1 Preventative Maintenance Task Sheet Plant/Equipment: Job ID: 8711 Site Address: Asset Name: Location: Existing Building KHCCAHU026 ID EG-004 MECHANICAL ROOM Date of Service: Log Book Location: System Code No.: 12-Jun-2016 AHU G - 6 Operating Hours: Technician Name: Technician Contact No.: Make: Jonathan Layug Model: SerialNo: York YSM40*60 XSM04851 Job Start Date & Time: Equipment End Date & Time: Maintenance Frequency: 12-Jun :00 pm Equipment Start Date & Time: 12-Jun :10 pm Job End Date & Time: HALF YEARLY 12-Jun :50 pm General Instructions 12-Jun :00 pm Air Handling Unit (AHU) - HY Ensure the contractor carry out PPM tasks on time, safe manner, and correctly as per checklist. Select the appropriate frequency of check box to carry out the PPM.

2 Tasklong Range units Bef Value Aft Value Completed NA Follow Up Remarks 1 (M) Inspect Unit Isolator. Ensure electrical connection are tight and not loose nor over-heating. Test and reset emergency switch. 2 (M) check heater condition and operation performance. 3 (M) Inspect blowers, shafts, motors, pulleys, and belts. Inspect and Lubricate bearings. Ensure no vibration/noise. 4 (M) Inspect and adjust tension and alignment of belts drive and replace if necessary. 5 (M) Inspect and clean all Bag and Pre-Filters. Replace if necessary 6 (M) Inspect and clean condensate drain pan, flush drain line, and service drain pump. 7 (M) Inspect and clean water coils with water. Inspect seals and piping for leaks and rectify as necessary. Inspect and Clean unit casing. 8 (M) Perform functional test of all thermostat, safety cut-out & automatic controls and FSR shutdown is operational. 9 (M) Inspect electrical components in the control panel and check indication lamps/switches. 10 (M) Inspect and test actuators, valves, clean, adjust and lubricate the spindle as necessary. Inspect and test motorized dampers and smoke dampers. 11 (M) Check all anti-vibration isolators for deterioration of rubber and spring. Inspect and tighten all bolts and nuts. 12 (M) Inspect the proper function of Variable Frequency Drive (VFD). 13 (M) Check and record operating voltage, phase balance, and amperage. 14 (Q) Check and record motor temperature and insulation value and tighten motor terminal. 15 (Q) Check unit panels for corrosion, air leakage, worn insulation and touch up if necessary. 16 (Q) Clean air supply and return air diffusers. 17 (Q) Check and comb all dented fins of the cooling coils. 18 (HY) test VAV operation. Inspect actuator and damper mechanism. Check transformer condition. Lubricate moving parts.

3 Comments Contractor : Name & Signature : Signature UGS Rep : Client Rep :

4 Preventative Maintenance Task Sheet Plant/Equipment: Job ID: 8918 Site Address: Asset Name: Location: Existing Building KHCCWAC009 Medical Records Date of Service: Log Book Location: System Code No.: 05-Jun-2016 Operating Hours: Technician Name: Medical Records Technician Contact No.: Make: Jonathan Layug Model: SerialNo: Job Start Date & Time: N/A Equipment End Date & Time: N/A Maintenance Frequency: 05-Jun :00 pm Equipment Start Date & Time: 05-Jun :10 pm Job End Date & Time: HALF YEARLY 05-Jun :50 pm General Instructions 05-Jun :00 pm Window Type AC Unit (WAC) - HY Ensure the contractor carry out PPM tasks on time, safe manner, and correctly as per checklist. Select the appropriate frequency of check box to carry out the PPM. Tasklong Range units Bef Value Aft Value Completed NA Follow Up Remarks 1 General Check For Abnormality, Noise & Vibration 2 Check Electrical Connections & Clean Panel 3 Check & Clear Drain Water Flow 4 Clean/Replace Air Filters 5 Clean & Wash Evaporator / Condenser (If Required) 6 Clean Drip Tray And Drain Pan 7 Measure Unit Current & Voltage 8 Narc / Itmc Reference Number/Time 9 General cleaning and housekeeping in the area Comments Contractor : Name & Signature : Signature UGS Rep : Client Rep :

5 Preventative Maintenance Task Sheet Plant/Equipment: Job ID: 9441 Site Address: Asset Name: Location: Existing Building KHCCSTA133x ID EG-123 COMP-ROOM(ADMIN DEPT) Date of Service: Log Book Location: System Code No.: 04-Jun-2016 Operating Hours: Technician Name: KHCCSTA133 Technician Contact No.: Make: Jonathan Layug Model: SerialNo: Job Start Date & Time: H2 DB024S06A Equipment End Date & Time: EANM Maintenance Frequency: Equipment Start Date & Time: Job End Date & Time: HALF YEARLY General Instructions Air Curtain Unit (ACU) - HY Ensure the contractor carry out PPM tasks on time, safe manner, and correctly as per checklist. Select the appropriate frequency of check box to carry out the PPM. Tasklong Range units Bef Value Aft Value Completed NA Follow Up Remarks 1 (Q) Inspect Unit Isolator. Ensure electrical connection are tight and not loose nor over-heating. Test and reset emergency switch. 2 (Q) Visual Inspection, general cleaning 3 (Q) Tyers visual check (must be free from oil,grease,tar and degreaser) 4 (Q) Cracks or slight cuts on the rolling surface are admissible 5 (Q) Check rolling surface for wear & tears 6 (Q) Check tighten torque, wheels fixing screws 7 (Q) Inspect electrical components in the control panel and check indication lamps/switches. 8 (Q) General Check For Abnormality, Noise & Vibration 9 (Q) Check Electrical Connections 10 (Q) Clean Blower & Internal Housing 11 (HY)Tyers visual check (must be free from oil,grease,tar and degreaser 12 (HY)Cracks or slight cuts on the rolling surface are admissible 13 (HY)Check rolling surface for wear & tears 14 (HY)Check Air Flow ( High / Medium / Low)

6 Comments Contractor : Name & Signature : Signature UGS Rep : Client Rep :

7 Preventative Maintenance Task Sheet Plant/Equipment: Job ID: 9444 Site Address: Asset Name: Location: Existing Building KHCCFCU009x ID EB 022 HVAC WORKSHOP Date of Service: Log Book Location: System Code No.: 04-Jun-2016 Operating Hours: Technician Name: KHCCFCU009 Technician Contact No.: Make: Jonathan Layug Model: SerialNo: Job Start Date & Time: N/A Equipment End Date & Time: N/A Maintenance Frequency: Equipment Start Date & Time: Job End Date & Time: HALF YEARLY General Instructions Air Curtain Unit (ACU) - HY Ensure the contractor carry out PPM tasks on time, safe manner, and correctly as per checklist. Select the appropriate frequency of check box to carry out the PPM. Tasklong Range units Bef Value Aft Value Completed NA Follow Up Remarks 1 (Q) Inspect Unit Isolator. Ensure electrical connection are tight and not loose nor over-heating. Test and reset emergency switch. 2 (Q) Visual Inspection, general cleaning 3 (Q) Tyers visual check (must be free from oil,grease,tar and degreaser) 4 (Q) Cracks or slight cuts on the rolling surface are admissible 5 (Q) Check rolling surface for wear & tears 6 (Q) Check tighten torque, wheels fixing screws 7 (Q) Inspect electrical components in the control panel and check indication lamps/switches. 8 (Q) General Check For Abnormality, Noise & Vibration 9 (Q) Check Electrical Connections 10 (Q) Clean Blower & Internal Housing 11 (HY)Tyers visual check (must be free from oil,grease,tar and degreaser 12 (HY)Cracks or slight cuts on the rolling surface are admissible 13 (HY)Check rolling surface for wear & tears 14 (HY)Check Air Flow ( High / Medium / Low)

8 Comments Contractor : Name & Signature : Signature UGS Rep : Client Rep :

START-UP CHECKLIST. Date: Job Name: Customer Name: Address: City: State: Zip: Model Number: Serial Number: Qualified Start-up Technician:

START-UP CHECKLIST. Date: Job Name: Customer Name: Address: City: State: Zip: Model Number: Serial Number: Qualified Start-up Technician: START-UP INSTRUCTION OPTIMUM 36000 To 72000 BTU S PACKAGE UNITS 3 To 6 Ton START-UP CHECKLIST Date: Job Name: Customer Name: Address: City: State: Zip: Model Number: Serial Number: Qualified Start-up Technician:

More information

START-UP CHECKLIST. Date: Job Name: Customer Name: Address: City: State: Zip: Model Number: Serial Number: Qualified Start-up Technician:

START-UP CHECKLIST. Date: Job Name: Customer Name: Address: City: State: Zip: Model Number: Serial Number: Qualified Start-up Technician: START-UP INSTRUCTION START-UP CHECKLIST SERIES 5 36000 To 72000 BTU S PACKAGE UNITS 3 To 6 Ton Date: _ Job Name: Customer Name: Address: City: State: Zip: Model Number: Serial Number: Qualified Start-up

More information

Electric Duct Heater X X X X X X

Electric Duct Heater X X X X X X EHIBIT B-SERVICE SCHEDULE & CHECKLIST Electric Duct Heater Comprehensives Check overall condition of unit Check for unusual noise and vibration Check Voltage Check Controls Check and insure that heater

More information

Air Handling Unit Construction Checklist

Air Handling Unit Construction Checklist Air Handling Unit Construction Checklist Project: Date: AHU Tag: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

BOILER PM & INSPECTION

BOILER PM & INSPECTION BOILER PM & INSPECTION Record inspection log for Gaming Commission and Safety Department. The following listed maintenance items are not intended to be a complete list. Follow any additional maintenance

More information

Heating and Gas Installations - December 2014

Heating and Gas Installations - December 2014 This is an example of good practice maintenance specifications. It is not exhaustive and should only be used to assist with facilities management or specification of a maintenance contract. Emergency Gas

More information

Engine Compartment Inspection

Engine Compartment Inspection Engine Compartment Inspection Unit Contents Student Page Student Components Learning Activities Sheet... 7 3 Abbreviated Checklist.... 7 5 Objective Sheet... 7 7 Expanded Checklist... 7 9 * Job Sheets

More information

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis.

CENTRIFUGAL CHILLER. Lubrication System Pull oil sample for spectroscopic analysis. CENTRIFUGAL CHILLER Annual Inspection Refrigerant Circuit Check and record refrigerant level Inspect for leak results Calculate refrigerant lass and report to the customer. Repair minor leaks as required

More information

BAS Construction Checklist

BAS Construction Checklist BAS Construction Checklist Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist items

More information

DIM Heating and Air Conditioning

DIM Heating and Air Conditioning 2014 NATEF JOB TASKS COMPLETION REQUIREMENT: P1-95% P2-70% P3-25% Student Name: DETAILED COURSE CONTENT VI. HEATING, VENTILATION, & AIR CONDITIONING A. HVAC SYSTEMS -- The student will be able to: P1 P2

More information

6. Document tasks performed during visit and report any observations to the appropriate

6. Document tasks performed during visit and report any observations to the appropriate Chiller Annual Maintenance RFP Attachment B Services Required Tasking: Vibration Analysis 1. All work shall be performed in accordance with safety policies 2. Check with appropriate customer representative

More information

1) Scheduled maintenance checks

1) Scheduled maintenance checks 1) Scheduled maintenance checks Definition This section lists the periodic inspections which must be carried out after a specified periods of operation. Intervals Periodic inspections are those which must

More information

REPLACEMENT PARTS MANUAL

REPLACEMENT PARTS MANUAL REPLACEMENT PARTS MANUAL WAA-C Wall-Mount Air Conditioner with 0- VFD-High Resistance Ground Kit NOTE: For installation guidance for the 0- kit, contact Bard Technical Services at () -0. Contents Description

More information

POWER EXHAUST START UP PRE START UP ONCE THE POWER EXHAUST ECONOMIZER IS INSTALLED, REMOVE THE ACCESS DOORS ON THE EXHAUST CABINET. ROUTE LINE VOLTAGE CABLE FROM THE VFD TO THE DISCONNECT OR UNIT POWER

More information

COOLING SYSTEM. Return to Main Table of Contents

COOLING SYSTEM. Return to Main Table of Contents COOLING SYSTEM Return to Main Table of Contents GENERAL... 2 COOLING SYSTEM... 7 RADIATOR... 9 ENGINE COOLANT PUMP... 12 THERMOSTAT... 14 ENGINE COOLANT TEMPERATURE SENDER &, SENSOR... 15 ENGINE COOLANT

More information

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks.

ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks. ALTERNATOR STARTUP Turning gear to full operation. Procedure initiated by:. 7/03 Before starting procedure, remove all check marks. 1. Check log book for incomplete compliance for further operation. 2.

More information

4.2 Component Identification

4.2 Component Identification Digital Control Panels Deep Sea Electronics 5220 4.1 General 4.2 Component Identification 4.3 The YML5220 Controller 4.4 Description of Controls 4.5 Navigation 4.5.1 General Navigation 4.5.2 The Event

More information

System Verification Checklist

System Verification Checklist Manufacturer: Model Number: Unit Identification/Installation Equipment and Piping Identification Affixed, Specification 230553 Comply with Equipment Manufacturer s Written Installation Instructions Extra

More information

Quarries National Joint Advisory Committee (QNJAC) Plant Safety. Information Sheet 3. November Drill Rigs Maintenance and Safety checks

Quarries National Joint Advisory Committee (QNJAC) Plant Safety. Information Sheet 3. November Drill Rigs Maintenance and Safety checks Quarries National Joint Advisory Committee (QNJAC) Plant Safety Information Sheet 3 November 2011 Drill Rigs Maintenance and Safety checks This Information Sheet has been developed by the Quarries National

More information

Service/Inspection Checklist and Report

Service/Inspection Checklist and Report Fastrac 2155 and 2170 Service/Inspection Checklist and Report Fastrac 2155 and 2170 Issued by JCB Technical Publications, JCB Service, World Parts Centre, Beamhurst, Uttoxeter, Staffordshire, ST14 5PA,

More information

Pump Acceptance Test Data

Pump Acceptance Test Data Customer Location: 500 Base Ave East Venice, Fl. 34275 941-485-5402 941-483-3321 Fax Pump Acceptance Test Data Division: Customer Number: Date: City & State Work Order: Technician: PUMP IF VERTICAL TYPE

More information

REPLACEMENT PARTS MANUAL

REPLACEMENT PARTS MANUAL REPLACEMENT PARTS MANUAL PACKAGE HEAT PUMP Models: PH242-A PH363-A PH302-A PH363-B General Notes Revised and/or additional pages may be issued from time to time. A complete and current manual consists

More information

Planned Preventative Maintenance Schedule. AC Systems PPM Schedule

Planned Preventative Maintenance Schedule. AC Systems PPM Schedule Planned Preventative Maintenance Schedule AC Systems PPM Schedule Support Planned and contracted maintenance services To ensure that data centre or building services are always operating to their full

More information

Issue 4 (Record Only) Job #: Innovent Submittal Date: October 30, 2012 Project: Location: Columbus, OH Innovent Job #: Submittal Issue: 4 (Record Only) Engineer: Contractor: Tag Innovent Model # AHU-BG-01

More information

WX-900 Oil (REV. 08/09)

WX-900 Oil (REV. 08/09) WX-900 Oil (REV. 08/09) Oil Heat System Evaluation: Kentucky Housing Corporation Department of Design & Construction Review (Weatherization) Clients Name: Job #: : A. B. C. Heating Unit Location Make &

More information

D M S 760 C01 A A 1 1

D M S 760 C01 A A 1 1 CONTENTS Description Features Options Available Selection Method Product Data Cooling Performance Data (85 F Ambient Cooling Performance Data (95 F Ambient) Cooling Performance Data (105 F Ambient)..............................

More information

FABER BURNER ROUTINE MAINTENANCE

FABER BURNER ROUTINE MAINTENANCE FABER BURNER ROUTINE MAINTENANCE Version 2016 The Faber burner is designed for minimal maintenance; however, the frequency and quantity of maintenance that is required depends upon many factors which vary

More information

HUNTLEY COMMUNITY SCHOOL DISTRICT #158 Addendum No. 1 to Bid Specifications for HVAC Preventative Maintenance Services Bid #

HUNTLEY COMMUNITY SCHOOL DISTRICT #158 Addendum No. 1 to Bid Specifications for HVAC Preventative Maintenance Services Bid # HUNTLEY COMMUNITY SCHOOL DISTRICT #158 Addendum No. 1 to Bid Specifications for Bid # 2017-44 8-15-17 Dear Bidders; Following is Addendum No. 1 for Bid Specification for Bid # 2017-44 for Huntley Community

More information

Unit Number: RDC001 SMU: Date: Feb 2, 2014

Unit Number: RDC001 SMU: Date: Feb 2, 2014 MAINTCLF002 CAT 777BCD DUMP TRUCK 500HR SERVICE Unit Number: C001 SMU: 10256 Date: Feb 2, 2014 SAMPLE Initial Engine Transmission Hydraulic / Brakes Steering Front hubs LH (X) RH (X) Differential Final

More information

INSPECTION FORM. Percuss. hours 1109* Shut down of suction for water holes x Water injector SanRemo. See report for more information

INSPECTION FORM. Percuss. hours 1109* Shut down of suction for water holes x Water injector SanRemo. See report for more information 1 (1) - Sandvik Surface TH/DTH Drills equipment Brand Ingersoll Rand Type CM780D Inspector Inspection date 7 April 016 Manufacture year Serial number USSG78379M Q Engine hours 6930 Percuss. hours 1109*

More information

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST

AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST AIR COMPRESSOR OPERATING INSTRUCTION AND PARTS LIST BELT TYPE IMPORTANT PLEASE MAKE CERTAIN THAT THE PERSON WHO IS TO USE THIS EQUIPMENT CAREFULLY READS AND UNDERSTANDS THESE INSTRUCTIONS BEFORE STARTING

More information

GENERAL SPECIFICATIONS 25-2 GENERAL. Water cooling, forced circulation with electric fan

GENERAL SPECIFICATIONS 25-2 GENERAL. Water cooling, forced circulation with electric fan COOLING SYSTEM GENERAL 2 COOLING SySTEM 8 RADIATOR 10 RADIATOR FAN MOTOR ASSY 12 WATER PUMP 14 THERMOSTAT 16 WATER HOSE AND PiPE 17 WATER TEMPERATURE GAUGE UNIT AND SENSOR 18 GENERAL GENERAL Y25CAOA SPECIFICATIONS

More information

Pagla Sewage Treatment Plant

Pagla Sewage Treatment Plant Draft Dhaka Water Supply and Sewerage Authority of Volume 3 Pagla Sewage Treatment Plant May 2010 Schedule of maintenance activities are to assist the maintenance personnel of Dhaka WASA to conduct maintenance

More information

INSTALLATION & OPERATION MANUAL. Fan Powered Terminals VAV TERMINALS. Redefine your comfort zone.

INSTALLATION & OPERATION MANUAL. Fan Powered Terminals VAV TERMINALS. Redefine your comfort zone. INSTALLATION & OPERATION MANUAL Fan Powered Terminals VAV TERMINALS IOM FAN POWERED TERMINALS Receiving Inspection After unpacking the terminal, check it for shipping damage. If any shipping damage is

More information

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE BENNETT CNG DISPENSER MAINTENANCE SCHEDULE Serial #: DIN #: Company Name: CAUTION: Only trained personnel may work on dispensers. CAUTION: The emergency shut off valve if installed must be closed. CAUTION:

More information

PIPER AIRCRAFT CORPORATION

PIPER AIRCRAFT CORPORATION PA-28-181 INSPECTION REPORT ARCHER II ARCHER III PIPER AIRCRAFT CORPORATION (PART NUMBER 230 1039) PIPER AIRCRAFT CORPORATION INSPECTION REPORT This form meets requirements of FAR Part 43 Inspections must

More information

VERTICAL SINGLE AND DOUBLE WALL BELT DRIVE AIR HANDLER DX OR CHILLED WATER COOLING WITH HOT WATER OR ELECTRIC HEAT

VERTICAL SINGLE AND DOUBLE WALL BELT DRIVE AIR HANDLER DX OR CHILLED WATER COOLING WITH HOT WATER OR ELECTRIC HEAT VERTICAL SINGLE AND DOUBLE WALL BELT DRIVE AIR HANDLER DX OR CHILLED WATER COOLING WITH HOT WATER OR ELECTRIC HEAT SIZES FROM 600 TO 4,000 All Technical Specifications are Subject to Change without Notice.

More information

AirBrakeSystems. "Safety - Technology - Support" WABCO TRAILER EBS INSPECTION & SERVICE PROCEDURES AIR BRAKE SYSTEMS PTY LTD

AirBrakeSystems. Safety - Technology - Support WABCO TRAILER EBS INSPECTION & SERVICE PROCEDURES AIR BRAKE SYSTEMS PTY LTD WABCO TRAILER EBS INSPECTION & SERVICE PROCEDURES AIR BRAKE SYSTEMS PTY LTD 16 Leighton Place, Hornsby NSW 2077 Tel: 02 9482 1733 Fax: 02 9476 1828 "" E: sales@airbrake.com.au W: www.airbrake.com.au Additional

More information

Compressor Installation Guide. Technical helpline :

Compressor Installation Guide. Technical helpline : Compressor Installation Guide Technical helpline : 0843 330 4097 Compressor Installation All air-conditioning repairs should only be undertaken by someone that has sufficient knowledge and training that

More information

Operating Instructions for Models Cobra and Lynx Air and Duct Leakage Testers: (Inlet Damper and Digital Gauges)

Operating Instructions for Models Cobra and Lynx Air and Duct Leakage Testers: (Inlet Damper and Digital Gauges) Operating Instructions for Models Cobra and Lynx Air and Duct Leakage Testers: (Inlet Damper and Digital Gauges) Table of Contents Introduction Introduction.. 2 Safety Precautions Safety Precautions. 2

More information

Vibration Damper - Installation (0-118) Fan Hub - Installation (0-119)

Vibration Damper - Installation (0-118) Fan Hub - Installation (0-119) Vibration Damper - Installation (0-118) Section 0 - Engine Disassembly and Assembly - Group 00 Page 0-110 B Series Shop Manual 10 mm Install the package. Torque Value: 24 N m [18 ft-lb] Vibration Damper

More information

Service Schedule Chevrolet Utility

Service Schedule Chevrolet Utility 1. This Service Schedule will have preference over the Owner's Manual and Warranty & Service Guide 2. Refer to the Warranty and Service Guide for Severe Driving Conditions. 3. Consult the Owner/Customer

More information

Safety Precautions. If a vehicle fire occurs, extinguish it with a Class D powder-type fire extinguisher.

Safety Precautions. If a vehicle fire occurs, extinguish it with a Class D powder-type fire extinguisher. Safety Precautions Your Toyota Prius has both high-voltage DC and AC systems as well as a 12-volt system. Both DC and AC high voltage are very dangerous and can cause personal injury, severe burns, electric

More information

A U T O. Maintenance and Light Repair. National Institute for AUTOMOTIVE SERVICE EXCELLENCE

A U T O. Maintenance and Light Repair. National Institute for AUTOMOTIVE SERVICE EXCELLENCE S T U D Y G U I D E A U T O Maintenance and Light Repair National Institute for AUTOMOTIVE SERVICE EXCELLENCE Overview This guide is intended to help technicians study for the ASE Auto Maintenance & Light

More information

Q6SE Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. Single Packaged Heat Pump, Single Phase

Q6SE Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. Single Packaged Heat Pump, Single Phase TECHNICAL SPECIFICATIONS Q6SE Series Single Packaged Heat Pump, Single Phase Q6SE-14 SEER, 8.0 HSPF 2-5 Ton Units Cooling: 23,000 to 58,000 Btuh Heating: 22,800 to 59,000 Btuh The Q6 Series single packaged

More information

TECHNICAL GUIDE GENERAL SPECIFICATIONS COMMERCIAL SPLIT-SYSTEM COOLING UNITS FOUR PIPE SYSTEM OUTDOOR UNIT:

TECHNICAL GUIDE GENERAL SPECIFICATIONS COMMERCIAL SPLIT-SYSTEM COOLING UNITS FOUR PIPE SYSTEM OUTDOOR UNIT: 036-21323-001-B-0202 GENERAL SPECIFICATIONS OUTDOOR UNIT: Two independent refrigerant circuits Inherently protected fan motors Two independent scroll compressors V-Coil Design Exterior service port connections

More information

Quarries National Joint Advisory Committee (QNJAC) Plant Safety. Information Sheet 1. November Mobile Plant Maintenance and Safety checks

Quarries National Joint Advisory Committee (QNJAC) Plant Safety. Information Sheet 1. November Mobile Plant Maintenance and Safety checks Quarries National Joint Advisory Committee (QNJAC) Plant Safety Information Sheet 1 November 2011 Mobile Plant Maintenance and Safety checks This Information Sheet has been developed by the Quarries National

More information

Diesel Technology: Engines

Diesel Technology: Engines Diesel Technology: Engines NATEF Crosswalk The following NATEF Diesel Engines tasks (rev. 2004) are covered in this publication. The chart shows where each task is located within the publication. The first

More information

GP4SN Series TECHNICAL SPECIFICATIONS. Single Packaged Electric Cooling Units. P4SN 10.3 EER Commercial System 7½ and 10 Ton Units

GP4SN Series TECHNICAL SPECIFICATIONS. Single Packaged Electric Cooling Units. P4SN 10.3 EER Commercial System 7½ and 10 Ton Units TECHNICAL SPECIFICATIONS GP4SN Series Single Packaged Electric Cooling Units P4SN 10.3 EER Commercial System 7½ and 10 Ton Units These 7½ and 10 ton units are designed specifically for retrofit applications

More information

A I R H A N D L E R S CB26UH-R. MERIT Series R-22 - Upflow / Horizontal P R O D U C T S P E C I F I C AT I O N S

A I R H A N D L E R S CB26UH-R. MERIT Series R-22 - Upflow / Horizontal P R O D U C T S P E C I F I C AT I O N S P R O D U C T S P E C I F I C AT I O N S A I R H A N D L E R S CB6UH-R MERIT Series R- - Upflow / Horizontal Bulletin No. 1067 April 01 Supersedes January 01 Nominal Capacity - 1.5 to 5 Tons Optional Electric

More information

University of Delaware

University of Delaware SECTION 23 36 00 _ SUMMARY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Constant/Variable volume supply terminal units. 2. Fan powered terminal units. 3. Exhaust valves B. Related Sections: Section

More information

Daikin McQuay. Large Capacity Fan Coil Direct Drive. HCDB, HHDB Design 1. Replacement Parts List No Revision B 03/2016

Daikin McQuay. Large Capacity Fan Coil Direct Drive. HCDB, HHDB Design 1. Replacement Parts List No Revision B 03/2016 Replacement s List 70002400 Revision B 03/206 Daikin McQuay Large Capacity Fan Coil Direct Drive HCDB, HHDB 06-20 Design To find your Daikin Applied parts distributor, call -800-377-2787 or visit www.daikinapplied.com

More information

Medium Heavy Vehicle Hydraulics 1

Medium Heavy Vehicle Hydraulics 1 Medium Heavy Vehicle Hydraulics Student/intern information: Name Class Vehicle used for this activity: Year Make Model Odometer VIN Learning Objective / Task (Actuators) 2007 NATEF Reference Number 2007

More information

AIR HANDLING UNIT. MODEL: PM0809 to PM CFM to CFM

AIR HANDLING UNIT. MODEL: PM0809 to PM CFM to CFM AIR HANDLING UNIT MODEL: PM0809 to PM2738 700CFM to 41000 CFM POWER METAL TECHNOLOGIES (M) SDN BHD Lot 37830, Jalan Bukit Naga, Kampung Bukit Naga, Section 32, 40460 Shah Alam, Selangor Darul Ehsan. Tel:

More information

Planned Maintenance Agreement Renewal Between Illingworth-Kilgust Mechanical, Inc. and River Valley School District

Planned Maintenance Agreement Renewal Between Illingworth-Kilgust Mechanical, Inc. and River Valley School District Milwaukee Location: Madison Location: 11217 W. Becher St. 6950 Gisholt Drive Milwaukee, WI 53227-1032 Madison, WI 53713-4828 Phone: 414.476.5790 Phone: 608.222.9196 Fax: 414.476.0916 Fax: 608.222.3339

More information

REPLACEMENT PARTS MANUAL

REPLACEMENT PARTS MANUAL REPLACEMENT PARTS MANUAL WALL MOUNTED PACKAGE AIR CONDITIONER Models: HAA-A HAA-A H0AA-A HAA-A HAA-B HAA-B H0AA-B HAA-B Contents Description Page Cabinet Components Exploded View... Usage List... Usage

More information

READ AND SAVE THESE INSTRUCTIONS

READ AND SAVE THESE INSTRUCTIONS READ AND SAVE THESE INSTRUCTIONS Part #469003 Model Vektor -H Installation Operation and Maintenance Manual for Vektor-H Laboratory Exhaust System Receiving Greenheck model Vektor-H fans are thoroughly

More information

ENGINE COOLING SYSTEM

ENGINE COOLING SYSTEM B ENGINE A SECTION ENGINE COOLING SYSTEM CO C D CONTENTS E PRECAUTIONS... 2 Precautions for Supplemental Restraint System (SRS) AIR BAG and SEAT BELT PRE-TEN- SIONER... 2 Precautions for Liquid Gasket...

More information

PERFORMANCE DATA TYPICAL FIELD WIRING CERTIFIED DIMENSION PRINT CERTIFIED ROOF CURB DIMENSION PRINTS

PERFORMANCE DATA TYPICAL FIELD WIRING CERTIFIED DIMENSION PRINT CERTIFIED ROOF CURB DIMENSION PRINTS 50FN-1SB 50FNX,FNY078,088,104 SINGLE-PACKAGE COOLING UNITS CONSTANT/VARIABLE AIR VOLUME PRODUCT INTEGRATED CONTROLS CARRIER COMFORT NETWORK COMPATIBLE WITH INTEGRAL ECONOMIZER AND HIGH-CAPACITY MODULATING

More information

HVAC HOUSING - REMOVAL AND INSTALLATION

HVAC HOUSING - REMOVAL AND INSTALLATION 2005 Jeep Truck Grand Cherokee 4WD V8-4.7L VIN N Vehicle > Heating and Air Conditioning > Housing Assembly HVAC > Service and Repair > Removal and Replacement HVAC HOUSING - REMOVAL AND INSTALLATION REMOVAL

More information

Component Coverage* A/C Presidential Plan. A/C Executive Plan $ $278

Component Coverage* A/C Presidential Plan. A/C Executive Plan $ $278 Honest Abe Plumbing, Heating, and Cooling is pleased to offer you our exclusive maintenance agreements. Our Executive and Presidential plans not only offer our thorough annual inspection, and priority

More information

Engine Leaks and Cures

Engine Leaks and Cures Engine Leaks and Cures The following information, printed in blue, is taken with permission from the website of Antique Engine Rebuilding located in Skokie Illinois. I have inserted a few pictures within

More information

Section 10 Chapter 17

Section 10 Chapter 17 Section 10 Chapter 17 24 Valve, 8.3 Liter Engine Air Intake System Note: All coding used in the 8.3 Liter and 9 Liter engine manuals are Cummins engine codes. These engine codes have no meaning to New

More information

Wiring diagrams on page 29 are for reference only. For detailed vehicle wiring refer to Navistar documents.

Wiring diagrams on page 29 are for reference only. For detailed vehicle wiring refer to Navistar documents. 1 10/2014 REV 7 !!Attention!! Before performing diagnostics: Wiring diagrams on page 29 are for reference only. For detailed vehicle wiring refer to Navistar documents. Check for Fault Codes using the

More information

ELTAFANTECH Air Handling Unit 700 up to 42,000 CFM

ELTAFANTECH Air Handling Unit 700 up to 42,000 CFM an ELTA GROUP company ELTAFANTECH 700 up to 42,000 CFM INNOVATIVE Design & Performance INTRODUCTION There are 24 standard sizes of optimally engineered s to handle air volumes from 700 CFM to 42,000CFM.

More information

SERVICE & OWNER S MANUAL

SERVICE & OWNER S MANUAL 1 of 10 SERVICE & OWNER S MANUAL Product Specifications 25 x 36 x 7 Weight: 47 lbs. Air Flow: 260 CFM Air Conditioner p/n: 1ACUNIT-G1 Fits with Curtis Roof Kit: Contact Curtis for Details. Fits with Curtis

More information

INSTALLATION MANUAL TBH/TBV BELT DRIVE BLOWER-COIL UNITS HORIZONTAL. Redefine your comfort zone.

INSTALLATION MANUAL TBH/TBV BELT DRIVE BLOWER-COIL UNITS HORIZONTAL. Redefine your comfort zone. INSTALLATION MANUAL TBH/TBV BELT DRIVE BLOWER-COIL UNITS HORIZONTAL BELT DRIVE BLOWER-COIL UNITS TBH/TBV, HORIZONTAL Table of Contents Safety Symbols & Considerations...3 Return / Exhaust Casing Extension...4

More information

Air Handling Units. Geniox. Accessories

Air Handling Units. Geniox. Accessories Air Handling Units Geniox Accessories The right accessories are important to optimise your Geniox air handling unit to the task at hand. SystemairCAD provides you with a wide selection of accessories.

More information

24-00 ELECTRICAL POWER

24-00 ELECTRICAL POWER ELECTRICAL POWER 1. GENERAL This chapter contains information on DC Generation, External Power, and Electrical Load Distribution. The airplane is equipped with a two-alternator, two-battery, 28-volt direct

More information

BAAS Component AS 2017 Rev. 01 INSTALLATION, OPERATION AND MAINTENANCE MANUAL - DAMPERS

BAAS Component AS 2017 Rev. 01 INSTALLATION, OPERATION AND MAINTENANCE MANUAL - DAMPERS BAAS Component AS 2017 Rev. 01 INSTALLATION, OPERATION AND MAINTENANCE MANUAL - DAMPERS 1 List of Contents 1 INSTALLATION, OPERATION AND MAINTENANCE MANUAL... 3 1.1 GENERAL INTRODUCTION... 3 1.2 SCOPE...

More information

CWK Circular duct coolers for cooled water

CWK Circular duct coolers for cooled water Circular duct coolers for cooled water Circular duct coolers for cooled water The with circular duct connection uses chilled water as the energy carrier and is used for cooling the ventilation air in a

More information

TECHNICAL GUIDE DESCRIPTION MODELS: D4HH 024 THRU 180 HORIZONTAL FEATURES SINGLE PACKAGE AIR CONDITIONERS HORIZONTAL INDOOR & CONDENSER AIR FLOW

TECHNICAL GUIDE DESCRIPTION MODELS: D4HH 024 THRU 180 HORIZONTAL FEATURES SINGLE PACKAGE AIR CONDITIONERS HORIZONTAL INDOOR & CONDENSER AIR FLOW DESCRIPTION TECHNICAL GUIDE SINGLE PACKAGE AIR CONDITIONERS HORIZONTAL INDOOR & CONDENSER AIR FLOW MODELS: D4HH 024 THRU 180 York horizontal ductable air conditioning packages offer a complete line of

More information

In-Duct High Pressure Nozzle Humidification System - HP HVAC Series Submittal Drawings

In-Duct High Pressure Nozzle Humidification System - HP HVAC Series Submittal Drawings In-Duct High Pressure Nozzle Humidification System - HP HVAC Series Submittal Drawings Date: Job Name: Contractor: Contractor or Order No.: Engineer: Agent: Agent P.O. No.: Date Ordered: Date Required:

More information

SCHEDULED MAINTENANCE SERVICE PROGRAM

SCHEDULED MAINTENANCE SERVICE PROGRAM NOTES SCHEDULED MAINTENANCE SERVICE PROGRAM Services suggested in this schedule have been determined by the manufacturer s general recommendations and our years of automotive experience in our severe climate

More information

½" to 4" (DN15 to DN100) LEA31 and LEA33 ANSI Control Valves Installation and Maintenance Instructions

½ to 4 (DN15 to DN100) LEA31 and LEA33 ANSI Control Valves Installation and Maintenance Instructions 00050/1 IM-P0-02 CH Issue 1 ½" to " (DN15 to DN100) LEA1 and LEA ANSI Control Valves Installation and Maintenance Instructions 1. Safety 2. Technical details. Installation and commissioning. Maintenance

More information

NSGV PT-1000 PORTABLE WELDING STATION I, O & M MANUAL

NSGV PT-1000 PORTABLE WELDING STATION I, O & M MANUAL APPLICATION OF DUST CONTROL EQUIPMENT: CAUTION - Warning Improper operation of dust control system may contribute to conditions in the work area or facility that could result in severe personal injury

More information

Daikin McQuay. Large Capacity Fan Coil Belt Drive. HCBB, HHBB Design 1. Replacement Parts List No Revision E 03/2018

Daikin McQuay. Large Capacity Fan Coil Belt Drive. HCBB, HHBB Design 1. Replacement Parts List No Revision E 03/2018 Replacement s List No. 700024000 Revision E 03/2018 Daikin McQuay Large Capacity Fan Coil Belt Drive HCBB, HHBB 08-30 Design 1 To find your Daikin Applied parts distributor, call 1-800-377-2787 or visit

More information

R6GI Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS

R6GI Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS TECHNICAL SPECIFICATIONS R6GI Series Single Packaged Gas/Electric Units 20 SEER 81% AFUE Multi-Stage Cool/Two-Stage Heat 2-5 Ton Single-Phase Units The iq Drive gas/electric packaged system features modulating

More information

Q6SD Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. Single Packaged Heat Pump, Single Phase

Q6SD Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. Single Packaged Heat Pump, Single Phase TECHNICAL SPECIFICATIONS Q6SD Series Single Packaged Heat Pump, Single Phase Q6SD-13 SEER, R-410A 2-5 Ton Units Cooling: 22,800 to 58,500 Btuh Heating: 22,800 to 58,500 Btuh The Q6 Series single packaged

More information

TerraGator Benson Boom / Liquid System Inspection Report

TerraGator Benson Boom / Liquid System Inspection Report TerraGator Benson Boom / Liquid System Inspection Report Completing the Inspection Report Instructions for the Service Technician: 1. Complete the customer information in the booklet. 2. Review each item

More information

IOM IR-110-X. Solenoid Control Valve

IOM IR-110-X. Solenoid Control Valve IOM IR-110-X Solenoid Control Valve (Sizes 1.5''- 6"; DN40-150) Description: The BERMAD Solenoid Controlled Valve is a Hydraulically operated, diaphragm actuated control valve. The BERMAD Model IR-110-X

More information

RBV Sales Guide FAN COIL UNITS FLOOR-MOUNTED, VERTICAL

RBV Sales Guide FAN COIL UNITS FLOOR-MOUNTED, VERTICAL RBV Sales Guide FAN COIL UNITS FLOOR-MOUNTED, VERTICAL RBVS RBVR RBVC www.superiorrex.com RBV Series: LOW POWER CONSUMPTION, ACCESSIBLE AND FLEXIBLE Owners Owners can choose between a standard or elevated

More information

McQuay. Water Source Heat Pump. HPH, HPV Vintage A, B. Last Manufactured: Replacement Parts List No Revision B 05/2012

McQuay. Water Source Heat Pump. HPH, HPV Vintage A, B. Last Manufactured: Replacement Parts List No Revision B 05/2012 Replacement Parts List No. 055211500 Revision B 05/2012 McQuay Water Source Heat Pump HPH, HPV 009-059 Vintage A, B Last Manufactured: 1986 To find your Daikin Applied parts distributor, call 1-800-377-2787

More information

GR4GN Series TECHNICAL SPECIFICATIONS. Single Packaged Gas/Electric Units. GR4GN 10.1 EER Commercial System 7½ and 10 Ton Units FEATURES AND BENEFITS

GR4GN Series TECHNICAL SPECIFICATIONS. Single Packaged Gas/Electric Units. GR4GN 10.1 EER Commercial System 7½ and 10 Ton Units FEATURES AND BENEFITS TECHNICAL SPECIFICATIONS GR4GN Series Single Packaged Gas/Electric Units GR4GN 10.1 EER Commercial System 7½ and 10 Ton Units The GR4GN is designed specifically for retrofit applications and compatibility

More information

k. Components not properly adjusted. Refer to machine technical manual for proper adjustment of components.

k. Components not properly adjusted. Refer to machine technical manual for proper adjustment of components. General Troubleshooting Charts General Troubleshooting Charts Use the charts on the following pages to help in listing all the possible causes of trouble when you begin diagnosing and testing of a machine.

More information

MOTORIZED VOLUME DAMPER

MOTORIZED VOLUME DAMPER MOTORIZED VOLUME DAMPER 1 a perfect partner in performance... Our Product Ranges Dampers 1 Fire Dampers 2 Fire / Smoke Dampers 3 Volume Control Dampers 4 Motorized Control Dampers 5 Pressure Relief Dampers

More information

D3000. Troubleshooting Guide

D3000. Troubleshooting Guide Page 1 of 6 17486-00 Rev B s3 April 2009 Contents Description Page Safety.. 3 Introduction 3 Standard External Controls, Indicators and Normal Alarm Conditions 3 Troubleshooting Table.. 4 Unable to program

More information

REPLACEMENT PARTS MANUAL

REPLACEMENT PARTS MANUAL REPLACEMENT PARTS MANUAL DC FREE COOLING UNIT SYSTEM AIR CONDITIONER MODELS DAPA DLPA DAPA DLPA DAPB DLPB CONTROLLER MODELS LC00 LC0 LC000 Description Page Cabinet Components Exploded View... Usage List...

More information

HS17. HS17 SERIES CONDENSING UNITS 17.6 to 65.2 kw ( to Btuh) Cooling Capacity. MATCHED REMOTE SYSTEMS 50hz ENGINEERING DATA

HS17. HS17 SERIES CONDENSING UNITS 17.6 to 65.2 kw ( to Btuh) Cooling Capacity. MATCHED REMOTE SYSTEMS 50hz ENGINEERING DATA ENGINEERING DATA ENGINEERING DATA MATCHED REMOTE SYSTEMS 50hz HS17 SERIES CONDENSING UNITS 17.6 to 65.2 kw (60 200 to 222 500 Btuh) HS17 Bulletin #490001 November 1995 Supersedes August 1994 HS17-1353

More information

2.2 The following are the rules and regulations to be complied by the Contractors:

2.2 The following are the rules and regulations to be complied by the Contractors: 1 GENERAL SPECIFICATIONS FOR SERVICING & MAINTENANCE 1.1 The Contractor shall supply all materials, labour, appliances and everything else necessary for maintenance of all the installation at SATS Maintenance

More information

CWK Circular duct coolers for cooled water

CWK Circular duct coolers for cooled water Circular duct coolers for cooled water Circular duct coolers for cooled water duct coolers are designed for using cooled water as the cooling medium and are used for cooling the ventilation air in ventilation

More information

SMALL BLOCK FORD SERPENTINE DRIVE SYSTEM WITH & WITHOUT POWER STEERING. an ISO 9001:2008 Registered Company

SMALL BLOCK FORD SERPENTINE DRIVE SYSTEM WITH & WITHOUT POWER STEERING. an ISO 9001:2008 Registered Company an ISO 9001:2008 Registered Company SMALL BLOCK FORD SERPENTINE DRIVE SYSTEM WITH & WITHOUT POWER STEERING 904100 REV E 01/20/15, SBF FRONTRUNNER w & wo POWER STEERING INST PG 1 OF 10 PAGES 1. COVER 2.

More information

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY PART B-04 TITLE: DISTRIBUTION SUBSTATIONS SPECIFICATION NO: B-04 INCEPTION DATE: AFTER GAZETTING (WORKING DOCUMENT FOR A 2 YEAR PERIOD) AMENDMENTS/REVISIONS DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

More information

Hanna Daily Preventive Maintenance Schedule

Hanna Daily Preventive Maintenance Schedule Hanna Daily Preventive Maintenance Schedule Location Location # Daily operation and inspection procedures to be performed by car wash personnel. Mark status in the spaces on the right after performing

More information

Models & Options Lubrication. 1/2 Through 10 Hp Models 1Ø 3Ø 1/2 Through 10 Hp Models 1Ø and 3Ø

Models & Options Lubrication. 1/2 Through 10 Hp Models 1Ø 3Ø 1/2 Through 10 Hp Models 1Ø and 3Ø P U R E A I R T E C H N O L O G Y Climate Control Duplex Please read and save these instructions. Read carefully before attempting to assemble, install, operate or maintain the product described. Protect

More information

A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES

A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES Article Text ARTICLE BEGINNING 1993 AIR CONDITIONING & HEAT A/C General Diagnostic Procedures Diagnosis is an important first step in A/C system servicing. To save time and effort, systems should be carefully

More information

INSTALLATION INSTRUCTIONS FOR COZY CAB A-1 AIR CONDITIONING KIT

INSTALLATION INSTRUCTIONS FOR COZY CAB A-1 AIR CONDITIONING KIT INSTALLATION INSTRUCTIONS FOR COZY CAB A-1 AIR CONDITIONING KIT 05-11 INSTALLATION INSTRUCTIONS A-12235 Air Conditioner Kit Cab set up instructions; This air conditioning kit is designed to be used with

More information

Accident Prevention Program

Accident Prevention Program Accident Prevention Program Maintenance Aspects of Owning Your Own Airplane Introduction As an owner-pilot, FAR Part 43 allows you to perform certain types of inspections and maintenance on your airplane.

More information

MAINTENANCE INSTRUCTIONS VDL WEWELER HD & MBS-L/V/W/F AIR SUSPENSION SYSTEMS

MAINTENANCE INSTRUCTIONS VDL WEWELER HD & MBS-L/V/W/F AIR SUSPENSION SYSTEMS MAINTENANCE INSTRUCTIONS VDL WEWELER HD & MBS-L/V/W/F AIR SUSPENSION SYSTEMS DOCUMENT: DATE: 05-2017 REVISION: - Contact Details For additional information contact VDL Weweler b.v. P.O. Box 142, 7300 AC

More information

3 POINT HITCH LEAF AND DEBRIS BLOWERS MODELS BW 1600 OPERATOR'S MANUAL AND PARTS BOOK

3 POINT HITCH LEAF AND DEBRIS BLOWERS MODELS BW 1600 OPERATOR'S MANUAL AND PARTS BOOK AgriMetalINC. 3 POINT HITCH LEAF AND DEBRIS BLOWERS MODELS BW 1600 OPERATOR'S MANUAL AND PARTS BOOK AGRIMETAL INC. 3 POINT HITCH LEAF AND DEBRIS BLOWERS WARRANTY AgriMetal Incorporated (AgriMetal) warrants

More information