MCM CABLE 3/15/2010

Size: px
Start display at page:

Download "MCM CABLE 3/15/2010"

Transcription

1 MCM CABLE //00 C UEE Elbow Enclosure - Deadend C UEE Elbow Enclosure - Feed-Through C UP 000 MCM Cable iser ~ UP 000MCM Power Cable iser Grounding Detail N UP 000 MCM Cable iser with Ø Switch N UP 000 MCM Cable iser with 00 Amp Disconnects ~ USG Padmount Switchgear - 00A Elbow - 000MCM Cable ~ USG Padmount Switchgear Chart ~ USG Deadfront Switchgear ~ USG Livefront Switchgear ~ USG- Switch Vault Duct Entry for 000MCM Cable ~ USG- Switch Vault Detail, Vault Base ~ USG- Switch Vault Detail, Vault Cover N New Standard edrawn Standard C Changed Standard ~ No Change

2 /0 BC GD LINE 8" "-" 8" GD LINE FONT KV 000 MCM 8' GD OD FUTUE " CONDUIT EE TEMPLATE C " " C 8" ØC " " B 8 8" B 0" ØB " " ØA A A FONT 8" GD OD FONT NOTES:. Use EE template when framing conduits and backfilling.. Leave enough cable slack to position the elbow near the top of the enclosure lid. This provides future operating room.. Terminators assemble " apart (Center to Center). Align conduits to avoid cable bending. ev : Corrected material list. CONSTUCTION STANDADS ELBOW ENCLOSUE DEADEND DATE ENG OPS 0 //00 HWH MA //0 LB AH 0//0 LB AH //0 KJP of UEE UEE /0 00

3 0 #0 SOL BC (FOM CONCENTIC NEUTAL OF CABLE) 8 FO INSULATING PLUG: USE TOQUE WENCH & TIGHTEN EXETING 0 TO 0 FT-LBS OF TOQUE. FO CONNECTO PLUG, TAP PLUG O TAP WELL: USE TOQUE WENCH WITH AN ELASTIMOLD 00SW SPANNE WENCH. SINCE THE INDICATED TOQUE EADING IS NOT THE ACTUAL TOQUE APPLIED IN THIS CASE, THE INDICATED TOQUE SHOULD BE 0 TO 8 FT-LBS. DEADEND ev : Corrected material list. 8 0 Enclosure, Fiberglass od, Ground, /8" x 8' Clamp, Ground od, Large Conductor, /0 BSDC Connector, Crimpet, Cu /0-/0 Elbow, 00 Amp Cable Adapter, 000 MCM Loadbreak educing Plug, 00A-00A Cap, Protective Insulated, 00A DESCIPTION 000 MCM AL Compression Contact /" Non-Threaded Hole Basic Insulating Plug With Cap Cable Sealing Kit, 000MCM Connector, Crimpet, Cu /0-/0 CONSTUCTION STANDADS ELBOW ENCLOSUE DEADEND UEE QTY. S/N 8 0 Ft DATE ENG OPS 0 //00 HWH MA //0 LB AH 0//0 LB AH //0 KJP of UEE UEE /0 00

4 0 8 GD LINE /0 BC 8" GD LINE "-" 8" FONT KV 000 MCM 8' GD OD KV 000 MCM " CONDUIT " CONDUIT EE TEMPLATE C " " " C 8" " ØC B 8 8" B 0" ØB NOTES: " " A A FONT 8" ØA GD OD FONT. Use EE template when framing conduits and backfilling.. Leave enough cable slack to position the elbow near the top of the enclosure lid. This provides future operating room.. Elbows assemble " apart (Center to Center). Align conduits to avoid cable bending. ev : Corrected material list callout and added UEE kit. CONSTUCTION STANDADS ELBOW ENCLOSUE FEED-THOUGH DATE ENG OPS 0 //0 LB AH 0//0 LB AH 8//0 CM AH of UEE UEE KJP 00

5 8 #0 SOL BC (FOM CONCENTIC NEUTAL OF CABLE) FEED-THOUGH FO INSULATING PLUG: USE TOQUE WENCH & TIGHTEN EXETING 0 TO 0 FT-LBS OF TOQUE. FO CONNECTO PLUG, TAP PLUG O TAP WELL: USE TOQUE WENCH WITH AN ELASTIMOLD 00SW SPANNE WENCH. SINCE THE INDICATED TOQUE EADING IS NOT THE ACTUAL TOQUE APPLIED IN THIS CASE, THE INDICATED TOQUE SHOULD BE 0 TO 8 FT-LBS. #0 SOL BC (FOM CONCENTIC NEUTAL OF CABLE) ev : Corrected material list callout and added UEE kit. 8 UEE 00A Elbow Kit Consists Of: (Items # Thru #) Connecting Plug, 00A Elbow, 00A Cable Adapter Loadbreak educing Plug, 00A-00A Cap, Protective Insulated, 00A DESCIPTION 000 MCM AL Compression Contact /" Hole (Non-Threaded) Basic Insulating Plug With Cap 00A Al Stud UEE QTY. S/N Enclosure, Fiberglass od, Ground, /8" x 8' Clamp, Ground od, Large Connector, Crimpet, Cu /0-/0 Conductor, /0, BSDC Elbow Sealing Kit, 000MCM Connector, Crimpet, CU /0-/0 CONSTUCTION STANDADS ELBOW ENCLOSUE FEED-THOUGH ft DATE ENG OPS 0 //0 LB AH 0//0 LB AH 8//0 CM AH of UEE UEE KJP 00

6 0 A B C 8 0 '-0" NEUTAL 8 0 NOTES & '-" " NOTE TO STATIC WIE 8 NOTE 8 ' MIN Notes:. UP is the preferred standard. This standard is to be used for short dips such as airport dips or if other switches are nearby for isolation. See UP for the recommended construction.. See UP for grounding details.. All ground wire is # solid copper covered.. Static wire ground when required. DO NOT connect to neutral. See N for static wire details. Engineer must call for static wire ground separately.. Avoid sharp turns in lightning arrester grounds and primary leads.. /0 CU neutral in substation get-a-way risers only. /0 CU from terminators to overhead neutral for all 000 MCM construction.. Press directly to neutral if there is no /0 substation get-a-way neutral. ev : Corrected material list and changed drawing to show pre-assembled deadend. CONSTUCTION STANDADS 000 MCM CABLE ISE DATE ENG OPS 0 //00 HWH MA //0 LB AH //0 CM AH of UP UP /0 00

7 Bolt, Machine, /8" x " Washer, Spring, /8" Screw, Lag, /" x /" Cable Positioner DESCIPTION Bracket, Term, Mount 000 MCM Cable Washer, Sq., Curved, Cast, " x " x /8" Thick x /" Hole 8 Clamp, Ground rod, /8", Small, Bronze 0 od, Ground, /8" x 8' Conductor, Cu # SLD /C Connector, Compression, Cu/Al, Neutral Staple, Ground Wire Connector, Tap, Power Booster, to Conductor, Cu, /0 ST, 00v, XLP Conductor, MCM AL Terminator, 000 MCM Arrester, kv, iser Pole Connector, Comp., Lug, AL, MCM 8 Connector, Comp., Lug, AL, 000 MCM 0 Hot Line Clamp, GP0 Bolt, Machine, /" x " Assembly Conductor, # BSDC, /C Screw, Lag, /" x /" Connector, Crimpet, Cu /0-C- 8 ev : Corrected material list and changed drawing to show pre-assembled deadend. Conduit, " x 0', Sch 80 Clamp, Standoff Bracket, " " End Bell, Sch 0 Conductor, # Cu Covered, /C, 00v HMP Standoff Bracket, " DESCIPTION DESCIPTION Phase A Tag 0 Phase B Tag Phase C Tag Connector, Crimpet, Cu, /0-/0 Wildlife Guard Fault Indicator, 00A, OH, Beacon CONSTUCTION STANDADS 000 MCM CABLE ISE QTY. UP B0 S/N N QTY. S/N DATE ENG ADDITIONAL MATEIAL QTY. 0 S/N OPS 0 //00 HWH MA //0 LB AH //0 CM AH of UP UP /0 00

8 NOTE # # CU COVEED TYP. MCM AL TYP. TEMINATO L.A. TEMINATO L.A. L.A. TEMINATO NOTE # SEE DETAIL A NOTE # & # NOTE # SYSTEM NOTE # NEUTAL # CU NOTE # TO STATIC WIE /0- CIMPET /0-/0 CIMPET /0 CU COVEED NOTE #0 DETAIL A NOTE # NOTE #8 MIN. ' EV - EMOVED EQUIPMENT MOUNTING BACKET GOUND AND EVISED NOTE CONSTUCTION STANDADS 000 MCM POWE CABLE ISE GOUNDING DETAIL DATE ENG OPS 0 //00 HWH MA //0 LB AH 0 of UP UP- /0 00

9 NOTES:. Make connections as close to terminator as possible but DO NOT make a sharp bend. Use hot line clamp for easy removal.. Connect surge arrester lead to concentric neutral.. Connect concentric neutral wires (twist together) to /0 stranded copper with /0 crimpet. Connect separate /0 runs, as per drawing, from each concentric neutral to the system neutral. Use /0 covered conductor and train this conductor back down along the 000MCM cable for appearance.. Connect /0 copper riser neutral to system neutral only. This riser neutral is only used for substation get-a-ways.. Use separate ground lead for system neutral grounding connection. Any other equipment grounds may be connected to this ground lead also. WAC --0 () (a) & (b). Do not connect arrester grounds separately to system neutral. Connect to concentric neutral as near to the terminator as possible.. Do not ground equipment mounting bracket per 00 NESC A. 8. Top of ground rod must be underground. WAC --0-()(c). If more than one ground rod is required they must be separated by at least feet. WAC --0-()(B) 0. Static wire ground when required. DO NOT connect neutral. See t-n to T-N for static wire details. EV - EMOVED EQUIPMENT MOUNTING BACKET GOUND AND EVISED NOTE CONSTUCTION STANDADS 000 MCM POWE CABLE ISE GOUNDING DETAIL DATE ENG OPS 0 //00 HWH MA //0 LB AH 0 of UP UP- /0 00

10 Ø MCM AL 8 0 A B C '-" '-0" 8 0 NEUTAL ' '-" " NOTE OPEATO SAFETY INSULATO 0 NOTE 8 8 ' MIN. ' MIN. 0 NOTES:. This is the recommended 000 MCM riser standard. See UP or UP when it is not possible to install a switch.. See UP for grounding details.. All ground wire is # solid copper covered.. Avoid sharp turns in lightning arrester ground and primary leads.. The pole must be ' or taller. CONSTUCTION STANDADS DATE ENG OPS 000 MCM CABLE ISE WITH Ø SWITCH of UP UP CM/AH //0 00

11 DESCIPTION Bracket, Term, Mount 000 MCM Cable Bolt, Machine, /8" x " Washer, Sq., Curved, Cast, " x " x /8" Thick x /" Hole Washer, Spring, /8" Screw, Lag, /" x /" Cable Positioner 8 Clamp, Ground rod, /8", Small, Bronze 0 od, Ground, /8" x 8' Conductor, Cu # SLD /C Connector, Compression, Cu/Al, Neutral Staple, Ground Wire Loadbreak Switch, Horizontal, 00A, kv Conductor, OH, MCM AL Connector, Clamp, to NEMA -Hole Bolt, Machine, /" x " Assembly Connector, Tap, Power Booster, to Conductor, # Cu, SLD, /C 8 Ground Wire Staples 0 Ground od Clamp, /8", Small Bronze Ground od, /8" x 8' Machine Bolt, Galv., /" x " Washer, Curved, " x " Washer, Spring, /" 8 Padlock, Hardened Stainless Steel Conductor, /0 Cu ST, 00v, XLP Terminator, 000 MCM Arrester, kv, iser Pole Connector, Comp., Lug, AL, 000 MCM DESCIPTION DESCIPTION Hot Line Clamp GP 0 0 Conductor, # BSDC, /C Screw. Lag, /" x /" 8 0 Connector, Crimpet, Cu /0-C- Conduit, " x 0', Sch 80 Clamp, Standoff Bracket, " End Bell, " Sch 0 Conductor, # Cu SD, /C, 00v, HMP Standoff Bracket, " Phase A Tag Phase B Tag Phase C Tag Connector, Crimpet, Cu, /0-/0 Wildlife Guard Fault Indicator, 00A, OH CONSTUCTION STANDADS 000 MCM CABLE ISE WITH Ø SWITCH QTY. UP B0 N QTY. S/N 0 0 DATE ENG S/N ADDITIONAL MATEIAL QTY. S/N OPS of UP UP CM/AH //0 00

12 A B C '-0" '-." '-0" '-" NEUTAL " " Notes:. UP is the preferred standard. This standard is to be used if an object interferes w/ the switch handle of UP. See UP for the recommended construction.. See UP for grounding details.. All ground wire is # solid copper covered.. Static wire ground when required. DO NOT connect to neutral. See N for static wire details. Engineer must call for static wire ground separately.. Avoid sharp turns in lightning arrester grounds and primary leads.. /0 CU neutral in substation get-a-way risers only. /0 CU from terminators to overhead neutral for all 000 MCM construction.. Press directly to neutral if there is no /0 substation get-a-way neutral. CONSTUCTION STANDADS DATE ENG OPS 000 MCM CABLE ISE WITH 00 AMP DISCONNECTS of UP UP CM/AH //0 00

13 8 0 Clamp, Ground rod, /8", Small, Bronze 0 od, Ground, /8" x 8' Conductor, Cu # SLD /C Connector, Compression, Cu/Al, Neutral Staple, Ground Wire Connector, Tap, Power Booster, to 8 Conductor, Cu, /0 ST, 00v, XLP Conductor, MCM AL Terminator, 000 MCM Arrester, kv, iser Pole Connector, Comp., Lug, AL, MCM Connector, Comp., Lug, AL, 000 MCM 8 0 Hot Line Clamp, GP0 Bolt, Machine, /" x " Assembly Conductor, # BSDC, /C Screw, Lag, /" x /" Connector, Crimpet, Cu /0-C- Conduit, " x 0', Sch 80 Clamp, Standoff Bracket, " " End Bell, Sch 0 Conductor, # Cu Covered, /C, 00v HMP 8 0 Crossarm (Distr.) /" x /" x 0' Bolt, Machine, /" x " Not Used Bolt, Double, Arm, /8" x 0" Gain, Pole Plastic Brace, Angle, " Washer, Spring, /8" Washer, Spring, /" Washer, Sq. Flat /8", /" x /" Bolt Machine, /8" x " Washer, ound, Flat /" Cable Positioner Standoff Bracket, " DESCIPTION DESCIPTION Phase A Tag Phase B Tag Phase C Tag Connector, Crimpet, CU, /0-/0 Wildlife Guard Disconnect, 00 Amp, Single Blade Fault Indicatior, 00A, OH, Beacon DESCIPTION CONSTUCTION STANDADS 000 MCM CABLE ISE WITH 00 AMP DISCONNECTS UP CB () QTY. S/N - N QTY. S/N DATE ENG ADDITIONAL MATEIAL QTY. 0 S/N OPS of UP UP CM/AH //0 00

14 ASSEMBLY DIAGAM ONE ASSEMBLY PE 00A PHASE equires an installation tool (Long Allen Wrench) Note: Fault indicator window should be on top Install drain wire to drain attachment Integral Bushing Padmount SwitchGear 8 ev : Added Voltage-reset fault indicator to drawing and USG 00A elbow kit. 00A Elbow Kit For Switchgear Consists Of # to #8: Housing Elbow, 00A Adapter, Cable, 000 MCM Contact, Conductor, 000 MCM, Al Plug, Loadbreak educing tap, 00A-00A Cap, Protective Insulated, 00A, KV DESCIPTION CONSTUCTION STANDADS PADMOUNT SWITCHGEA 00 AMP ELBOW - 000MCM CABLE USG QTY. S/N 00A Al Stud 0 00A Elbow Sealing Kit DATE ENG 8 OPS 0 //00 HWH MA //0 LB AH //0 CM AH of USG USG JEH //00 00

15 COMPATMENT- OADSIDE COMPATMENT- COMPATMENT- OADSIDE COMPATMENT- A B C C B A A B C C B A COMPATMENT- PMDF COMPATMENT- COMPATMENT- PMDF COMPATMENT- OADSIDE COMPATMENT- COMPATMENT- COMPATMENT- COMPATMENT- A B C C B A A B C C B A COMPATMENT- PMDF0 COMPATMENT- COMPATMENT- PMDF COMPATMENT- PADMOUNT DEADFONT (District Standard) PADMOUNT LIVEFONT 00 AMP Ø SWITCH 00 AMP Ø POSITIONS PMDF PMLF PMDF0 PMLF0 0 PMDF PMLF PMDF PMLF ev : Changed to Voltage-reset fault indicators and added sealing kit. CONSTUCTION STANDADS PADMOUNT SWITCHGEA CHAT DATE ENG OPS 0 //00 HWH MA //0 LB AH 0//0 LB AH //0 CM AH of USG USG JEH //00 00

16 ev : Changed to Voltage-eset fault indicators and added sealing kit. DEADFONT (District standard) DESCIPTION PMDF Housing, Elbow, 00 AMP 8 Adapter, Cable, 000 MCM Contact, Conductor, 000 MCM Plug, Loadbreak educing Tap, 00/00 A Cap Protective, Insulated, 00A KV 00A Al Stud 0 8 Elbow Sealing Kit, 00A Clamp, Ground od, Large 8 0 Conductor, /0 BC, ST Connector, Crimpet, /0 - / od, Ground, /8" x 8' Vault, Concrete, 00 AMP SW, Mod. U-J- Switch, Padmt, Deadfront, PMDF 8 PMDF 0 PMDF PMDF CONTACT STANDADS ENGINEE - NOT STOCKED LIVEFONT (Non-standard. For Maintenance only) DESCIPTION S/N S/N QTY PMLF QTY PMDF0 QTY PMLF0 QTY PMDF QTY PMLF QTY PMDF 00A Elbow Kit For Switchgear Consists Of # to #8: Holder, Fuse, Padmount, Deadfront Fault Indicator, 800A, Voltage-eset, Beacon Caulk, Switchgear 0 Bolt, Machine, /" x ", SS Clamp, Ground od 8 Conductor, /0 BC, ST Connector, Comp Lug YCA-NCU /0 Connector, Crimpet, /0 - /0 od, Ground, /8" x 8' " x /" Bolt Assembly 8 8 Connector, Comp Lug, YA-AAL/CU 000 MCM 0 Vault, Concrete, 00 AMP SW, Mod. U-J- 0 Terminator, Outdoor, Molded ubber /0 Terminator, Outdoor, Butyl, 00 AMP, 000 MCM Switch, Padmt, Linefront, PMLF PMLF0 PMLF 8 PMLF Holder, Fuse, Padmount, Livefront Fault Indicator, 800A, Current-eset, Beacon Caulk, Switchgear 0 NOTE : MATEIAL ISSUE HAS THE MAXIMUM NUMBE OF FAULT INDICATOS THAT MAY BE USED. ENGINEE TO DETEMINE THE ACTUAL NUMBE NEEDED. NOTE : THE ENGINEE SHOULD CALL FO SPAE FUSES TO BE STOED IN THE SWITCHGEA CABINET. FUSE SIZE S/N E 00 E E CONTACT SYSTEMS ENGINEEING FO POPE FUSE COODINATION. CONSTUCTION STANDADS PADMOUNT SWITCHGEA CHAT DATE ENG QTY PMLF QTY OPS 0 //00 HWH MA //0 LB AH 0//0 LB AH //0 CM AH of USG USG JEH //00 00

17 TYPICAL COSS- SEE USG- FO OPTIONS 00 AMP SIDE 00 AMP SIDE NOTE: CAULK ALL AOUND SWITCHGEA AND VAULT. VAULT LID FINISH GADE /0 CU " /0 CU /0 CU 8" TYPICAL MINIMUM TENCH DEPTH, " CONDUIT / BEND, ALL CONDUITS NOTE : INSTALL GOUND ODS AND /0 CU BUS LOOP AOUND VAULT & BOND TO SWITCHGEA CASE IN OPPOSITE CONES. NOTE : BOND CONCENTIC NEUTAL FOM UD CABLE TO /0 CU GOUND. LEAVE ENOUGH SLACK TO OPEATE CABLES. NOTE : EMOTE INDICATO FO FAULT INDICATO IS TO BE INSTALLED IN THE UPPE HINGED-SIDE OF DOO OF COMPATMENT WITH INDICATO. EV : ADDED NOTE AND COECTED NOTES & EV : ADDED CAULK NOTE CONSTUCTION STANDADS DEADFONT SWITCHGEA DATE ENG OPS 0 //00 HWH MA //0 LB AH 0//0 LB AH of USG USG- 0 JEH //00 00

18 TYPICAL COSS- SEE USG- FO OPTIONS 00 AMP SIDE 00 AMP SIDE NOTE: CAULK ALL AOUND SWITCHGEA AND VAULT. VAULT LID FINISH GADE /0 CU " /0 CU /0 CU 8" TYPICAL MINIMUM TENCH DEPTH, " CONDUIT / BEND, ALL CONDUITS NOTE : INSTALL GOUND ODS AND /0 CU BUS LOOP AOUND VAULT AND BOND TO SWITCHGEA CASE IN OPPOSITE CONES. NOTE : BOND CONCENTIC NEUTAL FOM UD CABLE TO /0 CU GOUND. LEAVE ENOUGH SLACK TO OPEATE CABLES. NOTE : EMOTE INDICATO FO FAULT INDICATO IS TO BE INSTALLED IN THE UPPE HINGED-SIDE OF DOO OF COMPATMENT WITH INDICATO. EV : ADDED NOTE - / BEND FO CONDUITS EV : ADDED CAULKING NOTE CONSTUCTION STANDADS LIVEFONT SWITCHGEA DATE ENG OPS 0 //00 HWH MA //0 LB AH 0//0 LB AH of USG USG- 0 JEH //00 00

19 "- / BENDS ALL CONDUITS AØ AØ BØ BØ CØ CØ "-0" CØ CØ "-" BØ BØ AØ AØ "-" ' (LID OF VAULT) VAULT PLAN VIEW (CONDUIT SHOWN AS TYPICAL FO " CONDUITS) FINISH GADE To Switch To Switch COSS " CONDUIT DETAIL " 8" TYPICAL MINIMUM TENCH DEPTH, " CONDUIT / BEND, ALL CONDUITS DESCIPTION VAULT, CONCETE W/LID COVE, VAULT " X ", FIBEGLASS QTY S/N EV : ADDED PHASING TO CONDUITS AND MATEIAL ISSUE. CONSTUCTION STANDADS SWITCH VAULT DUCT ENTY FO 000MCM CABLE DATE ENG OPS 0 //00 HWH MA //0 LB AH of USG- USG- JEH //00 00

20 ' () /8" GALV. PULL IONS ONE EACH SIDE '- '-" ' '-" Ø.0" ALL HOLES " DEEP Top View (Vault) KNOCKOUTS EACH SIDE & END '-8" '-" '-" (OPEN BOTTOM) EV - ADD S/N S/N - - Minor drawing changes Front View (Vault) VAULT, CONCETE, 00 AMP SW MOD (INCLUDES LID USG-) BASE WIEGHT -,00 Lbs COLLA WIEGHT -,0 Lbs CONSTUCTION STANDADS SWITCH VAULT DETAIL VAULT BASE DATE ENG OPS //00 HWH MA //0 JEH T MINO DAWING CHANGES of USG- USG- / 00

21 ' ' GALV. UNISTUT PLACES Top View (Vault Lid) ' '-" Front View (Vault Lid) " S/N - S/N - VAULT, CONCETE, 00 AMP SW MOD (INCLUDES VAULT USG-) BASE WIEGHT -,00 Lbs COLLA WIEGHT -,0 Lbs COVE, VAULT, "x" FIBEGLASS (TO BE USED WHEN SWITCHGEA WILL BE INSTALLED LATE) TOTAL WIEGHT - 8 Lbs - Minor drawing changes CONSTUCTION STANDADS SWITCH VAULT DETAIL VAULT COVE of USG- USG- DATE ENG OPS 0 //00 HWH MA //0 JEH T MINO DAWING CHANGES JEH //00 00

1100 OVERHEAD TRANSFORMERS

1100 OVERHEAD TRANSFORMERS 00 OVEHEAD TANSFOMES //00 ~ F Pole Type - Transformer Fuse Schedule ~ T Transformer Field Stenciling Code ~ TA Transformer Coding for Material Mgmt System C T,TH Pole Mounted Transformer and Cutout on

More information

1400 UG PADMOUNT TRANSFORMERS

1400 UG PADMOUNT TRANSFORMERS 00 UG PADMOUNT TANSFOMES //0 ~ FA Bay-O-Net Fuse Schedule for Padmount Transformers ~ HB,HB Hillside Barrier ~ UID Padmounted Equipment Identification Tags & Safety Signs ~ UT Single Phase Padmount Transformer

More information

SECTION 32 - PAD-MOUNTED CAPACITORS TABLE OF CONTENTS

SECTION 32 - PAD-MOUNTED CAPACITORS TABLE OF CONTENTS . PAD-MOUNTED CAPACITOS PAD-MOUNTED CAPACITO PAD-MOUNTED CAPACITO.-A.-B. PAD-MOUNTED CAPACITO OPEATIONS PAD-MOUNTED CAPACITOS ENEGIZING PAD-MOUNTED CAPACITO DE-ENEGIZING PAD-MOUNTED CAPACITO PAD-MOUNTED

More information

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE

34.00 METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4. METERING GENERAL LABELING MULTIPLE METER ENCLOSURES ON A SINGLE PREMISE 4.-4 4. SELF-CONTAINED METERING, SINGE-PHASE INSTALLATION DETAILS /4 VOLT SINGLE-PHASE UNDERGROUND RESIDENTIAL SERVICE AND METER

More information

CABLE TERMINALS

CABLE TERMINALS 14 00 00 01 Sheet 1 of 1 TABLE OF CONTENTS LOCATION & PLACEMENT OF RISERS ON JOINT USE POLES STANDOFF BRACKET PLACEMENT AND GROUNDING ONE RISER WITH U GUARD, 2, 3, 4, & 5 SPLIT CONDUIT OR SCHEDULE 40 0

More information

1150 CLEARANCES 11/28/2016

1150 CLEARANCES 11/28/2016 1150 CLEAANCES 11/28/2016 ~ CFG Construction Framing Guide N CO OH Clearance to oadways & Other Surfaces - ~ CTS OH Clearance to Structures N DC OH Clearance to oadways & Other Surfaces - Design Minimum

More information

SYSTEM PROTECTION SYSTEM PROTECTION. Underground Electric Distribution Standards I. FUSE COORDINATION

SYSTEM PROTECTION SYSTEM PROTECTION. Underground Electric Distribution Standards I. FUSE COORDINATION I. FUSE COORDINATION I.1. GENERAL I.1.1. The purpose of protective coordination is to provide isolation of a fault as close to the fault as possible so that a minimum of customers will be affected. The

More information

SECTION 8 - SWITCHES AND PROTECTIVE DEVICES TABLE OF CONTENTS

SECTION 8 - SWITCHES AND PROTECTIVE DEVICES TABLE OF CONTENTS 08.00 GENERAL DISTRIBUTION SURGE ARRESTERS 08.00-0 CUTOUTS AND ARRESTERS GENERAL 08.00-03 08.0 CUTOUTS AND ARRESTERS METAL OXIDE ARRESTERS WITH POLYMER HOUSINGS 08.0-0 APPLICATION OF DIRECT CONNECTED ARRESTERS

More information

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes Engineering Service Specifications Commercial Single-Phase Current Transformer Metering Schemes Specifications for Commercial Underground Current Transformer Metering Requirements for a Single-Phase Customer

More information

BRACKETS, MOUNTS & HARDWARE

BRACKETS, MOUNTS & HARDWARE HIGH VOLTAGE SWITCHGEAR & AUTOMATION EQUIPMENT SECTION 6 Brackets, Mounts & Misc. Hardware CAT. NO: 040930G May, 2008 INERTIA Engineering & Machine Works, INC. Fax: (209) 931-8186 6665 Hardaway Road, Stockton,

More information

GENREADY LOAD CENTER AND TRANSFER SWITCH

GENREADY LOAD CENTER AND TRANSFER SWITCH GENEADY LOAD CENTE AND TANSFE SWITCH DESCIPTION The Geneady load center is a hybrid panel that operates as a normal load center and also allows for seamless integration of standby generators. GENEADY LOAD

More information

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

9. Non-Residential Services (Commercial, Industrial, and Agricultural) Section 9 2016 Electric Service Requirements, 3rd Edition Section 9 Non-Residential Services Directory Page 9.1 General Requirements 68 9.2 Direct-Connect Metering, Single Installations 69 9.3 Direct-Connect

More information

SECTION 3 - PRIMARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS

SECTION 3 - PRIMARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS 03.00 GENERAL CONSTRUCTION NOTES PRIMARY CONSTRUCTION PRIMARY CONSTRUCTION PIN INSULATOR INSTALLATION 03.00-02 03.00-04 03.00-20 03.02 CONNECTORS AUTOMATIC SPLICE INSTALLATION 03.02-01 INSTALLATION GUIDE

More information

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION

CONSTRUCTION STANDARD ELECTRIC OPERATIONS ORGANIZATION Page 1 of 11 R1 ****This Standard Supercedes CE Macros MPR1S, MUR1S, MPR3S & MUR3S and portions of BECo Standards CS2.7-1.1, CS2.7-1.5 & CS2.7-1.7**** PRIMARY URD RISER CONSTRUCTION TABLE OF CONTENTS Page

More information

Customer Requirements Downtown Secondary Network Service

Customer Requirements Downtown Secondary Network Service Application This standard describes the limitations and requirements for receiving service from the Tacoma Power secondary network system within the City of Tacoma downtown core area. In This Standard

More information

10 Commercial, Industrial, Agricultural Services

10 Commercial, Industrial, Agricultural Services 10 Commercial, Industrial, Agricultural Services This section describes the Power Company requirements for commercial, industrial, and agricultural services. This section covers single phase and three

More information

SWITCHGEAR DIVISION PRODUCT PROFILES

SWITCHGEAR DIVISION PRODUCT PROFILES SWITCHGEAR DIVISION PRODUCT PROFILES Metal-Enclosed Load-Interrupter Switchgear Product Profiles Three-Phase, Group-Operated Load-Interrupter Switches with Fuses in Single and Multi-Bay Assemblies Manual,

More information

SYSTEM PROTECTION - PLATING

SYSTEM PROTECTION - PLATING INTRODUCTION 1. Plates F1 thru F10 supply only the material required for one-phase. Therefore, for threephase construction, you will be required to call for the specified plate three times at that station.

More information

M-Force three-phase switch

M-Force three-phase switch Supersedes K-SEC 926 December 2012 M-Force three-phase switch Description The M-Force switch from Eaton's Cooper Power Systems is a distribution-class, gangoperated, factory unitized three-phase overhead

More information

A. Submit manufacturer's literature and technical data before starting work.

A. Submit manufacturer's literature and technical data before starting work. SECTION 16425 SWITCHBOARD PART 1 GENERAL 1.01 SUMMARY A. Related Section: 1. 16450 - Grounding. 1.02 SUBMITTALS A. Submit manufacturer's literature and technical data before starting work. B. Submit Shop

More information

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS November 17, 2016 Engineering Service Specifications Table of Contents Commercial Service Requirements SLEMCO Commercial

More information

Installation Instructions LINK---C

Installation Instructions LINK---C IS---LINK---C Page 1 of 10 Installation Instructions LINK---C DEADBREAK CAM LINK OPERABLE CONNECTOR SYSTEM The is a 600 amp, connector designed to: 1.) provide a fully shielded, fully submersible hot stick

More information

your Green Power WIND POWER SOLUTIONS only Greener

your Green Power WIND POWER SOLUTIONS only Greener your Green Power WIND POWER SOLUTIONS only Greener WIND POWER SOLUTIONS Thomas & Betts is committed to being your partner in power delivery by leading the industry in innovative wind power solutions and

More information

COMMERCIAL QUICK REFERENCE

COMMERCIAL QUICK REFERENCE COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR

More information

A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system.

A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system. 1. APPLICATION A. Three-phase, oil filled self-cooled, padmounted transformers are installed outdoors on pads in the EWEB distribution system. 2. REFERENCE STANDARDS A. The transformers supplied shall

More information

FROM B.C. HYDRO ENCLOSURE (SEE NOTE 4) RIGID CONDUITS (SEE NOTE 8) ALTERNATIVE TO LOAD BARRIER (SEE NOTE 7) SERVICE ENTRANCE ENCLOSURE

FROM B.C. HYDRO ENCLOSURE (SEE NOTE 4) RIGID CONDUITS (SEE NOTE 8) ALTERNATIVE TO LOAD BARRIER (SEE NOTE 7) SERVICE ENTRANCE ENCLOSURE FROM B.C. HYDRO FOR OVERHEAD INSTALLATION ONLY DUCT SEAL (SEE NOTE 8) PULL BOX (SEE NOTE 5) PULL BOX (SEE NOTE 5) FROM B.C. HYDRO 7- REVISED NOTES & TABLES ON PAGES,3,4,5,.MARCH AJ - GENERAL REV.MA 08

More information

M-Force three-phase switch

M-Force three-phase switch Switches and Disconnects CA008004EN Supersedes May 2015 COOPER POWER SERIES M-Force three-phase switch Description Eaton's Cooper Power series M-Force switch is a distribution-class, gang-operated, factory

More information

WILDLIFE PROTECTION

WILDLIFE PROTECTION 05 00 00 01 TABLE OF CONTENTS GENERAL INFORMATION INSTALLATION OF CRITTER LINE GUARDS INSTALLATION OF TANK MOUNTED LIGHTNING ARRESTER BRACKET GUARDS 25KV & BELOW EXISTING STRUCTURE MODIFICATION 05 00 00

More information

CONTROL POWER OFF ON ALARM SILENCE / TEST NEMA 4X 304 STAINLESS STEEL ENCLOSURE W/ OUTER DOOR LAYOUT CUSTOMER JOB NAME PRODUCT O:

CONTROL POWER OFF ON ALARM SILENCE / TEST NEMA 4X 304 STAINLESS STEEL ENCLOSURE W/ OUTER DOOR LAYOUT CUSTOMER JOB NAME PRODUCT O: PUMP HOU METE PUMP HOU METE 3 4 5 3 4 5 MAIN POWE EMEGENCY POWE ON ON PUMP UN PUMP UN OFF OFF G G PUMP HAND-OFF-AU PUMP HAND-OFF-AU CONTOL POWE OFF ON w 00 AMP GENEA ECEPTACLE PUMP OVELOAD TIP PUMP OVELOAD

More information

Approved Contractor Construction e-guide Residential Commercial

Approved Contractor Construction e-guide Residential Commercial Approved Contractor Construction e-guide Residential Commercial Clark Public Utilities PO Box 8900 Vancouver, WA 98668 (PAGE 2) TABLE OF CONTENTS PAGE Trenching 3 Wire 8 Single-Phase Transformer Set 13

More information

Lighting and Power Distribution Panelboards

Lighting and Power Distribution Panelboards EXPLOSIONPROOf Lighting and Power Distribution Panelboards The design offers sufficient gutter space on sides to allow through wiring and easy lug connection. All enclosures are furnished with hinges,

More information

SERVICE REQUIREMENTS COMMERCIAL & INDUSTRIAL CUSTOMERS

SERVICE REQUIREMENTS COMMERCIAL & INDUSTRIAL CUSTOMERS ENERGY SERVICES ENGINEERING 840 Northgate Drive Telephone (509) 942-7403 Fax (509) 942-7405 P.O. Box 190 Richland, WA 99352 www.ci.richland.wa.us SERVICE REQUIREMENTS COMMERCIAL & INDUSTRIAL CUSTOMERS

More information

Distribution Arresters

Distribution Arresters Heavy Duty & Riser Pole Ÿ Tested to the latest IEEE C62.11 standards Ÿ High Strength Fiberglass Isolator Brackets Ÿ Ground Lead Disconnect will operate with a minimum of 1 amp Ÿ Protective Cap RUS APPROVED

More information

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT

NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT NEW SERVICE HANDBOOK COMMERCIAL & IRRIGATION SUPPLEMENT Meter Installations There are three basic ways to measure electricity consumption: Small and medium services are metered directly using direct connect

More information

35-kV Safefront SuperWell Mini-Switch Source Isolated Pad-Mounted Switchgear 50 Amp (Max) Clip-Mounted Current Limiting Fuses

35-kV Safefront SuperWell Mini-Switch Source Isolated Pad-Mounted Switchgear 50 Amp (Max) Clip-Mounted Current Limiting Fuses Page 1 2016 EPMR-35-311S-R2/ESW-CM9 Three Phase Two Ways per Phase 200 Amp 35 kv Class Eaton s CPS LRTPs 50 Amp (Max) 27 kv Clip-Mounted NX Fuse Provisions 21.1/36.6 kv Grounded Wye Max Design, 150 kv

More information

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS

SECTION 27 - PAD-MOUNTED TRANSFORMERS TABLE OF CONTENTS CABLE AND CONDUIT ENTRANCE SINGLE-PHASE PAD-MOUNTED TRANSFORMER INSTALLATION 100 KVA AND LARGER (CONCRETE PADS ONLY) 27.05-01 CABLE AND CONDUIT ENTRANCE SINGLE-PHASE PAD-MOUNTED TRANSFORMER INSTALLATION

More information

ELECTRICAL SCHEMATIC FOR VAULT OIL MINDER SYSTEM STANCOR OIL MINDER SYSTEM CONTROLLER

ELECTRICAL SCHEMATIC FOR VAULT OIL MINDER SYSTEM STANCOR OIL MINDER SYSTEM CONTROLLER 9. VAULTS, GENEAL GENEAL EQUIMENTS FO VAULT OOMS GENEAL EQUIMENTS FO VAULT OOMS GENEAL EQUIMENTS FO VAULT OOMS 9.-A 9.-B 9.-C 9. VAULT ACCESS, LADDE, SUMP PUMP AND CONTOL FIXED LADDE FO VAULTS ALL ALUMINUM

More information

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse-SS Power Pedestals

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse-SS Power Pedestals Lighthouse-SS Power Pedestal Dimensions Height: 44.00" (1117.60 mm) Width: 9.565" (242.95 mm) Depth: 9.875" (250.83 mm) Lighthouse-SS Base Diagram Ø0.50" MOUNTING HOLE (TYP.) 9.5625" 8.0625" 7.3125" C:\Documents

More information

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement.

More information

T & D Inventory Items Bidder Price List Group 1: 120V/240V Pole Mounted Transformers ASPA ITEM NO.

T & D Inventory Items Bidder Price List Group 1: 120V/240V Pole Mounted Transformers ASPA ITEM NO. T & D Inventory Items Bidder Price List Group 1: 120V/240V Pole Mounted Transformers No ASPA ITEM NO. 1 69361525 2 69361537 3 69361550 Group 2: Poles DESCRIPTION Make/Model Cat/Spec QTY UNIT MEASURE UNIT

More information

AMENDMENT ELECTRIC SERVICE MANUAL 2014

AMENDMENT ELECTRIC SERVICE MANUAL 2014 AMENDMENT (Pages 20,43,50,72,74,,76,78,83,86,99) ELECTRIC SERVICE MANUAL 2014 Effective April 1, 2015 18-7 6.0 SERVICE AND SERVICE ENTRANCES (General), Continued Conductor Sizing It is recommended that

More information

When power interruptions happen.

When power interruptions happen. When power interruptions happen. We know it s never a good time to have your power go out, so we work all year pruning trees and investing in our system to cut down on problems before they start. Outage

More information

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse Power Pedestal

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Lighthouse Power Pedestal DRILL \ PUNCH OUT TO SIZE REQUIRED DRILL \ PUNCH OUT TO SIZE REQUIRED Lighthouse Power Pedestal - Specifications Lighthouse Power Pedestal Dimensions Height: 44.00" (1117.60 mm) Width: 13.67" (347.22 mm)

More information

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location.

UNDERGROUND SERVICE ENTRANCE LOCATION. No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. UNDERGROUND SERVICE No meter base or entrance should be installed before an KREMC engineer has checked the proposed location. Entrance cabinet must be directly through wall or directly under meter in basement.

More information

MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS. Larry Vogt. Manager, Rates

MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS. Larry Vogt. Manager, Rates MINIMUM DISTRIBUTION SYSTEM CONCEPTS AND APPLICATIONS Larry Vogt Manager, Rates Minimum Distribution System What is MDS? MDS is an analysis module of the cost-of-service study in which distribution investment

More information

GENERAL INFORMATION POLE MOUNT TRANSFORMER SINGLE PHASE PAD MOUNT TRANSFORMER SINGLE PHASE POLE MOUNT TRANSFORMER THREE PHASE 17

GENERAL INFORMATION POLE MOUNT TRANSFORMER SINGLE PHASE PAD MOUNT TRANSFORMER SINGLE PHASE POLE MOUNT TRANSFORMER THREE PHASE 17 GENERAL INFORMATION SECTION GUIDE SECTION 10 PAGE 1 DESCRIPTION SECTION NUMBER GENERAL INFORMATION... 10 POLE MOUNT TRANSFORMER SINGLE PHASE... 15 PAD MOUNT TRANSFORMER SINGLE PHASE..... 16 POLE MOUNT

More information

SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION

SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION Roseville Electric SPECIFICATIONS FOR COMMERCIAL CONSTRUCTION REVISED 06/28/18 Commercial Construction Specifications Revision List REVISION Date Page No. Description 03/01/00 4.2-4.3 Changed leveling

More information

Elastimold. Cable Accessories. Underground Distribution Switchgear. Molded Vacuum Switches and Fault Interrupters

Elastimold. Cable Accessories. Underground Distribution Switchgear. Molded Vacuum Switches and Fault Interrupters Underground Distribution Switchgear Molded Vacuum Switches and Fault Interrupters MVS Molded Vaccum Switches Spring-energy, load-switching devices that make, carry and interrupt load currents through 600

More information

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev.

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev. Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY ANCHOR, DROP-IN FOR 1/2" BOLT 18564-7 A-11.00 11/2/2016 ANCHOR, DROP-IN FOR 3/9" BOLT 18549-3 A-11.00 11/2/2016 ANCHOR, NO-WRENCH: 10" X 96" 01558-6 A-5.00

More information

15-kV Live Terminal 600 Amp Group Operated Pad-Mounted Metal-Enclosed Outdoor Switchgear 140 Amp (Max) Clip Mount Current-Limiting Fuses

15-kV Live Terminal 600 Amp Group Operated Pad-Mounted Metal-Enclosed Outdoor Switchgear 140 Amp (Max) Clip Mount Current-Limiting Fuses Page 1 2015 Heavy duty 11-gauge steel enclosure is all-welded construction for long life Corrosion proof nameplate is located to provide easy access for the operator Glass reinforced barriers meet NEMA

More information

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment. General Unit substations shall be 500 kva minimum, 1500 kva maximum unless approved otherwise by the University. For the required configuration of University substations see Standard Electrical Detail

More information

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service. UNDERGROUND SERVCE tems to consider f your trenching route has to be dug by hand, or if a cable must be installed under a paved surface, additional charges apply. f your service cable has to be moved later

More information

TYPE PSI/II PADMOUNT SWITCHGEAR 15KV 25KV

TYPE PSI/II PADMOUNT SWITCHGEAR 15KV 25KV Cutler Hammer SECTION PB-1A-110 PAGE 1 Replaces April, 1996 TYPE PSI/II PADMOUNT SWITCHGEAR 15KV 25KV The PSI/II Padmount is the second generation of switchgear in the PSI switchgear family. The PSI/II

More information

UG FEEDING OH UG FEEDING OH. Electric Distribution Standards I. INTRODUCTION

UG FEEDING OH UG FEEDING OH. Electric Distribution Standards I. INTRODUCTION I. INTRODUCTION Electric Distribution Standards Design, Construction & Material Standards formed a special committee to establish some basic design guidelines for construction alternatives to be used for

More information

UNDERGROUND SERVICES - SECONDARY

UNDERGROUND SERVICES - SECONDARY UNDERGROUND SERVICES - SECONDARY Contents - Underground Services... U-1 General Requirements for Underground Service...U-2 Names of Parts for Underground Service... U-3 Service Termination in a Service

More information

CT Metering. CT Metering. Meter Mounting Equipment

CT Metering. CT Metering. Meter Mounting Equipment Single Meter Sockets, Without Bypass - CT Rated.................................. 67-68 Single Meter Sockets, CT Rated With Test Switch Bypass Provision............. 69-70 Meter Socket / Enclosure Combination

More information

TYPE BLT DISCONNECT SWITCHES

TYPE BLT DISCONNECT SWITCHES TYPE BLT DISCONNECT SWITCHES OUTDOOR-HOOK OPERATED 8.3KV through 38KV A & A Current Furnished with hooks for loadbreak tool REA/RUS approved S M C O 1 BLT PARALLEL BLADE DISTRIBUTION CLASS DISCONNECT SWITCH

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

15-kV Wall-Mount Switchgear Three-Phase Indoor/Outdoor 600 Amp S&C Mini-Rupter Switch

15-kV Wall-Mount Switchgear Three-Phase Indoor/Outdoor 600 Amp S&C Mini-Rupter Switch Page 1 2015 Kinked roof prevents standing moisture Glass reinforced barriers meet NEMA GPO-3 Standards 0.625" diameter copper ground bar Elliott air-insulated bushings accept IEEE Standard inserts and

More information

35-kV Safefront 200 Amp SuperWell Primary Capacitor Station Pad-Mounted Outdoor

35-kV Safefront 200 Amp SuperWell Primary Capacitor Station Pad-Mounted Outdoor Page 1 2016 EPM-PCS-35-320P-R2/ESW-GCM6-2S-SA Three Phase Two Ways per Phase 200 Amp 35 kv Class Eaton's CPS LRTPs 35 kv Elliott Air-Insulated SuperWell Bushings 21.1/36.6 kv Grounded Wye Max Design, 150

More information

Metering and Service Installation:

Metering and Service Installation: Table of Contents 1. Metering Installation Requirements, General... 1 2. Type of Service... 2 3. Definitions... 2 4. Who Provides Metering Equipment?... 2 5. Establishment of Service... 2 6. Meter Access...

More information

Division 1 Explosionproof Panelboards

Division 1 Explosionproof Panelboards Division 1 Explosionproof Panelboards Designed for use in Class 1, Division 1 Zone 1 areas such as petroleum refineries, chemical or petrochemical facilities, the X1Pb panelboards are used to control lighting

More information

Busway Construction. Bus Bars

Busway Construction. Bus Bars Busway Construction Bus Bars A better understanding of what busway is can be gained by examining its construction. A typical Siemens Sentron busway section has three or four formed aluminum or copper bars

More information

Customer Substation Manual

Customer Substation Manual Customer Substation Manual Table of Contents Section Page 2 of 81 Description 0 Preface 010.00 General 010.10 Information Required for the Review of New Customer Substations 010.20 New Customer Substation

More information

Three-Phase Pole Mounted Recloser

Three-Phase Pole Mounted Recloser Three-Phase Pole Mounted Recloser Page 1 of 8 Table of Contents 1 GENERAL... 3 2 CONSTRUCTION... 3-5 3 BUSHINGS... 5 4 LINE CONNECTOR... 5 5 TOOLS....5 6 NAMEPLATES..6 7 PAINT... 6 8 EXTERNAL HARDWARE

More information

General Specifications for Lighthouse Power Pedestal

General Specifications for Lighthouse Power Pedestal Dimensions Height: 44.00 11 (1117.60 mm) Width: 13.67" (347.22 mm) Depth: 13.75" (349.25 mm) Lighthou98 Base Diagram ---13,75 1 --- Approximate Weight: 30 lbs. (13.6 kg) Multiply base dimensions by 25.4

More information

Pretest Module 24 Three-phase Service Entrance

Pretest Module 24 Three-phase Service Entrance Pretest Module 24 Three-phase Service Entrance 1. What is the most widely used three-phase service entrance system? 2. What are the three most common voltage combinations for three-phase, four-wire systems?

More information

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions WARNING HIGH VOLTAGE 115V 4 M AP Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions Important: For your protection and the safety of the

More information

35-kV Safefront 200 Amp SuperWell Primary Metering Station Pad-Mounted Outdoor

35-kV Safefront 200 Amp SuperWell Primary Metering Station Pad-Mounted Outdoor 35-kV Safefront 2 Amp SuperWell 5-33 Page 1 216 EPM-PMS-35-311P-R2/ESW Three Phase Two Ways per Phase 2 Amp 35 kv Class Eaton's CPS LRTPs NEMA Standard Outdoor Instrument Transformer Provisions 21.1/36.6

More information

squareworx For every eventuality: Square shoulder, slotting and chamfering milling with only one insert

squareworx For every eventuality: Square shoulder, slotting and chamfering milling with only one insert squaewox Fo evey eventuality: Squae shoulde, slotting and chamfeing milling with only one inset squaewox M squae shoulde, slotting and chamfeing milling cutte bodies milling cutte bodies One fo two: Squae

More information

12. ILLUSTRATIONS 12.1 GENERAL

12. ILLUSTRATIONS 12.1 GENERAL 12. ILLUSTRATIONS 12.1 GENERAL Illustrations of typical service equipment and installations are shown in this section as an aid to interpretation of these Electric Service Requirements. The illustrations

More information

15-kV Live Terminal 200 Amp Mini-Switch Source-Isolated Pad-Mounted Switchgear 40 Amp (Max) Arc-Strangler NX Fuses

15-kV Live Terminal 200 Amp Mini-Switch Source-Isolated Pad-Mounted Switchgear 40 Amp (Max) Arc-Strangler NX Fuses Page 1 2015 Heavy duty 11-gauge steel enclosure is all-welded construction for long life Door safety barrier removal instructions Safety latches on the door safety barriers, front and rear, are insulating

More information

Disconnect & ByPass Switches

Disconnect & ByPass Switches Disconnect & ByPass Switches Disconnect & Oil Circuit Recloser Bypass Switches; Regulator & Current Transformer Bypass Switches Electrical Apparatus K-SEC 060 & 090 Contents Type D-73 Distribution Class

More information

Outdoor Power Transmission & Distribution

Outdoor Power Transmission & Distribution Description: The purpose of the section is to highlight the current applicable UMCP Design Standards and requirements for Outdoor Power Transmission and Distribution, including but not limited to the following:

More information

15-kV Safefront Mini-Switch Source Isolated Pad-Mounted Switchgear 140 Amp (Max) Clip-Mounted Current-Limiting Fuses

15-kV Safefront Mini-Switch Source Isolated Pad-Mounted Switchgear 140 Amp (Max) Clip-Mounted Current-Limiting Fuses Page 1 2016 Heavy duty 11-gauge steel enclosure is all-welded construction for long life 200 Amp Elliott air-insulated bushing wells accept IEEE Standard inserts and elbows ushing wells may be added or

More information

International Motors/Gearmotors/Controls

International Motors/Gearmotors/Controls International Motors/Gearmotors/Controls AC INTENATIONAL PODUCTS INTODUCTION The metric products listed in this section have been designed with international design standards in mind. The 230 volt, 50

More information

NEW Solutions for Underground System Growth

NEW Solutions for Underground System Growth NEW Solutions for Underground System Growth Cooper s Single-Phase Voltage Regulator Improved Power Quality More Economical Improved System Reliability Increased Safety Better Aesthetics Lower Maintenance

More information

Loadbreak Elbows. 3 Loadbreak Elbows. 200 Amp 5-15 kv Industrial pg Loadbreak Elbows. 200 Amp 25 kv Industrial pg. 254.

Loadbreak Elbows. 3 Loadbreak Elbows. 200 Amp 5-15 kv Industrial pg Loadbreak Elbows. 200 Amp 25 kv Industrial pg. 254. 3 Loadbreak Elbows 200 Amp 5-15 kv Industrial pg. 252 Loadbreak Elbows 200 Amp 25 kv Industrial pg. 254 Loadbreak Elbows 200 Amp Industrial pg. 255 Loadbreak Elbows Accessories 3 Loadbreak Elbows 3M 200

More information

Wind Power Solutions. Make Energy Renewable and Reliable!

Wind Power Solutions. Make Energy Renewable and Reliable! Wind Power Solutions Make Energy Renewable and Reliable! Reliable Thomas & Betts Products for Clean, Green, Thomas & Betts makes all the products that connect and protect a wind farm and its power distribution

More information

600A Deadbreak Elbow. K656LR Elbow Connector (with Test Point) Features:

600A Deadbreak Elbow. K656LR Elbow Connector (with Test Point) Features: Issue Date: 07/17/2017 Page: 1 of 5 PSS- K656LR Elbow Connector (with Test ) Applications: The Elastimold K656LR (with test point) is designed to provide fully shielded, dead-front submersible cable connections

More information

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein. 16425 SWITCHBOARD ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 13 An optional keynote to

More information

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev.

GAINESVILLE REGIONAL UTILITIES APPROVED ELECTRIC SYSTEM MATERIALS MANUAL Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY. Rev. Page 1 ACTIVE MATERIAL INDEXED ALFHABETICALLY ANCHOR, DROP-IN FOR 1/2" BOLT 18564-7 A-11.00 9/12/2011 ANCHOR, DROP-IN FOR 3/9" BOLT 18549-3 A-11.00 9/12/2011 ANCHOR, NO-WRENCH: 10" X 96" 01558-6 A-5.00

More information

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Hatteras Light Pedestals

Eaton Corp. - Marina Power and Lighting, Inc. General Specifications for Hatteras Light Pedestals Hatteras Light Power Pedestal Dimensions Height: 31.00" (787.40 mm) Width: (190.50 mm) Depth: (190.50 mm) Hatteras Light Base Diagram Approximate Weight: 14 lbs. (6.4 kg) 1.73" UL FILE # E133781 Ø0.41

More information

Single phase pole mounted. 11kV. Electrical Engineer KEU ID#:

Single phase pole mounted. 11kV. Electrical Engineer KEU ID#: Single phase pole mounted Distribution Transformers 11kV Prepared by: ARY SAIDAHMED SHEKSAEED Electrical Engineer KEU ID#: 4252 Email: ary.sayd@hotmail.com 1 S # Contents Page # 1 Introduction 3 2 Type

More information

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT SECTION 16400 LOW VOLTAGE DISTRIBUTION EQUIPMENT A. General 1. The University does not accept Series-Rated equipment for power distribution switchboards, distribution panels and branch circuit panelboards.

More information

CABINET OPTIONS AND DESIGNATORS CODE LETTERS

CABINET OPTIONS AND DESIGNATORS CODE LETTERS CABINET OPTIONS AND DESIGNATORS Hinges: ~Stainless steel lift off Nuts and Bolts: ~ Stainless steel Hardware: ~ Handles and Corbin locks are stainless steel or zinc plated Windows: ~ Lexan Backboards:

More information

Approved Meter Sockets and Cabinets

Approved Meter Sockets and Cabinets Single Unit Residential Guide 1 PHASE, 120/240 VOLT SERVICES SERVICE CAPACITY OWNED METERING (Metering sockets and cabinets are supplied by Customer). Outdoor meter mounting height is 1730 mm ( 5 8 ) to

More information

Switchgear Skid, C1192

Switchgear Skid, C1192 CUSTOM SOLUTIONS 15kV Modular Stairs stored on floor in front of battery bay Ground grid stored on front tongue of trailer Stairs deployed for unit access Storage box for fencing materials and other parts

More information

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE SOURCE 20V 240V STUD (PER NEC) A customer supplied and installed teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals.

More information

Current Transformer, Termination & Disconnect Cabinets WE Energies Approved

Current Transformer, Termination & Disconnect Cabinets WE Energies Approved Current Transformer, Termination & Disconnect Cabinets WE Energies Approved 2 TABLE OF CONTENTS Table of Contents Current Transformer Cabinets Overhead Entry... 4 Underground Entry and Underground Exit...

More information

FEBRUARY 14, 2017 Elastimold Solid dielectric switchgear customer presentation

FEBRUARY 14, 2017 Elastimold Solid dielectric switchgear customer presentation FEBRUARY 14, 2017 Elastimold Solid dielectric switchgear customer presentation Elastimold solid dielectric switchgear agenda Compelling value Design principles Product overview Switchgear applications

More information

Grounding equipment COOPER POWER SERIES. Temporary Connections CA325004EN. Contents

Grounding equipment COOPER POWER SERIES. Temporary Connections CA325004EN. Contents Temporary Connections CA325004EN Supersedes November 2016 Grounding equipment COOPER POWER SERIES Contents Description Page Grounding elbow products... 2 Grounding elbow and kit product ratings... 5 200

More information

INDEX Welcome 1.2 Contacting Powergrid Solutions, Inc. 1.3 Terms Of Usage 1.4 Product Codes and Descriptions

INDEX Welcome 1.2 Contacting Powergrid Solutions, Inc. 1.3 Terms Of Usage 1.4 Product Codes and Descriptions INDEX SECTION 1 INTRODUCTION 1.1 Welcome 1.2 Contacting Powergrid Solutions, Inc. 1.3 Terms Of Usage 1.4 Product Codes and Descriptions SECTION 2 PADMOUNTED ENCLOSURES/CABLE SWITCHING/TERMINATING GEAR

More information

Medium voltage switchgear SafeGear HD 63 ka arc resistant metal-clad switchgear. ABB Group February 25, 2015 Slide 1

Medium voltage switchgear SafeGear HD 63 ka arc resistant metal-clad switchgear. ABB Group February 25, 2015 Slide 1 Medium voltage switchgear SafeGear HD 63 ka arc resistant metal-clad switchgear ABB Group February 25, 2015 Slide 1 SafeGear HD arc resistant switchgear 63 ka arc resistant metal-clad air insulated switchgear

More information

320A Single Phase URD Meter Loop Installations

320A Single Phase URD Meter Loop Installations 320A Single Phase URD Meter Loop Installations Location: The meter loop shall be mounted on the side of the pedestal facing the consumer's lot. (The side being one of the four flat surfaces of the pedestal

More information

Index Section 103 Joint Use. General Requirements for Installation of Attachments on Oncor Poles

Index Section 103 Joint Use. General Requirements for Installation of Attachments on Oncor Poles 103 09-17 103 Index Section 103 Joint Use Title Date Number General Requirements for Installation of Attachments on Oncor Poles... 103-100 Supply and Communication Space... 103-105 Communication Lines

More information

Wisconsin Public Utility Institute. June 28, Minimum Distribution Charges. Larry Vogt. Director, Rates Mississippi Power

Wisconsin Public Utility Institute. June 28, Minimum Distribution Charges. Larry Vogt. Director, Rates Mississippi Power Wisconsin Public Utility Institute June 28, 2017 Minimum Distribution Charges Larry Vogt Director, Rates Mississippi Power 1 Costs of Service vs. Cost Recovery Residential Service Example Assuming that

More information

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp

SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp Printed from NIPSCO.com 04-01-17 PAGE 1 OF 6 USE: Arrangement of service equipment to supply electric energy to an underground, outdoor self contained meter installation. LATEST REVISION: PREVIOUS REVISION

More information

Standard switch modules (type WS) are designed for flexibility, space savings, & durability.

Standard switch modules (type WS) are designed for flexibility, space savings, & durability. Power Mod Standard switch modules (type WS) are designed for flexibility, space savings, & durability. Features include: QuickSystem features Standard compression lug capability Invertibility: 400-800

More information

ARPF. Air Handler with Painted Cabinet. 1½ to 5 Tons Multi-Position,

ARPF. Air Handler with Painted Cabinet. 1½ to 5 Tons Multi-Position, Air Handler with Painted Cabinet Standard Features Suitable for use with refrigerants -40A and - Check flowrater expansion device Direct-drive, multi-speed motor Transformer and blower time-delay on all

More information