1 Road Development Agency Zambia Road Concept Designs and Standard Drawings Package 1 Mkushi District May 2018 Improved Rural Connectivity Project (P159330) Consulting Services for the Design and Preparation of Bidding Documents for a Countrywide Roll Out of the Output and Performance Based Road Contracts, OPRC Region III, Zambia RDA/CS/SSS/006/017 World Bank/Road Development Agency In Association with:

2 Contents District CONCEPT DESIGNS FOR THE FOLLOWING ROADS Road Code Length (km) Starting at Mkushi U Mpalasha (Jct. T2) Nshinso Mkushi U Mulungwe Nshinso Mkushi U Fiwila Mboloma Mkushi RD Masansa Fiwila Mkushi U Mkushi Musofu Mkushi RD Musofu Salingwa Mkushi D Mundawanga (Jct. T3) Salingwa Total Ending at Map 1: Road selection for Package 1 Mkushi District Source: Garmin Basecamp

3 Schedule of Standard Drawings Type No. Drawing Description OPRC/STD/01 Road Reserve Limits OPRC/STD/02 Standard Cross Section (Embankment high and low)) OPRC/STD/03 Standard Cross Section (Standard and Urban) OPRC/STD/04 Standard Single Cell Pipe Culvert OPRC/STD/05 Standard Double Cell Pipe Culvert OPRC/STD/06 Standard Triple Cell Pipe Culvert OPRC/STD/07 Inlet and Outlet Culvert Bedding Types OPRC/STD/08 Protection for Culvert Outlet & Inlet OPRC/STD/09 Drainage Details OPRC/STD/10 Ramp over Culvert OPRC/STD/11 Prefabricated Box Culvert Details OPRC/STD/12 In situ Box Culvert Details OPRC/STD/13 Standard In situ Box Culvert 1 OPRC/STD/14 Standard In situ Box Culvert 2 OPRC/STD/15 Standard Invert Drift OPRC/STD/16 Standard Pipe Vented Drift OPRC/STD/17 Standard Box Culvert Vented Drift OPRC/STD/18 Standard Single Span Concrete Bridge OPRC/STD/19 Standard 15m Span Concrete Bridge 1 OPRC/STD/20 Standard 15m Span Concrete Bridge 2 OPRC/STD/21 Bridge Barrier Details OPRC/STD/22 Stone Masonry Details OPRC/STD/23 Kilometer Marker Post Standard Details OPRC/STD/24 Guard Rail Details 1 OPRC/STD/25 Guard Rail Details 2 OPRC/STD/26 Standard Road Signs OPRC/STD/27 Road Sign Installation Details OPRC/STD/28 Road Deviation Details OPRC/STD/29 Project Signboard OPRC/STD/30 Bus Bay

4 in assiciation with Conceptual Design Mkushi District Road: U4 Mpalasha (42km from Mkushi Junction at T2) Nshinso (total 31.0 km) Contents I. Road Location Map II. III. IV. Road Main Features Photographic Impressions Road Inventory & Condition V. Road Improvement Plan VI. VII. Schedule of Structural Works Technical Data Project Office Kiran & Musonda Associates 20 Matandani Close, Rhodes Park PO Box Lusaka, Zambia Tel: Fax: Head Office IMC Worldwide Ltd London Road Redhill, Surrey RH1 1LG, United Kingdom Tel: +44 (0) Fax: +44 (0)

5 I. Road Location Map

6 Units 8 & 11, Innovation Centre I, Meson Street, Technopark, Stellenbosch, 7600, South Africa gps_mapper Tracks4Africa (c) 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, km 3.5 km 7 km 10.5 km 14 km MN -4.9 TN 01-Jan-10

7 II. Road Main Features

8 Mkushi District U4 from Mpalasha (T2) Nshinso Village Main Inventory Data Main Improvement Data Starting Point: Mpalasha (along T2) Vegetation Control: : 12.0 km Medium: km Ending Point: Nshinso Village, connecting to gravel road Heavy: 19.0 km under OPRC (U5) Road Formation: reshaping: 8.0 km Total length under OPRC: 31.0 km Medium reshaping: 21.8 km Heavy reshaping: 1.0 km Socio Economic Data: Embankment earthworks: 2250 cum No. of villages: No. of schools: 5 5 Wearing Course No. of health centres: 1 Not required: km No. of local markets: 4 Thickness : 30.5 km No. of storage sheds: 1 Single Seal / Slurry: km Interlocking Bricks: 0.47 km Road Technical Data: Lowest Elevation: 1310 m Stabilization treatment: km Highest Elevation: 1527 m Total Rise/Fall: 217 m Structures: No. of major structures: 2 Stream crossings Maintenance & Repairs: 11 No. No. of minor structures: 11 Pipe culverts Length gravelled: 8.0 km No. of gravel sources identified: 1 No. No. of Dambo's & total length: 2 total 400 m Most existing small culverts need minor to medium repairs. New pipe culverts: 6 No. Current Road Condition: Riding comfort: Good: 1.0 km 0% Major structures: 2 No. : 16.0 km 52% : 14.0 km 45% At 2 locations, the existing small concrete bridge (box culvert) needs to be replaced with larger portal culverts. Roadshape & Drainage: Good: 1.0 km 3% Ancillary Works: : 27.0 km 87% Traffic signs: : 3.0 km 10% Bus stops: Storage Sheds: Market Stalles: Where required. At major villages. T.B.A. T.B.A.

9 III. Photographic Impressions

10 PHOTOGRAPHIC IMPRESSIONS OF U4 in MKUSHI DISTRICT Picture P-01: Mkushi District Date: 30/11/2017 Mpalasha (T2) - Nshinso Chainage Observations: At the starting point at the junction with T2, a marketing center has been established, where there is a requirement for a storage facility and market stalls. Picture P-02: Mkushi District Date: 30/11/2017 Mpalasha (T2) - Nshinso Chainage Observations: Graveled road section leading to the railway crossing. Picture P-03: Mkushi District Date: 30/11/2017 Mpalasha (T2) - Nshinso Chainage Observations: Existing gravel borrow pit at RHS of the road. Picture P-04: Mkushi District Date: 30/11/2017 Mpalasha (T2) - Nshinso Chainage Observations: Graded and shaped road section, but no gravel surfacing carried out. The section is damaged during wet conditions. Road Inventory and Visual Condition Survey of U4, Mkushi District Page 1

11 Picture P-05: Mkushi District Date: 30/11/2017 Mpalasha (T2) - Nshinso Chainage Observations: Marketing center. Picture P-06: Mkushi District Date: 30/11/2017 Mpalasha (T2) - Nshinso Chainage Observations: Drainage challenge at earth shaped road. Heavy bush clearing required. Picture P-07: Mkushi District Date: 30/11/2017 Mpalasha (T2) - Nshinso Chainage Observations: Existing 4m span concrete slab at dambo area. This structure needs replacement with portal culverts. Picture P-08: Mkushi District Date: 30/11/2017 Mpalasha (T2) - Nshinso Chainage Observations: Graded and shaped road section, but no gravel surfacing carried out. The section is damaged during wet conditions. Road Inventory and Visual Condition Survey of U4, Mkushi District Page 2

12 IV. Road Inventory & Condition

13 Road Inventory & Condition Schedule Province/District: Central, Mkushi Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 1 of 7 Description Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Mpalasha Village Marketing centre at T2-Jnc. Railway crossing Ntekete P.School LHS Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 01 P 02 DCP #1 DCP #2 DCP #3 P 03 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Flat Flat Straight Straight Straight Curvy Straight Gr Sd/Fm Sd/Fm Sd/Fm Fm/Sd Fm/Sd 1 2 RHS DCP #4 Curvy 3 Road Width / Free Clearance (in meter) 6.2m 6.2m 6m 6m 6.1m 5.5m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Tarmac Gravel Earth Earth Earth Earth Remarks:

14 Road Inventory & Condition Schedule Province/District: Central, Mkushi Description Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 2 of Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Lwimba Village Nambo P.School, LHS Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 04 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM 4 DCP #5 Flat Flat Flat Flat Flat Curvy Curvy Curvy Straight Curvy Fm/Sd Clay Clay Fm/Sd Fm/Sd Fm/Sd DCP # Curvy Road Width / Free Clearance (in meter) 5.5m 5.2m 5.1m 5.2m 5.2m 5.1m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth Gravel Earth Remarks:

15 Road Inventory & Condition Schedule Province/District: Central, Mkushi Description Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 3 of Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) MarketLHS Kandawo Combined School, RHS Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 05 P 06 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Flat Flat Curvy Curvy Curvy Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 8 DCP #7 Borehole - waterpoint RHS Straight Road Width / Free Clearance (in meter) 5.1m 5.1m 5.2m 5m 5m 5m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth Earth Remarks:

16 Road Inventory & Condition Schedule Province/District: Central, Mkushi Description Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 4 of Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Village Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #8 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Rolling Flat Flat Flat Straight Straight Straight Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 9,10 Curvy Road Width / Free Clearance (in meter) 5m 5.3m 5.6m 5.2m 5.6m 5.6m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth gravel Remarks:

17 Road Inventory & Condition Schedule Province/District: Central, Mkushi Description Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 5 of Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Market Mankanda Mankanda P.School, RHS Jehovah Church Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 07 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Flat Flat Curvy Curvy Curvy Straight Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 11 Borehole - waterpoint RHS 12 Curvy Road Width / Free Clearance (in meter) 5.6m 5.2m 5.2m 5.4m 5.6m 5.2m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Gravel Gravel Earth Earth Gravel Remarks:

18 Road Inventory & Condition Schedule Province/District: Central, Mkushi Description Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 6 of Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Nshinso Technical Inventory Data Current Road Condition Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 08 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Remarks: Indicate L/R and Access Length in KM Unsuitable material (m) Rock outcrops, Stoniness (Area) Relief culverts missing Add culverts Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Rolling Flat Flat Rolling Curvy Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 5.2m 5.2m 5.1m 5.1m 5.1m 5.1m Earth Earth Earth Gravel Gravel 13 Raise 1m Scourchecks required. Rolling Curvy

19 Road Inventory & Condition Schedule Province/District: Central, Mkushi Description Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 7 of Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Nshinso Rural Health Center Market Turn Off - U5 Nshinso P. School Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Straight Fm/Sd Borehole Road Width / Free Clearance (in meter) 5.1m 5.1m Riding Comfort (Good//) Good Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Good Gravel Remarks:

20 V. Road Improvement Plan

21 Road Improvement Plan Province/District: Central, Mkushi Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 1 of 7 Description Socio Econ. Technical Inventory Data Veritcal Profile Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 01 P 02 DCP #1 DCP #2 DCP #3 P 03 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Mpalasha Village Marketing centre at T2-Jnc. 1 Railway crossing Ntekete P.School LHS Flat Flat Flat Flat Flat Straight Straight Straight Curvy Straight Gr Sd/Fm Sd/Fm Sd/Fm Fm/Sd Fm/Sd 2 RHS DCP #4 Curvy 3 Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Medium Medium Medium Heavy Medium Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 1x900 1x900 Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks:

22 Road Improvement Plan Province/District: Central, Mkushi Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 2 of 7 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Lwimba Village Nambo P.School, LHS Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 04 DCP #5 DCP #6 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM 4 Flat Flat Flat Flat Flat Curvy Curvy Curvy Straight Curvy Fm/Sd Clay Clay Fm/Sd Fm/Sd Fm/Sd Curvy Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 1x900 1x900 1x900 Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks:

23 Road Improvement Plan Province/District: Central, Mkushi Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 3 of 7 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) MarketLHS Kandawo Combined School, RHS Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 05 P 06 DCP #7 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Flat Flat Curvy Curvy Curvy Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 8 Borehole - waterpoint RHS Straight Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Heavy Heavy Heavy Heavy Heavy Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Medium Medium Medium Medium Medium Estimated Fill height (m), or Quantity (cub.m) 0.5m Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 Box/Portal culvert: Size (m) 8 Plain/Vented Drift / Bridge: (m, No., Ø) Construction of dish drain Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks:

24 Road Improvement Plan Province/District: Central, Mkushi Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 4 of 7 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Village Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #8 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Rolling Flat Flat Flat Straight Straight Straight Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 9,10 Curvy Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Heavy Heavy Heavy Heavy Heavy Medium Medium Medium Medium Medium Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 1x900 Box/Portal culvert: Size (m) 9,10 Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks:

25 Road Improvement Plan Province/District: Central, Mkushi Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 5 of 7 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Market Mankanda Mankanda P.School, RHS Jehovah Church Technical Inventory Data Rehabilitation Plan Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 07 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Isolated Problems & Defects: Improvement Standard Clearing (, Medium, Heavy) Removal of Unsuitable Material Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Indicate L/R and Access Length in KM Dambo (m) Full / / Spot Length (m) Flat Flat Flat Flat Flat Curvy Curvy Curvy Straight Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Borehole - waterpoint RHS Heavy Heavy Heavy Heavy Heavy Medium Medium Medium Estimated Fill height (m), or Quantity (cub.m) 0.5m Medium Medium Curvy Improvement Plan Climate Change measures Re alignment (Re )gravelling Length (m) Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 Box/Portal culvert: Size (m) 11 Replace with 2x2.4mx1.5m portal culverts Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Ref. 12 Road or Traffic Sign: Ref. No. Remarks: 12

26 Road Improvement Plan Province/District: Central, Mkushi Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 6 of 7 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Nshinso Technical Inventory Data Rehabilitation Plan Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 08 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Isolated Problems & Defects: Improvement Standard Clearing (, Medium, Heavy) Removal of Unsuitable Material Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Indicate L/R and Access Length in KM Dambo (m) Full / / Spot Length (m) Rolling Flat Flat Rolling Curvy Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Heavy Heavy Heavy Heavy Medium Medium Estimated Fill height (m), or Quantity (cub.m) 1.0m Medium 13 Rolling Curvy Improvement Plan Climate Change measures Re alignment (Re )gravelling Stabilizing / Sealing treatment Length (m) Thickness (cm) ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) Construct 2 additional culverts Box/Portal culvert: Size (m) Construct 3 additional culverts Replace with 3x2.4mx1.5m portal culverts Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Ref. 13 Road or Traffic Sign: Ref. No. Remarks: 13 Scourchecks required.

27 Road Improvement Plan Province/District: Central, Mkushi Road Number: U4 Road Name: Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: Page: 7 of 7 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Nshinso Rural Health Center Market Turn Off - U5 Nshinso P. School Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Straight Fm/Sd Borehole Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks: IPB

28 VI. Schedule of Structural Works

29 KIRAN & MUSONDA ASSOCIATES Ltd Consulting Engineers Schedule of Structural Works Province: Central Drawing No.: Page: 1 of 1 Road No. Location (Chainage) Type of Existing Structure Dimensions of Existing Structure Length (m) Name of River/Stream Area (Km 2 ) L (Km) H max (m) H min (m) H (m) T c (min) I (10yr) (mm/hr) C topo C soil C veg C total coeff. Q max (m 3 /s) V (m/s) Area Req. (m 2) Proposed Intervention U4-Mkushi Br Single span bridge 1 x 4.0m span 7.2 Mankanda ,434 1, Replace with 3 x 2.4m x 1.5m portal culverts U4-Mkushi Br Multi-span bridge 2 x 3.0m span 5.0 Chiso ,400 1, Replace with 3 x 2.4m x 1.5m portal culverts NOTES

30 KIRAN & MUSONDA ASSOCIATES Ltd Consulting Engineers No. Schedule of Structural Works Province / District: Central, Mkushi Road Name / No.: U4 Mpalasha (T2) Nshinso Length: 31.0 km Drawing No.: SS U4 Page: 1 of 1 Location (Chainage) Type of Structure (CP / AP / PC / BC / PDr / VDr / Br) Dimensions of Structure (No. of barrels/cells x Dia. or HxW) Length (m) Condition (VG / G / F / P / VP) Description of Defects Inlet Type Outlet Type PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Headwall at the outlet is broken Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm Description of Works required ( M aintenance / Repair / R e-construction / N ew Construction) PC Existing Cross culvert 1 x Ø 600mm The structure is buried Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 600mm The structure is buried PC Existing Cross culvert 1 x Ø 600mm The structure is buried Replace with 1 x Ø 900mm Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Headwall is broken and outlet is blocked Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 600mm 8.2 P Headwall at the inlet is broken Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 600mm 8.2 P Headwalls at the inlet and outlet are broken Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 600mm The structure is buried Replace with 1 x Ø 900mm Br Existing small bridge 1 x 4.0m span 8.2 F Insufficient capacity Wing wall Wing wall M Replace with 2 x 2.4m x 1.5m portal culverts Br Existing small bridge 2 x 3.0m span 8.2 F Insufficient capacity Wing wall Wing wall M Replace with 3 x 2.4m x 1.5m portal culverts

31 VII. Technical Data Analysis of DCP s

32 Layer No. Penetration Rate (mm/blow) CBR (%) Thickness (mm) Depth to layer bottom (mm) U4 MKUSHI Test 1 Chainage Layer Layer Test 2 Chainage Layer Layer Test 3 Chainage Layer Layer Test 4 Chainage Layer Layer Test 5 Chainage Layer Layer Test 6 Chainage Layer Layer Test 7 Chainage Layer Layer Test 8 Chainage Layer Layer

33 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/1.75m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 85 Surface Moisture: Moderate Test Date: 17/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 1 of 8

34 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/1.75m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 85 Surface Moisture: Moderate Test Date: 17/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 2 of 8

35 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/1.75m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 100 Surface Moisture: Moderate Test Date: 17/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 3 of 8

36 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/1.75m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 100 Surface Moisture: Moderate Test Date: 17/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 4 of 8

37 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/1.75m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 91 Surface Moisture: Moderate Test Date: 17/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 5 of 8

38 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/1.75m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 100 Surface Moisture: Moderate Test Date: 17/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 6 of 8

39 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/1.75m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 90 Surface Moisture: Moderate Test Date: 17/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 7 of 8

40 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/1.75m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 100 Surface Moisture: Moderate Test Date: 17/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 8 of 8

41 in assiciation with Conceptual Design Mkushi District Road: U5 Mulungwe (at Junction with U6) to Nshinso (total 20.4 km) Contents I. Road Location Map II. III. IV. Road Main Features Photographic Impressions Road Inventory & Condition V. Road Improvement Plan VI. VII. Schedule of Structural Works Technical Data Project Office Kiran & Musonda Associates 20 Matandani Close, Rhodes Park PO Box Lusaka, Zambia Tel: Fax: Head Office IMC Worldwide Ltd London Road Redhill, Surrey RH1 1LG, United Kingdom Tel: +44 (0) Fax: +44 (0)

42 I. Road Location Map

43 Units 8 & 11, Innovation Centre I, Meson Street, Technopark, Stellenbosch, 7600, South Africa gps_mapper Tracks4Africa (c) 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, km 3.5 km 7 km 10.5 km 14 km MN -4.9 TN 01-Jan-10

44 II. Road Main Features

45 Mkushi District U5, from Mulungwe at U6 to Nshinso, connecting with U4 Main Inventory Data Main Improvement Data Starting Point: Mulungwe (at Jct with U6) Vegetation Control: : 16.4 km Medium: km Ending Point: Nshinso (connecting to end of U4) Heavy: 4.0 km Road Formation: reshaping: 15.4 km Total length under OPRC: 20.4 km Medium reshaping: 5.0 km Heavy reshaping: km Socio Economic Data: Embankment earthworks: 250 cum No. of villages: No. of schools: 3 3 Wearing Course No. of health centres: 2 Not required: km No. of local markets: 3 Thickness : 20.3 km No. of storage sheds: 1 Single Seal / Slurry: km Interlocking Bricks: 0.15 km Road Technical Data: Lowest Elevation: 1272 m Stabilization treatment: nil km Highest Elevation: 1402 m Total Rise/Fall: 131 m Structures: No. of major structures: 2 Stream crossings Maintenance & Repairs: 23 No. No. of minor structures: 23 Pipe culverts Length gravelled: 9.4 km No. of gravel sources identified: 5 No. No. of Dambo's & total length: nil total nil m Desilting and minor repairs are required on most small structures. New pipe culverts: No. Current Road Condition: Riding comfort: Good: km 0% Major structures: 2 No. : 11.0 km 54% Two portal culverts were constructed a couple of years : 9.4 km 46% ago, and are in good condition. Minor repairs and erosion protection works are required. Roadshape & Drainage: Good: km 0% Ancillary Works: : 16.4 km 80% Traffic signs: Where required. : 4.0 km 20% Bus stops: Storage Sheds: Market Stalles: At major villages. T.B.A. T.B.A.

46 III. Photographic Impressions

47 PHOTOGRAPHIC IMPRESSIONS OF U5 in MKUSHI DISTRICT Picture P-01: Mkushi District Date: 13/12/2017 Mulungwe (U6) Nshinso Chainage Observations: Starting point of U5 going left, at junction with U6. Picture P-02: Mkushi District Date: 29/11/2017 Mulungwe (U6) Nshinso Chainage Observations: Road is in good to fair condition, as it was rehabilitated 2 years ago. Picture P-03: Mkushi District Date: 13/12/2017 Mulungwe (U6) Nshinso Chainage Observations: Katula marketing center. A candidate for the construction of market stalls and storage facility. Picture P-04: Mkushi District Date: 29/11/2017 Mulungwe (U6) Nshinso Chainage Observations: End point of U5 in Nshinso Road Inventory and Visual Condition Survey of U5, Mkushi District Page 1

48 IV. Road Inventory & Condition

49 Road Inventory & Condition Schedule Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 1 of 5 0 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Mulungwe Clinic and School Market Jnc. with U6 Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 01 P 02 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Curvy DCP #10 Flat Curvy Curvy Curvy Curvy Cly Cly Cly Cly Cly RHS Flat Flat Flat RHS Road Width / Free Clearance (in meter) 6m 6m 6m 6m 6m 6m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Gravel Gravel Gravel Gravel Gravel Remarks: Borrow pit nearby

50 Road Inventory & Condition Schedule Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 2 of 5 Description Veritcal Profile Socio Economic Inventory Horizontal Profile Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Katula Katula MB School Market T-Jnc, RHS to Changulube Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #9 P 03 DCP #8 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Curvy Curvy Curvy Curvy Curvy Cly Cly Cly Cly Cly # # Flat Flat LHS Road Width / Free Clearance (in meter) 6m 6m 6m 6m 6m 6m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Gravel Gravel Gravel Gravel Earth Remarks: Erosion in sidedrain towards structure

51 Road Inventory & Condition Schedule Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 3 of 5 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #7 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Curvy Curvy Curvy Curvy Curvy Cly Cly Cly Cly Cly Flat Flat Road Width / Free Clearance (in meter) 6m 6m 6m 6m 6m 6m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth Earth Remarks:

52 Road Inventory & Condition Schedule Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 4 of 5 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Nshinso Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #6 DCP #5 DCP #4 DCP #3 DCP #2 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM 17 Flat Flat Flat Flat Flat Curvy Curvy Curvy Curvy Curvy Cly Cly Cly Cly Cly R R 24 Road Width / Free Clearance (in meter) 6m 6m 6m 6m 6m 6m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth Earth Remarks:

53 Road Inventory & Condition Schedule Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 5 of 5 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Nshinso School, Clinic Market, Storage Shed T-Jnc with U4 Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #1 P 04 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Curvy Cly 25 Current Road Condition Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Remarks: 6m Gravel

54 V. Road Improvement Plan

55 Road Improvement Plan Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 1 of 5 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Mulungwe Clinic and School Market Jnc. with U6 Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 01 P 02 DCP #10 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Flat Flat Curvy Curvy Curvy Curvy Curvy Cly Cly Cly Cly Cly RHS RHS Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Stabilizing / Sealing treatment Thickness (cm) ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 Box/Portal culvert: Size (m) 2 4 Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. 1 3 Remarks: 5 6 Borrow pit nearby

56 Road Improvement Plan Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 2 of 5 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Katula Katula MB School Market T-Jnc, RHS to Changulube Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #9 P 03 DCP #8 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Flat Flat Curvy Curvy Curvy Curvy Curvy Cly Cly Cly Cly Cly # # LHS Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Re alignment Length (m) (Re )gravelling Thickness (cm) Improvement Plan Climate Change measures Stabilizing / Sealing treatment ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks: Erosion in sidedrain towards structure

57 Road Improvement Plan Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 3 of 5 Description Socio Econ. Data Veritcal Profile Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM DCP #7 Flat Flat Flat Flat Flat Curvy Curvy Curvy Curvy Curvy Cly Cly Cly Cly Cly Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Heavy Heavy Heavy Heavy Medium Medium Medium Medium Medium Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Stabilizing / Sealing treatment Thickness (cm) ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 Box/Portal culvert: Size (m) 13 Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. 12 Remarks:

58 Road Improvement Plan Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 4 of 5 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Nshinso Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #6 DCP #5 DCP #4 DCP #3 DCP #2 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM 17 Flat Flat Flat Flat Flat Curvy Curvy Curvy Curvy Curvy Cly Cly Cly Cly Cly R R Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Stabilizing / Sealing treatment Thickness (cm) ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 1x900 1x900 1x900 Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

59 Road Improvement Plan Province/District: Central, Mkushi Road Number: U5 Road Name: Mulungwe to Nshinso Length: 20.4 km Drawing No.: Page: 5 of 5 Description Socio Econ. Data Veritcal Profile Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Nshinso School, Clinic Market, Storage Shed T-Jnc with U4 Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #1 P 04 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Curvy Cly 25 Rehabilitation Plan Isolated Problems & Defects: Dambo (m) Improvement Standard Full / / Spot Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Improvement Plan Climate Change measures Re alignment (Re )gravelling Length (m) Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 Box/Portal culvert: Size (m) 25 Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks:

60 VI. Schedule of Structural Works

61 KIRAN & MUSONDA ASSOCIATES Ltd Consulting Engineers Schedule of Structural Works Province / District: Central, Mkushi Road Name / No.: Mulungwe Nshinso, (U5) Length: 20.4 Km Drawing No.: SS U5 Page: 1 of 1 No. Location (Chainage) Type of Structure (CP / AP / PC / BC / PDr / VDr / Br) Dimensions of Structure (No. of barrels/cells x Dia. or HxW) Length (m) Condition (VG / G / F / P / VP) Description of Defects Inlet Type Outlet Type PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 7.0 F Wing wall Wing wall M Description of Works required ( M aintenance / Repair / R e-construction / N ew Construction) Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 7.0 F Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M BC Existing Cross culvert 2 x 2.4m x 1.8m 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 1200mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 7.0 F Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 7.0 P Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 7.0 P Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 7.0 P Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 900mm 7.0 F Wing wall Wing wall M CP + PC 1 x 1.8m x 1.8m and Existing Cross culvert 3 x Ø 900mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 7.0 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 7.0 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 7.0 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 7.0 VP Wing wall Wing wall M Replace with 1 x Ø 900mm Replace with 1 x Ø 900mm Replace with 1 x Ø 900mm Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 900mm 7.0 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 7.0 VP Wing wall Wing wall M Replace with 1 x Ø 900mm

62 VII. Technical Data Analysis of DCP s

63 Layer No. Penetration Rate (mm/blow) CBR (%) Thickness (mm) Depth to layer bottom (mm) U5 MKUSHI Test 1 Chainage Layer Layer Test 2 Chainage Layer Layer Chainage Layer Layer Chainage Layer Layer Test 5 Chainage Layer Layer Test 6 Chainage Layer Layer Test 7 Chainage Layer Layer Test 8 Chainage Layer Layer Test 9 Chainage Layer Layer Test 10 Chainage Layer Layer

64 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 50 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 1 of 10

65 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 55 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 2 of 10

66 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 50 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 3 of 10

67 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 48 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 4 of 10

68 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 49 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 5 of 10

69 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 55 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 6 of 10

70 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 105 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 7 of 10

71 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 45 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 8 of 10

72 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 57 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 9 of 10

73 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U5 Mkushi Chainage (km): Surface Type: Unpaved Direction: Thickness (mm): 0 Location/Offset: Carriageway Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 51 Surface Moisture: Moderate Test Date: 29/11/2017 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 10 of 10

74 in assiciation with Conceptual Design Mkushi District Road: U6 Fiwila Mission - Mulungwe - Mboloma (total 82.8 km) Contents I. Road Location Map II. III. IV. Road Main Features Photographic Impressions Road Inventory & Condition V. Road Improvement Plan VI. VII. Schedule of Structural Works Technical Data Project Office Kiran & Musonda Associates 20 Matandani Close, Rhodes Park PO Box Lusaka, Zambia Tel: Fax: kma.lusaka@iconnect.zm Head Office IMC Worldwide Ltd London Road Redhill, Surrey RH1 1LG, United Kingdom Tel: +44 (0) Fax: +44 (0) nuria.biosca@imcworldwide.com

75 I. Road Location Map

76 Units 8 & 11, Innovation Centre I, Meson Street, Technopark, Stellenbosch, 7600, South Africa gps_mapper Tracks4Africa (c) 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, km 3.5 km 7 km 10.5 km 14 km MN -5.0 TN 01-Jan-10

77 II. Road Main Features

78 Mkushi District U6, from Fiwila Mission via Mulungwe to Chief Mboloma Main Inventory Data Main Improvement Data Starting Point: Fiwila Mission, at end of RD208 Vegetation Control: : 82.8 km Medium: km Ending Point: Chief Mboloma Palace, at junction with road to Heavy: km Chingombe. (Access road to Palace included) Road Formation: reshaping: 60.0 km Total length under OPRC: 82.8 km Medium reshaping: 21.0 km Heavy reshaping: 1.8 km Socio Economic Data: Embankment earthworks: 2625 cum No. of villages: No. of schools: 5 5 Wearing Course No. of health centres: 3 Not required: km No. of local markets: 3 Thickness : 80.7 km No. of storage sheds: nil Single Seal / Slurry: 0.92 km Interlocking Bricks: 1.18 km Road Technical Data: Lowest Elevation: 545 m Stabilization treatment: nil km Highest Elevation: 1360 m Total Rise/Fall: 815 m Structures: No. of major structures: 1 Stream crossings Minor structures: 96 No. No. of minor structures: 96 Culverts Many minor structures need desilting, head and wing Length gravelled: 29.5 km 36% wall construction, and some need re installation. No. of gravel sources identified: 1 No. No. of Dambo's & total length: 9 total 1500 m New pipe culverts: No. Current Road Condition: Riding comfort: Good: km 0% Major structures: 1 No. : 41.0 km 50% Maswishi River crossing, just before Chief Mboloma : 41.8 km 50% Palace requires a 5 x 1.8m x 1.8m portal culvert, and embankment needs to be raised.. Roadshape & Drainage: Good: km 0% Ancillary Works: : 62.8 km 76% Traffic signs: Where required. : 20.0 km 24% Bus stops: Storage Sheds: Market Stalles: At major villages. T.B.A. T.B.A.

79 III. Photographic Impressions

80 PHOTOGRAPHIC IMPRESSIONS OF U6 in MKUSHI DISTRICT Picture P-01: Mkushi District Date: 28/11/2017 Fiwila Mission Mulungwe Chief Mboloma Chainage Observations: Starting point of the road at Fiwila Mission. Picture P-02: Mkushi District Date: 28/11/2017 Fiwila Mission Mulungwe Chief Mboloma Chainage Observations: Marketing center at Chibanga village. Picture P-03: Mkushi District Date: 28/11/2017 Fiwila Mission Mulungwe Chief Mboloma Chainage Observations: Typical condition of structures, constructed app. 3 years ago. Picture P-04: Mkushi District Date: 28/11/2017 Fiwila Mission Mulungwe Chief Mboloma Chainage Observations: Multi-line culvert structure in embankment crossing a dambo area. Road Inventory and Visual Condition Survey of U6, Mkushi District Page 1

81 Picture P-05: Mkushi District Date: 28/11/2017 Fiwila Mission Mulungwe Chief Mboloma Chainage Observations: Typical road condition at this section of the road, consisting of sandy soil without gravel surfacing. Picture P-06: Mkushi District Date: 28/11/2017 Fiwila Mission Mulungwe Chief Mboloma Chainage Observations: Typical road condition of this road section with natural occurring poor graded gravel. Picture P-07: Mkushi District Date: 28/11/2017 Fiwila Mission Mulungwe Chief Mboloma Chainage Observations: Mboloma Rural Health Centre. Picture P-08: Mkushi District Date: 13/12/2017 Fiwila Mission Mulungwe Chief Mboloma Chainage Observations: Stream crossing the road, just before Chief Mboloma Palace. Road Inventory and Visual Condition Survey of U6, Mkushi District Page 2

82 IV. Road Inventory & Condition

83 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 1 of 17 0 Description Veritcal Profile Socio Economic Inventory Horizontal Profile Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Fiwila Fiwila Mission School Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 01 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Hilly Straight DCP #1 Hilly DCP #2 Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd DCP #3 Straight Straight Straight Straight Hilly Hilly Hilly DCP # Road Width / Free Clearance (in meter) 4.5m 5.5m 5.8m 8.8m 6.2m 6.8m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Gravel Gravel Gravel Gravel Gravel Remarks:

84 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 2 of 17 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #5 DCP #6 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Straight Hilly Hilly Hilly flat Flat Flat Winding winding Straight Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Borehole/waterpoint - LHS Current Road Condition Road Width / Free Clearance (in meter) 6.8m Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) 200m Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Remarks: 6.6m 6.6m 7.2m 7.4m 7.8m Gravel Gravel Gravel Gravel Gravel

85 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 3 of 17 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Chibanga PS, RHS DCP# 14 Market Chibanga Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 02 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Straight Flat Flat Straight Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Flat flat Borehole/waterpoint - RHS 30 Rolling Current Road Condition Road Width / Free Clearance (in meter) 7.8m 7.8m 7.2m 7.8m 7.2m 7.2m Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Gravel Gravel Gravel Gravel Gravel Isolated Problems & Defects: Dambo (m) 250m Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Remarks:

86 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 4 of 17 Description Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Technical Inventory Data Horizontal Profile Current Road Condition Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 03 P 04 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) 200m 200m Remarks: Indicate L/R and Access Length in KM Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) 7.2m Rolling Straight Borehole/waterpoint - LHS Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd m Scouring at steep approaches 7.1m DCP #8 Rolling Rolling Rolling Rolling Straight Straight Straight Straight 7.1m 7.4m 7.4m Gravel Gravel Gravel Gravel Gravel

87 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 5 of 17 Description Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #9 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM LHS Rolling Rolling Rolling Rolling Rolling Straight Straight Straight Straight Curvey Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Borehole /waterpoint - RHS Straight 42 Road Width / Free Clearance (in meter) 7.0m 5.7m 6.2m 6.1m 5.5m 5.2m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Gravel Gravel Gravel Gravel Gravel Earth Remarks:

88 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 6 of 17 Description Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Primary School, LHS Mulungwe Health Post - RHS Market - RHS L-Fm/Sd Shamibanga Comm. School, RHS Turn off U5, LHS Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #10 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Rolling Rolling Rolling Flat Flat Straight Straight Straight Curvy Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Borehole - LHS Road Width / Free Clearance (in meter) 5.2m 4.8m 4.6m 4.5m 5.2m 4.8m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth Earth Remarks:

89 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 7 of 17 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 05 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Curvy Borehole, waterpoint - LHS DCP #11 Rolling Rolling Rolling Rolling Flat Curvy Curvey Curvey Straight Curvey Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Curvey Current Road Condition Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Remarks: 4.8m 5.2m 5.2m 4.8m 6.2m 6.7m Earth Earth Earth Earth Gravel Earth

90 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 8 of 17 Description Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #12 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Flat Rolling Rolling Flat Rolling Winding Winding Curvy Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Road Width / Free Clearance (in meter) 6.7m 4.2m 4.5m 4.9m 4.5m 5.2m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth Earth Remarks:

91 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 9 of 17 Description Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Horizontal Profile Technical Inventory Data Current Road Condition Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 06 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) 200m 100m Steep gradient (m) Remarks: Indicate L/R and Access Length in KM Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) 5.2m Flat Curvy 5m 6.2m 6.2m 6.2m 5.9m Raise embankment 52 DCP #44 Curvy Curvy Winding Winding Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Rolling Curvy Rolling Earth Earth Earth Earth Earth Rolling Rolling 53

92 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 10 of 17 Description Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #14 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Rolling Rolling Hilly Hilly Hilly Winding Straight Curvy Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Road Width / Free Clearance (in meter) 5.9m 5.9m 4.8m 4.8m 4.8m 4.5m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth Earth Remarks:

93 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 11 of 17 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM DCP #15 Hilly Hilly Rolling Rolling Rolling Rolling Curvy Curvy Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 66 67, Road Width / Free Clearance (in meter) 4.8m 4.5m 4.6m 4.5m 5.2m 5.1m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Earth Earth Earth Remarks:

94 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 12 of 17 Description Veritcal Profile Horizontal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM DCP #16 Rolling Flat Rolling Rolling Rolling Flat Rolling Curvy Curvy Curvy Curvy Straight Winding Winding Fm/Sd Fm/Sd Gr Fm/Sd Fm/Sd Fm/Sd Current Road Condition Road Width / Free Clearance (in meter) 5.1m 5.2m 5.2m 5.1m 5.2m 5.2m Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Earth Earth Gravel Earth Earth Earth Isolated Problems & Defects: Dambo (m) 50m Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Remarks:

95 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 13 of 17 Description Veritcal Profile Socio Economic Inventory Horizontal Profile Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #17 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Rolling Rolling Rolling Rolling winding Winding winding Fm/Sd Fm/Sd Gr Gr Gr winding winding Gr 76 Road Width / Free Clearance (in meter) 5.2m 5.5m 4.3m 4.3m 4.3m 4.3m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) 100m Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Earth Gravel Gravel Gravel Remarks:

96 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 14 of 17 Description Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Technical Inventory Data Current Road Condition Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Remarks: Indicate L/R and Access Length in KM Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) DCP #18 Hilly Hilly Rolling Rolling Rolling Curvy Curvy Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd m 4.3m 4.3m 4.3m 4.3m Earth Earth Earth Earth Earth

97 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 15 of 17 Description Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #19 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Curvy Fm/Sd Rolling Rolling Rolling Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Rolling Curvy Fm/Sd Current Road Condition Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Remarks: 5.2m 4.3m 4.3m 4.3m 4.3m Earth Earth Earth Earth Earth

98 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 16 of 17 Description Horizontal Profile Veritcal Profile Socio Economic Inventory Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Chipande Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Curvy Fm/Sd Rolling Rolling Curvy Curvy Fm/Sd Fm/Sd Flat Straight Fm/Sd Flat Curvy Fm/Sd Current Road Condition Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Remarks: 5.0m 4.3m 5.2m 4.3m 5.0m Earth Earth Earth Earth Earth

99 Road Inventory and Condition Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 17 of 17 Description Current Road Condition Technical Inventory Data Veritcal Profile Socio Economic Inventory Horizontal Profile Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) RHC Basic School Chief Mboloma Palace Marketing center Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 07 P 08 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) T Jnc., RHS to Ching'ombe Isolated Problems & Defects: Dambo (m) 200m Steep gradient (m) Remarks: Indicate L/R and Access Length in KM Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Mboloma Flat Flat Flat Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd m 5.0m 4.5m Earth Earth Earth

100 V. Road Improvement Plan

101 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 1 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Fiwila Fiwila Mission School Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 01 DCP #1 DCP #2 DCP #3 DCP #4 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): VD VD Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Hilly Straight Hilly Hilly Straight Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Hilly Hilly Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Medium Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 1x900 1x900 1x900 1x900 1x900 Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks: 13

102 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 2 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #5 DCP #6 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): VD VD VD Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Straight Hilly Winding Hilly Hilly Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd flat winding Straight Straight Straight Straight Flat Flat Borehole/waterpoint - LHS Isolated Problems & Defects: Dambo (m) 200m Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) 0.5m Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 Box/Portal culvert: Size (m) 14 Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

103 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 3 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Chibanga PS, RHS DCP# 14 Market Chibanga Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 02 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Straight Flat Flat Flat flat Rolling Straight Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Borehole/waterpoint - RHS 30 Isolated Problems & Defects: Dambo (m) 250m Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) 0.5m Improvement Plan Climate Change measures Re alignment (Re )gravelling Stabilizing / Sealing treatment Length (m) Thickness (cm) ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks: IPB 30

104 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 4 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 03 P 04 DCP #8 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Straight Borehole/waterpoint - LHS Rolling Rolling Rolling Rolling Straight Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Isolated Problems & Defects: Dambo (m) 200m 200m Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) 0.5m 0.5m Re alignment Length (m) (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB Improvement Plan Climate Change measures Concrete Pipe Culvert: (Ø, barrels) Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks: Scouring at steep approaches

105 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 5 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #9 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM LHS Rolling Rolling Rolling Rolling Rolling Straight Straight Straight Straight Curvey Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Borehole /waterpoint - RHS Straight 42 Isolated Problems & Defects: Dambo (m) Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

106 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 6 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Primary School, LHS Mulungwe Health Post - RHS Market - RHS L-Fm/Sd Shamibanga Comm. School, RHS Turn off U5, LHS Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #10 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Rolling Rolling Rolling Flat Flat Straight Straight Straight Curvy Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Borehole - LHS Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Thickness (cm) Stabilizing / Sealing treatment ST / SSS / IPB IPB Concrete Pipe Culvert: (Ø, barrels) 1x900 Box/Portal culvert: Size (m) 44 Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. 43 Remarks: 45 46

107 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 7 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 05 DCP #11 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Curvy Rolling Rolling Rolling Rolling Flat Curvy Curvey Curvey Straight Curvey Curvey Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Borehole, waterpoint - LHS Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Re alignment Length (m) (Re )gravelling Thickness (cm) Improvement Plan Climate Change measures Stabilizing / Sealing treatment ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

108 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 8 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM DCP #12 Rolling Flat Rolling Rolling Flat Rolling Winding Winding Curvy Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Isolated Problems & Defects: Improvement Standard Dambo (m) Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Medium Medium Medium Medium Re alignment Length (m) (Re )gravelling Thickness (cm) Improvement Plan Climate Change measures Stabilizing / Sealing treatment ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) Box/Portal culvert: Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: (No.) Lined Drain: (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

109 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 9 of 17 Description Veritcal Profile Socio Econ. Data Technical Inventory Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 06 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Curvy Rolling Curvy Rolling 52 DCP #44 Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Rolling Rolling Curvy Curvy Winding Winding 53 Rehabilitation Plan Improvement Plan Climate Change measures Isolated Problems & Defects: Dambo (m) 200m 100m Improvement Standard Clearing (, Medium, Heavy) Removal of Unsuitable Material Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Re alignment (Re )gravelling Full / / Spot Length (m) Estimated Fill height (m), or Quantity (cub.m) Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Length (m) Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks: Medium 0.5m 0.5m Raise embankment 52 Medium 53

110 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 10 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #14 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Rolling Rolling Hilly Hilly Hilly Winding Straight Curvy Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Isolated Problems & Defects: Dambo (m) Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Improvement Plan Climate Change measures Re alignment (Re )gravelling Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Length (m) Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks:

111 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 11 of 17 Description Veritcal Profile Socio Econ. Data Technical Inventory Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM DCP #15 Hilly Hilly Rolling Rolling Rolling Rolling Curvy Curvy Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 66 67, Isolated Problems & Defects: Dambo (m) Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Medium Medium Heavy Improvement Plan Climate Change measures Re alignment (Re )gravelling Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Length (m) Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks: ,

112 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 12 of 17 Description Veritcal Profile Socio Econ. Data Technical Inventory Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM DCP #16 Rolling Flat Rolling Rolling Rolling Flat Rolling Curvy Curvy Curvy Curvy Straight Winding Winding Fm/Sd Fm/Sd Gr Fm/Sd Fm/Sd Fm/Sd Isolated Problems & Defects: Dambo (m) 50m Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) 0.5m Medium Medium Medium Medium Improvement Plan Climate Change measures Re alignment (Re )gravelling Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Length (m) Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks:

113 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 13 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #17 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Rolling Rolling Rolling Rolling winding Winding winding Fm/Sd Fm/Sd Gr Gr Gr winding winding Gr 76 Isolated Problems & Defects: Dambo (m) 100m Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Medium Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

114 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 14 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #18 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Hilly Hilly Rolling Rolling Rolling Curvy Curvy Curvy Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Isolated Problems & Defects: Dambo (m) Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Medium Medium Medium Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

115 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 15 of 17 Description Rehabilitation Plan Technical Inventory Data Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Isolated Problems & Defects: Improvement Standard Clearing (, Medium, Heavy) Removal of Unsuitable Material Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Indicate L/R and Access Length in KM Dambo (m) Full / / Spot Length (m) Estimated Fill height (m), or Quantity (cub.m) Rolling Curvy Fm/Sd Rolling Curvy Fm/Sd Rolling Curvy Fm/Sd Rolling Curvy Fm/Sd Medium 86 Rolling Curvy Fm/Sd Medium DCP #19 Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

116 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 16 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Chipande Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Rolling Curvy Fm/Sd Rolling Rolling Curvy Curvy Fm/Sd Fm/Sd Flat Straight Fm/Sd Flat Curvy Fm/Sd Isolated Problems & Defects: Dambo (m) Improvement Standard Full / / Spot Rehabilitation Plan Clearing (, Medium, Heavy) Removal of Unsuitable Material Length (m) Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Estimated Fill height (m), or Quantity (cub.m) Medium Medium Re alignment Length (m) Improvement Plan Climate Change measures (Re )gravelling Stabilizing / Sealing treatment Concrete Pipe Culvert: Box/Portal culvert: Thickness (cm) ST / SSS / IPB (Ø, barrels) Size (m) Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No Remarks:

117 Road Improvement Plan Province/District: Central, Mkushi Road Number: U6 Road Name: Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: Page: 17 of 17 Description Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Mboloma RHC Basic School Chief Mboloma Palace Marketing center T Jnc., RHS to Ching'ombe Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) P 07 P 08 Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Flat Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Rehabilitation Plan Improvement Plan Climate Change measures Isolated Problems & Defects: Dambo (m) 200m Improvement Standard Clearing (, Medium, Heavy) Removal of Unsuitable Material Removal of Rock Outcrops (Re )shaping (, Medium, Heavy) Borrow to Fill Re alignment (Re )gravelling Full / / Spot Length (m) Estimated Fill height (m), or Quantity (cub.m) Stabilizing / Sealing treatment Length (m) Thickness (cm) ST / SSS / IPB Concrete Pipe Culvert: (Ø, barrels) Box/Portal culvert: Size (m) Construct 5 x 1.8m x 1.8m portal culvert. Plain/Vented Drift / Bridge: (m, No., Ø) Scour checks: Lined Drain: (No.) (L/R) Repair Existing Structure: Ref. No. Road or Traffic Sign: Ref. No. Remarks: IPB Heavy 0.5m 97

118 VI. Schedule of Structural Works

119 KIRAN & MUSONDA ASSOCIATES Ltd Consulting Engineers Schedule of Structural Works Province: Central Drawing No.: Page: 1 of 1 Road No. Location (Chainage) Type of Existing Structure Dimensions of Existing Structure Length (m) Name of River/Stream Area (Km 2 ) L (Km) H max (m) H min (m) H (m) T c (min) I (10yr) (mm/hr) C topo C soil C veg C total coeff. U6-Mkushi PC Portal culverts 4 x 1.8m x 1.8m 4.8 Muswishi , Q max (m 3 /s) V (m/s) Area Req. (m 2) Proposed Intervention 5 x 1.8m x 1.8m prefabricated portal cuverts in addition to existing. NOTES

120 KIRAN & MUSONDA ASSOCIATES Ltd Consulting Engineers Schedule of Structural Works Province / District: Central, Mkushi Road Name / No.: U6 Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: SS/U6 4 pages No. Location (Chainage) Type of Structure (CP / AP / PC / BC / PDr / VDr / Br) Dimensions of Structure (No. of barrels/cells x Dia. or HxW) Length (m) Condition (VG / G / F / P / VP) Description of Defects Inlet Type Outlet Type Description of Works required ( M aintenance / Repair / R e-construction / N ew Construction) AP Existing Cross culvert 1 x 900mm PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm AP Existing Cross culvert 1 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm AP Existing VD 9.1m with 4 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 8.2 VP The outlet is compeletly blocked Wing wall Wing wall M Replace with 1 x Ø 900mm AP Existing VD 6.8m with 3 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm AP Existing Cross culvert 1 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 8.2 VP Wing wall Wing wall M Replace with 1 x Ø 900mm AP Existing Cross culvert 2 x Ø 900mm 8.2 VP The inlet and outlet are blocked Wing wall Wing wall M AP Existing Cross culvert 1 x Ø 900mm 8.2 VP The outlet is blocked Wing wall Wing wall M AP Existing VD 6.8m with 3 x Ø 900mm 8.2 VP Wing wall Wing wall M AP Existing Cross culvert 6.8m with 1 x Ø 900mm 8.2 VP The outlet is blocked Wing wall Wing wall M AP Existing Cross culvert 1 x Ø 900mm 8.2 VP Wing wall Wing wall M AP Existing VD 6.8m with 3 x Ø 900mm 8.2 VP Wing wall Wing wall M AP Existing VD 6.8m with 3 x Ø 900mm 8.2 VP The outlet is blocked Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 900mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 600mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 600mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 600mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 600mm 8.2 VP Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 8.2 F Wing wall Wing wall M Replace with 1 x Ø 900mm

121 KIRAN & MUSONDA ASSOCIATES Ltd Consulting Engineers Schedule of Structural Works Province / District: Central, Mkushi Road Name / No.: U6 Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: SS/U6 4 pages No. Location (Chainage) Type of Structure (CP / AP / PC / BC / PDr / VDr / Br) Dimensions of Structure (No. of barrels/cells x Dia. or HxW) 2 x Ø 2400mm x 1830mm PHOTO # Length (m) Condition (VG / G / F / P / VP) Description of Defects Inlet Type Outlet Type BC Existing Cross culvert 8.2 VP Wing wall Wing wall M Description of Works required ( M aintenance / Repair / R e-construction / N ew Construction) PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M AP Existing Cross culvert 19.5m with 3 x Ø 900mm and 6 x Ø 1200mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M AP Existing Cross culvert 5.8m with 1 x 1200mm and 1 x 1600mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm 8.2 F Wing wall Wing wall M Replace with 1 x Ø 900mm PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F The wingwalls are brocked at the inlet Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M BC & PC 2 x 1.5m x 1.5m and 1 x Ø Existing Cross culvert 1200mm 8.2 F PHOTO # Wing wall Wing wall M

122 KIRAN & MUSONDA ASSOCIATES Ltd Consulting Engineers Schedule of Structural Works Province / District: Central, Mkushi Road Name / No.: U6 Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: SS/U6 4 pages No. Location (Chainage) Type of Structure (CP / AP / PC / BC / PDr / VDr / Br) Dimensions of Structure (No. of barrels/cells x Dia. or HxW) Length (m) Condition (VG / G / F / P / VP) Description of Defects Inlet Type Outlet Type PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M Description of Works required ( M aintenance / Repair / R e-construction / N ew Construction) PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 1.2mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F The outlet is blocked Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M VD Existing Cross culvert 4.5m with 3 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 2 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F The headwall at the outlet is broken Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm x 1000mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm x 1000mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 1200mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 900mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x Ø 600mm x 4000mm 8.2 F Wing wall Wing wall M VD Existing Cross culvert 3 x Ø 900mm 4800mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x 2400mm x 1800mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x 2400mm x 1800mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x Ø 600mm x 300mm 8.2 F The headwall at the outlet is broken Wing wall Wing wall M BC Existing Cross culvert 1 x Ø 600mm x 450mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x Ø 600mm x 450mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x Ø 600mm x 450mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x Ø 600mm x 450mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x Ø 600mm x 450mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x Ø 600mm x 450mm 8.2 F The outlet is blocked Wing wall Wing wall M

123 KIRAN & MUSONDA ASSOCIATES Ltd Consulting Engineers Schedule of Structural Works Province / District: Central, Mkushi Road Name / No.: U6 Fiwila Mission Mulungwe Mboloma Length: 82.8 km Drawing No.: SS/U6 4 pages No. Location (Chainage) Type of Structure (CP / AP / PC / BC / PDr / VDr / Br) Dimensions of Structure (No. of barrels/cells x Dia. or HxW) Length (m) Condition (VG / G / F / P / VP) Description of Defects Inlet Type Outlet Type BC Existing Cross culvert 1 x Ø 600mm x 500mm 8.2 F Wing wall Wing wall M Description of Works required ( M aintenance / Repair / R e-construction / N ew Construction) BC Existing Cross culvert 1 x Ø 600mm x 500mm 8.2 F Wing wall Wing wall M BC Existing Cross culvert 1 x Ø 600mm x 450mm 8.2 F Wing wall Wing wall M PC Existing Cross culvert 1 x 2.4m x 1.8m 8.2 F Wing wall Wing wall M AP Existing Cross culvert 1 x Ø 1200mm 8.2 F The headwall at the outlet is broken Wing wall Wing wall M Water crossing the embankment section through dambo. N 5 x 1.8m x 1.8m prefabricated portal cuverts PC Existing Cross culvert 4 x 1.8m x 1.8m 8.2 F Head wall Head wall M

124 VII. Technical Data Analysis of DCP s

125 Layer No. Penetration Rate (mm/blow) CBR (%) Thickness (mm) Depth to layer bottom (mm) U6 MKUSHI Test 1 Chainage Layer Layer Test 2 Chainage Layer Layer Test 3 Chainage Layer Layer Test 4 Chainage Layer Layer Test 5 Chainage Layer Layer Test 6 Chainage Layer Layer Test 7 Chainage Layer Layer Test 8 Chainage Layer Layer Test 9 Chainage Layer Layer Test 10 Chainage Layer Layer Test 11 Chainage Layer Layer Test 12 Chainage Layer Layer Test 13 Chainage Layer Layer Test 14 Chainage Layer Layer Test 15 Chainage

126 No. Penetration Rate (mm/blow) CBR (%) Thickness (mm) Depth to layer bottom (mm) U6 MKUSHI Layer Layer Test 16 Chainage Layer Layer Test 17 Chainage Layer Layer Test 18 Chainage Layer Layer Test 19 Chainage Layer Layer Test 20 Chainage Layer Layer

127 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 90 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 1 of 20

128 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 87 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 2 of 20

129 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 105 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 3 of 20

130 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 82 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 4 of 20

131 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 90 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 5 of 20

132 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 96 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 6 of 20

133 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 84 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 7 of 20

134 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 90 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 8 of 20

135 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 91 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 9 of 20

136 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 90 Surface Moisture: Moderate Test Date: 14/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 10 of 20

137 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 92 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 11 of 20

138 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 88 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 12 of 20

139 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 83 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 13 of 20

140 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 94 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 14 of 20

141 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/2.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 90 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 15 of 20

142 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 103 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 16 of 20

143 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/2.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 93 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 17 of 20

144 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 113 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 18 of 20

145 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 92 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 19 of 20

146 UK DCP V3.1 DCP Layer Strength Analysis Report Project Name: U Mkushi Chainage (km): Surface Type: Unpaved Direction: EAST Thickness (mm): 0 Location/Offset: Carriageway/3.00m Base Type: Cone Angle: 60 degrees Thickness (mm): Zero Error (mm): 92 Surface Moisture: Moderate Test Date: 15/03/2016 Moisture adjustment factor: Not adjusted Layer Boundaries Chart CBR Chart Layer Properties No. Penetration Rate CBR (%) Thickness (mm) Depth to layer bottom (mm/blow) (mm) CBR Relationship: TRL equation: log 10 (CBR) = x log 10 (Strength) Report produced by... Report Date: 25-Jan-2018 Page 20 of 20

147 in assiciation with Conceptual Design Mkushi District Road: RD208 Masansa (Picadilly Circus) to Fiwila Mission (total 27.1 km) Contents I. Road Location Map II. III. IV. Road Main Features Photographic Impressions Road Inventory & Condition V. Road Improvement Plan VI. VII. Schedule of Structural Works Technical Data Project Office Kiran & Musonda Associates 20 Matandani Close, Rhodes Park PO Box Lusaka, Zambia Tel: Fax: Head Office IMC Worldwide Ltd London Road Redhill, Surrey RH1 1LG, United Kingdom Tel: +44 (0) Fax: +44 (0)

148 I. Road Location Map

149 Units 8 & 11, Innovation Centre I, Meson Street, Technopark, Stellenbosch, 7600, South Africa gps_mapper Tracks4Africa (c) 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, km 3.5 km 7 km 10.5 km 14 km MN -4.9 TN 01-Jan-10

150 II. Road Main Features

151 Mkushi District RD208 from Masansa to Fiwila Main Inventory Data Main Improvement Data Starting Point: Masansa, in town center at junction with D207, Vegetation Control: which is being upgraded to Tarmac standard. : 27.1 km Medium: km Ending Point: Fiwila Mission School, connection to U6, which Heavy: km is indicated on maps as the start of RD492. Road Formation: reshaping: 12.1 km Total length under OPRC: 27.1 km Medium reshaping: 15.0 km Heavy reshaping: km Socio Economic Data: Embankment earthworks: 3000 cum No. of villages: No. of schools: 4 4 Wearing Course No. of health centres: 2 Not required: km No. of local markets: 4 Thickness : 25.6 km No. of storage sheds: 1 Single Seal / Slurry: km Interlocking Bricks: 1.50 km Road Technical Data: Lowest Elevation: 1218 m Stabilization treatment: nil km Highest Elevation: 1314 m Total Rise/Fall: 96 m Structures: No. of major structures: 2 Stream crossings Minor structures: 44 No. No. of minor structures: 44 Pipe culverts Most minor structures are Armco pipes, many of which Length gravelled: 26.5 km require desilting, head and wing wall construction, and No. of gravel sources identified: 1 No. re installation. No. of Dambo's & total length: 3 total 500 m New pipe culverts: No. Current Road Condition: Riding comfort: Good: km 0% Major structures: 1 No. : km 0% Mkushi River bridge needs further investigation, and : 27.1 km 100% may be required to be replaced with 2.4m x 2.4m portal culverts. Roadshape & Drainage: Good: km 0% Ancillary Works: : 3.0 km 11% Traffic signs: Where required. : 24.1 km 89% Bus stops: Storage Sheds: Market Stalles: At major villages. T.B.A. T.B.A.

152 III. Photographic Impressions

153 PHOTOGRAPHIC IMPRESSIONS OF RD208 in MKUSHI DISTRICT Picture P-01: Mkushi District Date: 28/11/2017 Masansa to Fiwila Chainage Observations: Starting point of RD208 in the middle of the busy center of Masansa. Picture P-02: Mkushi District Date: 28/11/2017 Masansa to Fiwila Chainage Observations: Typical local marketing stalls, which could be improved under this project. Picture P-03: Mkushi District Date: 28/11/2017 Masansa to Fiwila Chainage Observations: Concrete slab bridge crossing Mkushi River. Further investigation is required, whether the bridge needs to be replaced with a new structure Picture P-04: Mkushi District Date: 28/11/2017 Masansa to Fiwila Chainage Observations: Concrete slab bridge crossing Mkushi River, consisting of 3 spans of 6.0m and 2 spans of 3.0m. Hand railings are missing. Road Inventory and Visual Condition Survey of RD208, Mkushi District Page 1

154 Picture P-05: Mkushi District Date: 28/11/2017 Masansa to Fiwila Chainage Observations: Typical road condition at this section of the road, where poor gravel was used for surfacing. Picture P-06: Mkushi District Date: 28/11/2017 Masansa to Fiwila Chainage Observations: Typical road condition with potholes, ruts and deformations. Picture P-07: Mkushi District Date: 13/12/2017 Masansa to Fiwila Chainage Observations: Storage point, where a storage facility may be required at the RH-junction onto U2 to Chin gombe. Picture P-08: Mkushi District Date: 28/11/2017 Masansa to Fiwila Chainage Observations: End point of the road at Fiwila Mission, and starting point of U6. Road Inventory and Visual Condition Survey of RD208, Mkushi District Page 2

155 IV. Road Inventory & Condition

156 Road Inventory and Condition Province/District: Central, Mkushi Road Number: RD208 Road Name: Masansa to Fiwila Length: 27.1 km Drawing No.: Page: 1 of 6 0 Description Horizontal Profile Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Market Sch -RHS Jnc. with D207 Masansa Sec.School Masansa Town Market Masansa Bsc. Sch -RHS Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat DCP #1 DCP #2 DCP #3 DCP #4 Flat Straight Straight Straight Straight Cly Cly Fm/Sd Fm/Sd Fm/Sd Flat ,8 9 Flat RHS Flat Straight Road Width / Free Clearance (in meter) 6.2m 7.5m 8m 6.5m 4.5m 5.8m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Earth Gravel Gravel Gravel Gravel Remarks:

157 Road Inventory and Condition Province/District: Central, Mkushi Road Number: RD208 Road Name: Masansa to Fiwila Length: 27.1 km Drawing No.: Page: 2 of 6 Description Horizontal Profile Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) 7th Day Adv. Church Technical Inventory Data Current Road Condition Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Road Width / Free Clearance (in meter) Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Remarks: Indicate L/R and Access Length in KM Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) DCP #5 Flat Flat Flat Flat Flat Straight Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd m 6.2m 6.2m 6.6m 6.8m 7.8m RHS Gravel Gravel Gravel Gravel Gravel DCP #6 Straight Rolling

158 Road Inventory and Condition Province/District: Central, Mkushi Road Number: RD208 Road Name: Masansa to Fiwila Length: 27.1 km Drawing No.: Page: 3 of 6 Description Horizontal Profile Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Mukulaulo Bsc. Sch Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM DCP #7 Rolling Rolling Flat Flat Flat Flat Straight Straight Straight Curvy Curvy Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd Mkushi River crossing Bridge LHS Road Width / Free Clearance (in meter) 7.8m 7.2m 7.1m 7.2m 7.1m 7.2m Current Road Condition Riding Comfort (Good//) Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Remarks: Gravel Gravel Gravel Gravel Gravel Handrails missing on bridge

159 Road Inventory and Condition Province/District: Central, Mkushi Road Number: RD208 Road Name: Masansa to Fiwila Length: 27.1 km Drawing No.: Page: 4 of 6 Description Horizontal Profile Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Kampoko village Anglican Church, RHS Market, Storage Shed RH Jnc. Onto U2 to Ching'ombe Technical Inventory Data Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM DCP #8 Flat Flat Rolling Rolling Flat Flat Winding Straight Straight Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Cly Fm/Sd 19 20,21,22,23 RHS LHS RHS Road Width / Free Clearance (in meter) 7.2m 8.2m 8.3m 6.2m 6m 6.4m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Gravel Gravel Gravel Gravel Gravel 200m Remarks:

160 Road Inventory and Condition Province/District: Central, Mkushi Road Number: RD208 Road Name: Masansa to Fiwila Length: 27.1 km Drawing No.: Page: 5 of 6 Description Horizontal Profile Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Chikoloma village Market RH Jnc. To Shaibila Chief Shaibila Palace, LHS Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM LHS Flat Flat Flat Flat Flat Straight Straight Straight Straight Straight Fm/Sd Fm/Sd Fm/Sd Fm/Sd Fm/Sd 24,25,26 27,28, ,33,34,35,36,37,38 39 RHS 40 Road Width / Free Clearance (in meter) 6.4m 7.5m 7.2m 7.2m 7.2m 7.2m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Gravel Gravel Gravel Gravel Gravel 200m 100m Remarks:

161 Road Inventory and Condition Province/District: Central, Mkushi Road Number: RD208 Road Name: Masansa to Fiwila Length: 27.1 km Drawing No.: Page: 6 of 6 Description Horizontal Profile Veritcal Profile Socio Econ. Data Village / Community Clinic, School, Other Social / Economic Amenities Road Junction (L/R to where..) Fiwila Resource Centre, LHS Fiwila Dev. Trust, LHS Fiwila Mission Fiwila School, RHS RH Jnc. to mission; End of RD208, and start of U6 Picture/Waypoint/Soil Sample/DCP taken (P/W/SS/DCP) DCP #9 Technical Inventory Data Vertical Alignment (Flat/Rolling/Hilly) Horizontal Alignment (Straight/Curvy/Winding) In Situ Soil type (Fm/Sd, Ls/Sd, Gr, Cly) Stream / River Crossing (Name/Width) Existing Structure (Reference No. Table #)): Gravel Borrow Pit Stones / Sand Water (Bore Hole/Dam/Stream) Indicate L/R and Access Length in KM Flat Flat Straight Straight Fm/Sd Fm/Sd Road Width / Free Clearance (in meter) 7.2m 7.2m 7.2m Riding Comfort (Good//) Current Road Condition Road Shape/Camber (Good//) Road Drainage (Good//) Existing Wearing Course (Earth/Gravel) Isolated Problems & Defects: Dambo (m) Steep gradient (m) Unsuitable material (m) Rock outcrops, Stoniness (Area) Drainage challenge Potholes, Corrugations, Ruts, Gullies (m) Gravel Gravel Remarks:

Transportation Engineering II UNIT - I

Transportation Engineering II UNIT - I Transportation Engineering II UNIT - I I. Components of a Permanent Way: A. Rails: Rails are the I-section members of a track laid in two parallel lines to provide a level surface for the movement of trains.

More information

CATALOGUE SEWAGE MANHOLES

CATALOGUE SEWAGE MANHOLES CATALOGUE SC SEWAGE MANHOLES Table of contents TABLE OF CONTENTS Introduction 4 Inspection chamber, type 315 7 Inspection chamber, type 400 10 Inspection chamber, type 425 14 Assembly instruction 19 Catch

More information

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders.

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders. BRIDGE INSPECTION BRIDGE NO./NAME SI - 3041: Mt. Brenton FSR (2.00 KM) Inspection Date: October 31 st 2012 Inspected By: D. Chen, D. Harrison Year Built: 1995 Number of Spans: 1 Span Lengths: Superstructure

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Appendix G Aquilla Lake Pool Rise Recreational Resources

Appendix G Aquilla Lake Pool Rise Recreational Resources Appendix G Aquilla Lake Pool Rise Recreational Resources 1. INTRODUCTION The purpose of this appendix is to document the impacts of a 2.5 ft (Alternative A), 4.5 ft (Alternative B), and 6.5 ft. (Alternative

More information

RSMS. RSMS is. Road Surface Management System. Road Surface Management Goals - CNHRPC. Road Surface Management Goals - Municipal

RSMS. RSMS is. Road Surface Management System. Road Surface Management Goals - CNHRPC. Road Surface Management Goals - Municipal RSMS Road Surface Management System RSMS is. CNHRPC Transportation Advisory Committee 6/1/12 1 2 a methodology intended to provide an overview and estimate of a road system's condition and the approximate

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study)

ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) ATTACHMENT D (As referenced in Attachment B ) (Hydrology and Hydraulics Study) Southern California Edison So Cal Gas Sub-transmission Project Hydrology and Hydraulics Study January 2014 2 Hydrology & Hydraulics

More information

Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ

Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ Blockade Services Limited Unit O, Lambs Business Park, Tilburstow Hill Road, South Godstone RH9 8LJ Tel: 01342 893806 Fax: 01342 893158 www.blockadeservices.co.uk Steve Burrows started as a sole trader

More information

LOW VOLUME ROADS The Backbone of Your County Road System

LOW VOLUME ROADS The Backbone of Your County Road System 2018 Far West County Judges & Commissioners Assn. Conference September 11-14, 2018 LOW VOLUME ROADS The Backbone of Your County Road System County Commissioners continue to face ever-increasing challenges

More information

Northern Line Extension Project

Northern Line Extension Project 1 16 TH OCTOBER 2018 Northern Line Extension Project Suresh Thiagarajan Senior Project Engineer 2 Northern Line Extension Battersea 2020 - part of the wider Northern Line story 3 Contents Project Background

More information

Geometric Design and Road Surface: Impacts on Motorcycle Safety

Geometric Design and Road Surface: Impacts on Motorcycle Safety Geometric Design and Road Surface: Impacts on Motorcycle Safety International Conference on Transport and Road Research, Mombasa, Kenya, 15 th to 17 March 2016 Introduction Findings of AFCAP-funded research

More information

Aluminum Box Culverts

Aluminum Box Culverts Steel and Aluminum s The Solution for Small Bridge Replacement: s Contech s are a practical and costefficient solution for small bridge replacement. They have a lower installed cost because they are faster

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

78th TRB 99 Session 440

78th TRB 99 Session 440 ICAP 97 78th TRB 99 Session 440 Latest Developments on Tyre Road Surface Interface Stress Measurements Using the 3-D Cell (PP99-3486) Morris De Beer () Louw Kannemeyer (SANRA Ltd) (1st Reference: 8th ICAP

More information

Project Details. Description. 2 Commencement date of Concession 9 May Schedule Commencement date of O&M

Project Details. Description. 2 Commencement date of Concession 9 May Schedule Commencement date of O&M Project Details NH-45 (popularly known as GST Road) is one of the important National Highways, which connects Chennai, the Capital City of Tamilnadu with the southern districts of the State, including

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7 . INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31st October 2014.1. a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing

More information

Performance-Based Communication Tools for Maintenance Budgets. 11th National Conference on Transportation Asset Management July 12th, 2016.

Performance-Based Communication Tools for Maintenance Budgets. 11th National Conference on Transportation Asset Management July 12th, 2016. Performance-Based Communication Tools for Maintenance Budgets 11th National Conference on Transportation Asset Management July 12th, 2016 Rob Zilay Presentation Outline Performance-based maintenance tools

More information

GOPALAN COLLEGE OF ENGINEERING AND MANAGEMENT Department of Civil Engineering COURSE PLAN

GOPALAN COLLEGE OF ENGINEERING AND MANAGEMENT Department of Civil Engineering COURSE PLAN Appendix - C GOPALAN COLLEGE OF ENGINEERING AND MANAGEMENT Department of Civil Engineering Academic Year: 2016-17 Semester: EVEN COURSE PLAN Semester: VI Subject Code& Name: 10CV64 & Geotechnical Engineering-II

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

Hosur Krishnagiri Project Of NH-7

Hosur Krishnagiri Project Of NH-7 9. INSPECTION AND MONITORING OF THE CONSTRUCTION WORKS. PROGRESS UP TO 31 May 2015 1a. HIGHWAYS - MCW & Service Road Sl Description Unit Total Scope (Km) Completed Percentage achieved % 1 Clearing & Grubbing

More information

Smart Infrastructure and Construction. Kenichi Soga

Smart Infrastructure and Construction. Kenichi Soga Smart Infrastructure and Construction Kenichi Soga London Bridge Station 200,000-250,000 passengers/day 55 million passengers per year Oldest station in London First built in 1836 Five Year Improvement

More information

TE-II (10CV63) Ballast

TE-II (10CV63) Ballast Lecture-09 10CV63 TE-II Introduction Ballast The ballast is a layer of broken stones, gravel, moorum, or any other granular material placed and packed below and around sleepers for distributing load from

More information

The Pump Matic Range

The Pump Matic Range The Below Ground packaged pumping Stations Ideal for - Sewage, Wastewater, Stormwater Pump Technology Ltd, manufactures its own pumping station tanks. We have complete control over the construction, quality

More information

M.D. OF PINCHER CREEK NO. 9. Approved by Council Date: March 22, 2016

M.D. OF PINCHER CREEK NO. 9. Approved by Council Date: March 22, 2016 1.0 LEGISLATION Municipal Government Act, M-26, RSA 2000 Highways Development and Protection Act, H-8.5, RSA 2004 2.0 PURPOSE The Municipal District of Pincher Creek No.9 (MD) is the only agency responsible

More information

Ohio Transportation Engineering Conference 2012

Ohio Transportation Engineering Conference 2012 Ohio Transportation Engineering Conference 2012 October 31, 2012 Mitch Hardert Chief Engineer CBC Engineers Jim Noll Director Engineering Services CONTECH Joe Dennis Director Business Development CBC Engineers

More information

kerb and gully range fast delivery on ex-stock items to any postcode nationwide

kerb and gully range fast delivery on ex-stock items to any postcode nationwide kilform 253/08/13 UK Tel: 0800 0393367 - Rep. Irl Tel: 057 9353018 kerb and gully range fast delivery on ex-stock items to any postcode nationwide KERB RANGE Half Batter Pressed Kerbs Full Batter Pressed

More information

Road Condition Assessment and Road Contributions Study. 270 Grants Road, Somersby. June 2015 Our Ref: SY140135

Road Condition Assessment and Road Contributions Study. 270 Grants Road, Somersby. June 2015 Our Ref: SY140135 Condition Assessment and Contributions Study 270 June 2015 Our Ref: SY140135 Copyright Barker Ryan Stewart Pty Ltd 2015 All Rights Reserved Project No. SY140135 Author DH Checked PM Approved GB Rev No.

More information

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR)

Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) Alignment Comparison Report (May 9, 2002) PARK BRIDGE TO BRAKE CHECK (10 Mile Bridge) TRANS CANADA HIGHWAY (CCR) INTRODUCTION The Ministry of Transportation (MoT), Region 2, Highway Engineering staff were

More information

DATABASE HEALTH INDEX - DASHBOARD

DATABASE HEALTH INDEX - DASHBOARD Page 1 of 7 DATABASE HEALTH INDEX - DASHBOARD Carriageway Asset Inventory Collected Data Non-Carriageway Asset Inventory Area: PSMC 006 Date: 5/09/2013 Category Measures Result Measure Capital Projects

More information

Underground Drainage Manhole & Inspection Chambers Prefabricated Polyethylene (PE)

Underground Drainage Manhole & Inspection Chambers Prefabricated Polyethylene (PE) Underground Drainage Manhole & Inspection Chambers Prefabricated Polyethylene (PE) July 2013 1 Material July 2013 7 Production Material Polyethylene (PE) Virgin material 100 % Recycling-contents Foam-contents

More information

PROPEX The exceptional choice for sustainable erosion control to replace hard armour

PROPEX The exceptional choice for sustainable erosion control to replace hard armour AUSTRALIAN COMPANY // GLOBAL EXPERTISE PROPEX The exceptional choice for sustainable erosion control to replace hard armour BEFORE AFTER PROPEX LANDLOK PROPEX PYRAMAT PROPEX ARMORMAX BEFORE AFTER Global

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

Section 5. Manhole Inspection Report

Section 5. Manhole Inspection Report Section 5 Inspection Report Ypsilanti Community Utilities Authority Huron River Interceptor I/I Study Inspection Report Technical Memorandum December, 2008 Introduction Several manholes within the Huron

More information

COST ANALYSIS FOR BRIDGE AND CULVERT. Essam A. Mostafa

COST ANALYSIS FOR BRIDGE AND CULVERT. Essam A. Mostafa Seventh International Water Technology Conference IWTC7 Cairo 1-3 April 2003 357 COST ANALYSIS FOR BRIDGE AND CULVERT Essam A. Mostafa Associate Professor, Irrigation & Hydraulics Department, Faculty of

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Pipex px PROTECTION SYSTEMS Pipex px Subsea Cable Protection Systems

Pipex px PROTECTION SYSTEMS Pipex px Subsea Cable Protection Systems Pipex px PROTECTION SYSTEMS Pipex px Subsea Cable Protection Systems (Robust scour zone high visibility Cable Protection Systems (CPS) during deployment) Project Offshore Wind Farm CPS Location United

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

Appendix D. List of Existing Structures

Appendix D. List of Existing Structures A120 Braintree to A12 Technical Appraisal Report Appendix D. List of Existing Structures B3553T41-JAC-HGN-00-REP-C-0002 Page 134 of 135 A120 Braintree to A12 - Existing Structures Existing Structure Name

More information

INSTALLATION GUIDELINES

INSTALLATION GUIDELINES SUMP TANKS INSTALLATION GUIDELINES Thank you for purchasing a quality SumpTank. In order to gain the maximum benefit from your purchase, we have outlined the following instructions for the installation

More information

Kentucky Highway District 6

Kentucky Highway District 6 Kentucky Highway District 6 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA

HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA HYDROLOGIC/HYDRAULIC ANALYSIS REPORT FOR THE TROLLEY BROOK CULVERT ASHLAND, MA Prepared for: THE TOWN OF ASHLAND BOARD OF SELECTMEN AND PLANNING DEPARTMENT Prepared by: June 3, 216 Hydrologic/Hydraulic

More information

Tool 3-2 Rope pump installation check list for quality control, 3 rd Edition August 2016 Rope Pump INSTALLATION checklist for quality control A A1 Des

Tool 3-2 Rope pump installation check list for quality control, 3 rd Edition August 2016 Rope Pump INSTALLATION checklist for quality control A A1 Des Rope Pump INSTALLATION checklist for quality control A A1 Site selection and preparations of the well before installation Hygiene and site selection Before the Rope pump is installed on a well, please

More information

COMHAIRLE CONTAE MHAIGH EO MAYO COUNTY COUNCIL. National Roads Design Office

COMHAIRLE CONTAE MHAIGH EO MAYO COUNTY COUNCIL. National Roads Design Office COMHAIRLE CONTAE MHAIGH EO MAYO COUNTY COUNCIL Provision of footpaths, pedestrian crossings and traffic calming in the village of Mulranny in the townlands of Mallaranny and Murrevagh, in the D.E.D. of

More information

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P )

RE: S.P (T.H. 210) in Crow Wing County Located on T.H. 210 from Brainerd (R.P ) to Ironton (R.P ) District 3 Administration 7964 Industrial Park Road Baxter, MN 56425 Memo To: Dan Anderson Transportation District Engineer From: Scott Zeidler Senior Engineering Specialist Date: December 11, 2017 RE:

More information

COMMERCIAL SCHEME Approval No

COMMERCIAL SCHEME Approval No COMMERCIAL SCHEME Approval No. 12806 MADE at the City of Calgary, in the Province of Alberta, on ALBERTA ENERGY REGULATOR IN THE MATTER of a commercial scheme of Imperial Oil Resources Ventures Limited

More information

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M

Total Ex. Tax/VAT. (Rs.) (if any) in Rs. (Bought out/direct) length 587M 226M ORISSA POWER TRANSMISSION CORPORATION LIMITED Supply & Laying of 132 KV XLPE Double Circuit (4 cable per Circuit including one spare) underground 1000 Sq. mm annealed Copper XLPE EHV Cable with Associated

More information

GL0098P Beta+ Septic Tanks Installation & Operation Guidelines

GL0098P Beta+ Septic Tanks Installation & Operation Guidelines 000535 GL0098P Beta+ Septic Tanks Installation & Operation Guidelines Kingspan Environmental Service Contact Numbers: UK: 0844 846 0500 NI: 028 3025 4077 IRL: 048 3025 4077 Enclosed Documents DS1151P Beta+

More information

AUTOMATIC SELF-ACTUATING DAM OUTLET VALVES

AUTOMATIC SELF-ACTUATING DAM OUTLET VALVES AUTOMATIC SELF-ACTUATING DAM OUTLET VALVES PD Townshend Amanziflow Projects (Pty) Ltd, Johannesburg, South Africa ABSTRACT Many older dams have bottom outlet valves which are now malfunctioning and require

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

Drain Waste & Vent (DWV) Systems SCJ PIPE & FITTINGS FOR NON-PRESSURE SEWERAGE APPLICATIONS

Drain Waste & Vent (DWV) Systems SCJ PIPE & FITTINGS FOR NON-PRESSURE SEWERAGE APPLICATIONS Drain Waste & Vent (DWV) Systems SCJ PIPE & FITTINGS FOR NON-PRESSURE SEWERAGE APPLICATIONS contents Drain Waste & Vent (DWV) Systems SCJ PIPE & FITTINGS FOR NON-PRESSURE SEWERAGE APPLICATIONS product

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/27/06 PAGE : 1 TABULATION OF BIDS PAGE : 1 NUMBER OF DAYS: 63 BRIDGE COUNT : 9 CONTRACT DESCRIPTION : BITUMINOUS OVERLAY & BRIDGE APPROACH PANEL REPLACEMENT CONTRACT LOCATION: LOCATED ON TH 90 FROM 0.8 MILE WEST OF THE BLUE EARTH RIVER

More information

Guardrail/Bridgerail Recommendations for Very Low Volume Local Roads in Kansas

Guardrail/Bridgerail Recommendations for Very Low Volume Local Roads in Kansas Guardrail/Bridgerail Recommendations for Very Low Volume Local Roads in Kansas MINK Conference September 20, 2017 Ronald J. Seitz, P.E. and Tod Salfrank The Problem The Local Road System in Kansas is Very

More information

VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur DEPARTMENT OF CIVIL ENGINEERING SUBJECT NAME: HIGHWAY ENGINEERING

VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur DEPARTMENT OF CIVIL ENGINEERING SUBJECT NAME: HIGHWAY ENGINEERING VALLIAMMAI ENGINEERING COLLEGE SRM Nagar, Kattankulathur 603 203 DEPARTMENT OF CIVIL ENGINEERING SUBJECT CODE: CE6504 SUBJECT NAME: HIGHWAY ENGINEERING YEAR: III SEM : V QUESTION BANK (As per Anna University

More information

UNIT-1 PART:A. 3. (i) What are the requirements of an ideal highway alignment? Discuss briefly.

UNIT-1 PART:A. 3. (i) What are the requirements of an ideal highway alignment? Discuss briefly. UNIT-1 PART:A 1. What is meant by TRANSPORTATION. 2. List twenty-year road development plans. 3. Mention any two Recommendation of Jayakar committee. 4. What are the functions of IRC and CRRI. 5. Define

More information

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS

INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS INFRASTRUCTURE AND TRANSPORTATION ADVERTISING SCHEDULE 2015/2016 CONSTRUCTION AND MATERIAL SUPPLY TENDERS Manitoba Infrastructure and Transportation Contract Services Branch 1630-215 Garry Street Winnipeg,

More information

Vigaun bridge. Picture credits: Florian Schreiber Fotografie for SSF Ingenieure GmbH

Vigaun bridge. Picture credits: Florian Schreiber Fotografie for SSF Ingenieure GmbH Vigaun bridge Vigaun bridge For the bridge in Vigaun a total length of 78.45 m over three spans was chosen. The bridge is in a straight line over the whole length. The radius measures 25 m at the west

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

RAINWATER HARVESTING INSTALLATION GUIDE RH High Capacity Vortex Rainwater Fine Filter for Above or Below Grade Application

RAINWATER HARVESTING INSTALLATION GUIDE RH High Capacity Vortex Rainwater Fine Filter for Above or Below Grade Application RAINWATER HARVESTING INSTALLATION GUIDE RH9521-12 High Capacity Vortex Rainwater Fine Filter for Above or Below Grade Application RH9521-12 Vortex Filter Operation and Maintenance Overview The RH9521-12

More information

Sustainable Rail Strategy The Value of Quality

Sustainable Rail Strategy The Value of Quality Graz University of Technology Institute of Railway Engineering and Transport Economics Sustainable Rail Strategy The Value of Quality Peter Veit June 30 th, 2015 www.ebw.tugraz.at Challenge Graz, Austria

More information

Smart transit system and e-mobility technologies for the GCC s railway aspirations

Smart transit system and e-mobility technologies for the GCC s railway aspirations Smart transit system and e-mobility technologies for the GCC s railway aspirations Serge Van Themsche Vice President, Europe, Middle East, Africa & Brazil Systems Division, Bombardier Transportation GCC

More information

Spatial planning and sustainable urban transport systems

Spatial planning and sustainable urban transport systems Jean-Christophe Goudouneix Rita Magris Laura Richter Nicolae Serban Stef Tomesen George Yates Erasmus Intensive Programme 2013 Oradea Group 4 Spatial planning and sustainable urban transport systems Developing

More information

HDM-4 Road Use Costs Model Documentation. Version February 2, The World Bank

HDM-4 Road Use Costs Model Documentation. Version February 2, The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank Technical Documentation HDM-4 Road Use Costs Model Documentation Version 1.10

More information

Cathodic Protection for AST s. Why is Cathodic Protection Important?

Cathodic Protection for AST s. Why is Cathodic Protection Important? Cathodic Protection for AST s Presented by: James T. Lary Corrpro Companies, inc. 1055 West Smith Road Medina, Ohio 44256 jlary@corrpro.com 330-241-6615 Why is Cathodic Protection Important? Preserve Assets

More information

CSE CONCLAVE. ENABLING CITY ACTION PLAN FOR CLEAN AIR India Habitat Centre, New Delhi April 19-20,

CSE CONCLAVE. ENABLING CITY ACTION PLAN FOR CLEAN AIR India Habitat Centre, New Delhi April 19-20, CSE CONCLAVE ENABLING CITY ACTION PLAN FOR CLEAN AIR India Habitat Centre, New Delhi April 19-20,2016 --------------------------------- Action on Emission Standards Roadmap and Controls on Vehicular Emissions

More information

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 Integrated Road Investment Program (RRP SRI 47273) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 1. Sri Lanka s road network is dense and well laid out, providing basic access to the country

More information

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E

Hydraulic Report. County Road 595 Bridge over Second River. Prepared By AECOM Brian A. Hintsala, P.E Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9, 2011 Hydraulic Report County Road 595 Bridge over Second River Prepared By AECOM Brian

More information

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY

SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP. 1 OF 1 P:\8417\ Bridge A\AT\Albany A.MDB 7/21/2014 7:32:31 AM REVISION NO COUNTY 7/18/2014 - UCTURE REVISION NO REVISIONS DATE BY DIICT COUNTY ROUTE SECTION SHEET - SEE SPECIAL PROVISIONS SUMMARY 3-0 BRADFORD ALBANY TOWNSHIP T-410 4 OF 8 QUANTITY ITEM NO UNIT DESCRIPTION DESIGN NO

More information

h2* linear fall up to 20 m, stepped fall, without fall Loading classes: A 15, B 125, C 250 to EN 1433

h2* linear fall up to 20 m, stepped fall, without fall Loading classes: A 15, B 125, C 250 to EN 1433 MEADRAIN Supreme System Z 1000 Technical Data 500 130 100 1000 0 h* h1* h* h1* 1 85 (100) 1 85 (100) 1 h1* = Total height 1 h* = Total height Material properties Channel body Polymer concrete based on

More information

.MAINTENANCE. Strategic Initiative Four:

.MAINTENANCE. Strategic Initiative Four: The accompanying fact sheets explain specific components of the department s effort to prioritize maintenance activities. This information provides the basis of ODOT s 2001 Strategic Initiative Four: Re-Defining

More information

NETWORK. Annex AC. Aurizon Network Ballast Fouling, 4 March 2013

NETWORK. Annex AC. Aurizon Network Ballast Fouling, 4 March 2013 NETWORK Annex AC 4 March 2013 Aurizon Network Ballast Fouling, Overview of the problem Ballast is the material that is laid on the rail bed under the sleepers, providing stability and drainage to the track

More information

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS

PN /21/ SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS PN 420-10/21/2016 - SURFACE SMOOTHNESS REQUIREMENTS FOR PAVEMENTS DESCRIPTION: The surface tolerance specification requirements are modified as follows for all pavements of constant width with at least

More information

Concrete Pipes 62 Traditional Manholes Sealed Manholes 66 Retaining Walls 67 Boc Culverts / Gully Pots 68 Inspection Chambers 69

Concrete Pipes 62 Traditional Manholes Sealed Manholes 66 Retaining Walls 67 Boc Culverts / Gully Pots 68 Inspection Chambers 69 Concrete Drainage & Accessories CPM Concrete Pipes 62 Traditional Manholes 63-65 Sealed Manholes 66 Retaining Walls 67 Boc Culverts / Gully Pots 68 Inspection Chambers 69 F P McCann Concrete Pipes / Precast

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

The Provincial Profile Mapped Rural Indigenous Fijians Only

The Provincial Profile Mapped Rural Indigenous Fijians Only The Provincial Profile Mapped A Prototype Social Atlas for Fiji, U.S. Peace Corps Volunteer 1 Introduction The following pages introduce a prototype Social Atlas for Fiji. GIS skills are still in the developing

More information

Depth of Bury Tables 9B-5. A. General. B. Rigid Pipe Assumptions. Design Manual Chapter 9 - Utilities 9B - Trench Design

Depth of Bury Tables 9B-5. A. General. B. Rigid Pipe Assumptions. Design Manual Chapter 9 - Utilities 9B - Trench Design Design Manual Chapter 9 - Utilities 9B - Trench Design 9B-5 Depth of Bury Tables A. General The depth of bury tables on the following pages are based upon the design methodology from the various pipe material

More information

ACO Drain. For more information on ACO Drain visit ACO KerbDrain 280 Splay

ACO Drain. For more information on ACO Drain visit  ACO KerbDrain 280 Splay Uniclass L223 + L735 EPIC J343 ACO Drain ACO KerbDrain Splay CI/SfB (52.5) ACO KerbDrain Splay Kompact combined drainage and kerb system ACO KerbDrain Splay Product Overview Introduction to ACO KerbDrain

More information

Multi Mode TBMs. OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling

Multi Mode TBMs. OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling OCT 4 6, 2015 Queens University Kingston, ON Canada Challenges and Innovations in Tunnelling Multi Mode TBMs Shawn Hourtovenko Herrenknecht Tunnelling Systems Canada, Inc. October 5 th, 2015 Tunnelling

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA

PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS PIPPELINE IN INDIA PIPELINE INTEGRITY CONFERENCE BHR GROUP 5th-7th NOVEMBER 2008 SCHIPOL, THE NETHERLANDS REHABILITATING A MAJOR OIL PIPPELINE IN INDIA K.G. GUPTA, INDIAN OIL CORPORATION LTD, INDIA R. JOHN, BERRY PLASTICS

More information

ABS lifting station Synconta

ABS lifting station Synconta 15975187GB (03/2006) 106800 GB Installation and Operating Instructions www.absgroup.com Installation and Operating Instructions 601 801 901 901L 902 902L Contents 1 General... 3 1.1 Application areas...

More information

IMPLEMENTATION OF TRACTOR BASED ROAD MAINTENANCE

IMPLEMENTATION OF TRACTOR BASED ROAD MAINTENANCE IMPLEMENTATION OF TRACTOR BASED ROAD MAINTENANCE Presented By: Presley Chilonda 1 PRESENTATION OUTLINE: Rationale for Tractor Technology in Low Volume Road works and rural development Positive experiences

More information

Geoscience Testing laboratory (Al Ain)

Geoscience Testing laboratory (Al Ain) Soil 1 In-situ Density by Sand Replacement Method Using Large Pouring Cylinder & Small Pouring Cylinder In-place Density Test by Sand Cone Method BS 1 Part ASTM D 1556 Dry Density Moisture Content Relationship

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

AMERICAN RECIRCULATING SAND FILTER SYSTEMS

AMERICAN RECIRCULATING SAND FILTER SYSTEMS American Manufacturing Company, Inc. P.O. Box 549, Manassas, VA 20108 1-800-345-3132 AMERICAN RECIRCULATING SAND FILTER SYSTEMS ENGINEERING DESIGN GUIDELINES FOR COMMUNITY AND COMMERCIAL SIZED TREATMENT

More information

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW)

Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Sano Milti Khola Hydropower Project, Fulasi VDC, Ramechhap (3 MW) Monthly Progress Report Prepared by : Sano Milti Khola Hydropower Limited www.smi.com.np smi.investment.limited@gmail.com Date : June,

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

Engineering Dept. Highways & Transportation Engineering

Engineering Dept. Highways & Transportation Engineering The University College of Applied Sciences UCAS Engineering Dept. Highways & Transportation Engineering (BENG 4326) Instructors: Dr. Y. R. Sarraj Chapter 4 Traffic Engineering Studies Reference: Traffic

More information

DMB Proposed Toll Increase

DMB Proposed Toll Increase DMB Proposed Toll Increase December 2018 The Delaware River and Bay Authority Bi-state agency established in 1962 Provides Crossings between Delaware and New Jersey Economic development benefitting the

More information

The Knowledge Bank at The Ohio State University. Ohio State Engineer. Electrolysis in Underground Structures

The Knowledge Bank at The Ohio State University. Ohio State Engineer. Electrolysis in Underground Structures The Knowledge Bank at The Ohio State University Ohio State Engineer Title: Creators: Issue Date: Publisher: Electrolysis in Underground Structures Rei, P. F. Pepper, H. C. Hoover, C. H. Frankenberg, R.

More information

2a. Excavating and Lifting

2a. Excavating and Lifting Construction Methods 110401542 2a. Excavating and Lifting Dr. Khaled Hyari Department of Civil Engineering Hashemite University Introduction Excavator: A power-driven digging machine Three Major types

More information

The complete product range. Tailor made products to meet your requirements

The complete product range. Tailor made products to meet your requirements The complete product range. Tailor made products to meet your requirements 02 03 WIRTGEN where innovation happens What began as a haulage company for construction materials in 1961 has developed, over

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

CULVERT DESIGN WITH HY-8

CULVERT DESIGN WITH HY-8 Back to the Basics CULVERT DESIGN WITH HY-8 Purdue University Road School 2006 Your Presenters... Merril Dougherty INDOT, Hydraulics Unit Supervisor David Finley CTE Engineers, Inc. 1 Part One: Culvert

More information

UTILITY CROSSING DETAIL

UTILITY CROSSING DETAIL 6" OF CSBC COMPACTED TO A FIRM AND UNYIELDING CONDITION. NOTE: - SILT FENCE SHALL CONFORM TO 8-01.3(9)A - SILT FENCES SHALL BE INSTALLED ALONG CONTOUR WHENEVER POSSIBLE. - POST SPACING MAY BE INCREASED

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information