1 Key to Fields in the List KEY Description is under consideration as possible solution to a Concept need, but little or no analysis is available National Grid has internally detemined that the project is an appropriate solution to a need, but has not yet obtained Proposed Plan () from ISO-NE (I.3.9 ISO-NE Proposed approval) has been approved (if required) and has Sanction Paper approval. has approval and has Sanction Paper and is under construction. In is complete. Cancelled

2 National Grid Local System Plan List ed In Owner Primary Driver Major by Sep-16 Jun-18 Jun-16 Deerfield 5 Transformer E Tewksbury #59 Transformer E. Webster upgrade transformer T1 Foxboro Area Load Supply (previously Union Loop) Concept $29,750,000 No Jun-16 N Grafton Jun-18 N. Oxford add a 2nd Transformer Jun-15 Jun-18 Mid Weymouth sub Add T1 40 MVA sub Phillips Lane 2nd Transformer Addition May-19 Salem Harbor - transformer Oct-17 Mar-19 Nov-16 Mar-17 May-17 Feb-16 Jun-15 Sandy Pond substation remove distribution load from tertiary windings of transformer and install kv substation. Shrewsbury 306 Transformer Vernon Hill #8 Transformer West Street - transformer replacement Y25N Bennington - Harriman + Taps Z1-Y2 Refurbishment (Condition Improvement and Structural Analysis - Fall River, Somerset, Swansea, MA) Everett kV Transformer Meadowbrook Substation - two new kv transformers & upgrade A-153 (from Tewksbury to Meadowbrook) and I-161 (from Sandy Pond to Meadowbrook) Read St Sub Replace T4 with 40 MVA sub Proposed $5,200,000 No Proposed $21,285,000 No Proposed $2,200,000 No 09/30/20133:17 PM 2

3 Owner by ed In Major Shrewsbury al & Cable Operations Dec-14 Sep-15 Replace transformer and switches at E. Longmeadow substation Assoc. with RSP #946 Substation Upgrades at Park St., Gardner, MA Proposed $7,622,222 No Proposed $6,740,000 No Jun-17 Wamesit Substation Proposed $8,000,000 11/08/12 Mar-14 Ward Hill T1 Transformer Proposed $1,840,000 No Dec-16 Webster St transformers Proposed $4,650,000 No Dec-15 Field Street $9,745,000 03/01/11 Quincy Area Upgrade Dec-15 N. Quincy Sub Improvements $2,000,000 03/01/11 Dec-16 Oct-14 Oct-15 Carpenter Hill - install kv 56 MVA autotransformer and low side breaker. Install distribution transformer at new West Hampden substation. (Assoc. with RSP #946) Adams St - Replace kv 15/30 MVA transformer Harrison Blvd (previously Avon) - new kv substation $3,575,000 12/2007 $4,250,000 03/29/11 $2,780,000 12/07/12 $3,000,000 04/03/09 Apr-14 E. Holbrook Breaker $1,950,000 NR Hull 1 and 2 lines (23kV) $280,000 NR Nov-15 Centech - New Shrewsbury and Cable Operations (SELCO) Substation Revere Substation s S145 & T kv Taps to new Wakefield Municipal Substation - Wallace $0 (Ngrid portion of project is PTF) 03/07/13 $1,640,000 No $600,000 07/25/13 Oct-15 T20 Meadow St. - East Webster $3,250,000 NR Marlboro Area Study Merrimack Valley/North Shore Reliability 2nd kv transformer at E. Main St. sub in Westboro Re-conductor Meadowbrook - N. Chelmsford portion of I-161 and A kv lines $4,830,000 05/01/10 $9,421,000 07/ /30/20133:17 PM 3

4 Owner by New Hampshire ed In Apr-14 Dec-16 Dec-14 Oct Nov-16 Major DuPont kv Substation Transformer Addition Everett#37 Transformer sub Norwell Area C3 & S9 Line Norwell sub - replace kv transformer U21S - Prospect St Sub Improvements Mount Support substation - install 2nd transformer Pelham 14 - add second 115/13 kv transformer Y151 and Taps Hudson- Tewksbury ACR $3,900,000 04/03/09 $8,300,000 03/01/11 $14,200,000 12/01/10 $2,600,000 12/2010 $2,140,000 NR Concept TBD 4/2013 Mar Tap ACR (Sub-T) Mar ACR (Sub-T) Mar ACR (Sub-T) Mar ACR (Sub-T) Mar ACR (Sub-T) Mar ACR (Sub-T) Jul-15 Aug-14 New Hampshire Cooperative kv 3318 Delivery Point Slayton Hill sub replace T1 with 55 MVA Install new control house at Comerford substation with protection and control equipment $379,000 NR $1,630,000 4/2013 $3,277,755 NR Rhode Island Jun-18 Jun-17 Newport Area Study Newport Area Transmission Phillipsdale (E. Bay) Substation Rebuilt 09/30/20133:17 PM 4

5 Owner by ed In Major Phase I: Jun- 16 Phase II: Dec- 17 Newport Area Study Newport Area Supply Proposed $42,000,000 No Jun-16 Kent County Transformer Addition Proposed $600,000 No Jun-15 Riverside Sub Upgrade Proposed $1,388,000 No Apr-18 Greater Rhode Island Transmission Admiral St-Franklin Square (Q143 and R144) 115 kv UG $22,600,000 04/2008 Dexter Substation Changes $3,180,000 04/2008 Conversion of Jepson 69 kv substation to 115 kv substation. $11,800,000 04/2008 Oct-15 BITS - cable between New Shoreham and mainland Rhode Island $75,000,000 (paid by Block Island and ) Highland Park Substation $5,300,000 01/18/13 Jan-15 Johnston #18 Substation Expansion NR $1,620,000 10/24/2011 Sep-15 Kilvert St. #87 Substation $1,824,000 08/27/12 May-15 Jun-16 Mar-14 New Chase Hill (formally Hopkinton) kv Substation in Hopkinton, RI (associated with RSP #1253) New London Ave. (formally W. Warwick) kv Sub Q143S & R144 Refurbishment from Woonsocket Substation to Admiral St. Terminal $2,350,000 6/2011 $4,735,500 06/01/10 $10,130,000 NR 09/30/20133:17 PM 5

6 Owner by ed In Major Sep-13 Removed from the 2013 Local System Plan List Shun Pike substation (previously Sims Metal Recycling - Johnston, RI) $1,500,000 11/08/12 Feb-13 Greater Boston Study L-164 Line Reconductoring In- $3,300,000 08/27/12 Mar-13 May-13 Oct-12 Worcester Area Palmer - install new 115/23 kv transformer and circuit switcher Webster St. - add three 115 kv circuit switchers and new control house. Cooks Pond Substation #23 - Replace two new kv transformers with larger transformers. In- $3,630,000 12/2007 In- $7,056,000 12/2007 In- $4,605,000 No Nov-12 A1-B2 Taps Refurbishment In- $9,300,000 NR Mar Sep-12 Jun-13 Nov-12 Central/Western Upgrades Attleborough 1-2 Taps Refurbishment (Static wire and structure improvement crossing I- 95) Chartley Replace T1 with 55 MVA sub Extend existing E kv line to Mansfield Substation. Merrimac MA Municipal - 2nd 23 kv line North Marlboro Rd #318 substation Pratts Jct. - supply 13 kv from T3 and T4 - This is Part of RSP #926 and PTF solution is under construction Maintain VAR support to 230 kv AC system in Monroe/Comerford area In- $585,000 NR In- $2,590,000 11/2003 In- $250,000 NR Concept $3,100,000 No Jun-13 New Michael Avenue substation In Nasonville substation 2nd transformer addition $0 Part of RSP 926 In- $24,769,309 01/30/07 $6,832,000 (Liberty will reimburse for $2.701M) 4/2013 Concept $4,600,000 No 09/30/20133:17 PM 6

7 Owner by ed In Major Install a new kv, 33.6/44.8/56 MVA autotransformer (No. 4) and a new kv, 30/40/50 MVA autotransformer (No. 5) Apr-13 Bellows Falls Substation Revitalization Install one new 69 kv GCB (G33). Install two new 115kV circuit switchers (4T-115 and 5T-115) Remove the existing kv, 8 MVA autotransformer (No. 3). Replace the three existing, threewinding GSUs with two new twowinding kv. Upgrade Line kv from Vilas bridge to National Grid/CVPS demarcation point G33 Refurbishment & Reconductoring (Vernon to Bellows Falls/NH & VT) In- $24,427,709 01/28/08 In- $34,800,000 10/01/11 09/30/20133:17 PM 7

KEY. Key to Status Fields in the Project List

KEY. Key to Status Fields in the Project List Key to Fields in the List KEY Description is under consideration as possible solution to a Concept need, but little or no analysis is available National Grid has internally detemined that the project is

More information

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

2018 Annual Progress Report to WECC Pacific Gas and Electric Company 2018 Annual Progress Report to WECC Pacific Gas and Electric Company Waiver of Significant Transmission Project Status Table 1 and 2 update the planned transmission and generation projects, respectively,

More information

HOUSING VOUCHERS FUNDED IN MASSACHUSETTS UNDER PENDING PROPOSALS

HOUSING VOUCHERS FUNDED IN MASSACHUSETTS UNDER PENDING PROPOSALS 820 First Street NE, Suite 510 Washington, DC 20002 Tel: 202-408-1080 Fax: 202-408-1056 center@cbpp.org www.cbpp.org November 1, HOUSING VOUCHERS FUNDED IN MASSACHUSETTS UNDER PENDING PROPOSALS For 2007,

More information

Local Market Update February 2013

Local Market Update February 2013 Local Market Update February 213 February sales of single-family homes reported in Lucas and Upper Wood County by the Toledo Board of REALTORS totaled 315. This was unchanged compared to February of 212.

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2015 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., SGC

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

Pacific Gas and Electric Company s 2013 Annual Progress Report

Pacific Gas and Electric Company s 2013 Annual Progress Report March 14, 2013 Mr. David Franklin Chair, WECC Technical Studies Subcommittee Southern California Edison 1 Innovation Way Pomona, CA 91768 Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake

More information

San Diego Community College District. Proposition S and N Program Schedule

San Diego Community College District. Proposition S and N Program Schedule San Diego City College 835 30/Apr/13 A 13/Aug/19 56.42% SDCCD Proposi on S 786 30/Jun/16 13/Aug/19 23.76% Child Development Center 786 30/Jun/16 13/Aug/19 23.76% 11210 100 Design 320 30/Jun/16* 20/Sep/17

More information

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Pacific Gas and Electric Company s Revised 2016 Annual Progress March 06, 2016 Mr. Philip Augustin Chair, WECC Technical Studies Subcommittee Mr. Enoch Davies WECC Technical Staff 155 North 400 West Salt Lake City, UT 84103-1114 Subject: Report Pacific Gas and Electric

More information

Local Market Update 2012 Year In Review

Local Market Update 2012 Year In Review Northwest Area Home Sales for the Year 2012 Sales of single-family homes reported in Toledo and the surrounding area by the Toledo Board of REALTORS totaled 6,793. This was an increase of 6% compared to

More information

Transmission Planning for Wind Energy Resources in the Eastern United States. Dale Osborn

Transmission Planning for Wind Energy Resources in the Eastern United States. Dale Osborn Transmission Planning for Wind Energy Resources in the Eastern United States Dale Osborn Layered Design Typical utility planning Distribution delivery to loads Lower voltage transmission delivery from

More information

ANCR CRU Statistics February 2007 to December 2007

ANCR CRU Statistics February 2007 to December 2007 ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior

More information

Location Upgrade Need Category Affected DU s Lead DU Reasons for selecting Affected utilities Reasons for Lead DU

Location Upgrade Need Category Affected DU s Lead DU Reasons for selecting Affected utilities Reasons for Lead DU St. Johnsbury Construct new with Loss of transformer causes loss of load 115/34.5 kv transformer. Middlebury St. Albans Install capacitor banks. transformer & rebuild to ring Construct new ring with two

More information

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: October 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: October 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

National Routing Number Administration p-ani Activity and Projected Exhaust Report

National Routing Number Administration p-ani Activity and Projected Exhaust Report National Routing Number Administration 2016 p-ani Activity and Projected Exhaust Report The ATIS Industry Numbering Committee developed the P-ANI Administration Guidelines, which contain the following

More information

Pacific Gas and Electric Company s Revised 2015 Annual Progress

Pacific Gas and Electric Company s Revised 2015 Annual Progress March 02, 2015 Mr. Tracy Rolstad Chair, WECC Technical Studies Subcommittee Avista PO Box 3727 MSC-16 1411 East Mission Ave Spokane, WA 99220-3727 Mr. Enoch Davies WECC Technical Staff 155 North 400 West

More information

JOSEPH A. KEOUGH JR.* JEROME V. SWEENEY III* SEAN P. KEOUGH* STACI L. KOLB JEROME V. SWEENEY II OF COUNSEL

JOSEPH A. KEOUGH JR.* JEROME V. SWEENEY III* SEAN P. KEOUGH* STACI L. KOLB JEROME V. SWEENEY II OF COUNSEL KEOUGH & SWEENEY, LTD. ATTORNEYS AND COUNSELORS AT LAW 41 MENDON AVENUE PAWTUCKET, RHODE ISLAND 0261 TELEPHONE (401) 724-3600 FACSIMILE (401) 724-9909 www.keoughsweeney.com RAYNHAM OFFICE: 90 NEW STATE

More information

NE (SE) Beam

NE (SE) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 60

More information

Sunrise: 05:48 N (S) Beam

Sunrise: 05:48 N (S) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 40

More information

Up and Down Months of the Stock Market

Up and Down Months of the Stock Market Up and Down Months of the Stock Market 1926-2017 Positive years (66) in the stock market were not good all year long and losing years (24) were not losers throughout the year. Winning years produce losing

More information

CLEARWATER POLICE DEPARTMENT. Traffic Safety Improvement Program July 1, 2012 to June 30, 2014

CLEARWATER POLICE DEPARTMENT. Traffic Safety Improvement Program July 1, 2012 to June 30, 2014 CLEARWATER POLICE DEPARTMENT Traffic Safety Improvement Program July 1, 2012 to June 30, 2014 Red Light Cameras were installed at two intersections to help reduce the number of red light running crashes

More information

TRAFFIC VOLUME TRENDS July 2002

TRAFFIC VOLUME TRENDS July 2002 TRAFFIC VOLUME TRENDS July 2002 Travel on all roads and streets changed by +2.3 percent for July 2002 as compared to July 2001. Estimated Vehicle-Miles of Travel by Region - July 2002 - (in Billions) West

More information

Performance Measures Second Quarter 2012

Performance Measures Second Quarter 2012 Performance Measures Second Quarter 2012 2Q2011 Earn & Retain Community Trust 6 Performance Measures: Ridership Cost Effectiveness (Cost per Passenger) Cost Efficiency (Cost per Revenue Hour) Service Effectiveness

More information

Transmission Planning Attachment K Public Input Meeting

Transmission Planning Attachment K Public Input Meeting Transmission Planning Attachment K Public Input Meeting FERC 890 6 th Quarter Meeting May 25, 2011 Agenda Mountain Time Topic Presenter 1:00 1:15 Greetings and Introduction Dennis Desmarais 1:15 1:30 Attachment

More information

Exemptions currently in force

Exemptions currently in force exemptions by Western Power s currently in force Neerabup Units G11 & G12 3.3.3.1 (a) 16 Jan 2008 Ongoing Modified performance criteria: 0.8 Lagging 101.3 MVAr 0.9 Leading 68.5 MVAr Financial contribution

More information

Kevin M. Shea Vice President Government Relations - NH 900 Elm Street, Suite 1922 Manchester, NH 03101

Kevin M. Shea Vice President Government Relations - NH 900 Elm Street, Suite 1922 Manchester, NH 03101 Kevin M. Shea Vice President Government Relations - NH 900 Elm Street, Suite 1922 Manchester, NH 03101 October 20, Kathryn M. Bailey, PE Telecommunications Division Director New Hampshire Public Utilities

More information

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC

OCTOBER 17, Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC Engineering LLC OCTOBER 17, 2018 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting Emera Maine Representative: Jeffrey Fenn, P.E., LR/SGC

More information

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Sixteenth Revised Page No A LIGHTING SERVICE Rate Schedule L - S AVAILABILITY

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Sixteenth Revised Page No A LIGHTING SERVICE Rate Schedule L - S AVAILABILITY Sixteenth Revised Page No. 57 907A LIGHTING SERVICE Rate Schedule L - S AVAILABILITY Available to municipal organizations for controlled street, highway and area lighting from dusk to dawn. Also available

More information

Sub Regional RTEP Committee Mid-Atlantic

Sub Regional RTEP Committee Mid-Atlantic Sub Regional RTEP Committee Mid-Atlantic September 24, 2014 1 Reliability Analysis Update 2 AE Transmission Zone Generation Deliverability Violation: The Middle 230/69 kv is overloaded for line fault stuck

More information

New McNicoll Bus Garage Public Open House

New McNicoll Bus Garage Public Open House New McNicoll Bus Garage Public Open House Kennedy Public School 1 The Need for a New Bus Garage Riders Increased ridership means Buses Need for new buses Garage And a new buses facility Problems Garages

More information

In Slot. Permanent + In Slot

In Slot. Permanent + In Slot Updated: 27 Feb 18 Location Id + + + Program Elementary s 1401 Aloma 15 Jul 13 612 90 702 0 612 91.3% 29 3 12 553 547 6 0 101.1% 2 321 Andover 14 Oct 10 730 180 910 0 730 92.8% 25 4 31 843 646 197 10 130.5%

More information

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects

Entergy Texas, Inc. Transmission Draft Construction Plan Update 1 Projects Entergy Texas, Inc. Transmission 2014 2018 Draft Construction Plan Update 1 Projects 1 2014-2018 ETI Draft Construction Plan Update 1 Projects Completed in the Fall of 2012 & 2013 to date 1) Cedar Hill

More information

Monthly Statement. 374 kwh 2.8% from last year $ HOW WE CALCULATED YOUR BILL See reverse side for detailed description of charges Taxes

Monthly Statement. 374 kwh 2.8% from last year $ HOW WE CALCULATED YOUR BILL See reverse side for detailed description of charges Taxes JONATHAN SAMPLE 1234 MAIN STREET ANYWHERE, ST 00000-0000 Rate Plan: 12 Month CNE Account ID: 1-1222333456 Utility Number: 1001010202033334111555 Service Period: 08/17/17 to 09/16/17 HOW WE CALCULATED YOUR

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption

More information

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune

Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune Automated Occupancy Detection October 2015 (Phase I) Demonstration Results Presented by Kathy McCune 2016 TRB Managed Lanes Conference May 5th, Session 6 Presentation Background Outline Metro ExpressLanes

More information

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693. 11983978 Jun 19, 217 1 124 958 PAST DUE $1,693.97 Meter Reading Information Meter # 55271 May 3 655 Jun 15 6642 17 days 1397 on or about Aug 15 82 Past Due Balance payable includes an amount which is payable

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Units Pending Units Las Vegas Market Update - November 2017 Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption

More information

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009

State Regulatory Affairs and Local Relations Update. ATC Customer Meeting November 19, 2009 State Regulatory Affairs and Local Relations Update ATC Customer Meeting November 19, 2009 Project Certification Steve Parker Manager State Regulatory Affairs CA/CPCN Applications (Filed/Ordered/Under

More information

W (W) Beam

W (W) Beam Predicted clear day beam and diffuse irradiances (/ W m 2 ) on vertical and horizontal surfaces on specified days in northern (N) and southern (S) hemispheres (see notes at foot of table): LATITUDE 0 N/S

More information

DIRECTIONS FROM GENERAL DYNAMICS TAUNTON TO EXTENDED STAY NORTON

DIRECTIONS FROM GENERAL DYNAMICS TAUNTON TO EXTENDED STAY NORTON DIRECTIONS FROM GENERAL DYNAMICS TAUNTON TO EXTENDED STAY NORTON 280 South Washington Street Norton, MA 02766 PHONE: 508-285-7800 FAX: 508-285-3232 Start out going NORTHWEST on JOHN QUINCY ADAMS ROAD towards

More information

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2 11983979 Jun 19, 217 1 124 962 Jul 11, 217 $24.34 Meter Reading Previous Bill. Balance from your previous bill $. Meter # 552711 May 3 19813 Account Account charge 12.4* Charges 17 days 82 Jun 15 19895

More information

Graph #1. Micro-Generation Generating Units in Alberta 20

Graph #1. Micro-Generation Generating Units in Alberta 20 2, Graph #1. Micro-Generation Generating Units in Alberta 2 Cumulative # of Generating Units 1,9 1,8 1,7 1,6 1,5 1,4 1,3 1,2 1,1 1, 9 8 7 6 5 4 3 2 Number of MGG Units as of 216 Mar 31 Number of Solar

More information

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012

First Energy Generator Deactivation Request - January Deactivation Study Results and Required Upgrades April 25, 2012 First Energy Generator Deactivation Request - January 2012 Deactivation Study Results and Required Upgrades April 25, 2012 General PJM received a notice on January 26, 2012 from FirstEnergy of its intent

More information

August 2018 MLS Statistical Report

August 2018 MLS Statistical Report January February March April May June July August Septem October Novem Decem August 218 MLS Statistical Report Total Sales Overall, sales are down 3%; however, total volume sold is up 7% and Median Sale

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Units Pending Units Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Absorption

More information

SECOND QUARTER 2018 THE BLUE MOUNTAINS REAL ESTATE MARKET REPORT LOCATIONS ROYAL LEPAGE S 2016 BROKERAGE OF THE YEAR FOR ONTARIO

SECOND QUARTER 2018 THE BLUE MOUNTAINS REAL ESTATE MARKET REPORT LOCATIONS ROYAL LEPAGE S 2016 BROKERAGE OF THE YEAR FOR ONTARIO THE BLUE MOUNTAINS REAL ESTATE MARKET REPORT SECOND QUARTER 2018 WE RE PROUD AND GRATEFUL TO HAVE BEEN CHOSEN AS ROYAL LEPAGE S BROKERAGE OF THE YEAR FOR ONTARIO OVERVIEW SECOND BEST Q2 VOLUME SALES EVER,

More information

Sub Regional RTEP Committee South

Sub Regional RTEP Committee South Sub Regional RTEP Committee South December 18, 2017 Baseline Reliability and Supplemental Projects Second Review 2 Date Project Last Presented: 10/30/2017 SRRTEP Problem Statement: DOM End of Life Criteria

More information

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010

FINAL FACILITY STUDY. 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1. September 10, 2010 FINAL FACILITY STUDY 230/69/13.8 kv Transformer Addition(s) at Badwater Substation 2009 T1 September 10, 2010 I. Introduction This is a revised facility study performed for Transmission Queue Request 2009

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Units Pending Units Las Vegas Market Update - August 2018 Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold Price

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Units Pending Units Las Vegas Market Update - January 2019 Greater Las Vegas Snapshot by Sale Type Last Month's Sold Units Median List Price Average List Price Median Sold Price Average Sold

More information

TRAFFIC VOLUME TRENDS

TRAFFIC VOLUME TRENDS Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle

More information

Demonstrative Research on Development of Islanding Prevention Methods under Clustered PV Conditions and Improvement of Power Quality.

Demonstrative Research on Development of Islanding Prevention Methods under Clustered PV Conditions and Improvement of Power Quality. Demonstrative Research on Development of Islanding Prevention Methods under Clustered Conditions and Improvement of Power Quality August 17, 2006 The kansai electric power co., inc. Fuji electric systems

More information

Seabrook Substation Reliability Improvement Project

Seabrook Substation Reliability Improvement Project New England Division Seabrook Substation Reliability Improvement Project 1. Project Summary Description Seabrook Substation is critical to ISO-New England as a Pool Transmission Facility, to grid availability

More information

Sub Regional RTEP Committee - Southern. August 19, 2011

Sub Regional RTEP Committee - Southern. August 19, 2011 Sub Regional RTEP Committee - Southern August 19, 2011 2011 RTEP Analysis Summary 2010 2015 Project Updates 2016 Analysis NERC Category A, B NERC Category C (N-1-1 in progress) Load Deliverability Generator

More information

Performance Measures 4 th Quarter/Year End 2010

Performance Measures 4 th Quarter/Year End 2010 Performance Measures 4 th Quarter/Year End 2010 Earn & Retain Community Trust 6 Performance Measures: Ridership Cost Effectiveness (Cost per Passenger) Cost Efficiency (Cost per Revenue Hour) Service Effectiveness

More information

Greater Las Vegas Snapshot by Sale Type Last

Greater Las Vegas Snapshot by Sale Type Last September 217 Greater Las Vegas Market Update Greater Las Vegas Snapshot by Sale Type Last Available Pending Month's Median List Price List Price Median Price Price Months 3 Day of Absorption DOM Inventory

More information

ANCR CRU Statistics Februa.. to December 2007

ANCR CRU Statistics Februa.. to December 2007 ANCR CRU Statistics Februa.. to December 2007 Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes Answered dato from Perimeter phone system unavailable prior

More information

New England East West Solutions (Formerly Southern New England Transmission Reliability) Report 2 Options Analysis. (Redacted)

New England East West Solutions (Formerly Southern New England Transmission Reliability) Report 2 Options Analysis. (Redacted) New England East West Solutions (Formerly Southern New England Transmission Reliability) Report 2 Options Analysis (Redacted) (c) ISO New England Inc. Southern New England Regional Working Group ISO New

More information

Key to Status Fields in the Project List

Key to Status Fields in the Project List Key to Fields in the Project List Load Growth Interconnection Economic Reliability Concept Proposed Planned Under Construction In Cancelled N/A Backstop Too early TO Update Base case Increasing load served

More information

Year to Date Summary. Average and Median Sale Prices

Year to Date Summary. Average and Median Sale Prices A Publication of RMLS, The Source for Real Estate Statistics in Your Community Residential Review: Southwest Washington September 2018 Reporting Period September Residential Highlights Southwest Washington

More information

Greater Las Vegas Snapshot by Sale Type Last

Greater Las Vegas Snapshot by Sale Type Last October 217 Greater Las Vegas Market Update Greater Las Vegas Snapshot by Sale Type Last Available Pending Month's Median List Price List Price Median Price Price Months 3 Day of Absorption DOM Inventory

More information

Sub-Regional RTEP Committee PJM South

Sub-Regional RTEP Committee PJM South Sub-Regional RTEP Committee PJM South SRRTEP - South December 1, 2016 www.pjm.com PJM Baseline Project B2185 Update Problem: NERC Category B Violation (DVP Analysis) The 2017 summer base case indicates

More information

RIDERSHIP TRENDS. March 2017

RIDERSHIP TRENDS. March 2017 RIDERSHIP TRENDS March 2017 Prepared by the Division of Strategic Capital Planning May 2017 Table of Contents Executive Summary...1 Ridership...3 Estimated Passenger Trips by Line...3 Estimated Passenger

More information

PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP)

PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP) Public Disclosure Authorized PROCUREMENT PLAN RENEWABLE ENERGY INTEGRATION PROJECT (REIP) Revision 4.0 Public Disclosure Authorized I. General 1. Project Information Country Borrower Project Name Loan

More information

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M of Need In-service Cost Alternatives Service Projects in PG&E Service Territory Mare Island - Ignacio 115 kv NERC Category 2010 Reconductor the limiting 19 $19M Connect Highway May 2012 Line re-rates and

More information

Distribution Capacity Impacts of Plug In Electric Vehicles. Chris Punt, P.E. MIPSYCON 2014

Distribution Capacity Impacts of Plug In Electric Vehicles. Chris Punt, P.E. MIPSYCON 2014 Distribution Capacity Impacts of Plug In Electric Vehicles Chris Punt, P.E. MIPSYCON 2014 1 Outline EV Benefits EV Growth Where are we today? Where are we going? Potential Distribution Capacity Issues

More information

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director

Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th. Alex Bettencourt Managing Director Energy storage - two Canadian Case Studies ESA Annual Conference, Washington, June 4th Alex Bettencourt Managing Director National Association Made Up of Entire Industry Utilities Industry Academia / R&D

More information

Your electricity bill

Your electricity bill Your electricity bill Bill date: February 22, 2017 Summary of what you owe Amount due on your last bill $1,271.36 Payment made on Jan 30, thank you -$1,271.36 Your balance forward $0.00 Your new charges

More information

Englewood Area Board of Realtors Monthly Sales Trend Indicator 2017 Sales by Price Range - Single Family Homes & Villa s

Englewood Area Board of Realtors Monthly Sales Trend Indicator 2017 Sales by Price Range - Single Family Homes & Villa s Englewood Area Board of Realtors Englewood Area Board of Realtors Sales by Price Range - Single Family Homes & Villa s Price Range Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17

More information

Child Protection and Permanency. Monthly Screening and Investigation Report September 2015

Child Protection and Permanency. Monthly Screening and Investigation Report September 2015 Child Protection and Permanency Monthly Screening and Investigation Report tember Allison Blake, Ph.D., L.S.W. Commissioner October 16, Data in this report is preliminary and may differ from any final

More information

National Grid s 2017 Local Transmission Plan

National Grid s 2017 Local Transmission Plan National Grid s 2017 Local Transmission Plan Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

More information

Greater Las Vegas Snapshot by Sale Type

Greater Las Vegas Snapshot by Sale Type 500,000 Available Greater Las Vegas Snapshot by Sale Type Pending Last Month's Sold SFR Market Prices Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory Closed

More information

Red Light Cameras in Austin. Austin Police Department Highway Enforcement Command

Red Light Cameras in Austin. Austin Police Department Highway Enforcement Command Red Light Cameras in Austin Austin Police Department Highway Enforcement Command video MLK WB/I35 EF SB Video 2014 Red Light Violations Ø 10 camera approaches (direction of cameras) in Austin throughout

More information

WIM #29 was operational for the entire month of October Volume was computed using all monthly data.

WIM #29 was operational for the entire month of October Volume was computed using all monthly data. OCTOBER 2015 WIM Site Location WIM #29 is located on US 53 near Cotton in St Louis county. System Operation WIM #29 was operational for the entire month of October 2015. Volume was computed using all monthly

More information

PG&E s 2012 Request Window Proposals

PG&E s 2012 Request Window Proposals 1 PG&E s 2012 Request Window Proposals Central Valley Patrick Tan Transmission System Planning PG&E September 27, 2012 Transmission Projects Overview 2 Projects Seeking CAISO Approval Pease 115/60 kv Transformer

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Pending Greater Las Vegas Snapshot by Sale Type Last Month's Sold Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Average Absorption DOM Rate

More information

Greater Las Vegas Snapshot by Sale Type Last Month's Sold

Greater Las Vegas Snapshot by Sale Type Last Month's Sold Available Pending Greater Las Vegas Snapshot by Sale Type Last Month's Sold Median List Price Average List Price Median Sold Price Average Sold Price Months of Inventory 30 Day Average Absorption DOM Rate

More information

STATE OF NEW HAMPSHIRE Inter-Department Communication

STATE OF NEW HAMPSHIRE Inter-Department Communication STATE OF NEW HAMPSHIRE Inter-Department Communication DATE: February 11, 2010 AT (OFFICE): NHPUC FROM: Torn Frantz Director, Electric Division SUBJECT: DE 09-277: Petition by Public Service Company of

More information

RIDERSHIP TRENDS. July 2018

RIDERSHIP TRENDS. July 2018 RIDERSHIP TRENDS July Prepared by the Division of Strategic Capital Planning September Table of Contents Executive Summary...1 Ridership...3 Estimated Passenger Trips by Line...3 Estimated Passenger Trips

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

Chapter 7 - Appendix A

Chapter 7 - Appendix A Chapter 7 - Appendix A Transmission and Distribution Supplemental Information Table 7A.1 MTEP Transmission Projects in Missouri 1 Project Approved Project Title Project Description Category Estimated Cost

More information

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 EAST GRAND FORKS MONTHLY REPORT - JANUARY 2015 WIM Site Location WIM #31 is located on US 2 at mile post 8.0, southeast of

More information

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239

OPERATIONS TOTALS ,135 7,511 8,823 8,056 8,021 8,319 8,039 8,283 8,001 8,738 8,219 8,094 98,239 2007 OPERATIONS AIRCRAFT OPS-2006 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL AIR CARRIER - ITINERANT 748 725 907 804 930 969 832 996 841 899 990 1,249 10,890 AIR TAXI - ITINERANT 3,744 3,638

More information

3 Reliability Issues and Solutions

3 Reliability Issues and Solutions 3 Reliability Issues and Solutions 3.1 Reliability issues identified Figure 3 1 summarizes the transmission reliability issues identified as part of the 2009 planning process. These areas represent locations

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

Housing Market Data December 2008

Housing Market Data December 2008 Housing Market Data December 2008 Prepared by: The North Shore Barrington Association of REALTORS Look Inside: - market quickdata (3-4) - active listings (5-10) - absorption rates (11) - supply and demand

More information

APPENDIX F: 2012 Request Window Submittals

APPENDIX F: 2012 Request Window Submittals APPENDIX F: 2012 Request Window Submittals Table F-1: 2012 Request Window Submittals Project Name Service Submitted by 1 Lockeford-Lodi 230 kv Development City of Lodi, Electric Utility Department 5/31/2017

More information

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 BACKGROUND

ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 BACKGROUND ELECTRICAL UTILITY COST REDUCTION THROUGH PREDICTIVE CONTROL December 2008 Project Manager: Chris Hayes Advisor: Paul I-Hai Lin 1 BACKGROUND Kraft Foods 35 uction of Energy Costs Over The Next 5 Yrs. (2005

More information

Valley Real Estate Review

Valley Real Estate Review Valley Real Estate Review 35, 3, 25, 2, 15, 1, 5, December 218 Listings Months of Inventory 217 218 % of Change 2,479 2,74 1.53% 2.46 2.77 12.6% Offices Combined Force Total Listing Issued Total Annual

More information

Yield Reduction Due to Shading:

Yield Reduction Due to Shading: x9 31 x SunPower 1 x Power-One SPR-E0-37 37 W TRIO-8.5-TL-OUTD 10 ; 1x13 1x13 1 x Power-One 10 ; -30 7.5kW 9 x SunPower 1 x Power-One SPR-E0-37 37 W 10 ; 59 7.5kW 7 x SunPower 1 x Power-One SPR-E0-37 37

More information

Port Botany. Trade Statistics Bulletin 1 July June 2018

Port Botany. Trade Statistics Bulletin 1 July June 2018 Port Botany Trade Statistics Bulletin 1 July 2017 30 June 2018 FY 2017/18 Port Botany Container Trade Jul 2017 Aug 2017 Sep 2017 Oct 2017 Nov 2017 Dec 2017 Jan 2018 Feb 2018 Mar 2018 Apr 2018 May 2018

More information

DRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E

DRAFT. Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E Total Month Average Point (MAP) A Massage 4/30/2014 8/1/2015 A CENTER E 2.25 2.00 2.00 2.25 2.00 2.00 1.00 2.25 2.00 2.25 2.00 A Massage 10/31/2017 9/1/2015 B MEZZANINE 2.25 2.00 2.00 2.25 2.25 2.25 2.25

More information

Public Service Company of Colorado Transmission Projects Status. CCPG August 18, 2016

Public Service Company of Colorado Transmission Projects Status. CCPG August 18, 2016 Public Service Company of Colorado Transmission Projects Status CCPG August 18, 2016 1 Transmission Ownership Colorado 2016 Generation Additions/Reductions Name Interconnection Owner Net MW Type ISD Zuni

More information