Prioritization HIGHWAY Project Data and Final Scores (Detailed) January 31, 2012

Size: px
Start display at page:

Download "Prioritization HIGHWAY Project Data and Final Scores (Detailed) January 31, 2012"

Transcription

1 Bonus Total 1297 Mobility Capacity Odell Mobility SR1008 West Market Mobility Capacity Aycock NC 24/87 (Bragg SR 1546 (Guilford College Spring Garden Armistead (Fort Bragg Boundary) Lee Widen way to four lanes with a median (FS- 0806B) Inter and sidewalk improvements. Replace railroad overpass and widen roadway. Mobility Mobility Urban Area Mobility Urban Area 1304 Mobility Capacity U-3831A SR2048 Gordon Mobility Capacity U-3415B SR Mobility Capacity U-3415A SR Mobility Capacity U Mobility Capacity U-4015A SR1556 Poplar Tent Poplar Tent Macy Grove Gallimore Dairy Mobility Capacity U-3621A SR1604 Hunter Hill NC 132 Interchange Kannapolis SR 1445 (Derita RoaWoodhaven Place / Gable Oaks d) SR 1005 (East Mountain ) NC 68 SR 1613 (North Winstead SR 2270 (Wood Sorrell US 29/601 George Liles NC 150 (North Main ) South of international Drive Mobility Capacity Wayside Plank US Mobility Widen roadway to three lanes SR 1394 (Poplar Tent, SR 1445 (Derita to US 29/601 Bypass. Widen to Multi- s. (Coordinate With I-3803). Section B: Concord-Kannapolis Westside Bypass to US 29/601. SR 1445 (Derita to US 29/601 Bypass. Widen to Multi-s. (Coordinate With I-3803). Section A: Woodhaven Place / Gable Oaks to George Liles. SR 1005 (East Mountain ) to NC 150 (North Main ). Multi- Facility on New NC 68 to SR 1008 (Market ). Widen to Multi-s. Section A: NC 68 to South of international Drive. SR 1613 (North Winstead to NC 43/48 NC 43/48 (Benvenue. Widen to Multi- s - SR (Benvenue 1613 (North Winstead to SR 1616 (Country Club. Wayside, widen to four lanes divided, from Plank to US 401 Mobility Urban Area Mobility Mobility Mobility Urban Area Mobility Urban Area Rocky Mount Mobility Urban Area R-4705 SR1142 NC 903 SR 1182 NC 903 to SR Upgrade Facility. Mid-East U-5026 I-095 SR 1770 (Sunset I-95 at SR 1770 (Sunset. Convert Grade Separation to an Interchange. Mobility Rocky Mount Mobility Urban Area 1044 Mobility Capacity 001 SR1452 US 70 (Church ) NC 87 (Webb ####################################### Burlington- Graham Mobility Mobility Capacity U-4753 SR Mobility Capacity U-2817 SR Mobility Capacity 074 SR Mobility Capacity R-3430 SR Mobility Corridor Management SR1470 SR1717 Wayne Memorial Drive Evans / Tar Dickinson Avenue Polkton Connector Connelly Springs Western Jack Bennett Mobility Capacity SR1708 Firetower 1193 Mobility Capacity 067 SR1423 SR 1003 (New Hope SR 1711 (Worthington in Winterville NC11 Proposed US 70 Bypass US 264A (Greenville US 74 NC 218 Catawba River at Caldwell/Burke County Line US 17 (Marine US 15/501 NC 43 (Charles US 17 (New Bern Highway) SR 1610 (Reade Circle) SR 1933 (South- West in Lenoir NC 24 (Lejeune SR 1721 (Lystra Rd) SR 1704 (Fourteenth ) NC 24 (Freedom Way) SR 1003 (New Hope to Proposed US 70 Bypass. Widen to Multi-s. SR 1711 (Worthington in Winterville to US 264A (Greenville. Widen to Multi- s. ####################################### Connections from NC 218 to US 74 via new bridge to connect over the train tracks. there needs to be at least on elevated crossing to get emergency crews over the tracks. Trains often stops for long periods of time. This would be a two lane new alignment Catawba River at Caldwell/Burke County Line to SR 1933 (South-West in Lenoir. Widen to Multi-s. Construct median, Inter and access management improvements from US Hwy 17 to NC Hwy 24 including drainage improvements at the NC Hwy 24 and Western Inter. Jack Bennett Rd (SR 1717) (US 15/501 to Lystra Rd (SR 1721) safety improvements. Widen existing 2-lane roadway to a multi-lane urban facility Consturct A Multi- Highway Partially On New Alignment, Upgrade Waters, 30 And Riggs. Wide Outside s Goldsboro Urban Area Area Area Mobility Mobility Mobility Mobility Mobility Urban Area Area Mobility Mobility- Urban Area Mobility Capacity U-5120 SR 1211 (Kimball SR 2739 (Main ) SR 1221 (Bostian SR 2739 (Main ) to SR 1221 (Bostian. Construct Connector on New Mobility

2 Bonus Total 1043 Mobility Corridor Management Mobility Capacity FS-1106A Arlington Spring Lake Bypass R-4708 Dow SR 1708 Firetower Rd NC 210 US 421 in Carolina Beach Upgrade drainage facilities, construct medians / NC43 (W 5Th St) channelized turn lanes, bicycle facilities, and sidewalk. Spring Lake Bypass from NC 210 to Odell Rd Upgrade way. Part on new location. Use Odell this as THE CORRECT Construction Estimate for revised project location: const=38,000,000 r/w =10,000,000 US 421 in Kure Beach Widen shoulders and stripe bicycle lanes, construct Inter improvements, install and multi-use path on the east side of the roadway. Area Urban Area Mobility Mobility Mobility Capacity Balfour NC 191 (Brevard US 64 Balfour - Construct New 4-lane Expressway, Hendersonville Mobility Capacity R-5100 SR1109 Williamson I-77 NC 150 Widen to Multi-s SR1711 SR1110 Bruce Garner Barbee Chapel /Farrington SR1666 Dearborn Drive Mobility Capacity U-5106A Mobility Capacity U Mobility SR1104 U-3337 US074 Dairyland /Buckhorn Northwest Loop Firetower U-2909 SR1780 Estes Drive 068 SR1005 SR1006, SR1102 Orange Grove, Dodsons Cross Mobility Capacity U-2412A SR1486, SR1421 -High Point Stanly School SR1372 Lotla Northern Falls Rd Mays Store Rd NC 54 SR 1669 (East Club SR 1006 (Orange Grove US 258/NC 24 SR 1127 (Frog Level SR 1437 ( Fayetteville SR 1772 ( ) SR 1107 (Stagecoach SR 1004 ( Oxford SR 1146 (West Ten SR 1308 (Gum Branch NC 11/903 NC 86 SR 2057 Alamance (Sturbridge ) County Line I-40 US 311 Bypass SR 1177 (Dairyland SR 4228 (Vickrey Chapel NC 138 US 52 (North (Aquadale Main ) NC 28 (Bryson City Mobility Capacity Concord Lake Dale Earnhardt /Branchview Drive US Mobility Capacity Gilead (Statesville (Woodhaven US 601 NC 115 Add bicycle accommodations Construct bike lanes and sidewalks. Construct Bicycle s and Sidewalks Construct 4-foot paved shoulders River Lake Norman Burlington- Graham Mobility Mobility US 258/NC 24 to US 17. Four- Divided Facility, Part on New Location and Along Existing Mobility- way. Section A: US 258-NC 24 to SR Urban Area (Gum Branch. SR 1127 (Frog Level to NC 11/903. Construct Multi- Facility, Part on New SR 1437 ( Fayetteville. Convert Grade Separation to an Interchange. SR 1772 ( ) to NC 86. Widen to add bike lanes, sidewalks, and transit accommodations. Add 4-foot paved shoulders Add 4' Paved shoulders to accommodate bicycles. This route is designated as North Carolina Bike Route #2. Hilltop to Proposed US 311 Bypass. Widen to Multi-s, Part on New Section A: US 311 Bypass to SR 4228 (Vickrey Chapel. Stanly School is a cut-through for traffic traveling from Norwood to points west. The request is to have the road upgraded to 24 feet for its entire legnth. improvements and widening for new North Macon School Widen Branchview/Concord Lake from 2 lanes to 4 lanes from US 601 to Dale Earnhardt in Kannapolis. Widening to 4 s and add Bike s. Area Mobility Mobility Urban Area High Point Urban Area Union Mobility Mobility Mobility Mobility Capacity 067 SR1871 NC 24 (Freedom Way) SR 1406 (Piney Green Connect Hunters Trail And Upgrade To Three- Cross-Section Mobility Urban Area Mobility Capacity U-2729 SR1672 Hanes Mills Museum Drive Mobility Capacity Landsford Davidson River Village Connector South Carolina State Line SR 4000 (University ) White Store US 64 US 64/US 276 Museum Drive to SR 4000 (University ). Widen to Multi-s With Curb and Gutter. Widening of Landsford to a minimum width of 24 feet and replacing older bridges and culverts where needed. Also to include overpass at Inter of US 601/Landsford. Davidson River Village Connector, including 2 bridges, connecting US 64 to US 276/64 in Pisgah Forest. Mobility Urban Area Mobility

3 Bonus Total Mobility Capacity 2081 SR1127 Frog Level Poplar Tent US 13 (Dickinson NC 903 Derita NC SR1150 River NC 24/27 NC Mobility Capacity R-2555B Catawba Avenue NC 73 (Sam Furr Mobility Capacity SR1118 Fayetteville Woodcroft Pkwy 1062 Mobility Lawndale Drive SR1354 Bruce Mobility Capacity SR1203 Allen SR1307 Tusquittee 1110 Mobility Capacity Church Mobility Capacity R-2594 Sunburst, FH Mobility Capacity SR Mobility Corridor Management SR1362 U-5121 SR1103 SR1395 Gum Branch Piney Grove Church Pisgah Church SR 1609 (South Main ) SR 1467 (Stantonsburg SR 1365 (Riverview St) Wendover Avenue US 64 at Cherryfield Summersill School SR 1006 ( US 421) SR 2151 (Jetton SR 1171 (Riddle SR 1353 (Riddle Hill, US 13 (Dickinson SR 1330 (Cold Branch Rd) Cone widen to tolerable lane width and add continuous 2 way left turn lane Widen Poplar Tent from 2 lanes to 4 lanes from Derita to NC 73. Wide shoulders for bicycle route, straighten turns, turn lanes, site distance improvement for safety NC 73 (Sam Furr to SR 2151 (Jetton Widen to Multi-s. SR 1118 (Fayetteville (Woodcroft Pkwy to Riddle (SR 1171)) widen to 4-lane divided, bikelanes and sidewalks. Area Piedmont Triad Mobility Mobility Mobility ####################################### Mobility Urban Area Upgrade and Widen Near Main in Mars Hill - project ends at Mars Hill Elementary School driveway, approximately 2500 ft from start of project Widen existing 2 and 3 lane roadway to multilane urban facility with sidewalk, bicycle, and landscaping improvements improvements and widening Widen from 3 lanes to 4 lanes divided on Church. Please refer to attached shapefile and Feasibility Study for details about the project andfigures SR 1326 (Macedonia US 64 at Cherryfield to SR 1326 (Macedonia Church Church South of Balsam Grove. Two South of Balsam s on New Grove Urban Area Boundary US 421 Widen from Summersill School to UAB (ultimately US Hwy 258 in Richlands). Modernize way Lewisville- Clemmons I-40 US 158 I-40 to US 158. Convert to Four Median Section. Cove Creek Mountain Boyd Mountain Mobility Capacity U-3424 SR1410, SR1411 Bunce US Mobility Capacity U-4714C SR1009, SR1010 John / Monroe SR 1008 (Indian Trail Great Smoky Mountains National Park SR 1400 (Cliffdale SR 1377 (Wesley Chapel-Stouts Boyd Mountain to Great Smoky Mountains National Park - Upgrade and Pave US 401 to SR 1400 (Cliffdale. Widen to Multi-s. Area Union Mobility Mobility Urban Area Mobility Mobility Urban Area Mobility Urban Area SR 3448-SR 3474 (Trade ) to SR 1377 (Wesley Chapel-Stouts in the towns of Matthews, Stallings and indian Trail. Widen to Union Multi-s. Section C: SR 1008 (Indian Trail to SR 1377 (Wesley Chapel-Stouts Mobility Mobility Mobility Capacity 067 SR1336 SR 1308 (Gum Branch NC 53 (Western Widen To A Four- Divided Highway Mobility Urban Area Mobility Capacity U-2924 SR4000 University SR 3973 (North Point SR 1672 (Hanes Mill SR 3973 (North Point to SR 1672 (Hanes Mill. Add Additional s. Mobility Urban Area 1060 Mobility Mobility Capacity R-3833C SR Mobility Capacity SR1708, SR Mobility Capacity U Mobility Capacity 090 SR1009 Pisgah Church Brawley School Firetower, Portertown Jake Alexander Elm ####################################### Mobility Urban Area I-77 US 21 SR 1704 (Fourteenth ) Harrison NC 33 Peach Orchard SR 1377 (Wesley SR 1007 (Rocky Chapel-Stouts River SR 1177 (Chuckwood to US 21. Widen to Lake Norman Multi-s With Interchange at I-77. Section C: I-77 to US 21. Widen existing 2-lane roadways to multi-lane urban facilities. includes Inter improvements at Firetower and Portertown change the primary movement to East Area Firetower and the northern leg of Portertown Harrison to Peach Orchard at I-85. Two s on Multi- Right of Way, New Widen roadway to multi-lanes, with median, bike lanes and sidewalks Union Mobility Mobility Mobility Mobility

4 Bonus Total Mobility Capacity U-3425 SR1136 Myrtle School US 29/ Mobility Capacity 063 SR1115 NC 211 NC Mobility Capacity U-3614 NC 127-US 321 Connector From 29th Avenue Drive, NW in Hickory 1107 Mobility Capacity 041 SR2176 Holden SR 1255 (Hudson SR 1751 (Grace Chapel in Caldwell County Wendover Avenue US 29/74 to SR 1255 (Hudson. Widen to Multi- s. Western Connector. Construct 4-lane divided roadway on new location. Consider use of existing roads (includingchickenplantandlinden s) when possible. US 321 to NC 127. Two s on Four Right of Way, Some New From 29th Avenue Drive, NW in Hickory to Grace Chapel in Caldwell County. Widen from 5 lanes to 6 lanes on Benjamin / Bryan. Adding a 3rd inbound lane. Add sidewalk on Benjamin from Wendover to Bryan. Area Mobility Mobility Mobility Mobility Urban Area Mobility Capacity U-3617 SR2045 East Mountain / US 421 NC 66 in Kernersville (Forsyth County) SR 2007(Bunker Hill in Guilford County NC 66 in Kernersville (Forsyth County) to SR 2001 (Guilford County). Widen to Multi-s. Mobility Urban Area SR1904, SR1833 End of SR 1904 Long Island (Kale Rd)at Long, Kale Island Marina SR 1004 (Hudson Chapel Construct Paved s Unifour Mobility Capacity 049 SR1246 Alcove Rd. (SR 1206) Fairview Rd. (SR 1246) Construct Fairview Rd, overpass over I-77 to Alcove Rd. Lake Norman Mobility Mobility Capacity SR1804 Ratchford NC 279 (Lower Dallas Highway) US 321 Widen existing two lane road to three lanes. onehalf mile of road on new location. Area Mobility Mobility Capacity 099 SR Mobility Capacity U-3334B Booker Dairy 700 Feet South Of Beamer/Billy Reynolds Rd SR 1003 (Buffalo US 421/Bemer Rd Interchange US 301 (Bright Leaf ####################################### Northwest Piedmont Improve existing two lanes and construct two lanes on new location. Plain Mobility Mobility Mobility Capacity U Mobility Capacity U-2307B Mobility Capacity SR1850 Carey SR 1572 (Rouse Eastside SR 1453 Thoroughfare/Mc (Springs, Donald Pkwy Sandy Ridge Mobility Capacity SR1704 Fourteenth Red Banks Mobility Capacity U-3343 SR1002 Aviation NC 54 I Mobility Capacity Mobility Capacity U-4707 SR1403 Florida Country Club I-40 US 258 NC 127 SR 1008 (West Market ) SR 1708 (Firetower SR 1572 (Rouse to US 258. Multi- s on New Eastern Carolina US to NC 127. Multi-s, Part on New Section B: SR 1453 (Springs to NC 127. Widen to multi-lane and improve safety at railroad. Widen existing 2-lane roadway to a multi-lane urban facility with Inter improvements from Red Banks to Firetower (SR 1708) NC 54 to I-40. Widen to Multi-s with interchange modifications at I-40 Mobility Mobility Mobility Urban Area Area Mobility Mobility Lee US 70 ####################################### Mobility Urban Area SR 1308 (Bell Fork Mobility Capacity U-4762 SR1250 Springfield US 64 Alternate 1051 Mobility Capacity Rural Retreat 1061 Mobility Capacity 064 SR1770 Eastern Avenue 1218 Mobility Capacity 036 SR Mobility Capacity New Route University Red Oak (SR Xxxx) East Ozark Avenue/Lowell Gaston Day School SR 1406 (Piney Green SR 1243 (Leggett Springwood Church Carriage (SR Xxxx) Central Avenue Union SR 1308 (Bell Fork to SR 1406 (Piney Green. Widen to Multi-s With Bicycle and Pedestrian Accommodations. US 64 Alternate to SR 1243 (Leggett. Widen to Multi-s. Extend Rural Retreat (SR 1300) with a two lanes facility with sidewalks, bike lanes, street lights and mast arm traffic signal poles Widen from 2-lane road to 4-lane divided road. Widen two lane road to a three lane cross from NC 7 (East Ozark to Central Avenue Construct new four lane divided highway from Kinmere Drive to NC 274, Union Mobility Urban Area Rocky Mount Mobility Urban Area Burlington- Graham Mobility Rocky Mount Mobility Urban Area Area Area Mobility Mobility Mobility Capacity U-2707 SR3000 Idols SR 2999 (Hampton US 158 SR 2999 (Hampton to US 158. Two Section on New Mobility Urban Area 1303 Mobility Capacity R-4063 SR 1472 Village Drive West of SR 1437 ( Fayetteville SR 1438 (Lanvale Widen to Multi-lanes Mobility Urban Area 4

5 Bonus Total Mobility Capacity U Mobility Capacity Mobility Capacity U-5002 Newton-Conover Loop (Southern Portion) Church Bypass US SR1542. Airport SR1555, SR Mobility Capacity U-3422 SR1003 Camden Mobility Capacity U-5019 Wilma Dykeman Riverway Mobility Capacity U-3818 New Route NC 10 NC 16 Goodman 301 Bypass (Wesleyan Fayetteville Outer Loop (U-2519) US 70 SR 1903 (Mill Menius SR 1401 (Tanner NC 59 (Hope Mills Broadway (SR 1781) NC 10 West to NC 16. Construct Multi-lane Facility With Paved s from NC 10 to NC 16 via P and SR Part on New New alignment of Church and NC 152. Bypass of downtown China Grove. US 301 Bypass (Wesleyan to SR 1401 (Tanner. Widen to Multi-s. Fayetteville Outer Loop (U-2519) to NC 59 (Hope Mills. Widen to Multi-s. US 70 to Broadway (SR 1781), Widen to 2 or 4 lanes with median or 3-lane with parallel parking, 9.0 miles. SR 1903 (Mill to SR 1426 (Aberdeen. Construct Two s Utilizing Sections SR 1426 of SR 1923 (Broad ), SR 1641 (Clemmer (Aberdeen and SR 1645 (Mt. Olive Church, Remainder on New Mobility Mobility Rocky Mount Mobility Urban Area River Mobility Mobility Mobility Mobility Capacity New Route NC 58 Erkin Smith Construct two-lane roadway on new location Rocky Mount Mobility Urban Area 1045 Mobility Capacity New Route Mobility Capacity Mobility Capacity U-2723 SR1501 Erkin Smith US 29/74 Belmont-Mt Holly (Wilkinson Central Loop US 64 Alt Gastonia-Mt. Holly Connector SR1001 (Henderson), Warrenton Bath Highway Mobility Capacity U-3611 SR1003 New Hope NC SR1326, 020 SR1452 'SR 1306 (12th ) SR 1556 (Wayne Memorial Drive) Timber Rd. (SR 1245) Town 020 SR1337 Bald Creek Mobility Capacity R-3822A New Route Mobility Capacity R-3822B New Route Mobility Capacity Smithfield Way Mobility Capacity SR1713 Mill Mobility Capacity Mobility Capacity Mobility Capacity SR Mobility Capacity 049 SR Mobility Capacity SR1346 South of Proposed Bridge at Chockoyotte Creek Proposed Bridge at Chockoyotte Creek End of Current Smithfield Way US 301 Bypass (Wesleyan SR 1507 (Slatestone SR 1713 (Miller's Chapel Beaty St./Mecklenburg County Line Tennessee State Line Tennessee State Line NC 125 US 258 West Loop Minor US 64/276 US 64 Thoroughfare Henderson Western Outer Loop Ocean Isle Beach Younger SR 1101 ( County Home Bethlehem (SR 1714) NC 39 US 17 NC 179 Judas Rd. (SR 1378) SR 1333 (Chub Lake US 21 SR 1364 (Carver Drive) Construct two lane roadway on new location 'Construct four-lane divided facility including bridge over I-85 from US 29/74 (Wilkinson to the proposed Gastonia-Mt. Holly Connector. Widen to 12-foot lanes rom Henderson to Warrenton. SR 1306 (12th ) to SR 1507 (Slatestone. Widen to Multi-s. SR 1556 (Wayne Memorial Drive) to SR 1713 (Miller's Chapel. Widen to Multi-s. NC 115 from Timber Rd. to Mecklenburg County Line. Widen lanes and add paved shoulders Widen and pave Joe Brown Highway Widening and Paving NC 125 to South of US 158. Construct A Two Facility Parallel to I-95. Section A: South of Proposed Bridge at Chockoyotte Creek to NC 125. NC 125 to South of US 158. Construct A Two Facility Parallel to I-95, Section B: Proposed Bridge at Chockoyotte Creek With Approaches on New Service Along I-95. Extend roadway for additional access to industrial park. Widen from 2 lanes to 3 lanes. US 64/276 to Nicholson Creek /US 64 - West Loop Minor Thoroughfare Continuation of the Western Outer Loop from County Home to US 1 Bypass and terminating at NC 39. Upgrade to 4 lanes from NC 179 to US 17 to increase capacity. Cornelius Rd. Widen to multi-lanes from Judas Rd. to US 21 Extend Younger (SR 1346) 0.6 mile from Chub Lake (SR 1333) to Carver Drive Rocky Mount Mobility Urban Area Area Kerr-Tar Mobility Mid-East Mobility Goldsboro Urban Area Lake Norman Mobility Peanut Belt Mobility Peanut Belt Mobility Eastern Carolina Mobility Rocky Mount Mobility Urban Area Mobility Kerr-Tar Mobility Cape Fear Mobility Lake Norman Mobility Kerr-Tar Mobility

6 Bonus Total Mobility Capacity U-2529 Newton-Conover Loop (Western Section) Mobility Capacity SR1004 NC 75 NC 10 Southwest of Newton Durham County Line Proposed Newton-Conover North Loop Stem NC 10 Southwest of Newton to Proposed Newton-Conover North Loop. Widen to Multi- s using existing SR 1476 (Fairgrove Church and Construct remaining Multi- Connector on New Mobility Section A - Upgrade to a four-lane Divided facility from Durham County line to Stem, including wide Kerr-Tar Mobility shoulders to accommodate bicycles Mobility Capacity R-3434 Galloway NC 211 US 17 NC 211 to US 17 Bypass. Widen to Multi-s. Cape Fear Mobility Mobility Capacity R-2246A George Liles Mobility Capacity U-2528AB Northwest Loop NC Mobility Capacity New Route NC Mobility Capacity U Mobility Capacity U-3407 I-40/SR 1124 (33 Rd. ) Interchange SR 1309 (Main Proposed US 17 ) Bypass Southern Loop 1263 Mobility Capacity New Route Mobility Capacity SR1001 Oakwoods US Mobility 087 SR1336 NC 62 at Grand Oaks Crowders Mountain Depot / Ramseur Mobility Capacity R-4456 New Route NC Mobility I Mobility Capacity SR1631 Frontage SR 1302 (Cornelius SR 1631 (Frontage SR 1304 (Roberta NC 49 to South of I-85. Widen to Four s Divided, Some New Section A: NC 49 Mobility to SR 1304 (Roberta. 33rd at I-40 to Airport. Multi- SR 1196 (13th s, Connector on New Location and Avenue SW-19th New Interchange at SR 1124 and I-40. Section SW) AB: I-40/SR 1124 (33 Rd. ) Interchange to SR 1196 (13 Th. Avenue SW-19Th. SW). Shearers Rd. (SR 1125) US 17 Bypass (Hughes NC 87 Edgewood NC 268 (East Main ) Proposed NC 24 (R-2303) in Roseboro NC 213 East-West Connector. NC115 at Langtree Rd. to Shearers Rd. Proposed US 17 Bypass to US 17 Bypass (Hughes. Upgrade way, Some New Location With Interchange at the Proposed US 17 Bypass. NC 62 at Grand Oaks to NC 87. Widen to Multi-s and Construct Multi- Connectors on New Location with sidewalks and mast arm signal poles. Construct new three lane facility from Crowders Mountain to Edgewood. Lake Norman Mobility Mobility Albemarle Mobility Burlington- Graham Area I-26/Hwy 213 Interchange - Connect Frontage to Highway 213 or I-26 exit. Mobility Mobility Mobility Mobility Mobility Mobility Mobility Mobility Mobility I-3804 I-085 SR1186 Tucker Micaville Loop Mobility Capacity U-3831B SR2048 Gordon Mobility Capacity R-4909 New Route Mobility Capacity U Mobility Capacity US 264-NC 33 Connector Southern Connector I-40/85 SR 1221 ( Beatty Ford US 19E NC 80 NC 132 Interchange SR 1126 (Newland US 264 NC 33 Plyler Mill West of US 17 (Market ) SR 1125 (Millpond Synders ore, Convert existing Grade Separation to Interchange Construct an Interchange. Upgrade the existing 2 lane roadway. See FS- High Country 0711B. Inter safety improvements (Need more Details) NC to the Proposed NC 24 (R-2303) in Mid-Carolina Roseboro. Two s on New Feasibility Study Underway. Construct a new Interchange for Cornelius Lake Norman (SR 1302) at I-77 between Mooresville and Troutman. Burlington- Graham Inter improvement and sight distance for High Country NC 80 at SR Widen the pavement width to 24 ft along this. Widen roadway to four lanes with a median Mobility Mobility Mobility Urban Area Construct Two Facility on New Albemarle Mobility US264-NC33 connector: Construct new bridge over Tar River, East of Greenville ####################################### Area Mobility Mobility Mobility 1048 R-2716 Mattress Factory I-40/ SR1121 US 176 NC Mobility Capacity SR1605 East Main US Mobility Capacity 065 SR1175 Kerr Avenue 2085 SR1100 Airport SR 1411 (Wrightsville SR 1181 (Gilliand SR 1765 (Unifi Industrial, US 76 (Oleander Drive) SR 1107 (West Third ) Convert Grade Separation to an Interchange With I-40/85. Burlington- Graham Widen and add sidewalks to meet complete Isothermal streets policy compliance and to improve mobility Widen to a 3-lane facility. Construct extension of existing roadway on new location Modernize way Northwest Piedmont Mobility Mobility Mobility Urban Area

7 Bonus Total 1248 Mobility Capacity 026 SR1112 Rockfish SR1195 US Mobility Capacity U-2553 South Strickland Bridge Camden West Court US 52 Business US 601 (West Lebanon (Rockford ) ) Widen to multilanes with sidewalks Modernize way to improve capacity and compliance with complete streets policy US 601 (Rockford ) to US 52 Business (West Lebanon ). Widen to Multi-s and Improve Inters at Worth and Grace s Mobility Capacity 078 SR1997 Fayetteville Farrington East 22nd Widen roadway to six lanes with a median Mobility Capacity SR1102 Gillis Hill Mobility Capacity New Location - Frog Pond US 401 (Raeford NC 24/ Mobility Capacity Williams US SR1158 West Cornwallis SR1009 NC 86 SR1727 Eubanks Mobility Capacity SR1008 Mount Carmel Church Northern Gibsonville Bypass SR 1306 (Erwin SR 1777 (Homestead SR 1009 ( NC 86) US University Drive SR 1418 (Lindsay Barbee Groves SR 1127 (Chapel Hill SR 1727 (Eubanks Rogers Chatham County Line County Farm Mobility Capacity SR2302 Ricks US 70 US SR1012 Pittsboro- Moncure Mobility Capacity U-3400 SR1577, SR1004 Archdale Mobility Capacity U-4404 SR1400 Cliffdale SR1727 US 15/501/NC 87 SR 1011 ( US 1) SR 1567 US 311 (Main (Robbins Country ) Mcpherson Church SR 1729 (Rogers SR 1404 (Morganton NC SR1180 NC 191 US 64 From Raeford to Lindsay in Hoke County. Widen to multi-lanes with median. Isothermal Northwest Piedmont Frog Pond: 24/27 to Barbee's Grove East of Bogger Hollar. to give better connective to Oakboro downtown, for traffic and from Aquadale and Norwood. Two lane extension. Williams Bridge over US Widen bridge over US 421,4-lanes-curb and gutter bike lanes and sidewalk with roundabouts. Construct Bicycle s and Sidewalks Construct bike lanes and sidewalks and transit accommodations. Construct bike lanes and sidewalks and transit accommodations. Construct bike lanes. Northern Gibsonville Bypass. University Drive to County Farm. New Location, Four Divided faciltiy. include sidewalks and mast arm signal poles Widen to three (3) lanes from US 70 to US 301 in Johnston County Upgrade to accommodate new development occurring in corridor. SR 1567 (Robbins Country to US 311 (Main ). Widen to Multi-s. Mcpherson Church to SR 1404 (Morganton. Widen to Multi-s. Construct bicycle lanes, sidewalks, safety and inter improvements Mobility Capacity SR1216 Surrett Drive Eden Terrace I-85 Widen to Multi-lane facility Mobility Capacity Rim Mobility Capacity Mobility Capacity U-4758 Piedmont Johnson - Sandy Ridge Raeford NC 6 Skeet Club I-40 Cliffdale SR 1850 (Sandy Ridge Mobility Mobility Mobility Mobility Mobility Mobility Urban Area Burlington- Graham Plain High Point Urban Area Upgrade roadway - Add turn lanes, widen shoulder and improve geometrics as appropriate; River From Raeford to Cliffdale Widen to multi-lanes with median. NC 68 (Eastchester Drive) to Sandy Ridge Skeet Club to I-40. Widen to Multi-s. High Point Urban Area High Point Urban Area Mobility Mobility Mobility Mobility Mobility Mobility Mobility Mobility Urban Area Mobility Mobility Capacity U-4420 SR2165, SR2055 I-085 Kivett Drive New Interchange of I-85 and Kivett Drive Turner /Liberty NC 62 (Cloniger ) Mobility Capacity U-3432 SR1595, SR1216 Surrett Drive Eden Terrace SR1701 East Thompson Martin Luther King, Jr. Drive SR 2123 (National Highway) Market Center Drive US 64 Business NC 62 (Cloniger ) to SR 2123 (National Highway). Widen to Multi-s. Eden Terrace to Market Center Drive. Widen to Multi-s. Resurfacing and Sidewalk (on one side) s. High Point Urban Area High Point Urban Area High Point Urban Area Mobility Mobility Mobility SR1900 Mason Farm /Finley Golf Course NC 54 NC 54/US (Fordham Blvd.) Construct bike lanes and sidewalks

8 Bonus Total Mobility Capacity SR2241 Oak SR1208 W. Kitty Hawk SR 2159 (Piney Ridge SR 1210 (Bob Perry US 74 Ivy Mobility Capacity SR1547 Finch Farm I-85 SR SR1540 Wilson 050 SR1340 NC Mobility Capacity Lawyers SR Mobility Capacity U-2811 SR1219 Ireland Drive Mobility Capacity SR1151 US SR 1504 ( US 64) Laywers Railroad Underpass SR 1141 (Cumberland US 276 NC 116 Webster Lawyers Bridge #105 US 401 (Raeford Warren County HUB Site Widen existing two-lane facility to a three lane curb and gutter typical. Modernize roadway with wide shoulders for bicyclists Isothermal Mobility Albemarle Beginning at the Inter of I-85 and ending at the Inter of SR 3106; widen Finch Farm High Point Urban (SR 1547) to a multi-lane facility with Area sidewalks and bike lanes. Upgrade way. Proposed typical is 20' paved roadway with 6'grass shoulders. Current typical is two lane 18' paved roadway with 4' grass shoulders Widen; upgrade to minimum 22' capacity. Potential new designation of NC 116 onto this route in near fu. This new alignment and brigde will connect Lawyers with Lawyers over the. This project will cross from the Union into MU. the road portion would be 18 to 24 feet widening. Widen to 20' of pavement with 6' unpaved shoulders. Improve alignment, replace rail struc and bridge #105 SR 1141 (Cumberland to US 401 (Raeford. Widen to Multi-s. Upgrade SR 1151 from US 1 to Warren County HUB Site on Manson-Axtell (SR 1100). Construction of a connector road from US 401 south of Warrenton connecting to 158 Business on new location. SR1135 Settawig SR 1100 US 64 improvements and widening Mobility Capacity U-2710 SR1403 Reilly SR SR 1400 (Cliffdale SR1415 Colon US 1 US 421 Widen roadway Mobility Capacity U-4710 SR1115 Golfview SR1533 Everette Farm SR1166 Rutledge Drive 045 SR1574 US Mobility Capacity SR1501 Swift Creek Mobility Capacity U-4709 SR1112 Rockfish SR1173 SR 1112 (Rockfish NC 59 (Main ) SR 1528 SR 1504 NC 225/SR 1890 (Brookdale Ave) NC 225 US 70 Business US 301 SR 1115 (Golfview SR 1175 (Will Hyatt 045 SR1127 Kanuga US 25 Business 088 SR1504 Hendersonville Highway (SR 1528) Crab Creek SR 1565 (Terrys Gap) NC 59 (Main ) Richland Creek Bridge East Of Sulphur Springs SR 1123 (Little River US 64 SR 3569 to SR 1400 (Cliffdale. Widen to Multi-s. SR 1112 (Rockfish to NC 59 (Main ). Widen to Four s Divided. Upgrade roadway. Proposed typical is 22' paved roadway with 6' grass shoulders. Current typical is two lane 18' paved roadway with 3' grass shoulders Construct Bicycle s and construct geometric improvements Construct 24' paved roadway with 6' grass shoulders way improvements that connect US 70 Business to US 301 in Johnston County SR 1115 (Golfview to NC 59 (Main ). Widen to Four s Divided. Upgrade roadway to improve safety, reduce congestion and provide pedestrian facilities. Improve Geometrics and Widen as appropriate Current typical is two lane 18' paved roadway with 4' grass shoulders / Proposed typical is 22' paved roadway with 6'grassshoulders, rebuild Bridges No. 193, 194, and 195 to match proposed typical 1245 Mobility Capacity 047 SR1418 Lindsey US 401 Gillis Hill Rd Widen to multilanes with sidewalks SR1521 Kelly 1247 Mobility Capacity 026 SR Stoney Point Ayden Golf Club SR1723,, Tucker SR1759, SR2241, Ivy Mobility Capacity U-3431 SR1763 Miller SR 1519 (Nash ) Lindsey NC 102 NC 33 SR 1756 (Lake US 421 Bypass Strickland Bridge Outer Banks Drive Realignment to provide direct access from the US 421 Bypass to the Central Carolina Community College Sanford Campus. Widen to multilanes with sidewalks Widen to meet tolerable lane width requirements, including straightening and realigning Inters, to serve as a connector between NC-102, NC-43 South, and NC-33 East. SR 1756 (Lake to Outer Banks Drive. Widen to Multi-s Mobility Capacity 026 SR1112 Rockfish Camden Golfview Widen to multilanes with sidewalks Mobility Mobility Mobility Kerr-Tar Mobility River River Plain River River Area Mobility Mobility Mobility Mobility Mobility Mobility Down East Mobility Mobility

9 Bonus Total Mobility Capacity U-2531 North Crosstown Connector NC 127 NC 16 in Conover NC 127 to NC 16 in Conover. Multi- s partially on New Mobility Mobility 087 SR1140 US 74 SR1305 Qualla US SR1667 US 441 Business 050 SR1001 NC 107 SR1309 Lower Alarka 088 SR1546 Neely SR 1304 (Cold Springs SR 1504 ( US 64) SR1368 Acquoni Big Cove Deep Gap SR 1137 SR 1307 (Tusquittee SR 1729 (Depot ) Inter Of Tilley Creek And Cullowhee Mountain Rd. SR 1311 (Grassy Branch Rd) SR 1544(French Broad St) Mobility Capacity Hoke Loop Raeford Cliffdale Mobility Capacity U-4713A Widening and drainage improvements on Upper Alarka improvements and widening Widen existing 16' roadway to 24' roadway with curb & gutter and pedestrian facilities. Replace signalized inter on each end of project with roundabouts. Construct 24' roadway with 5' paved shoulders for bike lanes and a 3' grass shoulders improvements and widening Upgrade way. Proposed typical is 20' paved roadway with 6' grass shoulders. Current typical is two lane 18' paved roadway with 4' grass shoulders Widening, construction of turn lanes, and a new signal at the Inter of Big Cove and Acquoni in Cherokee NC, in Swain County. from Raeford to Cliffdale Widen to multi-lanes with median. SR1518 US 17 SR 1519 Widen from US 17 to SR 1519 Down East 045 SR1351 US 25 NC 280 Straightening and of Geometrics SR 3440 (McKee SR 3448 (Pleasant Plains Mobility Capacity R-5117 New Route Marshall Mobility Capacity U-5101 SR 1437 (Shaw -SR 1614 (Shaw Mill -SR 1615 (Rosehill - Stacey Weaver Drive) SR 1009 (John ) Spring Creek Community SR 3457 (Campus Ridge to SR 3448 (Pleasant Plains. Two s on Multi- Right of Way on New Section A: SR 3448 (Pleasant Plains to SR 1009 (John ). Construct Facility on New Location SR 1437 (Shaw -SR 1614 (Shaw Mill -SR 1615 (Rosehill - Stacey Weaver Drive). interconnect and Widen to Multi-s Mobility Capacity R-5101 New Route Construct New Crossing of Yadkin River Mobility Capacity New Route Bridgeford Northdowns SR SR Mobility Capacity 026 SR1104 South Alston Avenue North Country Club Beattys State Capps Brevard City Limit SR 1171 (Riddle US 64 US 29 Roy Cline Improve way SR 1172 (Hebron SR 1127 (Kanuga 045 SR1323 US 64 NC SR1140 NC 69 US 64 Strickland Bridge US 401 SR 1112 (Stoney Point River Union Northwest Piedmont Construct a new bridge across I-77 south of NC 73, linking SR 2141 (Northcross Drive) to US 21. Union Construct Bicycle s and Sidewalks Upgrade way. Proposed typical is 26' paved roadway with curb and gutter, sidewalks, and in compliance with Complete s policy. Current typical is two lane 20' paved roadway with curb and gutter Upgrade roadway - Add turn lanes, widen shoulder and improve geometrics as appropriate; River Improve Geometrics (straightening) and Widen with spot safety improvements. Widen roadway from 17' to 20' pavement width along with construction of a dedicated bike lane. Replace narrow bridges to accommodate bicycles. Widen to multilanes with sidewalks River Mobility Mobility Mobility Mobility Mobility Mobility Mobility Mobility

10 Bonus Total 1272 Mobility Capacity 098 SR SR1393 Bass Lake 041 SR2135 US 220 SR1324 Florence NC 55 SR3449 Beaverdam Mobility Capacity SR1003 Buffalo US Mobility Capacity New Route SR1525, SR1540 SR 1134 (Millenport /Running Creek Church Hamlets Chapel, Jones Ferry Black Creek Rd. (SR 1606) SR 4046 (Briarglen ) US 25 (Merrimon Military Cutoff SR 1400 ( Salisbury US 15/ SR2347 Plainfield Mobility Capacity U-3615A SR1003, SR1820 Skeet Club US SR1492 Myrtle Grove Mobility Capacity Kivett Drive I Mobility Capacity US 311 Connector Masonboro Loop I-40 Business US 264 Salem Ridge Pleasant Ridge SR 1321 (Straight Wolfe Cove SR 1934 ( Beulah Market NC 24/27 Orange County Line.5 Miles North Of Squirrel Chase East of SR 1818 (Johnson ) Carolina Beach I-85 Business/US 29/US 70 I-40/US 311 Interchange Mobility Capacity U-0213 SR1009 Charlotte Avenue CSX Railroad Concord Avenue Mobility Capacity U SR1516, SR Mobility Capacity 086 SR Monroe Northern US 74 Loop Graham SR1004, SR1357 Efland-Cedar Grove SR1308 Double Island NC 87 Cc Camp Rd (SR 1138) SR 1332 (Highland Farm Upgrading to a four-lane divided boulevard with a araised 23-foot median with bicycle and pedestrian lanes, and curb and gutter Plain andan underpass at the the inter with the CSX rail-road line. Bass Lake Rd Enhancements - Salem Ridge to SR 4046 (Briarglen ) Resurface and widen shoulders a minimum of 4 feet within the Summerfield town limits. Mobility Urban Area Widen and resurface. Down East Beaverdam Upgrade and Pedestrian Widen to three (3) lanes from US 70 to SR 1934 ( Beulah in Johnston Co. Construct a route on new location from Military Cutoff extension to Market Upgrade to 24 feet. Widen and add bicycle lanes on SR 1525 (Jones Ferry Rd) and SR 1540 (Hamlets Chapel Rd) from US to the Orange County Line Resurface and widen shoulders a minimum of 4 feet within the town limits of Summerfield. US 311 to NC 68 (Eastchester Drive). Widen to Multi-s. Section A: US 311 to East of SR 1818 (Johnson ). Construct bicycle lanes (Soundside route) Widen Kivett Drive between I-85 Business and I- 85 US 311 Connector - New 4-lane Median Divided from I-40 Business to I-40/US 311 Interchange with a parallel Bicycle and Pedestrian Facility. CSX Railroad to Concord Avenue. Widen to Multi- s. River Plain Mobility Mobility Urban Area Urban Area High Point Urban Area Urban Area High Point Urban Area Mobility Mobility Mobility Urban Area Union SR 1751 US 74 to SR 1751 (Walkup at SR 1763 (Walkup (Bivens. Two s on Four Right of at SR 1763 Union Way. (Bivens Chicken Bridge Widen each lane by 2 feet Hugh Chatham Improve to 3-lane facility from CC Camp to Memoria Hospital Hospital. SR 1352 (Carr Store US 19E NC SR1783 NC 225 US Mobility Capacity U-4409 SR1876 Hemlock Drive R-3824 SR1644 NC 210 SR1728 Cash, Gate # Two SR 1876 (Hemlock Drive) Weaver Trail, Cash Corbin SR 1569 (Hoover Gate # Two, Will Suitt s to turn lanes, straightening, and addition of bicycle lanes. Upgrade the existing facility to 24 ft shoulder. Construct 24' paved roadway with 4' paved shoulders and 6' grass shoulders SR 1876 (Hemlock Drive) to Corbin. Construct Multi- Connector and Upgrade Existing Facility. NC 210 to SR 1569 (Hoover. Upgrade way to Secondary Standards, Some New Add bicycle accommodations. Northwest Piedmont High Country River Mobility Mobility Mobility Mobility Urban Area Urban Area SR1131 Airport Loop Airport Rd. US 70 Add Paved. Down East SR1009 NC 86 I-40 SR 1727 (Eubanks Widen outside lanes

11 Bonus Total SR1126 Boyd NC 11 Railroad ####################################### 068 SR1927 Merritt Mill 1010 (Franklin ) 1919 (South ) Construct bicycle lanes and sidewalks. 010 SR1472 Village Lanvale Carolina Avenue Construct bicycle lanes on new pavement 049 SR2350 US 21 I Mobility Capacity U-3467C Mobility Capacity U SR1492 Masonboro Loop SR 1316 (Rea NC 84 Northern Loop Mobility Capacity U-4761 SR1149 Boone Trail Pine Grove Drive NC 58 (Nash ) SR 1007 (Owen Drive) Myrtle Grove SR 1008 (Indian Trail-Waxhaw Murdock Rd. from US-21 to I-77 at Exit 45 Improve to wider s and wider shoulders Construct bicycle lanes (Soundside route) Widen roadway to four lanes with a median US 301 Interchange at NC 58 (Nash ) to US 301 Interchange at SR 1436 SR 1436 (Rosebud Church. Multi-s (Rosebud Church on New SR 1141 (Cumberland Mobility Capacity New Route US 421 Piner Mobility Capacity SR Ligon Mill SR1009 NC 86 US 1A NC 98 (bypass), New, 4-lane road. SR 1009 (Hillsborough 027 SR1227 NC168 U-3436 SR1148, SR1192 SR1501 Eno Mountain, Mayo Garner Chapel SR 1006 (Orange Grove SR 1530 (Willie Best SR 1777 (Homestead Camden County Line SR 1502 (Bennett's Bridge SR 1007 (Owen Drive) to SR 1141 (Cumberland. Widen to Multi-s. Construct a new route on new location from Carolina Beach (US 421) to Piner Construct bike lanes and sidewalks and transit accommodations. Area Urban Area Lake Norman Urban Area Union Plain Mobility Mobility Mobility Mobility Urban Area Widen to 24 feet with paved shoulders and turn lanes where necessary from Albemarle the Camden County line to the location of the proposed NC 168 Bypass. SR 1148 (Eno Mountain and SR 1192 (Mayo ) at SR 1006 (Orange Grove. Realign Inter and Make s. include bicycle lanes and sidewalks. From SR 1530 (Willie Best east to SR 1502 (Bennett's Bridge. Widen to twentyfour feet, construct paved shoulders. SR1801 Deadmon US 601 NC 801 Widen to 2 12-foot lanes. SR1123 Little River EB SR1104 Dairyland Mobility Capacity SR1927 East Anderson SR 1127 (Kanuga SR 1111 (Union Grove Church Webb I-95 US 25 (Greenville Highway) SR 1006 (Orange Grove Little River - Resurface, Widen, and Bike s, Flat Rock Construct 4-foot paved shoulders on Dairyland Widen to three (3) lanes from I-95 to Webb in Johnston County Eastern Carolina Northwest Piedmont River Plain Mobility Mobility Mobility Capacity R-4744 New Route US 421 NC 268 North Wilkesboro - Construct Connector, Part on New High Country Mobility U-4447 Hillsborough NC008 Winston 12th 060 SR SR Mobility Capacity SR Concord Sugar Creek Buffalo Lake SR1592 Beaverdam Mobility Capacity U-3471 SR1606 Black Creek Gorman Gardner Complete Approach. Mallard Creek Church Biesecker in Lexington Newell-Hickory Grove Winston scape, Phase III; from 12th street to Biesecker in Lexington Construct bicycle lanes N Tryon I-85 Construct bicycle lanes NC 27 NC 87 NC 215 (Champion Drive) US 264 Bypass Cherry US 301/264 Alternate (Ward Widen to Multi-s and Enhance with Sidewalks from Highway 27 to Highway 87 Beaverdam - s US 264 Bypass to US 301/264 Alternate (Ward. Widen to Multi-s. Piedmont Triad Union Union Mid-Carolina River Plain Mobility Mobility

Prioritization HIGHWAY Project Data and Final Scores (Detailed) January 31, 2012

Prioritization HIGHWAY Project Data and Final Scores (Detailed) January 31, 2012 Bonus Total 1297 Mobility Capacity 026 99999999 Odell 709 44516 Mobility SR1008 West Market 730 44570 Mobility Capacity Aycock NC 24/87 (Bragg SR 1546 (Guilford College Spring Garden Armistead (Fort Bragg

More information

Total C_T Turn Go on road Exit.1 Magic Mart Parking lot.1.1 Right.1 Jake Alexander

Total C_T Turn Go on road Exit.1 Magic Mart Parking lot.1.1 Right.1 Jake Alexander Salisbury-Oakboro-Ellerbe-Raeford-Garland Lumberton-Leland-Hallsboro-Sunset Beach-Boardman Lumberton-Raeford-Norwood-Locust 0km start: 10/06 06:00.0.0 Exit.1 Magic Mart Parking lot.1.1 Right.1 Jake Alexander.2.2

More information

Draft US Corridor Study Traffic Analysis Report

Draft US Corridor Study Traffic Analysis Report Draft US 15-501 Corridor Study Traffic Analysis Report US 15-501 from NC 54 to US 64 Year 2013-2040 Prepared for: North Carolina Department of Transportation Prepared by: Stantec Consulting Services, Inc.

More information

Southeast Pond Stocking, LLC Spring Fish Day Schedule Round 2

Southeast Pond Stocking, LLC Spring Fish Day Schedule Round 2 Southeast Pond Stocking, LLC. 2016 Spring Fish Day Schedule Round 2 Friday May 13 th 8:00 am 9:00 am Tractor Supply Wadesboro 1051 E. Caswell St. 10:00 am 11:30 am Tractor Supply Co. Midland 11855 US Hwy

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Southeast Pond Stocking, LLC Spring Fish Day Schedule

Southeast Pond Stocking, LLC Spring Fish Day Schedule Southeast Pond Stocking, LLC. 2019 Spring Fish Day Schedule Thursday February 28 th 9:00 am 10:30 am Big Blue Store Kinston 701 McLewean St. 11:00 am 12:30 pm Yoder s Farm & Garden Grifton 4100 Hwy. 118

More information

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012

Station Evaluation. Durham-Orange Light Rail Transit Project Spring 2012 Station Evaluation Durham-Orange Light Rail Transit Project Spring 2012 Key Ingredients for Station Development Platform Designs UNC Hospitals Station The UNC Hospitals Station Option D would be the westerly

More information

600k Salisbury-Oakboro-Ellerbe-Raeford-Garland Lumberton-Raeford-Norwood-Locust 600k 0km start: 09/16 06:00. Total C_T Turn Go on road

600k Salisbury-Oakboro-Ellerbe-Raeford-Garland Lumberton-Raeford-Norwood-Locust 600k 0km start: 09/16 06:00. Total C_T Turn Go on road Salisbury-Oakboro-Ellerbe-Raeford-Garland Lumberton-Raeford-Norwood-Locust 0km start: 09/16 06:00.0.0 Exit.1 Magic Mart Parking lot.1.1 Right.1 Jake Alexander.2.2 Right.8 Klumac 1.0 1.0 Left.4 Julian 1.4

More information

CS NAME K Total. 00A NC Connections Academy

CS NAME K Total. 00A NC Connections Academy Projected for 2018-2019 School Year (Charter Schools) CS NAME K 1 2 3 4 5 6 7 8 9 10 11 12 Total CS # 00A NC Connections Academy 21 24 32 41 40 49 63 88 102 122 98 88 0 768 00B NC Virtual Academy 42 45

More information

Middle Georgia Regional Investment List

Middle Georgia Regional Investment List MGRC 003 Baldwin Kings Road Safety Enhancements $6,579,700 x MGRC 005 Baldwin Log Cabin Road Widening $11,109,500 x MGRC 154 Baldwin Widen & Resurface N. Jefferson St. $6,897,900 x MGRC 155 Baldwin Widen

More information

Triangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority

Triangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority Triangle Mobility Action Partnership (Tri-MAP) Friday, July 18, 2014 RDU Airport Authority Strategic Transportation Investments Prioritization Mark Ahrendsen Durham-Chapel Hill-Carrboro MPO Alex Rickard

More information

Capital Improvement Program 2018 ~ 2023

Capital Improvement Program 2018 ~ 2023 sustainability energy conservation water sound planning reliability integrity award-winning hometown utility Capital Improvement Program 2018 ~ 2023 Fayetteville Public Works Commission 2018 2023 Capital

More information

Charter School Membership By Region Total LEA

Charter School Membership By Region Total LEA 2016 Members 2015 Members 2016 2015 1 070 Beaufort 335 7,027 7,362 4.6% 284 7,038 7,322 3.9% 1 080 Bertie 243 2,453 2,696 9.0% 166 2,645 2,811 5.9% 1 150 Camden 1 1,900 1,901 0.1% - 1,923 1,923 0.0% 1

More information

Data - North Carolina Department of Public Instruction, Transportation Services (2b) Students Transported on EC Buses (NOTE 1)

Data - North Carolina Department of Public Instruction, Transportation Services (2b) Students Transported on EC Buses (NOTE 1) (1) Average Daily Membership (2) (2a)+(2b)+(2c) Total (2a) on non-ec buses (2b) on EC Buses (NOTE 1) (2c) transported by contracted transportation (3) (3a)+(3b)+(3c) Number of district-owned buses operated

More information

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018 Mid-East RPO P5. Scores: Local Point Assignment - TAC Amended on October 8, 218 SPOT ID Mode TIP Project Category Route / Name From / Cross To / Cross Description Specific Improvement Type Cost to NCDOT

More information

FINAL Volleyball Brackets. 1 Ronald Reagan. Higher seeded team will host. Overall Seed. Best of 5 Set W/L/T 4A. School Name 4A A 4A

FINAL Volleyball Brackets. 1 Ronald Reagan. Higher seeded team will host. Overall Seed. Best of 5 Set W/L/T 4A. School Name 4A A 4A /L/T 1 Ronald Reagan 25-1-0 32 BY 16 Scotland 15-9-0 17 Myers Park 16-6-0 8 Davie 22-4-0 25 BY 9 Pinecrest 16-6-0 24 Grimsley 9-12-0 5 Providence 15-10-0 28 BY 12 David. Butler 16-10-0 21 Hopewell 10-9-0

More information

IMPROVEMENT CONCEPTS

IMPROVEMENT CONCEPTS IMPROVEMENT CONCEPTS for the South Novato Transit Hub Study Prepared by: January 11, 2010 DKS Associates With Wilbur Smith Associates IMPROVEMENT CONCEPTS Chapter 1: Introduction 1. INTRODUCTION The strategic

More information

What Does it All Mean?

What Does it All Mean? What Does it All Mean? There are several hopeful indicators that 2017 could be the turn around year for our Market. There is progress being made on bike lanes, a few cross walks have been installed and

More information

What Does it All Mean?

What Does it All Mean? What Does it All Mean? There are several hopeful indicators that 2017 could be the turn around year for our Market. There is progress being made on bike lanes, a few cross walks have been installed and

More information

What Does it All Mean?

What Does it All Mean? What Does it All Mean? New Construction Inventory is still balanced at 6.1 months of new construction inventory and is tracking almost identical to last year. 2018 has been a great year for Existing Residential

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

VR Statistics by Ward

VR Statistics by Ward Date: 05/07/2018 09:16:45 Forsyth County Board of Elections Page 1 of 12 Not 011 Glenn High School 97 25 38 0 0 34 48 45 4 2 22 0 1 2 4 66 1 76 20 012 Union Cross Elementary 2,624 584 1,229 22 0 789 1,336

More information

Replacement buses hybrid $3,129,010

Replacement buses hybrid $3,129,010 Urban ARRA Projects Alamance Buncombe See Guilford, Piedmont for Regional Asheville Transit System Replacement buses (15) * Bus shelters, benches, fareboxes, computer technology, support $2,004,598 Cabarrus

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILLIAMSON/ MAURY NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 SR-247 (Duplex Road) Widening TIP # 2004-051 Road Widening Spring Hill Williamson Length 3.10 Regional Plan ID 1062-170 Air

More information

VR Statistics by County Commissioner

VR Statistics by County Commissioner Date: 05/07/2018 09:13:33 Forsyth County Board of Elections Page 1 of 6 Not 081 Crestwood Baptist Church 3,499 1,739 843 8 0 909 1,793 1,598 108 17 1,387 11 22 142 158 1,762 202 2,488 809 082 East Forsyth

More information

NC and Granville County Cancer Incidence By Year Per 100,000 Population Age-Adjusted to the US 2000 Census

NC and Granville County Cancer Incidence By Year Per 100,000 Population Age-Adjusted to the US 2000 Census 1990-2013 NC and Granville Cancer Incidence By Year Per 100,000 Population Age-Adjusted to the US 2000 Census NC Granville NC Granville NC Granville NC Granville NC Granville All Cancers All Cancers Colorectal

More information

SC Highway 41 Existing Conditions

SC Highway 41 Existing Conditions SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next

More information

ALL-TIME MEN'S STATE BASKETBALL CHAMPIONSHIP GAME RECORDS (Records since 1915)

ALL-TIME MEN'S STATE BASKETBALL CHAMPIONSHIP GAME RECORDS (Records since 1915) 3A Andrews, TW 2 2 0 1.000 2001 2A Anson 1 0 1.000 1965 B, 4A Apex 3 1 2.333 2014 4A Ashbrook 1 0 1.000 1977 2A Ashe Central 1 1 0 1.000 1965 O,3A,4A Asheville 5 2 3.400 1969 4A Ashley 1 1 0 1.000 1967

More information

Getting to EvCC: Bus, Bike & Carpool

Getting to EvCC: Bus, Bike & Carpool Getting to EvCC: Bus, Bike & Carpool September 201 March 2018 Campus Map CARPOOL LOT BICYCLE BICYCLE REPAIR COLLEGE BROADWAY & TOWER SB BROADWAY & TOWER NB North Area Transit & Bicycle s Transit s Transit

More information

What Does it All Mean?

What Does it All Mean? What Does it All Mean? September existing closing numbers are down from August they but they are up +3% over last September. While New Construction numbers are down -12% compared to last September. We

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

NCTCOG CATEGORY 5 RECAP FY 2016

NCTCOG CATEGORY 5 RECAP FY 2016 NCTCOG CATEGORY 5 RECAP FY 2016 A + B = C Total Uncommitted Funds FY 2016 C + D = E E - F = G A B C D E F G FY 15 Carryover 1 FY (includes all adjustments) 2 Total Available Total Obligations and Transfers

More information

CHNAME CHADD1 CHCITY CHST CHZIP Calvary FWB Church 3044 Old Wilkesboro Rd Glendale Spgs NC Calvary FWB Church 2176 Hwy 70 W Swannanoa NC 28778

CHNAME CHADD1 CHCITY CHST CHZIP Calvary FWB Church 3044 Old Wilkesboro Rd Glendale Spgs NC Calvary FWB Church 2176 Hwy 70 W Swannanoa NC 28778 CHNAME CHADD1 CHCITY CHST CHZIP Calvary FWB Church 3044 Old Wilkesboro Rd Glendale Spgs NC 28629 Calvary FWB Church 2176 Hwy 70 W Swannanoa NC 28778 Calvary FWB Church 212 Malcolm Blvd Rutherford College

More information

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors.

system performance I-820 East Loop FM 156 TxDOT is working to expand its busiest metropolitan corridors. system performance TxDOT is working to expand its busiest metropolitan corridors. Nine of the state s 100 most congested highways are located in Tarrant County. Six of these highways will be expanded and

More information

Millridge Commercial Real Estate Inventory List February 2014

Millridge Commercial Real Estate Inventory List February 2014 Millridge Commercial Real Estate Inventory List February 2014 BUILDINGS WAKE COUNTY or Lease Heritage Office Building 3319 Heritage Trade Drive 2 story 1.01 Acre lot Yr. Built: 2006 Sale Price: $1,500,000

More information

Division of Adult Correction & Juvenile Justice Rehabilitative Programs & Services STATISTICS REQUEST

Division of Adult Correction & Juvenile Justice Rehabilitative Programs & Services STATISTICS REQUEST Title: County and Statewide DATE: 10/13/2014 DATABASE: NC-JOIN DATABASE DATE: 10/3/2014 DATASET: Complaint, Juvenile Table 1: Frequency and of by County Complaint County Non of Non of Total Number of complaints

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

US 70 Corridor Planning for the Future

US 70 Corridor Planning for the Future New Bern/James City Area - Work Session US 70 Corridor Planning for the Future Brinson Elementary School Thursday, January 31, 2008 Agenda Sign-in, in, View Maps, Talk to Project Team Public Q & A Session

More information

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 10

2010 Virginia Department of Transportation Daily Traffic Volume Estimates Including Vehicle Classification Estimates. Jurisdiction Report 10 Daily Traffic Volume Estimates Including Vehicle Classification Estimates where available Jurisdiction Report 10 Prepared By In Cooperation With U.S. Department of Transportation Federal Highway Administration

More information

FY Regional Surface Transportation Program (RSTP) Allocations *

FY Regional Surface Transportation Program (RSTP) Allocations * FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

DIRECTIONS TO FRAC SITES

DIRECTIONS TO FRAC SITES DIRECTIONS TO FRAC SITES *To Abbott's Farm (Barnesville) from Griffin: Go south on the 4-lane U. S. Hwy. 19/41 Bypass. It's 19.1 mi. on the 4-lane from Williamson Rd. (Ga. Hwy. 362) to Brent Rd. on the

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

TransNet Dollars Keep San Diego Moving

TransNet Dollars Keep San Diego Moving TransNet Dollars Keep San Diego Moving In 1987, San Diego region voters approved the TransNet program a half-cent sales tax to fund a variety of important transportation projects throughout the region.

More information

Williamson County Projects

Williamson County Projects Williamson Projects SR-6/ US-31/ Franklin Road TIP # 2006-408 Road Widening TDOT Williamson Length 2.30 Regional Plan ID 1062-160 Air Quality Status Non-Exempt TDOT PIN 105717.00 $38,000,000.00 SR-31/Franklin

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Cape Fear RPO P5.0 Final Division Needs tier Local Input Point Assignments

Cape Fear RPO P5.0 Final Division Needs tier Local Input Point Assignments Cape Fear RPO P5.0 tier Local Input Point Assignments H090133-C 3 6 2 Description Widen NC 87 to 4 lanes from NC 11 to US 74/76 [R-2561C] $93,000,000 100 33.59 High 100 High 100 60 76.08 100 #1 Co highway

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

John Winthrop / Valley Regional AM Stops Bus 1 Bus 2 Bus 3 6:33 PLEASANT RIDGE RD. 6:45 STRAITS PROSEPCT ST. 6:35 GOOSE HILL RD.

John Winthrop / Valley Regional AM Stops Bus 1 Bus 2 Bus 3 6:33 PLEASANT RIDGE RD. 6:45 STRAITS PROSEPCT ST. 6:35 GOOSE HILL RD. Bus 1 Bus 2 Bus 3 6:33 PLEASANT ST. @ RIDGE RD. 6:45 STRAITS RD. @ PROSEPCT ST. 6:35 GOOSE HILL RD.@ GAZEBO 6:37 PLEASANT ST.@ WIG HILL RD. 6:46 44 STRAITS RD. 6:38 PATTACONK DR. @ WATERHOUSE LA. 6:41

More information

Hillsdale Academy Directions to Sporting Events

Hillsdale Academy Directions to Sporting Events Hillsdale Academy Directions to Sporting Events ADDISON HIGH SCHOOL 219 N Comstock St., Addison, MI 49220 Phone 517-547-6121 Take State Road EAST out of Hillsdale. Follow State Road until it turns LEFT

More information

Tahlequah Public Schools

Tahlequah Public Schools Tahlequah Public Schools Department of Transportation 820 Pendleton - 918.458.4168 Tahlequah, OK 74464 2016-2017 Bus Routes Route 1 6:20am Mathis Park & Jones Ave 6:25am Jones Ave. & West Seneca 6:30am

More information

Prioritization 3.0 Total Scores September 24, 2014

Prioritization 3.0 Total Scores September 24, 2014 Prioritization 3.0 Total s September 24, 2014 Clear Search Prioritization 3.0 Local Input Points and Final s These scores represent the cumulative Local Input and Quantitative points assigned to each project

More information

EXHIBIT A STREET LIST

EXHIBIT A STREET LIST EXHIBIT A STREET LIST 2017-3 Resurfacing Contract Local Roads (North) Comm District (centerline miles) PAVEMENT AREA No. ROAD NAME BEGIN END SUBDIVISION 1 Bridewater Court Bridgewater Drive Cul-de-sac

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

The Eastern Connector Study November, 2007 planning for the future

The Eastern Connector Study November, 2007 planning for the future The Eastern Connector Study November, 2007 planning for the future In late 2006, Albemarle County and the City of Charlottesville jointly initiated the Eastern Connector Corridor Study. The Project Team

More information

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 SFY 2022-2023 Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000 DES NUM LPA PROJECT TITLE TYPE TOTAL SCORE FUND TYPE SFY FEDERAL COST LOCAL COST

More information

Middle Georgia Transportation Executive Committee. September 27, 2017

Middle Georgia Transportation Executive Committee. September 27, 2017 Middle Georgia Transportation Executive Committee September 27, 2017 Project Discussions MACON BIBB, CRAWFORD, MONROE Project List Development Process to Date Cities, Counties and MPOs submitted projects

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

Hazardous Waste Section Civil Penalty Assessments 2008

Hazardous Waste Section Civil Penalty Assessments 2008 Hazardous Waste Section Civil Penalty Assessments 2008 # Name Violation Initial Penalty Assessed Date Issued 1 M&L Motor Company, Inc. 406 Piedmont Drive Lexington, NC 27295-2410 NCR 000 009 902 make a

More information

G.S. 7A-133, District Court, Effective 1/1/19

G.S. 7A-133, District Court, Effective 1/1/19 G.S. 7A-133, District Court, Effective 1/1/19 Ashe Haywood Swain Cherokee Clay Macon Alexander 28 29B Polk 27B Cleveland Transylvania 27A Gaston Cabarrus 19A 26 Mecklenburg 20B Union 1 2 3B 3A 4 5 6 6A

More information

Major Widening/New Roadway

Major Widening/New Roadway Revised Evaluation s Major Widening/New Roadway This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds Committee meeting. The information

More information

Maryland Gets to Work

Maryland Gets to Work I-695/Leeds Avenue Interchange Reconstruction Baltimore County Reconstruction of the I-695/Leeds Avenue interchange including replacing the I-695 Inner Loop bridges over Benson Avenue, Amtrak s Northeast

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

Elkhart River Greenway Trail

Elkhart River Greenway Trail EXTENDED ROUTE Elkhart River Greenway Trail For more information on this trail, see page 34 of the Elkhart County 2017 Trail Guide. Start at the Elkhart River Greenway Trailhead in Studebaker Park and

More information

New Construction Absorption and Inventory Report As of March 31, 2014

New Construction Absorption and Inventory Report As of March 31, 2014 New Construction Absorption and Inventory Report As of March 31, 2014 This report identifies the current inventory levels for New Construction in Cumberland Hoke and Harnett County. For Cumberland County

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

COUNTY OF LINCOLN, NORTH CAROLINA

COUNTY OF LINCOLN, NORTH CAROLINA To: All Lincoln County Low Pressure Sewer Customers From: Chris Henderson Engineering Associate Public Works Subj.: Approved Grinder Pump Systems in the Lincoln County Sewer System The following is the

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains.

This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. Alignment is double tracked for 186 mph speeds. This corridor section will carry commuter trains from Portland to Longview/Kelso, CHSR inter-city and inter-city express trains. BNSF right-of-way will be

More information

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina

TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina TRAFFIC IMPACT ANALYSIS SHORTBREAD LOFTS 2009 MODIFICATION Chapel Hill, North Carolina Prepared for: The Town of Chapel Hill, NC Prepared by: Architects-Engineers-Planners, Inc. November 2009 Traffic Impact

More information

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019 I-4 Beyond the Ultimate Florida Transportation Builders Association January 18, 2019 FDOT District 5 Improving Mobility & Safety in Central Florida FDOT District 5 is: Designing and building a better Interstate

More information

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions

RECOMMENDATIONS. 7-1 Anchorage Metropolitan Area Transportation Solutions RECOMMENDATIONS 7-1 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan Transportation Plan 7-2 A Call to Action 7-3 Anchorage Metropolitan Area Transportation Solutions 2035 Metropolitan

More information

WCPSS School General Information, Page 1 of 5

WCPSS School General Information, Page 1 of 5 WCPSS General Information, 2013-2014 Met 920304 304 Adams Elementary E KI 5 Y R 776 293 37.4% 144 18.5% YES 65.9 Meets 96.6 920307 307 Alston Ridge Elementary E KI 5 Y R t4 956 67 6.9% 62 6.5% NO 72.7

More information

NVTA SIX YEAR PLAN PROJECTS BY MODE

NVTA SIX YEAR PLAN PROJECTS BY MODE NVTA SIX YEAR PLAN PROJECTS BY MODE FINAL Rebuild the King Street Metro Parking Lot and Bus Loading Area This project will reconfigure the existing Metrorail station parking lot, maximize bus bay capacity

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Civil Penalties Assessed During the Month of February 2003

Civil Penalties Assessed During the Month of February 2003 Civil Penalties During the Month of February 2003 Responsible Party Facility Name Violation(s) Penalty Issued Satish Desai P.O. Box 1505 Grey, GA 31032 321 Mini Mart 2118 N. Aspen Dr. Lincolnton, NC Violation

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives:

The range of alternatives has been reviewed with the RTAC Subgroup and the preliminary analysis is proceeding on the following HCT alternatives: Attachment 2 Boise Treasure Valley Phase 1 Alternatives Analysis August 14, 2009 Introduction The Treasure Valley High Capacity Transit Priority Corridor Phase 1 Alternatives Analysis is being prepared

More information

Responsible Party Facility Name Violation(s) Penalty Amount

Responsible Party Facility Name Violation(s) Penalty Amount Civil Penalties Assessed During the Month of 20 Date Issued Ronald G. Overcash 1150 Shelton Ave. Concord, NC 28027 Cabarrus County Overcash Gravel & Grading Co., Inc 1150 Shelton Rd. Concord, NC 28027

More information

Regional Transportation Plan: APPENDIX P

Regional Transportation Plan: APPENDIX P Regional Transportation Plan: 2011-2040 Appendix P APPENDIX P TRANSIT PROJECT DESCRIPTIONS Pleasant View Brigham City Corridor: Downtown Ogden Box Elder County Line Funded Mode(s): Corridor Preservation

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

Short Title: Various Court Districts Changes. (Public) May 29, 2018

Short Title: Various Court Districts Changes. (Public) May 29, 2018 GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 01 S SENATE BILL Select Committee on Elections Committee Substitute Adopted //1 Third Edition Engrossed /0/1 House Committee Substitute Favorable /1/1 Short Title:

More information

WAKE TRANSIT PLAN Summer 2018

WAKE TRANSIT PLAN Summer 2018 WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.

More information

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017

Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Recommendation for 2017 PSRC Funding Transportation Policy Board - June 8, 2017 Background PSRC s 2017 funding: Rural Town Centers and Corridor program Regional FTA competition May - Board released projects

More information

2018 Blue Ridge Relay Driver Handbook

2018 Blue Ridge Relay Driver Handbook 2018 Blue Ridge Relay Driver Handbook Introduction Driving the Blue Ridge Relay course requires much preparation and planning. The preparedness of the team driver(s) greatly impacts the experience of the

More information

East Kings Highway and Roberts Avenue Speed Hump Analysis

East Kings Highway and Roberts Avenue Speed Hump Analysis East Kings Highway and Roberts Avenue Speed Hump Analysis BOROUGH OF HADDONFIELD, CAMDEN COUNTY, NEW JERSEY 5/18/2018 Prepared By: Remington & Vernick Engineers 232 EAST KINGS HIGHWAY, HADDONFIELD, NEW

More information

Preliminary End of Year Composite Test Results by School

Preliminary End of Year Composite Test Results by School - Preliminary End of Year Composite Test Results by School in in CMS DISTRICT 228992 72.9% 140955 0.129 Met Met 216252 77.7% 125438 0.161 Met Met 300 ALBEMARLE RD ES 1031 57.3% 622 0.072 Met NotMet 1059

More information

Division of Waste Management UST Section Civil Penalty Assessments. January 2014

Division of Waste Management UST Section Civil Penalty Assessments. January 2014 January 2014 LSAA, LLC 7935 Council Pl. Matthews, NC Sampson-Bladen Oil Co., Inc. 520 E. Railroad St. Clinton, NC Sams Mart 770 13025 Independence Blvd. Matthews, NC Union Co. Benson Construction 1485

More information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0 TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

NCGS Journal Index - Places "F"

NCGS Journal Index - Places F NCGS Journal Index - Places "F" Fair Grove, Davidson Co., NC 4 4 232, 240 1978 Fairfax Co., VA 8 3 183 1982 20 3 218 1994 21 1 80 1995 Fairfax Courthouse, VA 22 4 392 1996 Fairfield 21 3 251 1995 Fairfield,

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

Corridor Sketch Summary

Corridor Sketch Summary Corridor Sketch Summary SR 241: I-82 Jct (Sunnyside) to SR 24 Jct Corridor Highway No. 241 Mileposts: 7.53 to 25.21 Length: 17.65 miles Corridor Description The seventeen and one-half mile corridor begins

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

Summary of the Alcoa Highway Redevelopment Project

Summary of the Alcoa Highway Redevelopment Project Appendix B Summary of the Alcoa Highway Redevelopment Project By Marcia Finfer, October 2009 The Timberlake community, along with numerous other concerned citizen groups (including the Lakemoor Hills community)

More information

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT PROJECT CONTEXT 510 Hicks L A C E Y Mullen Rd SE Thurston County Fairgrounds Rd SE Carpenter Long Woodland Elementary Rd SE Marvin Old Paci c H w y 510 Reservation Rd SE Nisqually Indian Community Nis

More information