1 HELIOS SYSTEMS HS 100 Operating manual HS80/HS100/HS120 Helios Systems S.L. Eckernförder Landstrasse Flensburg Tel.: +49-(0) Fax: +49-(0) Mail: All rights reserved. Full or partial reproduction is only permitted with the consent of Helios Systems. Creation date: 10. September 2010 Translation of original operating manual Version 1.0

2 Table of contents 1 Introduction Designated purpose Intended use Non-intended use Standards and directives About this operating manual Safety Safety instructions Basic safety instructions Obligations of the owner Obligations of the qualified electrician Obligations of the crane operator Obligations of the industrial truck operator Safety instructions on the central inverter Identification of the central inverter Technical description Delivery Included in the delivery Functional description Principle of the central inverter Exterior view Display Operating Manual HS80/HS100/HS120, Helios Systems

3 Table of contents Emergency stop switch AC main switch Interior view Optional heating elements Technical data Technical data of the HS Technical data of the HS Technical data of the HS Transport and the necessary conditions at the installation site Packaging Transport General instructions Crane transport Industrial truck support Securing the central inverter for transport Installation site prerequisites Grid Connections Foundation Distances Ventilation Ambient variables Operating Manual HS80/HS100/HS120, Helios Systems

4 Table of contents 5 Installation Mounting switch knob Q Connect the solar generator (DC) Connecting solar generator without string option Connecting the solar generator to power switch (Option with power switches, up to 5 solar generator strings) Connecting to the grid (AC) Suitable cable lugs Connection area power switch Q Connecting the auxiliary power supply Internal power supply External power supply (optional) Connect the monitoring system Commissioning Preparing for the commissioning process Commissioning Operating states Standby Start up MPP mode Shutdown Stop Operating Manual HS80/HS100/HS120, Helios Systems

5 Table of contents 8 De-commissioning Emergency stop switch AC main switch Switching off the control voltage Maintenance Executing maintenance tasks Taking measurements Disposal Disposal of the electrolytic capacitors Errors Appendix Spare Parts List Operating Manual HS80/HS100/HS120, Helios Systems

6 Introduction 1 Introduction 1.1 Designated purpose The central inverters from Helios Systems have been specially developed for photovoltaic systems. They convert the DC voltage that is given off by the solar generators into gridconformant alternating current and feed it into the power grid, three-phase. 1.2 Intended use The central inverters from Helios Systems should only be operated in photovoltaic systems. In photovoltaic systems central inverters are used exclusively for converting direct current into DC voltage. Intended use also includes reading the operating manual, as well as complying with all instructions contained in the operating manual, particularly the safety instructions. All maintenance tasks should be executed exclusively by qualified electricians who have been trained and authorized, at the specified intervals. Central inverters should only be set up within the ambient conditions cited in section Technical data" on page Non-intended use Any use other than the use specified under section Intended use" on page 5 is considered non-intended use. The following uses of the central inverter are considered non-intended use: in wind turbines, in uninterruptible power supplies (UPS), in powered vehicles, as a component of a frequency converter. Safe operation is not ensured if the central inverter is not used as intended. Do not make any changes to the central inverter. 1.4 Standards and directives The central inverter complies with the standards and directives cited in the Declaration of Conformity. Operating Manual HS80/HS100/HS120, Helios Systems 5

7 Introduction 1.5 About this operating manual This operating manual contains information on safety, function, transport, installation, commissioning, de-commissioning, maintenance, disposal and errors of the central inverters from Helios Systems. This operating manual has been prepared exclusively for qualified electricians who have been trained and authorized. In addition special qualifications are required for the following activities: Activity Transport Set-up Commissioning Instruction Error correction Maintenance/service Cleaning Repair De-commissioning Qualification/should only be executed by Authorized and trained specialists Qualified electricians who have been trained and authorized Qualified electricians who have been trained and authorized Employees of Helios Systems Qualified electricians who have been trained and authorized Qualified electricians who have been trained and authorized Qualified electricians who have been trained and authorized Employees of Helios Systems Qualified electricians who have been trained and authorized Operating Manual HS80/HS100/HS120, Helios Systems 6

8 Safety 2 Safety 2.1 Safety instructions Safety instructions must be strictly complied with! The safety instructions are classified according to the following risk levels: Identifies a serious risk situation. Serious, irreversible injuries or fatal injuries will occur if this safety instruction is not complied with. WARNING! Identifies a serious risk situation. Serious, irreversible injuries or fatal injuries can occur if this safety instruction is not complied with. CAUTION! Identifies a risk situation. Minor or moderate injuries can occur if this safety instruction is not complied with. NOTICE! Identifies risk of material damage. Material damage can occur if this safety instructions is not complied with. Operating Manual HS80/HS100/HS120, Helios Systems 7

9 Safety 2.2 Basic safety instructions Life-threatening danger due to high voltage. During operation the doors of the central inverter must remain closed! Life-threatening danger due to residual voltage. Strictly maintain a minimum wait time of 30 minutes after switching off and prior to opening the central inverter. Life-threatening danger due to high voltage. For all tasks in the vicinity of the central inverter: Maintain the safety distance to the central inverter that must be complied with in accordance with BGV A3 (see Table 4/BGV A3 "Safety distances for non-electrical work, depending on the rated voltage )! Comply with the sequence of protective measures: 1. Disconnect, 2. Safeguard from being switched on again, 3. Ensure that equipment is de-energized, 4. Ground and short circuit, 5. Cover or shield adjacent live components. Have the work area marked before starting work (responsible party according to BGI 758). Operating Manual HS80/HS100/HS120, Helios Systems 8

10 Safety Life-threatening danger due to high voltage. Ensure that only qualified electricians who have been trained and authorized work on the central inverter. In addition special qualifications are required for some activities (see About this operating manual" on page 6). Prior to starting all tasks on the central inverter: Ensure that the central inverter is disconnected from the grid. Ensure that the intermediate circuit of the central inverter is discharged. Safeguard the central inverter from switching on again spontaneously. Prior to performing tasks on the central inverter use a suitable tool to ensure that residual voltage is not present. Use suitable tools with appropriate markings and PPE for working on live parts (VDE 0680/VDE 0682). Life-threatening danger due to a lack of help. If there is an accident a second person must provide help. Always work with a second person near you! NOTICE! Warning - damage to the central inverter. The control cabinet door can only be opened when the AC main switch has manually been placed in the OFF position. NOTICE! Warning - damage to the central inverter. Improper repair work can cause damage to the central inverter. All repair tasks should be performed by employees of Helios Systems. Operating Manual HS80/HS100/HS120, Helios Systems 9

11 Safety Life-threatening danger due to failure to comply with the safety instructions. Comply with the information and safety instructions affixed to the device and in this operating manual. Ensure that the operating manual is kept on hand in the vicinity of the central inverter. Cut wounds due to hand tools. WARNING! Only use suitable tools to cut and strip. Only use knives with a covered handle and cable measurement handles with a circular protrusion to prevent fingers from sliding in the direction of the blade. Wear protective gloves when using knives with a fixed blade. Do not keep a knife with open blade in work clothes or in the tool belt. Danger of falling and injury when working on ladders. Check whether the tasks that must be executed can be safely executed from ladders. If this is not the case use work platforms or scaffolds. Select a suitable ladder and use it as intended (e.g. do not use a step ladder as an extension ladder). Ensure that the set-up site is safe (capable of bearing a load, level, and that the ladder cannot slip). Wear safety footwear. Operating Manual HS80/HS100/HS120, Helios Systems 10

12 Safety WARNING! Warning - harmful to health. The electrolytic capacitors contain ethylene glycol that is considered to be an irritant and harmful to health. Wear protective goggles. Wear suitable protective clothing. If there is contact seek medical attention immediately. If there is eye contact rinse eyes with water for at least 10 minutes. If swallowed drink plenty of water. Only have the person affected vomit if the person affected is fully conscious. Immediately taken off contaminated clothing and remove it safely. If there is skin contact wash off immediately with plenty of water. Life-threatening danger due to flammable or explosive gasses. Ensure that the ambient air is free of flammable or explosive gasses. Life-threatening danger due to corrosive substances. Ensure that the ambient air is free of corrosive substances. Danger of injury due to inadequate protective clothing. Wear safety footwear for all tasks performed on the central inverter. Operating Manual HS80/HS100/HS120, Helios Systems 11

13 Safety 2.3 Obligations of the owner Life-threatening danger due to high voltage. Ensure that only qualified electricians who have been trained and authorized work on the central inverter. In addition special qualifications are required for some activities (see About this operating manual" on page 6). For tasks performed on the central inverter it must remain in a de-energized state to the extent possible for the entire duration of the tasks. This is achieved via the following five safety rules: 1. Disconnect - provide suitable devices for activating the switch elements. 2. Safeguard against restart - make suitable devices available to safeguard against restart. 3. Ensure de-energized status - provide suitable voltage detectors (to 1000 V rated voltage, two-pole). 4. Ground and short circuit. 5. Cover or shield adjacent live parts - provide suitable covering material appropriate for the activity that will be executed. The release for work should only be given after the person responsible for the work executes and checks the five safety rules. Ensure that the central inverter is operated in accordance with the applicable statutory regulations and in accordance with the safety instructions on the device and in this operating manual, all safety instructions cited in this manual and affixed to the central inverter are complied with, understood, and followed, all safety devices are always in faultless and functional operating status, (e.g. emergency stop switch), the prescribed intervals or intervals specified in the operating manual for maintenance tasks are complied with, maintenance tasks are executed only by qualified electricians who have been trained and authorized, repair tasks are only executed by employees of Helios Systems. Operating Manual HS80/HS100/HS120, Helios Systems 12

14 Safety 2.4 Obligations of the qualified electrician Life-threatening danger due to residual voltage. The central inverter should only be installed, maintained, commissioned, and de-commissioned by qualified electricians who have been trained and authorized. Ensure that a second instructed person, who can help in an emergency, is always present for all tasks performed on electrical equipment. If there is an accident the second person must switch off the power supply and provide help. Strictly maintain a minimum wait time of 30 minutes after switching off and prior to opening the central inverter. Prior to performing tasks on the central inverter use a suitable tool to ensure that residual voltage is not present. On the display, read out the DC voltage that is applied. Never open the central inverter during operation. Comply with the operating instructions and safety instructions in this operating manual. Comply with the safety instructions affixed on the central inverter. Only operate the central inverter in TN networks. 2.5 Obligations of the crane operator Danger of injury during crane operation. Defects that occur during crane operation can result in severe or fatal injuries. The crane should only be operated by authorized specialists who have been trained in the area of crane operation. Ensure that the guidelines specified in BGV D6: Cranes, are satisfied. The angle between the ropes or chains of the crane and the top side of the central inverter must be at least 60 o or greater (see "Crane transport" on page 30). Operating Manual HS80/HS100/HS120, Helios Systems 13

15 Safety 2.6 Obligations of the industrial truck operator Danger of injury during transport. Defects that occur during transport can cause severe or fatal injuries. The industrial truck should only be operated by authorized specialists who have been trained to handle industrial trucks. Ensure that the guidelines specified in BGV D27: Industrial trucks, are satisfied. Operating Manual HS80/HS100/HS120, Helios Systems 14

16 Safety 2.7 Safety instructions on the central inverter CAUTION! Device damage due to loose power line. ALUMINUM CONDUCTORS Recommendation! Comply with the following when using aluminum conductors: 1. Remove the oxide layer of the conductor (wire) with a wire brush. 2. Grease the aluminum conductor (wire) with acid-free grease (e.g. Vaseline or terminal grease). 3. The conductor should be checked after approx. 4 weeks with a torque wrench (Nm), thereafter it should be checked yearly. 4. Only one conductor (wire) should be connected in one terminal. Life-threatening danger due to high voltage. You must wait at least 30 minutes until the intermediate circuit has discharged. Life-threatening danger due to high voltage. Ensure that only qualified electricians who have been trained and authorized work on the central inverter. Operating Manual HS80/HS100/HS120, Helios Systems 15

17 Safety 2.8 Identification of the central inverter The type plates are on the inside of the door, on the outside of the door, and on the mounting plate. Operating Manual HS80/HS100/HS120, Helios Systems 16

18 Technical description 3 Technical description 3.1 Delivery Check the delivery for completeness. If the delivery is not complete, please contact Helios Systems. Check the central inverter for transport damage. If you determine that there is transport damage, immediately contact the freight forwarder Included in the delivery Central inverter Control cabinet key Operating manual Test log - final test Test protocol - insulation monitor 3.2 Functional description The central inverter from Helios Systems has been specially developed for use in photovoltaic systems, and it has been equipped with state-of-the-art, efficiency-optimized technology. The central inverter converts the DC voltage that is given off by the solar generators into gridconformant alternating current and feeds it into the public power grid, three-phase. The central inverter has an integrated transformer and is intended for connection to the TN network. Operating Manual HS80/HS100/HS120, Helios Systems 17

19 Technical description 3.3 Principle of the central inverter A8 9 A1 8 A Fig. 3-1 Principle circuit diagram of the central inverter 1 EMC filter (interference suppression filter) 6 Power supply 2 Intermediate circuit 7 A3 - communication PCB 3 IGBT bridge 8 A1 - control card V - grid 9 A8 - insulation monitor V from external The HS80/HS100/HS120 is a three-phase central inverter for grid-coupled photovoltaic systems. The solar generator is connected on the left side on the optional DC fuses or on the power switches. Via the DC switch disconnector Q1 and an interference suppression filter (1) the DC voltage gets to the intermediate circuit (2). The intermediate circuit (2) supplies the IGBT bridge (3). Downstream of the IGBT bridge (3) there is the transformer T4 for galvanic separation, an interference suppression filter (1) and the grid contactor K1. In series there is the power switch Q2, which is manually operated from the front side of the central inverter. The station service supply for the controller can be executed internally (bridges set on terminal block X1) or can be supplied from outside (bridges on terminal block X1removed) (5) (see "Connecting the auxiliary power supply" on page 45). Operating Manual HS80/HS100/HS120, Helios Systems 18

20 Technical description 3.4 Exterior view HELIOS SYSTEMS HS Fig. 3-2 Exterior view 1 Display 2 Emergency stop switch 3 AC main switch Operating Manual HS80/HS100/HS120, Helios Systems 19

21 Technical description Display The display is used to show status data, to reset error messages, and to switch the central inverter on and off. The device is operated via the display Emergency stop switch Life-threatening danger due to residual voltage. Strictly maintain a minimum wait time of 30 minutes after switching off, and prior to opening the central inverter! Prior to performing tasks on the central inverter use a suitable tool to ensure that residual voltage is not present. In an emergency the central inverter can be immediately disconnected from the grid (AC) and from the solar generator (DC) (see "Emergency stop switch" on page 53) AC main switch The central inverter is disconnected from the grid by activating the AC main switch (Position off ) or connected to the grid (position on ). If the central inverter is switched off automatically due to excess AC voltage the position of the AC main switch changes to tripped. In this case the central inverter is disconnected from the grid. To be again switched on the central inverter must first be taken out of service (see "Decommissioning" on page 53) and placed in service again (see "Commissioning" on page 48). Operating Manual HS80/HS100/HS120, Helios Systems 20

22 Technical description 3.5 Interior view Fig. 3-3 Interior view Operating Manual HS80/HS100/HS120, Helios Systems 21

23 Technical description 1 Communication board 9 DC switch disconnector Q1 2 Intermediate circuit 10 DC power switch ( string option ) 3 IGBT bridge 11 Insulation monitor 4 Measuring transducer AC current 12 Overvoltage protector DC 5 Contactor K1 13 DC EMC filter 6 Overvoltage protector AC 14 Measuring transducer DC current 7 Terminal strip X1/X V power unit 8 AC power switch Q2 16 Control card Optional heating elements NOTICE! Warning - damage to the central inverter. The values of the thermostats and of the hygrostats should not be adjusted. Optionally two heating elements can be installed on the inside of the door. In addition there are two thermostats and one hygrostat on the inside of the door. The values are set in the factory: -BT1-5 C, -BT2 5 C, -BT3 > 90 % relative humidity. The heating elements switch themselves on if the temperature drops below 5 C or if the humidity increases above 90 %. If the temperature drops below -5 C the central inverter switches off. The heating elements remain switched on. If the temperature increases above -5 C the central inverter will be switched on again automatically. Operating Manual HS80/HS100/HS120, Helios Systems 22

24 Technical description 3.6 Technical data Technical data of the HS80 General data Description Value/unit More detailed description Dimensions 1000 mm x 1900 mm x 850 mm W x D x H Weight < Approx kg Maximum set-up altitude 2000 m above sea level without power loss Humidity < 95 % Non-condensing Ambient temperature 0 o C to 50 o C other on request Protection class IP20 Type of cooling Forced convection cooling 1500 m 3 /h Min. air quality Class 3S2 in accordance with EN Cabinet color RAL7035 other on request EMC satisfies EN , EN Low-voltage directive satisfies EN Test Grid monitor CE conformity TÜV in accordance with VDEW guidelines satisfied Electrical data Description Value/unit More detailed description Rated output power 80 kw at +/-10 % of the rated grid voltage Rated output power 88 kw at rated voltage Rated grid voltage 400 V, 3~, 50 Hz, clockwise TN network, other forms of networks, voltages, and frequencies on request Maximum grid short-circuit current Maximum output current 36 ka other on request 128 A Power factor (cos?) > 0,99 from 20 % rated power Distortion factor (THD) < 3 % at rated power Rated PV power 84 kw within +/-10 % rated grid voltage Operating Manual HS80/HS100/HS120, Helios Systems 23

25 Technical description Electrical data Description Value/unit More detailed description Max. PV power 92 kw at rated voltage Max. PV power 205 A Maximum PV off-load voltage 900 V= MPP range 450 V= to 820 V= at rated PV power Regulating procedure MPP tracking Efficiency (94,6/96,9/96,9/96,7/96,3) % at (10/30/50/75/100) % power EC efficiency 96,5 % incl. transformer losses, excl. station service EC efficiency 96,3 % incl. transformer losses and station service Infeed from Loss in standby/at night Maximum station service 450 W < 30 W < 250 W Equipment/components Buffer amplifier Three-phase current power switch (AC power switch Q2) Emergency stop switch Display Ground fault monitor Overvoltage protector Load disconnect switch with motor drive Power switch with activation from outside present Touch screen with numeric and graphic output Insulation monitor with adjustable limit value monitored overvoltage protector - DC current side three-phase current side Options - DC current fuses or DC current power switches to protect up to 5 inputs - Measurement and monitoring of the individual input currents - Cabinet heater Operating Manual HS80/HS100/HS120, Helios Systems 24

26 Technical description Technical data of the HS100 General data Description Value/unit More detailed description Dimensions 1000 mm x 1900 mm x 850 mm W x D x H Weight < Approx kg Maximum set-up altitude 2000 m above sea level without power loss Humidity < 95 % Non-condensing Ambient temperature 0 o C to 50 o C other on request Protection class IP20 Type of cooling Forced convection cooling 1500 m 3 /h Min. air quality Class 3S2 in accordance with EN Cabinet color RAL7035 other on request EMC satisfies EN , EN Low-voltage directive satisfies EN Test Grid monitor CE conformity TÜV in accordance with VDEW guidelines satisfied Electrical data Description Value/unit More detailed description Rated output power 100 kw at +/-10 % of the rated grid voltage Rated output power 110 kw at rated voltage Rated grid voltage 400 V, 3~, 50 Hz, clockwise TN network, other forms of networks, voltages, and frequencies on request Maximum grid short-circuit current Maximum output current 36 ka other on request 160 A Power factor (cos?) > 0,99 from 20 % rated power Distortion factor (THD) < 3 % at rated power Rated PV power 104 kw Within +/-10 % rated grid voltage Max. PV power 115 kw at rated voltage Max. PV power 250 A Operating Manual HS80/HS100/HS120, Helios Systems 25

27 Technical description Electrical data Description Value/unit More detailed description Maximum PV off-load voltage 900 V= MPP range 450 V= to 820 V= at rated PV power Regulating procedure MPP tracking Efficiency (93,9/96,9/97,1/97,0 /96,7) % at (10/30/50/75/100) % power EC efficiency 96,5 % incl. transformer losses, excl. station service EC efficiency 96,3 % incl. transformer losses and station service Infeed from Loss in standby/at night Maximum station service 560 W < 30 W < 250 W Equipment/components Buffer amplifier Three-phase current power switch (AC power switch Q2) Emergency stop switch Display Ground fault monitor Overvoltage protector Load disconnect switch with motor drive Power switch with activation from outside present Touch screen with numeric and graphic output Insulation monitor with adjustable limit value monitored overvoltage protector - DC current side three-phase current side Options - DC current fuses or DC current power switches to protect up to 5 inputs - Measurement and monitoring of the individual input currents - Cabinet heater Operating Manual HS80/HS100/HS120, Helios Systems 26

28 Technical description Technical data of the HS120 General data Description Value/unit More detailed description Dimensions 1000 mm x 1900 mm x 850 mm W x D x H Weight < Approx kg Maximum set-up altitude 2000 m above sea level without power loss Humidity < 95 % Non-condensing Ambient temperature 0 o C to 50 o C other on request Protection class IP20 Type of cooling Forced convection cooling 1500 m 3 /h Min. air quality Class 3S2 in accordance with EN Cabinet color RAL7035 other on request EMC satisfies EN , EN Low-voltage directive satisfies EN Test Grid monitor CE conformity TÜV in accordance with VDEW guidelines satisfied Electrical data Description Value/unit More detailed description Rated output power 120 kw at +/-10 % of the rated grid voltage Rated output power 132 kw at rated voltage Rated grid voltage 400 V, 3~, 50 Hz, clockwise TN network, other forms of networks, voltages, and frequencies on request Maximum grid short-circuit current Maximum output current 36 ka other on request 190 A Power factor (cos?) > 0,99 from 20 % rated power Distortion factor (THD) < 3 % at rated power Rated PV power 125 kw Within +/-10 % rated grid voltage Max. PV power 137 kw at rated voltage Max. PV power 260 A Operating Manual HS80/HS100/HS120, Helios Systems 27

29 Technical description Electrical data Description Value/unit More detailed description Maximum PV off-load voltage 900 V= MPP range 450 V= to 820 V= at rated PV power Regulating procedure MPP tracking Efficiency (94,0/97,0/97,1/96,9 /96,5) % at (10/30/50/75/100) % power EC efficiency 96,5 % incl. transformer losses, excl. station service EC efficiency 96,3 % incl. transformer losses and station service Infeed from Loss in standby/at night Maximum station service 560 W < 30 W < 250 W Equipment/components Buffer amplifier Three-phase current power switch (AC power switch Q2) Emergency stop switch Display Ground fault monitor Overvoltage protector Load disconnect switch with motor drive Power switch with activation from outside present Touch screen with numeric and graphic output Insulation monitor with adjustable limit value monitored overvoltage protector - DC current side three-phase current side Options - DC current fuses or DC current power switches to protect up to 5 inputs - Measurement and monitoring of the individual input currents - Cabinet heater Operating Manual HS80/HS100/HS120, Helios Systems 28

30 Transport and the necessary conditions at the installation site 4 Transport and the necessary conditions at the installation site 4.1 Packaging Unless otherwise agreed, the packaging satisfies the HPE packaging guidelines that have been specified by the German Associations for Wooden Materials, Pallets, Export Packaging (Bundesverband Holzmittel, Paletten, Exportverpackung e.v). 4.2 Transport Life-threatening danger due to the central inverter tipping. Only transport the central inverter with cranes and industrial trucks that have sufficient load-bearing capacity. The central inverter should only be transported by authorized personnel who have been trained to operate industrial trucks. NOTICE! Improper transport can damage the device. To avoid damage, only transport the central inverter in a vertical position General instructions Check the delivery immediately after it arrives for completeness and possible transport damage. If the delivery is incomplete contact Helios Systems. Use suitable transport equipment appropriate for the local conditions. Comply with the information in sections Obligations of the crane operator" on page 13 and Obligations of the industrial truck operator" on page 14 in this regard. Only remove the transport safeguards when the central inverter is standing vertically at the intended installation site. Operating Manual HS80/HS100/HS120, Helios Systems 29

31 Transport and the necessary conditions at the installation site Crane transport Life-threatening danger due to falling loads. Falling loads can cause fatal injuries. Only use the permissible lifting devices to lift loads. Ensure that no one is in the danger zone of the suspended load. Wear appropriate protective work clothing. Life-threatening danger if the wrong lifting devices are used. Use of the wrong lifting devices can cause severe or fatal injuries. Only use the permissible lifting devices to lift the central inverter (weight of the central inverter: See "Technical data" on page 23). Fasten the crane tackle on the transport eyes so that it cannot slip. Lashing eyes as specified in DIN 580 are provided of the roof of the control cabinet, for loading the central inverter. The following permissible total loads apply for systematic load: At 60 cable angle N At 90 cable angle N Fig. 4-1 Crane transport Operating Manual HS80/HS100/HS120, Helios Systems 30

32 Transport and the necessary conditions at the installation site Industrial truck support NOTICE! Warning - damage due to use of a lifting device (e.g. fork lift). Due to the lifting device components and connections on the underside of the floor of the central inverter can be damaged. When lifting the central inverter ensure that components and connections on the floor of the unit are not damaged. When lifting the central inverter ensure that the stress or load is only applied in the area of the pedestal feet. Fig. 4-2 Fork lift transport Operating Manual HS80/HS100/HS120, Helios Systems 31

33 Transport and the necessary conditions at the installation site Securing the central inverter for transport NOTICE! Warning - do not use improper transport safeguards. Improper transport safeguards can damage the central inverter. For transport on a truck or trailer the central inverter must be properly lashed. The truck or trailer must have lashing eyes. Trained, specialized personnel that meet the requirements specified in regulations VDI 2700 and VDI 2703 must load the central inverter. The correct dimensioning and implementation of load securing measures must be specified on a case-by-case basis. To lash the central inverter, fasten the ratchet strap on the lashing eyes and on the lashing eyes of the landing surface. Tighten the ratchet strap with the tensioning device. 4.3 Installation site prerequisites Grid NOTICE! Ensure that the rotary field is correct. The rotary field must be clockwise. If this is not the case the central inverter will not establish a connection to the public grid. The standard version of the central inverter is configured for the TN network 400 V, 3~, 50 Hz, clockwise. Central inverters for other grid forms, voltages and frequencies on request. Operating Manual HS80/HS100/HS120, Helios Systems 32

34 Transport and the necessary conditions at the installation site Connections The connection cables must be present, prepared, and secured: Solar generator connection, Grid connection, Auxiliary voltage connection, Communication connection. Life-threatening danger due to high voltage. Protect cables and lines against mechanical influences. Route the cables and lines that go to the central inverter through a highly flexible plastic protective hose. Offload the plastic protective hose on both ends with catching clamps to relieve the hose from pull and pressure. Fit a marked pull-in aid (not metal) on each plastic protective hose. Ensure that the cables and lines are introduced into the central inverter from below. In this regard at least protection class IP54 must be ensured. The pull and pressure relief at the introduction point must be executed via a C-profile rail in accordance with EN Life-threatening danger due to defective lines and cable. Comply with the specified bend radii. Offload the plastic protective hose on both ends to relieve the hose from pull and pressure. Only route one cable through each cable gland. Ensure that the diameter of the cables and lines match the diameters of the cable glands and threaded unions. Operating Manual HS80/HS100/HS120, Helios Systems 33

35 Transport and the necessary conditions at the installation site 4.4 Foundation Ensure that the foundation can bear the weight of the central inverter and of the transport device (See "Technical data" on page 23). The foundation must be level, stable, slip-resistant, and fire resistant. 4.5 Distances The central inverter must be easily accessible for operation and maintenance. In this regard the following distances must be maintained: Front: Minimum 500 mm with the door open Top: Minimum 200 mm The central inverter does not require a defined distance or clearance to sides and to the rear. Fig. 4-3 Distance upward (left)/distance to the front with the door open (right) Operating Manual HS80/HS100/HS120, Helios Systems 34

36 Transport and the necessary conditions at the installation site 4.6 Ventilation Life-threatening danger due to flammable or explosive gasses. Ensure that the ambient air is free of flammable or explosive gasses. Life-threatening danger due to corrosive substances. Ensure that the ambient air is free of corrosive substances. NOTICE! Warning - damage or overheating of the central inverter. Insufficient cooling air for the central inverter can cause damage or overheating. Ensure that sufficient cooling air is available at the installation site. The central inverter must be set up on a foundation that ensures that sufficient air can be suctioned in. The intake air is distributed in the interior of the central inverter through two radial fans that are attached below the cover. The air is suctioned in from below and blown out on the top side of the central inverter. The air volume that is displaced is 1500 m 3 /h. The central inverter generates a maximum of 5 kw power loss that must be dissipated via the ventilation. 4.7 Ambient variables The protection class must meet the specifications in section Technical data" on page 23. Operating Manual HS80/HS100/HS120, Helios Systems 35

37 Installation 5 Installation Life-threatening danger due to high voltage. Only only qualified electricians who have been trained and authorized are allowed to install the central inverter. Comply with the safety instructions affixed to the central inverter and in this operating manual. Cover the live copper rails with a Plexiglas cover. Check the cable feeds for damage. Prior to performing tasks on the central inverter use a suitable tool to ensure that the central inverter is switched off and de-energized. NOTICE! Material damage due to the wrong torque. If the cable lugs are tightened too tightly damage can occur. If the cable lugs are tightened too loosely the cables and lines can loosen. NOTICE! Material damage due to improper connection. Ensure that the oxide layer of the aluminum conductor has been removed with a wire brush, the aluminum conductor (wire) has been greased with acid-free grease (e.g. Vaseline or terminal grease), the connection of the aluminum conductor is checked after approx. 4 weeks, with a torque wrench, thereafter it must be checked yearly, only one aluminum conductor is connected per terminal. Operating Manual HS80/HS100/HS120, Helios Systems 36

38 Installation 5.1 Mounting switch knob Q2 NOTICE! Material damage due to an incorrect AC main switch position. Ensure that prior to connecting the control cabinet door the control element and the AC main switch in the interior of the control cabinet are in the OFF position. The control element and the actuating rod for the AC main switch Q2 are delivered in dismounted status. You will find the parts of the AC main switch Q2 in the interior of the central inverter on the sliding floor plate. Fig. 5-1 Dismounted AC main switch Q2 1. Unscrew the fastening screws for the actuating rod on the AC main switch Q2. 2. Insert the actuating rod. In this process pay attention to the alignment of the actuating rod. Fig. 5-2 Insert the actuating rod in the AC main switch Q2 Operating Manual HS80/HS100/HS120, Helios Systems 37

39 Installation 3. Fasten the actuating rod in the AC main switch Q2 with the screws. Fig. 5-3 Fasten the actuating rod on the AC main switch Q2. 4. Remove the screws from the control element. 5. Insert the control element into the intended opening in the control cabinet door from the outside. In this process pay attention to the alignment of the control element. Fig. 5-4 Insert the control element of the AC master switch Q2 6. Screw fasten the control element from the inside with the previously removed screws. Fig. 5-5 Fasten the control element onto the control cabinet door Operating Manual HS80/HS100/HS120, Helios Systems 38

40 Installation 5.2 Connect the solar generator (DC) There are two different ways to connect the solar generator (DC). One connection type is without string option (See "Connecting solar generator without string option" on page 39). The second connection type is executed with power switches and offers the possibility of connecting up to 5 solar generators (See "Connecting the solar generator to power switch (Option with power switches, up to 5 solar generator strings)" on page 40) Connecting solar generator without string option Life-threatening danger due to high voltage. The installation should be executed only by qualified electricians who have been trained and authorized. 1. Open the front door. 2. Unscrew the threaded unions of the Plexiglas cover. 3. Take off the Plexiglas cover. 4. Remove the sliding floor plate. 5. Route the cable to the connection area from below. 6. Check the cable feeds for damage. Fig. 5-6 Copper rails with (left) and without (right) Plexiglas cover Operating Manual HS80/HS100/HS120, Helios Systems 39

41 Installation 7. The cable lugs must be configured for fastening with M8 screws. Route the cable lugs to the correct copper rail. Ensure correct polarity. 8. Fasten the cable lugs (tightening torque: 20 Nm). 9. Screw on the Plexiglas cover. 10. Fix the cables in place on the cable catch strip with aluminum cable clamps. 11. If no other cables will be connected reinstall the sliding door Connecting the solar generator to power switch (Option with power switches, up to 5 solar generator strings) Life-threatening danger due to high voltage. The installation should be executed only by qualified electricians who have been trained and authorized. 1. Open the front door. 2. Unscrew the threaded unions of the lower Plexiglas cover. 3. Take off the Plexiglas cover. 4. Remove the sliding floor plate. 5. Route the cable to the connection area from below. 6. Check the cable feeds for damage. Fig. 5-7 Connect the solar generators to the power switches Operating Manual HS80/HS100/HS120, Helios Systems 40

42 Installation 7. Route the cable that is fitted with wire end sleeves, coming from below to the appropriate power switches. The polarity is marked on the mounting plate under the power switches. The sequence is as follows, from left to right: String 1 - plus String 1 - minus String 2 - plus String 2 - minus String 3 - plus String 3 - minus String 4 - plus String 4 - minus String 5 - plus String 5 - minus The short red-marked bridge cable in the middle between the lower plus and minus connection terminal of a string are connected in the factory. 8. Fasten the cable lugs (tightening torque: 3-4 Nm). The maximum cable cross section is 50 mm Screw on the lower Plexiglas cover. 10. Fix the cables in place on the cable catch strip with aluminum cable clamps. 11. If no other cables will be connected reinstall the sliding door. Operating Manual HS80/HS100/HS120, Helios Systems 41

43 Installation 5.3 Connecting to the grid (AC) NOTICE! Ensure that the rotary field is correct. The rotary field must be clockwise. If this is not the case the central inverter will not establish a connection to the public grid. 1. Open the front door. 2. Pull off the contact protection via the cable inlets of the AC power switch Q2. 3. Remove the sliding floor plate. 4. Route the cable to the connection area from below. 5. Check the cable feeds of the grid connection for damage. Fig. 5-8 AC power switch Q2 6. The cable lugs must be configured for fastening with M8 screws. Route the cable lugs to the AC power switch inputs. The color sequence is as follows, from left to right (tightening torque: 8 Nm): - L1 left/brown - L2 center/black - L3 right/gray Ensure that the underlying measurement lines are correctly connected for the grid power supply. Operating Manual HS80/HS100/HS120, Helios Systems 42

44 Installation Life-threatening danger due to defective and inadequate grounding. In the central inverter there are interference suppression filters with increased work currents to ground. Ensure that the PE conductor has at least half the cross section of the phase conductor. 7. Connect the PE conductor. The cable shoe must be configured for M8 screws (tightening torque: 23 Nm). 8. Fit the N conductor with a wire end sleeve and connect the N-conductor (tightening torque: 3.2 Nm Nm). The maximum N-conductor cross section is 35 mm 2. The N-conductor should only be connected for the internal power supply (see Internal power supply" on page 45). Fig. 5-9 PE (green-yellow) and N-conductor (blue) 9. Slide the contact protection back on. 10. Fix the cables in place on the cable catch strip with aluminum cable clamps. 11. If no other cables will be connected reinstall the sliding door. Operating Manual HS80/HS100/HS120, Helios Systems 43

45 Installation Suitable cable lugs Suitable cable lugs for connecting the grid (AC) are available from the company FeCon or from the company Elpress. FeCon item number Elpress catalog number Suitable for cable cross section KRFS mm KRFS mm KRFS mm KRFS mm KRFS mm Connection area power switch Q2 The cable lugs for connecting the grid should be a maximum of 24 mm wide, so that they fit in the connection area of the power switch Q2. max. 24 mm max. 9,5 mm Fig Power switch Q2 Operating Manual HS80/HS100/HS120, Helios Systems 44

46 Installation 5.4 Connecting the auxiliary power supply The central inverter is delivered with an internal power supply. Optionally an external power supply is possible Internal power supply 1. Open the front door. 2. Connect the N-conductor to the blue screw-type terminal next to the AC power switch Q2. 3. Switch the miniature circuit breaker F32 (1) to the on position. 1 Fig Miniature circuit breaker F32 Operating Manual HS80/HS100/HS120, Helios Systems 45

47 Installation External power supply (optional) 1. Open the front door. 2. Switch the miniature circuit breaker F32 to the off position. 3. Remove the two bridges from X1.1 to X1.3 and from X1.2 to X1.5 Use a suitable flat-head screwdriver with a blade width of 3.5 mm. Fig Remove the bridges 4. Fit each cable with a wire end sleeve (cross section: 0.75 mm mm 2 ) and connect the cables as follows: L-conductor to X1-3, N-conductor to X1-5 (blue), PE-conductor to X1-8 (green-yellow). Fig External power supply Operating Manual HS80/HS100/HS120, Helios Systems 46

48 Installation 5.5 Connect the monitoring system Data communication is executed via Ethernet. Fig Connect the Ethernet cable: NOTICE! Warning - damage to the central inverter. Ensure that lightning protection is present if the Ethernet cable of the central inverter exits the building. 1. Connect the network cable (1) to the communication PCB. 2. Route the cable downward on the right inside of the central inverter. 3. Fix the network cable in place with cable ties. Operating Manual HS80/HS100/HS120, Helios Systems 47

49 Commissioning 6 Commissioning Life-threatening danger due to high voltage. Comply with the safety instructions affixed to the central inverter and in this operating manual. The central inverter should only be commissioned by qualified electricians who have been trained and authorized. 6.1 Preparing for the commissioning process Life-threatening danger due to high voltage. Ensure that the central inverter is de-energized, the slide switch on the DC switch disconnector Q1 is in position Auto, the AC main switch and the AC power switch Q2 are in the off position, the emergency stop switch is unlocked, all power switches for the string option with power switches are switched off, the fuse switch F31 is switched on, the miniature circuit breaker F32 for internal power supply is switched on, or for external power supply is switched off, all cables and lines are undamaged, correctly connected and in faultless condition, the threaded unions on all connection rails and terminal strips have the correct tightening torque. Operating Manual HS80/HS100/HS120, Helios Systems 48

50 Commissioning Commissioning 1. The central inverter must be connected on the DC main supply. 2. The central inverter must be connected on the AC main supply. Life-threatening danger due to high voltage. Only take measurements with appropriate measurement devices. 3. For the option solar generator without string option (Page 39) measure the DC voltage from plus to minus. The polarity must correspond to the plus/minus markings, and the measured values must be within the tolerances (see section Technical data" on page 23). Life-threatening danger due to high voltage. When taking the measurements all DC power switches must be switched off. 4. For the option solar generator with string option (Page 40) measure the DC voltage of each individual string from plus to minus. The polarity must correspond to the plus/minus markings, and the measured values must be within the tolerances (see section Technical data" on page 23). 5. Switch on all DC power switches. 6. Measure the grid voltage AC: - Phase to phase - Phase to N - Phase to PE The measured values must be within the tolerances (see section Technical data" on page 23). Operating Manual HS80/HS100/HS120, Helios Systems 49

51 Commissioning WARNING! Danger of pinching when closing the front door. When closing the front door, ensure that bodily extremities (hands, fingers) do not get in the closing edges. 7. Close the front door. 8. Touch the display. The display shows the operating status of the central inverter. 9. Set the AC main switch to the "on" position. This automatically activates the DC switch disconnector Q1 in the interior of the central inverter. After approximately 90 seconds, the central inverter starts up. Operating Manual HS80/HS100/HS120, Helios Systems 50

52 Operating states 7 Operating states After commissioning, the central inverter runs through operating states described below. The parameters that cause the central inverter to change to a certain operating state are prescribed. 7.1 Standby If the solar generator voltage is over 480 V, the central inverter changes to the Standby operating status. The central inverter is connected to the grid via the grid contactor K Start up If the solar generator voltage increases above 500 V, the infeed operation is started. If the solar generator current drops below 2 A, the infeed operation is switched off for 30 seconds. When the solar generator voltage again climbs above 500 V, the infeed mode is switched on again. If the solar generator current is continuously over 2 A the central inverter is in normal mode and infeed is continuous. 7.3 MPP mode Thanks to the Maximum Power Point Tracker (MPPT) the solar power of the solar generator is optimally used. The MPPT is comprised of the continuous MPPT and the cyclical MPPT. The continuous MPPT varies the solar generator voltage in small increments, and determines the solar generator power after each increment. In this process the continuous MPPT always the tracks the path of optimal solar generator power. Cyclic MPPT is active every 20 seconds and scans a defined voltage range in larger increments (normally +/- 5 % of the applied solar generator voltage). If the cyclic MPPT has found the solar generator voltage with the greatest solar generator power, the continuous MPPT takes over this solar generator voltage for further tracking. 7.4 Shutdown If the solar generator current drops below 2 A, initially only the infeed operation is switched off. If the solar generator voltage drops below 460 V the central inverter is disconnected from the grid by opening the grid contactor K1. Operating Manual HS80/HS100/HS120, Helios Systems 51

53 Operating states 7.5 Stop Error monitoring is active in each operating state. If a error occurs, all functions of the central inverter will be stopped automatically. A error message will be shown on the display. If the cause of the error is eliminated, the central inverter resumes operation in Standby mode after approximately one minute. Operating Manual HS80/HS100/HS120, Helios Systems 52

54 De-commissioning 8 De-commissioning Life-threatening danger due to residual voltage. Strictly maintain a minimum wait time of 30 minutes after switching off and prior to opening the central inverter! Prior to performing tasks on the central inverter use a suitable tool to ensure that residual voltage is not present. 8.1 Emergency stop switch NOTICE! Only activate the emergency stop switch in an emergency. In an emergency the emergency stop switch immediately disconnects the central inverter from the power supply (AC) and from the solar generator (DC). Only when the dangerous situation has been resolved, and possible errors have been corrected, should the emergency stop switch be unlocked by pulling it out. Press the emergency stop button to shut down the central inverter in an emergency. After unlocking the emergency stop switch the central inverter wills resume operation after a wait time of one minute. 8.2 AC main switch By switching the AC main switch to the off position, the central inverter will be disconnected from the grid on the AC side by the power switch Q2. The DC-side disconnect via the switch disconnector Q1 occurs in the interior of the central inverter. 8.3 Switching off the control voltage If there is an internal power supply the control voltage must be switched off on the miniature circuit breaker F32. If there is an external power supply the control voltage must be switched off outside of the central inverter. Operating Manual HS80/HS100/HS120, Helios Systems 53

55 Maintenance 9 Maintenance Life-threatening danger due to high voltage. The central inverter should only be maintained by qualified electricians who have been trained and authorized. Prior to performing tasks on the central inverter use a suitable tool to ensure that the central inverter is switched off and de-energized. Always work with a second person near you. NOTICE! Warning - damage to the central inverter. Improper repair work can cause damage to the central inverter. All repair tasks should be performed by employees of Helios Systems. 9.1 Executing maintenance tasks 1. Shut down the central inverter (see section De-commissioning" on page 53). Life-threatening danger due to residual voltage when performing maintenance tasks on the outer area. For all tasks in the vicinity of the central inverter: Maintain the safe distance to the central inverter that must be complied with in accordance with BGV A3 (see Table 4/BGV A3 "Safety distances for non-electrical work depending on the rated voltage"). Operating Manual HS80/HS100/HS120, Helios Systems 54

56 Maintenance Life-threatening danger due to residual voltage when performing maintenance tasks in the interior. Strictly maintain a minimum wait time of 30 minutes after switching off and prior to opening the central inverter! Prior to performing tasks on the central inverter use a suitable tool to ensure that residual voltage is not present. The maintenance tasks described must be executed within the specified intervals, starting with the installation date. Maintenance tasks Every 12 months Every 24 months Check the housing and interior area for discoloration, corrosion, fouling, significant dust and water accumulation, and damage. Check all fans and their filters, if present. Check whether foreign objects on the central inverter hinder air circulation. Check the function of the DC load switch (Q1). Check the status of the copper rails. Check the status of all cables and lines. X X X X X Check all fuses for damage. Check the AC and DC overvoltage protection for damage. Check the function of the internal 24 V power supply. Check the accuracy of the AC measured values (See "Taking measurements" on page 56). Check the function of the emergency stop switch. Check the status of the capacitors. X X X X X X Operating Manual HS80/HS100/HS120, Helios Systems 55

57 Maintenance Taking measurements Life-threatening danger due to residual voltage. Maintain a minimum wait time of 30 minutes after switching off and prior to opening the central inverter. Prior to performing tasks on the central inverter use a suitable tool to ensure that residual voltage is not present. Only take measurements with appropriate measurement devices. 1. Use a multimeter. Check the output voltage of the internal 24 V power supply. The DC output voltage of the 24 V power supply unit should be 24 V +/- 0.5 V. 2. Check the accuracy of the AC measured values. In the display the AC voltages of phase L1, L2, and L3 are shown. Compare these display values with the values measured by the voltmeter. The accuracy should be +/-2.5 %. WARNING! Danger of pinching when closing the front door. When closing the front door, ensure that bodily extremities (hands, fingers) do not get in the closing edges. 3. Close the front door. 4. Switch on the central inverter (See "Commissioning" on page 48). Operating Manual HS80/HS100/HS120, Helios Systems 56

58 Disposal 10 Disposal Life-threatening danger due to residual voltage. The central inverter should only be dismantled and disposed of by qualified electricians who have been trained and authorized. The central inverter contains electrical components and metal. Final and professional disposal of the central inverter must be executed under the applicable statutory regulations of the user country. Particularly comply with the special regulations for electronics and electrical equipment. The central inverter has been manufactured in accordance with the applicable EC Directive 2002/95/EC on the Restriction of the use of certain Hazardous Substances in Electrical and Electronic Equipment (RoHS). No solder points contain lead, thus there are no hazardous substances. Separate disposal is not necessary. The waste management company is responsible for the correct coding and description of its waste. Operating Manual HS80/HS100/HS120, Helios Systems 57

59 Disposal 10.1 Disposal of the electrolytic capacitors Warning - harmful to health. WARNING! The electrolytic capacitors contain ethylene glycol that is considered to be an irritant and harmful to health. Wear protective goggles. Wear suitable protective clothing. If there is contact seek medical attention immediately. If there is eye contact rinse eyes with water for at least 10 minutes. If swallowed drink plenty of water. Only have the person affected vomit if the person affected is fully conscious. Immediately taken off contaminated clothing and remove it safely. If there is skin contact wash off immediately with plenty of water. CAUTION! Environmental damage is possible because ethylene glycol poses a slight hazard to water. The ethylene glycol from the electrolytic capacitors should not get into soil or ground water. Electrolytic capacitors are in the intermediate circuit, in the 24 V power supply unit and in other electronic components. Particularly comply with the regulations for disposal of special waste. The regulations issued by government agencies apply, particularly the regulations associated with the European Waste Catalogue. Operating Manual HS80/HS100/HS120, Helios Systems 58

Turbocharger / A100-L Original assembly instructions English

Turbocharger / A100-L Original assembly instructions English Assembly Instructions Turbocharger / A100-L Original assembly instructions English This document is valid for the A100-L series: A165-L, A170-L, A175-L, A180-L, A185-L, A190-L Purpose The assembly instructions

More information

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z

Installation and operating instructions. Solar charge controller MPPT 10 A / 20 A Z Z Installation and operating instructions Solar charge controller MPPT 10 A / 20 A EN 1 Contents 1. About these instructions... 3 1.1 Applicability... 3 1.2 Users... 3 1.3 Description of symbols... 3 2.

More information

Central Inverter SUNNY CENTRAL 500CP-JP / 500CP XT / 630CP XT / 720CP XT / 760CP XT / 800CP XT / 850CP XT / 900 CP XT

Central Inverter SUNNY CENTRAL 500CP-JP / 500CP XT / 630CP XT / 720CP XT / 760CP XT / 800CP XT / 850CP XT / 900 CP XT Central Inverter SUNNY CENTRAL 500CP-JP / 500CP XT / 630CP XT / 720CP XT / 760CP XT / 800CP XT / 850CP XT / 900 CP XT Maintenance Manual SCCP-WH-B4-en-20 98-4046720 Version 2.0 EN SMA Solar Technology

More information

Central Inverter SUNNY CENTRAL 500HE-20/630HE-20/720HE-20/ 760HE-20/800HE-20

Central Inverter SUNNY CENTRAL 500HE-20/630HE-20/720HE-20/ 760HE-20/800HE-20 Central Inverter SUNNY CENTRAL 500HE-20/630HE-20/720HE-20/ 760HE-20/800HE-20 Maintenance Manual SC500-800HE20-WH-en-10 98-4110410 Version 1.0 EN SMA Solar Technology AG Table of Contents Table of Contents

More information

Turbocharger / TPL-B Original assembly instructions English

Turbocharger / TPL-B Original assembly instructions English Assembly Instructions Turbocharger / TPL-B Original assembly instructions English This document is valid for the TPL-B series: TPL85-B14/15/16, TPL91-B Purpose The assembly instructions explain how the

More information

Turbocharger / TPS-H Original assembly instructions English

Turbocharger / TPS-H Original assembly instructions English Assembly Instructions Turbocharger / TPS-H Original assembly instructions English This document is valid for the TPS-H series: TPS44-H, TPS48-H, TPS52-H Purpose TPS-H turbocharger The assembly instructions

More information

Pressure relief valve

Pressure relief valve Pressure relief valve Operating manual Series DHV 712 Version BA-2015.10.20 EN Print-No. 300 510 TR MA DE Rev001 ASV Stübbe GmbH & Co. KG Hollwieser Straße 5 32602 Vlotho Germany Phone: +49 (0) 5733-799-0

More information

HANGKAI GROUP HOYMILES MICRO-INVERTER MI-250

HANGKAI GROUP HOYMILES MICRO-INVERTER MI-250 HANGKAI GROUP HOYMILES MICRO-INVERTER MI-250 TECHNICAL MANUAL CONTENTS INTRODUCTION... 3 SAFETY... 4 SYMBOL ILLUSTRATION... 4 INSTALLATION WARNINGS... 6 PREPARE FOR INSTALLING... 7 TRANSPORT AND INSPECT...

More information

Operating Instructions Flexdip CYA112

Operating Instructions Flexdip CYA112 BA00432C/07/EN/13.13 71207066 Products Solutions Services Operating Instructions Wastewater assembly About this document Safety messages The structure, signal words and safety colors of the signs comply

More information

Turbocharger / VTR..0, VTR..1 Original assembly instructions English

Turbocharger / VTR..0, VTR..1 Original assembly instructions English Assembly Instructions Turbocharger / VTR..0, VTR..1 Original assembly instructions English This document is valid for the VTR..0/..1 series: VTR160, VTR200, VTR250, VTR320, VTR400 VTR161, VTR201, VTR251,

More information

MAKING MODERN LIVING POSSIBLE. UniLynx Indoor Installation Manual. ULX 1800i ULX 3000i ULX 3600i ULX 5400i SOLAR INVERTERS

MAKING MODERN LIVING POSSIBLE. UniLynx Indoor Installation Manual. ULX 1800i ULX 3000i ULX 3600i ULX 5400i SOLAR INVERTERS MAKING MODERN LIVING POSSIBLE UniLynx Indoor Installation Manual ULX 1800i ULX 3000i ULX 3600i ULX 5400i SOLAR INVERTERS Contents Contents 1. Introduction 2 Introduction 2 Installation Sequence 2 Important

More information

SOLAR CHARGE CONTROLLER

SOLAR CHARGE CONTROLLER SOLAR CHARGE CONTROLLER SCE 1010 / SCE 1515 / SCE 2020 / SCE 3030 Instruction Manual Please read user manual carefully before use. 1.About this manual These operating instructions are part of the product.

More information

USER MANUAL MPS 1-5KW SERIES

USER MANUAL MPS 1-5KW SERIES USER MANUAL MPS 1-5KW SERIES Low Series Frequency Solar and Wind Power Charging Inverter CONTENTS 1 WWW.NEXTGENNRG.COM 1. Introduction... 3 2. Profile Structure 4 2.1. Working Principle 4 2.2.Product Features..5

More information

MICRO-INVERTER OMNIKSOL M-300

MICRO-INVERTER OMNIKSOL M-300 MICRO-INVERTER OMNIKSOL M-300 TECHNICAL MANUAL CONTENTS INTRODUCTION... 3 SAFETY... 4 SYMBOL ILLUSTRATION... 4 INSTALLATION WARNINGS... 6 PREPARE FOR INSTALLING... 7 TRANSPORT AND INSPECT... 7 CHECK INSTALLATION

More information

Installation and operating instructions. Solar charge controller 10 A / 15 A / 0 A / 30 A PHOTOVOLTAIK - PHOTOVOLTAICS - PHOTOVOLTAIQUE - FOTOVOLTAICA

Installation and operating instructions. Solar charge controller 10 A / 15 A / 0 A / 30 A PHOTOVOLTAIK - PHOTOVOLTAICS - PHOTOVOLTAIQUE - FOTOVOLTAICA PHOTOVOLTAIK - PHOTOVOLTAICS - PHOTOVOLTAIQUE - FOTOVOLTAICA Installation and operating instructions Solar charge controller 10 A / 15 A / 0 A / 30 A EN 74.86 08.4 1. About this manual These operating

More information

EN Operating manual. Motorised zone valve. Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3

EN Operating manual. Motorised zone valve. Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3 EN Operating manual Motorised zone valve Three-way, 22 mm & 28 mm 3PV2, 3PV8 & VRMH3 This manual ensures safe and efficient use of the 3PV2 or 3PV8 force-actuated three-way valve with spring-loaded return

More information

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600

Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600 Accessories for Wind Power Inverter WINDY BOY PROTECTION BOX 400 / 500 / 600 Installation Guide WBP-Box-IEN103320 IMEN-WBP-BOX Version 2.0 EN SMA Solar Technology AG Table of Contents Table of Contents

More information

Original Operating Manual

Original Operating Manual matev GmbH Nürnberger Str. 50 90579 Langenzenn T +49 (0) 9101 9087-0 F +49 (0) 9101 9087-20 info@matev.eu www.matev.eu Original Operating Manual Snow blade SRM-FB 120 CD Angle adjustment mechanical Version

More information

Original Operating Manual

Original Operating Manual matev GmbH Nürnberger Str. 50 90579 Langenzenn T +49 (0) 9101 9087-0 F +49 (0) 9101 9087-20 info@matev.eu www.matev.eu Original Operating Manual Front Power System und Front PTO shaft FPS- JD X 950 R for

More information

Operating Instructions (Translation)

Operating Instructions (Translation) Product Description Definition The ANTARES RCU consists of the ANTARES Head Module and the ANTARES Connection Module. The ANTARES Head Module contains a CPU, communication interface and power pack. In

More information

Appendix: Safety and application notes for... 15

Appendix: Safety and application notes for... 15 Contents Safety... 2 Warnings... 2 Symbols used in this manual... 2 Operator s safety... 2 Avoid filter module damage... 2 DC-link resonance... 2 Description... 3 Description... 3 Ordering numbers, 380-415

More information

Operating Manual (Edition 04/2004) sinamics. Braking Module / Braking Resistor SINAMICS G130

Operating Manual (Edition 04/2004) sinamics. Braking Module / Braking Resistor SINAMICS G130 Operating Manual (Edition 04/2004) sinamics Braking Module / Braking Resistor SINAMICS G130 04/04 Contents Contents 1 Safety Information 1-1 2 General 2-1 3 Mechanical Installation 3-1 4 Connection 4-1

More information

Installation and operating instructions. Solar charge controller Solarix MPPT 1010 and Z Z

Installation and operating instructions. Solar charge controller Solarix MPPT 1010 and Z Z Installation and operating instructions Solar charge controller Solarix MPPT 1010 and 2010 EN 730927 Z04 1440 730927 Z04 1440 1 Contents 1. About these instructions...3 1.1 Applicability...3 1.2 Users...3

More information

SOLAR CHARGE CONTROLLER N 2010 IN 2011/ N 2012/ N 2014

SOLAR CHARGE CONTROLLER N 2010 IN 2011/ N 2012/ N 2014 SOLAR CHARGE CONTROLLER N 2010 IN 2011/ N 2012/ N 2014 Instruction Manual Please read user manual carefully before use. CE 1.About this manual These operating instructions are part of the product. ~ Read

More information

HOYMILES MICRO-IVERTER MI-250

HOYMILES MICRO-IVERTER MI-250 HOYMILES MICRO-IVERTER MI-250 TECHNICAL MANUAL CONTENTS INTRODUCTION... 3 SAFETY... 4 SYMBOL ILLUSTRATION... 4 INSTALLATION WARNINGS... 5 PREPARE FOR INSTALLING... 6 TRANSPORT AND INSPECT... 6 CHECK INSTALLATION

More information

DC Master 24/ A

DC Master 24/ A USERS MANUAL DC Master 24/12 50-60A DC-DC converter MASTERVOLT Snijdersbergweg 93, 1105 AN Amsterdam The Netherlands Tel.: +31-20-3422100 Fax.: +31-20-6971006 www.mastervolt.com ENGLISH Copyright 2015

More information

Operating Instructions CYR52

Operating Instructions CYR52 BA01300C/07/EN/02.14 71261315 Products Solutions Services Operating Instructions CYR52 Ultrasonic cleaning Document information Warnings The structure, signal words and safety colors of the signs comply

More information

FLÄKTGROUP PM-MOTOR WITH INTEGRATED FC 106 FREQUENCY CONVERTER

FLÄKTGROUP PM-MOTOR WITH INTEGRATED FC 106 FREQUENCY CONVERTER FLÄKTGROUP PM-MOTOR WITH INTEGRATED FC 106 FREQUENCY CONVERTER INSTALLATION AND MAINTENANCE INSTRUCTIONS Risk of electric shock: Motor terminals may still be live if the impeller is rotating, even when

More information

i-energy i-micro inverter GT260

i-energy i-micro inverter GT260 i-energy i-micro inverter GT260 This installation guide contains important instructions on safety matters and the installation of the i-energy i-micro inverter GT260. Please read this guide carefully and

More information

Instruction Manual. Harmonic Filter AHF 005/010. Drives Solutions

Instruction Manual. Harmonic Filter AHF 005/010. Drives Solutions Harmonic Filter AHF 005/010 Instruction Manual Drives Solutions Contents Safety... 2 Warnings... 2 Symbols used in this manual... 2 Operator s safety... 2 Avoid filter module damage... 2 DC-link resonance...

More information

Original operating manual

Original operating manual matev GmbH Nürnberger Str. 50 90579 Langenzenn T +49 9101 9087-0 F +49 9101 9087-20 info@matev.eu www.matev.eu Original operating manual Engine PTO Shaft FPS-PTO JD-3R for John Deere, type 3033R, 3038R,

More information

Operating instructions Rotary actuators M135 M140 M150 M180. June 2012 / / EN

Operating instructions Rotary actuators M135 M140 M150 M180. June 2012 / / EN Operating instructions Rotary actuators M135 M140 M150 M180 June 2012 / 118614 / EN General information General information Proof of amendment Copyright Subject to alterations Manufacturer Version Date

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Type 5282 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating instructions contain

More information

Compact System NRGS 11-2 NRGS Original Installation Instructions English

Compact System NRGS 11-2 NRGS Original Installation Instructions English Compact System NRGS 11-2 NRGS 16-2 EN English Original Installation Instructions 810366-05 1 Contents Important Notes Page Usage for the intended purpose...4 Safety note...4 LV (Low Voltage) Directive

More information

Manual. BlueSolar Grid Inverter 1500 / / / / / 230

Manual. BlueSolar Grid Inverter 1500 / / / / / 230 Manual EN BlueSolar Grid Inverter 1500 / 230 2000 / 230 2800 / 230 4000 / 230 5000 / 230 Before you start This manual contains important information regarding installation and safe operation of this unit.

More information

THREE PHASE AND SINGLE PHASE ASYNCHRONOUS ELECTRIC MOTORS OPERATION AND MAINTENANCE BOOKLET Rev

THREE PHASE AND SINGLE PHASE ASYNCHRONOUS ELECTRIC MOTORS OPERATION AND MAINTENANCE BOOKLET Rev MORATTO S.R.L. Electrical Machinery I 31030 PERO DI BREDA (Treviso) Italy Via A Volta, 2 Tel. +390422904032 fax +39042290363 www. moratto.it - moratto@moratto.it THREE PHASE AND SINGLE PHASE ASYNCHRONOUS

More information

Mass Sine 24/10000 Mass Sine 24/15000

Mass Sine 24/10000 Mass Sine 24/15000 USERS- AND INSTALLATION MANUAL Mass Sine 24/10000 Mass Sine 24/15000 Modular high power inverter system MASTERVOLT Snijdersbergweg 93, 1105 AN Amsterdam The Netherlands ENGLISH: PAGE 1 Tel.: +31-20-342

More information

SOS SERIES SOS1 SOS2. Spares On Site Battery Cabinet Installation Guide rEV3

SOS SERIES SOS1 SOS2. Spares On Site Battery Cabinet Installation Guide rEV3 Atlantic Battery Systems 1065 Market Street Paterson, NJ 07513 Phone: (800) 875-0073 Fax: (973) 523-2344 sales@atbatsys.com www.atbatsys.com SOS1 SOS2 SOS SERIES Spares On Site Battery Cabinet Installation

More information

Rotary feed-through DDF-S/-KS

Rotary feed-through DDF-S/-KS Translation of the Original Operating Manual Rotary feed-through DDF-S/-KS Assembly and Operating Manual Superior Clamping and Gripping Imprint Imprint Copyright: This manual remains the copyrighted property

More information

Appendix: Safety and application notes for 19

Appendix: Safety and application notes for 19 Contents Safety 2 Warnings 2 Symbols used in this manual 2 Operator's safety 2 Avoid filter module damage 2 DC-link resonance 2 Description 3 Description 3 Ordering numbers, 380-415 V, 50 Hz 4 Ordering

More information

Installation Instructions (Translation) Marking. Description. Danger, warning and note symbols. Technical data. ANTARES ExtSet.

Installation Instructions (Translation) Marking. Description. Danger, warning and note symbols. Technical data. ANTARES ExtSet. Description Marking The ANTARES ExtSet makes it possible to distribute the Remote I/O ANTARES modules of an explosion-protected Remote I/O system ANTARES among a maximum of 4 metal mounting rails. For

More information

Galaxy VM. Battery Breaker Box Installation 09/

Galaxy VM. Battery Breaker Box Installation 09/ Galaxy VM Battery Breaker Box Installation 09/2016 www.schneider-electric.com Legal Information The Schneider Electric brand and any registered trademarks of Schneider Electric Industries SAS referred

More information

ABB central inverters PVS to 2091 kva

ABB central inverters PVS to 2091 kva SOLAR INVERTERS ABB central inverters PVS980 1818 to 2091 kva 01 ABB central inverters raise reliability, efficiency and ease of installation to new levels. The inverters are aimed at system integrators

More information

CPS Energy Balancer. Version: 1.0

CPS Energy Balancer. Version: 1.0 CPS Energy Balancer Version: 1.0 CHINT POWER SYSTEMS AMERICA CO., LTD. Address: 700 International Parkway, Suite 102 Richardson, Texas Zip Code: 75081 Web: www.chintpower.com/na Email: americasales@chintpower.com

More information

General Instructions and Inspection Instructions for Crane

General Instructions and Inspection Instructions for Crane General Instructions General Instructions and Inspection Instructions for Crane Distributed by Ergonomic Partners Sales@ErgonomicPartners.com www.ergonomicpartners.com Tel: 314-884-8884 EN R_(EN)/1 --

More information

Owner's/Installation Manual

Owner's/Installation Manual Owner's/Installation Manual Power Management Module (PMM) and Starter Kit NOTE: The starter kit must be purchased and installed prior to individual PMM usage. Model Numbers: 00686-0 PMM 00699-0 PMM WITH

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation Type 0131 2/2- or 3/2-way solenoid valve 2/2- oder 3/2-Wege-Magnetventil Électrovanne 2/2 ou 3/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating

More information

ABB central inverters PVS to 1000 kw

ABB central inverters PVS to 1000 kw Solar inverters ABB central inverters PVS800 100 to 1000 kw ABB central inverters raise reliability, efficiency and ease of installation to new levels. The inverters are aimed at system integrators and

More information

ABB central inverters PVS to 1000 kw

ABB central inverters PVS to 1000 kw ABB central inverters PVS800 100 to 1000 kw ABB central inverters raise reliability, efficiency and ease of installation to new levels. The inverters are aimed at system integrators and end users who require

More information

Assembly and Maintenance Manual Type ASNU

Assembly and Maintenance Manual Type ASNU Assembly and Maintenance Manual Type ASNU Hatschekstr.36 69126 Heidelberg Germany Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 30.05.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\_ASNU.docx

More information

PV Inverter SUNNY BOY 3300/3800

PV Inverter SUNNY BOY 3300/3800 PV Inverter SUNNY BOY 3300/3800 Installation Guide SB33_38-IEN111851 IME-SB3800 Version 5.1 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Notes on this Guide...............................

More information

Operating manual. original operating manual. HDA eco Box 12/24V DC Automatic Dispenser. Translation of the. Item No.:

Operating manual. original operating manual. HDA eco Box 12/24V DC Automatic Dispenser. Translation of the. Item No.: Operating manual HDA eco Box 12/24V DC Automatic Dispenser Item No.: 110 500 900 Translation of the original operating manual Important! Copyright The operating manual is always to be read before commissioning

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Type 5282 2/2-Way Solenoid Valve 2/2-Wege-Magnetventil Électrovanne à 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation Contents 1 Operating Instructions... 2 2 Authorized use...

More information

Swing Piston Compressors and Vacuum Pumps

Swing Piston Compressors and Vacuum Pumps Swing Piston Compressors and Vacuum Pumps NPK 018 AC Pressure NPK 018 DC Pressure NPK 018 AC Vacuum NPK 018 DC Vacuum Operating and Installation Instructions Read and observe these Operating and Installation

More information

Installation manual wall-mounted distributor

Installation manual wall-mounted distributor EN Installation manual wall-mounted distributor EN 60003233 Issue 11.2016 2016-14-11 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal words used 4 2

More information

SolarMax 50TS/80TS/100TS/300TS. Ready for the future.

SolarMax 50TS/80TS/100TS/300TS. Ready for the future. SolarMax 50TS/80TS/100TS/300TS Ready for the future. Ready for the future. Sputnik Engineering commissioned the first SolarMax PV central inverter in 1992. Since then thousands of central inverters have

More information

Installation manual portable distributors

Installation manual portable distributors EN Installation manual portable distributors EN 60003206 Issue 11.2016 15/11/2016 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal words used 4 2 Intended

More information

Wind Power Inverter WINDY BOY 5000A/6000A

Wind Power Inverter WINDY BOY 5000A/6000A Wind Power Inverter WINDY BOY 5000A/6000A User Manual WB5A-6A-BA-BEN114530 TBEN-WB50-60A Version 3.0 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Information on this Manual.........................

More information

Wilo-Control SC-Fire Jockey

Wilo-Control SC-Fire Jockey Pioneering for You Wilo-Control SC-Fire Jockey de en fr Einbau- und Betriebsanleitung Installation and operating instructions Notice de montage et de mise en service nl Inbouw- en bedieningsvoorschriften

More information

VEM motors Thurm GmbH

VEM motors Thurm GmbH VEM motors Thurm GmbH Installation, Operating and Maintenance Instructions Single-Phase Squirrel-Cage Induction Motors, Standard Version March 2005 1. General To avoid damage to the motors and equipment

More information

Technical specifications

Technical specifications KINGDOM OF SAUDI ARABIA THE SAUDI FUND FOR DEVELOPMENT ( SFD) ITB -207-7 Technical specifications Project name: Reconstruction, Furniture and Equipping of Three Schools Photovoltaic Solar System for Holly

More information

Assembly and Maintenance Manual Type RSBW

Assembly and Maintenance Manual Type RSBW Assembly and Maintenance Manual Type RSBW Hatschekstr. 36 69126 Heidelberg Germany Tel +49(0)6221 30470 Tel +49(0)6221 304731 info@stieber.de www.stieber.de Stieber Clutch Date of issue: 16/03/2017 GB

More information

Operating Instructions

Operating Instructions Operating Instructions Ex UPS Combination of > 8265/5 GUBox control panel > 8316 battery box Contents 1 Contents 1 Contents 2 2 General Information 2 3 Safety Instructions 2 4 Conformity to standards 3

More information

Ultra Sine Inverter (US) Generation 4 (G4) User Guide

Ultra Sine Inverter (US) Generation 4 (G4) User Guide IBS Intelligent Battery System GmbH Seestrasse 24, CH-3600 Thun, Schweiz Tel: +41 33 221 06 16 Fax: +41 33 221 06 17 E-Mail: info@ibs-tech.ch Ultra Sine Inverter (US) Generation 4 (G4) User Guide IBS-USG4_en_v2.0.3.doc

More information

GEatom306KHF-5U Three-phase Grid-Tied Battery Inverter. Version 1.1. Global Mainstream Dynamic Energy Technology Ltd. 1

GEatom306KHF-5U Three-phase Grid-Tied Battery Inverter. Version 1.1. Global Mainstream Dynamic Energy Technology Ltd. 1 GEatom306KHF-5U Three-phase Grid-Tied Battery Inverter Version 1.1 Global Mainstream Dynamic Energy Technology Ltd. 1 Content Prelude... 4 1. Safety... 5 1.1 How to Use This Manual... 5 1.2 Safety Rules...

More information

Softstarter SAS SAS 11PUST, 22PUST Assembly- and Commissioning Instructions

Softstarter SAS SAS 11PUST, 22PUST Assembly- and Commissioning Instructions electronic Softstarter SAS 3...11 SAS 11PUST, 22PUST Assembly- and Commissioning Instructions Quality is our Drive. SAS 3...11, SAS 11PUST, 22PUST 1 Stand 03/17 10800.10002 Table of contents Page 1. Safety

More information

Accessories for Stand-alone inverter SUNNY ISLAND GENMAN

Accessories for Stand-alone inverter SUNNY ISLAND GENMAN Accessories for Stand-alone inverter SUNNY ISLAND GENMAN Technical Description GenMan-TEN082730 98-2001230 Version 3.0 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Notes on this manual..............................

More information

PURE SINE WAVE DC TO AC POWER INVERTER

PURE SINE WAVE DC TO AC POWER INVERTER PURE SINE WAVE DC TO AC POWER INVERTER 60S-12A / 60S-24A 60S-12E / 60S-24E 100S-12A / 100S-24A 100S-12E / 100S-24E 150S-12A / 150S-24A 150S-12E / 150S-24E Instruction manual SINE WAVE INVERTER Please read

More information

Operator s and Maintenance Manual

Operator s and Maintenance Manual Industrial Cleaning Machines Floor Scrubbers - Battery Version Operator s and Maintenance Manual HAZAN ISI VE MAKİNA SANAYİ LTD. ŞTİ. KISIKLI CAD.NO.79 ALTUNIZADE 34662 İSTANBUL-TÜRKİYE TEL : +90 216 321

More information

Installation and Operation Instructions. VAG ROTOP Portable Electric Drive

Installation and Operation Instructions. VAG ROTOP Portable Electric Drive Installation and Operation Instructions VAG ROTOP Portable Electric Drive KAT-B 5551 Edition 1-01/2018 Content 1 General 3 1.1 Safety 3 1.2 Proper use 3 2 Transport and Storage 3 2.1 Transport 3 2.2 Storage

More information

General operating manual for assembly, commissioning and maintenance of valves and hydraulic manifolds

General operating manual for assembly, commissioning and maintenance of valves and hydraulic manifolds for assembly, commissioning and maintenance of valves and hydraulic manifolds 110210_general_operating_manual 07.2018 Table of contents Contents Page Important information 2 Important safety instructions

More information

Swing Piston Compressors and Vacuum Pumps

Swing Piston Compressors and Vacuum Pumps Swing Piston Compressors and Vacuum Pumps NPK 050 NPK 0100 Operating and Installation Instructions Read and observe these Operating and Installation Instructions! KNF Neuberger GmbH Alter Weg 3 D-79112

More information

Technical Manual. DLM Module. This manual should remain with the unit.

Technical Manual. DLM Module. This manual should remain with the unit. Technical Manual DLM Module This manual should remain with the unit. Safety Rules SAVE THESE INSTRUCTIONS! Read the following information carefully before attempting to install, operate or service this

More information

OPEN/CLOSE SERVICE ELECTRIC ACTUATORS OPERATION AND MAINTENANCE MANUAL COMMERCIAL AND INDUSTRIAL VALVES AND AUTOMATION

OPEN/CLOSE SERVICE ELECTRIC ACTUATORS OPERATION AND MAINTENANCE MANUAL COMMERCIAL AND INDUSTRIAL VALVES AND AUTOMATION SERIES 1000-X OPEN/CLOSE SERVICE ELECTRIC ACTUATORS OPERATION AND MAINTENANCE MANUAL COMMERCIAL AND INDUSTRIAL VALVES AND AUTOMATION Publication S1000X-110 VER0215-1 For information on this product and

More information

2-PHASE STEPPING MOTOR DRIVER FE Z5 DISPENSE

2-PHASE STEPPING MOTOR DRIVER FE Z5 DISPENSE 2-PHASE STEPPING MOTOR DRIVER FE Z5 DISPENSE For Diaphragm Dosing Pumps FEM 1.02_.55 / FEM 1.09_.55 Controller board package, without pump: ID 160536 Operating and Installation Manual It is important to

More information

FLENDER ZAPEX couplings. Type ZWT. Operating instructions BA 3505 EN 10/2011. FLENDER couplings

FLENDER ZAPEX couplings. Type ZWT. Operating instructions BA 3505 EN 10/2011. FLENDER couplings FLENDER ZAPEX couplings Type ZWT Operating instructions FLENDER couplings FLENDER ZAPEX couplings Type ZWT Operating instructions Translation of the original operating instructions Technical data Notes

More information

Type 8635 Remote-Positioner. Zusatzanleitung. English Deutsch Français

Type 8635 Remote-Positioner. Zusatzanleitung. English Deutsch Français Type 8635 Remote-Positioner Installation on process valves with internal air flow (series 2103, 2300, 2301) Anbau an Prozessventile mit interner Luftführung (Reihe 2103, 2300, 2301) Intégration sur des

More information

Aurora Wind Interface Box

Aurora Wind Interface Box Aurora Wind Interface Box Installation and Operator s Manual Page 2 of 15 REVISION TABLE Document Revision Author Date Change Description 1.0 T. Melzl 5/9/2006 First release of the document SAVE THESE

More information

Solar System Controller

Solar System Controller POWER FAULT 50 Amp MPPT Installation and Operating Instructions Solar System Controller ISC5040 ABOUT THIS MANUAL These operating instructions come with the product and should be kept with it as a reference

More information

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING dv Sentry TM 208V 600V INSTALLATION GUIDE FORM: DVS-IG-E REL. January 2018 REV. 003 2018 MTE Corporation High Voltage! Only a qualified electrician can carry out the electrical installation of this filter.

More information

Type 3320, Service Manual. Serviceanleitung Service Manuel

Type 3320, Service Manual. Serviceanleitung Service Manuel Electromotive 2/2-way valve Elektromotorisches 2/2-Wege-Ventil Vanne électromotorisée à 2/2 voies Service Manual Serviceanleitung Service Manuel We reserve the right to make technical changes without notice.

More information

Operating instructions ErgoPack 600 E

Operating instructions ErgoPack 600 E Operating instructions ErgoPack 600 E Operation of the device is only permitted if the operating instructions have been carefully read and understood before use! Declaration of conformity EU declaration

More information

User Manual. Solar Charge Controller 3KW

User Manual. Solar Charge Controller 3KW User Manual Solar Charge Controller 3KW 1 CONTENTS 1 ABOUT THIS MANUAL... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 SAFETY INSTRUCTIONS... 3 2 INTRODUCTION... 4 2.1 Features... 4 2.2 Product Overview... 5

More information

OPERATING INSTRUCTIONS

OPERATING INSTRUCTIONS Emergency Cord Switch Type LRS 004 Device identification no.: 93.046 690.004 OPERATING INSTRUCTIONS 2 CE-Sign and Conformity The device meets the requirements of the valid European and national regulations.

More information

UZK12.071, UZO DATA 1. GENERAL DESCRIPTION 4. MARKINGS 3. ORDER NUMBERS PASSIVE BATTERY MODULE BATTERY MODULE 12V, 7AH 1/9.

UZK12.071, UZO DATA 1. GENERAL DESCRIPTION 4. MARKINGS 3. ORDER NUMBERS PASSIVE BATTERY MODULE BATTERY MODULE 12V, 7AH 1/9. PASSIVE BATTERY MODULE Two Mounting Options: DIN-Rail or panel/wall mounting IP00 Open Type Protection Level Easy Access to the Terminals and the Fuse Heavy Duty Fuse Holder and Spare Fuse Included 1.

More information

ACROBAT SWING STAND MODEL

ACROBAT SWING STAND MODEL Mounting instructions Directions for use ACROBAT SWING STAND MODEL Dr. Mach GmbH u. Co.KG, Flossmannstrasse 28, D-85560 Ebersberg Tel.: +49 (0)8092 2093 0, Fax +49 (0)8092 2093 50 Internet: www.dr-mach.com,

More information

PV Inverter SUNNY BOY 3300/3800

PV Inverter SUNNY BOY 3300/3800 PV Inverter SUNNY BOY 3300/3800 Installation Manual SB33-38-11-IA-en-62 IMEN-SB33-38-11 Version 6.2 EN SMA Solar Technology AG Table of Contents Table of Contents 1 Information on this Manual.........................

More information

AIS and 40 kva 400 V. Site Preparation and Installation Manual

AIS and 40 kva 400 V. Site Preparation and Installation Manual AIS 3100 20 and 40 kva 400 V Site Preparation and Installation Manual www.apc.com AIS 3100 20 and 40 kva 400 V Site Preparation and Installation Manual www.apc.com IMPORTANT SAFETY INSTRUCTIONS SAVE THESE

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Type 5404 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation Contents 1 Operating instructions...2 2 Intended use...3 3

More information

Assembly and Maintenance Manual Type AS

Assembly and Maintenance Manual Type AS Assembly and Maintenance Manual Type AS Hatschekstr.36 69126 Heidelberg Germany Tel +49(0)6221 30470 Fax +49(0)6221 304731 info@stieber.de www.stieber.de Date of issue: 30.05.2018 GB Revision: 0 U:\EngUsers\!ProduktDoku\1AAA_Einbauerklaerung_Wartungsanleitung_Konformitaetserklaerung\1AAA_Wartungsanleitungen\Orginal_Worddatei\_AS.docx

More information

PV Inverter SUNNY MINI CENTRAL 9000TL / 10000TL / 11000TL with Reactive Power Control

PV Inverter SUNNY MINI CENTRAL 9000TL / 10000TL / 11000TL with Reactive Power Control PV Inverter SUNNY MINI CENTRAL 9000TL / 10000TL / 11000TL with Reactive Power Control User Manual SMC9-11TLRP-BA-en-30 TBEN-SMCTLRP Version 3.0 EN SMA Solar Technology AG Table of Contents Table of Contents

More information

Rotary feed-through DDF 2

Rotary feed-through DDF 2 Translation of the original operating manual Rotary feed-through DDF 2 Assembly and Operating Manual Superior Clamping and Gripping Imprint Imprint Copyright: This manual remains the copyrighted property

More information

Oil-free piston compressors KK and piston vacuum pumps KV

Oil-free piston compressors KK and piston vacuum pumps KV Oil-free piston compressors KK and piston vacuum pumps KV Installation and Operating Instructions 0678106030L02 1707V003 Contents Important information 1 About this document 2 1.1 Warnings and symbols

More information

3.3kWh Battery Pack Specification 3.3

3.3kWh Battery Pack Specification 3.3 3.3kWh Battery Pack Specification 3.3 DATE Revision Date : MODEL P/N 48V 3.3kWh : Aug. 30. 2016 R4863P3S CONTENTS 1. Features 2. Outline Dimensions 3. Technical Data 4. Product Composition 5. LED indicators

More information

SolarMax 330TS-SV. The all-round solution for large-scale PV installations.

SolarMax 330TS-SV. The all-round solution for large-scale PV installations. SolarMax 0TS-SV The all-round solution for large-scale PV installations. Modular and flexible The best choice for PV installations is the SolarMax 0TS-SV, the inverter which is directly connected to medium

More information

Operating and Installation Manual Shut-off damper Type AK-Ex with control components T0* and P50

Operating and Installation Manual Shut-off damper Type AK-Ex with control components T0* and P50 Operating and Installation Manual Shut-off damper Type AK-Ex with control components T0* and P50 AK-Ex with electric actuator II 2G c II TX II 2D c II T 80 C AK-Ex with pneumatic actuator II 2G c IIB TX

More information

Installation and Operating Instructions Electric Vibrators HV/VFL Series

Installation and Operating Instructions Electric Vibrators HV/VFL Series Installation and Operating Instructions Electric Vibrators HV/VFL Series Original Instruction Würges Vibrationstechnik GmbH Daimlerstraße 9 D-86356 Neusäß Telephone +49 821 463081 Telefax +49 821 463084

More information

Catalyser Introduction. 3. Hazard Information. 2. Area of Application. 3.1 Symbology

Catalyser Introduction. 3. Hazard Information. 2. Area of Application. 3.1 Symbology ENGLISCH Catalyser 2300-0001 1. Introduction We are pleased with your decision to purchase the Catalyser. Please read the following operating instructions carefully and observe the safety information they

More information

Florham Park, NJ USA Call (ASCO) for sales or service

Florham Park, NJ USA Call (ASCO) for sales or service Operator s Manual 7000 Series ATS Automatic Transfer Switches D design, 30 through 230 A DANGER is used in this manual to warn of a hazard situation which, if not avoided, will result in death or serious

More information

THREE-PHASE TR BATTERY CHARGER

THREE-PHASE TR BATTERY CHARGER THREE-PHASE TR BATTERY CHARGER USER AND MAINTENANCE MANUAL Dear Customer, Thank you for your trust and for buying this high-quality T.C.E. product. These instructions will help you to know the battery