Blohm+Voss Pipe Handling Equipment Safety Clamps Type C and T Technical Documentation Original Instructions

Size: px
Start display at page:

Download "Blohm+Voss Pipe Handling Equipment Safety Clamps Type C and T Technical Documentation Original Instructions"

Transcription

1 Blohm+Voss Pipe Handling Equipment Safety Clamps Type C and T Technical Documentation Original Instructions Manual PN D Rev. 010, August 2013 Blohm + Voss is a trademark of Blohm + Voss Shipyards GmbH Blohm + Voss Oil Tools 1

2 GENERAL INFORMATION Warnings and Note WARNING: A warning indicates a definite risk of equipment damage or danger to personnel. Failure to observe and follow proper procedures could result in serious or fatal injury to personnel, significant property loss, or significant equipment damage. NOTE: A note indicates that additional information is provided about the current topics. WARNING: This technical documentation contains instructions on safety, installation, operation and maintenance for the Blohm + Voss Oil Tools tool. It must be studied before working with the tool. Improper / Unsafe Use The tool must only be used for the designated purpose. When using the tool, the rated load must never be exceeded. Intended use of this manual This manual is intended for use by field service, engineering, installation, operation, and repair personnel. Every effort has been made to ensure the accuracy of the information contained herein. Blohm + Voss Oil Tools, will not be held liable for errors in this material, or for consequences arising from misuse of this material. Anyone using service procedures or tools, whether or not recommended by Blohm + Voss Oil Tools, must be thoroughly satisfied that neither personal safety nor equipment safety will be jeopardized. Intellectual property All rights retained. No part of this document may be reproduced in any form (print, photocopy, microfilm or any other procedure) or be processed using an electronic system without written approval of Blohm + Voss Oil Tools. All information contained in this manual is based upon the latest product information available at any time of printing. Dependent on ongoing technical improvements (ISO 9001) Blohm + Voss Oil Tools reserves the right to change the design and specifications without announcement. The values specified in this manual represent the nominal values of a unit produced in series. Slight deviations in the case of the individual devices are possible. NOTE: In the event of problems that cannot be solved with the aid of this manual, please contact one of the addresses listed below. CE Marking The tool complies with the Machinery Directive 98/37/EC and 2006/42/EC For machines containing any hydraulic or pneumatic powered parts, the Directive 94/9/EC Equipment and protective systems in potentially explosive atmospheres applies. The marking is as follows: CE Ex II 2G T5 (hydraulic tools) or CE Ex II 2G T6 (pneumatic tools). Limited Warranty The warranty provided will be void if the tool is either: 1. Repaired or serviced by a service facility which was not authorised by Blohm + Voss Oil Tools. 2. Replacement parts not manufactured by Blohm+Voss Oil Tools are used. 3. Modifications were made to the tool which were not approved by Blohm+Voss Oil Tools. Manufacturer & Agents World wide Blohm + Voss Oil Tools Hermann-Blohm-Straße Hamburg Germany Phone: / /1162 Fax: / oiltools@blohmvoss.com Blohm + Voss Oil Tools, LLC 7670 Woodway, Suite 266 Houston, Texas United States of America Phone: Fax: bvot@blohmvoss.com Premier Sea & Land Pte. Ltd. 1, Scotts Road #19-12 Shaw Centre Singapore Republic of Singapore Phone: Fax: enquiries@mtqpremier.com.sg 2

3 General safety issues Safe handling WARNING: One should avoid creating ignition sources, like heat, as a result of the use of the tool with other tools or equipment. WARNING: Do not use the tool for any other purpose than given in this document within it`s specification. WARNING: Failure to conduct routine maintenance could result in equipment damage or injury to personnel. WARNING: It is not allowed to use any components which are of "non-b+v" origine, or use "non-oem" parts which are not approved by B+V. It will void any warranty and may effect the correct functioning of the tool and it's safety features. WARNING: The company operating the tool is responsible for evaluating safe and proper use of the tool in a hazard analysis. WARNING Handles/grip points are marked by green paint. During operations these grips are the only places the tool can be handled safely. In all NON-green marked places there is the risk for injury. Automatic/ remote operated tools may not have any green painted grip-points. In this case it is not allowed to touch the tool while operating. Warning sign PN General warning Warning sign PN Pay attention: Apply grease at least once a day. WARNING: Wear personal protection equipment while working with the equipment. WARNING: If any safety elements (like safety ropes, safety sheets, plates or washers) were disassembled due to maintenance work, do NOT re-use them. Always replace them with new safety elements. WARNING: All warning plates, signs and labels attached to the equipment must be observed. The warning plates, signs and labels must be present on the tool. Do not remove the labels. If they are missing, replacing is mandatory. WARNING: Any modification to the tool carried out without the approval of Blohm + Voss Oil Tools will void any warranty. WARNING: Using the tool with damaged or worn parts can create serious incidents. WARNING: The operating company is obligated to issue working instructions for safe use and supervise observance of these working instructions. WARNING: Every Employee, which operates, services, inspects or otherwise involved with the use of the tool in other areas has to ensure, that these actions are done by trained and by an Blohm + Voss Oil Tools authorized personnel, and should complete regular courses of training, to ensure proper use as well as safe operation, correct maintainance and inspection. WARNING: If necessary, a reasonable, additional supervisor should be appointed during operation. WARNING: Stay away from the tool during operation. In case it is remote operated it may make movements without warning. Safe gripping points Warning Signs WARNING: The warning plates, signs and labels must be present on the tool. Do not remove the labels. If they are missing, replacing is mandatory. Warning sign PN Danger: Do not touch. Warning sign PN Pay attention: Do not place your hands between moving parts. Warning sign PN Pay attention: Risk of crushing. 3

4 EC-DECLARATION OF CONFORMITY We, Blohm + Voss Oil Tools Hermann-Blohm-Strasse Hamburg Phone:+49(0) Fax:+49(0) declare that the product B+V Safety Clamp Type C + T which is the subject of this declaration, is in conformity with the following standard(s) or normative documents 2006/42/EC: Machinery Directive from 31 December DIN EN ISO : Safety of machinery, part 1 and 2 DIN EN ISO : Safety of machinery, Risk assessment Directive 94/9/EC: Devices and protection systems for intended use in explosive areas DIN EN : : Non-electrical equipment for use in potentially explosive atmospheres ISO 14693/API 7K: Specification for Drilling and Well Servicing Equipment Marking: II 2G T6 4

5 Table of contents GENERAL INFORMATION 2 Warnings and Note 2 Intended use of this manual 2 Intellectual property 2 Improper / Unsafe Use 2 Manufacturer & Agents World wide 2 CE Marking 2 Limited Warranty 2 General safety issues 3 Safe handling 3 Warning Signs 3 EC-DECLARATION OF CONFORMITY 4 1. DESCRIPTION 8 Generell 8 Intend of use 8 Function 8 Main Assembly 8 Identification 9 2. COMMISSIONING 12 Commissioning Safety Clamp Type C and Type T 12 Scope of supply 12 Pneumatic Characteristics (if applicable) 12 Check and Lubrication 12 Function Test 12 Safety Clamp Type C 13 Safety Clamp Type T 13 Safety Clamp Type "C and T 13 Safety Clamp Type C with Pneumatic kit 14 Safety Clamp Pneumatic kit 14 Commissioning Safety Clamp Pneumatic Kit P/N from 3.3/4 to Safety Clamp Type C PN Pneumatic Kit 3.3/4 to Safety Clamp Type C PN Pneumatic Kit 3.3/4 to Commissioning Safety Clamp Pneumatic Kit P/N from 22 to Safety Clamp Type C P/N Pneumatic Kit INSTALLATION OPERATION 22 Standard clamp 22 Pneumatic clamp MAINTENANCE & INSPECTION 24 General 24 Grease daily 24 Grease quality 24 Inspection categories acc. to API RP 7L 25 Frequency 25 Periodic inspection 25 Non-periodic inspection 25 Inspection 25 Critical Load Inspection 26 Dismantling Inspection 26 Inspection check lists 27 Check Category I (Ongoing observation) 28 Check List Category II (Daily) 28 Check List Category III (every 6 months) 29 Check List Category IV (every year) 29 Critical Areas 30 Handling, storage and transport 31 Storage 31 Short term storage after use and less then 3 months 31 Long term storage over 3 months 31 Handling 31 Transport DRAWINGS 34 Standard Safety Clamp Type C 34 Parts list 34 Safety Clamp Type C Pneum. Kit P/N /4"-22" 35 Parts list 35 Safety Clamp Type C Pneum. Kit P/N "-36" 36 Parts list 37 Safety Clamp Type C Basic Version for Pneumatic Kit 38 Parts list 38 Standard Safety Clamp Type T 39 Parts list 39 TABLE OF CONTENTS DESCRIPTION INSTALLATION OPERATIONS MAINTENANCE & INSPECTION DARWINGS 5

6 TABLE OF CONTENTS DESCRIPTION INSTALLATION OPERATIONS MAINTENANCE & INSPECTION DRAWINGS 6

7 DESCRIPTION DESCRIPTION 7

8 1. DESCRIPTION Generell The Blohm + Voss Safety Clamp is available as Type "T" from 1.1/8" to 4.1/2" with a special design for small pipes and as Type "C" from 3.3/4" to 42" for larger pipe sizes. The Intermediate Links and Inserts (wedges) of the two types are not interchangable. The Type "C" Clamp is also available with a pneumatic kit to improve speed at tightening the Clamp. From 3.3/4" to 22" with pneumatic kit and from 22" to 42" with pneumatic kit Intend of use DESCRIPTION The Blohm + Voss Safety Clamp is desigend for being fastened on a flush joint tubular and allows lifting of a single joint whereby the Type T and C Blohm + Voss Safety Clamp has to be used together with a single joint elevator or together with Handslips. The safe working load of the safety Clamp Type "C" is 10 sh tons and must never be exceeded. Never use Blohm + Voss Safety Clamp as a hoist Tool. Function When the Blohm + Voss Safety Clamp is triggered, each individual insert instantly grips tightly on the surface of the pipe. If the pipe string weight takes effect, or should there be any increase in the load on the inserts, the conical mount causes the insert to be pressed more tightly against the surface of the pipe, i.e. the pipe is secured against any further movement by means of the Blohm + Voss Safety Clamp. The gripping pressure at all points around the pipe is always uniform minimizing risk of crushing thin-walled pipes or damaging the pipe surface. As each link, complete with conical insert, can be interchanged as an assembly with the other links, the Blohm + Voss safety clamp Type "T" can be used from 1.1/8" to 4.1/2" and Type "C" from 3.3/4"-42" in diametre and from -20 C (-4 F9) to +40 C (176 F) if not otherwise stated in the Databook. All parts are made by heat-treatment hardened steel and are suitable for maximum load and maximum gripping safety. WARNING: Welding on any part is not allowed. Main Assembly 1. Intermediate Link Pin 2. Insert Spring 3. Insert 4. Intermediate LInk 5. Handle 6. Nut 7. Screw Safety Clamp Typ C 5 7 Safety Clamp Typ T 8

9 Identification The identification area clearly identifies the Safety Clamp area (manufacturer, type, material, part number, serial number, date of manufacture). It is important to keep this information ready for the purpose of servicing and repair work. DESCRIPTION 9

10 DESCRIPTION 10

11 COMMISSIONING COMMISSIONING COMMISIONING 11

12 2. COMMISSIONING Commissioning Safety Clamp Type C and Type T Blohm + Voss strongly recommends to accomplish the Safety Clamp commissioning with the Blohm + Voss Commissioning. Read manual before first use! COMMISSIONING OK o Check crew is aware of all danger regarding handling the B + V tool. OK o Go through manual with crew. Prior to use of the Blohm + Voss Safety Clamp following checks must be carried out : Scope of supply OK o Cross check all delivered parts. Pneumatic Characteristics (if applicable) OK o Recommended air supply OK o Recommended flow rate OK o Lubricator, air regulator and filter installed. Check and Lubrication OK o Check Safety Clamp is in closed position. Apply grease to all greasing points until grease is visibly coming out of OK o the bores. OK o Check if Safety Clamp is installed as outlined in manual. Function Test OK o OK o OK o OK o OK o Check pneumatic impact wrench on its adjustment (Pos. 2 if adjustment of wrench is possible. Check Safety Clamp opens. Check all safety / lock wire is present. Check Safety Clamp closes. Check if all inserts are properly gripping on a pipe. 12

13 Safety Clamp Type C Safety Clamp Type "C and T P/N Min O.D Max O.D. Total # of links /4 4 5/ /2 5 5/ /2 6 5/ /2 7 5/ /2 8 5/ /2 9 5/ /2 10 5/ /2 11 5/ /2 12 5/ /2 13 5/ /2 14 5/ /2 15 5/ / / / / / / / / /2 30 1/ /2 36 1/ /2 42 1/2 39 Place the box near the place of use. 1. Check if all parts are present and in good working order. 2. If all parts are sufficiently lubricated. 3. If there is a need to assemble parts, use the part lists. 4. Now, the safety clamp has to be taken out of the box. 5. In case of a wide range clamp, the clamp may consist of two boxes and has to be assembled before use. 6. Once the clamp is assembled, remove the box from the floor and store it. COMMISSIONING C clamp size # of handles # of clamp screws 3 3/4" - 4 5/8" /2" upto 15 5/8" /2" upto 42" 4 2 Safety Clamp Type T P/N Min O.D Max O.D. Total # of links /8" 2" /8" 3 1/4" /4" 4 1/2" 6 T clamp size # of handles # of clamp screws 1 1/8" 4 1/2"

14 Safety Clamp Type C with Pneumatic kit The Safety Clamp Type C Pneumatic Kit can be added to any Safety Clamp Type C by removing both end links for P/N and for P/N Before using a Safety Clamp modified from manual operated to pneumatic operated, you have to check the number of intermediate links according to the manual. The pneumatic kit is now ready to be assembled to the safetty clamp. Make sure that all securing devices are properly attached to the Safety Clamp. COMMISSIONING The Pneumatic kit is used to tighten the Safety Clamp faster, reducing manual handling. Pneumatic Kit P/N from 3.3/4 to 22 Pneumatic Kit P/N from 22 to 42 Safety Clamp Pneumatic kit Place the box near the place of use. 1. Check if all parts are present and in good working order. 2. If all parts are sufficiently lubricated. 3. If there is a need to assemble parts, use the part lists. 4. Now, the safety clamp has to be taken out of the box. 5. Check pneumatic impact wrench of correct adjustment. Commissioning Safety Clamp Pneumatic Kit P/N from 3.3/4 to 22 Remove cotter pin from first Link behind the Pivot endlink and from the End link pin. 1. Remove Intermediate link pin and end link pin 2. Remove one intermediate link with the Pivot end link complete with nut and screw. 3. Insert pneumatic safety clamp Kit P/N Insert the intermediate link pin and the end link pin. check if the number of links is according to your required pipe size. 5. Secure the intermediate link pin and the end link pin with new cotter pins. 14

15 Picture 1: Remove the Cotter pin Picture 4: Insert Pneumatic kit P/N COMMISSIONING Picture 2:Pulling pins Picture 5: Insert lubricated pins Picture 3: Remove Safety Clamp lock Picture 6: Secure pins with new cotter pins 15

16 Safety Clamp Type C P/N Pneumatic Kit 3.3/4 to 22 Pos Part No. Description Safety Clamp Type C upgrade Kit Max 22" Pneumatic C Clamp Screw Driver Pneumatic hose with adapter COMMISSIONING P/N Min O.D Max O.D. # Links # Locks # Handle /4 4 5/ /2 5 5/ /2 6 5/ /2 7 5/ /2 8 5/ /2 9 5/ /2 10 5/ /2 11 5/ /2 12 5/ /2 13 5/ /2 14 5/ /2 15 5/ /2 16 5/ /2 17 5/ /2 18 5/ (1x pneumatic lock PN one conventional lock) / (1x pneumatic lock PN one conventional lock) /

17 Commissioning Safety Clamp Pneumatic Kit P/N from 22 to 42 Picture 1: Remove the Cotter pin Remove cotter pin from first Link behind the Pivot endlink and from the End link pin. 1. Remove Intermediate link pin and end link pin 2. Remove one intermediate link with the Pivot end link complete with nut and screw. 3. Insert pneumatic safety clamp Kit P/N Insert the intermediate link pin and the end link pin. check if the no. of links is according to your required pipe size. 5. Secure the intermediate link pin and the end link pin with new cotter pins. COMMISSIONING Picture 2:Pulling pins Picture 3: Remove Safety Clamp lock Picture 5: Insert lubricated pins Picture 4: Insert Pneumatic Clamp P/N Picture 6: Secure pins with new Cotter pins 17

18 Safety Clamp Type C P/N Pneumatic Kit Pos Part No. Description Safety Clamp Type "C" upgrade Kit 22"-42 1/2" Pneumatic C Clamp Screw Driver Pneumatic hose with adapter COMMISSIONING P/N Min O.D Max O.D. # Links # Locks # Handle / (1x pneumatic lock PN one conventional lock) / / /2 30 1/ /2 36 1/ /2 42 1/

19 INSTALLATION INSTALLATION 19

20 2. INSTALLATION The Safety Clamp Type "T" and Type "C" always has to be used with a Single Joint or Handslips. Put the Safety Clamp around the pipe and bring all Links into gripping position. The Safety Clamp lock or pneumatic lock now has to be fastened. While fastening you have to make sure that all Inserts are gripping properly. The Safety Clamp is sufficient gripping, when the torque of the nut or the pneumatic screw is above 135 Nm and below 400 Nm. Too much tightening can cause loss of safe working load up to destroying the Safety Clamp. The pneumatic impact wrench has to be set on position II or is already in this default. This adjustment guarantees a suitable torque. The Nut is fastened, when the impact wrench is starting to slip stick. INSTALLATION 20

21 OPERATIONS OPERATIONS 21

22 3. OPERATION After installation of the safety clamp, follow the following guidelines. WARNING: NeveR use the SAfety CLAMP ALONE AS A hoist tool Standard clamp The Safety Clamp, which is fastened on a flush joint tubular, allows lifting of a single joint whereby the Safety Clamp has always to be used together with a single joint elevator or handslips, to lift single joints from cantilever to the rig floor. The safe working load of 10 short tons must never be exceeded. Safety Clamp pneumatic kit P/N with Single Joint OPERATIONS Pneumatic clamp The clamp is handled as normal safety clamp around the pipe. The Pneumatic kit replaces manual tightening through a wrench and sledgehammer. The Pneumatic kit (P/N 99630) is used to turn the Left/Right hand threat bolt and the different threads will tighten the Clamp. The Pneumatic kit (P/N 99650) uses a mounted threat bolt for tightining the Safety Clamp. The Pneumatic kit uses a pneumatic Screwdriver to tighten the clamp. Safety Clamp standard with Handslips Safety Clamp with pneumatic kit P/N Safety Clamp with pneumatic kit P/N

23 MAINTENANCE & INSPECTION MAINTENANCE & INSPECTION 23

24 4. MAINTENANCE & INSPECTION General If cracks, excessive wear etc. is recognised, contact Blohm + Voss Oil Tools or an authorised service company. Greasing Warning: Welding on any B+V Safety Clamp part is not allowed Grease daily All greasing points, which are labelled Grease Daily, must be greased at least once a day. It can be necessary to carry this out more often depending on use. To be graesed daily are: Insert slots Intermediate Link Pins Safety Clamp Screw Safety pin Nut. Grease quality In order to achieve efficient greasing even at different environmental temperatures, we recommend the following grease types should be used (obtainable from Blohm + Voss Oil Tools): Low-Viscosity grease Type AVIATICON Grease XRF NLGI 0 Greasing areas Greasing MAINTENANCE & INSPECTION Alternatively; use EP gear lubricating grease for greasing non-oil tight gear trains NESSOS SF0 NLGI 0 DIN GPOF-25 DIN GPOF-25 For higher ambient temperature up to 30 Celsius / 86 Fahrenheit we recommend to use NLGI 2. 24

25 Inspection categories acc. to API RP 7L Category I This category involves observing the equipment during operation for indications of inadequate performance. When in use, equipment shall be visually inspected on a daily basis for cracks, loose fits or connections, elongation of part, and other signs of wear, corrosion or overloading. Any parts found to show cracks, excessive wear, etc., shall be removed from service for further examination. The equipment shall be visually inspected by a person knowledgeable in that equipment and its function. Category II This is Category I inspection plus further inspection for corrosion, deformation, loose or missing components, deterioration, proper lubrication, visible external cracks, and adjustment. Category II may involve some disassembly to access specific components and to identify wear that exceeds the allowable tolerances. Category III This is Category II inspection plus further inspection, which should include NDT of critical areas and may involve some disassembly to access specific components and to identify wear that exceeds the allowable tolerances. Prior to inspection, all foreign material such as dirt, paint, grease, oil, scale, etc. shall be removed from the concerned parts by a suitable method (e.g. paint-stripping, steam-cleaning, grit-blasting). Category IV This is Category III inspection plus further inspection for which the equipment is disassembled to the extent necessary to conduct NDT of all primary-load-carrying components. Equipment shall be: disassembled in a suitableequipped facility to the extent necessary to permit full inspection of all primary-loadcarrying components and other components that are critical to the equipment. inspected for excessive wear, cracks, flaws and deformation. Procedure: Corrections shall be made in accordance with the manufacturer s recommendations. Prior to inspection, all foreign material such as dirt, paint, grease, oil, scale, etc. shall be removed from the concerned parts by a suitable method (e.g. paintstripping, steam-cleaning, gritblasting) Frequency Periodic inspection The recommended schedule for inspection of Safety Clamps are Ongoing: Inspection category I Daily: Inspection category II Every 6 months: Inspection category IV The recommended frequencies apply for equipment in use during the specified period. The inspection frequencies are only recommendations. The schedule of inspection heavily depends on the following factors: environment load cycles regulatory requirements operating time testing repairs re manufacture Non-periodic inspection A complete, on-job, shut-down inspection equivalent to the periodical Category III or Category IV should be made before (if anticipated) and after critical jobs (e.g., running heavy casing / drill strings, jarring, pulling on stuck pipes and/or operating at extreme low temperatures) <-20 C (<-4 F). Inspection A thorough inspection should be carried out periodically (every 3 months) or as special circumstances may require. Before starting an inspection disconnect hydraulic/ pneumatic system and remove all foreign materials (dirt, paint, grease Oil, scale, etc.) from surface by a suitable method. After a field inspection, it is advisable to record the extent of testing and testing results. Conduct the periodic or critical load inspection in the field by the crew with the supervisor. If cracks, excessive wear etc. is recognized, contact Blohm + Voss Oil Tools or an authorized service company. MAINTENANCE & INSPECTION 25

26 Critical Load Inspection Critical loads may occur. For example: impact loads such as jarring, pulling on stuck pipe, etc. If critical loads occurred unexpectedly, conduct the inspection immediately. Dismantling Inspection Generally, when the equipment returns to base, warehouse, etc. Carry out the Tool inspection, immediately. Furthermore, control it prior to its being sent on the next job. The Tool should be dismantled and inspected in a suitably equipped facility for excessive wear, cracks, flaws or deformations. Corrections should be made in accordance with recommendations which can be obtained from Blohm + Voss Oil Tools. Weldings at the castings should be done only by Blohm + Voss Oil Tools or an authorized service company in according to Blohm + Voss welding procedure. When need is shown in a field inspection, dismantle the Tool and arrange an inspection in a suitably equipped facility. Springs should be carefully visually inspected for excessive wear and obvious weakness. MAINTENANCE & INSPECTION 26

27 Inspection check lists CHECK LIST FRONT PAGE TYPE OF EQUIPMENT SERIAL NUMBER PART NUMBER SUPERVISOR DATE OF INSPECTION INSPECTION CATEGORY PLACE OF INSPECTION MAINTENANCE & INSPECTION 27

28 Check Category I (Ongoing observation) Observe during operation for inadequate performance. Check List Category II (Daily) CHECK FOR THE FOLLOWING GENERAL ISSUES (but not limited to): DESCRIPTION CHECKED SIGNATURE 1 Complete front page of check list for the records. OK 2 Check state of lubrication. OK 3 Check functioning of Safety Clamp as a whole. OK Remarks CHECK FOR LOOSE ITEMS, ESPECIALLY FOR (but not limited to): DESCRIPTION CHECKED SIGNATURE 1 Pins & bolts. OK 2 Screws, bolts, nuts, retainers, springs and lock wire. OK Remarks CHECK FOR CRACKS, ELONGATION, DAMAGE AND CORROSION, ESPECIALLY FOR (but not limited to): DESCRIPTION CHECKED SIGNATURE 1 Links. OK 2 Pins & bolts, nuts, Pivot blocks OK Remarks DESCRIPTION CHECKED SIGNATURE 1 Check Links OK 2 Check pins & bolts, nuts, Pivot blocks OK MAINTENANCE & INSPECTION Remarks SUPERVISOR DATE 28

29 Check List Category III (every 6 months) GENERAL DESCRIPTION CHECKED SIGNATURE 1 Carry out an Category II inspection. OK 2 NDT (MPI) critical areas. Some disassembly may be needed to do so. OK 3 Check parts for wear according to allowable tolerances. OK Remarks Check List Category IV (every year) GENERAL DESCRIPTION CHECKED SIGNATURE 1 Carry out an Category III inspection. OK 2 NDT (MPI) critical areas. Strip Safety Clamp to do so. OK Remarks MAINTENANCE & INSPECTION SUPERVISOR DATE 29

30 Critical Areas The whole clamp is considered critical and must be checked accordingly, see previous pages. MAINTENANCE & INSPECTION 30

31 Handling, storage and transport Storage Storage of the tool requires the following measures to be taken: Ensure the tool is protected from water ingress Ensure the tool is stored in such a way, that personnel cannot be wounded by moving parts or sharp edges. If needed, secure the tool with ropes or otherwise in order to protect it from sliding due to ship movements. Short term storage after use and less then 3 months Preserve the tool: Grease all blank surfaces with grease: Cylinders Preserve all other blank surfaces with Amber/Tectyl 846 Spray or equivalent Storage: Store in a dry environment with humidity max 80%. Commissioning: Not needed Long term storage over 3 months Preserve the tool: Grease all blank surfaces with grease: Cylinders Preserve all other blank surfaces with Amber/Tectyl 846 Spray or equivalent Storage: Store in a dry environment with humidity max 80% Commissioning: As per procedure in the User Manual Handling Lift the tool by the green marked area of the handles. Transport When the tool is in it s original crate, use a fork lift for lifting the crate only. The weight of the tool is indicated on the identification area of the tool, and also on its original transporting crate. MAINTENANCE & INSPECTION 31

32 MAINTENANCE & INSPECTION 32

33 DRAWINGS DRAWINGS 33

34 5. DRAWINGS Standard Safety Clamp Type C Pos. 12 and 13 not shown Parts list Item Qty. Part No. Description Recommended Qty End Link, Pivot Block (type C) Link Intermediate End link Handle for Safety Clamp (type C) Safety Clamp Screw Pivot Block (type C) Safety Clamp Nut Intermediate Link Pin = # of links / 3 DRAWINGS Insert (without Cotter Pin) = # of links Insert Spring for Safety Clamp Type C = # of links End link pin with chain Slugging wrenches, open end S Box for safety clamp (small) Pivot block pin (type C) Cotter pin = # of links x Cotter pin = # of links x3 34

35 Safety Clamp Type C Pneum. Kit P/N /4"-22" Pos. 11 mit Loctite sichern Parts list Item Qty. Part No. Description End Link, Pivot Block L End Link, Pivot Block R Left/Right hand thread bolt End Link Pin with chain Pivot Block L Pivot Block R Insert Insert Spring Shackle Pivot Block Pin (Type C) Eye Screw Clamping Pin Cotter Pin DRAWINGS 35

36 Safety Clamp Type C Pneum. Kit P/N "-42 1/2" Pos.7 (66612-S) is not shown DRAWINGS 18 P 7 (99612 S) i t h

37 Parts list Item Qty. Part No. Description End Link, Pivot Block L (Type "C") Pivot Block R Rotation Bolt Insert (without Cotter Pin) End Link Pin with Chain(pneumatic) Pivot Block Pin (Type "C") S Box for Safety Clamp (small) Insert Spring for Safety Clamp, (Type "C) Grease Nipple Cotter Pin Cotter Pin Eye Screw Shackle Coupling Hose nipple Pneumatic Hose DN 6 26 ft;with adapter 3/8" NPT to DN pneumatic impact wrench;with 1/2" square end Straight-Connection I Straight-Connection II DRAWINGS 37

38 Safety Clamp Type C Basic Version for Pneumatic Kit Parts list Pos. Partno. Description Recommended Qty Link Intermediate Inserts without Cotter Pin = # of links Insert Spring = # of links Cotter Pin = # of links x Intermediate Link Pin = # of links / Handle Box for Safety Clamp DRAWINGS Above the 15 5/8 range the basic version will consists of 2 standard link sections and 1 left/ right hand threaded bolt section. 38

39 Standard Safety Clamp Type T Pos. 14 and 15s not shown Parts list Item Partno. Description Recommended Qty End Link, Pivot Block End Link (Screw) Safety Clamp Screw Safety Clamp Nut Pivot Block Pivot Block Pin End Link Pin with Chain Link Intermediate # Inserts without Cotter Pin = # of links Insert Spring = # of links Handle Cotter Pin = # of links Intermediate Link Pin Safety Clamp Nut Wrench S Box for Safety Clamp Clamping Pin = # of Handle x 2 DRAWINGS 39

Blohm+Voss Pipe Handling Equipment Special Link Connector Technical Documentation Original instructions

Blohm+Voss Pipe Handling Equipment Special Link Connector Technical Documentation Original instructions Blohm+Voss Pipe Handling Equipment Special Link Connector Technical Documentation Original instructions Manual PN 554106-D Rev. 002, May 2012 Blohm + Voss Oil Tools 1 GENERAL INFORMATION Warnings and Note

More information

Blohm + Voss Pipe Handling Equipment VES-CL Center Latch Elevator, Manual Operated c/w Bushing Technical Documentation Original Instructions

Blohm + Voss Pipe Handling Equipment VES-CL Center Latch Elevator, Manual Operated c/w Bushing Technical Documentation Original Instructions Blohm + Voss Pipe Handling Equipment VES-CL 150-1000 Center Latch Elevator, Manual Operated c/w Bushing Technical Documentation Original Instructions Manual PN 611000-Y-D Rev 003 February 2012 Blohm +

More information

Blohm+Voss Pipe Handling Equipment FPS 500-AIR Flush Power Slip Technical Documentation Original Instructions

Blohm+Voss Pipe Handling Equipment FPS 500-AIR Flush Power Slip Technical Documentation Original Instructions Blohm+Voss Pipe Handling Equipment FPS 500-AIR Flush Power Slip Technical Documentation Original Instructions Manual 754000-AIR-D Rev 000, October 2012 Blohm + Voss Oiltools 1 GENERAL INFORMATION Warnings

More information

Blohm + Voss Oil Tools

Blohm + Voss Oil Tools Blohm + Voss Pipe Handling Equipment Rotary Hand Slips: RSM / RSX / LRS Drill Collar Slips: DCS / DCM / DCL Casing Slips: CSL / CSC Technical Documentation Original Instructions Manual PN 83500-D Rev 008,

More information

TECHNICAL DOCUMENTATION

TECHNICAL DOCUMENTATION Read before first use! VES-CL-1000 Elevator Hydraulically Operated Part No. 611000-Y-H Blohm + Voss Oil Tools Hermann-Blohm-Straße 2 20457 Hamburg Germany Telephone ++49 (0)40/3119-1826/1162 Fax ++49 (0)40/3119-8194

More information

Blohm + Voss Pipe Handling Equipment SDS Side Door Elevators 65, 100, 150, 250, 350 & 500 tons Technical Documentation Original Instructions

Blohm + Voss Pipe Handling Equipment SDS Side Door Elevators 65, 100, 150, 250, 350 & 500 tons Technical Documentation Original Instructions Blohm + Voss Pipe Handling Equipment SDS Side Door Elevators 65, 100, 150, 250, 350 & 500 tons Technical Documentation Original Instructions Manual PN 641020-Y-BC-D Rev 013, Mai 2013 Blohm + Voss Oil Tools

More information

Blohm + Voss Pipe Handling Equipment BVE / BVS 750 Frame 1 air operated 4.1/2 14 Technical Documentation Original Instructions

Blohm + Voss Pipe Handling Equipment BVE / BVS 750 Frame 1 air operated 4.1/2 14 Technical Documentation Original Instructions Blohm + Voss Pipe Handling Equipment BVE / BVS 750 Frame 1 air operated 4.1/2 14 Technical Documentation Original Instructions Manual PN 710000-Y-A-D Rev 004, February 2012 Blohm + Voss Oil Tools 1 GENERAL

More information

Blohm + Voss Pipe Handling Equipment ABVC-200 Sliptype Elevator Technical Documentation Original Instructions

Blohm + Voss Pipe Handling Equipment ABVC-200 Sliptype Elevator Technical Documentation Original Instructions Blohm + Voss Pipe Handling Equipment ABVC-200 Sliptype Elevator Technical Documentation Original Instructions Blohm + Voss Oil Tools Manual PN 672600-Y-D Rev 003, February 2012 1 GENERAL INFORMATION Warnings

More information

Blohm + Voss Oil Tools

Blohm + Voss Oil Tools Blohm+Voss Pipe Handling Equipment Hydraulic Operated Elevator/Spider BVE / BVS 500 PN 752000-Y-H-VC 4.1/2-14 Technical Documentation Original Instructions Manual PN 752000-Y-H-VC-D Rev 001, February 2012

More information

Blohm + Voss B+V hinged Adapter

Blohm + Voss B+V hinged Adapter Blohm + Voss B+V hinged Adapter 49 /2 to 37 /2 for RT National Inspection and maintenance procedure Part No. 55320 Blohm+Voss Oil Tools Hermann-Blohm-Straße 2 20457 Hamburg Germany Telephone ++49 (0)40/39-826/62

More information

Blohm+Voss. BVE / BVS /8 7.5/8 250 metric tons

Blohm+Voss. BVE / BVS /8 7.5/8 250 metric tons Blohm+Voss BVE / BVS 250 2.3/8 7.5/8 250 metric tons Part-No. 725000 READ THESE INSTRUCTIONS BEFORE USE! Blohm+Voss Oil Tools Hermann-Blohm-Straße 2 20457 Hamburg Germany Telephone ++49 (0)40/3119-1826/1162

More information

Blohm+Voss BVE/S-750 Elevator/Spider 4 ½ 14 Pipe Range Diameter

Blohm+Voss BVE/S-750 Elevator/Spider 4 ½ 14 Pipe Range Diameter Read before first use! Blohm+Voss BVE/S-750 Elevator/Spider 4 ½ 14 Pipe Range Diameter Part No. 710000-Y-H hydraulic version Blohm + Voss Oil Tools Hermann-Blohm-Straße 2 20457 Hamburg Germany Telephone

More information

Blohm + Voss Oil Tools

Blohm + Voss Oil Tools Blohm+Voss Pipe Handling Equipment VES-HCL 350 Elevator Hydraulically Operated Part no. 63000-Y-H-F (with closing signal) Technical Documentation Original Instructions Manual PN 63000-Y-H-F-D Rev 005 valid

More information

CONTROL UNIT FOR POWER SLIPS PN:

CONTROL UNIT FOR POWER SLIPS PN: CONTROL UNIT FOR POWER SLIPS PN: 757105 Blohm + Voss Oiltools Herrmann-Blohm-Strasse 2 20457 Hamburg Germany Telephone ++49 (0)40/3119-1826/1162 Fax ++49 (0)40/3119-3305 Revision 001, February 2012 All

More information

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE

BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE Page 1 BVM Corporation TYPE MS TONG 6,500 FT/LBS. TORQUE Part number: Serial Number: BVM CORPORTION TYPE MS TONG 6,500 FT/LBS. TORQUE WRNING: Manual tongs which have experienced excessive wear or are found

More information

Blohm + Voss Oil Tools, LLC GraySpin Mark 40 Hydraulic Drill Pipe Spinner With and without Hydraulic Lift Technical Documentation

Blohm + Voss Oil Tools, LLC GraySpin Mark 40 Hydraulic Drill Pipe Spinner With and without Hydraulic Lift Technical Documentation Blohm + Voss Oil Tools, LLC GraySpin Mark 40 Hydraulic Drill Pipe Spinner With and without Hydraulic Lift Technical Documentation 1 GENERAL INFORMATION Warnings and Notes WARNING: A WARNING INDICATES A

More information

Blohm + Voss Oil Tools Circular Buttons, Inserts and Dies Catalog

Blohm + Voss Oil Tools Circular Buttons, Inserts and Dies Catalog Blohm + Voss Oil Tools Circular Buttons, Inserts and Dies Catalog A company of ThyssenKrupp Marine Systems Blohm + Voss Repair Blohm + Voss Oil Tools General Information Brochure Contents INSERTS: DIMENSIONS...

More information

Translation of the Original operating instructions Lifting device Z 70 /...

Translation of the Original operating instructions Lifting device Z 70 /... Translation of the Original operating instructions Lifting device Z 70 /... Content 1. Lifting device / Correct use according to regulations 2. Basic principles 3. General information 4. Special remarks

More information

Pipe Handling Equipment

Pipe Handling Equipment Pipe Handling Equipment Blohm+Voss Repair GmbH Oil Tool Division Hermann-Blohm-Straße 2 20457 Hamburg, Germany Phone: +49-40-31 19-81 42 Fax: +49-40-31 19-34 00 E-mail: info@blohmvoss-oiltools.com www.blohmvoss-oiltools.com

More information

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased: Pushed & Geared Trolleys OPERATION MANUAL This operation manual is intended as an instruction manual for trained personnel who are in charge of installation, maintenance, repair etc. Before equipment use,

More information

Safety Clamp Operation Manual

Safety Clamp Operation Manual TECHNICAL MANUAL Safety Clamp Operation Manual 2005-2016 Texas International Oilfield Tools, LTD. Published by Texas International Oilfield Tools, LTD, Engineering 14620 Henry Road. Houston, TX 77060 www.texasinternational.com

More information

HST -LS Interlocking device (Translation of Original Manual)

HST -LS Interlocking device (Translation of Original Manual) Installation and Operating Manual for Components HST -LS Interlocking device (Translation of Original Manual) HST-LS Ident.-No.: 10268 HST-LS Ident.-No.: 10269 HST-LS, pictured Ident-Nr. 10269 The image

More information

MEYER-Rotating Fork Positioners are attachments used to transport loads and replace

MEYER-Rotating Fork Positioners are attachments used to transport loads and replace This MEYER-Attachment complies in every aspect to the EC-Safety Guidelines. The Certificate of Conformation / Declaration by the Manufacturer has been delivered with the attachment. The CE-Symbol can be

More information

350 Ton Elevator Links/Link Extensions Operation Manual

350 Ton Elevator Links/Link Extensions Operation Manual TECHNICAL MANUAL 350 Ton Elevator Links/Link Extensions Operation Manual 2005-2015 Texas International Oilfield Tools, LTD. Published by Texas International Oilfield Tools, LTD, Engineering 14620 Henry

More information

RENFROE. WARNING: Before putting tool in service, take to your immediate supervisor.

RENFROE. WARNING: Before putting tool in service, take to your immediate supervisor. WARNING: Before putting tool in service, take to your immediate supervisor. RENFROE Model NM Clamp Application, Operation and Maintenance Manual OM 211-NM Operators Manual This Operator s Manual covers

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation Globe control valve, pneumatically operated Actuator sizes 40 mm - 125 mm, Nominal diameter DN10-65 Kolbengesteuertes Geradsitzventil Antriebsgrößen 40 mm - 125 mm, Nennweiten DN10-65 Vanne à siège droit

More information

Innovative Landing String system for ultra-deep offshore

Innovative Landing String system for ultra-deep offshore Innovative Landing String system for ultra-deep offshore V. Flores, J.Franchi, S. Granger Vallourec Drilling Products A. Vierke, J. Grotherr Blohm+Voss Oil Tools Introduction Offshore industry trends:

More information

Mounting and Operating Instructions EB 8039 EN. Type 3351 Pneumatic On/off Valve. Type 3351 Pneumatic On/off Valve. Type 3351 Pneumatic On/off Valve

Mounting and Operating Instructions EB 8039 EN. Type 3351 Pneumatic On/off Valve. Type 3351 Pneumatic On/off Valve. Type 3351 Pneumatic On/off Valve Type 3351 Pneumatic On/off Valve Type 3351 Pneumatic On/off Valve Type 3351 Pneumatic On/off Valve Version with handwheel Mounting and Operating Instructions EB 8039 EN Edition May 2016 Definition of signal

More information

Safelift Overhead Runway Beams & Rolling Beam Cranes

Safelift Overhead Runway Beams & Rolling Beam Cranes Operation & Maintenance Instructions Instructions for Safe Use Safelift Overhead Runway Beams & Rolling Beam Cranes Certification Safelift overhead runway beams and rolling beam cranes are lifting appliances

More information

Baumann Way Control Valve

Baumann Way Control Valve Instruction Manual 24003 Valve Baumann 24003 3-Way Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Educational Services... 3 Maintenance... 3 Installation... 3 Air

More information

Declaration of Conformity as per Directive 97/23/EC

Declaration of Conformity as per Directive 97/23/EC Declaration of Conformity as per Directive 97/23/EC The manufacturer declares that:, 47906 Kempen, Germany PTFE-lined Rotary plug valves Series 23e, with packing with lever for 90 operation with worm gear

More information

Turbocharger / A100-L Original assembly instructions English

Turbocharger / A100-L Original assembly instructions English Assembly Instructions Turbocharger / A100-L Original assembly instructions English This document is valid for the A100-L series: A165-L, A170-L, A175-L, A180-L, A185-L, A190-L Purpose The assembly instructions

More information

Operating Manual TWN 0121/1. Lifting point, screw-type TWN 0122 TWN 0123 TWN 0127 TWN 1120 TWN 1830 TWN 1890

Operating Manual TWN 0121/1. Lifting point, screw-type TWN 0122 TWN 0123 TWN 0127 TWN 1120 TWN 1830 TWN 1890 TWN 0121/1 Operating Manual Lifting point, screw-type TWN 0122 TWN 0123 TWN 0127 TWN 1120 TWN 1830 TWN 1890 THIELE GmbH & Co. KG Werkstraße 3 Tel: +49 (0)2371 / 947-0 58640 Iserlohn www.thiele.de B07905-D

More information

Side Door Elevator SDS

Side Door Elevator SDS Pipe-Handling-Equipment Hoisting Equipment Side Door Elevator SDS SDS / VES SDS / SDS-H Type Series Manual and hydraulic operated elevators SDS Type Series Side Door Collar Type Elevator VES SDS Type Series

More information

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080

CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080 CO 3-WAY PNEUMATIC VALVE INSTRUCTION MANUAL 2080 STI S.r.l has taken every care in collecting and verifying the documentation contained in this Instruction Manual. The information herein contained are

More information

CE Operating and Maintenance Manual

CE Operating and Maintenance Manual CE Operating and Maintenance Manual Demolition and Sorting Grab Type S 450-D Zijtveld Grijpers The Netherlands www.zijtveld-grijpers.nl 1 Introduction Dear User, The Demolition/Selector grab is a piece

More information

A company of ThyssenKrupp Elevator. ThyssenKrupp Aufzugswerke. Operating Manual. Oil buffer

A company of ThyssenKrupp Elevator. ThyssenKrupp Aufzugswerke. Operating Manual. Oil buffer A company of ThyssenKrupp Elevator ThyssenKrupp Aufzugswerke Operating Manual Oil buffer OPERATING MANUAL Printer s imprint All rights reserved. Copyright by: THYSSENKRUPP AUFZUGSWERKE GMBH P.O. box 23

More information

Keystone Butterfly valves ParaSeal Installation and maintenance instructions

Keystone Butterfly valves ParaSeal Installation and maintenance instructions Before installation these instructions must be fully read and understood Please read these instructions carefully Hazard potentials: disregarding of instructions improper use of product insufficiently

More information

INSTRUCTION MANUAL. Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps

INSTRUCTION MANUAL. Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps INSTRUCTION MANUAL Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps IMPORTANT Please read this instruction manual before using these products. This manual contains

More information

USE AND MAINTENANCE MANUAL

USE AND MAINTENANCE MANUAL LATERAL TURNOVER 360 ORIGINAL INSTRUCTIONS INTRODUCTION This manual includes instructions for assembly, maintenance (regular and extraordinary), and for possible faults with remedies. The instructions

More information

Instruction Manual. Unique 7000 Series Aseptic - Manually Operated ESE02421-ENUS Original manual

Instruction Manual. Unique 7000 Series Aseptic - Manually Operated ESE02421-ENUS Original manual Instruction Manual Unique 7000 Series Aseptic - Manually Operated 2210-0042 ESE02421-ENUS1 2013-03 Original manual Table of contents The information herein is correct at the time of issue but may be subject

More information

Installation and operating manual Quick closing valve (Bellow sealed) LK product no:

Installation and operating manual Quick closing valve (Bellow sealed) LK product no: LK product no: 902002 Article no: 74506 Revision: 2 Contents 1. General information... 3 2. Safety precautions... 3 2.1 Significance of symbols... 3 2.2 Explanatory notes on safety information... 3 3.

More information

Installation and Operational Instructions for ROBATIC -clutch Types _.0 and _.0 Sizes 3 7

Installation and Operational Instructions for ROBATIC -clutch Types _.0 and _.0 Sizes 3 7 Please read these Installation and Operational Instructions carefully and follow them accordingly! Ignoring these Instructions may lead to malfunction or to clutch failure, resulting in damage to other

More information

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012 PAGE 1 OF 5 PURPOSE: OVERHEAD CRANES AND LIFTS PROCEDURE The purpose of this procedure is to define the safety and training requirements for use of overhead cranes and lifts. Procedure: Definitions Designated

More information

Turbocharger / TPS-H Original assembly instructions English

Turbocharger / TPS-H Original assembly instructions English Assembly Instructions Turbocharger / TPS-H Original assembly instructions English This document is valid for the TPS-H series: TPS44-H, TPS48-H, TPS52-H Purpose TPS-H turbocharger The assembly instructions

More information

Predelivery Instructions

Predelivery Instructions PINK Predelivery Instructions SR5030 Split-Row Planter Manufacturing, Inc. P.O. Box 5060 Salina, Kansas 67402-5060! Read this manual entirely. When you see this symbol, the subsequent instructions and

More information

Installation Instructions. Install Hubs Set Spacing Install Element FINISHED BORE INTERFERENCE FIT. Step 1 - HUB INSTALLATION

Installation Instructions. Install Hubs Set Spacing Install Element FINISHED BORE INTERFERENCE FIT. Step 1 - HUB INSTALLATION Instruction Manual for Baldor Dodge Raptor Spacer Couplings These instructions must be read thoroughly before installing or operating this product. Video walkthroughs of each installation procedure are

More information

Condensate Drain Valve AK 45. Original Installation Instructions English

Condensate Drain Valve AK 45. Original Installation Instructions English Condensate Drain Valve AK 45 EN English Original Installation Instructions 810467-03 1 Contents Important Notes Page Usage for the intended purpose...4 Safety note...4 Danger...4 Attention...4 PED (Pressure

More information

LOG CHOP. Hydraulic Wood Guillotine. Owners Illustrated Instruction Book & Parts List

LOG CHOP. Hydraulic Wood Guillotine. Owners Illustrated Instruction Book & Parts List LOG CHOP Hydraulic Wood Guillotine Owners Illustrated Instruction Book & Parts List Grovebury Road, Leighton Buzzard, Bedfordshire. LU7 4UX. UK. Tel:01525 375157. Fax:01525 385222. Email: enquires@brownsagricultural.co.uk

More information

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2 Lineman s Hoist LMST0- Operating, Maintenance & Parts Manual Lineman s Hoist Follow all instructions and warnings for inspecting, maintaining and operating this hoist. The use of any hoist presents some

More information

Mounting and Operating Instructions EB 8111/8112 EN. Series V2001 Valves Type 3321 Globe Valve

Mounting and Operating Instructions EB 8111/8112 EN. Series V2001 Valves Type 3321 Globe Valve Series V2001 Valves Type 3321 Globe Valve Type 3321 Globe Valve with rod-type yoke and Type 3372 Electropneumatic Actuator (350 cm²) Mounting and Operating Instructions EB 8111/8112 EN Edition June 2013

More information

Installation and operating manual

Installation and operating manual LK product no: 901002 and 901102 501002 and 501102 (JIS) Article no: 74500 Revision: 9 Article no: 74500 Revision: 9 2 (23) Contents 1. General information... 5 2. Safety precautions... 5 2.1 Significance

More information

Baumann Little Scotty Bronze Control Valve

Baumann Little Scotty Bronze Control Valve Instruction Manual 24000 Valve Baumann 24000 Little Scotty Bronze Control Valve Contents Introduction... 1 Scope of Manual... 1 Safety Precautions... 2 Maintenance... 2 Installation... 3 Air Piping...

More information

RENFROE. WARNING: Before putting tool in service, take to your immediate supervisor. Model SCSL Clamp Application, Operation and Maintenance Manual

RENFROE. WARNING: Before putting tool in service, take to your immediate supervisor. Model SCSL Clamp Application, Operation and Maintenance Manual WARNING: Before putting tool in service, take to your immediate supervisor. RENFROE Model SCSL Clamp Application, Operation and Maintenance Manual OM 311 SCSL Operators Manual This Operator s Manual covers

More information

Top Drive System Installation and Commissioning Manual

Top Drive System Installation and Commissioning Manual TDS-1000A Top Drive System Installation and Commissioning Manual SM01040 General Information Conventions.............................. 1-3 Notes, Cautions, and Warnings......................... 1-3 Illustrations.........................................

More information

STRUT SPRING COMPRESSOR

STRUT SPRING COMPRESSOR OWNER S MANUAL PRODUCT CODE: 1221T STRUT SPRING COMPRESSOR Capacity Stroke Spring Coil Spring Spring Coil Net Weight (Maximum) Thickness Length Diameter 1,000kg 330mm 10-18mm 210-570mm 100-158mm 36kg Made

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation. 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Type 5404 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation Contents 1 Operating instructions...2 2 Intended use...3 3

More information

Mounting and Operating Instructions EB 8111/8112 EN. Valve Series V2001 Globe Valve Type 3321

Mounting and Operating Instructions EB 8111/8112 EN. Valve Series V2001 Globe Valve Type 3321 Valve Series V2001 Globe Valve Type 3321 Fig. 1 Type 3321 Valve with mounted rod-type yoke for pneumatic or electric actuators (partial view) Mounting and Operating Instructions EB 8111/8112 EN Edition

More information

NEOTECHA NTB-NTC BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

NEOTECHA NTB-NTC BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood 2 SAFETY Please also read through these notes carefully. 2.1 General potential danger due to: a. Failure to observe the instructions

More information

CENTAX-TEST Assembly and operating instructions 053C GB3. M EN Rev. 1

CENTAX-TEST Assembly and operating instructions 053C GB3. M EN Rev. 1 Assembly and operating instructions Contents 1 General remarks... 5 2 Safety... 6 2.1 Safety remarks... 6 2.1.1 Signal words... 6 2.1.2 Pictograms... 7 2.2 Qualification of deployed personnel... 7 2.3

More information

AC 100. Operating instructions Pneumatic Crimper AC 100. Date of issue: 05/2010. Keep for future use!

AC 100. Operating instructions Pneumatic Crimper AC 100. Date of issue: 05/2010. Keep for future use! Operating instructions Pneumatic Crimper AC 100 Date of issue: 05/2010 Keep for future use! SAFETY SAFETY Basic information The basic prerequisite for ensuring safe use and continuous operation of the

More information

Turbocharger / VTR..0, VTR..1 Original assembly instructions English

Turbocharger / VTR..0, VTR..1 Original assembly instructions English Assembly Instructions Turbocharger / VTR..0, VTR..1 Original assembly instructions English This document is valid for the VTR..0/..1 series: VTR160, VTR200, VTR250, VTR320, VTR400 VTR161, VTR201, VTR251,

More information

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation

Type Operating Instructions. Bedienungsanleitung Manuel d utilisation 2/2-way angle seat control valve 2/2-Wege-Schrägsitzregelventil Vanne de réglage à siège incliné 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation We reserve the right to make technical

More information

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM

SHOP RIGGING & OVERHEAD HOIST SAFETY PROGRAM Purpose & Scope CLIMATE ENGINEERS, INC. (CE) is dedicated to the protection of our employees from occupational injuries and illnesses. The purpose of this program is to provide procedures to be followed

More information

WB-100B Walk-Behind Broadcast Spreader

WB-100B Walk-Behind Broadcast Spreader July 15, 2013 Lit. No. 43597, Rev. 00 WB-100B Walk-Behind Broadcast Spreader 85103 Owner's Manual and Installation Instructions Original Instructions CAUTION Read this document before operating or servicing

More information

Instruction Manual. Maximum Operating Pressure 700 bar

Instruction Manual. Maximum Operating Pressure 700 bar Remote Hydraulic Cutter Model HC-120R Maximum Operating Pressure 700 bar ABSOLUTE EQUIPMENT PTY LTD 2/186 Granite Street, GEEBUNG QLD 4034 Australia sales@absoluteequipment.com.au Phone: +61 7 3865 4006

More information

TONS. Before each shift: Before operating: Before initial operation of hoist:

TONS. Before each shift: Before operating: Before initial operation of hoist: LEVER HOIST 0.25 9 TONS Manual Notice It is the responsibility of the owner/user to install, inspect, test, maintain, and operate these lever hoists in accordance with ASME B30.21, Safety Standard for

More information

INSTRUCTION MANUAL. I/P Converter DSG BXXY3Z DSG BXXY4Z

INSTRUCTION MANUAL. I/P Converter DSG BXXY3Z DSG BXXY4Z INSTRUCTION MANUAL I/P Converter DSG BXXY3Z DSG BXXY4Z Revision 2.0 3.626 016136 en Page 1/15 Should you have any questions concerning the I/P converter, please contact the Service Department of the Product

More information

Please visit for the latest version of these installation instructions.

Please visit   for the latest version of these installation instructions. Please visit www.blueox.com for the latest version of these installation instructions. BX2409 2009-18 Dodge Ram 1500 Sport/ST/Laramie Limited Please read BOTH these and the General Information sheet prior

More information

Mounting and Operating Instructions EB 8048 EN. Type and Type Pneumatic Control Valves Type 3249 Aseptic Angle Valve

Mounting and Operating Instructions EB 8048 EN. Type and Type Pneumatic Control Valves Type 3249 Aseptic Angle Valve Type 3249-1 and Type 3249-7 Pneumatic Control Valves Type 3249 Aseptic Angle Valve Ball body version Special version with packing Type 3249-7 Control Valve with Type 3277 Actuator and integrated positioner

More information

Operating Manual for Automatic sprayvalve KA-2 / GT

Operating Manual for Automatic sprayvalve KA-2 / GT Operating Manual for Automatic sprayvalve KA-2 / GT KA-2 / GT, round spray with clamp (option) KA-2 / GT, flat spray with clamp (option) Read this manual carefully before installing, operating or servicing

More information

OPERATING MANUAL. Black Bruin Hydraulic Rotators

OPERATING MANUAL. Black Bruin Hydraulic Rotators OPERATING MANUAL All information given in this manual is current and valid according to the information available at the time of publication. Sampo Hydraulics Ltd. reserves the rights to implement changes

More information

SuperGrip SG. User s manual

SuperGrip SG. User s manual SuperGrip SG User s manual This publication contains instructions for the installation and handling of the SuperGrip SG grapples. The instructions cover both general information for all models, and procedures

More information

500kg TELESCOPIC TRANSMISSION LIFTER

500kg TELESCOPIC TRANSMISSION LIFTER Product Code: 2056T PRODUCT CODE: 2056T 500kg TELESCOPIC TRANSMISSION LIFTER Safe Working Capacity 500kg Base Dimension 540 x 570 mm Minimum Height 1175mm Maximum Height 1900mm Made in China to TQB Brands

More information

Installation manual wall-mounted distributor

Installation manual wall-mounted distributor EN Installation manual wall-mounted distributor EN 60003233 Issue 11.2016 2016-14-11 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal words used 4 2

More information

Type 6213 EV, 6281 EV

Type 6213 EV, 6281 EV Type 6213 EV, 6281 EV 2/2-way solenoid valve 2/2-Wege-Magnetventil Électrovanne 2/2 voies Operating Instructions Bedienungsanleitung Manuel d utilisation 1 OPERATING INSTRUCTIONS The operating instructions

More information

EPS 16 ATEX 1121 X, IECEx EPS X Solenoid coil Type 06xx Magnetspule Typ 06xx Bobine magnétique Type 06xx. Operating Instructions

EPS 16 ATEX 1121 X, IECEx EPS X Solenoid coil Type 06xx Magnetspule Typ 06xx Bobine magnétique Type 06xx. Operating Instructions , IECEx EPS 16.0053X Solenoid coil Type 06xx Magnetspule Typ 06xx Bobine magnétique Type 06xx Device with II 2G/D Ex approval Geräte mit II 2G/D Ex Zulassung Appareils avec mode de protection II 2G/D Ex

More information

EPS 16 ATEX 1072 X, IECEx EPS X. Operating Instructions. Solenoid coil Type AC19 Magnetspule Typ AC19 Bobine magnétique Type AC19

EPS 16 ATEX 1072 X, IECEx EPS X. Operating Instructions. Solenoid coil Type AC19 Magnetspule Typ AC19 Bobine magnétique Type AC19 , IECEx EPS 16.0030X Solenoid coil Type AC19 Magnetspule Typ AC19 Bobine magnétique Type AC19 Device with II 2G/D Ex approval Geräte mit II 2G/D Ex Zulassung Appareils avec mode de protection II 2G/D Ex

More information

Guides, Brakes and Valves

Guides, Brakes and Valves Guides, Brakes and Valves Operating Instructions ORIGA SYSTEM PLUS Appendix to the Operating Instructions OSP-P / OSP-E Guides, Brakes and Valves OSP-P / OSP-E Content 1 Foreword to the Operating Instructions

More information

Baumann Sanitary Control Valve

Baumann Sanitary Control Valve Instruction Manual 89000 Valve Baumann 89000 Sanitary Control Valve Contents Introduction... 2 Scope of Manual... 2 Educational Services... 2 Safety Precautions... 3 Maintenance... 4 Installation... 4

More information

Operating Manual for extrusion valve MMKD-40 KV/LV/LVP

Operating Manual for extrusion valve MMKD-40 KV/LV/LVP Operating Manual for extrusion valve MMKD-40 KV/LV/LVP Read this manual carefully before installing, operating or servicing this equipment. Keep always handy for further use. ALFRED SCHÜTZE Apparatebau

More information

WB-100B Walk-Behind Broadcast Spreader

WB-100B Walk-Behind Broadcast Spreader Western Products, PO Box 245038, Milwaukee, WI 53224-9538 www.westernplows.com November 1, 2017 Lit. No. 43577, Rev. 01 WB-100B Walk-Behind Broadcast Spreader 85101 Owner's Manual and Installation Instructions

More information

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and Crane Safety Fact Sheet In This Document MODULE DESCRIPTION This module provides information on the safety concerns and Introduction necessary precautions you will need to be aware of when working Crane

More information

Alfa Laval Toftejorg Rotary Spray Heads MultiMidget & MultiMagnum

Alfa Laval Toftejorg Rotary Spray Heads MultiMidget & MultiMagnum 4102-0008 Instruction Manual Alfa Laval Toftejorg Rotary Spray Heads MultiMidget & MultiMagnum Covering: Standard versions IM-TE91A748-EN5 First published: 2014-04 ESE02830-EN5 2016-02 Original manual

More information

Technical Description Edition 2007 Mounting, maintenance and repair of propshafts with flanged universal joints

Technical Description Edition 2007 Mounting, maintenance and repair of propshafts with flanged universal joints Technical Description Edition 2007 Mounting, maintenance and repair of propshafts with flanged universal joints 1. Recommendations Assembly, disassembly, maintenance and repair of propshafts should be

More information

Mounting and Operating Instructions EB 8222 EN. Type 3310/AT and Type 3310/3278 Pneumatic Control Valves. Type 3310 Segmented Ball Valve

Mounting and Operating Instructions EB 8222 EN. Type 3310/AT and Type 3310/3278 Pneumatic Control Valves. Type 3310 Segmented Ball Valve Type 3310/AT and Type 3310/3278 Pneumatic Control Valves Type 3310 Segmented Ball Valve Fig. 1 Type 3310/3278 with positioner Fig. 2 Type 3310/AT Mounting and Operating Instructions EB 8222 EN Edition

More information

OPERATING MANUAL C-1350 CABLE PUSHER. Copyright 2003 by CBS Products (KT), Ltd

OPERATING MANUAL C-1350 CABLE PUSHER. Copyright 2003 by CBS Products (KT), Ltd CBS Products (KT), Ltd, Pillings Road, Oakham, Rutland, LE15 6QF. UK Telephone: +44(0)1572723665 Fax: +44(0)1572 756006 E-Mail: sales@cbsproducts.com Website:www.cbsproducts.com OPERATING MANUAL C-1350

More information

FRP Ball Valves INSTALLATION & MAINTENANCE MANUAL

FRP Ball Valves INSTALLATION & MAINTENANCE MANUAL FRP Ball Valves INSTALLATION & MAINTENANCE MANUAL FRP BALL VALVES TABLE OF CONTENTS MAINTENANCE AND INSTALLATION INSTRUCTIONS 1. 2. 2.1 2.2 2.3 2.4 GENERAL...Page 1 HANDLING...1 Receiving and Storing...1

More information

User Manual Hoof trimmingcrush:sa0010. Version: User manual. Hoof trimming crush SA0010

User Manual Hoof trimmingcrush:sa0010. Version: User manual. Hoof trimming crush SA0010 User Manual Hoof trimming crush SA0010 Manufacturer: Wopa Constructiebedrijf BV Rector Hulshofstraat 10 7135 JV Harreveld The Netherlands : +31-(0)544 372415 : +31-(0)544 372445 Email: info@wopa.com Website:

More information

Broetje-Automation Company Standard Coating

Broetje-Automation Company Standard Coating Broetje-Automation Company Standard Table of Contents Scope and Objective... 2 1 Standards and Corrosion Protection... 2 1.1 Standards... 2 1.2 Corrosion Resistance... 2 2 Surface Preparation... 3 2.1

More information

Lifting Points Rotating Ball-bearing De-centered Weldable Screw-on

Lifting Points Rotating Ball-bearing De-centered Weldable Screw-on ifting Points Rotating Ball-bearing De-centered Weldable Screw-on ifting Points ifting Points Information 3:2 Rotating Eye ifting Point - REP 3:4 Rotating ifting Point - RP 3:5 Decentered ifting Point

More information

Application cup for OptiFlex 2 GM03 manual powder gun

Application cup for OptiFlex 2 GM03 manual powder gun En Operating instructions and spare parts list Application cup for OptiFlex 2 GM03 manual powder gun Translation of the original operating instructions Documentation OptiFlex GM03 application cup Copyright

More information

ov-lifting_bolts_divider - Updated Lifting Bolts

ov-lifting_bolts_divider - Updated Lifting Bolts ov-lifting_bolts_divider - Updated - 09-01-2017 Lifting Bolts Technical Information roduct information Lifting Bolts roduct marking Compliant with 2006/42/EC, and with individual date of manufacture and

More information

Assembly instructions PRORUNNER mk1 2

Assembly instructions PRORUNNER mk1 2 Assembly instructions PRORUNNER mk1 Version 0.1 / 01-JUN-2013 Copyright Qimarox B.V. All rights reserved. No part of this document may be copied, stored in a database and/or published by means of printing,

More information

Instructions for Use Plain Trolley ULK Geared Trolley UHK

Instructions for Use Plain Trolley ULK Geared Trolley UHK Instructions for Use Plain Trolley Geared Trolley Item no. Load-carrying capacity (payload) Weight Trolley widths *special trolley widths* Device dimensions mm H / W / D Minimum curve radius mm -005 0,5

More information

OPERATING MANUAL: BLACK BRUIN ROTATORS. Translation of the original document

OPERATING MANUAL: BLACK BRUIN ROTATORS. Translation of the original document : BLACK BRUIN ROTATORS Translation of the original document CONTENTS 1 GENERAL INSTRUCTIONS... 3 1.1 About the manual... 3 1.2 Revision comments... 3 1.3 Applicability... 3 1.4 Intended use... 3 1.5 Warranty...

More information

Exchange of rollers from the XTS-Mover

Exchange of rollers from the XTS-Mover Service documentation for AT901-0050-0550 and AT9011-00x0-0550 Version: Date: 1.0 0.10.017 Table of contents Table of contents 1 Foreword... 5 1.1 Notes on the documentation... 5 1. Documentation issue

More information

Installation manual portable distributors

Installation manual portable distributors EN Installation manual portable distributors EN 60003206 Issue 11.2016 15/11/2016 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3 Signal words used 4 2 Intended

More information

PORTABLE LADDER SAFETY PROGRAM

PORTABLE LADDER SAFETY PROGRAM PORTABLE LADDER SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.25 Portable Wood Ladders* - 29 CFR 1910.26 Portable Metal Ladders* - 29 CFR 1926.1050-1060* *The above standards are intended to prescribe

More information

Mounting and Operating Instructions EB 8097 EN. Type and Type Pneumatic Control Valves

Mounting and Operating Instructions EB 8097 EN. Type and Type Pneumatic Control Valves Type 3347-1 and Type 3347-7 Pneumatic Control Valves Type 3347-7, cast body with welding ends Type 3347-7, bar stock body with threaded connections Mounting and Operating Instructions EB 8097 EN Edition

More information