamond element bit

AxeBlade. Ridged diamond element bit AxeBlade Ridged diamond element bit Instantaneous ROP Improvement. Better Steerability. The AxeBlade* ridged diamond element bit positions Axe* elements along the bit face to achieve increased ROP and

More information

GWS 850 C Professional Angle Grinder

GWS 850 C Professional Angle Grinder Bosch Power Tools tions 2018 GWS 80 C Professional Angle Grinder The lightweight tool with high performance Order the GWS 80 C (1/230 V) to receive special pricing. Powerful 80 watts with Constant Electronics

More information

Wind Turbine Assembly

Wind Turbine Assembly Wind Turbine Assembly The parts for the installer Assembling the WT1kW Assembling the WT1kW The parts in the box RIF CODE DESCRIPTION 400 SW00002012 Assembly Blade Wt1kw Warm Grey 2uo 401 G006538 Box for

More information

A George & Associates

A George & Associates PLANS PREPARED FOR: SHEET 6 INDEX OF SHEETS SHEET UNDERROUND UTILITIES & PUBLIC INFRASTRUCTURE DEPARTMENT WATER RESOURCES MANAEMENT C.O.T. WORK ORDER NO. 008 Sheet Number Sheet Title Cover Sheet Drainage

More information

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary Construction Contract Bid Evaluation Summary I. Lowest responsive, responsible bidder: Eastman Aggregate Enterprises, LLC (Primary) and Rio Bak Corporation (Secondary) II. Bidders, ranked from lowest to

More information

Providing Solutions for Deep Foundation Needs

Providing Solutions for Deep Foundation Needs 1932-09 09 Providing Solutions for Deep Foundation Needs A. H. BECK FOUNDATION CO. INC. Deep Foundation Pioneers JANUARY 09 S M T W T F S 7 DECEMBER 08 1 2 3 4 5 6 8 9 10 11 1 8 FEBRUARY 09 2 3 4 5 6 7

More information