1 , IA DIVISION 1 - GENERAL 1.01 TRAFFIC CONTROL LS 1 $50, $50, $30, $30, $24, $24, $24, $24, $24, $24, DIVISION 2 - EARTHWORK 2.01 CLEARING AND GRUBBING UNIT 76 $75.00 $5, $ $14, $75.00 $5, $68.00 $5, $ $14, TOPSOIL, COMPOST-AMENDED (12 INCH DEPTH) IN LANDSCAPE AREAS CY 667 $70.00 $46, $65.00 $43, $63.00 $42, $65.00 $43, $60.00 $40, TOPSOIL, SAND-COMPOST-AMENDED (DEPTH VARIES) IN BIORETENTION CELLS CY 1,490 $60.00 $89, $65.00 $96, $60.00 $89, $65.00 $96, $60.00 $89, TOPSOIL, FURNISH AND SPREAD, OFF-SITE (6 INCH DEPTH) CY 8,653 $25.00 $216, $12.00 $103, $12.00 $103, $12.00 $103, $12.00 $103, EXCAVATION, CLASS 10 CY 60,527 $7.00 $423, $5.00 $302, $5.00 $302, $5.00 $302, $5.00 $302, EXCAVATION, CLASS 20 CY 1,978 $15.00 $29, $6.75 $13, $6.75 $13, $6.75 $13, $6.75 $13, EXCAVATION, BIORETENTION CELL CY 2,234 $15.00 $33, $7.00 $15, $7.00 $15, $7.00 $15, $6.50 $14, SUBGRADE PREPARATION, 12 IN. SY 51,789 $1.50 $77, $0.50 $25, $0.50 $25, $0.50 $25, $0.50 $25, SUBGRADE TREATMENT, GEOGRID (RECTANGULAR TYPE 1) SY 1,112 $6.00 $6, $2.50 $2, $2.50 $2, $2.50 $2, $2.50 $2, SUBBASE, MODIFIED, 6 IN. SY 51,789 $6.00 $310, $4.00 $207, $4.00 $207, $4.00 $207, $4.00 $207, REMOVAL OF KNOWN BOX CULVERT, 6' X 4' RCP LF 51 $50.00 $2, $ $6, $30.00 $1, $ $6, $ $5, REMOVAL OF KNOWN PIPE AND CONDUIT, VARIOUS TYPES LF 1,882 $20.00 $37, $13.50 $25, $10.00 $18, $13.50 $25, $15.00 $28, COMPACTION TESTING LS 1 $5, $5, $12, $12, $8, $8, $8, $8, $9, $9, DIVISION 3 - TRENCH AND TRENCHLESS CONSTRUCTION 3.01 TRENCH COMPACTION TESTING LS 1 $3, $3, $6, $6, $14, $14, $8, $8, $8, $8, GRANULAR BACKFILL TON 1,933 $25.00 $48, $15.00 $28, $15.00 $28, $15.00 $28, $15.00 $28, DIVISION 4 - SEWERS AND DRAINS 4.01 SANITARY SEWER GRAVITY MAIN, TRENCHED, PVC TRUSS, 10 IN. LF 174 $95.00 $16, $ $29, $ $17, $61.50 $10, $ $33, STORM SEWER, TRENCHED, RCP, 15 IN. LF 1,805 $50.00 $90, $49.00 $88, $50.00 $90, $47.50 $85, $54.00 $97, STORM SEWER, TRENCHED, RCP, 18 IN. LF 1,192 $55.00 $65, $47.00 $56, $62.00 $73, $47.50 $56, $65.00 $77, STORM SEWER, TRENCHED, RCP, 24 IN. LF 655 $60.00 $39, $74.00 $48, $67.00 $43, $55.50 $36, $67.00 $43, STORM SEWER, TRENCHED, RCP, 30 IN. LF 305 $75.00 $22, $73.00 $22, $92.00 $28, $75.00 $22, $95.00 $28, STORM SEWER, TRENCHED, RCP, 36 IN. LF 295 $90.00 $26, $94.50 $27, $ $39, $97.00 $28, $ $34, STORM SEWER, TRENCHED, CONCRETE ELLIPTICAL PIPE, (30 X 19) IN. LF 68 $94.00 $6, $73.50 $4, $95.00 $6, $81.00 $5, $75.00 $5, STORM SEWER, TRENCHED, CONCRETE ELLIPTICAL PIPE, (38 X 24) IN. LF 31 $ $3, $94.00 $2, $ $3, $ $3, $ $3, STORM SEWER, TRENCHED, PLASTIC, 8 IN. LF 131 $20.00 $2, $17.00 $2, $15.00 $1, $22.50 $2, $26.00 $3, STORM SEWER, TRENCHED, PLASTIC, 15 IN. LF 3,187 $25.00 $79, $32.00 $101, $31.00 $98, $31.00 $98, $31.00 $98, STORM SEWER, TRENCHED, PLASTIC, 18 IN. LF 1,501 $30.00 $45, $41.50 $62, $40.00 $60, $33.00 $49, $34.00 $51, STORM SEWER, TRENCHED, PLASTIC, 30 IN. LF 305 $45.00 $13, $68.00 $20, $85.00 $25, $54.00 $16, $49.00 $14, PIPE APRON, METAL, 15 IN. DIA. EA 2 $ $ $ $ $ $ $ $ $ $ PIPE APRON, METAL, 18 IN. DIA. EA 0 $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ PIPE APRON, RCP, 24 IN. DIA. EA 3 $2, $6, $ $2, $ $1, $1, $3, $1, $5, PIPE APRON, RCP, 30 IN. DIA. EA 5 $2, $11, $ $4, $ $3, $1, $5, $1, $6, PIPE APRON, RCP, 36 IN. DIA. EA 3 $2, $8, $1, $3, $1, $3, $1, $4, $2, $6, PIPE APRON, RCP, ELLIPTICAL (30 X 19) IN. EA 1 $2, $2, $ $ $1, $1, $ $ $1, $1, PIPE APRON, RCP, ELLIPTICAL WITH HEADWALL (DR-206),(38 X 24) IN. EA 1 $2, $2, $ $ $2, $2, $2, $2, $2, $2, FOOTING FOR CONCRETE PIPE APRON, PCC, VARIOUS SIZES EA 11 $ $5, $ $5, $ $5, $1, $16, $ $9, SUBDRAIN, TYPE 1, LONGITUDINAL, 4 IN. LF 8,901 $9.00 $80, $7.00 $62, $6.00 $53, $5.50 $48, $7.00 $62, SUBDRAIN, TYPE 1, 4 IN., WING WALLS LF 340 $9.00 $3, $6.50 $2, $10.00 $3, $6.50 $2, $6.50 $2, SUBDRAIN, PERFORATED PLASTIC PIPE, 6-IN DIAMETER IN BIORETENTION CELLS LF 2,545 $15.00 $38, $6.00 $15, $6.00 $15, $5.65 $14, $6.00 $15, SUBDRAIN CLEANOUT, PVC, NON-PERFORATED, 6-IN. WITH NYLOPLAST BEEHIVE CASTING EA 29 $ $17, $ $17, $ $10, $ $20, $ $17, SUBDRAIN CLEANOUT, PVC, NON-PERFORATED, 4-IN. EA 33 $ $11, $ $16, $ $11, $ $18, $ $16,500.00

2 , IA SUBDRAIN OUTLETS AND CONNECTIONS, 4 IN. EA 29 $ $5, $ $9, $ $7, $ $13, $ $9, SUBDRAIN OUTLETS AND CONNECTIONS, 6 IN. EA 27 $ $6, $ $8, $ $6, $ $12, $ $8, BRC SNORKEL INTAKE EA 27 $ $10, $ $11, $ $6, $ $12, $ $8, DIVISION 5 - WATER MAINS AND APPURTENANCES 5.01 WATER MAIN, TRENCHED, PVC, 12 IN. LF 1,510 $50.00 $75, $39.00 $58, $40.00 $60, $37.50 $56, $45.00 $67, WATER MAIN, TRENCHED, DIP, 12 IN., WITH VITON GASKETS LF 160 $ $16, $66.00 $10, $ $17, $85.00 $13, $90.00 $14, WATER MAIN, TRENCHED, PVC, 12 IN., WITH STEEL 24 IN. CASING PIPE LF 360 $ $90, $ $54, $ $73, $ $46, $ $59, WATER MAIN, TRENCHED, PVC, 18 IN. LF 465 $60.00 $27, $56.00 $26, $69.00 $32, $68.00 $31, $70.00 $32, WATER MAIN, TRENCHED, DIP, 18 IN., WITH VITON GASKETS LF 80 $ $9, $ $11, $ $16, $ $10, $ $15, WATER MAIN FITTINGS, VARIOUS LBS 2,633 $7.00 $18, $6.00 $15, $9.00 $23, $16.25 $42, $7.00 $18, VALVE, GATE, 12 IN. EA 9 $2, $19, $2, $19, $2, $19, $2, $21, $3, $27, FIRE HYDRANT ASSEMBLY EA 8 $5, $40, $3, $31, $4, $35, $4, $35, $4, $39, REMOVAL OF FIRE HYDRANT EA 4 $ $3, $1, $4, $ $2, $1, $4, $ $3, VALVE BOX REPLACEMENT EA 8 $ $2, $ $3, $ $2, $ $2, $ $3, DIVISION 6 - STRUCTURES FOR SANITARY AND STORM SEWERS 6.01 STORM MANHOLE TYPE SW-401, 48 IN. DIA. EA 6 $3, $21, $3, $18, $3, $18, $3, $20, $3, $23, STORM MANHOLE TYPE SW-401, 60 IN. DIA. EA 7 $5, $35, $4, $31, $4, $33, $4, $33, $5, $41, STORM MANHOLE TYPE SW-401, 72 IN. DIA. EA 3 $6, $19, $5, $16, $5, $17, $5, $17, $6, $20, STORM MANHOLE TYPE SW-406, (4 X 4) FT. EA 1 $7, $7, $2, $2, $3, $3, $3, $3, $2, $2, STORM MANHOLE TYPE SW-406, (4 X 6) FT. EA 1 $8, $8, $3, $3, $3, $3, $3, $3, $3, $3, STORM INTAKE TYPE SW-507 EA 22 $3, $77, $3, $69, $3, $72, $3, $77, $2, $57, STORM INTAKE TYPE SW-508 EA 1 $4, $4, $3, $3, $3, $3, $3, $3, $3, $3, STORM INTAKE TYPE SW-509 EA 3 $4, $13, $4, $12, $4, $12, $3, $11, $4, $12, STORM INTAKE TYPE SW-512, 24 IN. DIA. EA 5 $2, $10, $1, $5, $1, $7, $1, $9, $1, $6, STORM INTAKE TYPE SW-513, 5 FT. X 5 FT. EA 1 $3, $3, $3, $3, $4, $4, $4, $4, $3, $3, STORM INTAKE TYPE SW-541 EA 2 $5, $10, $3, $6, $3, $7, $6, $12, $3, $7, STORM INTAKE TYPE SW-542, EXTENSION EA 2 $2, $5, $1, $2, $ $1, $9, $18, $1, $3, STORM INTAKE TYPE SW-545 (14' EXTENDED OPENING) EA 1 $10, $10, $5, $5, $4, $4, $7, $7, $5, $5, STORM INTAKE, SPECIAL WITH INTEGRAL FOREBAY EA 25 $8, $212, $4, $103, $6, $165, $4, $121, $6, $150, MANHOLE ADJUSTMENT, MINOR EA 3 $2, $8, $1, $3, $ $ $1, $4, $1, $3, MANHOLE ADJUSTMENT, MAJOR EA 3 $3, $9, $1, $4, $3, $9, $3, $10, $2, $6, REMOVE MANHOLE EA 4 $ $2, $ $2, $ $2, $1, $7, $ $3, REMOVE INTAKE EA 8 $ $5, $ $4, $ $4, $1, $12, $ $4, DIVISION 7 - STREETS AND RELATED WORK 7.01 PAVEMENT, PCC, 10 IN. SY 46,650 $47.00 $2,192, $44.20 $2,061, $44.25 $2,064, $50.00 $2,332, $45.00 $2,099, PAVEMENT, PCC, MEDIAN, 7 IN. SY 1,298 $90.00 $116, $50.00 $64, $50.00 $64, $70.00 $90, $69.00 $89, PCC PAVEMENT SAMPLES AND TESTING LS 1 $2, $2, $5, $5, $5, $5, $4, $4, $2, $2, PAVEMENT, HMA, TEMPORARY, 8 IN. SY 1,090 $40.00 $43, $40.85 $44, $40.85 $44, $40.85 $44, $44, HMA PAVEMENT SAMPLES AND TESTING LS 1 $1, $1, $ $ $ $ $ $ $ $ REMOVAL OF SIDEWALK SY 628 $10.00 $6, $5.00 $3, $5.00 $3, $5.00 $3, $5.00 $3, SHARED USE PATH, PCC, 5 IN. SY 6,417 $31.00 $198, $25.50 $163, $25.50 $163, $28.00 $179, $30.00 $192, SPECIAL SUBGRADE PREPARATION FOR SHARED USE PATH SY 8,738 $3.00 $26, $1.00 $8, $1.00 $8, $1.00 $8, $1.00 $8, SIDEWALK, PCC, 4 IN. SY 58 $20.00 $1, $30.00 $1, $30.00 $1, $ $6, $75.00 $4, SIDEWALK, PCC, 7 IN. SY 1,468 $70.00 $102, $46.85 $68, $52.50 $77, $70.00 $102, $70.00 $102, SIDEWALK, PCC, 12 IN. SY 178 $ $17, $74.00 $13, $74.00 $13, $ $33, $ $26, CONCRETE PAVERS WITH 4" MODIFIED SUBBASE, TYPE 1 SY 1,783 $ $231, $92.00 $164, $88.67 $158, $92.00 $164, $89.00 $158, CONCRETE PAVERS WITH 4" MODIFIED SUBBASE, TYPE 2A/2B SY 764 $ $99, $63.00 $48, $88.60 $67, $63.00 $48, $89.00 $67,996.00

3 , IA CONCRETE PAVERS WITH 4" MODIFIED SUBBASE, TYPE 4A/4B SY 201 $ $39, $76.00 $15, $86.16 $17, $76.00 $15, $87.00 $17, CONCRETE PAVERS WITH CONCRETE BASE, TYPE 3 SY 299 $ $38, $ $41, $ $40, $ $30, $ $59, DETECTABLE WARNING, PCC PAVER SF 434 $40.00 $17, $26.00 $11, $24.80 $10, $38.25 $16, $92.25 $40, DETECTABLE WARNING, CAST IRON SF 12 $47.00 $ $35.00 $ $35.00 $ $35.00 $ $50.00 $ FULL DEPTH PATCHES, 10 IN. SY 6 $ $ $ $ $ $ $ $1, $ $1, PAVEMENT REMOVAL SY 24,166 $7.00 $169, $4.00 $96, $4.00 $96, $4.00 $96, $4.00 $96, DIVISION 8 - PERMANENT TRAFFIC CONTROL 8.01 TRAFFIC SIGNAL, OAKDALE BLVD INTERSECTION LS 1 $240, $240, $192, $192, $273, $273, $183, $183, $336, $336, TRAFFIC SIGNAL, UNIVERSITY PKWY INTERSECTION LS 1 $235, $235, $186, $186, $212, $212, $186, $186, $245, $245, TRAFFIC SIGNAL, WHEATON RD INTERSECTION LS 1 $215, $215, $188, $188, $196, $196, $188, $188, $240, $240, TRAFFIC SIGNAL, FOREVERGREEN RD INTERSECTION LS 1 $280, $280, $268, $268, $297, $297, $268, $268, $250, $250, TEMPORARY TRAFFIC SIGNAL LS 1 $20, $20, $44, $44, $18, $18, $44, $44, $110, $110, TRAFFIC SIGNAL INTERCONNECT FIBER OPTIC CABLE LF 1,142 $25.00 $28, $5.35 $6, $7.00 $7, $5.35 $6, $2.00 $2, PAINTED PAVEMENT MARKINGS, DURABLE LF 20,781 $5.50 $114, $0.28 $5, $0.28 $5, $0.28 $5, $0.30 $6, PERMANENT TAPE MARKINGS, INTERSECTION LF 1,205 $2.50 $3, $3.00 $3, $3.00 $3, $3.00 $3, $3.00 $3, PAINTED SYMBOLS AND LEGENDS, INTERSECTION EA 91 $ $14, $ $25, $ $25, $ $25, $ $25, PAVEMENT MARKINGS REMOVED STA 18.1 $ $5, $ $1, $ $1, $ $1, $ $1, GROOVES CUT FOR PAVEMENT MARKINGS LF 21,986 $5.50 $120, $0.50 $10, $0.50 $10, $0.50 $10, $0.50 $10, GROOVES CUT FOR SYMBOLS AND LEGENDS EA 91 $ $13, $ $9, $ $9, $ $9, $ $9, PERFORATED SQUARE STEEL TUBE POSTS EA 55 $ $7, $ $7, $ $7, $ $7, $ $7, SIGNS, SHEET ALUMINUM SF 495 $10.00 $4, $16.00 $7, $16.00 $7, $16.00 $7, $16.00 $7, SIGN REMOVAL EA 13 $ $1, $50.00 $ $50.00 $ $50.00 $ $50.00 $ DIVISION 9 - SITE WORK AND LANDSCAPING 9.01 SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING (SUDAS TYPE 1) AC 9.49 $3, $34, $3, $28, $3, $28, $3, $28, $3, $28, SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING (SUDAS TYPE 4) AC $1, $21, $2, $27, $2, $27, $2, $27, $2, $27, SOD SQ 402 $45.00 $18, $48.00 $19, $48.00 $19, $48.00 $19, $48.00 $19, PLANTS WITH WARRANTY, TREE: ACER PLATANOIDES 'CRIMSON SENTRY' - CRIMSON EA 3 SENTRY NORWAY MAPLE $ $2, $ $1, $ $1, $ $1, $ $1, PLANTS WITH WARRANTY, TREE: BETULA NIGRA - RIVER BIRCH EA 0 $ $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ PLANTS WITH WARRANTY, TREE: CRATAEGUS CRUS-GALLI VAR. INERMIS - THORNLESS EA 21 COCKSPUR HAWTHORN $ $13, $ $5, $ $5, $ $5, $ $5, PLANTS WITH WARRANTY, TREE: MALUS 'PRAIRIEFIRE'- PRAIRIEFIRE CRABAPPLE EA 14 $ $9, $ $3, $ $3, $ $3, $ $3, PLANTS WITH WARRANTY, TREE: PICEA PUNGENS F. GLAUCA - COLORADO BLUE SPRUCE EA 12 $ $9, $ $4, $ $4, $ $4, $ $4, PLANTS WITH WARRANTY, TREE: PINUS STROBUS - WHITE PINE EA 8 $ $6, $ $2, $ $3, $ $2, $ $3, PLANTS WITH WARRANTY, TREE: QUERCUS MACROCARPA - BUR OAK EA 9 $ $7, $ $3, $ $3, $ $3, $ $3, PLANTS WITH WARRANTY, SHRUB: CORNUS SERICEA 'ISANTI'- REDOSIER DOGWOOD EA 50 $75.00 $3, $35.00 $1, $39.25 $1, $35.00 $1, $39.25 $1, PLANTS WITH WARRANTY, SHRUB: HYDRANGEA PANICULATA 'JANE'- LITTLE LIME EA 55 HYDRANGEA $75.00 $4, $50.00 $2, $44.95 $2, $50.00 $2, $44.95 $2, PLANTS WITH WARRANTY, SHRUB: JUNIPERUS CHINENSIS 'GOLD LACE' - GOLD LACE EA 162 JUNIPER $75.00 $12, $40.00 $6, $47.60 $7, $40.00 $6, $47.60 $7,711.20

4 , IA Streb Construction Horsfield Construction 9.14 PLANTS WITH WARRANTY, SHRUB: RHUS AROMATICA 'GRO-LOW'- GRO-LOW FRAGRANT EA 310 SUMAC $75.00 $23, $35.00 $10, $37.10 $11, $35.00 $10, $37.10 $11, PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: CALAMAGROSTIS X EA 366 ACUTIFLORA 'KARL FOERSTER' - FEATHER REED GRASS $30.00 $10, $10.00 $3, $11.80 $4, $10.00 $3, $11.80 $4, PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: HEMEROCALLIS 'STELLA DE EA 1,444 ORO' - STELLA DE ORO DAYLILY $30.00 $43, $10.00 $14, $11.60 $16, $10.00 $14, $11.60 $16, PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: MISCANTHUS SINENSIS EA 418 'PURPURASCENS'- PURPLE MAIDEN GRASS $30.00 $12, $10.00 $4, $11.90 $4, $10.00 $4, $11.90 $4, PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: NEPETA X FAASSENII EA 153 'NOVANEPJUN'- JUNIOR WALKER CATMINT $30.00 $4, $10.00 $1, $12.05 $1, $10.00 $1, $12.05 $1, PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: SPOROBOLUS EA 170 HETEROLIEPIS - PRAIRIE DROPSEED $30.00 $5, $10.00 $1, $12.35 $2, $10.00 $1, $12.35 $2, EA PLANTS WITH WARRANTY, PERENNIAL/ORNAMENTAL GRASS: SEDUM SPECTABILE 'AUTUMN FIRE' - AUTUMN FIRE SEDUM $30.00 $9, $10.00 $3, $11.90 $3, $10.00 $3, $11.90 $3, SWPPP MANAGEMENT LS 1 $15, $15, $6, $6, $6, $6, $6, $6, $6, $6, FILTER SOCK, 12 INCH DIAMETER MULCH, INSTALLATION OF DEVICE LF 22,500 $2.50 $56, $1.75 $39, $1.75 $39, $1.75 $39, $1.75 $39, FILTER SOCK, 12 INCH DIAMETER MULCH, REMOVAL OF SEDIMENT LF 22,500 $0.50 $11, $0.05 $1, $0.05 $1, $0.05 $1, $0.05 $1, FILTER SOCK, 12 INCH DIAMETER MULCH, REMOVAL OF DEVICE LF 22,500 $0.50 $11, $0.35 $7, $0.35 $7, $0.35 $7, $0.35 $7, TEMPORARY ROLLED EROSION CONTROL PRODUCT, TYPE 1C SY 8,400 $3.00 $25, $1.20 $10, $1.20 $10, $1.20 $10, $1.20 $10, RIP RAP, CLASS D REVETMENT TONS 147 $50.00 $7, $48.00 $7, $50.00 $7, $48.00 $7, $40.00 $5, SILT FENCE OR SILT FENCE DITCH CHECK, INSTALLATION OF DEVICE LF 15,600 $2.00 $31, $1.50 $23, $1.50 $23, $1.50 $23, $1.50 $23, SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF SEDIMENT LF 15,600 $2.00 $31, $0.25 $3, $0.25 $3, $0.25 $3, $0.25 $3, SILT FENCE OR SILT FENCE DITCH CHECK, REMOVAL OF DEVICE LF 15,600 $1.00 $15, $0.10 $1, $0.10 $1, $0.10 $1, $0.10 $1, STABILIZED CONSTRUCTION ENTRANCE SY 670 $15.00 $10, $11.00 $7, $11.00 $7, $11.00 $7, $11.00 $7, INLET PROTECTION DEVICE, FILTER SOCK, SURFACE-APPLIED EA 84 $ $14, $ $9, $ $9, $ $9, $ $9, INLET PROTECTION DEVICE, MAINTENANCE EA 84 $ $8, $5.00 $ $5.00 $ $5.00 $ $5.00 $ REMOVAL AND REINSTALLATION OF EXISTING FENCE LF 4,673 $10.00 $46, $6.75 $31, $6.75 $31, $5.00 $23, $6.75 $31, PLANTER FOREBAY STONE (CLEAN COBBLE STONE, 2-6 IN. DIA., WASHED) TON 40 $ $12, $ $12, $ $6, $90.00 $3, $70.00 $2, STORAGE AGGREGATE, IDOT 4115 "#57 CLEAN" (BIORETENTION CELLS) TON 1,126 $38.00 $42, $25.00 $28, $25.00 $28, $25.00 $28, $25.00 $28, FILTER AGGREGATE, IDOT 4125 "3/8 INCH CLEAN" (BIORETENTION CELLS) TON 282 $40.00 $11, $30.00 $8, $30.00 $8, $30.00 $8, $30.00 $8, PRE-VEGETATED NON-TURF SOD MATTING SF 16,077 $5.00 $80, $7.16 $115, $7.16 $115, $7.16 $115, $8.00 $128, NORTH LIBERTY SEATWALL WITH COLUMNS - 14' LONG (WEST SIDE) EA 2 $20, $40, $19, $38, $19, $38, $19, $38, $34, $68, NORTH LIBERTY SEATWALL WITH COLUMNS - 16' LONG (EAST SIDE) EA 2 $22, $44, $19, $39, $19, $39, $19, $39, $35, $70, CORALVILLE MASONRY COLUMNS EA 4 $7, $30, $7, $31, $7, $31, $7, $31, $11, $46, FT. X 3 FT. X 2 FT. LIMESTONE BLOCKS EA 53 $1, $92, $1, $103, $1, $97, $1, $103, $1, $98, LIMESTONE SLAB (OUTCROPPING AT BIKE NODE) EA 16 $ $8, $ $6, $ $4, $ $6, $ $4, NYLOPLAST INLET STRUCTURE (18 INCH) EA 25 $1, $45, $1, $36, $1, $35, $1, $36, $2, $50, NYLOPLAST DISSIMILAR MATERIALS, SPECIAL CONNECTION EA 29 $ $11, $ $8, $ $10, $ $8, $ $8, DIVISION 11 - MISCELLANEOUS CONSTRUCTION SURVEY LS 1 $40, $40, $43, $43, $43, $43, $39, $39, $43, $43, MONUMENT PRESERVATION AND REPLACEMENT LS 1 $5, $5, $5, $5, $5, $5, $3, $3, $5, $5, MOBILIZATION LS 1 $180, $180, $398, $398, $233, $233, $315, $315, $575, $575, CONCRETE WASHOUT LS 1 $1, $1, $2, $2, $2, $2, $5, $5, $ $ UTILITY DUCTS LF 906 $5.00 $4, $10.00 $9, $9.00 $8, $10.00 $9, $11.00 $9, PRECAST REINFORCED CONCRETE BOX CULVERT, 14 FT. X 10 FT. LF 99.5 $1, $139, $1, $109, $1, $109, $1, $109, $1, $109, STRUCTURAL CONCRETE, WING WALLS CY $ $113, $ $132, $ $132, $ $132, $ $132,160.00

5 , IA REINFORCING STEEL, WING WALLS LBS 0 $2.25 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $ CONCRETE BARRIER, BA-102, MODIFIED LF 32 $ $6, $ $8, $ $8, $ $8, $ $8, CONCRETE BARRIER RAIL, BA-107 EA 2 $2, $4, $3, $6, $3, $6, $3, $6, $3, $6, STEEL BEAM GUARDRAIL END ANCHOR, BOLTED EA 2 $ $ $ $ $ $ $ $ $ $ STEEL BEAM GUARDRAIL BARRIER TRANSITION SECTION, BA-201 EA 2 $1, $3, $1, $3, $2, $5, $1, $3, $2, $5, STEEL BEAM GUARDRAIL LF $22.00 $5, $15.00 $3, $28.00 $6, $15.00 $3, $28.00 $6, STEEL BEAM GUARDRAIL TANGENT END TERMINAL, BA-205 EA 2 $2, $4, $2, $4, $3, $6, $2, $4, $3, $6, ORNAMENTAL RAILING LF 910 $ $150, $ $158, $ $142, $95.00 $86, $ $159, FIBER OPTIC DUCTS LF 699 $7.00 $4, $5.35 $3, $7.00 $4, $5.35 $3, $9.00 $6, LIGHTING INSTALLATIONS, L1 EA 28 $5, $154, $6, $181, $5, $141, $6, $181, $5, $157, LIGHTING INSTALLATIONS, L1A EA 5 $5, $27, $6, $32, $5, $25, $6, $32, $5, $27, LIGHTING INSTALLATIONS, L2 EA 49 $4, $235, $5, $283, $5, $246, $5, $283, $5, $267, LIGHTING INSTALLATIONS, L2A EA 3 $5, $15, $5, $17, $4, $14, $5, $17, $5, $16, LIGHTING INSTALLATIONS, L3 EA 12 $ $9, $ $6, $1, $12, $ $6, $ $6, LIGHTING INSTALLATIONS, L3A EA 3 $ $1, $ $ $ $ $ $ $ $ LIGHTING INSTALLATIONS, L3B EA 1 $1, $1, $1, $1, $1, $1, $1, $1, $2, $2, LIGHTING INSTALLATIONS, L4 EA 4 $2, $9, $2, $8, $2, $11, $2, $8, $2, $10, LIGHTING INSTALLATIONS, TL1 EA 7 $ $5, $1, $11, $1, $9, $1, $11, $1, $8, ELECTRICAL CIRCUITS LF 12,716 $9.00 $114, $7.08 $90, $12.49 $158, $7.08 $90, $11.00 $139, LIGHTING CONTROLLER LC2, LC3, LC4 EA 3 $15, $45, $27, $82, $19, $58, $27, $82, $19, $57, LIGHTING CONTROLLER LC5 EA 1 $17, $17, $21, $21, $19, $19, $21, $21, $19, $19, HANDHOLES EA 40 $ $30, $ $17, $ $14, $ $17, $ $24, GALVANIZED RIGID CONDUIT LF 110 $3.00 $ $13.00 $1, $20.00 $2, $13.00 $1, $12.00 $1, PROJECT MANAGEMENT LS 1 $10, $10, $150, $150, $160, $160, $30, $30, $125, $125, SUBTOTAL 1: BASE BID (ITEMS ) $9,678, $8,397, $8,411, $8,511, $9,249,714.67

6 , IA A.01 TOPSOIL, FURNISH AND SPREAD, OFFSITE (6 INCH DEPTH) CY -200 $ $5, $ $2, $ $2, $ $2, $ $2, A.02 SUBGRADE PREPARATION, 12 IN. SY 1,178 $1.50 $1, $0.50 $ $0.50 $ $0.50 $ $0.50 $ A.03 SUBBASE, MODIFIED, 6 IN. SY 1,178 $6.00 $7, $4.25 $5, $4.25 $5, $4.25 $5, $4.25 $5, A.04 PAVEMENT, PCC, 10 IN. SY 1,178 $47.00 $55, $44.20 $52, $44.25 $52, $50.00 $58, $49.00 $57, A.05 SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING (SUDAS TYPE 1) AC $3, $ $3, $ $3, $ $3, $ $3, $ A.06 SEEDING, FERTILIZING, AND MULCHING FOR HYDRAULIC SEEDING (SUDAS TYPE 4) AC $1, $ $2, $ $2, $ $2, $ $2, $ SUBTOTAL 2: ALTERNATE A (ITEMS A.01 - A.06) $57, $53, $54, $60, $59, TOTAL BID: SUM OF SUBTOTAL 1 & SUBTOTAL 2 $9,736, $8,451, $8,465, $8,572, $9,309,336.17

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

ENGINEERING & ENVIRONMENTAL

ENGINEERING & ENVIRONMENTAL 1-800-292-8989 www.iowaonecall.com CITY OF WEST BRANCH, IOWA THIS ENGINEERING DOCUMENT HAS BEEN REVIEWED BY THE JURISDICTION AND IS RECOMMENDED FOR FILING WITH THE CITY CLERK ENGINEERING & ENVIRONMENTAL

More information

Project Book Worksheet for Cost Estimation

Project Book Worksheet for Cost Estimation 001.01 MOBILIZATION LS $34,716.18 007 3/17/2039 001.02 INCIDENTAL LS $23,929.43 019 3/17/2039 001.03 CONSTRUCTION STAKING LS $10,504.39 201 5/9/2013 001.04 REESTABLISH PROPERTY CORNERS EA $496.08 201 5/9/2013

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M.

BID TABULATION REPORT McKINNEY STREET DRAINAGE IMPROVEMENTS PROJECT No. PWDR10012 BID OPENED : TUESDAY, AUGUST 13, :00 P.M. PAVING IMPROVEMENTS McKINNEY 101 Rightofway Preparation LS 1 75,000.00 75,000.00 200,000.00 200,000.00 67,000.00 67,000.00 110,000.00 110,000.00 102 12inch HMAC Street Pulvermix SY 11,650 3.00 34,950.00

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO

CONTRACTOR'S REQUEST FOR PAYMENT CHASKA VETERANS PARK IMPROVEMENTS STANTEC PROJECT NO Owner: City of Chaska, 1 City Hall Plz., Chaska, mn 55318 Date: December 12, 2017 For Period: 12/1/2017 to 1/31/2018 Request No: 1 Contractor: Blackstone Contractors, LLC, 9520 County Rd. 19, Ste. D, Loretto,

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications:

Date: 04/20/2018 City Project No.: Addendum No.: 4. The following changes shall be made to the project plans and specifications: DEVELOPMENT SERVICES PHONE: (209) 668-5520 ENGINEERING DIVISION FAX: (209) 668-5563 156 S. BROADWAY, SUITE 150 TDD: (800) 735-2929 TURLOCK, CA 95380 engineering@turlock.ca.us Date: 04/20/2018 City Project

More information

Oaks Commerce Center

Oaks Commerce Center Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST

BID ITEM ESTIMATED UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY UNIT ITEM COST COST COST COST COST COST PAGE 1 BID OPENING: AUGUST 11, 2011 ENGINEER'S ESTIMATE: $3,108,320.60 CONTRACT NO.110269 SABINO CANYON AND TANQUE VERDE INTERSECTION IMPROVEMENTS *FOR A MORE DETAILED ITEM DESCRIPTION* *REFER TO PROPOSAL

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00001 Removal of Structure 24 EA 202-00019 Removal of Inlet 24 EA 202-00195 Removal of Median cover 930 SY 202-00200 Removal of Sidewalk 1,188 SY 202-00201 Removal of Curb Head 273 LF 202-00203 Removal

More information

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max:

Kansas Department of Transportation DISTRICT 2. Project(s): Min: Max: Page 1 of 23 518122 SECTION: 01 COMMON ITEMS 1 020100 CONTRACTOR CONSTRUCTION STAKING 2 025602 FIELD OFFICE AND LABORATORY (TYPE C) 3 025323 MOBILIZATION 4 070626 MOBILIZATION (DBE) 5 020001 MAINTENANCE

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS

McCRORY & WILLIAMS, INC. HILLCREST ROAD CONNECTOR MCR ROADWAY ITEMS BID TABULATION Hillcrest Road Connector John G. Walton Construction M. C. Williams Contracting Hosea. Weaver & Sons, Inc. BID OPENING: March 25, 29 Company, Inc. Company, Inc. QTY DESCRIPTION DOLLARSjCTS

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

Patton Hill Road (Four Inch Main), Project No

Patton Hill Road (Four Inch Main), Project No Patton Hill Road (Four Inch Main), Project No. 2016100 MP-5.01 MOBILIZATION (3% MAX) 1 LS MP-5.02.8(d) 8" DIP (CLASS 350) ALL DEPTHS 600 LF MP-5.02.6(p) 6" PVC ALL DEPTHS, INCLUDING BEDDING 10 LF MP-5.02.4(p)

More information

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director Project No. 080598 PID 21272 CUY-SR-237-4.93 - PART I (FRONT STREET); CUY-237-4.55 - P Federal Type: RAILROAD

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH

2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH Page 1 2015 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2015 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

CITY OF STANDARD SPECIFICATIONS

CITY OF STANDARD SPECIFICATIONS CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12

More information

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES

SPECIAL GRADING INTERSECTION IMPROVEMENT JOHN WARD RD AT IRWIN RD REVISION DATES 9/20/2017 2:39:11 PM GPLOT-V8 2016104_18-001.dgn Project Number Sheet Total Sheets djackson gplotborder-v8i-po.tbl X2802 30 118 966.5 21+00 L.P. EL. 966.34 L.P. EL. 966.58 0.29% 0.11% 965 H.P. EL. 966.54

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH

2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH Page 1 2016 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR 2016 ENGLISH ITEM ITEM DESCRIPTION UNITS N TOTAL QUANTITY AVERAGE PRICE 106.05100 FIELD LABORATORY

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation

Franklin County Engineer's Office - Highway Design ALKIRE RD & DEMOREST RD ROUNDABOUT CR NO. 11 & CR NO. 25 Bid Tabulation 7/07/2015 Page 1 of 20 Strawser Paving Co., Inc. Shelly & Sands, Inc. Double Z Construction Co Columbus Asphalt Paving, Inc. 1595 Frank Road P.O.Box 2469 2550 Harrison Road 1196 Technology Dr Columbus,

More information

Licensed Class C Virginia Contractor No.

Licensed Class C Virginia Contractor No. month period is seven hundred and fifty thousand dollars (750,000) or more, the Bidder is required under Title 54.11100, Code of Virginia (1950), as amended, to be licensed by the State Board of Contractors

More information

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10)

2017 WEIGHTED AVERAGE BID PRICES WYOMING DEPARTMENT OF TRANSPORTATION AVERAGE UNIT BID PRICES FOR ENGLISH (10) 106.05100 FIELD LABORATORY EA 33 33.00 $12,605.17 201.03201 CLEARING AND GRUBBING ACRE 2 76.00 $1,269.74 201.03206 CLEARING TREES 6 in EA 1 53.00 $122.27 201.03210 CLEARING TREES 10 in EA 3 66.00 $227.33

More information

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14

Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Grays Ferry Cost Estimate Breakdown Budgetary Numbers for Machinery Drive Options 10 Nov 14 Hardesty & Hanover, LLC Alternative 1 Bogie Support System Alternative Based on AW Sketch of New Bridge Component

More information

Macomb County Department of Roads Bid Comparison

Macomb County Department of Roads Bid Comparison Macomb County Department of Roads Bid Comparison Contract ID: 1643 Description: M-53 Freeway to 33 Mile Road Connector to the proposed 33 Mile Road & McKay Road Roundabout Location: Projects(s): M-53 &

More information

CENTER LINE GROUND LINE EXISTING MANHOLE TRUE SCALE SEWER LINES & MANHOLES GAS WATER CULVERT PERMANENT REFERENCE MONUMENT P.R.M.

CENTER LINE GROUND LINE EXISTING MANHOLE TRUE SCALE SEWER LINES & MANHOLES GAS WATER CULVERT PERMANENT REFERENCE MONUMENT P.R.M. STANDARD SYMBOLS AND ABBREVIATIONS EXISTING CATCHBASIN OR INTAKE CENTER LINE B/B BACK TO BACK OF CURBS PCC PORTLAND CEMENT CONCRETE EXISTING MANHOLE TRUE SCALE GROUND LINE B/J BACK TO JOINT PL PROPERTY

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc.

BID TABULATION PAGE 1 OF 4. BL S.R. Harbins Road/Alcovy Road - Intersection Improvements Department of Transporation. CMES, Inc. BID TABULATION PAGE 1 OF 4 E.R. Snell Contractor, Inc. G.P.'s Enterprises, Inc. Est. 1 005 Traffic Control Project No M-0679 1 LS $27,811.00 $27,811.00 $48,800.00 $48,800.00 $22,021.80 $22,021.80 2 010

More information

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Units Est. Qty. Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 1 1500001 Mobilization, Max. $25,000.00 LSUM 1.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 4,400.00 4,400.00 2 2020040 Tree, Rem, 6 inch to 18 inch Ea 2.00 600.00

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013

Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D November 21, 2013 Bid Summary Still Creek Wastewater Improvements Phase III City Job No. 411-D4-1102 November 21, 2013 Doughtie Construction Co., Elliott Construction Dudley Construction Ltd. SUBTOTAL GENERAL ITEMS : $191,713.00

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 180573 PID 93496 FRA-IR 71-01.53 Federal Type: BRIDGE REPLACEMENT (2 BRIDGES) Letting Date: 12/20/2018 Completion

More information

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783.

Tahoe-Reno Industrial Center Total Bonding Amounts Engineer's Opinion of Probable Construction Costs (30% Submittal) Project No. 783. Total Bonding Amounts Brent Farr Date: 05/05/17 Item Project Estimated Cost 1 Induction Well 1 and Britain Ave Non potable Water Line $1,084,353 2 Storage Reservoir Upgrades $11,560,463 3 Booster Station

More information

City of West Branch. Office of the City Administrator

City of West Branch. Office of the City Administrator City of West Branch Office of the City Administrator To: City Council and Mayor From: Matt Muckler, City Administrator Date: October 15, 2016 Weekly Council Update South Downey Construction Schedule: Rathje

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

VIEW ONLY - NOT FOR BIDDING

VIEW ONLY - NOT FOR BIDDING CNRACR S BI AE: PLACE FR CNRACRS SUBMI BIS: ALL PLANHLERS: BRIGEPR WES IMPRVEMENS (SEABAR RIUMPH PARKWAY, BULEVAR F CHAMPINS, AN HARBR RIVE) PRJEC Project No: 6845-719-247 2016 uesday, August 2, 2016,

More information

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32. PROJECT 2506; 2017 ANNUAL REPAIR CONTRACT; J.C. DILLON, INC., CONTRACTED SCHEDULE OF ITEMS, QUANTITIES AND COSTS 1 Hour Lowboy Including Both Permits and Paid Driver $75.00 2 Hour Single Axle Dump Truck

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS

CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS CITY OF DAVIS PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS JANUARY 1996 EDITION ADDENDA THROUGH JULY 2017 DIANNA JENSEN City Engineer 1717 Fifth Street Davis, CA 95616 530-757-5686 2017 Edition STANDARD

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/04 AND 12/31/04 BY ITEM GROUP 201 CONTRACTS - AWARDED TOTAL: $340,971,276 AVERAGE BID PRICES FOR AWARDED PROJECTS 14:37 Wednesday, February 2, 2005 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 17 $920 $54,140.65 17 2011.601/00040 DESIGN LS 1 $4 $3,500.00 1 2011 $924 2013

More information

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND

HOUR TRAINING UNLOCKED HOUR SURVEY CREW UNLOCKED LUMP SUM CLEARING AND GRUBBING UNLOCKED FORCE ACCOUNT CLEARING AND 1100050 HOUR TRAINING UNLOCKED 2000100 HOUR SURVEY CREW UNLOCKED 2010100 LUMP SUM CLEARING AND GRUBBING UNLOCKED 2010110 FORCE ACCOUNT CLEARING AND GRUBBING UNLOCKED 2010120 ACRE CLEARING AND GRUBBING

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1

McCRORY & WILIJAMS, INC. PROJECT NO. MCR-2008-OO1 McCRORY & WILIJAMS, INC. THEODORE DAWES ROADISCHILLINGER ROAD SOUTH BID TABULATION: Theodore DaweslSchillingor Road PROJECT NO.: M5700-2033 BIDDER #1 BIDDER #2 BIDDER #3 Hosea 0. Weaver & Sons, Inc. John

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273

DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 01/01/10 AND 12/31/10 BY ITEM GROUP 211 CONTRACTS - AWARDED TOTAL: $649,895,273 AVERAGE BID PRICES FOR AWARDED PROJECTS 06:54 Friday, February 18, 2011 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 9 $276 $30,713.33 9 2011.601/00010 VIBRATION MONITORING LS 2 $73 $36,700.00 2 2011

More information

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18

ADDENDUM NO. 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18 DECEMBER 6, 2018 ADDENDUM 3 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT GWINNETT COUNTY DEPARTMENT OF WATER RESOURCES RP031-18 ADDITIONAL INFORMATION DOCUMENTS The following document: Questions and Responses

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY

EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY EXHIBIT C [** Subdivision Name **] (** Filing No., Phase No. '] SUMMARY DESCRIPTION QTY J ] COST/ _ ] TOTAL AMOUNT STREET IMPROVEMENTS 16,271 LF $151.6 $2,467,247 WATER DISTRIBUTION SYSTEM LF $412,110

More information

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements

Project # & Name: # CDBG - Pugh Street Streetscape - East College Ave to East Beaver Ave & East Beaver Ave/Locust Lane Improvements Bid Opening Date: May 6, 2014 Time: 11:00 a.m. Surety NCA Surety NCA Yes Yes Yes Yes Total Amount Bid: $1,358,851.00 Total Amount Bid: $1,386,098.72 Item Nos. Approx. Quantities Unit Item & Unit Prices

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Artist Rendering. Design-Build Project for. Route 29 Solutions. Albemarle County, Virginia Contract ID No. C DB80

Artist Rendering. Design-Build Project for. Route 29 Solutions. Albemarle County, Virginia Contract ID No. C DB80 Artist Rendering Design-Build Project for Route 29 Solutions Albemarle County, Virginia Contract ID No. C00077383DB80 Price Proposal January 20, 2015 ATTACHMENT 4.0.1.2 DESIGN-BUILD PRICE PROPOSAL CHECKLIST

More information

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15

Ingham County Request for Proposals Okemos Road and Sandhill Road Widening, Packet #15-15 COST FORM (1 of 5) Packet #15-15, Okemos Road & Sandhill Road Widening Project (Please Type or Print Clearly in Ink) Pay Description Unit Quantity Unit Price Total 1500001 Mobilization, Max. LS 1 2020002

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY (1) McKenna General Engineering, (2) Zusser Company, (3) Palp, (4) C. W. Crosser Construction, 1,155,777.00 1,306,820.00 1,439,957.00 1,461,985.00 1 IMPLEMENTATION OF THE SWP 1 15,000.00 LS 15,000.00 2

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 02/26/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : LEFT & RIGHT TURN LANES AND FLASHING BEACON SYSTEM CONTRACT LOCATION: LOCATED ON TH 7 FROM 327 M WEST OF JCT TH 25 TO 445 M EAST OF JCT TH 25 RECOMMENDATION: AWARD TO LOW

More information

SAN ANTONIO WATER SYSTEM

SAN ANTONIO WATER SYSTEM SAN ANTONIO WATER SYSTEM SAWS WATER JOB NO. 17-5026 2017 SMP MERRY ANN DR. FROM FRANCES JEAN TO DEAD END G:\TXC\Projects\SAWS\SAWS - Merry Ann\03_CADD\01_Sheets\Merry Ann_Water\01_Sheets\1 MANN WATR CVR.dwg

More information

2011 LOCAL STREET IMPROVEMENTS

2011 LOCAL STREET IMPROVEMENTS 11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING April 10, 2018 REVISED Rev 2: Call No. 320, File No. 0247541 - Added Rev 1: Call No. 010, File No. 0425551

More information

Federal Project No.: STP-5A27(380), STP-5A27(381)

Federal Project No.: STP-5A27(380), STP-5A27(381) Order : M42 Schedule of Items Page: 2 Oversight/State Project : (NFO)0649-020-136,C502, C503 Federal Project : STP-5A27(380), STP-5A27(381) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING

More information

County of Los Angeles Department of Public Works BID SUMMARY

County of Los Angeles Department of Public Works BID SUMMARY PROJECT NAME 3RD STREET - INDIANA STREET TO RECORD AVENUE PROJECT ID RDC0015034 Engineer's Estimate (1) Sully-Miller Contracting Company (2) TORO ENTERPRISES, INC. (3) Sequel Contractors, Inc. (4) All

More information

L1.0 DEMOLITION EXISTING CONDITIONS/ DEMOLITION NOTES EXISTING

L1.0 DEMOLITION EXISTING CONDITIONS/ DEMOLITION NOTES EXISTING EXISTING TREES [TYP] 910' 912' 914' 916' 918' 920' & DRAINTILE EXISTING TREES [TYP] EXISTING DOWNSPOUT & DRAINTILE 920' 918' N GARAGE 904' 906' 908' 3 4 PARKING 5 6 7 BONAVENTYURE CONDOS 8 916' 914' ENTRANCE

More information

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications.

Proposal, pages P-1 through P-8 of the Contract Documents and Specifications. ADDENDUM 2 PROJECT: POKAGONEK AWAT HARTFORD CLIENT: ISSUE DATE: JUL 1, 2015 The following clarifications and changes shall be included in the Plans and Specifications for the above referenced project,

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

CENTENNIAL PARK EXPANSION

CENTENNIAL PARK EXPANSION 2 working days CITY ELKO EXISTING LEGEND PROPOSED CENTENNIAL PARK EXPANSION SEET LIGHT POWER POLE ELECICAL BOX 1-800-227-2600 AVOID CUTTING UNDERGROUND UTILITIES WATER VALVE GAS VALVE FIRE HYDRANT OWNER/DEVELOPER: