1 Analysis of Bus Efficiency and Schedule Adherence Case study: Sun Metro Route 15 LUIS DAVID GALICIA CABRERA University of Texas at El Paso Outline Background Problem Statement Justification Objective of the Research Methodology Analysis and Results Observations Conclusions & Recommendations 1
2 Background El Paso Public Transportation System El Paso TRANSIT AGENCIES Sun Metro (City of El Paso Mass Transit Department, EPMTD) MVT (El Paso County Rural Transit, Mission Valley Transit) Background According to Sun Metro s s official site, there are 63 routes. The agency operates a fleet of: 172 fixed-route buses and 56 paratransit buses for riders with disability. 79 buses are 15 years old, 55 are more than 12 years old, and some have been driven 700,000 miles.* Sun Metro operates on a $50 million budget annually (2006) and employs 685 people*. *Jake Rollow interview with Sun Metro Director/ El Paso Times 06/10/2006 2
3 El Paso Public Transportation System Background In addition, Sun Metro has modified 14 routes and/or schedules throughout El Paso starting October 1 st, 2006: Route 3 Route 53 Route 4 Route 57 Route 10 Route 61 Route 22 Route 62 Route 41 Route 64 Route 50 Route 65 Route 51 Route 66 3
4 Sun Metro quality of service survey 63% of regular riders are dissatisfied with Sun Metro's services. 65% of regular riders wait for late buses three or more times a week. 70% of riders who have used Sun Metro for a year or more say service is worsen every year. El Paso Times May Sun Metro quality of service survey Nearly two-thirds thirds of regular riders, those who use the bus three or more times a week, said they frequently wait for late buses. 38% of riders said they had waited an hour or longer for a late bus. 19.4% of riders said they have waited two hours or longer El Paso Times May
5 User s s opinions of Sun metro service El Pasoans were satisfied with Sun Metro, rating it a 3.39 on a 5-point 5 scale Survey on measurement of satisfaction March Institute for Policy and Economic Development at the UTEP. Some other comments. It frustrates me, I have to leave two and a half to three hours early to make sure I get to work on time," said Yvette Lopez, who rides Sun Metro regularly from the Lower Valley to her East Side job. (Yasmin A. Aboytes / El Paso Times) 5
6 More comments. After waiting two hours at the Sun Metro Eastside Terminal near Cielo Vista Mall, Ofelia Martinez, 80, stood while riding the packed Route 59 bus to San Jacinto plaza Friday afternoon (Yasmin A. Aboytes / El Paso Times) More and more. "People got to go to work, they have places to go people to see. This hot weather and the buses ain't working," said Alfredo Gomez from Northeast El Paso. "It's too hot, we're sweating," complained Araceli Artelejo.. She was at a temporary bus location where there's no shade and no place to sit. KFOXTV, June 21,
7 users comments. In fact, I ve I known at least three people who have lost their jobs because of Sun Metro s s infamous tardiness Jenni Jenni Burton, Newspaper Tree. El Paso s s Original News Source May Validating data O-D D Travel Time from Acacia Park to UTEP (5.3miles) using five different modes Walking: Running: Bicycle: Car: 2.1 hours 1 hour 0.7 hour 0.2 hours Bus: hours 7
8 Problem Statement Different Surveys and comments are qualitative measurements of service. This makes it difficult to define a more realistic Level of Service. Existing evaluations concerning Sun Metro s quality of service depend largely on the users and even non users perception during the interview. The need of an alternative approach to obtain a more reliable evaluation of bus performance (LOS). Justification It is necessary to obtain a reliable measurement of service quality to: Identify problematic sections along the route base on quantitative s rather than qualitative methods. Allow a better understanding of route performance. Implement effective plans to ensure schedule adherence and service efficiency. 8
9 Objective of the Research To obtain the service measures of a sample route (Sun Metro R-15) R based on the methodology of Transit Capacity and Quality of Service Manual with emphasis in Quantitative Methods. Methodology 1. Documentary and empirical data 2. Data collection 3. Analysis 4. Results Feedback 9
10 Methodology Documentary and empirical data Meeting with Sun metro staff for some basic information: -Line characteristics: Line length Numbers of drivers per route Drivers work hours Service Coverage Service Hours Methodology -Fleet characteristics and size: Units regular service Units in reserve Units in maintenance Bus capacities Line capacity Peak hours -Schedule Timetable during the study period One-way operating time Terminal time Headway Frequency Cycle speed Maximum operating speed 10
11 Methodology Data collection -Definition of route characteristics Bus station location Survey trip along the route to collect the total number of bus stops Providing codes to stations and stops Identifying the physical conditions of facilities Service hours and schedules provided Line length measurement Geometric configuration Methodology On-board data collection: Boarding different buses during two days to determine the peak hours (corroborating official information). 11
12 Methodology -Once peak hours were identified: Boarding different buses during 5 days to get data on: Running time Dwell time Operating travel time Boarding and Alighting times Headway and Frequency (indirect method) Forms Methodology Route information Route 15 Downtown-Crossroads (OUTBOUND) Date: NOV 2006 Dwell Time Passangers ID & NAME STOP RUN Boarding Alighting MS CIVIC CENTER DOWNTOWN Start Station 1 Oregon St North 2 Franklin Ave 3 Yandell Dr 4 Rio Grande Ave 5 Arizona Ave 6 California Ave 7 Cliff 8 Crosby Ave 9 Rim Rd 10 University Ave 11 Kerbey Ave 12 Robinson Ave 13 Baltimore Dr 14 Kern Plaza 15 Kern Dr 16 Mesita Dr 17 Mesita Dr (across) 18 Waymore Dr 19 Brentwood Ave 20 Executive Center Blvd 21 Foothills Village 22 Sunset Inn MOTEL 23 OSA 24 Warren Inn complex (front) 25 Castellano Dr 26 Argonaut Dr 27 Vista Sol (across) 28 Festival Dr Uncle Bao's (GYM) 31 Mesa Hills Dr NOTES 12
13 1 Oregon St North Methodology Route information Route 15 Downtown-Crossroads (OUTBOUND) Date: Wednesday NOV 15th 2006 ID & NAME Dwell Time Passangers NOTES STOP RUN Boarding Alighting MS CIVIC CENTER DOWNTOWN 9:13:19 9:20:01 42 Start Station 2 Franklin Ave 9:22:58 9:23: Yandell Dr 4 Rio Grande Ave (EPC College) 9:19:09 9:19: Arizona Ave 9:20:12 9:20: California Ave 7 Cliff Dr 9:22:02 9:22: Crosby Ave 9 Rim Rd 0 10 University Ave 9:28:45 9:28: univ@intersection 9:28:45 11 Kerbey Ave 12 Robinson Ave 9:30:28 9:30: Baltimore Dr 14 Kern Plaza 15 Kern Dr 16 Mesita Dr 17 Mesita Dr (across) 18 Waymore Dr 9:32:50 9:32: Brentwood Ave 9:33:38 9:33: Executive Center Blvd 21 Foothills Village 9:34:53 9:34: Sunset Inn MOTEL 9:34:11 23 OSA 9:35:39 9:35: Warren Inn complex (front) 9:36:20 9:36: Analysis and Results Analysis was based on methodology of Transit Capacity and Quality of Service Manual Quantitative method Quality Service Indexes and Parameters 13
14 Headway Analysis and Results Timetable headway 30 minutes Level of Service D Some cases even showed a LOS: E Availability Analysis and Results The service availability for Route 15 is from 5:53 am to 9:40 pm (15h 47 ). Therefore the corresponding LOS is C 14
15 Analysis and Results Comfort and convenience Transit stops Acceptable level of services (A/B) off-peak hours However, during the peak hour the LOS is D Analysis and Results Comfort and convenience On-time Performance On time percentage observed: 84% Corresponding level of service: D 15
16 Analysis and Results Availability Coverage area (using a GIS package) *Further research Analysis and Results *Further research 16
17 Schedule Adherance 0:24:29 0:22:02 0:19:35 Time deviation (min) 0:17:08 0:14:41 0:12:14 0:09:48 20-Nov 16-Nov 17-Nov 15-Nov 21-Nov Series6 0:07:21 0:04:54 0:02:27 0:00:00 Leave Dowtown Mesa at Executive Mesa at Mesa Hills Mesa at Belivedere Mesa at Doniphan Check Points Mesa at Belivedere Mesa at Mesa Hills Mesa at Executive Arrive Dowtown Analysis and Results Comfort and convenience. Survey trips made on Tuesday November 14 th using car: CAR BUS DIFFERENCE OUTBOUND TRIP (min) INBOUND TRIP (min) Corresponding level of service: C 17
18 Summary of Results Comfort and convenience. Availability Avg Headway Hours of Service Coverage area D C Not possible Comfort and convenience Load factor On-time Convenience D D C Overall Level of Service for route 15: D 80 Outbound 70 Passenger volume P (prs/h) CIVIC CENTER DOWNTOWN Oregon St North Franklin Ave Yandell Dr Rio Grande Ave (EPC College) Arizona Ave California Ave Cliff Dr Crosby Ave Rim Rd University Ave Kerbey Ave Robinson Ave Baltimore Dr Kern Plaza Kern Dr Mesita Dr Mesita Dr (across) Waymore Dr Brentwood Ave Executive Center Blvd Foothills Village Sunset Inn MOTEL OSA Warren Inn complex (front) Castellano Dr Argonaut Dr Vista Sol (across) Festival Dr Festival Dr after Uncle Bao's (GYM) Mesa Hills Dr Crown Point Drive Shadow Mountain Dr Balboa Rd De Leon Dr Fountain Rd Alto Mesa Dr Pitt St Resler Dr (Albertsons) Colony Cove Belvidere St Golden Corral Remcon Cir The Promenade Barlett Dr Osborne Dr Crossroads Doniphan Dr Mesa/Doniphan Stations (bus stops) 15/Nov/06_7:11 15/Nov/06_11:11 15/Nov/06_7:41 15/Nov/06_9:20 15/Nov/06_10:47 16/Nov/06_45 16/Nov/06_07:12 16/Nov/06_08:41 16/Nov/06_10:14 17/Nov/06_6:44 17/Nov/06_8:12 17/Nov/06_7:14 17/Nov/06_8:44 17/Nov/06_10:13 20/Nov/06_7:42 20/Nov/06_9:12 20/Nov/06_7:11 20/Nov/06_8:46 20/Nov/06_10:29 18
19 50 Inbound 45 Passenger volume P (prs/hr) /Nov/06_8:00 15/Nov/06_11:48 15/Nov/06_8:28 15/Nov/06_10:04 16/Nov/06_45 16/Nov/06_07:58 16/Nov/06_09:30 17/Nov/06_7:28 17/Nov/06_8:58 17/Nov/06_8:02 17/Nov/06_9:28 20/Nov/06_7:24 20/Nov/06_8:20 20/Nov/06_10:02 20/Nov/06_8:03 20/Nov/06_9: Mesa/Doniphan Crossroads Dr 1 Osborne Dr 1st Remcon Cir Pep-boys 2nd Remcon Cir Belvidere St (before) Belvidere St (before) Belvidere St (across) Resler Dr Pitt St Alto Mesa Dr Palm Court Maguey Pl De Leon Rd Balboa Rd Coronado Center Sunland Park Dr Cresmont Dr Mesa Hills Dr Double Tree Ln (infront GYM) Pepper Tree (before Festival) Festival Dr Vista Sol (across) Argonaut Dr Mesa Park Business In front of Warren Inn Foothills Village Executive Center Blvd Brentwood Ave Waymore Dr Mesa Village (Tequila Bar) Sunbowl & Mesa Las Palmas Life Care Center Kern Dr Don Haskins Ctr Robinson Ave Kerbey Ave University Ave Hague Rd (Palmas Hospital) Schuster Ave Crosby Ave River Ave Nevada Ave Rio Grande Ave (EPCC) Yandell Dr Missouri Ave Stations (bus stations) Outbound Dwell Time 0:07:12 0:06:29 0:05:46 0:05:02 Time (hr:min:sec) 0:04:19 0:03:36 0:02:53 0:02:10 0:01:26 0:00:43 0:00:00 CIVIC CENTER DOWNTOWN Oregon St North Franklin Ave Yandell Dr Rio Grande Ave (EPC College) Arizona Ave California Ave Cliff Dr Crosby Ave Rim Rd University Ave Kerbey Ave Robinson Ave Baltimore Dr Kern Plaza Kern Dr Mesita Dr Mesita Dr (across) Waymore Dr Brentwood Ave Executive Center Blvd Foothills Village Sunset Inn MOTEL OSA Warren Inn complex (front) Castellano Dr Argonaut Dr Vista Sol (across) Festival Dr After Festival Uncle Bao's (GYM) After Mesa Hills Crown Point Drive Shadow Mountain Dr Balboa Rd De Leon Dr Fountain Rd Alto Mesa Dr Pitt St Resler Dr (Albertsons) Colony Cove Belvidere St Golden Corral Remcon Center The Promenade Barlett Dr Osborne Dr Crossroads Doniphan Dr Stations 19
20 Inbound Boarding, Alighthing and Volume Diagram Passanger volume boarding Alighthing 40 Passenger P (prs/hr) Distance (mile) Inbound Dwell Time 0:07:12 0:06:29 0:05:46 0:05:02 Time (hr:min:sec) 0:04:19 0:03:36 0:02:53 0:02:10 0:01:26 0:00:43 0:00:00 Crossroads Dr 1 Osborne Dr 1st Remcon Cir Pep-boys 2nd Remcon Cir Belvidere St (before) Belvidere St (across) Resler Dr Pitt St Alto Mesa Dr Palm Court Maguey Pl De Leon Rd Balboa Rd Coronado Center Sunland Park Dr Cresmont Dr Before Mesa Hills Double Tree Ln (infront GYM) Pepper Tree (before Festival) Festival Dr Vista Sol (across) Argonaut Dr Mesa Park Business In front of Warren Inn Foothills Village Executive Center Blvd Brentwood Ave Waymore Dr Mesa Village (Tequila Bar) Sunbowl & Mesa Las Palmas Life Care Center Kern Dr Don Haskins Ctr Robinson Ave Kerbey Ave University Ave Hague Rd (Palmas Hospital) Schuster Ave Crosby Ave River Ave Nevada Ave Rio Grande Ave (EPCC) Yandell Dr Missouri Ave Oregon St North (Mills) Stations 20
21 Other parameters evaluated Running speed Ave speed 16.9mph Running Speed Outbound Average Speed (mph) CIVIC CENTER DOWNTOWN Oregon St North Franklin Ave (0.05) Yandell Dr Rio Grande Ave (EPC College) (0.48) Arizona Ave (0.10) California Ave Cliff Dr Crosby Ave Rim Rd (0.41) University Ave (0.26) Kerbey Ave () Robinson Ave (0.26) Baltimore Dr () Kern Plaza (0.29) Kern Dr (0.17) Mesita Dr () Mesita Dr (across) (0.21) Waymore Dr (0.33) Brentwood Ave (0.19) Executive Center Blvd (0.35) Foothills Village (0.35) Sunset Inn MOTEL (0.24) OSA (0.08) Warren Inn complex (front) (0.19) Castellano Dr () Argonaut Dr (0.30) Vista Sol (across) () Festival Dr (0.70) After Festival (0.05) Uncle Bao's (GYM) () After Mesa Hills (0.62) Crown Point Drive (0.21) Shadow Mountain Dr () Balboa Rd (0.38) De Leon Dr (0.02) Fountain Rd (0.22) Alto Mesa Dr (0.21) Pitt St (0.42) Resler Dr (Albertsons) (0.14) Colony Cove Belvidere St (0.35) Golden Corral Remcon Center The Promenade (0.48) Barlett Dr Osborne Dr (0.48) Crossroads Doniphan Dr Station Running Speed Ave speed 17.42mph Running Speed Inbound Average Speed (mph) Crossroads Dr 1 Osborne Dr 1st Remcon Cir (12.63) Pep-boys (15.56) 2nd Remcon Cir Belvidere St (before) Belvidere St (across) (12.54) Resler Dr Pitt St (11.37) Alto Mesa Dr Palm Court Maguey Pl De Leon Rd Balboa Rd (27.76) Coronado Center (10.52) Sunland Park Dr Cresmont Dr (50.72) Before Mesa Hills (17.93) Double Tree Ln (infront GYM) Pepper Tree (before Festival) Festival Dr (23.444) Vista Sol (across) (23.56) Argonaut Dr (26.16) Mesa Park Business In front of Warren Inn (25.64) Foothills Village (11.58) Executive Center Blvd Brentwood Ave Waymore Dr Mesa Village (Tequila Bar) (31.56) Sunbowl & Mesa Las Palmas Life Care Center (9.03) Kern Dr Don Haskins Ctr Robinson Ave (15.60) Kerbey Ave (13.38) University Ave (9.38) Hague Rd (Palmas Hospital) (6.41) Schuster Ave Crosby Ave (7.82) River Ave Nevada Ave Rio Grande Ave (EPCC) (12.09) Yandell Dr Missouri Ave (10.91) Oregon St North (Mills) (15.19) Station 21
22 Outbound=49:00 min Inbound = 44:38 min Cycle time= 1:33:28 (3:28 diff) Outbound length= miles Inbound length= 8.991miles Speed Running speed outbound= 16.9mph Running speed inbound= 17.42mph Origin destination speed VODV = 11.09mph Origin destination speed VODV =12.04mph Cycle speed =11.26mph Observations Conflicting section from downtown to Baltimore there are 2 lanes so in peak hours the bus stops increase the vehicle queue behind the TU s. There is not terminal break time for drivers, This produces timetable deviation especially when drivers have the need to take a break at Mesa & Doniphan (10-15min). 15min). Dwell time is significantly affected by riders with some kind of disability requesting a stop (boarding or alighting). Even when there is a special service provided. 22
23 Observations Cont.. There are relatively close distances between stops (34, 80 90m) and as well there are stations with long distance in between (664, 538, 667, 649, 642m). There was a tendency to reach destinations on time when drivers felt monitored. Conclusions The evaluation provides an alternative measurement of service quality of sun metro service It was possible to identify problematic sections along the route (e.g. University stop) It gives a tool for planners to ensure schedule adherence and service efficiency 23
24 Conclusions The overall LOS obtained in Route 15 strongly encourages a revision in the entire bus system. Additionally, all calculations and parameters can be automated in a data base template or spreadsheet saving calculation time and contributing to an updated and reliable estimation of LOS. Thus, planners could use these resulting LOS to identify conflictive points or segments, ensuring schedule adherence and service efficiency in selected routes or the entire system. Recommendations The use of passenger counters devices to evaluate the load and demand discrepancy. GIS based analysis to optimize distances between stops. Origin-Destination study could be synchronized with Mexican transportation authorities or agencies to have better results on passenger mobility estimation. Low-floor (for people with disability) buses and smart cards are actions that help to reduce boarding and alighting times (TCQSM). 24
25 Recommendations A good practice might be installing an official clock due to the differences comparing all users time. Efforts in maintenance teams (relatively old bus fleet) Merging problems in bays: a possible solution is providing signs in the back part of buses to let private vehicle drivers know about the bus right of way Recommendations More recommendations in final report Full document available soon in ITE UTEP student chapter or by request ldgalicia@utep.edu 25
26 Thank Thank You Questions? Background As As part of transforming Sun Metro from a troubled organization into a first-rate rate bus service, a three-year, $1.6 million management contract had just been awarded to First Transit,, a transit management firm in Cincinnati. Jake Rollow,, El Paso Times, 10/11/
Troost Corridor Transit Study
Troost Corridor Transit Study May 23, 2007 Kansas City Area Transportation Authority Agenda Welcome Troost Corridor Planning Study Public participation What is MAX? Survey of Troost Riders Proposed Transit
More informationBackground Information about the Metrobus 29 Lines Study
Background Information about the Metrobus 29 Lines Study Questions Overview of Existing Service Q. Why is the study being conducted? A. The 29 Lines provide an important connection between Annandale and
More informationClick to edit Master title style
Nelson/Nygaard Consulting Associates SERVICE IMPROVEMENT STRATEGIES September 22, 2015 1 PROJECT OVERVIEW & WORK TO DATE 1. Extensive stakeholder involvement Throughout 2. System and market assessment
More informationWaco Rapid Transit Corridor (RTC) Feasibility Study
Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM
More informationMadison BRT Transit Corridor Study Proposed BRT Operations Plans
Madison BRT Transit Corridor Study Proposed BRT Operations Plans This paper presents a description of the proposed BRT operations plan for use in the Madison BRT Transit Corridor Study. The objective is
More informationPomona Rotary December 19, 2017
Pomona Rotary December 19, 2017 Los Angeles County s population will grow by 5.9% to 10.7 million by 2024 During that same period, the San Gabriel Valley will grow by 7.6% to more than 1.5 million; taking
More informationAppendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability
(http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix SAN San Diego, California 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement
More informationBlue Ribbon Committee
Blue Ribbon Committee February 26, 2015 Kick-off Meeting Blue Ribbon Committee 1 2,228 Metro CNG Buses 170 Bus Routes 18 are Contract Lines Metro Statistics 2 Transitway Lines (Orange/Silver Lines) 20
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: COMMUNITY BUS SERVICES ACTION ITEM RECOMMENDATION It is recommended that the Board not approve any routing
More informationTravel Time Savings Memorandum
04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost
More informationFasTracks News. RTD s Eagle P3 Transit Project Nears Halfway Mark to Opening Day EP3 will add three commuter rail lines to metro area in 2016
July 29, 2013 Welcome to Inside RTD FasTracks a monthly e- update to keep you informed about the progress of the Regional Transportation District's FasTracks program. FasTracks News RTD s Eagle P3 Transit
More informationInnovation and Transformation of Urban Mobility Role of Smart Demand Responsive Transport (DRT) service
Innovation and Transformation of Urban Mobility Role of Smart Demand Responsive Transport (DRT) service Eng. Mohammed Abubaker Al Hashimi Director of Planning & Business Development, Public Transport Agency
More informationAPPENDIX B Traffic Analysis
APPENDIX B Traffic Analysis Rim of the World Unified School District Reconfiguration Prepared for: Rim of the World School District 27315 North Bay Road, Blue Jay, CA 92317 Prepared by: 400 Oceangate,
More informationBus Stop Optimization Study
Bus Stop Optimization Study Executive Summary February 2015 Prepared by: Passero Associates 242 West Main Street, Suite 100 Rochester, NY 14614 Office: 585 325 1000 Fax: 585 325 1691 In association with:
More information6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION
June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments
More informationMore than $9 Million coming to Central Valley for transportation
More than $9 Million coming to Central Valley for transportation From free bus service to electric buses Part of overall $97 Million awarded to public transportation projects A total of 152 local public
More informationCity of El Paso: Sun Metro Legislative Agenda Briefing
Tiger V TOD Operational 2017 City of El Paso: Sun Metro Legislative Agenda Briefing March 2016 Sun Metro FY 2016/17 Legislative Agenda First and foremost, thanks for the new transportation bill: Fixing
More informationSpeaker Information Tweet about this presentation #TransitGIS
Making the Case for Transit: the Transit Competitiveness Index Title William E. Walter, GISP Speaker Information Tweet about this presentation #TransitGIS Understanding Conditions in Each Travel Market
More informationDraft Results and Open House
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi
More informationAppendix B CTA Transit Data Supporting Documentation
RED ED-PURPLE BYPASS PROJECT ENVIRONMENTAL ASSESSMENT AND SECTION 4(F) EVALUATION Appendix B CTA Transit Data Supporting Documentation 4( Memorandum Date: May 14, 2015 Subject: Chicago Transit Authority
More informationMay 23, 2011 APTA Bus & Paratransit Conference. Metro ExpressLanes
May 23, 2011 APTA Bus & Paratransit Conference Metro ExpressLanes Program Overview > Conversion of HOV lanes to HOT lanes on I-10 and I-110 > Multi-modal Integrated Corridor Emphasis > 1 of 6 Nationwide
More informationMichigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS
TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS Michigan / Grand River Avenue TECHNICAL MEMORANDUM #18 From: URS Consultant Team To: CATA Project Staff and Technical Committee Topic:
More informationFall 2018 Guide to SERVICE EXPANSION. and FARE CHANGE
Fall 2018 Guide to SERVICE EXPANSION and FARE CHANGE Fall 2018 Guide Service Expansion & Fare Change This fall, Community Transit is adding more trips on popular routes, and changing some routes to serve
More information5. OPPORTUNITIES AND NEXT STEPS
5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours
More informationAny comments or suggestions or recommendations would be appreciated. My address is on the LHSCG Roster.
Hi Car Club Members Michelle and I are planning to lead another trip to Pacific Grove this year in April. We ve had a lot of good comments each year. People seem to enjoy themselves, and many have asked
More informationService Quality: Higher Ridership: Very Affordable: Image:
Over the past decade, much attention has been placed on the development of Bus Rapid Transit (BRT) systems. These systems provide rail-like service, but with buses, and are typically less expensive to
More informationValley Metro Overview. ITE/IMSA Spring Conference March 6, 2014
Valley Metro Overview ITE/IMSA Spring Conference March 6, 2014 Valley Metro Who Are We? Operate Regional Transit Services Valley Metro and Phoenix are region s primary service providers Light Rail and
More informationDevelop ground transportation improvements to make the Airport a multi-modal regional
Project Overview TRANSPORTATION IMPROVEMENTS WHAT ARE THE PROJECT GOALS? Transportation transportation hub. Develop ground transportation improvements to make the Airport a multi-modal regional Land Use
More informationCentral Maryland Transit Development Plan
Central Maryland Transit Development Plan Planning the Future of Transit in Our Region Anne Arundel County Transportation Commission December 13, 2017 Anne Arundel County Howard County Prince George s
More informationNortheast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study
Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for
More informationAPPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]
APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY] Jackson/Teton Integrated Transportation Plan 2015 Appendix I. Fixed-Guideway Transit Feasibility Jackson/Teton County Integrated Transportation Plan v2
More informationCITY COUNCIL STUDY SESSION UPDATE ON SMART. January 19, 2017 CITY OF SAN RAFAEL
CITY COUNCIL STUDY SESSION UPDATE ON SMART January 19, 2017 CITY OF SAN RAFAEL SONOMA MARIN AREA RAIL TRANSIT UPDATE OUTLINE BACKGROUND INITIAL OPERATION SYSTEM (IOS1) CIVIC CENTER AREA LARKSPUR EXTENSION
More informationMichelle and I are planning to lead another trip to Pacific Grove next April. The Beasleys and Golenos will be our co-leaders.
Hi Car Club Members, Michelle and I are planning to lead another trip to Pacific Grove next April. The Beasleys and Golenos will be our co-leaders. We ve had a lot of good comments each year. People seem
More information2/1/2018. February 1, Item #1 CITIZENS PARTICIPATION
February 1, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments
More information9. Downtown Transit Plan
CORRADINO 9. Downtown Transit Plan KAT Transit Development Plan As part of the planning process for the TDP, an examination of downtown transit operations was conducted. The Downtown Transit Plan 1 is
More informationMarketing Research Update Paratransit/Trolley Customer Surveys
Marketing Research Update Paratransit/Trolley Customer Surveys April 2015 RTA s Mission Statement: Provide safe, reliable, clean and courteous public transportation. Vital Few Objective: Increase ridership.
More informationBROWARD BOULEVARD CORRIDOR TRANSIT STUDY
BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,
More informationA report on unmet San Fernando Valley. Wednesday, January 2, 2013
A report on unmet San Fernando Valley Transportation Needs Wednesday, January 2, 2013 About The Transportation Tiger Team The team consists of CSUN Urban Planning students concerned about public transportation
More information2.4 Build Alternatives
Table 2-1. Future Transit Network Changes between No Build and TSM Alternatives Operator Route Group No. Route ID and Description Peak Headway (min) No Build Off-peak Headway (min) Peak Headway (min) TSM
More informationAccessible Transit Service
Accessible Transit Service Independence Through Accessibility 520-792-9222 TDD 520-628-1565 www.suntran.com SUN TRAN Independence through Accessibility Sun Tran is the Tucson region s fixed-route public
More informationLOADING AND UNLOADING SURVEY NATIONAL SCHOOL BUS. Kansas leads the world in the success of each student.
NATIONAL SCHOOL BUS LOADING AND UNLOADING SURVEY Kansas leads the world in the success of each student. January 2018 The Kansas State Department of Education School Bus Safety Unit wishes to thank the
More informationDraft Results and Recommendations
Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System
More informationCITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6
2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY
More informationUTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018
UTA Transportation Equity Study and Staff Analysis Board Workshop January 6, 2018 1 Executive Summary UTA ranks DART 6 th out of top 20 Transit Agencies in the country for ridership. UTA Study confirms
More informationEl Metro Operations Proposed FY Budget
Laredo Transit Management Inc.- El Metro El Metro Operations Proposed FY 2017-2018 Budget Claudia San Miguel Acting General Manager Mission Statement To provide a safe, reliable, cost effective, and efficient
More informationMETRO SERVICE CHANGE LINE 577 EXPRESS: A TALE OF TWO BUS LINES
METRO SERVICE CHANGE LINE 577 EXPRESS: A TALE OF TWO BUS LINES METRO SERVICE TO RIO HONDO COLLEGE LINE 270 LINE 577 El Monte Rio Hondo College 2 BACKGROUND Overcrowding problems identified on Line 270
More informationRestoration of Historic Streetcar Services in Downtown Los Angeles
Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal
More information2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS
2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak
More informationMetra seeks your feedback!
Metra seeks your feedback! New Ticket - Day Pass Discounts - Off-Peak Times Zone fixes Tell us what you think: www.surveymonkey.com/r/metrafares or by e-mail metrafarestudy@metrarr.com. Attend a public
More informationHDR Engineering. HART North / South. Tampa Bay Applications Group Meeting May 14, 2009
HDR Engineering HART North / South BRT Corridor PD&E Tampa Bay Applications Group Meeting May 14, 2009 1 Agenda Update on Project Development and Environment (PD&E) Study Project Overview System Branding
More informationSANTA CLARITA TRANSIT Accessibility Advisory Committee Meeting January 5, 2016
Meeting location: City of Santa Clarita, City Hall, Century Room Time: 9:00AM Members Present: Keith Curry, Chair; John Panico, Vice Chair; John Taylor, Santa Clarita Senior Center; Jim Hogan; Lillian
More informationRiding Metrobus 16H from GHBC to Pentagon City (last update Oct )
Riding Metrobus 16H from GHBC to Pentagon City (last update Oct-17-2018) WMATA s Metrobus 16H is a very convenient, low-cost way for GHBC residents to get to/from Pentagon City for: o o Shopping trips
More informationHelp shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary
Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County
More informationCLAREMONT METROLINK STATION STUDY Claremont Town Hall Meeting December 11, 2017
CLAREMONT METROLINK STATION STUDY Claremont Town Hall Meeting December 11, 2017 1 Welcome Larry Schroeder Claremont Mayor 2 Agenda 1. Introduction of Panelists 2. Background 3. Metro Board Motion - Metrolink
More informationA Transit Plan for the Future. Draft Network Plan
A Transit Plan for the Future Draft Network Plan Project Overview and Status Completed Market Analysis and Service Evaluation. Developed Plan Framework and Guiding Principles. Developed a draft Five Year
More informationRolling Road (Route 638) Widening Project
Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public
More informationThe City of Toronto s Transportation Strategy July 2007
The City of Toronto s Transportation Strategy July 2007 Presentation Outline Transportation Statistics Transportation Building Blocks Toronto s Official Plan Transportation and City Building Vision Projects
More informationSean P. McBride, Executive Director Kalamazoo Metro Transit. Presentation to Michigan Transportation Planning Association July 13, 2016
Sean P. McBride, Executive Director Kalamazoo Metro Transit Presentation to Michigan Transportation Planning Association July 13, 2016 Metro Transit in Kalamazoo County Square Miles = 132 Urbanized Population:
More informationQUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N
QUALITY OF LIFE EXECUTIVE SUMMARY REPORT UN I O N S TAT I O N T R AV E L by TR A I N Published September 2017 2015 PROGRESS MAP This document reports FasTracks progress through 2015 BACKGROUND RTD The
More informationCentral Maryland Transit Development Plan Planning the Future of Transit in Our Region
Central Maryland Transit Development Plan Planning the Future of Transit in Our Region Presenting the Alternatives: Public Meetings NORTH LAUREL COMMUNITY CENTER --MONDAY, AUGUST 21, 2017 NON PROFIT CENTER
More informationDRAFT Evaluation Scores. Transit
DRAFT Evaluation s The criteria for evaluating applications for new funding commitments are used to measure how well they advance the six goals identified for the MTP. Through transportation: Reduce per
More informationWAKE TRANSIT PLAN Summer 2018
WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.
More informationMEETING GOVERNMENT MANDATES TO REDUCE FLEET SIZE
H O W W I R E L E S S F L E E T M A N A G E M E N T C A N H E L P E X C E E D F L E E T O P T I M I Z AT I O N G O A L S Table of Contents 3 4 4 5 5 6 6 6 8 8 Overview Using Wireless Fleet Management to
More informationFigure 2-14: Existing Bus Routing at Irwindale Station
494 W oothill Blvd 69 N Irwindale Ave 185 Irwindale E 1st St 3 6 feet igure 2-14: Existing Bus Routing at Irwindale 39 Proposed Bus Route 494 W oothill Blvd Proposed Discontinued Bus Route Proposed New
More informationUS 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017
US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master
More informationLos Angeles County Metropolitan Transportation Authority. Paid Parking Pilot Program Parking Management
Los Angeles County Metropolitan Transportation Authority Paid Parking Pilot Program Parking Management Overview Metro currently operates over 22,000 parking spaces at 48 stations. This number will increase
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee
More informationProject Scoping Report Appendix B Project Web Site. APPENDIX B Project Web Site
Project Scoping Report Appendix B Project Web Site APPENDIX B Project Web Site WESTSIDE EXTENSION TRANSIT CORRIDOR STUDY February 4, 2008 News and Info of 1 http://metro.net/projects_programs/westside/news_info.htm#topofpage
More informationSouthWest Transit s Microtransit Service 2018 APTA State Public Transportation Partnerships Conference Wednesday, August 15 th
SouthWest Transit s Microtransit Service 2018 APTA State Public Transportation Partnerships Conference Wednesday, August 15 th Who We Are Public Transportation serving southwestern suburbs of Minneapolis:
More informationUniversity of Washington. Stadium Expansion Parking Plan and Transportation Management Program Report
University of Washington Stadium Expansion Parking Plan and Transportation Management Program 2010 Report Table of Contents EXECUTIVE SUMMARY... 3 BACKGROUND... 4 INTRODUCTION... 5 TMP ELEMENTS... 6 Carpool
More informationKEY BUS ROUTE IMPROVEMENT PROJECT ROUTE 23 AGENDA
KEY BUS ROUTE IMPROVEMENT PROJECT ROUTE 23 December 9, 2009 Codman Tech 450 Washington Street AGENDA Introduction Key Bus Routes Program Route 23 Challenges Proposed Improvement Plan Next Steps Question
More informationService and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour
Service and Operations Planning for Ottawa s New Light Rail Line Pat Scrimgeour Manager, Transit Service Planning and Reporting OC Transpo Ottawa, Ontario Ottawa Light Rail Project 12.5 km, 13 stations
More informationCostco Gasoline Fuel Station Transportation Characteristics
Exhibit A MEMORANDUM Date: May 23, 2013 Project #: I-10 To: Jennifer Murillo, Costco Wholesale Terry Odle, Mulvanny G2 Architecture From: Sonia Hennum, PTOE Project: Subject: Signal Hill Costco Gasoline
More informationROCHESTER, MINNESOTA
ROCHESTER, MINNESOTA Rochester Public Works TRANSIT AND PARKING DIVISION Transit and Parking Manager Tony Knauer tknauer@rochestermn.gov SERVICE ATTITUDE CONSISTENCY - TEAMWORK ROCHESTER TRANSIT & PARKING
More informationInternal Audit Report. Fuel Consumption Oversight and Coordination TxDOT Internal Audit Division
Internal Audit Report Fuel Consumption Oversight and Coordination TxDOT Internal Audit Division Objective To determine if a process exists to ensure retail fuel consumption is appropriately managed and
More informationFebruary 2012 Caltrain Annual Passenger Counts Key Findings
February 2012 Caltrain Annual Passenger Counts Key Findings Key Findings February 2012 Caltrain Annual Passenger Counts The 2012 annual Caltrain passenger counts, which were conducted in February 2012,
More informationMemorandum. To: The Arlington County Board Date: June 29, 2018 From: Subject:
OFFICE OF THE COUNTY MANAGER 2100 Clarendon Boulevard, Suite 302, Arlington, VA 22201 TEL 703.228.3120 FAX 703.228.3218 TTY 703.228.4611 www.arlingtonva.us Memorandum To: The Arlington County Board Date:
More informationWelcome. Please Sign In
Welcome South Bay Bus Rapid Transit (BRT) Draft Environmental Impact Report (DEIR) Public Meeting Please Sign In Please comment in any of the following manners: 1. Submit a comment form 2. Provide verbal
More informationParks and Transportation System Development Charge Methodology
City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update
More informationAir Quality Impacts of Advance Transit s Fixed Route Bus Service
Air Quality Impacts of Advance Transit s Fixed Route Bus Service Final Report Prepared by: Upper Valley Lake Sunapee Regional Planning Commission 10 Water Street, Suite 225 Lebanon, NH 03766 Prepared for:
More informationDowntown Transit Connector. Making Transit Work for Rhode Island
Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project
More informationLetter EL652 City of Mercer Island. Page 1. No comments n/a
Letter EL652 City of Mercer Island Page 1 No comments n/a Page 2 Response to comment EL652 1 Section 4.5.3 of the Final EIS presents the range of potential impacts of the project. This project also lists
More informationTravel Demand Modeling at NCTCOG
Travel Demand Modeling at NCTCOG Arash Mirzaei North Central Texas Council Of Governments for Southern Methodist University The ASCE Student Chapter October 24, 2005 Contents NCTCOG DFW Regional Model
More informationApril 2010 April 2010 Presented by Alan Eirls
April 2010 April 2010 Presented by Alan Eirls A Partnership Between the Coeur d Alene Tribe, the State of Idaho, the KMPO, and Kootenai County. Current System The Citylink system began on the Coeur d Alene
More informationSan Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors
Transportation Committee November 17, 2016 Agenda Item No. 5, Update on the San Rafael Transit Center Relocation San Rafael Transit Center Relocation Study Update 11/17/16 Golden Gate Bridge, Highway &
More informationEUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT
EUGENE-SPRINGFIELD, OREGON EAST WEST PILOT BRT LANE TRANSIT DISTRICT (BRIEF) Table of Contents EUGENE-SPRINGFIELD, OREGON (USA)... 1 COUNTY CONTEXT AND SYSTEM DESCRIPTION... 1 SYSTEM OVERVIEW... 1 PLANNING
More informationGreen Line opens June 14
Winter 2014 Green Line opens June 14 To-do list for METRO Green Line s grand opening Yours: Study safety tips at www.centralcorridor.org/safety Learn about planned Metro Transit bus service changes on
More informationMr. Leif Dormsjo Director, District Department of Transportation 55 M Street, SE Washington, DC July 10, Dear Director Dormsjo,
Adams Morgan BID Capitol Hill BID Capitol Riverfront BID Coalition for Smarter Growth Destination DC Downtown BID Events DC Federal City Council Georgetown BID Golden Triangle BID Greater Greater Washington
More informationTraffic Engineering Study
Traffic Engineering Study Bellaire Boulevard Prepared For: International Management District Technical Services, Inc. Texas Registered Engineering Firm F-3580 November 2009 Executive Summary has been requested
More informationSCAT PASSENGER NO-SHOW/LATE CANCELLATION POLICY
SCAT PASSENGER NO-SHOW/LATE CANCELLATION POLICY The Federal Transit Administration s paratransit regulations permit Suffolk County Accessible Transportation (SCAT) to establish an administrative process
More informationMETRO TRANSIT a n n ua l re p o r t. madison, wisconsin // mymetrobus.com
METRO TRANSIT 2016 a n n ua l re p o r t madison, wisconsin // mymetrobus.com metro transit In 2016, Metro Transit took steps to address capacity issues both on and off the road. Off the road, Metro began
More informationCommunity Meetings June 2018
Community Meetings June 2018 1 Welcome and Agenda Thank you for joining us! 6:00 pm Open House 6:30 pm Welcome & Presentation 7:00 pm Q&A 7:15 pm Open House Resumes 8:00 pm Meeting Concludes 2 Purpose
More informationWelcome and Agenda. Thank you for joining us! 6:00 pm Open House. 6:30 pm Welcome & Presentation. 7:00 pm Q&A. 7:15 pm Open House Resumes
1 Welcome and Agenda Thank you for joining us! 6:00 pm Open House 6:30 pm Welcome & Presentation 7:00 pm Q&A 7:15 pm Open House Resumes 8:00 pm Meeting Concludes 2 Purpose of this Meeting Introduce project
More informationMBTA Key Bus Route Improvement Program. Community Meeting Route 66 Allston/Brighton
MBTA Key Bus Route Improvement Program Community Meeting Route 66 Allston/Brighton January 19, 2011 Honan-Allston Library 300 North Harvard Street Agenda Welcome and introductions Safety briefing/accommodations
More informationAMERICA. rides the BUS
AMERICA rides the BUS This brochure provides information on the positive development and direction of the bus industry today, as well as on the broad-based need the bus industry fills in American communities.
More informationApril 2011 April 2011 Presented by Robert Spaulding & Alan Eirls
April 2011 April 2011 Presented by Robert Spaulding & Alan Eirls A Partnership Between the Coeur d Alene Tribe, FTA, the State of Idaho, the Local MPO, and Kootenai County. Current System The Citylink
More informationI-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results. Public Meeting. Wulf Grote, Director Project Development Rick Pilgrim, Project Manager
I-10 West AA/EIS Pre-Screening and Tier 1 Analysis Results Public Meeting Wulf Grote, Director Project Development Rick Pilgrim, Project Manager March 4 & 5, 2008 Today s Agenda Overview of Alternatives
More informationCRRMA BOARD PRESENTATION
CRRMA BOARD PRESENTATION El Paso Streetcar Construction Status Report Gilbert Gardner August 9, 2017 El Paso Streetcar Infrastructure Construction Status Report AGENDA Progress Summary SBE Progress Construction
More informationREPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES
TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who
More informationPublic Meeting. City of Chicago Department of Transportation & Department of Housing and Economic Development
Public Meeting City of Chicago Department of Transportation & Department of Housing and Economic Development Funded by Regional Transportation Authority September 12, 2011 In partnership with Presentation
More information