1 Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae Dominic Spaethling Regional Program Manager Bethany Williams Public Involvement Manager, HNTB April 28, 2010
2 Agenda Meeting Objective : Understand characteristics of preliminary alternatives Open House Presentation Question and Answer Open House
3 Results Achieved by Improvements 2000 to trains per day / 5 peak hour Three types of service Express Baby Bullet SF-SJ in under 60 minutes Limited Local (Off Peak Only) Diesel push-pull service 46,000 riders per weekday 2,600 bicycles per weekday
4 The Challenge: Planning for the Future Infrastructure, signal system, and diesel vehicle technology limit capacity Tripled demand from regional growth, Transbay Transit Center and HSR Majority of fleet due for replacement by 2015 Uncertain funding commitment or sources
5 European-Style Rolling Stock Safer Train Design Main energy absorber Caltrain 2025 Maximum Speed Positive Train Control Improved Headway Grade Crossing Improvements Safety Improved By Speed Enforcement Improved Operating Speed and Journey Time Manual Control of Train Speed Limited Speed Med. Speed
6 European-Style Rolling Stock Safer Train Design Main energy absorber NO FUNDING Maximum Speed Positive Train Control Improved Headway Grade Crossing Improvements Safety Improved By Speed Enforcement Improved Operating Speed and Journey Time Manual Control of Train Speed Limited Speed Med. Speed
7 Largest Public Transportation Project in U.S. History 800 miles of new track + stations and related structures $40+ billion in planning and construction costs State, federal, local, and private partnership 10 years for Phase 1 build-out (includes SF SJ) Safely grade-separated 100% clean electric power
8 Why does CA need the High-Speed Train Project? California s population expected to jump by 30% 12 million people by 2030 Rising gas prices Reduced greenhouse gases Maintain a robust economy
9 How does California benefit? Jobs: 450,000 new jobs by ,000 construction jobs (1 year jobs) Reduce the $20B lost each year to congestion in fuel and time costs. HST uses 1/3 the energy of air travel HST uses 1/5 the energy of passenger cars Reduce dependence on foreign oil by 12.7 million barrels per year Reduce greenhouse gas emissions by 12 billion pounds per year
10 Different Systems; Common Needs Electrified System Vehicles High performing with crash energy management X X X X Positive Train Control Grade Crossing Improvement Grade Separated System X X X X
11 A New Partnership: The Peninsula Rail Program Caltrain (JPB) - CHSRA MOU in March/April 2009 Peninsula Rail Corridor - joint development of ONE Program
12 Project Schedule Prelim. Alternatives Analysis -- Spring Stations -- Spring/Summer % Engineering & Costs Summer 2010 Alternatives Dev. 4. Draft EIR/S -- Dec Public Comment Dec Feb Final EIR/S Summer 2011 Draft EIR/S 7. NOD/ROD September % Engineering Final EIR/S
13 Role of Alternatives Analysis Define a range of reasonable, practicable, and feasible project study alternatives Present these alternatives to the CHSRA Board, the FRA and the public for feedback
14 Planning Assumptions Stay within existing Caltrain Right of Way Four track, grade separated system HST up to 125 MPH and Caltrain up to 110 MPH Opportunity for joint operations
15 Planning Assumptions Improve Caltrain Service Shared High Speed & Caltrain Stations San Francisco, Millbrae (SFO), San Jose Potential high-speed train stop: Redwood City Palo Alto Mountain View
16 Additional Considerations Based on Feedback Evaluate the use of berms especially in commercial or residential areas Additional tunnel options Evaluate San Francisco terminal options
17 Feedback from Millbrae Support HSR multi-modal station in Millbrae Support implementation of the Millbrae BART Station Specific Plan Study and mitigate impacts to the Community Avoid 4 track on grade alignment and ROW impacts Traffic, circulation and parking studies Urban design and land use Alternative mode station access Economic development and tax revenues Coordinated and transparent process with City Staff, elected officials and public
18 WHAT IS DESIRED THE OPTIMAL SOLUTION WHAT IS FEASIBLE WHAT IS ACHIEVABLE
19 Findings Caltrain corridor is preferred alignment San Francisco joint terminal solution: Transbay Transit Center and 4th and King Limit use of high berms Tunnel options added Ending High Speed Train service in San Jose would negatively impact Caltrain and its riders, and does not meet Prop. 1A requirements.
20 AERIAL AT CALTRAIN GRADE TRENCH/CUT & COVER Caltrain HST DEEP TUNNEL High Speed Trains
21 Aerial Viaduct COLOR CODE: WIDTH: approx feet PROS: Improved or New East/West Connections, Narrow Width, Benefits to Riders, Constructability CONS: Visual Impact, Noise Impact
22 Existing Caltrain Grade COLOR CODE: WIDTH: approx feet PROS: Benefits to Riders, Constructability CONS: Larger Impacts to Properties on East/West Roads at Grade Crossings
23 Trench COLOR CODE: WIDTH: approx. 100 feet PROS: Limited Visual Impact, Limited Ventilation Needs CONS: Doesn t Improve Connectivity, Potential Impacts to Waterways and Utilities, Cost, Right of Way Needs
24 Cut & Cover COLOR CODE: WIDTH: approx feet PROS: Limited Visual Impact, Improved Connectivity CONS: Requires Ventilation System, Potential Impacts to Waterways and Utilities, Cost, Right of Way Needs
25 Deep Bored Tunnel HST ONLY COLOR CODE: WIDTH: approx feet PROS: Limited Visual Impact of HST, Limited Noise Impact of HST CONS: Cost, Fire & Life Safety Issues, Centralized Noise Impacts at Vent Shafts, No Upgrades to Caltrain
26 RESULTS INITIAL Single Option AERIAL AT GRADE TRENCH/ C&C
27 RESULTS Single Option AERIAL AT GRADE TRENCH/ C&C
28 Community Engagement Process Cities Stakeholders Communities Review C Inform G Outreach Present B D Input Opportunity F Report Back Design Team A Prepare Draft Deliverable E Revise
29 Context Sensitive Solutions (CSS) Collaborative engagement of communities Balance Desirability, Feasibility, and Achievability Design transit facilities that fit setting Preserve and enhance scenic, aesthetic, historic and environmental resources Enhance safety and mobility Promote transit-oriented development and sustainable, livable communities
30 What is in the Toolkit? Reference Documents Context and technical information Exercises Provide input to project team and TWG/PWG members at each step of the process Exercise #1: Mapping the Context Exercise #2: Grade Separation / Vertical Options More Exercises will be released oolkit.html
31 Next Steps Continue to gather feedback Stitch Corridor together 15% Design & Cost Estimates Stations Planning Environmental Studies Draft EIR/EIS, December 2010
32 WHAT IS DESIRED THE OPTIMAL SOLUTION WHAT IS FEASIBLE WHAT IS ACHIEVABLE
33 For More Information and ask to be added to our list. Peninsula Rail Program California High-Speed Rail Authority
34
Agenda. Open House Presentation Question and Answer Break Out Groups Report Out & Close
Agenda Open House Presentation Question and Answer Break Out Groups Report Out & Close Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Sunnyvale Dominic Spaethling
More informationSan Francisco to San Jose Preliminary Alternatives Analysis
San Francisco to San Jose High-Speed Train Project EIR/EIS San Francisco to San Jose Preliminary Alternatives Analysis April 15, 2010 Page 1 Largest Public Transportation Project in U.S. History 800 miles
More informationThis Evening s Agenda. Open House 7:00 7:30 Presentation 7:30 8:00 Community Feedback8:00 9:00 Adjourn
This Evening s Agenda Open House 7:00 7:30 Presentation 7:30 8:00 Community Feedback8:00 9:00 Adjourn Preliminary Station Footprint Potential Mid-Peninsula High Speed Train Station Palo Alto Dominic Spaethling,
More informationAgenda. Preliminary Station Footprint High Speed Train Station in the City of Millbrae
Agenda Preliminary Station Footprint High Speed Train Station in the City of Millbrae Open House 7:00 7:30 Presentation 7:30 8:00 Community Question/Answer 8:00 9:00 Adjourn 2 Preliminary Station Footprint
More informationCaltrain Modernization EMU Procurement
Caltrain Modernization EMU Procurement Boarding Height CAC Meeting May 20, 2015 Context 2 1 Riders (Boardings) Average Weekday Ridership Since 2004 143% increase 60,000 55,000 50,000 45,000 40,000 35,000
More informationCONNECTING AND TRANSFORMING CALIFORNIA
CONNECTING AND TRANSFORMING CALIFORNIA High-Speed Rail Local Policy Maker Group (LPMG) San Carlos, CA January 28, 2016 INTRODUCTIONS 1 STATEWIDE OVERVIEW CONNECTING CALIFORNIA Phase I:» 520 Miles» San
More informationSAN FRANCISCO TO SAN JOSE PROJECT UPDATE
SAN FRANCISCO TO SAN JOSE PROJECT UPDATE San Francisco County Transportation Authority Tuesday, April 25, 2017 Ben Tripousis, Northern California Regional Director HIGH-SPEED RAIL: Connecting California
More informationCaltrain Business Plan
Caltrain Business Plan FEBRUARY 2019 LPMG February 28, 2019 Caltrain Business Plan Project Update 2 3 What is the Caltrain Business Plan? What Why Addresses the future potential of the railroad over the
More informationSouthern California - CHSRA
CALIFORNIA HIGH-SPEED RAIL Michael Gillam, Deputy Program Director Southern California - CHSRA CMAA - Construction Management Association of America July 19, 2012 CALIFORNIA S HIGH-SPEED TRAIN SYSTEM Largest
More informationSAN FRANCISCO TO SAN JOSE PROJECT SECTION
SAN FRANCISCO TO SAN JOSE PROJECT SECTION Local Policy Maker Group Thursday, February 23, 2017 San Carlos, California INTRODUCTIONS 1 CALIFORNIA HIGH-SPEED RAIL PROGRAM UPDATE Jeff Morales, CEO HIGH-SPEED
More informationRailyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY
Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)
More informationElectric Multiple Unit Procurement Update
Electric Multiple Unit Procurement Update Public Meetings September 2014 Caltrain Today 2 1 Key Facts Diesel commuter rail system SF to SJ area 77 mile corridor, 32 stations 92 trains / weekday Ridership:
More informationRail alignment and benefits (rab) study
Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create
More informationHigh Speed Rail Conference
High Speed Rail Conference Denver, October 23, 2012 FAST START PROJECT FOR PENINSULA HIGH-SPEED RAIL Kern Jacobson InfraConsult LLC Objective Evaluate incremental approach to expedite high-speed rail to
More informationWhat is the Peninsula Corridor Electrification Project (PCEP)?
What is the Peninsula Corridor Electrification Project (PCEP)? Project Purpose and Need Improve Train Performance Increase Service and Ridership Increase Revenue and Reduce Cost Reduce Environmental Impacts
More informationCalMod Local Policy Maker Group (LPMG) Agenda
CalMod Local Policy Maker Group (LPMG) Thursday, March 27, 2014 6:00 PM 7:30 PM SamTrans Offices Bacciocco Auditorium 2 nd Floor 1250 San Carlos Ave., San Carlos Agenda 1. JPB Staff Report 2. Information/Discussion
More informationRail~Volution 2012 R. Gregg Albright
CALIFORNIA HIGH-SPEED RAIL AUTHORITY October 16 th, 2012 Rail~Volution 2012 R. Gregg Albright WHAT IS CALIFORNIA HIGH-SPEED TRAIN PROJECT (CHSTP) and HOW WILL IT BE IMPLEMENTED? 2 CALIFORNIA HIGH SPEED
More informationAgenda. Transbay Program. Brief History. Benefits of Transbay Ridership Financial Program Project Risks
2009 Executive Summit March 19, 2009 Transbay Transit Center Briefing 1 Parsons 1 Agenda Transbay Program Transit Center, Downtown Extension, Redevelopment Brief History Passenger Rail, Transbay Terminal,Transbay
More informationSAN FRANCISCO TO SAN JOSE PROJECT SECTION. City of Brisbane Baylands Public Hearing June 7, 2017
SAN FRANCISCO TO SAN JOSE PROJECT SECTION City of Brisbane Baylands Public Hearing June 7, 2017 CALIFORNIA HIGH-SPEED RAIL PROGRAM OVERVIEW 2 HIGH-SPEED RAIL: Connecting California 3 HIGH-SPEED RAIL: It
More informationRail alignment and benefits (rab) study
Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study June 5, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create
More informationCaltrain Business Plan. Project Update July 2018 through January 2019
Caltrain Business Plan JANUARY 2019 Project Update July 2018 through January 2019 2 Business Plan Overview Business Plan Overview A Vision for Growth Crafting Scenarios Looking Beyond the Tracks Outreach
More informationCaltrain Downtown Extension Study Ridership Forecast Summary
Caltrain Downtown Extension Study Ridership Forecast Summary presented to Transbay Joint Powers Authority presented by Cambridge Systematics date: March 12, 2009 Transportation leadership you can trust.
More informationCalMod Program EMU Procurement Update. TJPA Board May 14, 2015
CalMod Program EMU Procurement Update TJPA Board May 14, 2015 Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service (with level boarding)
More informationSan Francisco Transportation Plan Update
San Francisco Transportation Plan Update SPUR August 1, 2011 www.sfcta.org/movesmartsf twitter.com/sanfranciscota www.facebook.com/movesmartsf How does the RTP relate to the SFTP? Regional Transportation
More informationEMU Procurement Seats/Standees/Bikes/Bathroom
EMU Procurement Seats/Standees/Bikes/Bathroom LPMG May 28, 2015 Purpose Seats / standees / bikes / bathroom balance Develop framework for Draft EMU RFP Feedback on car configuration and range of increased
More informationThe Future of Transportation on the Caltrain Corridor
The Future of Transportation on the Caltrain Corridor 11.30.16 1 2 Today What is happening Vision Recommendations What is costs How to pay for it 3 The Caltrain Corridor is home to the world s innovation
More informationPeninsula Corridor Electrification Update Meeting
Peninsula Corridor Electrification Update Meeting Brisbane City Council September 6, 2018 Agenda Caltrain System Overview Project Overview Electric Multiple Unit (EMU) Design Brisbane Construction Activities
More informationStaff Contact: Carlos de Melo, Community Development Director, (650)
Meeting Date: April 10, 2018 STAFF REPORT Agency: City of Belmont Staff Contact: Carlos de Melo, Community Development Director, (650) 595-7440 cdemelo@belmont.gov Agenda Title: Agenda Action(s): Caltrain
More informationTransit in Bay Area Blueprint
Rail~Volution 2010 Click to edit Master title style Transit in Bay Area Blueprint October 21, 2010 0 Bottom Line State-of-Good Repair essential for reliable transit service large funding shortfalls BART
More informationCalMod Program EMU Procurement Update
CalMod Program EMU Procurement Update Board of Directors May 7, 2015 Agenda Item 7a Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service
More informationCalMod Local Policy Maker Group (LPMG) Agenda
CalMod Local Policy Maker Group (LPMG) Thursday, September 25, 2014 6:00 PM 7:30 PM SamTrans Offices Bacciocco Auditorium 2 nd Floor 1250 San Carlos Ave., San Carlos Agenda 1. JPB Staff Report 2. Information/Discussion
More informationPeninsula Corridor Electrification Project (PCEP)
Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract
More informationRavenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, Ravenswood Avenue Railroad Crossing Project
Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, 2017 1 Presentation Outline Project Background Review Current Alternatives City Council Requests Council Direction
More informationBART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010
BART Silicon Valley Berryessa Extension Project Community Update October 27, 2010 1 Agenda Welcome and Introductions Program and Project Background Project Status Project and Station Details Current and
More informationPacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis
Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Transit Coalition September 26, 2012 2 Study Area Pacific Electric Rightof-Way/West Santa Ana Branch (PEROW/ WSAB) extends
More informationTTC Phase I increases to $1.59B; Phase II (DTX) estimated $ B. CHSRA Business Plan grade separates 16 th & Mission Bay Dr (trenching)
Timeline of related projects Legend City and County of San Francisco Transbay Transit Center + DTN Extension Caltrain California High Speed Rail Metropolitan Transportation Authority First date New Starts
More informationElectric Multiple Unit Procurement Update
Electric Multiple Unit Procurement Update Board of Directors August 7, 2014 Context* * The proposed project is not yet approved pending environmental clearance. 2 1 Status April 2014 - JPB update on EMU
More informationDraft Results and Recommendations
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System
More informationSF-LA (125 mph) 2: : :32. SF-SJ (110 mph)
California High-Speed Rail Program Management Team To: Fr: Re: 3 January 203 Jeff Morales, CEO, California High-Speed Rail Authority Frank Vacca, Chief Program Manager, California High-Speed Rail Authority
More informationDRAFT Evaluation Scores. Transit
DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per
More informationAn Overview of High Speed Rail. David Randall Peterman Congressional Research Service
An Overview of High Speed Rail David Randall Peterman Congressional Research Service 1 Defining High Speed Rail in the U.S. What is High Speed Rail? Allusions to world-class European and Asian systems
More informationWhat We Heard Report - Metro Line NW LRT
What We Heard Report - Metro Line NW LRT by Metro Line NW LRT Project Team LRT Projects City of Edmonton April 11, 2018 Project / Initiative Background Name Date Location Metro Line Northwest Light Rail
More informationSustainability SFMTA Path to Platinum
Sustainability SFMTA Path to Platinum Ed Reiskin San Francisco Municipal Transportation Agency, Director of Transportation San Francisco, CA Timothy Papandreou Deputy Director Strategic Planning & Policy
More informationPeninsula Corridor Electrification Project Cost / Schedule Update
Peninsula Corridor Electrification Project Cost / Schedule Update LPMG Meeting November 20, 2014 Context Caltrain/high-speed rail blended system - Primarily 2 track system - Minimize impacts - Shared system
More informationKANSAS CITY STREETCAR
KANSAS CITY STREETCAR KAREN CLAWSON MID-AMERICA REGIONAL COUNCIL KANSAS CITY STREETCAR Regional Context Alternatives Analysis Kansas City Streetcar Project KANSAS CITY REGION KANSAS CITY REGION KANSAS
More informationPEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps
PEACHTREE CORRIDOR PARTNERSHIP Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Why Peachtree? Why Now? I. THE CONTEXT High Level View of Phasing Discussion Potential Ridership Segment 3 Ease
More information6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION
June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments
More informationDraft Results and Open House
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi
More informationREPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES
TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who
More informationVAN NESS AVENUE BUS RAPID TRANSIT
VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running
More informationEast Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St
East Bay Bus Rapid Transit Project 1 AC Transit at a Glance EAST BAY AREA S LARGEST PUBLIC TRANSIT PROVIDER RIDERSHIP Daily (weekday) 178,851* Annual 54,987,132 Paratransit (daily) 1,994 ** * Includes
More informationWOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017
WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017 TODAY WE LL TALK ABOUT Our challenges and how we re meeting them Why we re building this project Our planning process and considerations
More informationPublic Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development
Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation
More informationRecommended Vision for the Downtown Rapid Transit Network
Recommended Vision for the Downtown Rapid Transit Network April 2008 Presentation Overview Context Transit options Assessment of options Recommended network Building the network 2 1 Rapid Our Vision Reliable
More informationCaltrain Downtown Extension Project (DTX)
Presentation to TJPA Board Caltrain Downtown Extension Project Update June 21, 2007 Caltrain Downtown Extension Project (DTX) Topics: DTX Progress HSR QA Initiative Next Steps 1 DTX Progress DTX Progress
More informationPeninsula Corridor Electrification Project (PCEP)
Peninsula Corridor Electrification Project (PCEP) Q2 Quarterly Update #13 October 1 December 31, 2017 JPB Board Meeting February 1, 2018 Agenda Item # 8b Electrification - Infrastructure Progression of
More informationVTA Board of Directors: We are forwarding you the following: Comments regarding 2016 Peninsula Corridor SEIR. Member of the Public. Thank you.
From: Board.Secretary Sent: Friday, July 22, 2016 5:07 PM To: VTA Board of Directors Subject: VTA Correspondence: Comments Regarding 2016 Peninsula Corridor SEIR VTA Board of Directors: We are forwarding
More informationTransportation Sustainability Program
Transportation Sustainability Program Photo: Sergio Ruiz San Francisco 2016 Roads and public transit nearing capacity Increase in cycling and walking despite less than ideal conditions 2 San Francisco
More informationFebruary 2012 Caltrain Annual Passenger Counts Key Findings
February 2012 Caltrain Annual Passenger Counts Key Findings Key Findings February 2012 Caltrain Annual Passenger Counts The 2012 annual Caltrain passenger counts, which were conducted in February 2012,
More informationCrenshaw-Prairie Transit Corridor Study Public Meetings
Crenshaw-Prairie Transit Corridor Study Public Meetings Darby Park: Wednesday, February 20, 2008 6:30 8:00 PM US Bank Community Room: Thursday, February 21, 2008 6:30 8:00 PM Nate Holden Performing Arts
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationCalifornians Advocating Responsible Rail Design (CARRD)
Exhibit A March 04, 2013 Ms. Kathy Hamilton Californians Advocating Responsible Rail Design (CARRD) katham3@gmail.com SENT VIA EMAIL ONLY Dear Ms. Hamilton, On February 19, 2013, the California High-Speed
More informationTransportation Sustainability Program
Transportation Sustainability Program Photo: Sergio Ruiz San Francisco is a popular place to work, live and visit, straining the existing transportation network Roads and transit vehicles nearing capacity
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationUCLA Lake Arrowhead Conference. October 18, 2010
BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1
More informationBalancing the Transportation Needs of a Growing City
Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program
More informationAPPENDIX E: BIBLIOGRAPHY
Caltrain Electrification Program EA/EIR APPENDIX E: BIBLIOGRAPHY Technical Reports The following technical reports, listed alphabetically by report title, document the studies conducted for this EA/EIR.
More informationI-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager
I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives
More informationWhat is the Connector?
What is the Connector? The Connector is a plan for a high-capacity transit system from northeast to south Ann Arbor, connecting major destinations including downtown, commercial, and residential areas,
More informationValley Metro: Past, Present and Future. September 11, 2014
Valley Metro: Past, Present and Future September 11, 2014 Valley Metro Who are We? Two Boards of Directors Regional Public Transportation Authority Fund and operate regional transit services Valley Metro
More informationFREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program
More informationThe RoadMAP to ELectric Vehicle Adoption. Model policies and programs to accelerate EV adoption at the state and local level.
The RoadMAP to ELectric Vehicle Adoption Model policies and programs to accelerate EV adoption at the state and local level. Speakers Katherine Stainken Mary Lunetta Policy Director Plug In America Campaign
More informationCITY OF ANN ARBOR, MICHIGAN 301 E. Huron St., P.O. Box 8647 Ann Arbor, Michigan
Date: Wednesday, June 18, 2014 Location: Ann Arbor District Library Attendees: 14 citizen attendees Ann Arbor Station Environmental Review Citizen Working Group Meeting Notes Meeting #3 The third meeting
More informationDriving to Net Zero. County of Santa Clara Office of Sustainability. Submitted to: Santa Clara County Submitted by: ICF
Driving to Net Zero Submitted to: Santa Clara County Submitted by: ICF County of Santa Clara Office of Sustainability Funded through a grant awarded by the California Strategic Growth Council MARCH 9,
More informationMerger of the generator interconnection processes of Valley Electric and the ISO;
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric
More information11/24/2010. U.S. Highway 41 Tamiami Trial Petroleum Brownfields Road to Revitalization. By Channing Bennett EPA Region 4 UST Program
U.S. Highway 41 Tamiami Trial Petroleum Brownfields Road to Revitalization By Channing Bennett EPA Region 4 UST Program 1 Brownfields Across the U.S. 450,000Brownfields Sites 200,000 Brownfields are estimated
More informationNortheast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study
Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for
More informationKendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study
Florida Department of Transportation District Six Kendall Drive Premium Transit PD&E Study Project Kick-Off Meeting SR 94/Kendall Drive/SW 88 Street Project Development and Environment (PD&E) Study What
More informationConceptual renderings subject to change
Conceptual renderings subject to change OCTA Special Needs Committee Presentation Tuesday, Project Presenter Jamie Lai, P.E. Transit Manager, City of Anaheim The ARTIC Project Manager 2 The ARTIC Project
More informationPlanning of the HSR Network
Engineering Services Department A Global Solution in Public Works Project China s High Speed Rail Network Susan Pan, P.E., Manager of Engineering County of Ventura, Planning of the HSR Network Planning
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay
More informationAugust 2, 2010 Public Meeting
Public Meeting LYMMO Expansion Alternatives Analysis Study Purpose of study is to provide a fresh look at potential LYMMO expansion, following Federal Transit Administration (FTA) Alternatives Analysis
More informationNORTHERN CALIFORNIA REGION
1 NORTHERN CALIFORNIA REGION Local Policy Maker Group February 28, 2019 2 MEETING AGENDA Introduction from the Regional Director Rationale for Preferred Alternative Early Train Operator Outreach Update
More informationPomona Rotary December 19, 2017
Pomona Rotary December 19, 2017 Los Angeles County s population will grow by 5.9% to 10.7 million by 2024 During that same period, the San Gabriel Valley will grow by 7.6% to more than 1.5 million; taking
More informationNeeds and Community Characteristics
Needs and Community Characteristics Anticipate Population and Job Growth in the City Strongest density of population and jobs in Ann Arbor are within the Study Area Population expected to grow 8.4% by
More informationSOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015
SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment
More informationChapter 7. Transportation Capital Improvement Projects. Chapter 7
Chapter 7 Transportation Capital Improvement Projects Chapter 7 81 Chapter 7 Transportation Capital Improvement Projects Local Transportation Sales Tax Programs For over three decades, Santa Clara County
More informationCONNECTING CALIFORNIA
CONNECTING CALIFORNIA Michelle Boehm Southern California Regional Director CMAA, Southern California Chapter September 13, 2017 HIGH-SPEED RAIL: Connecting California HIGH-SPEED RAIL: Around the World
More informationTable of Contents. Attachment 1 Caltrain Service History Attachment 2 Tables and Graphs Caltrain Annual Passenger Counts 1 of 12 Final
February 2013 Caltrain Annual Passenger Counts Key Finding gs Table of Contents Methodology and Background... 2 Recent Service Changes... 2 Weekday Ridership... 2 Stations... 4 Baby Bullet Stations...
More informationU.S. System Summary: CALIFORNIA
U.S. System Summary: CALIFORNIA California High-Speed Rail System (Source: CHSRA) The California high-speed rail system is a proposed system containing 798 miles of routes in nine segments wholly contained
More informationNOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT (EIR)
BOARD OF DIRECTORS 203 Ken Yeager, Chair Tom Nolan, Vice Chair José Cisneros Malia Cohen Jerry Deal Ash Kalra Arthur L. Lloyd Adrienne Tissier Perry Woodward Michael J. Scanlon Executive Director NOTICE
More informationBIRMINGHAM CONNECTED Anne Shaw Tuesday 20 January 2015
BIRMINGHAM CONNECTED Anne Shaw Tuesday 20 January 2015 www.birmingham.gov.uk/connected Birmingham Connected Setting the context challenges in Birmingham The need for action The EU the SUMP process Strategy
More informationMountain View Automated Guideway Transit Feasibility Study Community Meeting September 25, 2017
Mountain View Automated Guideway Transit Feasibility Study Community Meeting September 25, 2017 Jim Lightbody, City of Mountain View Jenny Baumgartner, Lea+Elliott Eileen Goodwin, Apex Strategies 1 Agenda
More informationThe Engineering Department recommends Council receive this report for information.
CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision
More informationFebruary 2011 Caltrain Annual Passenger Counts Key Findings
February 2011 Caltrain Annual Passenger Counts Key Findings Key Findings February 2011 Caltrain Annual Passenger Counts The 2011 annual Caltrain passenger counts, which were conducted in February 2011,
More informationPublic Meeting. March 21, 2013 Mimosa Elementary School
Public Meeting March 21, 2013 Mimosa Elementary School Today s Meeting Purpose 2 Where We Are The Process What We ve Heard and Findings Transit Technologies Station Types Break-out Session Where We Are
More informationDRAFT Subject to modifications
TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The
More informationCaltrain Business Plan
Caltrain Business Plan DECEMBER 2018 LPMG December 20, 2018 The 2040 Vision: A Continued Focus on Service Planning What is the Caltrain Business Plan? What Why Addresses the future potential of the railroad
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal
More informationMultnomah County Commission December 15, 2016
Powell-Division Transit and Development Project Multnomah County Commission December 15, 2016 POWELL-DIVISION TRANSIT AND DEVELOPMENT PROJECT A partnership of Metro, TriMet, the cities of Portland and
More information