GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA

Size: px
Start display at page:

Download "GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA"

Transcription

1 RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES / LEAD CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR SCREEN ON OPENING THIS FILE CLICK ' YES ' AND ' SAVE ' THE FILE. CHANGES MADE IN BASIC DATA / HIRE CHARGES / LEAD CHARGES FILES GET INCORPORATED IN THIS FILE AUTOMATICALLY. ALL DATA IN THIS FILE IS PROTECTED BY PASS WORD. GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : CONTENTS PAGES REFERENCE DATA NOTES ON BASIC RATES DATA FOR SCHEDULE OF RATES PREPARED BY SCHEDULE OF RATES COMMITTEE 0

2 JUNE,

3 CANAL AND ALLIED WORKS - REFERENCE DATA FOR THE YEAR: ITEMS: 1-82 COST OF MATERIALS : Air hose 25 mm dia per Rm Rs: Asphalt 80 / 100 and 85 / 25 Gr per kg Rs: Binding wire per kg Rs: Cement per kg Rs: 2.90 Coarse aggregate mm per cum Rs: Coarse aggregate mm per cum Rs: Coarse aggregate mm per cum Rs: Curing Compound per ltr Rs: D - cord per Rm Rs: 7.00 Detonating fuse coil per Rm Rs: 5.00 Delay - noiseless trunk delay per No. Rs: Detonating shock tube / cord relay per Rm Rs: Detonator delay type per No. Rs: Detonator electric per No. Rs: 8.00 Detonator ordinary per No. Rs: 4.50 Diesel oil per ltr Rs: Empty cement bags per No. Rs: 1.00 Explosive ANFO high strength booster per kg Rs: Explosive ANFO per kg Rs: Explosive small dia.( Kelvex-220 ) per kg Rs: Extension rod with coupling sleeve per Rm Rs: Filter fabric 200 gsm per sqm Rs: Filter fabric 250 gsm per sqm Rs: Fine aggregate / Sand per cum ( Un-screened ) Rs: Fine aggregate per cum ( Screened ) Rs: G I pipe 50 mm dia A class per Rm Rs: Jack hammer Drill rod 1.5 m length per No. Rs: Khandki stone cm height per No. Rs: 2.30 Khandki stone cm height per No. Rs: 3.00 Khandki stone cm height per No. Rs: 5.00 LDPE sheet 500 micron thick per sqm Rs: LDPE sheet 750 micron thick per sqm Rs: LDPE sheet 1000 micron thick per sqm Rs: Murum per cum ( at quarry ) Rs: Paving Cylinder per Each Rs: PVC sealing strip per Rm Rs: Reinforcement steel per kg Rs: Rough stone 20 x 20 x 75 cm per No. Rs: 9.00 Shahabad stone slab per sqm Rs: Shutter oil per ltr Rs: Stone chips per cum ( at dump yard ) Rs: Stone chips per cum ( at quarry ) Rs: Structural steel angle / beam / channel / flat per kg Rs: Structural steel fabrication per kg Rs: 8.00 Structural steel plate per kg Rs: Sundries Rs: Super Plasticiser per ltr Rs: Tarfelt jointer filler board 12 mm thick per sqm Rs: Tarfelt jointer filler board 20 mm thick per sqm Rs: T.C Cross bit 100 mm dia per No. Rs:

4 Through stone 20 x 20 x 30 cm per No. Rs: 6.00 Through stones 25 x 25 x 45 cm per No. Rs: 7.50 Turfing sods per sqm Rs: Un-coursed rubble stones per cum ( at dump yard ) Rs: Un-coursed rubble stones per cum ( at quarry ) Rs: Wire mesh 20 guage per sqm Rs: LEAD CHARGES FOR 1 km REHANDLING LEAD: 1 km lead Loading Unloading Earth/ Sand Rs: Stone/ Coarse aggregates Rs: Cement Rs: Reinforcement steel Rs: ROYALTY CHARGES: Per tonne Earth / Soil / Murum Rs: 2.00 Stone / Coarse aggregate Rs: Fine aggregate / Sand Rs: HIRE CHARGES OF MACHINERY : Hire charge Fuel charge Crew charge Air compressor 8.5 cmm ( diesel ) per hour Rs: Angle dozer 90 hp per hour Rs: Batching plant 2 x 1 cum per hour Rs: Concrete hand mixer 45 / 30 ltr per hour Rs: Concrete mixer 300 / 200 ( diesel ) per hour Rs: Concrete mixer 600 / 400 ( diesel ) per hour Rs: Diesel generating set 30 KVA per hour Rs: Diesel generating set 50 KVA per hour Rs: Diesel road roller per hour Rs: Jack hammer per hour Rs: Mechanical concrete paver per hour Rs: Needle Vibrator 40 mm ( petrol ) per hour Rs: Pump 5 hp ( diesel ) per hour Rs: Shovel 0.85 cum per hour Rs: Shovel 0.50 cum per hour Rs: Tipper 5 cum per hour Rs: Transit mixer 2 cum per hour Rs: Vibratory pad foot roller per hour Rs: Waggon drill per hour Rs: Water tanker per hour Rs: WAGES OF WORKERS Per day Bar bender Rs: Blaster ( Licensed ) Rs: Carpentor Class II Rs: Cartman with double bullock cart Rs: Crowbarman Rs: Electrician Rs: Helper blasting Rs: Maistry Rs: Mason Class I Rs: Mason Class II Rs: Mazdoor heavy Rs: Mazdoor light Rs: Mechanic / Fitter / Welder Rs: Pipe fitter Rs: Rollerman with bullock roller Rs: Stone breaker Rs: Stone chiseller Cl- I Rs: Stone chiseller Cl- II Rs:

5 NOTES ON SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : All notes under ' General Notes on Schedule of Rates ' and Notes on Lead, Lift, Loading and un-loading Charges are applicable to Canal and Allied Works also to the extent they are relevant. 2. The basic rates are inclusive of finishing, wastage of materials in handling, incidental works, profit, overheads, small tools / plants, hidden cost on labour etc. 3. The basic rates are inclusive of royalty charges payable on materials. 4. The recovery of royalty charges on materials, wherever applicable, shall be as per the guide lines listed under ' General notes on schedule of rates ' and the amount of royalty charges shall be as per the statement of royalty charges included in this section. 5. Unless otherwise specified the basic rates are inclusive of all lifts. 6. For earth / rockfill embankment works 1 km initial lead is considered in the basic rates. As no storing / stacking and re-handling of materials is involved for these works lead charges for additional lead shall be worked out for total lead including initial lead of 1 km and then the cost of first km lead shall be deducted. No loading and un-loading charges shall be added as the additional lead does not involve re-handling of materials. Example : Total lead for soil from approved borrow area : 2 km Initial lead included in the basic rate in the SR : 1 km Additional lead charges : Lead charges for 2 km Rs: Less Lead charges for 1 km Rs: Additional lead charges Rs: 5.80 No loading and un-loading charges shall be added. 7. Cement content specified for cement concrete works in the item description is based on theoritical design mix computations. The basic rate shall be adjusted upword or downword including lead, loading and un-loading charges for any variations in cement content based on trial mix studies furnished by Q.C unit. 8. The quantities of materials including wastage, requirements for incidentals etc., for working out additional lead charges shall be as per the statement of requirement of materials under this section. 9. The basic rates are exclusive of cost of dewatering and desilting. For the perticular reach of canal where dewatering and desilting are contemplated 2 percent of basic rate shall be added to all items in the estimate for that reach towards dewatering and desilting during execution of work. 4

6 CANAL AND ALLIED WORKS - DATA RATES SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 1 ITEM: Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upto 1 km and all lifts. DATA:Capacity of shovel bucket : 0.85 cum Capacity of shovel bucket under heaped condition : 1.00 cum Capacity of tipper : 5.00 cum Lead for disposal of excavated soil : Upto 1 km Speed for loaded tipper under canal excavation condition : 15 km / hr Speed for empty tipper under canal excavation condition : 15 km / hr Turning and unloading time : 2.00 min Shovel digging and loading cycle per bucket : 20 sec In-situ quantity / bucket for 20 % bulkage on unloading ( 1 /1.20 ) : 0.83 cum In-situ quantity per load for 20 % bulkage of soil ( 5 /1.2 ) : 4.16 cum Number of buckets per load ( 4.16 / 0.83 ) say : 5 buckets Corrected Quantity of in-situ soil per load ( 5 x 0.83 ) say : 4.16 cum Ideal cycle time for loading 5 buckets ( 5 x 20 / 60 ) : 1.67 min The ideal cycle time for shovel requires spotting of a tipper within 1.67 minutes near the shovel. However, in practice for canal excavation the space available may not permit positioning of the tippers on either side of the shovel. Generally, one tipper has to move after loading to position the next tipper for loading. Assuming one cycle time extra the corrected cycle time for the shovel will be 2.00 minutes. Round trip cycle time for tipper: Ideal cycle time of shovel for digging & loading : 1.67 min Time for ( av ) 0.75km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Extra time for spotting : 0.33 min Total : min No. of tippers to match corrected cycle time of shovel ( 10.00/ 2.00 ) : 5 Nos Output of tipper / hr with 50 min working / hr ( 50 x 4.16 / ) : cum Output for 5 tippers per day ( 5 x x 8 ) : 832 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming the canal to final profile by manual labour the daily output will be : say : 925 cum Average output of 1 heavy & 1 light mazdoor assumed at 6 cum / day for trimming. Deploy 15 heavy and 15 light mazdoors for trimming 93 cum. Deploy one tipper for disposal of manually excavated soil. RATE ANALYSIS UNIT : cum 1 NIL TOTAL Rs: 0.00 Add for small Tools and 1% Rs:

7 Add for Contractor' 10% Rs: 0.00 Add for Contrators' 5% Rs: 0.00 Total cost of Materials Rs: Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Tippers 5 cum capacity 6 Nos Hour Fuel / Energy charges Hour TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' Profit on DPOL / 10% Rs: Add for Contrators' 5% Rs: Total hire charges of Machinery Rs: Crew for Shovel Hour Crew for Tipper Hour Maistry Day Heavy mazdoor Day Light mazdoor Day TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for hidden cost on 15% Rs: Add for Contrators' 5% Rs: Total cost of Labour Rs: A. Cost of Materials Rs: 0.00 B. Hire charges of Machinery Rs: C. Cost of Labour Rs: Total Rs: Add for enabling 1% Rs: Total cost for cum Rs: Rate per cum Rs: SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 2 ITEM: Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., complete with lead upto 10 m and lift upto 2 m. DATA:Capacity of shovel bucket : 0.50 cum Capacity of shovel bucket under heaped condition : 0.57 cum Lead for disposal of excavated soil : Upto 10 m Shovel digging and loading cycle per bucket : 30 sec In-situ qty / bucket for 15 % bulkage of soil ( 0.57 / 1.15 ) : 0.50 cum Output of shovel with 50 min./ hr working( 50 x 60 x 0.5 / 30 ) : 50 cum / hr 6

8 Daily output of excavation ( 8 x 50 ) : 400 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming bed and sides of channels / trenches to final profile by manual labour, the daily output will be : say : 440 cum Average output of 1 heavy & 1 light mazdoor assumed at 5 cum / day for trimming. RATE ANALYSIS UNIT : cum 1 NIL TOTAL Rs: 0.00 Add for small Tools and 1% Rs: 0.00 Add for Contractor' 10% Rs: 0.00 Add for Contrators' 5% Rs: 0.00 Total cost of Materials Rs: Shovel 0.50 cum capacity Hour Fuel / Energy charges Hour TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' Profit on DPOL / 10% Rs: Add for Contrators' 5% Rs: Total hire charges of Machinery Rs: Crew for Shovel Hour Maistry Day Heavy mazdoor Day Light mazdoor Day TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for hidden cost on 15% Rs: Add for Contrators' 5% Rs: Total cost of Labour Rs: A. Cost of Materials Rs: 0.00 B. Hire charges of Machinery Rs: C. Cost of Labour Rs: Total Rs: Add for enabling 1% Rs: Total cost for cum Rs: Rate per cum Rs:

9 SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 3 ITEM: Excavation in soft rock without blasting including boulders above 0.30 m upto 0.6 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing of bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soft rock neatly in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts. DATA:Capacity of shovel bucket : 0.85 cum Capacity of shovel bucket under heaped condition : 1.00 cum Capacity of tipper : 5.00 cum Lead for disposal of excavated soft rock : Upto 1 km Speed for loaded tipper under canal excavation condition : 15 km / hr Speed for empty tipper under canal excavation condition : 15 km / hr Turning and unloading time : 2.00 min Shovel digging and loading cycle per bucket : 30 sec In-situ qty / bucket for 30 % bulkage on unloading ( 1 / 1.30 ) : 0.77 cum In-situ quantity / load for 5 cum of soft rock ( 5 / 1.3 ) : 3.85 cum Number of buckets per load ( 3.85 / 0.77 ) say : 5 buckets Ideal cycle time for loading 5 buckets ( 5 x 30 / 60 ) : 2.50 min The ideal cycle time for shovel requires spotting of a tipper within 2.50 minutes near the shovel. However, in practice for dam or canal excavation the space available may not permit positioning of tippers on either side of the shovel. Generally one tipper has to move after loading to position the next tipper for loading. Assuming extra time of 20 seconds the corrected cycle time for the shovel will be 2.83 minutes. Round trip cycle time for tipper: Ideal cycle time of shovel for digging & loading : 2.50 min Time for ( av ) 0.75km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Extra time for spotting : 0.33 min Total : min No. of tippers to match corrected cycle time of shovel ( 10.83/ 2.83 ) : 4 Nos Output of tipper / hr with 50 min working / hr ( 50 x 3.85 / ) : : cum Output for 4 tippers per day ( 4 x x 8 ) say : 570 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming of bed / sides to final profile by manual labour the daily output will be : say : 630 cum Output of 1 crowbarman, 1 heavy & 1 light mazdoor assumed at 5.50 cum per day. Deploy 11 crowbarman, 11 heavy and 11 light mazdoors for 60 cum. Deploy one tipper for disposal of manually excavated soft rock. RATE ANALYSIS UNIT : cum 1 NIL TOTAL Rs: 0.00 Add for small Tools and 1% Rs: 0.00 Add for Contractor' 10% Rs: 0.00 Add for Contrators' 5% Rs: 0.00 Total cost of Materials Rs:

10 1 Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Tippers 5 cum capacity 5 Nos Hour Fuel / Energy charges Hour TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' Profit on DPOL / 10% Rs: Add for Contrators' 5% Rs: Total hire charges of Machinery Rs: Crew for Shovel Hour Crew for Tipper Hour Maistry Day Crowbarman Day Heavy mazdoor Day Light mazdoor Day TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for hidden cost on 15% Rs: Add for Contrators' 5% Rs: Total cost of Labour Rs: A. Cost of Materials Rs: 0.00 B. Hire charges of Machinery Rs: C. Cost of Labour Rs: Total Rs: Add for enabling 1% Rs: Total cost for cum Rs: Rate per cum Rs: SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 4 ITEM: Excavation in soft rock without blasting including boulders above 0.3 m upto 0.60 m dia. for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road as directed etc.,complete with lead upto 10 m and lift upto 2 m. DATA:Capacity of shovel bucket : 0.50 cum Capacity of shovel bucket under heaped condition : 0.57 cum Lead for disposal of excavated soil : Upto 10 m Shovel digging and loading cycle per bucket : 45 sec In-situ qty per bucket for 25 % bulkage of soil ( 0.57 /1.25 ) : 0.45 cum Output of shovel with 50 min./ hr working( 50 x 60 x 0.45 / 45 ) : 30 cum / hr Daily output of excavation ( 8 x 30 ) say : 240 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent 9

11 excavation mainly for trimming the canal to final profile by manual labour, the daily output will be : say : 265 cum Output of 1 crowbarman, 1 heavy & 1 light mazdoor assumed at 5 cum per day. Deploy 5 crowbarman, 5 heavy and 5 light mazdoors for 25 cum. RATE ANALYSIS UNIT : cum 1 NIL TOTAL Rs: 0.00 Add for small Tools and 1% Rs: 0.00 Add for Contractor' 10% Rs: 0.00 Add for Contrators' 5% Rs: 0.00 Total cost of Materials Rs: Shovel 0.50 cum capacity Hour Fuel / Energy charges Hour TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' Profit on DPOL / 10% Rs: Add for Contrators' 5% Rs: Total hire charges of Machinery Rs: Crew for Shovel Hour Maistry Day Crowbarman Day Heavy mazdoor Day Light mazdoor Day TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for hidden cost on 15% Rs: Add for Contrators' 5% Rs: Total cost of Labour Rs: A. Cost of Materials Rs: 0.00 B. Hire charges of Machinery Rs: C. Cost of Labour Rs: Total Rs: Add for enabling 1% Rs: Total cost for cum Rs: Rate per cum Rs:

12 SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 5 ITEM: Excavation in soft rock requiring blasting including boulders above 0.6 m upto 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated rock in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts. DATA:Excavation and disposal : Capacity of shovel bucket : 0.85 cum Capacity of shovel bucket under heaped condition : 1.00 cum Capacity of tipper : 5.00 cum Lead for disposal of excavated soft rock : Upto 1 km Speed for loaded tipper under canal excavation condition : 15 km / hr Speed for empty tipper under canal excavation condition : 15 km / hr Turning and unloading time : 2.00 min Shovel digging and loading cycle per bucket : 35 sec In-situ qty / bucket for 35 % bulkage on unloading ( 1 / 1.35 ) : 0.74 cum In-situ quantity / load for 5 cum of soft rock ( 5 / 1.35 ) : 3.70 cum Number of buckets per load ( 3.70 / 0.74 ) say : 5 buckets Ideal cycle time for loading 5 buckets ( 5 x 35 / 60 ) : 2.92 min The ideal cycle time for shovel requires spotting of a tipper within 2.92 minutes near the shovel. However, in practice for dam or canal excavation the space available may not permit positioning of tippers on either side of the shovel. Generally one tipper has to move after loading to position the next tipper for loading. Assuming extra time of 0.33 minute, the corrected cycle time for the shovel will be 3.25 minutes. Round trip cycle time for tipper: Ideal cycle time of shovel for digging & loading : 2.92 min Time for ( av ) 0.75 km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Extra time for spotting : 0.33 min Total : min No. of tippers to match corrected cycle time of shovel ( 11.25/ 3.25 ) : 3.5 Nos Output of tipper / hr with 50 min working / hr ( 50 x 3.70 / ) : : cum Output for 3.5 tippers per day ( 3.5 x x 8 ) say : 460 cum Further, assuming about 90 percent of excavation by deploying shovel and about 10 percent excavation mainly for trimming of bed and sides to final profile by manual the daily output will be : say : 500 cum Output of 1 crowbarman/ Stone breaker,1 heavy & 1 light mazdoor assumed at 5 cum per day. Deploy 8 crowbarman / stone breaker, 8 heavy and 8 light mazdoors for 40 cum. Deploy 4 tippers for disposal of excavated soft rock. Drilling and Blasting : Depth of drilling per hole : 1.40 m Effective depth of pull : 1.25 m Grid spacing of holes for soft rock requiring blasting depends on the nature of soft rock at any perticular location. For the purpose of rate analysis holes at average spacing of 1.5 times the spacing considered for hard rock is assumed. Grid spacing of holes : 1.50 x 2.00 m Area of excavation for 500 cum ( 500 / 1.25 ) : 400 sqm Nos. of holes for 400 sqm area ( 400 / 3 ) : 133 Nos. Depth of drilling including secondary blasting ( 133 x 1.4 x 1.05 ) say : m 11

13 Rate of drilling in soft rock per hour : 10 m Time required for drilling with 2 jack hammers : 9.80 hours Deploy 1 air compressor of 8.5 cmm capacity and 2 jack hammers for 12 hours considering 50 minutes per hour working. Quantity of Explosive ( Kelvex-220 ) at 0.2 kg / cum : 100 kg Ordinary detonators for secondary blasting : 7 Nos. Electric detonators at 1 per hole for main blast : 133 Nos. Fuse coil : 320 Rm Use rate of materials : Cost of drill rod 1.5 m Rs: / Each Rs: Life of drill rod for drilling in soft rock with reconditioning : 200 m Use rate of drill rod per Rm drilling ( cost / life ) Rs: Length of air hose for drilling for each jack hammer : 50 m Cost of 50 m air Rs: / Rm Rs: Life of air hose : 800 hours Use rate of air hose per hr ( cost / life ) Rs: 7.50 RATE ANALYSIS UNIT : cum 1 Use rate of drill rod 1.5 m length Rm Reconditioning 10 % Use rate of 50 m air hose 2 Nos Hour Explosive small dia ( Kelvex-220 ) kg Ordinary detonators Nos Electric detonators Nos Fuse coil Rm Sundries LS TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for Contrators' 5% Rs: Total cost of Materials Rs: Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Tippers 5 cum capacity 4 Nos. Hour Fuel / Energy charges Hour Air compressor 8.5 cmm ( diesel ) Hour Fuel / Energy charges Hour Jack hammers 2 Nos. Hour Fuel / Energy charges Hour TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' Profit on DPOL / 10% Rs: Add for Contrators' 5% Rs: Total hire charges of Machinery Rs:

14 1 Crew for Shovel Hour Crew for Tipper Hour Crew for Air compressor Hour Crew for Jack hammer Hour Maistry Day Blaster Day Helper blaster Day Crowbarman Day Stone breaker Day Heavy mazdoor Day Light mazdoor Day TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for hidden cost on 15% Rs: Add for Contrators' 5% Rs: Total cost of Labour Rs: A. Cost of Materials Rs: B. Hire charges of Machinery Rs: C. Cost of Labour Rs: Total Rs: Add for enabling 1% Rs: Total cost for cum Rs: Rate per cum Rs: SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 6.a ITEM: Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc., complete with initial lead upto 1 km and all lifts. Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m. ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever required. DATA:Assume m width of canal at the bench level and 1.25 m average depth of cutting. Assume side slopes of 0.5 horizontal to 1 vertical. Consider average 1.0 m wide excavation on either side under line drilling and smooth blasting to obtain neat excavated slopes. Rate analysis prepared separately for smooth blasting quantity. 13

15 10.40 m 1 m Excavation by normal blasting 1 m 8.4 m 1 Excavation by 1.25 m smooth blasting m 1.0 m 7.15 m 9.15 m 7.0 m Free face SKETCH SHOWING DRILLING PATTERN Sectional area of excavation ( ) x 0.5 x 1.25 : 9.72 sqm Number of rows considered : 7 No. Length of canal for 7 rows ( 7 x 1.00 ) : 7.00 m Quantity of excavation for 7 m length ( 9.72 x 7.00 ) say : cum Drilling and Blasting: Consider drilling by Jack hammers and mucking by combination of Shovel and Tippers. The burden ( distance of hole from free face of excavation ) is considered at 25 to 30 times dia of hole and spacing of holes is considered at 1.20 to 1.25 times burden. Burden distance for 32 mm dia jack hammer holes : 1.00 m Spacing of holes : 1.20 m Grid spacing of holes for 32 mm dia jack hammer holes : 1.00 x 1.20 m Depth of drilling per hole : 1.40 m Effective depth of pull : 1.25 m Rate of drilling by jack hammer in hard rock per hour : 8.00 m No. of blast holes in m interval staggered ( 4 x x 9 ) : 59 Nos 14

16 Length of drilling for m per hole : m Add drilling for secondary blasting for 5% 0.6 m / cum : 2.40 m : m Time for drilling 85 m for 2 jack hammers ( 85 / 16 ) : 5.31 hours Deploy 1 air compressors of 8.5 cmm capacity and 2 jack hammers for drilling with 50 min per hour working. ( 5.31 x 60 / 50 ) say : 6.50 hours Quantity of 0.3 kg / cum for 68 cum : kg Add for secondary 0.2 kg / cum : 0.80 kg Total : kg Ordinary detonators for secondary blasting : 4 Nos. Electric 1 per hole for main blast : 59 Nos Detonating fuse coil : 90 Rm Drilling and Blasting pattern : Pattern of holes : Staggered Hole initiation : Bottom Initiation system : Ele detonators Initiation pattern : All rows Disposal of excavated rock : Quantity of excavation ( in-situ ) : cum Capacity of shovel bucket : 0.90 cum Capacity of shovel bucket under heaped condition : 1.00 cum Capacity of tipper : 5.00 cum Lead for disposal of excavated rock rock : Upto 1 km Speed for loaded tipper under canal excavation condition : 15 km / hr Speed for empty tipper under canal excavation condition : 15 km / hr Turning and unloading time : 2.00 min Shovel digging and loading cycle per bucket : 50 sec In-situ qty / bucket for 40 % bulkage of hard rock ( 1 /1.40 ) : 0.71 cum In-situ qty per load for 40 % bulkage of hard rock ( 5 /1.40 ) : 3.57 cum Number of buckets per load ( 3.57 / 0.71 ) say : 5 buckets Ideal cycle time for loading 5 buckets ( 5 x 50 / 60 ) : 4.17 min The ideal cycle time for shovel requires spotting of a tipper within 4.17 minutes near the shovel. However, in practice for dam or canal excavation the space available may not permit positioning of tippers on either side of the shovel. Generally one tipper has to move after loading to position next tipper for loading. Assuming one loading cycle extra, the corrected cycle time for shavel will be 5.00 minutes. Round trip cycle time for tipper: Cycle time of shovel for digging & loading : 5.00 min Time for (av ) 0.75 km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and spotting : 1.00 min Total : min No. of tippers to match corrected cycle time of shovel ( 14.00/ 5.00 ) : 2.8 Nos Output of tipper / hr with 50 min working / hr ( 50 x 3.57 / ) : cum Deploy 0.9 cum shovel and 3 tippers for disposal of excavated rock. Output of 1 shovel & 3 tippers per hour ( in-situ qty ) ( x 3 ) : cum For 68 cum in-situ quantity deploy 1 shovel & 3 tippers for : 1.8 hours For levelling 68 cum muck in dump yard deploy 1 dozer for : 0.25 hour Deploy 1 Crowbarman, 1 Stone breakers for 0.5 day for levelling bed. Deploy 1 heavy and 1 light mazdoors for cleaning, manual disposal of muck at bed level and other miscellaneous works. Use rate of materials : Cost of drill rod 1.5 m Rs: / Each Rs:

17 Life of drill rod for drilling in hard rock with reconditioning : 150 m Use rate of drill rod per Rm drilling ( cost / life ) Rs: Length of air hose for drilling for each jack hammer : 50 m Cost of 25 mm dia 50 m air Rs: / Rm Rs: Life of air hose : 800 hours Use rate of air hose per hr ( cost / life ) Rs: 7.50 RATE ANALYSIS UNIT : cum 1 Use rate of drill rod 1.5 m length Rm Reconditioning 10 % Use rate of 50 m air hose 2 Nos. Hour Explosive small dia. (Kelvex-220 ) kg Ordinary detonators Nos Electric detonators Nos Fuse coil Rm Sundries LS TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for Contrators' 5% Rs: Total cost of Materials Rs: Shovel 0.85 cum capacity Hour Fuel / energy charges Hour Angle dozer 90 hp Hour Fuel / Energy charges Hour Tippers 5 cum capacity 3 Nos. Hour Fuel / Energy charges Hour Air compressor 8.5 cmm ( diesel ) 1 Nos Hour Fuel / Energy charges Hour Jack hammers 2 Nos. Hour Fuel / Energy charges Hour TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' Profit on DPOL / 10% Rs: Add for Contrators' 5% Rs: Total hire charges of Machinery Rs: Crew for Shovel Hour Crew for Dozer Hour Crew for Tipper Hour Crew for Air compressor Hour Crew for Jack hammer Hour

18 6 Maistry Day Blaster Day Helper blaster Day Crowbarman Day Stone breaker Day Heavy mazdoor Day Light mazdoor Day TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for hidden cost on 15% Rs: Add for Contrators' 5% Rs: Total cost of Labour Rs: A. Cost of Materials Rs: B. Hire charges of Machinery Rs: C. Cost of Labour Rs: Total Rs: Add for enabling 1% Rs: Total cost for cum Rs: Rate per cum Rs: SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 6.b ITEM: Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved controlled blasting methods for canals, cut-off trench of embankment, filter / catch-water drains etc., including controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified locations, costof all materials, machinery, labour, placing excavated rock neatly in approved dump area or other place as directed etc., complete with lead upto 1 km and all lifts. Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m. ii ) The rate under this item shall be adopted where the control of fly-rock and ground vibrations is required. DATA:Work requires: - use of delay detonators to reduce ground vibrations. - monitoring and recording ground vibrations. - conducting trial studies for drilling and blasting method to be adopted to avoid damages to near-by structures. - covering blasting area with chain link mesh or waste conveyor belts or waste tyres and sand bags to prevent flying of rock fragments during blasting. Assume m width of canal at the bench level and 1.25 m average depth of cutting. Assume side slopes of 0.5 horizontal to 1 vertical. Consider average 1.0 m wide excavation on either side under line drilling and smooth blasting to obtain neat excavated slopes. Rate analysis prepared separately for smooth blasting quantity. 17

19 10.40 m 1 m Excavation by normal blasting 1 m 8.4 m 1 Excavation by 1.25 m smooth blasting m 9.15 m m Delay time 1.0 m 150 ms 125 ms 100 ms 7.0 m 75 ms 50 ms 25 ms 0 ms Free face SKETCH SHOWING DRILLING PATTERN Sectional area of excavation ( ) x 0.5 x 1.25 : 9.72 sqm Number of rows considered : 7 No. Length of canal for 7 rows ( 7 x 1.00 ) : 7.00 m Quantity of excavation for 7 m length ( 9.72 x 7.00 ) say : cum Drilling and Blasting: Consider drilling by Jack hammers and mucking by combination of Shovel and Tippers. The burden ( distance of hole from free face of excavation ) is considered at 25 to 30 times dia of hole and spacing of holes is considered at 1.20 to 1.25 times burden. Burden distance for 32 mm dia jack hammer holes : 1.00 m Spacing of holes : 1.20 m Grid spacing of holes for 32 mm dia jack hammer holes : 1.00 x 1.20 m Depth of drilling per hole : 1.40 m Effective depth of pull : 1.25 m 18

20 Rate of drilling by jack hammer in hard rock per hour : 8.00 m No. of blast holes in m interval staggered ( 4 x x 9 ) : 59 Nos Length of drilling for m per hole : m Add drilling for secondary blasting for 5% 0.6 m / cum : 2.40 m : m Time for drilling 85 m for 2 jack hammers ( 85 / 16 ) : 5.31 hours Deploy 1 air compressors of 8.5 cmm capacity and 2 jack hammers for drilling with 50 min per hour working. ( 5.31 x 60 / 50 ) say : 6.50 hours Quantity of 0.3 kg / cum for 68 cum : kg Add for secondary 0.2 kg / cum : 0.80 kg Total : kg Ordinary detonators for secondary blasting : 4 Nos. Electric short delay 1 per hole for main blast : 59 Nos Detonating fuse coil : 90 Rm. Drilling and Blasting pattern : Pattern of holes : Staggered Hole initiation : Bottom Initiation system : Short delay detonators Delay system : 25 ms interval Initiation pattern : St line row by row Muffling arrangements: For controlling flying of rock fragments during blasting consider covering the blasting area with 20 guage 50 x 50 mm chain link mesh and sand bags. Requirement of chain link mesh and sand bags for smooth blast area is also included in this item and 10 % extra area of wire mesh is considered for overlaps. Area of chain link mesh for controlled blast area ( 8.40 x 7.5 x 1.1 ) say : sqm Add for smooth blast area ( 1.50 x 7.5 x 1.1 ) x 2 say : sqm Total : sqm Number of sand bags 25 kg each at 1 per hole and 20 % extra for edges : 72 Nos Add for smooth blast holes and 20 % extra for edges : 26 Nos Total : 98 Nos Disposal of excavated rock : Quantity of excavation ( in-situ ) : cum Capacity of shovel bucket : 0.90 cum Capacity of shovel bucket under heaped condition : 1.00 cum Capacity of tipper : 5.00 cum Lead for disposal of excavated rock rock : Upto 1 km Speed for loaded tipper under canal excavation condition : 15 km / hr Speed for empty tipper under canal excavation condition : 15 km / hr Turning and unloading time : 2.00 min Shovel digging and loading cycle per bucket : 50 sec In-situ qty / bucket for 40 % bulkage of hard rock ( 1 /1.40 ) : 0.71 cum In-situ qty per load for 40 % bulkage of hard rock ( 5 /1.40 ) : 3.57 cum Number of buckets per load ( 3.57 / 0.71 ) say : 5 buckets Ideal cycle time for loading 5 buckets ( 5 x 50 / 60 ) : 4.17 min The ideal cycle time for shovel requires spotting of a tipper within 4.17 minutes near the shovel. However, in practice for dam or canal excavation the space available may not permit positioning of tippers on either side of the shovel. Generally one tipper has to move after loading to position next tipper for loading. Assuming one loading cycle extra, the corrected cycle time for shavel will be 5.00 minutes. Round trip cycle time for tipper: Cycle time of shovel for digging & loading : 5.00 min Time for (av ) 0.75 km haulage under load ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and un-loading : 2.00 min 19

21 Time for average 0.75 km return trip ( 0.75 x 60 / 15 ) : 3.00 min Time for turning and spotting : 1.00 min Total : min No. of tippers to match corrected cycle time of shovel ( 14.00/ 5.00 ) : 2.8 Nos Output of tipper / hr with 50 min working / hr ( 50 x 3.57 / ) : cum Deploy 0.9 cum shovel and 3 tippers for disposal of excavated rock. Output of 1 shovel & 3 tippers per hour ( in-situ qty ) ( x 3 ) : cum For 68 cum in-situ quantity deploy 1 shovel & 3 tippers for : 1.8 hours For levelling 68 cum muck in dump yard deploy 1 dozer for : 0.25 hour Deploy 1 Stone chiseller and 1 Stone breakers for 0.5 day for levelling bed. Deploy 2.5 heavy and 0.5 light mazdoors for cleaning, manual disposal of muck at bed level, placing and removal of mesh / sand bags and other miscellaneous works. Use rate of materials : Cost of drill rod 1.5 m Rs: / Each Rs: Life of drill rod for drilling in hard rock with reconditioning : 150 m Use rate of drill rod per Rm drilling ( cost / life ) Rs: Length of air hose for drilling for each jack hammer : 50 m Cost of 50 m air Rs: / Rm Rs: Life of air hose : 800 hours Use rate of air hose per hr ( cost / life ) Rs: 7.50 Cost of wire Rs: / sqm Rs: less salvage value at 10 % Rs: Total Rs: Life of wire mesh with 25 % replacement each use : 4 uses Use rate of wire mesh / use / sqm ( cost / life ) Rs: Add for 25% Rs: 5.63 Total Rs: Cost of empty cement bag per 1.00 / Each Rs: 1.00 Cost of sand / bag for Rs: / cum Rs: 2.18 Add for 1 km lead/loading/unloading charges for cum Rs: 0.83 Filling 2 heavy mazdoors per 100 bags / day Rs: 1.62 Total cost per bag Rs: 5.62 Life of sand bag : 1 use Use rate of sand bag / use / bag ( cost / life ) Rs: 5.62 RATE ANALYSIS UNIT : cum 1 Use rate of drill rod 1.5 m length Rm Reconditioning 10 % Use rate of 50 m air hose 2 Nos. Hour Use rate of wire mesh sqm Use rate of sand bag Nos Explosive small dia. (Kelvex-220 ) kg Ordinary detonators Nos Electric delay detonators Nos Fuse coil Rm Sundries LS TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for Contrators' 5% Rs: Total cost of Materials Rs:

22 1 Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Angle dozer 90 hp Hour Fuel / Energy charges Hour Tippers 5 cum capacity 3 Nos. Hour Fuel / Energy charges Hour Air compressor 8.5 cmm ( diesel ) 1 No Hour Fuel / Energy charges Hour Jack hammers 2 Nos. Hour Fuel / Energy charges Hour TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' Profit on DPOL/ 10% Rs: Add for Contrators' 5% Rs: Total hire charges of Machinery Rs: Crew for Shovel Hour Crew for Angle dozer Hour Crew for Tipper Hour Crew for Air compressor Hour Crew for Jack hammer Hour Maistry Day Blaster Day Helper blaster Day Stone chiseller Cl - II Day Stone breaker Day Heavy mazdoor Day Light mazdoor Day TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for hidden cost on 15% Rs: Add for Contrators' 5% Rs: Total cost of Labour Rs: A. Cost of Materials Rs: B. Hire charges of Machinery Rs: C. Cost of Labour Rs: Total Rs: Add for blasting studies & monitoring vibrations 0.50% Rs: Add for enabling 1% Rs: Total cost for cum Rs: Rate per cum Rs:

23 SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 6.c ITEM: Excavation in hard rock of all toughness including boulders above 1.2 m dia. for dressing canal sides neatly on either side to required profile by line drilling and smooth blasting including removing under-cuts by chiselling / hammering, placing the excavated rock neatly in dump area or other place as directed, cost of all materials, machinery, labour etc., complete with lead upto 1 km and all lifts. Note: i ) For excavation of canal below free board level combination of normal / controlled blasting and line drilling and smooth blasting shall be adopted to obtain neat side slopes. For the purpose of payment 1 m width of excavation on either side shall be treated as excavation by line drilling and smooth blasting and remaining portion shall be treated as excavation by normal / controlled blasting as the case may be. ii ) The rate under this item shall be adopted for canals designed for carrying capacity of less than 15 cumecs or where the average depth of excavation in hard rock is less than 3 m. iii ) The rate includes controlling fly-rock wherever required. iv ) The rate under this item shall be paid only on ascertaining that the excavated face has come off neatly as per specifications or atleast 50 percent of smooth blast holes are visible for inspection and are spaced at specified interval. v ) In case, where the above criteria is not fulfilled payment shall be restricted to rate provided for excavation by normal blasting or controlled blasting as the case may be. DATA:Work requires: - drilling holes at closer interval along the final excavation lines on either side of canal with light blasting to achieve neat side slopes m 1m Excavation by normal blasting 1 m smooth blasting Smooth blast hole m 7.15 m 9.15 m SKETCH SHOWING DRILLING PATTERN Consider 1 m width of excavation on either side for line drilling and smooth blasting. Sectional area of excavation by smooth blasting ( 2 x 1 x 1.25 ) 2.50 sqm Assume side slopes of 0.5 horizontal to 1 vertical. Consider 7.0 m length of canal excavation for analysis. Quantity of excavation for 7.0 m length ( 7.0 x 2.50 ) say : cum Drilling and Blasting: Consider drilling by jack hammer and mucking by combination of shovel and tippers. Spacing of peripheral holes at 10 times diameter of hole. say : 0.33 m No. of holes for 7.0 m length trimming ( 2 x 7.0 / 0.33 ) say : 42 Nos Length of drilling for m / hole ( 42 x 1.5 ) : m Output for use of 2 jack hammers / 8 m / hr 16 m Time for drilling 63 m ( 63 / 16 ) : 4.00 hours Deploy 1 air compressors of 8.5 cmm capacity and 2 jack hammers for 5 hours for drilling with 50 min per hour working. 22

24 Consider loading of only alternate holes with half the normal charge per cum. Quantity of 0.20 kg / cum : 3.50 kg Electric delay 1 per alternate hole : 22 Nos Detonating fuse coil : 20 Rm Muffling arrangements: For controlling flying of rock fragments during blasting consider covering the blasting area with 20 guage 50 x 50 mm chain link mesh and sand bags. The quantity of wire mesh and sand bags to cover smooth blast area is included under item for controlled blasting. Hence no provision is considered for muffling arrangement for this item. Deploy 0.5 Stone breaker and 0.5 Stone chiseller for trimming bed / sides wherever required. Deploy 0.5 heavy and 0.5 light mazdoor for miscellaneous works. Disposal of excavated rock: All data same as in item-6.b. Deploy 0.85 cum shovel and 3 tippers for 0.5 hours for disposal of 17.5 cum excavated rock with 50 min per hour working. Use rate of materials : Cost of drill rod 1.5 m Rs: / Each Rs: Life of drill rod for drilling in hard rock with reconditioning : 150 m Use rate of drill rod per Rm drilling ( cost / life ) Rs: Length of air hose for drilling for each jack hammer : 50 m Cost of 50 m air Rs: / Rm Rs: Life of air hose : 800 hours Use rate of air hose per hr ( cost / life ) Rs: 7.50 RATE ANALYSIS UNIT : cum 1 Use rate of drill rod 1.5 m length Rm Reconditioning 10 % Use rate of 50 m air hose 2 Nos. Hour Explosive small dia. (Kelvex-220 ) kg Electric delay detonators Nos Fuse coil Rm Sundries LS TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for Contrators' 5% Rs: Total cost of Materials Rs: Shovel 0.85 cum capacity Hour Fuel / Energy charges Hour Tippers 5 cum capacity 3 Nos. Hour Fuel / Energy charges Hour Air compressor 8.5 cmm ( diesel ) 1 Nos Hour Fuel / Energy charges Hour Jack hammers 2 Nos. Hour Fuel / Energy charges Hour TOTAL Rs: Add for small Tools and 1% Rs:

25 Add for Contractor' Profit on DPOL / 10% Rs: Add for Contrators' 5% Rs: Total hire charges of Machinery Rs: Crew for Shovel Hour Crew for Tipper Hour Crew for Air compressor Hour Crew for Jack hammer Hour Maistry Day Blaster Day Helper blaster Day Stone breaker Day Stone chiseller Cl - II Day Heavy mazdoor Day Light mazdoor Day TOTAL Rs: Add for small Tools and 1% Rs: Add for Contractor' 10% Rs: Add for hidden cost on 15% Rs: Add for Contrators' 5% Rs: Total cost of Labour Rs: A. Cost of Materials Rs: B. Hire charges of Machinery Rs: C. Cost of Labour Rs: Total Rs: Add for blasting studies & monitoring vibrations 0.50% Rs: Add for enabling 1% Rs: Total cost for cum Rs: Rate per cum Rs: SECTION: CANAL AND ALLIED WORKS. YEAR: ITEM No: 7.a ITEM: Excavation in hard rock by blasting including boulders above 1.2 m dia. for canals, seating embankment etc., including levelling bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc.,complete with initial lead upto 1 km and all lifts. Note: i ) The rate under this item shall be adopted for canals designed for carrying capacity of more than 15 cumecs or where the average depth of excavation in hard rock is more than 3 m. ii ) The rate includes levelling canal bed by hammering / chiselling all rock projections wherever required. DATA:Assume m width of excavation for canal and 5.80 m depth of cutting in hard rock. Assume side slopes of 0.5 horizontal to 1 vertical. Consider average 1.4 m wide excavation on either side under line drilling and smooth blasting to obtain neat excavated slopes. Drilling and Blasting: Consider drilling by Waggon drill and mucking by combination of Shovel and Tippers. For good fragmentation to facilitate easy loading by 0.85 cum capacity shovel the bench height 24

GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES TUNNEL AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES

GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES TUNNEL AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES / LEAD CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR SCREEN ON OPENING THIS FILE CLICK

More information

WATER RESOURCES DEPARTMENT SCHEDULE OF RATES TUNNEL AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA RATES

WATER RESOURCES DEPARTMENT SCHEDULE OF RATES TUNNEL AND ALLIED WORKS REFERENCE DATA NOTES ON BASIC RATES DATA RATES d ÀA À ÀÆä E ÁS WATER RESOURCES DEPARTMENT SCHEDULE OF RATES FOR THE YEAR : 2011-12 CONTENTS PAGES REFERENCE DATA 3 -- 5 NOTES ON BASIC RATES 6 -- 6 DATA RATES 7 -- 111 ANNEXURES 67--82 zàgà ÀnÖ À«Äw ÄAzÀ

More information

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 6 SCHEDULE OF RATES TUNNEL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA

d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 6 SCHEDULE OF RATES TUNNEL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA d ÀA À ÀÆä E ÁSÉ WATER RESOURCES DEPARTMENT CHAPTER- WRD: 6 SCHEDULE OF RATES TUNNEL AND ALLIED WORKS FOR THE YEAR : 2016-17 CONTENTS PAGES REFERENCE DATA 1 -- 3 NOTES ON BASIC RATES 4 -- 4 DATA RATES

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

Suggested improvements to existing decanting station at Anna stadium Trichy

Suggested improvements to existing decanting station at Anna stadium Trichy Suggested improvements to existing decanting station at Anna stadium Trichy April 2018 TECHNICAL SUPPORT UNIT: IN ASSOCIATION WITH: Document History and Status Sheet S. No. Issue Issued by Issued Date

More information

Hydraulic power is the key to the utility of many excavators.

Hydraulic power is the key to the utility of many excavators. CHAPTER Construction Planning, Equipment, and Methods EXCAVATORS Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 8 By Dr. Ibrahim Assakkaf ENCE 420 Construction

More information

SMALL CONSTRUCTION EQUIPMENTS

SMALL CONSTRUCTION EQUIPMENTS SMALL CONSTRUCTION EQUIPMENTS SR NO CONCRETE MIXERS 1 [CM-1] FULL BAG CONCRETE MIXER WITH MECHANICAL HOPPER MOUNTED ON [500 19] TYRES CONCRETE MIX 200 LTS A] 6 HP AIR COOLED DIESEL B] 3PH 5 HP ELECTRIC

More information

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M ORISSA POWER TRANSMISSION CORPORATION LIMITED Supply & Laying of 132 KV XLPE Double Circuit (4 cable per Circuit including one spare) underground 1000 Sq. mm annealed Copper XLPE EHV Cable with Associated

More information

Appendix D. Noise Calculations

Appendix D. Noise Calculations Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with

More information

B.6 Construction Equipment Utilization and Workforce

B.6 Construction Equipment Utilization and Workforce Appendix B.6 Construction ment Utilization and Workforce B.6 Construction ment Utilization and Workforce To support environmental impact assessments, a preliminary estimate was prepared for construction

More information

Why? Faster To reduce the duration of the process

Why? Faster To reduce the duration of the process BUTE Department of Construction Management and Technology 20.10.2015 Why? Faster To reduce the duration of the process Cheaper To reduce costs (where labour is expensive) Easier To reduce (heavy) manual

More information

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate AIR EQUIPMENT & TOOLS: Compressors: Gas or Diesel, cfm @ 100 psi Gas or Diesel, cfm @ 100 psi 85-150 cfm $27,272.70 7% $1,909.09 $13.00 $130.00 151-175 cfm $34,848.45 7% $2,439.39 $13.50 $135.00 176-250

More information

MELBOURNE: BRISBANE: Ph : Fax : Ph : Fax :

MELBOURNE: BRISBANE: Ph : Fax : Ph : Fax : www.normeng.com.au BRISBANE: Ph : 07 3376 3177 Fax : 07 3376 3201 sales@normeng.com.au www.normeng.com.au 21 Spine Street Sumner Park Queensland 4074 MELBOURNE: Ph : 03 9775 1965 Fax : 03 9770 8054 victoria@normeng.com.au

More information

ALL AMERICAN CANAL LINING PROJECT. CM Status as of July 31, 2008

ALL AMERICAN CANAL LINING PROJECT. CM Status as of July 31, 2008 ALL AMERICAN CANAL LINING PROJECT CM Status as of 1 AACLP STATIONS 2 Reach 1A Reach 1B Reach 2 Reach 3 Reach 2 2 SAFETY 3 Monthly Injury/Illness Data KPC 0 Recordable accidents for the month of 1 Recordable

More information

Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) 48" Pallet Fork

Side Cutter Kit (Left and Right - fits all 68, 72, 80 Buckets) 48 Pallet Fork Side Cutter Kit (Left and Right - fits all 68", 72", 80" Buckets) These Bolt On Side Cutters (BOSC) greatly extend bucket service life and improve penetration power into hard packed soil or stock piled

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

ABSTRACT OF COST FOR PAVEMENT

ABSTRACT OF COST FOR PAVEMENT CHAPTER - 5 ABSTRACT OF COST FOR PAVEMENT Name of Work :- CONSTRUCTION OF TRANS - ARUNACHAL HIGHWAY (SH:- Road from Khodaso (Ch. 110.450 Km) to Dakte Hoj (Ch. 212.450 Km) via Sagalee, Toru, Kheel - 102.000

More information

Index. 1 Mmakgoge Group Structure. 2 Industrial Cleaning Industrial Cleaning and Waste Removal Dry Ice Cleaning Storage Plant Cleaning and Rehab

Index. 1 Mmakgoge Group Structure. 2 Industrial Cleaning Industrial Cleaning and Waste Removal Dry Ice Cleaning Storage Plant Cleaning and Rehab Index 1 Mmakgoge Group Structure 2 Industrial Cleaning Industrial Cleaning and Waste Removal Dry Ice Cleaning Storage Plant Cleaning and Rehab 3 Purification Services Material Drying (Sludge) Dewatering

More information

Plas-Crete Force Protection Blocks

Plas-Crete Force Protection Blocks Plas-Crete Force Protection Blocks Proudly Made in the USA by: Conigliaro Block, Inc. 701 Waverly Street Framingham, MA 01702 (888) CONIG - 25, fax (508) 653-6672 sales@conigliaroblock.com www.conigliaroblock.com

More information

QUARRYING PROCESS AND QUARRY PRODUCTS

QUARRYING PROCESS AND QUARRY PRODUCTS NORTHSTONE (NI) Ltd. QUARRY & ASPHALT DIVISION QUARRYING PROCESS AND QUARRY PRODUCTS We take many things in the material world for granted, not realising or appreciating their presence or value. Construction

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete 1-2 / 2-3 clear $18.00 $30.00

More information

Where Quality makes the Difference...

Where Quality makes the Difference... Concept/Design/Photography : Intelligent E-Business Solutions Where Quality makes the Difference... P.O. Box: 5723-Manama - Kingdom of Bahrain, Tel.: 17 62 0551, Fax: 17 62 0833 Instagram: @ALHAIDARIYA,

More information

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32. PROJECT 2506; 2017 ANNUAL REPAIR CONTRACT; J.C. DILLON, INC., CONTRACTED SCHEDULE OF ITEMS, QUANTITIES AND COSTS 1 Hour Lowboy Including Both Permits and Paid Driver $75.00 2 Hour Single Axle Dump Truck

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Portland Sand & Gravel Co. Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete

More information

Province of Prince Edward Island 2017

Province of Prince Edward Island 2017 Province of Prince Edward Island 2017 Standard Negotiated Rates A B C Trucking Rates Standard Prices - Unbid Jobs Machinery Rental Rates August 16, 2017 Department of Transportation, Infrastructure and

More information

Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ

Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ Tel: 01342 893806 Fax: 01342 893158 www.blockadeservices.co.uk Steve Burrows started as a sole trader

More information

MINI SKID STEER ATTACHMENT LITERATURE

MINI SKID STEER ATTACHMENT LITERATURE MINI SKID STEER ATTACHMENT LITERATURE 2 BUCKETS & BLADES When you need to power through with productivity you can be sure that you ve come to the right place. With our versatile lineup of buckets and blades,

More information

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,

More information

VCHS [V-Steel Container Handler, L-4]

VCHS [V-Steel Container Handler, L-4] OFF-THE-ROAD TIRES VCHS VCHS [V-Steel Container Handler, L-4] t o p applicat i o n Industrial Applications t o p conditions / e n v i r o n m e n t Reach Stackers, Top Picks, Straddle Carriers, Container

More information

Working Estimate for Construction of Goat Shed II at Jaring

Working Estimate for Construction of Goat Shed II at Jaring Working Estimate for Construction of Goat Shed II at Jaring 1 Excavation of foundation in all kinds of soil including dressing & leveling the bed and depositing the soil away from working area within all

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

INDEX ( ( ( (Brick superstructure) Model 1 (Brick superstructure) Size: 4 feet length X 4 feet breadth X 6.5 feet height Gramalaya - Tiruchirappalli Model 1 Individual household toilet (Brick superstructure)

More information

2a. Excavating and Lifting

2a. Excavating and Lifting Construction Methods 110401542 2a. Excavating and Lifting Dr. Khaled Hyari Department of Civil Engineering Hashemite University Introduction Excavator: A power-driven digging machine Three Major types

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

REVIEW FOR FINAL EXAM

REVIEW FOR FINAL EXAM REVIEW FOR FINAL EXAM A. J. Clark School of Engineering Department of Civil Engineering by Dr. Ibrahim A. Assakkaf Spring 2002 ENCE 420 - Construction Equipment and Methods Department of Civil Engineering

More information

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT

2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT FOREWARD This edition of the Nova Scotia Road Builders Association Suggested Schedule of Rental Rates for Construction Equipment is presented for the information

More information

Transfer. CE 431: Solid Waste Management

Transfer. CE 431: Solid Waste Management Transfer CE 431: Solid Waste Management Transfer Stations Transfer stations are the sites on which transfer of waste is carried out, placed on small and then larger vehicles for transportation over long

More information

158 PURDUE ENGINEERING EXTENSION DEPARTMENT

158 PURDUE ENGINEERING EXTENSION DEPARTMENT 158 PURDUE ENGINEERING EXTENSION DEPARTMENT repaired. With regular maintenance and a small amount of stone added each year, these roads have held up much better than we anticipated. The cost of this type

More information

Royex Gen II Rock breaking cartridge Technical data sheet

Royex Gen II Rock breaking cartridge Technical data sheet E T K E N T E K N O L O G I Royex Gen II Rock breaking cartridge Technical data sheet Etken Teknolgi Runsätravägen 5 123 63 Farsta, Sweden Tel: 08-94 10 70 www.royexsystem.com 1. Introduction The Royex

More information

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06

Backhoe & Hoe Ram (under 3/4 Yd.) $26.11 $34.81 $ Backhoes & Hoe Ram (3 Yds & Over) $26.44 $35.25 $44.06 2018 SPOKANE TRIBAL WAGE RATES FOR CONTRACTORS All rates are based on 100% of Washington State prevailing wage rates for Stevens County All wage rates are subject to annual adjustments by the TERO Commission

More information

Earthing UNIT. Learning Objectives. Introduction. To understand purpose of Earthing. To learn system of earthing.

Earthing UNIT. Learning Objectives. Introduction. To understand purpose of Earthing. To learn system of earthing. 274 Electrical Technician UNIT 10 Earthing Learning Objectives To understand purpose of Earthing. To learn system of earthing. Introduction The very purpose of earthing is to safe against dangers of shock

More information

QUIPMENT IRE RATES ATES EFFECTIVE

QUIPMENT IRE RATES ATES EFFECTIVE QUIPMENT IRE RATES ATES EFFECTIVE ST JANUARY 2017 ALL RATES ARE GST EXCLUSIVE S TAKEUCHI TB215R RUBBER TRACK EXCAVATOR 1.5 TONNE General Purpose Bucket Shaker Bucket Hammer Grabs Auger Wet saw $85 / hr

More information

8. The backhoe or Dipper dredger

8. The backhoe or Dipper dredger 8. The backhoe or Dipper dredger Figure 8. 1 BHD IJZEREN HEIN, 8. The backhoe or Dipper dredger...1 8.1. General considerations...1 8.2. Working method...2 8.3. Area of application...4 8.4. Main Layout...5

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

**Equipment production**

**Equipment production** Construction operations And methods **Equipment production** The Equipment that will be covered on the exam and in this section are; Dozers Graders Scrapers Loaders Excavators Cranes(will discuss another

More information

Dumpers (Wheeled & Tracked)

Dumpers (Wheeled & Tracked) Hubbway s range of dumpers combines top quality equipment with a good range of sizes available for hire. If you require dumpers from 1t to 10t - high tip, tracked, straight or swivel skip, or rear tip

More information

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1

*Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1 *Due to the shift of $1.00 from H&W to Pension below is the corrected rates for 6/1/17 APPENDIX 1 SCHEDULE A CLASSIFICATIONS AND WAGE SCALES On all work covered by this Agreement, and in all instances

More information

QA Mobile Crushing & Screening. Stu Gamble - Sandvik

QA Mobile Crushing & Screening. Stu Gamble - Sandvik QA 200 - Mobile Crushing & Screening Stu Gamble - Sandvik Presentation Overview This is a presentation on the functionality and role that mobile plants may play within the construction and mining industries.

More information

COURSE TITLE : GENERAL ENGINEERING COURSE CODE : COURSE CATEGORY : F PERIODS/WEEK : 4 PERIODS/SEMESTER : 72 CREDITS : 4

COURSE TITLE : GENERAL ENGINEERING COURSE CODE : COURSE CATEGORY : F PERIODS/WEEK : 4 PERIODS/SEMESTER : 72 CREDITS : 4 COURSE TITLE : GENERAL ENGINEERING COURSE CODE : COURSE CATEGORY : F PERIODS/WEEK : 4 PERIODS/SEMESTER : 72 CREDITS : 4 RATIONALE: The role of an Engineer is no longer limited to his major discipline.

More information

Introduction. Increase the rate of output through work progress with the best effective and efficient methods.

Introduction. Increase the rate of output through work progress with the best effective and efficient methods. Introduction It is a common fact that we find a wide variety of construction machines on every construction sites, which make the construction jobs easy, safe and quicker. Good project management in construction

More information

MOBILE MIXING PLANTS M1 - M2,5

MOBILE MIXING PLANTS M1 - M2,5 MOBILE MIXING PLANTS M1 - M2,5 Schwing-Stetter MOVES CONCRETE. WORLDWIDE. Wherever concrete is produced and moved is where you will find Schwing-Stetter machinery. With plants in Germany, Austria, USA,

More information

Let our professional customer service and product selection improve your bottom line.

Let our professional customer service and product selection improve your bottom line. We offer a complete line of diamond tools to suit every cutting need, engineered and designed to make the job easier. Let our professional customer service and product selection improve your bottom line.

More information

BATJIC Information Sheet

BATJIC Information Sheet BATJIC Information Sheet 2015-2016 New Wage rates from BATJIC Effective Monday 29th June 2015. The Building and Allied Trades Joint Industrial Council (BATJIC) has agreed new wage rates to apply from Monday

More information

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole 1 L.T Stay set Complete Set 5 2 7/12 GI stay wire kg 50 3 Concreting of stay NO 5 4 Stay clamp

More information

Phone:

Phone: KERALA AGRICULTURAL UNIVERSITY AGRICULTURAL RESEARCH STATION MANNUTHY 68065. THRISSUR Phone: 0487-37076 Email : arsmannuthy@kau.in RE-TENDER NOTICE No. B/400/ dated 0/03/06 Sealed tenders are invited for

More information

Ways to Reduce Costs

Ways to Reduce Costs Ways to Reduce Costs A Collection of Best Practices and Innovative Ideas from Asphalt Mix Producers and Construction Contractors Across the U.S. Dave Newcomb Minnesota Contractors Workshop February 19,

More information

Update of noise database for prediction of noise on construction and open sites

Update of noise database for prediction of noise on construction and open sites Update of noise database for prediction of noise on construction and open sites Phase 3: Noise measurement data for construction plant used on quarries July 2006 www.defra.gov.uk Department for Environment,

More information

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. Self Priming Pumps. farismachinery.com

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. Self Priming Pumps. farismachinery.com Self Priming Pumps TOUGH JOBS TOUGH MACHINES ASPHALT PARTS ENVIRONMENTAL SOLID WASTE CONCRETE RENTAL RATES Effective September 1, 2016 RENTAL SALES MUNICIPAL OIL & GAS SERVICE Self Priming Pumps ABOUT

More information

FAIR WAGE SCHEDULE Road Building

FAIR WAGE SCHEDULE Road Building City Manager's Office Fair Wage Office Human Resources Division 100 Queen treet West City Hall, 18 th Floor, West Tower Toronto, Ontario M5H 2N2 Tel: 416-392-7300 Fax: 416-392-0801 fairwage@toronto.ca

More information

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03)

EQUIPMENT HIRE Stawell Road PO Box 241 Horsham Victoria 3400 Phone: (03) Facsimile: (03) EQUIPMENT HIRE INTRODUCTION CONTENTS Millers are a long established plant hire company with a solid foundation in Victoria. We have become established from over 2 generations and 40 years in the industry.

More information

CEM 417 WEEK 6. CONSTRUCTION TECHNOLOGY & maintenance. Construction Plants 22/02/2011 WEEK 6 CONSTRUCTION PLANTS

CEM 417 WEEK 6. CONSTRUCTION TECHNOLOGY & maintenance. Construction Plants 22/02/2011 WEEK 6 CONSTRUCTION PLANTS CONSTRUCTION TECHNOLOGY & maintenance CEM 417 SOURCES FROM slide: MOHD AMIZAN MOHAMD MOHD FADZIL ARSHAD SITI RASHIDAH MOHD NASIR FKA, UiTM Shah Alam. WEEK 6 Construction Plants WEEK 6 CONSTRUCTION PLANTS

More information

A maximum of power with a minimum investment the economical solution for road construction.

A maximum of power with a minimum investment the economical solution for road construction. PAVING MACHINERY MADE IN GERMANY A maximum of power with a minimum investment the economical solution for road construction. an ASTEC Industries Company EQUIPMENT 01 02 10 09 08 07 01 02 03 Well-arranged

More information

1 GENERAL Project Description Labrador Island Transmission Link (LIL) Language and Units Site Climate Data...

1 GENERAL Project Description Labrador Island Transmission Link (LIL) Language and Units Site Climate Data... SLI Doc. No. 505573-8600-40EW-0001 02 26-Aug-2014 iii TABLE OF CONTENTS PAGE 1 GENERAL... 1 1.1 Project Description... 2 1.1.1 Labrador Island Transmission Link (LIL)... 3 1.2 Language and Units... 4 1.3

More information

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks)

Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks) Instructions for filling out the Equipment for Hire Registration Form (Other than Dump Trucks) 1. Personal Info: Ensure your legal company name is on the form. 2. Equipment Info: Ensure you complete all

More information

Appendix 4-2-C Project Air Emissions Inventory

Appendix 4-2-C Project Air Emissions Inventory Appendix A CALPUFF and CALMET Methods and Assumptions Appendix 4-2-C Project Air Emissions Inventory C.1 Introduction For the purposes of estimating effects on air quality associated with the Project,

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

CONSTRUCTION and OFF ROAD EQUIPMENT

CONSTRUCTION and OFF ROAD EQUIPMENT CONSTRUCTION and OFF ROAD EQUIPMENT QUICK REFERENCE GUIDE Vehicle Valuation Services, Inc. 1 South 450 Summit Avenue Suite 185 Oakbrook Terrace, IL 60181 888.475.9975 Fax: 888.475.9935 www.vvsi.com Vehicle

More information

Kansas Department of Transportation

Kansas Department of Transportation Kansas Department of Transportation STANDARD JOB CLASSIFICATIONS AND DESCRIPTIONS ASPHALT PAVER SCREED OPERATOR (Power Equipment Operator) Makes sure paver is in proper position before moving off the joint.

More information

RENTAL RATES SALES SERVICE PARTS RENTAL OIL & GAS MUNICIPAL CONCRETE ASPHALT ENVIRONMENTAL SOLID WASTE TOUGH JOBS TOUGH MACHINES

RENTAL RATES SALES SERVICE PARTS RENTAL OIL & GAS MUNICIPAL CONCRETE ASPHALT ENVIRONMENTAL SOLID WASTE TOUGH JOBS TOUGH MACHINES TOUGH JOBS TOUGH MACHINES ASPHALT PARTS ENVIRONMENTAL SOLID WASTE CONCRETE 2015 RENTAL RATES RENTAL SALES MUNICIPAL OIL & GAS SERVICE Effective November 1, 2014 ABOUT FARIS After 60 years, we at Faris

More information

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS

RENTAL RATES SALES SERVICE RENTAL OIL & GAS MUNICIPAL CONCRETE ENVIRONMENTAL SOLID WASTE. farismachinery.com TOUGH JOBS TOUGH MACHINES ASPHALT PARTS TOUGH JOBS TOUGH MACHINES ASPHALT PARTS ENVIRONMENTAL SOLID WASTE CONCRETE RENTAL RATES Effective February 1, 2019 RENTAL SALES MUNICIPAL OIL & GAS SERVICE ABOUT FARIS After 60 years, we at Faris Machinery

More information

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN 420-7/18/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-7/18/2014 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all mainline lanes and collector-distributor road

More information

EQUIPMENT HIRE RATES RATES EFFECTIVE 1 ST JULY 2015 ALL RATES ARE GST EXCLUSIVE

EQUIPMENT HIRE RATES RATES EFFECTIVE 1 ST JULY 2015 ALL RATES ARE GST EXCLUSIVE S S KUBOTA KX-121-3 RUBBER TRACKED EXCAVATOR (4.5 TONNE) MODEL KX-121-3 Net power - 30.2 kw Digging Force - 1790 kgf Digging Depth - 3.5 m Safe Working Load - 460 kg Operating Weight - 4,100 kilograms

More information

REMU MSU2-300US GRINDER KOEHRING EXCAVATOR MODEL

REMU MSU2-300US GRINDER KOEHRING EXCAVATOR MODEL MAJOR CONTRACTOR AUCTION JULY 20, 2007 LOT YEAR MAKE MODEL HRS/MILE VIN 1. DAVEY AIR COMPRESSOR 2. ROLLER 3. BARBER GREENE PAVER 2853 SA41X151 100. INGERSOL RAND BLAW KNOX PAVER PF5510 551030-25 101. 1982

More information

SECTIO N 610 PAVEMENT SMO O THNESS

SECTIO N 610 PAVEMENT SMO O THNESS SECTIO N 610 PAVEMENT SMO O THNESS 610.1 Description. This work shall consist of measuring the smoothness of the final pavement surface. Smoothness shall be measured using the International Roughness Index

More information

Tender No: /HTC/35 (Price Bid)

Tender No: /HTC/35 (Price Bid) GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TRANSMISSION CIRCLE HIMATNAGAR Tender No: 01-16/HTC/ (Price Bid) NAME OF WORK up keeping of 0 kv yard & Control Room by outsource for two year at 0 Kv Dhansura

More information

PRODUCT DATA. Parking Automat P kg 1

PRODUCT DATA. Parking Automat P kg 1 - Car KLAUS Multiparking Systems Pvt. Ltd. /, Prashant Apartments, Erandwane, Pune INDIA Phone +9-- 78 / 866 Fax +9-- 66 E-mail info@klausmultiparking.in Website www.klausindia.com PRODUCT DATA Parking

More information

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013. WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP 50-6-113 As of March 1, 2013 Class Code Sort CODE DESCRIPTION 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Steel Products. 8M Series

Steel Products. 8M Series 8M Series Steel Products This trench shield is engineered to the realities of profitable pipe laying. With high tensile steel, non-rigid design and strategic reinforcements, the GME 8M Series trench shield

More information

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer.

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. DOZERS Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. Blade is lowered to cut the soil and push the soil in front of blade. It unloads the soil by pushing it over

More information

200 SERIES SKID STEERS LOADERS/COMPACT TRACK LOADERS

200 SERIES SKID STEERS LOADERS/COMPACT TRACK LOADERS 200 SERIES SKID STEERS LOADERS/COMPACT TRACK LOADERS ENGINE POWER OPERATING RATED OPERATING CAPACITY (@50% OF TIPPING LOAD) ENGINE POWER OPERATING RATED OPERATING CAPACITY (@50% OF TIPPING LOAD) L213 L215

More information

INDUSTRIAL CONSTRUCTION: A Comprehensive Guide to the Heavy Equipment and Tools of the Trade

INDUSTRIAL CONSTRUCTION: A Comprehensive Guide to the Heavy Equipment and Tools of the Trade INDUSTRIAL CONSTRUCTION: A Comprehensive Guide to the Heavy Equipment and Tools of the Trade Table of Contents If you know where you re going, go ahead and click on a chapter. Introduction/Chapter 1: Understanding

More information

The complete product range. Tailor made products to meet your requirements

The complete product range. Tailor made products to meet your requirements The complete product range. Tailor made products to meet your requirements 02 03 WIRTGEN where innovation happens What began as a haulage company for construction materials in 1961 has developed, over

More information

Number 10 of 2012 MOTOR VEHICLE (DUTIES AND LICENCES) ACT 2012 ARRANGEMENT OF SECTIONS. 3. Amendment of Part I of Schedule to Act of 1952.

Number 10 of 2012 MOTOR VEHICLE (DUTIES AND LICENCES) ACT 2012 ARRANGEMENT OF SECTIONS. 3. Amendment of Part I of Schedule to Act of 1952. Number 10 of 2012 MOTOR VEHICLE (DUTIES AND LICENCES) ACT 2012 Section 1. Definitions. ARRANGEMENT OF SECTIONS 2. Application of sections 3 to 5. 3. Amendment of Part I of Schedule to Act of 1952. 4. Amendment

More information

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Appendix C Noise Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Activity Equipment HP Wharf Demolition Landside (A) Wharf Demolition Marine (B) Sheet Pile

More information

T.A.T Minimum Wage Scale

T.A.T Minimum Wage Scale T.A.T Minimum Wage Scale General Construction: Construction projects that are funded by the Three Affiliated Tribes or an Enrolled member of the Fort Berthold Reservation. Rates Fringes Electrician $29.24

More information

This appendix describes various types of equipment that can

This appendix describes various types of equipment that can Appendix GENERAL ENGINEER SUPPORT EQUIPMENT This appendix describes various types of equipment that can be used to support general engineer missions. This information is provided to help planners choose

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD. Filed with the secretary of state on DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION SAFETY AND HEALTH STANDARD Filed with the secretary of state on These rules take effect immediately upon filing with the secretary

More information

Quarrying and Aggregate Industry The Total Solution

Quarrying and Aggregate Industry The Total Solution Quarrying and Aggregate Industry The Total Solution 02 Komatsu The Total Solution Komatsu Solutions Komatsu is a leading supplier of high quality construction and mining equipment to the Australian quarrying

More information

DRAG-A-BOX BRAND MATERIAL SPREADERS

DRAG-A-BOX BRAND MATERIAL SPREADERS DRAG-A-BOX BRAND MATERIAL SPREADERS MODEL CE 7-12 OPERATION INSTRUCTIONS & OWNERS MANUAL BY J. PYOTT & ASSOCIATES 1 OPERATORS INSTRUCTIONS & OWNERS MANUAL These instructions cover the assembly and operation

More information

CRUSHING, FEEDER & SCREENING EQUIPMENT

CRUSHING, FEEDER & SCREENING EQUIPMENT CRUSHING, FEEDER & SCREENING EQUIPMENT BRINGING NEW DIMENSIONS TO THE CRUSHING INDUSTRY WWW.BUILDMATE.IN WHO WE ARE BuildMate is a strong technology oriented, high-tech engineering project and execution

More information

Chicago Pneumatic Construction Tools

Chicago Pneumatic Construction Tools Chicago Pneumatic Construction Tools Chipping Hammers, Clay Diggers, Demolition Picks and Busters Built to last Hammers, Picks and Clay Diggers Key features CP 0012 handle based on the famous CP 0009 design

More information

EL653. Low-noise Construction Machinery [EL /2/ ]

EL653. Low-noise Construction Machinery [EL /2/ ] EL653. Low-noise Construction Machinery [EL653-2002/2/2005-68] 1. Scope The scope shall apply to the machine provided for construction work (hereinafter referred to as construction machine ). 2. Definition

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

Occupations (Construction)

Occupations (Construction) Qualification Title: Level 2 NVQ Diploma in Sub-structure Work Occupations (Construction) Pathway 1: Level 2 NVQ Diploma in Sub-structure Work Occupations (Underpinning Operations Excavated Underpinning)

More information

Batch Plant Maintenance

Batch Plant Maintenance Batch Plant Maintenance Batch Plant Maintenance Preventative Maintenance PM Schedules Mixer (Haarup) Skip Hoist Cement Systems Pneumatic Valve Panels Water Systems Aggregate Bins & Equip Dust Collectors

More information

Landscaping Attachments

Landscaping Attachments Landscaping Attachments Skid Steer Compact Track Backhoe Compact Wheel Wheel SINCE 1842 AUGER Tackle fence work, foundations, and drainage work with a versatile auger. + + Auger options include various

More information

Appendix H: Construction Impacts H-3 Air Quality

Appendix H: Construction Impacts H-3 Air Quality Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263

More information

SUGGESTED SOLUTION IPCC NOVEMBER 2018 EXAM. Test Code -

SUGGESTED SOLUTION IPCC NOVEMBER 2018 EXAM. Test Code - SUGGESTED SOLUTION IPCC NOVEMBER 2018 EXAM COSTING Test Code - BRANCH - (MUMBAI-4) (GD-1) (Date : 01.07.2018) Head Office : Shraddha, 3 rd Floor, Near Chinai College, Andheri (E), Mumbai 69. Tel : (022)

More information