Agenda. Open House Presentation Question and Answer Break Out Groups Report Out & Close

Size: px
Start display at page:

Download "Agenda. Open House Presentation Question and Answer Break Out Groups Report Out & Close"

Transcription

1 Agenda Open House Presentation Question and Answer Break Out Groups Report Out & Close

2 Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Sunnyvale Dominic Spaethling Regional Program Manager June 10, 2010

3 Caltrain Improved Service on Existing Infrastructure 98 trains per day 42,000 riders per weekday at peak 2,600 bicycles per weekday Planning for the Future Demand predicted to triple Majority of fleet due for replacement by 2015 Uncertain funding commitment or sources

4 European-Style Rolling Stock Safer Train Design Main energy absorber Caltrain 2025 Maximum Speed Positive Train Control Improved Headway Grade Crossing Improvements Safety Improved By Speed Enforcement Improved Operating Speed and Journey Time Manual Control of Train Speed Limited Speed Med. Speed

5 European-Style Rolling Stock Safer Train Design Main energy absorber NO FUNDING Maximum Speed Positive Train Control Improved Headway Grade Crossing Improvements Safety Improved By Speed Enforcement Improved Operating Speed and Journey Time Manual Control of Train Speed Limited Speed Med. Speed

6 Largest Public Transportation Project in U.S. History 800 miles of new track + stations and related structures Connects major metropolitan areas of the state 10 years for Phase 1 build-out (includes SF SJ)

7 How does California benefit? Jobs: 450,000 new jobs by ,000 construction jobs (1 year jobs) Congestion: Reduce the $20B lost each year to congestion in fuel and time costs. Energy Independence: HST uses 1/3 the energy of air travel; 1/5 of passenger cars Reduce foreign oil by 12.7 million barrels per year Environment: Cut greenhouse gas emissions by 12 billion pounds per year

8 Different Systems; Common Needs Electrified System Vehicles High performing with crash energy management X X X X Positive Train Control Grade Crossing Improvement Grade Separated System X X X X

9 A New Partnership: The Peninsula Rail Program Caltrain (JPB) - CHSRA MOU in March/April 2009 Peninsula Rail Corridor - joint development of ONE Program

10 Project Schedule Prelim. Alternatives Analysis -- Spring Stations -- Spring/Summer % Engineering & Costs Summer 2010 Alternatives Dev. 4. Draft EIR/S -- Dec Public Comment Dec Feb Final EIR/S Summer 2011 Draft EIR/S 7. NOD/ROD September % Engineering Final EIR/S

11 Planning Assumptions Stay within existing Caltrain Right of Way to the extent feasible Four track, grade separated system HST up to 125 MPH and Caltrain up to 110 MPH Opportunity for joint operations, improve Caltrain

12 Planning Assumptions (continued) Utilize existing infrastructure where possible Maintain freight access Shared High Speed & Caltrain Stations: San Francisco Millbrae (SFO) San Jose Potential mid-peninsula high-speed train stop in either Redwood City, Palo Alto, or Mountain View

13 Feedback from Sunnyvale Coordinate planning with the City, with special emphasis on current City projects such as the Mathilda Avenue grade separation. Utilize General Plan noise standards as part of noise and vibration studies. Underground option is preferred to mitigate concerns about impacts of grade separation at Sunnyvale Avenue. Assume a Bernardo Avenue bicycle and pedestrian crossing in the planning process. Concerns about impacts around Sunnyvale Caltrain Station and new downtown development.

14 Preliminary Alternatives Analysis Report KEY INFORMATION LOCATION IN DOCUMENT Tables Comparing Potential Impacts of Various Alternatives Section 4 Plan & Profile Drawings for each Section Typical Section Drawings Caltrain Right of Way Schematics Comparative Cost Estimates Discussion of Alternative Routes Appendix B Appendix C Appendix J Appendix L Appendix A

15 Findings Caltrain corridor is preferred alignment San Francisco joint terminal solution: Transbay Transit Center and 4th and King Limit use of high berms Tunnel options added Ending High Speed Train service in San Jose would negatively impact Caltrain and its riders, and does not meet Prop. 1A requirements.

16 AERIAL AT CALTRAIN GRADE TRENCH/CUT & COVER Caltrain HST DEEP TUNNEL High Speed Trains

17 Aerial Viaduct COLOR CODE: WIDTH: approx feet COST: 3 X at grade PROS: Improved or New East/West Connections, Narrow Width, Usable Space Below Structure, Rider Views, Constructability CONS: Visual Impact, Noise Impact

18 Existing Caltrain Grade COLOR CODE: WIDTH: approx feet Cost: 1 X all costs relative to at grade PROS: No Increase in Visibility, Rider Views, Constructability, least Effect on Freight CONS: Larger Impacts to Properties on East/West Roads at Grade Crossings

19 Trench COLOR CODE: WIDTH: approx. 100 feet COST: 3.5 X at grade PROS: Limited Visual Impact, Limited Ventilation Needs, Options for Connectivity across Trench CONS: Doesn t Improve Connectivity, Potential Impacts to Waterways and Utilities, Cost, Right of Way Needs

20 Cut & Cover COLOR CODE: WIDTH: approx feet COST: 5 X at grade PROS: Limited Visual Impact, Less Noise at Covered Areas, Improved Connectivity, Useable Space at Grade CONS: Requires Ventilation System, Potential Impacts to Waterways and Utilities, Cost, Right of Way Needs, Vent Shaft Noise

21 Deep Bored Tunnel HST ONLY COLOR CODE: WIDTH: approx feet COST: 7 X at grade PROS: Limited Visual and Noise Impacts of HST, Improved Connectivity CONS: Cost, Fire & Life Safety Issues, Centralized Noise Impacts at Vent Shafts, No Upgrades to Caltrain, Decreased Rider Experience

22 Other Alternatives Various combinations of alternatives are also being studied. (See Appendix C)

23 INITIAL RESULTS San AERIAL Francisco to San Jose Project EIR/EIS AT GRADE California TRENCH/ High-Speed C&CTrain Project

24 RESULTS San AERIAL Francisco to San HST Jose AERIAL Project EIR/EIS AT GRADE California TRENCH/ High-Speed C&CTrain HST Project TUNNEL

25 RESULTS INITIAL San AERIAL Francisco to San Jose Project EIR/EIS AT GRADE California TRENCH/ High-Speed C&CTrain Project Tunnel Added

26 RESULTS Tunnel Added San Francisco to San HST Jose AERIAL Project EIR/EIS AT GRADE California TRENCH/ High-Speed C&CTrain HST Project TUNNEL

27 Question & Answer

28 Break-out Groups Review Alternatives Analysis Maps Feedback on Alternatives Report Back

29 Next Steps Continue to gather feedback Stitch Corridor together 15% Design & Cost Estimates Stations Planning Environmental Studies Draft EIR/EIS, December 2010

30 For More Information and ask to be added to our list. Peninsula Rail Program California High-Speed Rail Authority

31

Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae

Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae Preliminary Alternatives Analysis Caltrain Modernization & High Speed Train Projects City of Millbrae Dominic Spaethling Regional Program Manager Bethany Williams Public Involvement Manager, HNTB April

More information

San Francisco to San Jose Preliminary Alternatives Analysis

San Francisco to San Jose Preliminary Alternatives Analysis San Francisco to San Jose High-Speed Train Project EIR/EIS San Francisco to San Jose Preliminary Alternatives Analysis April 15, 2010 Page 1 Largest Public Transportation Project in U.S. History 800 miles

More information

This Evening s Agenda. Open House 7:00 7:30 Presentation 7:30 8:00 Community Feedback8:00 9:00 Adjourn

This Evening s Agenda. Open House 7:00 7:30 Presentation 7:30 8:00 Community Feedback8:00 9:00 Adjourn This Evening s Agenda Open House 7:00 7:30 Presentation 7:30 8:00 Community Feedback8:00 9:00 Adjourn Preliminary Station Footprint Potential Mid-Peninsula High Speed Train Station Palo Alto Dominic Spaethling,

More information

Agenda. Preliminary Station Footprint High Speed Train Station in the City of Millbrae

Agenda. Preliminary Station Footprint High Speed Train Station in the City of Millbrae Agenda Preliminary Station Footprint High Speed Train Station in the City of Millbrae Open House 7:00 7:30 Presentation 7:30 8:00 Community Question/Answer 8:00 9:00 Adjourn 2 Preliminary Station Footprint

More information

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE SAN FRANCISCO TO SAN JOSE PROJECT UPDATE San Francisco County Transportation Authority Tuesday, April 25, 2017 Ben Tripousis, Northern California Regional Director HIGH-SPEED RAIL: Connecting California

More information

What is the Peninsula Corridor Electrification Project (PCEP)?

What is the Peninsula Corridor Electrification Project (PCEP)? What is the Peninsula Corridor Electrification Project (PCEP)? Project Purpose and Need Improve Train Performance Increase Service and Ridership Increase Revenue and Reduce Cost Reduce Environmental Impacts

More information

SAN FRANCISCO TO SAN JOSE PROJECT SECTION. City of Brisbane Baylands Public Hearing June 7, 2017

SAN FRANCISCO TO SAN JOSE PROJECT SECTION. City of Brisbane Baylands Public Hearing June 7, 2017 SAN FRANCISCO TO SAN JOSE PROJECT SECTION City of Brisbane Baylands Public Hearing June 7, 2017 CALIFORNIA HIGH-SPEED RAIL PROGRAM OVERVIEW 2 HIGH-SPEED RAIL: Connecting California 3 HIGH-SPEED RAIL: It

More information

Caltrain Business Plan

Caltrain Business Plan Caltrain Business Plan FEBRUARY 2019 LPMG February 28, 2019 Caltrain Business Plan Project Update 2 3 What is the Caltrain Business Plan? What Why Addresses the future potential of the railroad over the

More information

SAN FRANCISCO TO SAN JOSE PROJECT SECTION

SAN FRANCISCO TO SAN JOSE PROJECT SECTION SAN FRANCISCO TO SAN JOSE PROJECT SECTION Local Policy Maker Group Thursday, February 23, 2017 San Carlos, California INTRODUCTIONS 1 CALIFORNIA HIGH-SPEED RAIL PROGRAM UPDATE Jeff Morales, CEO HIGH-SPEED

More information

CONNECTING AND TRANSFORMING CALIFORNIA

CONNECTING AND TRANSFORMING CALIFORNIA CONNECTING AND TRANSFORMING CALIFORNIA High-Speed Rail Local Policy Maker Group (LPMG) San Carlos, CA January 28, 2016 INTRODUCTIONS 1 STATEWIDE OVERVIEW CONNECTING CALIFORNIA Phase I:» 520 Miles» San

More information

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)

More information

Caltrain Modernization EMU Procurement

Caltrain Modernization EMU Procurement Caltrain Modernization EMU Procurement Boarding Height CAC Meeting May 20, 2015 Context 2 1 Riders (Boardings) Average Weekday Ridership Since 2004 143% increase 60,000 55,000 50,000 45,000 40,000 35,000

More information

High Speed Rail Conference

High Speed Rail Conference High Speed Rail Conference Denver, October 23, 2012 FAST START PROJECT FOR PENINSULA HIGH-SPEED RAIL Kern Jacobson InfraConsult LLC Objective Evaluate incremental approach to expedite high-speed rail to

More information

Agenda. Transbay Program. Brief History. Benefits of Transbay Ridership Financial Program Project Risks

Agenda. Transbay Program. Brief History. Benefits of Transbay Ridership Financial Program Project Risks 2009 Executive Summit March 19, 2009 Transbay Transit Center Briefing 1 Parsons 1 Agenda Transbay Program Transit Center, Downtown Extension, Redevelopment Brief History Passenger Rail, Transbay Terminal,Transbay

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

CalMod Local Policy Maker Group (LPMG) Agenda

CalMod Local Policy Maker Group (LPMG) Agenda CalMod Local Policy Maker Group (LPMG) Thursday, March 27, 2014 6:00 PM 7:30 PM SamTrans Offices Bacciocco Auditorium 2 nd Floor 1250 San Carlos Ave., San Carlos Agenda 1. JPB Staff Report 2. Information/Discussion

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study June 5, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

Peninsula Corridor Electrification Update Meeting

Peninsula Corridor Electrification Update Meeting Peninsula Corridor Electrification Update Meeting Brisbane City Council September 6, 2018 Agenda Caltrain System Overview Project Overview Electric Multiple Unit (EMU) Design Brisbane Construction Activities

More information

TTC Phase I increases to $1.59B; Phase II (DTX) estimated $ B. CHSRA Business Plan grade separates 16 th & Mission Bay Dr (trenching)

TTC Phase I increases to $1.59B; Phase II (DTX) estimated $ B. CHSRA Business Plan grade separates 16 th & Mission Bay Dr (trenching) Timeline of related projects Legend City and County of San Francisco Transbay Transit Center + DTN Extension Caltrain California High Speed Rail Metropolitan Transportation Authority First date New Starts

More information

Electric Multiple Unit Procurement Update

Electric Multiple Unit Procurement Update Electric Multiple Unit Procurement Update Public Meetings September 2014 Caltrain Today 2 1 Key Facts Diesel commuter rail system SF to SJ area 77 mile corridor, 32 stations 92 trains / weekday Ridership:

More information

CalMod Program EMU Procurement Update. TJPA Board May 14, 2015

CalMod Program EMU Procurement Update. TJPA Board May 14, 2015 CalMod Program EMU Procurement Update TJPA Board May 14, 2015 Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service (with level boarding)

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

EMU Procurement Seats/Standees/Bikes/Bathroom

EMU Procurement Seats/Standees/Bikes/Bathroom EMU Procurement Seats/Standees/Bikes/Bathroom LPMG May 28, 2015 Purpose Seats / standees / bikes / bathroom balance Develop framework for Draft EMU RFP Feedback on car configuration and range of increased

More information

Caltrain Downtown Extension Study Ridership Forecast Summary

Caltrain Downtown Extension Study Ridership Forecast Summary Caltrain Downtown Extension Study Ridership Forecast Summary presented to Transbay Joint Powers Authority presented by Cambridge Systematics date: March 12, 2009 Transportation leadership you can trust.

More information

Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, Ravenswood Avenue Railroad Crossing Project

Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, Ravenswood Avenue Railroad Crossing Project Ravenswood Avenue Railroad Crossing Project City Council Meeting Study Session April 4, 2017 1 Presentation Outline Project Background Review Current Alternatives City Council Requests Council Direction

More information

Caltrain Business Plan. Project Update July 2018 through January 2019

Caltrain Business Plan. Project Update July 2018 through January 2019 Caltrain Business Plan JANUARY 2019 Project Update July 2018 through January 2019 2 Business Plan Overview Business Plan Overview A Vision for Growth Crafting Scenarios Looking Beyond the Tracks Outreach

More information

The Future of Transportation on the Caltrain Corridor

The Future of Transportation on the Caltrain Corridor The Future of Transportation on the Caltrain Corridor 11.30.16 1 2 Today What is happening Vision Recommendations What is costs How to pay for it 3 The Caltrain Corridor is home to the world s innovation

More information

Peninsula Corridor Electrification Project Cost / Schedule Update

Peninsula Corridor Electrification Project Cost / Schedule Update Peninsula Corridor Electrification Project Cost / Schedule Update LPMG Meeting November 20, 2014 Context Caltrain/high-speed rail blended system - Primarily 2 track system - Minimize impacts - Shared system

More information

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010 BART Silicon Valley Berryessa Extension Project Community Update October 27, 2010 1 Agenda Welcome and Introductions Program and Project Background Project Status Project and Station Details Current and

More information

Southern California - CHSRA

Southern California - CHSRA CALIFORNIA HIGH-SPEED RAIL Michael Gillam, Deputy Program Director Southern California - CHSRA CMAA - Construction Management Association of America July 19, 2012 CALIFORNIA S HIGH-SPEED TRAIN SYSTEM Largest

More information

February 2012 Caltrain Annual Passenger Counts Key Findings

February 2012 Caltrain Annual Passenger Counts Key Findings February 2012 Caltrain Annual Passenger Counts Key Findings Key Findings February 2012 Caltrain Annual Passenger Counts The 2012 annual Caltrain passenger counts, which were conducted in February 2012,

More information

Staff Contact: Carlos de Melo, Community Development Director, (650)

Staff Contact: Carlos de Melo, Community Development Director, (650) Meeting Date: April 10, 2018 STAFF REPORT Agency: City of Belmont Staff Contact: Carlos de Melo, Community Development Director, (650) 595-7440 cdemelo@belmont.gov Agenda Title: Agenda Action(s): Caltrain

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

Key Findings. February 2009 Caltrain Annual Passenger Counts

Key Findings. February 2009 Caltrain Annual Passenger Counts Key Findings February 2009 Caltrain Annual Passenger Counts The 2009 annual Caltrain passenger counts, which were conducted starting in late-january and were complete by mid-february, followed the same

More information

Mobility Management: Caltrain

Mobility Management: Caltrain Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review

More information

CalMod Local Policy Maker Group (LPMG) Agenda

CalMod Local Policy Maker Group (LPMG) Agenda CalMod Local Policy Maker Group (LPMG) Thursday, September 25, 2014 6:00 PM 7:30 PM SamTrans Offices Bacciocco Auditorium 2 nd Floor 1250 San Carlos Ave., San Carlos Agenda 1. JPB Staff Report 2. Information/Discussion

More information

CalMod Program EMU Procurement Update

CalMod Program EMU Procurement Update CalMod Program EMU Procurement Update Board of Directors May 7, 2015 Agenda Item 7a Key Discussion Items Original Plan Alternative Plan Two Timeframes - 2020 electrified service - Future blended service

More information

SF-LA (125 mph) 2: : :32. SF-SJ (110 mph)

SF-LA (125 mph) 2: : :32. SF-SJ (110 mph) California High-Speed Rail Program Management Team To: Fr: Re: 3 January 203 Jeff Morales, CEO, California High-Speed Rail Authority Frank Vacca, Chief Program Manager, California High-Speed Rail Authority

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

Table of Contents. Attachment 1 Caltrain Service History Attachment 2 Tables and Graphs Caltrain Annual Passenger Counts 1 of 12 Final

Table of Contents. Attachment 1 Caltrain Service History Attachment 2 Tables and Graphs Caltrain Annual Passenger Counts 1 of 12 Final February 2013 Caltrain Annual Passenger Counts Key Finding gs Table of Contents Methodology and Background... 2 Recent Service Changes... 2 Weekday Ridership... 2 Stations... 4 Baby Bullet Stations...

More information

VTA Board of Directors: We are forwarding you the following: Comments regarding 2016 Peninsula Corridor SEIR. Member of the Public. Thank you.

VTA Board of Directors: We are forwarding you the following: Comments regarding 2016 Peninsula Corridor SEIR. Member of the Public. Thank you. From: Board.Secretary Sent: Friday, July 22, 2016 5:07 PM To: VTA Board of Directors Subject: VTA Correspondence: Comments Regarding 2016 Peninsula Corridor SEIR VTA Board of Directors: We are forwarding

More information

February 2011 Caltrain Annual Passenger Counts Key Findings

February 2011 Caltrain Annual Passenger Counts Key Findings February 2011 Caltrain Annual Passenger Counts Key Findings Key Findings February 2011 Caltrain Annual Passenger Counts The 2011 annual Caltrain passenger counts, which were conducted in February 2011,

More information

Caltrain Business Plan

Caltrain Business Plan Caltrain Business Plan DECEMBER 2018 LPMG December 20, 2018 The 2040 Vision: A Continued Focus on Service Planning What is the Caltrain Business Plan? What Why Addresses the future potential of the railroad

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q4 Quarterly Update #11 April 1 June 30, 2017 JPB Board Meeting August 3, 2017 Agenda Item # 8a Electrification - Infrastructure Design Build Contract

More information

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager

I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives

More information

Transit in Bay Area Blueprint

Transit in Bay Area Blueprint Rail~Volution 2010 Click to edit Master title style Transit in Bay Area Blueprint October 21, 2010 0 Bottom Line State-of-Good Repair essential for reliable transit service large funding shortfalls BART

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Laura Cornejo, DEO Regional Planner Regional Operator Metro is LA County s Regional Builder/Funder Rail Bus Service (Metro/Muni/Local)

More information

BART s Transbay Core Capacity Project

BART s Transbay Core Capacity Project BART s Transbay Core Capacity Project Duncan Watry, Principal Planner Bay Area Rapid Transit Oakland, CA dwatry@bart.gov Donald Emerson, Principal Consultant WSP Parsons Brinckerhoff San Francisco, CA

More information

APPENDIX E: BIBLIOGRAPHY

APPENDIX E: BIBLIOGRAPHY Caltrain Electrification Program EA/EIR APPENDIX E: BIBLIOGRAPHY Technical Reports The following technical reports, listed alphabetically by report title, document the studies conducted for this EA/EIR.

More information

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013

East San Fernando Valley Transit Corridor. TAC Briefing December 4, 2013 East San Fernando Valley Transit Corridor TAC Briefing December 4, 2013 Overview Measure R Project Long Range Transportation Plan Reserves $170.1 Million 2018 Revenue Operations Date Coordination with

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT (EIR)

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT (EIR) BOARD OF DIRECTORS 203 Ken Yeager, Chair Tom Nolan, Vice Chair José Cisneros Malia Cohen Jerry Deal Ash Kalra Arthur L. Lloyd Adrienne Tissier Perry Woodward Michael J. Scanlon Executive Director NOTICE

More information

DRAFT Evaluation Scores. Transit

DRAFT Evaluation Scores. Transit DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per

More information

San Francisco Transportation Plan Update

San Francisco Transportation Plan Update San Francisco Transportation Plan Update SPUR August 1, 2011 www.sfcta.org/movesmartsf twitter.com/sanfranciscota www.facebook.com/movesmartsf How does the RTP relate to the SFTP? Regional Transportation

More information

Caltrain / California HSR Blended Operations Analysis Supplemental Analysis Requested by Stakeholders. Service Plan / Operations Considerations Study

Caltrain / California HSR Blended Operations Analysis Supplemental Analysis Requested by Stakeholders. Service Plan / Operations Considerations Study Caltrain / California HSR Blended Operations Analysis Supplemental Analysis Requested by Stakeholders Service Plan / Operations Considerations Study Prepared for: Peninsula Corridor Joint Powers Board

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q2 Quarterly Update #13 October 1 December 31, 2017 JPB Board Meeting February 1, 2018 Agenda Item # 8b Electrification - Infrastructure Progression of

More information

For Lease: Building C, 2nd Floor 28,308 SF Available 3315 SCOTT BOULEVARD Santa Clara, California

For Lease: Building C, 2nd Floor 28,308 SF Available 3315 SCOTT BOULEVARD Santa Clara, California For Lease: Building C, 2nd Floor 28,308 SF Available 3315 SCOTT BOULEVARD Santa Clara, California tified ilver Cer LEED S >> Cafeteria "Arcade Cafe" >> Bocce Court >> Fitness Center >> Bike Lockers >>

More information

August 6 th, Board of Directors. Kent Riffey Tony Daniels. Chief Engineer Program Director. Project Implementation & Phasing Workshop

August 6 th, Board of Directors. Kent Riffey Tony Daniels. Chief Engineer Program Director. Project Implementation & Phasing Workshop Exhibit A Board of Directors Project Implementation & Phasing Workshop August 6 th, 2009 Kent Riffey Tony Daniels Chief Engineer Program Director Today s Workshop Objectives Discussion of Bringing Phase

More information

An Overview of High Speed Rail. David Randall Peterman Congressional Research Service

An Overview of High Speed Rail. David Randall Peterman Congressional Research Service An Overview of High Speed Rail David Randall Peterman Congressional Research Service 1 Defining High Speed Rail in the U.S. What is High Speed Rail? Allusions to world-class European and Asian systems

More information

Community Meetings June 2018

Community Meetings June 2018 Community Meetings June 2018 1 Welcome and Agenda Thank you for joining us! 6:00 pm Open House 6:30 pm Welcome & Presentation 7:00 pm Q&A 7:15 pm Open House Resumes 8:00 pm Meeting Concludes 2 Purpose

More information

Welcome and Agenda. Thank you for joining us! 6:00 pm Open House. 6:30 pm Welcome & Presentation. 7:00 pm Q&A. 7:15 pm Open House Resumes

Welcome and Agenda. Thank you for joining us! 6:00 pm Open House. 6:30 pm Welcome & Presentation. 7:00 pm Q&A. 7:15 pm Open House Resumes 1 Welcome and Agenda Thank you for joining us! 6:00 pm Open House 6:30 pm Welcome & Presentation 7:00 pm Q&A 7:15 pm Open House Resumes 8:00 pm Meeting Concludes 2 Purpose of this Meeting Introduce project

More information

Overview of Regional Commuter Rail Webinar: Phoenix, Arizona December 18, 2013

Overview of Regional Commuter Rail Webinar: Phoenix, Arizona December 18, 2013 Overview of Regional Commuter Rail Webinar: Phoenix, Arizona December 18, 2013 2013, All Rights Reserved. 1 The Maricopa Association of Governments (MAG) is the designated metropolitan planning organization

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Caltrain Downtown Extension Project (DTX)

Caltrain Downtown Extension Project (DTX) Presentation to TJPA Board Caltrain Downtown Extension Project Update June 21, 2007 Caltrain Downtown Extension Project (DTX) Topics: DTX Progress HSR QA Initiative Next Steps 1 DTX Progress DTX Progress

More information

U.S. System Summary: CALIFORNIA

U.S. System Summary: CALIFORNIA U.S. System Summary: CALIFORNIA California High-Speed Rail System (Source: CHSRA) The California high-speed rail system is a proposed system containing 798 miles of routes in nine segments wholly contained

More information

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015 Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8

More information

Chapter 7. Transportation Capital Improvement Projects. Chapter 7

Chapter 7. Transportation Capital Improvement Projects. Chapter 7 Chapter 7 Transportation Capital Improvement Projects Chapter 7 81 Chapter 7 Transportation Capital Improvement Projects Local Transportation Sales Tax Programs For over three decades, Santa Clara County

More information

Californians Advocating Responsible Rail Design (CARRD)

Californians Advocating Responsible Rail Design (CARRD) Exhibit A March 04, 2013 Ms. Kathy Hamilton Californians Advocating Responsible Rail Design (CARRD) katham3@gmail.com SENT VIA EMAIL ONLY Dear Ms. Hamilton, On February 19, 2013, the California High-Speed

More information

For Lease: Building D, 6th Floor 42,000 SF Available (Divisible) 3335 SCOTT BOULEVARD Santa Clara, California

For Lease: Building D, 6th Floor 42,000 SF Available (Divisible) 3335 SCOTT BOULEVARD Santa Clara, California For Lease: Building D, 6th Floor 42,000 SF Available (Divisible) 3335 SCOTT BOULEVARD Santa Clara, California 6th Floor Available >> Fitness Center >> Bike Lockers >> >> 3.3/1,000 Parking Shuttle Stop

More information

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St East Bay Bus Rapid Transit Project 1 AC Transit at a Glance EAST BAY AREA S LARGEST PUBLIC TRANSIT PROVIDER RIDERSHIP Daily (weekday) 178,851* Annual 54,987,132 Paratransit (daily) 1,994 ** * Includes

More information

AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph)

AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph) FOR IMMEDIATE RELEASE September 28, 2010 ATK-10-130a Contact: Media Relations 202 906.3860 AMTRAK ENVISIONS WORLD CLASS HIGH-SPEED RAIL Washington to Boston in about three hours at up to 220 mph (354 kph)

More information

End-of-Year Performance Report FY Community Relations Committee December 5, 2018

End-of-Year Performance Report FY Community Relations Committee December 5, 2018 End-of-Year Performance Report FY 2018 Community Relations Committee December 5, 2018 Annual Summary Shuttles Ridership All Modes Performance Statistics Highlights All Modes Initiatives 2 Bus Ridership

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

Rail~Volution 2012 R. Gregg Albright

Rail~Volution 2012 R. Gregg Albright CALIFORNIA HIGH-SPEED RAIL AUTHORITY October 16 th, 2012 Rail~Volution 2012 R. Gregg Albright WHAT IS CALIFORNIA HIGH-SPEED TRAIN PROJECT (CHSTP) and HOW WILL IT BE IMPLEMENTED? 2 CALIFORNIA HIGH SPEED

More information

Green Line opens June 14

Green Line opens June 14 Winter 2014 Green Line opens June 14 To-do list for METRO Green Line s grand opening Yours: Study safety tips at www.centralcorridor.org/safety Learn about planned Metro Transit bus service changes on

More information

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

CHAPTER 1: PURPOSE OF AND NEED FOR PROJECT

CHAPTER 1: PURPOSE OF AND NEED FOR PROJECT CHAPTER 1: PURPOSE OF AND NEED FOR PROJECT 1.1 PURPOSE The primary purposes of the Caltrain Electrification Program are to: Improve train performance, Reduce noise, Improve regional air quality, and Modernize

More information

Community Open Houses November 29 December 7, 2017

Community Open Houses November 29 December 7, 2017 Community Open Houses November 29 December 7, 2017 1 Community Open House Agenda 6:00 PM Open House 6:30-7:30 PM Presentation and Q&A 7:30-8:00 PM Open House Resumes after the presentation and Q&A Thank

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Why Peachtree? Why Now? I. THE CONTEXT High Level View of Phasing Discussion Potential Ridership Segment 3 Ease

More information

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010 BART Click to Capacity edit Master Overview title style for UCLA Lake Arrowhead Conference October 18, 2010 0 BART Basics 360,000 daily riders 104 miles 43 stations 1.3 billion annual passenger miles 1

More information

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Madison BRT Transit Corridor Study Proposed BRT Operations Plans Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is

More information

State of California Transit and Intercity Passenger Rail Program. Caltrain Grant Application Overview January 2018

State of California Transit and Intercity Passenger Rail Program. Caltrain Grant Application Overview January 2018 State of California Transit and Intercity Passenger Rail Program Caltrain Grant Application Overview January 2018 TIRCP Program Overview The TIRCP provides grants from the Greenhouse Gas Reduction Fund

More information

Key Project Elements Status Report

Key Project Elements Status Report Los Angeles County Metropolitan Transportation Authority Key Project Elements Status Report presented to the Corridor Advisory Committee August 18, 2016 Background Motion 22.1 elements are grouped into

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

Item No. 10 Town of Atherton

Item No. 10 Town of Atherton Item No. 10 Town of Atherton CITY COUNCIL STAFF REPORT REGULAR AGENDA TO: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI COMMUNITY SERVICES DIRECTOR DATE: DECEMBER

More information

SEPULVEDA PASS CORRIDOR

SEPULVEDA PASS CORRIDOR SEPULVEDA PASS CORRIDOR PUBLIC PRIVATE PARTNERSHIP DELIVERY PRE-DEVELOPMENT AGREEMENT PDA Sepulveda Pass Mobility Issues Most congested highway segment in the U.S. 295,000 vehicles per day (2010) 430,000

More information

THE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES. Prepared By: Jacki Murdock Transportation and Environmental Planner

THE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES. Prepared By: Jacki Murdock Transportation and Environmental Planner THE WILSHIRE CORRIDOR: RAIL AND ITS ALTERNATIVES Prepared By: Jacki Murdock Transportation and Environmental Planner December 13 th, 2012 Overview Characteristics of Wilshire Boulevard Overview of the

More information

UCSF Mount Zion Proposed Garage 2420 Sutter Street. November 18,

UCSF Mount Zion Proposed Garage 2420 Sutter Street. November 18, UCSF Mount Zion Proposed Garage 2420 Sutter Street November 18, 2010 1 UCSF Mount Zion UCSF Comprehensive Cancer Center -- only comprehensive cancer center in Northern California, designated by the National

More information

High-speed Rail in California:

High-speed Rail in California: High-speed Rail in California: The Process to Success AREMA 2010 National Conference By: Bruce Armistead Assistant Vice President Parsons Brinckerhoff 444 S. Flower Street, Suite 3700 Los Angeles, CA 90071

More information

5. Adjourn BOARD OF DIRECTORS 2019

5. Adjourn BOARD OF DIRECTORS 2019 BOARD OF DIRECTORS 2019 SPECIAL MEETING AGENDA PENINSULA CORRIDOR JOINT POWERS BOARD Bacciocco Auditorium, 2 nd Floor 1250 San Carlos Avenue, San Carlos CA 94070 January 10, 2019 Thursday JEANNIE BRUINS,

More information

Bicycle Advisory Committee CORRESPONDENCE. as of March 13, 2017

Bicycle Advisory Committee CORRESPONDENCE. as of March 13, 2017 Bicycle Advisory Committee CORRESPONDENCE as of March 13, 2017 From: To: Subject: Date: Attachments: Caltrain, Bac (@caltrain.com) Tietjen, Brent FW: SFCTA March 14 Board meeting Item #12. Update on the

More information

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016

Clifton Corridor Transit Initiative. Briefing to Great Lakes Community February 11, 2016 Clifton Corridor Transit Initiative Briefing to Great Lakes Community February 11, 2016 Neighborhood Concerns and Requests Provide a general overview and background of the project What are the different

More information

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION October 6, 2016 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 WELCOME 2 Item #4 TRAC ROADWAY RECOMMENDATIONS UPDATE Item #4 Completed Jurisdiction Presentations Boulder City August

More information

MINUTES OF SEPTEMBER 18, P. Bendix, J. Berk, B. Jenkins, A. Levin, A. Sweet, C. Tucker, K. Gardiner

MINUTES OF SEPTEMBER 18, P. Bendix, J. Berk, B. Jenkins, A. Levin, A. Sweet, C. Tucker, K. Gardiner CITIZENS ADVISORY COMMITTEE (CAC) PENINSULA CORRIDOR JOINT POWERS BOARD (JPB) SAN MATEO COUNTY TRANSIT DISTRICT ADMINISTRATIVE BUILDING Bacciocco Auditorium, 2 nd Floor 1250 San Carlos Avenue, San Carlos

More information

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development

Public Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation

More information