The 2011 Congested Corridors Report -- Chicago

Size: px
Start display at page:

Download "The 2011 Congested Corridors Report -- Chicago"

Transcription

1 The 2011 Congested s Report -- Chicago Information Length (miles) I-55 NB Stevenson Expy/I-55 SB Eisenhower Expy/I-290 EB IL-53/Exit 267 IL-43/Harlem Ave/Exit 283 IL-72/Higgins Rd/Exit 1 IL-83/Kingery Hwy/Exit 274 County Line Rd/Exit 276A Austin Blvd/Exit 23A , , ,863 31, , ,385 2,525 30, , ,027 24,741 94, ,079 20, ,021 1,282 16, , ,689 10,164 59,

2 The 2011 Congested s Report -- Chicago Information Length (miles) Eisenhower Expy/I-290 WB I-290 WB Stevenson Expy/I-55 NB S Ashland Ave/Exit 28B I-88/Exit 15A US-20/US-45/US-12/Exit 279A 9th Ave/Exit 19B IL-83/Exit 10A Pulaski Rd/Exit , , ,727 37,497 52, ,720 8,181 29, ,329 18,069 13, ,151 5,710 4, ,110 2,863 3, ,869 12,956 16,

3 Information Length (miles) The 2011 Congested s Report -- Chicago Edens Expy/I-94 EB I-90/I-94 WB (Dan Ryan/Kennedy I-90/I-94 EB (Kennedy/Dan Ryan E wer Rd/Exit 31 Pershing Rd/Exit 55B I-294/Tri llway I-90/Kennedy Expy Sayre Ave/Exit 81B Ruble St/Exit 52B ,054 2, ,155 88, , ,193 20,867 20, , ,358 32,558 59, ,308 14,535 18, ,175 17,499 16, ,510 30,377 42,

4 The 2011 Congested s Report -- Chicago Information Length (miles) Tri llway/i-294 SB Stevenson Expy/I-55 SB I-94 WB IL-58/Golf Rd St/Exit 293C W Lawrence Ave Ohare Oasis Pulaski Rd/Exit 287 uhy Ave/Exit , ,621 55,001 5, ,953 3, ,022 39,822 1, , , ,735 18,063 1,

5 Information Length (miles) The 2011 Congested s Report -- Chicago Chicago Chicago IL IL I-94 WB I-94 EB 115Th St/Exit 66B 75th St US-20/US-12/95th St/Exit 62 87th St/Exit 61B ,022 4, , , ,254 1,

TTI s 2011 Congested Corridors Report Powered by INRIX Traffic Data 1

TTI s 2011 Congested Corridors Report Powered by INRIX Traffic Data 1 TTI s 2011 Congested s Report Powered by INRIX Traffic Data 1 Norfolk Area New Haven Pittsburgh Riverside Washington, DC New Orleans Louisville Washington, DC Baltimore Baton Rouge New Haven GA-400 SB

More information

CONGESTED CORRIDORS REPORT

CONGESTED CORRIDORS REPORT 2011 NOVEMBER 2011 CONGESTED CORRIDORS REPORT POWERED BY TTI s 2011 CONGESTED CORRIDORS REPORT Powered by INRIX Traffic Data Bill Eisele Research Engineer David Schrank Associate Research Scientist And

More information

Red Light Camera Locations

Red Light Camera Locations INTERSECTION FIRST APPROACH SECOND APPROACH Pulaski-Diversey SB NB Pulaski-Foster SB WB Cicero-Fullerton SB WB Harlem-Belmont NB WB Narragansett-Fullerton EB WB Western-Montrose NB WB Halsted-Madison NB

More information

I-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia

I-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia June 2009 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT: VALIDATION OF INRIX DATA

More information

I-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report North Carolina

I-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report North Carolina I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report North Carolina June 2010 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT: VALIDATION OF INRIX

More information

Facility Conditions.

Facility Conditions. Facility Conditions Circle Interchange Under Construction Looking orth, Circa Late 1950s There have been no major improvements made to the Circle Interchange since its construction in the 1950s. Maintenance

More information

Chicago Transit Authority

Chicago Transit Authority Chicago Transit Authority Number 91-379----------1 Operations Planning 'Department Schedules Section Schedules Bulletin Effective Septart>er1. 199i------- Copies to : DistributionList #5 Supersedes TO:

More information

Chicago Transit Authority Service Standards and Policies

Chicago Transit Authority Service Standards and Policies Chicago Transit Authority Service Standards and Policies Overview and Objectives The Chicago Transit Authority (CTA) has revised its Service Standards and Policies in accordance with Federal Transit Administration

More information

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St.

Signal System Timing and Phasing Program SAMPLE. Figure 1: General Location Map. Second St. I. Overview Consultant A was retained by the Ohio Department of Transportation to conduct traffic signal timing analyses on approximately one mile of roadway on between the Main Street and the Fourth Street

More information

I-95 Corridor Coalition

I-95 Corridor Coalition I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Report for New Hampshire (#1) I-89 and I-93 October 2016 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT VALIDATION

More information

Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS)

Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Freight Performance Measures Using Truck GPS Data and the Application of National Performance Measure Research Data Set (NPMRDS) Chen-Fu Liao Department of Civil, Environmental, and Geo- Engineering University

More information

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No

More information

STOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

STOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775) H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A STOREY C H U R C H I L L W H I T E P I N E CARSON CITY L Y O N DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N NEVADA

More information

2017 Apparatuses & Auxiliary Apparatuses CHICAGO FIRE DEPARTMENT

2017 Apparatuses & Auxiliary Apparatuses CHICAGO FIRE DEPARTMENT 2017 Apparatuses & Auxiliary Apparatuses CHICAGO FIRE DEPARTMENT Revised - 1/9/2017 Table of Contents Apparatus Location Address Page # Fire Engine 1 High Pressure Engine 1 Fire Truck 1 Aerial Tower 1

More information

Monthly Ridership Report

Monthly Ridership Report Monthly Ridership Report Prepared by: Chicago Transit Authority Planning and Development Planning Analytics 4/21/2008 Table of Contents How to read this report...i Monthly notes... ii Monthly Summary...1

More information

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS

Per Revised Concept Plan Residential Condo/Townhouse. Proposed Land Use per TIS January 2, 2018 Mr. Paul DeBotton Marple Associates, L.P. 1604 Walnut Street, 4 th Floor Philadelphia, PA 19103 RE: Langford Run Road Traffic Analysis Proposed Mid County Shopping Center Marple Township,

More information

I-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia

I-95 Corridor Coalition. I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia I-95 Corridor Coalition I-95 Corridor Coalition Vehicle Probe Project: Validation of INRIX Data Monthly Report Virginia February 2010 I-95 CORRIDOR COALITION VEHICLE PROBE PROJECT: VALIDATION OF INRIX

More information

Understanding the. Illinois Size & Weight Laws

Understanding the. Illinois Size & Weight Laws Understanding the Illinois Size & Weight Laws INTRODUCTION This booklet has been prepared by the Illinois Department of Transportation and the Illinois State Police to assist you, the driver, in understanding

More information

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study FROM MICHIGAN AVENUE TO INDUSTRY ROAD BREVARD COUNTY, FLORIDA Financial Project ID No: 433605-1-22-01 Federal Aid Project

More information

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition

Countdown to the Closure Extended 53-Hour Closure of I-405 Freeway Between U.S. 101 and I-10 Planned in Mid-July for Mulholland Bridge Demolition Countdown to the Closure Extended 3-Hour Closure of I-40 Freeway Between U.S. 0 and I-0 Planned in Mid-July for Mulholland Bridge Demolition Work Los Angeles, Calif. Plan Ahead, Avoid The Area, Or Stay

More information

Scalable Methods for Monitoring Limited Access Roadways Using Crowd-Sourced Probe Data

Scalable Methods for Monitoring Limited Access Roadways Using Crowd-Sourced Probe Data Purdue University Purdue e-pubs Lyles School of Civil Engineering Faculty Publications Lyles School of Civil Engineering 16 Scalable Methods for Monitoring Limited Access Roadways Using Crowd-Sourced Probe

More information

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC.

INTERSECTION ANALYSIS PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) FOR LENHART TRAFFIC CONSULTING, INC. INTERSECTION ANALYSIS FOR PARK AVENUE AND BRADDOCK ROAD (FROSTBURG, MD) Prepared for: City of Frostburg, Maryland & Allegany County Commissioners Prepared by: LENHART TRAFFIC CONSULTING, INC. TRAFFIC ENGINEERING

More information

The future of transportation and how we ll pay for it

The future of transportation and how we ll pay for it The future of transportation and how we ll pay for it A Day With Northwestern 40 th Anniversary Seminar Day Joseph L. Schofer Department of Civil & Environmental Engineering April 18, 2009 1 What a great

More information

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm

PUBLIC MEETING. Bear Creek Park Community Center. January 24, :30 pm to 7:30 pm PUBLIC MEETING Bear Creek Park Community Center January 24, 2017 5:30 pm to 7:30 pm PURPOSE OF THE MEETING This is an open House No formal presentation Introduce the project to the public Present existing

More information

1. Incident I-10 West Bound, MM 17.9, Overturned Gas Tanker, on Fire and Leaking Fuel

1. Incident I-10 West Bound, MM 17.9, Overturned Gas Tanker, on Fire and Leaking Fuel 1. Incident I-10 West Bound, MM 17.9, Overturned Gas Tanker, on Fire and Leaking Fuel 2. Incident I-110 South Bound, MM 4.1, overturned Greyhound Bus (full of passengers) multiple injuries, some critical

More information

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability

Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability (http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement

More information

Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes

Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes Alachua/Bradford TIM Meeting February 14, 2017 Meeting Minutes The list of attendees, agenda, and meeting handouts are attached to these meeting minutes. Introductions and TIM Updates provided by Dee Dee

More information

STOREY C A RSON DOUGLAS NEVADA MILES 50 KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

STOREY C A RSON DOUGLAS NEVADA MILES 50 KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775) H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A C H U R C H I L L OREY W H I T E P I N E L Y O N C A RSON C IT Y DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N

More information

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No.

Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions Technical Memo #2B: Traffic Forecasts and Operations Analysis SEH No. TECHNICAL MEMORANDUM TO: FROM: Molly McCartney MnDOT Project Manager Haifeng Xiao, PE Tom Sohrweide, PE, PTOE DATE: November 27, 2012 RE: Trunk Highway 13 Corridor Study Update Existing and No-Build Conditions

More information

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place

Table of Contents. Traffic Impact Analysis Capital One Building at Schilling Place Traffic Impact Analysis Capital One Building at Schilling Place Table of Contents Executive Summary... 1 1. Introduction... 4 2. Project Description... 4 3. Background Information... 4 4. Study Scope...

More information

NEWS RELEASE November 8, 2017

NEWS RELEASE November 8, 2017 NEWS RELEASE November 8, 2017 Contact: Marsha Roa Public Information Manager 909.839.7055 mroa@diamondbarca.gov GRAND AVENUE INTERCHANGE AT SR-57 (ORANGE) AND SR-60 (POMONA) MULTIPLE ROADWAY, RAMP AND

More information

Existing Breakdown Count L eq L 10 Autos Med Heavy Bus

Existing Breakdown Count L eq L 10 Autos Med Heavy Bus Appendix E Noise Saratoga Racetrack Traffic Noise Analysis SiteID 1 2 3 Location Corner of Salem Drive and Caroline Street Union Avenue between East Avenue and Ludlow Street Nelson Avenue between Wright

More information

Neighborhood Traffic Calming Options

Neighborhood Traffic Calming Options 2017 Neighborhood Traffic Calming Options F.Q. Story Neighborhood Carl Langford Traffic Engineering Supervisor City of Phoenix Street Transportation Department Traffic Services 1 Division Meeting Agenda

More information

Department of Civil Engineering The University of British Columbia. Nicolas Saunier

Department of Civil Engineering The University of British Columbia. Nicolas Saunier Department of Civil Engineering The University of British Columbia TRUCK SIGNAL PRIORITY Nicolas Saunier Wook Kang Why Truck Priority? Reduce Rd the Cost of Goods Transportation Reduce Red Light Running

More information

Project Working Group Meeting #5

Project Working Group Meeting #5 September 17, 2013 Project Working Group Meeting #5 1 September 17, 2013 www.i-80will.com Meeting Purpose Project update Discuss Range of Alternatives Discuss next steps 2 September 17, 2013 www.i-80will.com

More information

Landside Access Modernization Program (LAMP)

Landside Access Modernization Program (LAMP) Landside Access Modernization Program (LAMP) LAX Los Angeles International Airport is the 2 nd busiest airport in the United States and is the largest airport in California. Since the start of the economic

More information

Red Light Cameras in Austin. Austin Police Department Highway Enforcement Command

Red Light Cameras in Austin. Austin Police Department Highway Enforcement Command Red Light Cameras in Austin Austin Police Department Highway Enforcement Command video MLK WB/I35 EF SB Video 2014 Red Light Violations Ø 10 camera approaches (direction of cameras) in Austin throughout

More information

Top Traffic Intersections

Top Traffic Intersections Top Traffic Intersections in 2006 for the Omaha Metro Area includes separate rankings for: Bellevue Council Bluffs Sarpy County January 2008 A Council of Governments Metropolitan Area Planning Agency 2222

More information

Existing CTA Blue Line: From Clinton Station to Forest Park Station IDOT Expansion Alternative: Forest Park Station to Mannheim Road

Existing CTA Blue Line: From Clinton Station to Forest Park Station IDOT Expansion Alternative: Forest Park Station to Mannheim Road Board 1: Blue Line Study Area History of the CTA Blue Line / I-290 system Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. Project Study Area Existing

More information

SERVICE IMPROVEMENT GUIDE

SERVICE IMPROVEMENT GUIDE SOUTH COOK COUNTY / WILL COUNTY RESTRUCTURING INITIATIVE SERVICE IMPROVEMENT GUIDE Working to Improve Your Commute Change has arrived for residents of south and southwest Cook County, in the form of improved

More information

New Generation of Curve Warning Devices. Steven D. Hoernig, P.E. Traffic Operations Engineer MoDOT SE District

New Generation of Curve Warning Devices. Steven D. Hoernig, P.E. Traffic Operations Engineer MoDOT SE District New Generation of Curve Warning Devices Steven D. Hoernig, P.E. Traffic Operations Engineer MoDOT SE District History: Caution Series Signs: 1927 (44 Pages) History: Curve Warning Signs (Class: Slow Type

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Output NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2015 Simulation Output Technical

More information

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017

Bennett Pit. Traffic Impact Study. J&T Consulting, Inc. Weld County, Colorado. March 3, 2017 Bennett Pit Traffic Impact Study J&T Consulting, Inc. Weld County, Colorado March 3, 217 Prepared By: Sustainable Traffic Solutions, Inc. http://www.sustainabletrafficsolutions.com/ Joseph L. Henderson,

More information

ST. LOUIS DISTRICT MOBILITY

ST. LOUIS DISTRICT MOBILITY ST. LOUIS DISTRICT MOBILITY BI-MONTHLY REGIONAL MOBILITY REPORT JANUARY / FEBRUARY 2018 EDITION NO. 02 Table of Contents EXECUTIVE SUMMARY Provide Outstanding Customer Service & Deliver Transportation

More information

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results

Interstate Operations Study: Fargo-Moorhead Metropolitan Area Simulation Results NDSU Dept #2880 PO Box 6050 Fargo, ND 58108-6050 Tel 701-231-8058 Fax 701-231-6265 www.ugpti.org www.atacenter.org Interstate Operations Study: Fargo-Moorhead Metropolitan Area 2025 Simulation Results

More information

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009

HDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009 HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1 Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding

More information

Bus stop number listing

Bus stop number listing Bus stop number listing Route 1 58 23rd Harper EB 59 Harper 23rd SB 60 23rd Harper WB 100 Haskell 15th SB 101 Haskell La Salle SB 102 19th Haskell EB 103 19th Harper EB 104 Harper 21st SB 105 Harper Edgelea

More information

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/30/2013 MnDOT Contract No. 998 Work Order No.47 213 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 9/3/213 TASK #4:

More information

Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO

Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide ITE Midwest Annual Meeting June 30, 2015 Branson, MO Restricted Crossing U-Turn (RCUT) Intersection Concept, Case Studies, and Design Guide 2015 ITE Midwest Annual Meeting June 30, 2015 Branson, MO Wei Zhang, Ph.D., P.E. Program Manager, Intersection Safety

More information

US 67 WIDENING PROJECT

US 67 WIDENING PROJECT US 67 WIDENING PROJECT From Belt Line Rd. to I-20 History & Background The US 67 improvements from Belt Line Rd to I-20 were originally part of TxDOT s Southern Gateway project, studied as part of the

More information

FY Regional Surface Transportation Program (RSTP) Allocations *

FY Regional Surface Transportation Program (RSTP) Allocations * FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected

More information

NOISE ANALYSIS TECHNICAL REPORT. Route 58 Martin Luther King Freeway. Portsmouth Virginia

NOISE ANALYSIS TECHNICAL REPORT. Route 58 Martin Luther King Freeway. Portsmouth Virginia NOISE ANALYSIS TECHNICAL REPORT Route 58 Martin Luther King Freeway Portsmouth Virginia May 2008 Prepared for: Virginia Department of Transportation NOISE ANALYSIS TECHNICAL REPORT Route 58 Martin Luther

More information

/13/D /14/W /14/D /12/D /16/D /15/D /14/D /18/D /15/D /11/W SR 18

/13/D /14/W /14/D /12/D /16/D /15/D /14/D /18/D /15/D /11/W SR 18 Windfall Rd SI = 0.18 10-20-13/2/D 08-15-15/14/D 07-16-13/16/D 05-06-15/15/D 01-19-09/12/W 09-29-14/17/D 11-10-09/7/D 01-08-10/7/S 04-26-11/3/W 01-30-10/15/D 12-20-11/14/W 11-16-10/14/W 07-26-08/18/W 07-08-13/15/D

More information

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 EAST GRAND FORKS MONTHLY REPORT - JANUARY 2015 WIM Site Location WIM #31 is located on US 2 at mile post 8.0, southeast of

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: March 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD DESIGN BUILD CONTRACTS Sealed proposals for certain highway

More information

Portland-Milwaukie Light Rail Project Johnson Creek Boulevard

Portland-Milwaukie Light Rail Project Johnson Creek Boulevard Portland-Milwaukie Light Rail Project Johnson Creek Boulevard EXISTING AND FUTURE OPERATIONS AND POTENTIAL MITIGATIONS Presented by Alan Snook DKS Associates October 12, 2009 1 AGENDA Traffic 101 Study

More information

Design and Application of Mini- Roundabout in the U.S.

Design and Application of Mini- Roundabout in the U.S. Design and Application of Mini- Roundabout in the U.S. ITE MID-COLONIAL DISTRICT & MID-ATLANTIC SECTION 2014 ANNUAL MEETING Session 2B: Roundabouts Not Another YORK in the Road 10:45 to 12:00, May 19,

More information

V. DEVELOPMENT OF CONCEPTS

V. DEVELOPMENT OF CONCEPTS Martin Luther King, Jr. Drive Extension FINAL Feasibility Study Page 9 V. DEVELOPMENT OF CONCEPTS Throughout the study process several alternative alignments were developed and eliminated. Initial discussion

More information

Wichita TMC Support- Monthly Incident Report for December 2017

Wichita TMC Support- Monthly Incident Report for December 2017 Highway Wichita TMC Support- Monthly Incident Report for December 7 There were a total of 6 actively logged incidents during the month. The Traffic Management Center (TMC) is actively staffed 6am to 7pm,

More information

STOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

STOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775) H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A OREY C H U R C H I L L W H I T E P I N E CARSON CITY L Y O N DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N NEVADA

More information

Appendix B: Transportation B-8 Technical Report 1 Traffic

Appendix B: Transportation B-8 Technical Report 1 Traffic Appendix B: Transportation B-8 Technical Report 1 Traffic New York State Department of Transportation New York State Thruway Authority Metropolitan Transportation Authority/Metro-North Railroad Technical

More information

2018 Corridors of Commerce Final Scoring

2018 Corridors of Commerce Final Scoring 2018 Corridors of Commerce Final Scoring District Highway Description Cost Return on Investment Economic Impact Freight Efficiency Safety Improvem ents Regional Connectio ns Policy Objectives Community

More information

RED LIGHT SAFETY PROGRAM

RED LIGHT SAFETY PROGRAM 2015 CALENDAR YEAR ANNUAL REPORT TABLE OF CONTENTS INTRODUCTION & PURPOSE OF THIS REPORT I RED LIGHT CAMERA LOCATIONS PAGE 3 II ACCIDENT DATA PAGE 11 ACCIDENT GRAPHS PAGE 12 III RED LIGHT CAMERA EVENTS

More information

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 7/31/2013 TASK #3 PROCESS TRUCK GPS DATA AND DERIVE PERFORMANCE

More information

STOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775)

STOREY CARSON CITY DOUGLAS NEVADA MILES KILOMETERS NEVADA DEPARTMENT OF TRANSPORTATION LOCATION DIVISION CARTOGRAPHY (775) H U M B O L D T E L K O W A S H O E P E R S H I N G L A N D E R E U R E K A OREY C H U R C H I L L W H I T E P I N E CARSON CITY L Y O N DOUGLAS M I N E R A L N Y E E S M E R A L D A L I N C O L N NEVADA

More information

Central Park Drives Traffic Management Overview

Central Park Drives Traffic Management Overview Central Park Drives Traffic Management Overview Spring 2015 New York City Department of Transportation Existing Traffic Management From Labor Day thru Last Day of NYC Public School: 8-10 AM weekdays (Southbound)

More information

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009

HCM Unsignalized Intersection Capacity Analysis 6: Brian Street & LC 111 5/26/2009 6: Brian Street & LC 111 5/26/2009 Movement EBL EBR NBL NBT SBT SBR Volume (veh/h) 116 20 8 405 137 56 Sign Control Stop Free Free Grade 0% 0% 0% Peak Hour Factor 0.81 0.81 0.67 0.67 0.89 0.89 Hourly flow

More information

CROSSING RAIL PROJECT (P4) RAIL

CROSSING RAIL PROJECT (P4) RAIL GRAND CROSSING RAIL PROJECT (P4) Community Advisory Group October 10, 2012 1:30 pm Grand Crossing Park Field House 7655 S. Ingleside Avenue, Chicago GRAND CROSSING RAIL PROJECT (P4) Community Advisory

More information

Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro

Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro Jihong Cao, PE, Parsons Brinckerhoff Arnab Gupta, PE, Parsons Brinckerhoff Jay Yenerich, PE, Valley Metro Outline Background Predictive Priority Algorithm Simulation Analysis Measure of Effectives (MOE)

More information

I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation

I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation I-95 Corridor Coalition Vehicle Probe Project: HERE, INRIX and TOMTOM Data Validation Report for Georgia (#03) I-75 Prepared by: Masoud Hamedi, Sanaz Aliari, Sara Zahedian University of Maryland, College

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

NEW URBAN RETAIL 1100 ELLESMERE ROAD - SCARBOROUGH. NOW LEASING Brokers Protected

NEW URBAN RETAIL 1100 ELLESMERE ROAD - SCARBOROUGH. NOW LEASING Brokers Protected NEW URBAN RETAIL 1100 ELLESMERE ROAD - SCARBOROUGH NOW LEASING Brokers Protected Concept rendering, rental rates and site data subject to change without notice. E. & O.E January 2016 HIGHLIGHTS Excellent

More information

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study

County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study County State Aid Highway 30 (Diffley Road) and Dodd Road Intersection Study City of Eagan, Dakota County, Minnesota Date: March 2012 Project No. 14957.000 444 Cedar Street, Suite 1500 Saint Paul, MN 55101

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

DRAFT Travel Demand Methodology & Forecast

DRAFT Travel Demand Methodology & Forecast DRAFT Travel Demand Methodology & Forecast February 2016 Revision 4 Southwest LRT Project Technical Report This page intentionally blank. Contents 1. Introduction... 1 2. Methodology... 3 2.1. Model Overview...

More information

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND

MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND MILLERSVILLE PARK TRAFFIC IMPACT ANALYSIS ANNE ARUNDEL COUNTY, MARYLAND Prepared for: Department of Public Works Anne Arundel County Prepared by: URS Corporation 4 North Park Drive, Suite 3 Hunt Valley,

More information

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation

TRAFFIC IMPACT DATA. Dillons #98 On-Site Relocation TRAFFIC IMPACT DATA For Dillons #98 On-Site Relocation COMMERCIAL DEVELOPMENT 1740 Massachusetts Street Lawrence, KS Revised April 6, 2011 Prepared by: Pickering Firm, Inc. Introduction The project site

More information

Rehabilitation Techniques to Improve Long-term Performance of Highway-Railway At-Grade Crossings

Rehabilitation Techniques to Improve Long-term Performance of Highway-Railway At-Grade Crossings Rehabilitation Techniques to Improve Long-term Performance of Highway-Railway At-Grade Crossings Dr. Jerry G. Rose, P.E. Professor of Civil Engineering 261 Raymond Building University of Kentucky 859-257-4278

More information

Pace Transit Signal Priority (TSP) Initiative. Evaluation Report. Harvey Area TSP Demonstration Project. Prepared for. Prepared by.

Pace Transit Signal Priority (TSP) Initiative. Evaluation Report. Harvey Area TSP Demonstration Project. Prepared for. Prepared by. Pace Transit Signal Priority (TSP) Initiative Evaluation Report for the Harvey Area TSP Demonstration Project Prepared for Prepared by March, 2012 1 Table of Contents EVALUATION HIGHLIGHTS.....ii SUMMARY...

More information

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project

3.1 Introduction Transportation Elements and Study Area Meeting the Need for the Project Chapter 3 Transportation Environment and Consequences 3. Introduction This chapter summarizes the characteristics of the transportation system in the East Link Project vicinity and discusses potential

More information

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer

Mr. Kyle Zimmerman, PE, CFM, PTOE County Engineer Los Alamos County Engineering Division 1925 Trinity Drive, Suite B Los Alamos, NM 87544 Attention: County Engineer Dear Kyle: Re: NM 502 Transportation Corridor Study and Plan Peer Review Los Alamos, New

More information

DISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/03/19 to 03/09/19 Contact: Rick Estrada (209)

DISTRICT 10, STOCKTON WEEKLY ACTIVITY REPORT 03/03/19 to 03/09/19 Contact: Rick Estrada (209) Additional formation C4KC 4 CC 48.34 48.39 03/03/19 03/09/19 19:01 5:01 EB/WB Begin: Old River Bridge : Old River Bridge Reason: Pile Driving P4AA 4 SJ 8.7 12.6 03/04/19 03/08/19 8:01 15:01 WB Begin: Whiskey

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Southern Windsor County 2016 Traffic Count Program Summary April 2017 Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern

More information

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT

MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY BAY OPERATIONS AND MAINTENANCE FACILITY PROJECT TRAFFIC IMPACT ANALYSIS DRAFT REPORT MONTEREY, CALIFORNIA Prepared for Denise Duffy & Associates 947 Cass St. Suite 5 Monterey, CA 93940 April 16,

More information

Max Speed Location Offence Date Vehicle Make & Model

Max Speed Location Offence Date Vehicle Make & Model Max Speed Location Offence Date Vehicle Make & Model 102 M40 JUNCTION 16-15 01/04/2014 BMW 1 SERIES 102 M50 E/B JCT 3-2 04/04/2014 MERCEDES VITO VAN 110 A5 W/B 05/04/2014 YAMAHA R1 101 M6 TOLL, T6, 44/7

More information

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers Traffic Impact Study For Eastern Springs A Proposed Development in Manorville, NY April 2018 Haas Group Inc Transportation Planners and Engineers Table of Contents 1) Executive Summary... 2 2) Study Purpose...

More information

STAFF REPORT INFORMATION ONLY

STAFF REPORT INFORMATION ONLY Insert TTC logo here STAFF REPORT INFORMATION ONLY Presentation: Subway Closures - 2016 Year In Review and 2017 Forecast Date: January 18, 2017 To: From: TTC Board Chief Executive Officer Summary The purpose

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

1.0 INTRODUCTION Organization of this Report Study Area EXISTING CONDITIONS CTA Rail Forest Park Branch...

1.0 INTRODUCTION Organization of this Report Study Area EXISTING CONDITIONS CTA Rail Forest Park Branch... Table of Contents 1.0 INTRODUCTION... 4 1.1 Organization of this Report... 4 1.2 Study Area... 4 2.0 EXISTING CONDITIONS... 5 2.1 CTA Rail Forest Park Branch... 5 3.0 SERVICE PATTERNS... 6 3.1 Car Requirements...

More information

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project

Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis. Durham-Orange Light Rail Transit Project Appendix C-5: Proposed Refinements Rail Operations and Maintenance Facility (ROMF) Traffic Impact Analysis Durham-Orange Light Rail Transit Project July 25, 218 ROMF Transportation Impact Analysis Version

More information

Lacey Gateway Residential Phase 1

Lacey Gateway Residential Phase 1 Lacey Gateway Residential Phase Transportation Impact Study April 23, 203 Prepared for: Gateway 850 LLC 5 Lake Bellevue Drive Suite 02 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering West

More information

Sepulveda Pass Corridor Systems Planning Study Update

Sepulveda Pass Corridor Systems Planning Study Update Los Angeles County Metropolitan Transportation Authority Sepulveda Pass Corridor Systems Planning Study Update June 20, 2012 Measure R Transit Corridors One of 12 Measure R Transit Corridors approved by

More information

Dulles Corridor Air Rights Study Investigation

Dulles Corridor Air Rights Study Investigation Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17, 2013 1 On March 19, 2013 the Fairfax County Board of Supervisors asked FCDOT staff

More information

*019 WADSWORTH-FERNLEY 46 EAST FERNLEY 48 STOREY CHURCHILL DOUGLAS MINERAL. Fernley. Silver Springs LAHONTAN RESERVOIR SEE ENLARGEMENT

*019 WADSWORTH-FERNLEY 46 EAST FERNLEY 48 STOREY CHURCHILL DOUGLAS MINERAL. Fernley. Silver Springs LAHONTAN RESERVOIR SEE ENLARGEMENT *019 Fernley SEE ENLARGEMENT STOREY Silver Springs LAHONTAN RESERVOIR CHURCHILL Silver City Dayton L Y O N Wabuska 118 DOUGLAS Weed Heights Mason YERINGTON SEE ENLARGEMENT 339 823 Wellington 824 Smith

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real-time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Lot Collection Notice

Lot Collection Notice THE COLLECTION Lot Collection Notice PAYMENT INFORMATION Christie s accepts the following methods of payment: Cash, Money Orders and Traveler s Checks up to $7500.00 Wire Transfer Checks require 5 business

More information

IATF REPORT, FALL 2012 Attachment 6

IATF REPORT, FALL 2012 Attachment 6 IATF REPORT, FALL 2012 Attachment 6 6. Presentation, January 4, 2011 Meeting Infrastructure Accessibility Task Force (IATF) January 4, 2011 January Agenda Summary of Concept Plans 10 min Irving Park Overview

More information