1 /Agency-Identified Capital Needs (FY15-19) Pavement Condition 1-Dec-1 Engineering Street Rehabilitation to Attain 6 Citywide Weighted Average PCI (Arterial) by FY19 $195,000,000 $195,000,000 1-Dec-1 Engineering Street Rehabilitation to Attain 6 Citywide Weighted Average PCI (Non-Arterial) by FY19 $75,000,000 $75,000,000 PAVEMENT CONDITION SUBTOTAL $70,000,000 $70,000, % Street Widening/Expressways 7-Feb-1 Engineering Proposed Widening $95,100, Jun-1 Engineering Yale Avenue, 81st St. to 91st Street South $1,50, Jun-1 Engineering 81st Street South, Sheridan Road to Memorial Drive $1,000, Jun-1 Engineering Yale Avenue, 96th St. South to 101st St. South $17,000, Jun-1 Engineering Riverside Drive, th to rd Place South $19,000, Jun-1 Engineering 5th W. Ave., Edison to Apache (design) $750, Jun-1 Engineering Pine Street, Mingo to U.S. 169 (design) $500,000 7-Feb-1 Engineering Gilcrease Expressway Local Match $7,500,000 $7,500,000 STREET WIDENING/EXPRESSWAYS SUBTOTAL $10,600,000 $88,000, % Bridges 7-Feb-1 Engineering Replace to structurally deficient bridges on the arterial system $10,00,000 $10,00,000 7-Feb-1 Engineering Rehabilitation (0+) $5,55,000 $5,55,000 7-Feb-1 Engineering Funds to coordinate with ODOT rehabilitation and replacement program (5 years of ODOT 8-Year Plan) $1,000,000 $1,000, Jun-1 Engineering Bridge sealing and painting $10,000 $10,000 BRIDGES SUBTOTAL $7,95,000 $7,95,000.0% Traffic Engineering 7-Feb-1 St. & Storm. Citywide guardrail replacement $,000,000 $1,000,000 7-Feb-1 St. & Storm. Citywide traffic signalization $,000,000 $,000,000 7-Feb-1 St. & Storm. Citywide median and curb return improvements $,500,000 7-Feb-1 St. & Storm. Roadway, pedestrian, and decorative lighting replacement $,000,000 $1,000,000 7-Feb-1 St. & Storm. Matching funds for ODOT traffic projects $,000,000 7-Feb-1 St. & Storm. Signing, pavement marking and deliniation $5,000,000 $,500,000 7-Feb-1 St. & Storm. Traffic calming $,00,000 $1,000,000 7-Feb-1 St. & Storm. Traffic signal inventory $1,000,000 7-Feb-1 St. & Storm. Traffic signal head upgrades $800,000 7-Feb-1 St. & Storm. Traffic signal installation, modification, and safety improvements $1,600,000 $,000,000 7-Feb-1 St. & Storm. Traffic signal pole replacement $,000,000 $1,000,000 7-Feb-1 St. & Storm. Upgrade school flashing beacon system $1,600,000 7-Feb-1 St. & Storm. 71st St. S. and Riverside Dr. - eastbound right turn lane $500,000 7-Feb-1 St. & Storm. 71st St. S. and U.S. 169 lane modifications $1,000,000 7-Feb-1 St. & Storm. Riverside Drive and Boulder Ave. - traffic signal and median modifications $1,500,000 7-Feb-1 St. & Storm. E. Seminole Street - widening and improvements west of Harvard (Celia Clinton Elementrary) $500,000 7-Feb-1 St. & Storm. 19th St. S. Extension - Midland Valley Trail to Boston Ave. (Lee Elementary) $,000,000 7-Feb-1 St. & Storm. Creek Turnpike Trail pedestrian bridge over Memorial Dr. ($00,000 for study only) $1,750,000 $00,000 Capital Improvement Program (DRAFT ).xlsx 1 of 10

2 /Agency-Identified Capital Needs (FY15-19) 7-Feb-1 St. & Storm. Citywide extruded panel sign - new installation and replacement $,500,000 7-Feb-1 St. & Storm. GPS emergency vehicle preemption system (approx. 0 intersections) $00,000 $00,000 TRAFFIC ENGINEERING SUBTOTAL $,850,000 $1,100,000 1.% STREETS/BRIDGES/TRAFFIC SUBTOTAL $6,95,000 $598,05, % Transit 1-Jan-1 MTTA Priority 1: Replace Aging Vehicles - local portion of cost of replacing fixed-route and 9 LIFT program busses $17,000,000 $1,750,000 1-Jan-1 MTTA Priority : Peoria Bus Rapid Transit (BRT) Project (may be as low as $15MM, depending on final design) $1,000,000 $15,000,000 1-Jan-1 MTTA Priority : Additional Fixed-Route Buses to Expand Service (18 additional buses to reach 0-min. weekday frequency) $7,700,000 TRANSIT SUBTOTAL $5,700,000 $9,750,000.% Bicycle and Pedestrian Infrastructure 1-Jan-1 Engineering Citywide ADA Transition Plan Implementation (Minimum for 0-Year Schedule - High and Medium Priority Needs) $10,00,000 $10,00,000 1-Jan-1 Engineering Arterial Sidewalk Improvements $,000,000 $1,500,000 1-Jan-1 Engineering Non-Arterial Sidewalk Improvements $,000,000 $500,000 1-Jan-1 Engineering Citywide Median and Curb Return Improvements $1,000,000 1-Jan-1 Engineering Citywide Matching Funds $7,500,000 $7,000, May-1 BPAC/INCOG Bicycle/Pedestrian Master Plan Implementation $1,750,000 $,00,000 BICYCLE & PEDESTRIAN INFRASTRUCTURE SUBTOTAL $1,50,000 $,00,000.5% Street & Highway Corridor Enhancement Planning & Economic Development Street and Highway Corridor Enhancement $5,000,000 $0 IDL Entrance Rehabilitation (1st, 7th, and 8th Streets; signals at 1st and nd & Greenwood) $,000,000 $,000,000 STREET & HIGHWAY CORRIDOR ENHANCEMENT FUNDING SUBTOTAL $8,000,000 $,000,000 0.% TRANSIT/BICYCLE & PEDESTRIAN/ENHANCEMENT SUBTOTAL $95,150,000 $56,150, % not including Strategic Mobility Plan (PED), Northland street improvements (PED), Charles Page Blvd. (PED), Pedestrian Bridge (River Parks), or Eugene Field infrastructure ALL TRANSPORTATION SUBTOTAL $78,55,000 $65,195, % 1-Jan-1 PED Annual Economic Development Priority Opportunities $10,000,000 $6,000,000 1-Jan-1 PED Strategic Mobility Plan $1,500,000 $1,500,000 1-Jan-1 PED Corridor and Small Area Planning $,000,000 $,000,000 1-Jan-1 PED Downtown On-Street Transit Lines and Rolling Stock $9,000,000 1-Jan-1 PED Phase I Northland Strategic Acquisition and Street Improvements $5,000,000 $5,000,000 1-Jan-1 PED Phase I Downtown Housing and Residential Development $5,000,000 $,000,000 1-Jan-1 PED Phase I Pearl District Flood Control and Redevelopment $5,000,000 $5,000,000 1-Jan-1 PED Sealed Corridor Phase II $5,000,000 1-Jan-1 PED Redfork Campus Plan $,000,000 1-Jan-1 PED Charles Page Boulevard $,000 $,000 PLANNING & ECONOMIC DEVELOPMENT SUBTOTAL $,9,000 $,9,000.6% Capital Improvement Program (DRAFT ).xlsx of 10

3 /Agency-Identified Capital Needs (FY15-19) Citywide Public Facilities 7-Feb-1 Engineering ADA Transition Plan - Buildings $1,7,000 $1,7,000 7-Feb-1 Engineering ADA Transition Plan - Parks $1,18,000 $1,18,000 7-Jun-1 Engineering Public Facilities, OTC $,90,000 $,90,000 7-Feb-1 Engineering Public Facilities, Roofing $,000,000 $,000,000 CITYWIDE PUBLIC FACILITIES SUBTOTAL $8,70,000 $8,70, % Animal Shelter 7-Feb-1 WIN Animal Shelter expansion - Phase I $,860,000 $,750,000 7-Feb-1 WIN Animal Shelter expansion - Phase II $,000,000 7-Feb-1 WIN Animal Shelter expansion - Phase III $,750,000 7-Jun-1 Engineering Animal Shelter immediate improvements - ventilation system and facility improvements $750,000 $750,000 ANIMAL SHELTER SUBTOTAL $9,60,000 $,500,000 0.% Stormwater/Flood Control 1-Feb-1 Engineering Joe Creek - 7th Street Relief Line $,000,000 1-Feb-1 Engineering Perryman Ditch - Phase $,700,000 1-Feb-1 Engineering Perryman Ditch - Phase $1,600,000 1-Feb-1 Engineering Local Match for Federal Grants $1,000,000 STORMWATER/FLOOD CONTROL SUBTOTAL $11,00,000 $0 0.0% Wastewater/Unsewered Areas 1-Feb-1 Engineering Romoland Cont. $00,000 1-Feb-1 Engineering Grimes Heights $10,000 1-Feb-1 Engineering Quail Point $950,000 1-Feb-1 Engineering Deatheridge Addition $00,000 1-Feb-1 Engineering 11th Street Acres $6,600,000 1-Feb-1 Engineering Forest Oaks Cont. $850,000 1-Feb-1 Engineering Unplatted Area 11th Street (11th St. & 19th E. Ave.) $600,000 1-Feb-1 Engineering Unplatted area 1st Street (1st & 85th E. Ave.) $550,000 1-Feb-1 Engineering Mohawk-Harvard $00,000 1-Feb-1 Engineering Southridge Estates $,750,000 1-Feb-1 Engineering Crown Pointe $680,000 1-Feb-1 Engineering Wentworth Acres $150,000 1-Feb-1 Engineering Barrow's Orchard $50,000 1-Feb-1 Engineering Villa Grove Park $0,000 WASTEWATER/UNSEWERED AREAS SUBTOTAL $1,90,000 $0 0.0% Tulsa Zoo 1-Feb-1 TZMI Master Plan - Tiger & Snow Leopard Exhibits $,750,000 $,750,000 1-Feb-1 TZMI Master Plan - Carnivores Exhibits $8,000,000 $8,000,000 1-Feb-1 TZMI Master Plan - Wild Islands Exhibit Complex $1,000,000 Capital Improvement Program (DRAFT ).xlsx of 10

4 /Agency-Identified Capital Needs (FY15-19) 1-Feb-1 TZMI Master Plan - Realm of the Jaguar Exhibit $,000,000 1-Feb-1 TZMI Master Plan - The Village & Giraffe Celebration Exhibit $10,000,000 1-Feb-1 TZMI Master Plan - Additional Deferred Maintenance Needs and Infrastructure Repairs $,800,000 TULSA ZOO SUBTOTAL $,550,000 $11,750,000 1.% River Parks 1-Feb-1 RPA Park Facilities Refurbishment $,01,500 $,000,000 1-Feb-1 RPA Turkey Mountain Urban Wilderness Master Plan $,860,000 1-Feb-1 RPA River Bank Stabilization $5,008,000 1-Feb-1 RPA Expanded Parking $,578,000 1-Feb-1 RPA Maintenance Facility Upgrade $1,68,000 1-Feb-1 RPA Trail Renovation - East Bank, Joe Creek to 101st $5,56,000 1-Feb-1 RPA Renovation of "Turkey Leg" Trail - I to Turkey Mountain $,76,000 1-Feb-1 RPA West Bank Trail Extension - 71st Street to Jenks $,780,000 1-Feb-1 RPA East Bank Acquisition and Development - 101st to 11st $1,100,000 1-Feb-1 RPA East Bank Acquisition and Development - 11st to Sheridan $1,500,000 1-Feb-1 RPA MK&T Trail Resurfacing and Erosion Control $5,0,000 1-Feb-1 RPA Pedestrian Bridge $7,756,000 $7,756,000 1-Feb-1 RPA Zink Dam Total Refurbishment $1,000,000 RIVER PARKS SUBTOTAL $111,97,500 $11,756,000 1.% Park & Recreation 1-Feb-1 P&R Aaronson - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Berry - Pool Reconstruction $1,98,5 $1,98,5 1-Feb-1 P&R Boots Adams - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Carl Smith Concession - Annual Service of HVAC, Flooring, Paint and Annualized HVAC Replacement $80,750 $80,750 1-Feb-1 P&R Carl Smith Concession - Roofing $8,075 $8,075 1-Feb-1 P&R Carl Smith Restrooms - Annual Service of HVAC, Flooring, Paint and Annualized HVAC Replacement $7,750 $7,750 1-Feb-1 P&R Carl Smith Restrooms - Roofing $,775 $,775 1-Feb-1 P&R Carl Smith Tournament Office - Annual Service of HVAC, Flooring, Paint and Annualized HVAC Replacement $7,750 $7,750 1-Feb-1 P&R Carl Smith Tournament Office - Roofing $,775 $,775 1-Feb-1 P&R Cousins Park - Add water, sewer, stormwater, electric and water infrastructure $71,50 $71,50 1-Feb-1 P&R Cousins Park - Construct 60 Space Parking Lot (materials only, County provides Labor) $11,50 $11,50 1-Feb-1 P&R Cousins Park - Construct One Room School House, Pioneer House and Barn $577,500 $577,500 1-Feb-1 P&R Cousins Park - Elevated Observatoin Deck $17,500 $17,500 1-Feb-1 P&R Cousins Park - Interprative Signage $18,750 $18,750 1-Feb-1 P&R Cousins Park - Native Tree, Grass and Wildflower Plantings $10,77 $10,77 1-Feb-1 P&R Cousins Park - New crushed stone trail $17,750 $17,750 1-Feb-1 P&R Cousins Park - New Train Depot Visitors Center with Restrooms $6,075 $6,075 1-Feb-1 P&R Crawford - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Crescent - Dredge Pond to remove siltation $75,000 1-Feb-1 P&R Florence - Tennis Court major rehabilitation or replacement with lighting $75,000 1-Feb-1 P&R Graham - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Graham - Tennis Court major rehabilitation or replacement with lighting $75,000 Capital Improvement Program (DRAFT ).xlsx of 10

5 /Agency-Identified Capital Needs (FY15-19) Feb-1 P&R Gunboat North - New Playground and Safety Surface $75,000 $75, Feb-1 P&R Heller - Tennis Court major rehabilitation or replacement with lighting $75, Feb-1 P&R Helmerich - New Playground (replace -5 and 5-1 equipment) $775,000 $775, Feb-1 P&R Helmerich - Renovate and Expand Existing Restroom Facility $00, Feb-1 P&R Henthorne - New Playground and Safety Surface $75,000 $75, Feb-1 P&R Henthorne - Upgrade Security System to current Standards $76, Feb-1 P&R Hicks - Annual Service of HVAC, Flooring, Paint and Annualized HVAC Replacement $571,15 $571, Feb-1 P&R Hicks - Roofing $57,11 $57, Feb-1 P&R Hicks - Tennis Court major rehabilitation or replacement with lighting $75, Feb-1 P&R Hicks - Upgrade Security System to current Standards $76, Feb-1 P&R Highland - Tennis Court major rehabilitation or replacement with lighting $75, Feb-1 P&R Hunter - Dredge Pond to remove siltation $00, Feb-1 P&R Hunter - New Playground (replace -5 equipment and replace walks) $75,000 $75, Feb-1 P&R Hunter - Renovate and Expand Existing Restroom Facility $00,000 $00, Feb-1 P&R Lacy - New Playground and Safety Surface $75,000 $75, Feb-1 P&R Lacy - Replace Existing Splashpad with Water Playground $578,16 $578, Feb-1 P&R Lacy - Pool Reconstruction $,67,571 $,67,571 Lacy - Phase 1 Add 50 space parking lot, new entry to center, a covered drop off area, exterior restroom facilities, new 1-Feb-1 P&R 195 signage, and a covered pavilion. $,600,000 $,600, Feb-1 P&R Langenheim - New Playground and Safety Surface $75,000 $75, Feb-1 P&R Leake - Dredge Pond to remove siltation $00, Feb-1 P&R Leake - Tennis Court major rehabilitation or replacement with lighting $75, Feb-1 P&R McClure - New Playground and Safety Surface $75,000 $75, Feb-1 P&R McClure - Pool Reconstruction $,71,87 $,71, Feb-1 P&R McClure - Upgrade Security System to current Standards $76, Feb-1 P&R Minshall - Dredge Pond to remove siltation $00, Feb-1 P&R Minshall - New Playground and Safety Surface $75,000 $75, Feb-1 P&R Mohawk - Rehabilitate Pielsticker and add Safety Surface $75,000 $75, Feb-1 P&R Mohawk Golf Course Club House - Service of HVAC, Flooring, Paint and Annualized HVAC Replacement $6,775 $6, Feb-1 P&R Mohawk Pro Shop - Upgrade Security System to current Standards $76,500 $76, Feb-1 P&R Newblock - Upgrade Security System to current Standards $76, Feb-1 P&R North Tulsa Sports Complex - Add New Security System for complex $76, Feb-1 P&R Owen - Dredge Pond to remove siltation $00, Feb-1 P&R Page Belcher Golf Clubhouse - Annual Service of HVAC, Flooring, Paint and Annualized HVAC Replacement $10,850 $10, Feb-1 P&R Page Belcher Golf Clubhouse - Roofing $1,085 $1, Feb-1 P&R Page Belcher Pro Shop - Service of HVAC, Flooring, Paint and Annualized HVAC Replacement $5,00 $5, Feb-1 P&R Page Belcher Pro Shop - Roofing $0,68 $0, Feb-1 P&R Page Belcher Pro Shop - Upgrade Security System to current Standards $76,500 $76, Feb-1 P&R Patrick - New Playground and Safety Surface $75,000 $75, Feb-1 P&R Penney - New Playground and Safety Surface $75,000 $75, Feb-1 P&R Penney - Replace Splash Pad with Water Playground $500,000 $500, Feb-1 P&R Pielsticker - Add Restroom Facility adjacient to Water Playground $00, Feb-1 P&R Plaza - New Playground and Safety Surface $75,000 $75, Feb-1 P&R Reed - Replace Splash Pad with Water Playground $500,000 $500, Feb-1 P&R Reed - New Playground and Safety Surface $75,000 $75,000 Capital Improvement Program (DRAFT ).xlsx 5 of 10

6 /Agency-Identified Capital Needs (FY15-19) 1-Feb-1 P&R Reed - Pool Reconstruction $,05,17 $,05,17 1-Feb-1 P&R Reed - Upgrade Security System to current Standards $76,500 1-Feb-1 P&R Savage Park Concession and Restrooms - Service of HVAC, Flooring, Paint and Annualized HVAC Replacement $106,850 $106,850 1-Feb-1 P&R Savage Park Concession and Restrooms - Roofing $6,75 $6,75 1-Feb-1 P&R Schlegel - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Shannon - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R SkateNorth - Add New Security System for complex $76,500 1-Feb-1 P&R Skelly - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Summerglen Plaza - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Terrace - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Tracy - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R Tracy - Tennis Court major rehabilitation or replacement with lighting $75,000 1-Feb-1 P&R WaterWorks - Upgrade Security System to current Standards $76,500 1-Feb-1 P&R West Highlands - New Playground and Safety Surface $75,000 $75,000 1-Feb-1 P&R West Highlands - Tennis Court major rehabilitation or replacement with lighting $75,000 1-Feb-1 P&R Whiteside - Add weight room and a multi-purpose room. $,85,000 1-Feb-1 P&R Whiteside - Tennis Court major rehabilitation or replacement with lighting $75,000 1-Feb-1 P&R Whiteside - Pool Reconstruction $1,8,01 $1,8,01 1-Feb-1 P&R Whiteside - Upgrade and repair plumbing in community center $5,000 $5,000 1-Feb-1 P&R Whiteside - Upgrade Security System to current Standards $76,500 1-Feb-1 P&R Woodward - Comprehensive solution involving regrading slopes, adding and repairing weathered limestone walls, extensive landscaping and renovating the stream and pond. With Design Fees (10%) $,850,000 $,850,000 PARK & RECREATION SUBTOTAL $,866,08 $,87,58.8% BOK Center 8-Feb-1 SMG Replace fire alarm system $50,000 $50,000 8-Feb-1 SMG Computer, telecommunications, security, and video display $80,000 8-Feb-1 SMG Marquee, scoreboard, and video boards $6,50,000 8-Feb-1 SMG Facility upgrades $10,000 8-Feb-1 SMG Culinary facility upgrades $15,000 BOK CENTER SUBTOTAL $8,01,000 $50, % Convention Center 8-Feb-1 SMG Marquee, scoreboard, and video boards - sound system $1,050,000 8-Feb-1 SMG Computer, telecommunications, security, and video display $1,175,000 8-Feb-1 SMG Facility upgrades $965,000 8-Feb-1 SMG Culinary facility upgrades $6,77,000 7-Jun-1 Engineering Convention Center - HVAC upgrade & roof over exhibit hall $850,000 $850,000 CONVENTION CENTER SUBTOTAL $10,517,000 $850, % Performing Arts Center 8-Feb-1 PAC Replace existing fire alarm system $50,000 $50,000 8-Feb-1 PAC Fire sprinklers $1,10,100 $1,10,000 8-Feb-1 PAC Renovations $1,950,000 $1,80,000 Capital Improvement Program (DRAFT ).xlsx 6 of 10

7 /Agency-Identified Capital Needs (FY15-19) 8-Feb-1 PAC Fan coil replacement $55,500 $55,500 8-Feb-1 PAC HVAC motor replacement $175,500 $175,500 8-Feb-1 PAC Roof replacement $1,00,000 $1,00,000 8-Feb-1 PAC Expansion $7,980,000 PERFORMING ARTS CENTER SUBTOTAL $1,618,100 $5,58, % Gilcrease Museum 8-Feb-1 TU Thomas Gilcrease House roof replacement $17,000 $17,000 8-Feb-1 TU Closed circuit TV camera upgrade $550,000 $550,000 8-Feb-1 TU Gilcrease Library/archival storage support $00,000 $00,000 8-Feb-1 TU Helmerich Hall floor replacement $55,891 $55,891 8-Feb-1 TU Gallery wood floor refinishing $100,07 $100,07 8-Feb-1 TU Kitchen grease trap and sanitary sewer replacement $166,050 $166,050 8-Feb-1 TU Gallery lighting controls replacement $07,500 $07,500 8-Feb-1 TU Galleries fire supression systems upgrade from wet to dry pipe $78,000 $78,000 8-Feb-1 TU Kitchen renovation $85,975 $85,975 8-Feb-1 TU Perimeter fence replacement $5,175 $5,175 8-Feb-1 TU Public restrooms renovation $08,60 $08,60 8-Feb-1 TU North parking restoration $98,000 $98,000 8-Feb-1 TU HVAC steam humidification upgrade $1,015,119 $1,015,119 8-Feb-1 TU Vista Room electro chromatic glass $108,117 $108,117 8-Feb-1 TU Chilled water system install variable frequency drives $15,750 $15,750 8-Feb-1 TU HVAC controls: pneumatic to electric conversion $99,750 $99,750 8-Feb-1 TU Halon fire supression system replacement $666,876 $666,876 8-Feb-1 TU Landscape Master Plan implementation $1,519,050 8-Feb-1 TU Parking expansion $500,000 $500,000 8-Feb-1 TU Roof replacement/repairs not included in 01 $1,500,07 $1,500,07 8-Feb-1 TU Repair and replacement projects under $100,000 $8,97 8-Feb-1 TU Parking expansion 8-Feb-1 TU,000 sq. ft. of dry, climate controlled storage space GILCREASE MUSEUM SUBTOTAL $11,015,5 $9,07, % Police 7-Mar-1 TPD Build heliport facility for aircraft and related operations $6,800 7-Mar-1 TPD Replace helicopter $,900,000 $1,500,000 7-Jun-1 Engineering Police Academy renovations/police Courts/COMPSTAT Building $,01,698 $,01,698 7-Mar-1 TPD Build new Police/Downtown Patrol Division headquarters $5,500,000 7-Jun-1 Engineering Uniform division renovations $,000,000 $,000, Jan-1 Finance Police Five-Year Capital Equipment Needs as Described in the 01 Equipment Study $,0,000 $,6,5 POLICE DEPARTMENT SUBTOTAL $60,78,98 $0,80,150.% Fire 7-Mar-1 TFD Self contained breathing apparatus (SCBA) $,600,000 $,600,000 7-Mar-1 TFD Apparatus replacement $18,700,000 $17,000,000 Capital Improvement Program (DRAFT ).xlsx 7 of 10

8 /Agency-Identified Capital Needs (FY15-19) 7-Mar-1 TFD Fire Station #8 (100 S. 175th E. Ave.) $1,500,000 7-Mar-1 TFD Storage facility - reserves $1,995,000 7-Jun-1 Engineering Fire station rehabilitation $7,5,000 $7,5,000 7-Mar-1 TFD Mobile data computers $500,000 7-Mar-1 TFD New training center props (phase II) $7,000,000 7-Jun-1 Engineering Fire station generators $1,500,000 $1,500,000 7-Jun-1 Engineering Fire facilities $,000,000 $,000, Jan-1 Finance Fire Five-Year Capital Equipment Needs as Described in the 01 Equipment Study $,61,000 $,50,67 FIRE DEPARTMENT SUBTOTAL $7,668,000 $,60,67.8% Information Technology 7-Mar-1 IT Financial system replacement $1,000,000 $10,000,000 7-Mar-1 IT Business continuity and disaster recovery $750,000 7-Mar-1 IT Law enforcement record management system $6,50,000 $6,50,000 7-Mar-1 IT Public safety radios infrastructure $9,000,000 7-Mar-1 IT Fire station alerting system $50,000 7-Mar-1 IT Courtroom automation $550,000 7-Mar-1 IT record retention $55, Jan-1 Finance Information Technology Five-Year Capital Equipment Needs as Described in the 01 Equipment Study $6,715,000 $,07,060 INFORMATION TECHNOLOGY SUBTOTAL $56,50,000 $9,60,060.% Air Force Plant /MRO 7-Mar-1 TAA Boiler replacement, asbestos and equipment removal (MRO) $1,700,000 7-Mar-1 TAA Electrical infrastructure - circuits (MRO) $,00,000 7-Mar-1 TAA Metasys conversion (MRO) $900,000 7-Mar-1 TAA Roof replacement - PALM (MRO) $8,500,000 7-Mar-1 TAA Roof replacement for AFP# (AFP) $10,900,000 7-Mar-1 TAA Electrical infrastructure (AFP) $,750,000 7-Mar-1 TAA Air handler, chiller, HVAC system replacement (MRO) $6,00,000 7-Mar-1 TAA Exterior repair and parking lot rehabilitation (MRO) $1,100,000 AIR FORCE PLANT /MRO SUBTOTAL $7,50,000 $0 0.0% OSU Medical Center 1-Mar-1 OSU Woman's Center renovation - labor and delivery $,000,000 1-Mar-1 OSU Woman's Center renovation - neonatal intensive care unit $,000,000 1-Mar-1 OSU Operating room expansion $6,700,000 OSU MEDICAL CENTER SUBTOTAL $11,700,000 $0 0.0% Tulsa City-County Library 1-Mar-1 TCCL Tulsa Central Library Project $10,000,000 $10,000,000 TULSA CITY-COUNTY LIBRARY SUBTOTAL $10,000,000 $10,000, % Capital Improvement Program (DRAFT ).xlsx 8 of 10

9 /Agency-Identified Capital Needs (FY15-19) Metropolitan Environmental Trust (MET) 1-Mar-1 MET Household hazardous waste (HHW) collection facility $,000,000 METROPOLITAN ENVIRONMENTAL TRUST (MET) SUBTOTAL $,000,000 $0 0.0% Downtown Coordinating Council 1-Mar-1 DCC Parking garages $6,000,000 1-Mar-1 DCC Streetscape and sidewalks (propose to be included with two-way street conversions) 1-Mar-1 DCC One-way to two-way conversions $1,070,000 DOWNTOWN COORDINATING COUNCIL SUBTOTAL $7,070,000 $0 0.0% Route 66 Village 1-Mar-1 R66 Route 66 Station (restrooms and short-term parking) $550,000 $550,000 1-Mar-1 R66 Parking entrance (61 spaces), bus lanes $0,000 1-Mar-1 R66 Depot/Exhibition Center $1,00,000 ROUTE 66 VILLAGE SUBTOTAL $,180,000 $550, % Equipment Management 1-Mar-1 EMD Compressed natural gas (CNG) fleet fueling infrastructure expansion $1,800,000 $1,800,000 1-Mar-1 EMD Install radio frequency identification (RFD) system at all fuel locations and on approximately,500 vehicles $750,000 $750,000 7-Jun-1 Engineering Install two emergency generators and EMD's two emergency operations shops (56th and Garnett; 1790 West Newblock) $00,000 $00,000 1-Mar-1 EMD Replace underground fuel tank at N. Mingo $00,000 7-Jun-1 Engineering EMD facilities maintenance $1,000,000 $1,000,000 1-Mar-1 EMD Remodel EMD office and break room area; create storage area $5,000 1-Mar-1 EMD Expansion of EMD fabrication shop for sandblasting projects $600,000 1-Mar-1 EMD Renovate/replace facilities at Newblock Dr. - maintenance and collision repair $,000,000 1-Mar-1 EMD Replace 00 petroleum-based vehicles with CNG vehicles $5,500,000 7-Jun-1 Engineering Lighting systems, driveways, sidewalks, energy efficiency upgrades, HVAC, and Plumbing $,00,000 $,00,000 EQUIPMENT MANAGEMENT DEPARTMENT SUBTOTAL $15,785,000 $6,050, % Eugene Field Redevelopment 1-Mar-1 PED Flood control $5,100,000 $5,100,000 1-Mar-1 PED Infrastructure for project development $5,800,000 $5,800,000 EUGENE FIELD REDEVELOPMENT SUBTOTAL $10,900,000 $10,900,000 1.% Levee District #1 6-Jun-1 Engineering Levee District #1 rehabilitation $,00,000 $,00,000 LEVEE DISTRICT #1 SUBTOTAL $,00,000 $,00,000 0.% Capital Equipment 10-Jan-1 Finance Five-Year Capital Equipment Needs as Described in the 01 Equipment Study (excluding Police, Fire & I.T.) $0,560,000 $18,91, CAPITAL EQUIPMENT SUBTOTAL $0,560,000 $18,91,.1% Capital Improvement Program (DRAFT ).xlsx 9 of 10

10 /Agency-Identified Capital Needs (FY15-19) 9 11-Jul-1 Finance Bond Issuance Costs $500, TOTAL $1,77,8,5 $919,917,69 100% PROJECTED REVENUE 98 -Jun-1 Finance Five-Year Extension of 1.167% Sales Tax and GO Bond Authorizations $818,005, Extension of 1.167% Sales Tax and GO Bond Authorizations Until Revenue Target is Reached $919,917,69 01 REMAINING/(SHORTFALL) ($559,87,5) $0 Capital Improvement Program (DRAFT ).xlsx 10 of 10

FY 2015 Sales Tax Program Project List

FY 2015 Sales Tax Program Project List FY 2015 Sales Tax Program Project List As Adopted By City Council on August 22, 2013 Ref. Project Name Council District Served Estimated Cost PUBLIC WORKS AND TRANSPORTATION 1 Arterial Street Rehabilitation

More information

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual - 2023 Proposed Capital Maintenance Improvement Program (CMIP) Fund/Departm ent New Original Amended 2019 2020 2021 2022 2023 FY18-23 110 - City - General Fund Chief Knowledge Office 1 9 AUTO - 1997 -

More information

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb

More information

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions Drainage Southshore Lagoon Dredging $525,000 74 Prepare drawings and design deepening or removal of sediment from lagoons. Marina Village Park $580,500 70 Resolve the drainage issue in the Marina Village

More information

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year

More information

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description 2017 CAPITAL BUDGET FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153 - WINTER RECOVER/SNOW

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance

More information

Summary of Funding Sources

Summary of Funding Sources GENERAL SOURCES General Revenue 91221 - EMS Capital Equipment 11,200 15,000 18,000 10,000 54,200 91229 - Replace & Upgrade Air Packs 22,500 22,500 91245 - Garage Door Replacement (Fire) 26,000 26,000 912xx

More information

CITY OF BELLEVILLE 2017 Capital Budget

CITY OF BELLEVILLE 2017 Capital Budget CITY OF BELLEVILLE 2017 Capital Budget Proposed Financing COMBINED SERVICES 1.001 Bridge St W Coleman to Highland Design EDS 73 300.0 150.0 150.0 1.002 University Ave McFarland Dr to Tice Cres EDS 65 1,900.0

More information

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

SCHEDULE OF CAPITAL PROJECTS BY FUND

SCHEDULE OF CAPITAL PROJECTS BY FUND CIP Project Funding Summary 5 7 8 9 10 11 Streets & Highways Fund 3,950,541 2,148,259 1,250,000 1,290,000 1,250,000 9,888,800 Prop C Fund 20,936,435 700,000 700,000 700,000 700,000 23,736,435 Measure R

More information

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested

Approved. Department & Item. Article # Requested. Requested. Requested Requested Requested Requested Requested Requested Requested AMOUNT SOURCE General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 0 155 MIS Technology Infrastructure 300,000 300,000 Tax Levy 300,000 300,000

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program

Tulsa Transportation Management Area. Urbanized Area Surface Transportation Program Tulsa Transportation Management Area Urbanized Area Surface Transportation Program FFY 2022 Application Information Sponsor Location Description STP Request Other Funds Broken Arrow Elm Place: Kenosha

More information

Summary of Approved Funding Sources

Summary of Approved Funding Sources GENERAL SOURCES General Revenue 91213 - Major Fire Apparatus Refurbishment 90,000 117,000 110,000 138,000 147,800 150,000 752,800 91221 - EMS Capital Equipment 7,200 11,200 15,000 18,000 51,400 91229 -

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

FY Projects

FY Projects FY 2009-2010 Projects Project # 1 1037 Light Emitting Diode (LED) Signal Lamps Upgrading Program Replace Light Emitting Diode indications in traffic signal heads. $50,000 2 1103 City Government Channel

More information

East Allen County Schools Facilities History Calendar Years October 5, 2015

East Allen County Schools Facilities History Calendar Years October 5, 2015 East Allen County Schools Facilities History Calendar Years 2007 2015 October 5, 2015 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and

More information

City of Des Moines. Operating Budget & Governmental CIP. January 22, 2018

City of Des Moines. Operating Budget & Governmental CIP. January 22, 2018 City of Des Moines Operating Budget & Governmental CIP January 22, 2018 Preliminary FY2019 Total Budget by Fund Operating Budget General & Road Use Tax Funds General Fund Budget General Fund Source & Use

More information

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX: 435 Martin Street, #3000 BLAINE, WA 98230 BUS: 360.332.8311 FAX: 360.332.8330 www.cityofblaine.com September 10, 2018 To: From: Subject: City Council Department Heads Michael Jones, City Manager Jeffrey

More information

City of Palm Coast Next Year Budget Analysis

City of Palm Coast Next Year Budget Analysis Next Year Analysis 43000099 CAPITAL PROJECTS FUND 034000 062000 99001 062000 49010 063000 23009 063000 99009 063000 61534 063000 59003 063000 66006 063000 51007 063000 99008 063000 66010 063000 52005 063000

More information

Purpose of Capital Improvement Program

Purpose of Capital Improvement Program 1 Purpose of Capital Improvement Program o To identify capital projects and funding sources. o To strategically plan and prioritize projects within a budget to maximize the efficient use of funds. o Preserve

More information

Working for Broward. Working for Coral Springs. September, 2016

Working for Broward. Working for Coral Springs. September, 2016 Working for Broward. Working for Coral Springs. September, 2016 Outline What is the Surtax? Why a Surtax? Why Now? Infrastructure Projects Transportation Projects Oversight Committee Ballot Questions What

More information

2015 Capital Improvement Plan

2015 Capital Improvement Plan 2015 Capital Improvement Plan 15 Unallocated 2014 s Grants/ Donations Prior Year Special Assessment New 48" Intake Improvement and Zebra Mussel Control 690,000 690,000 690,000 - Alley Paving 980,000 280,000

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

City of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

City of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT City of Lawrence, Kansas Proposed Capital Improvement Plan 2019 2023 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project # City Manager's Office Affordable Housing General Fund Transfer CI05

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget Capital Improvement Program (CIPs) City of Industry FY 2017/18 155 FY 2017/18 156 City of Industry, California Capital Improvement Program Overview of Department The Capital Improvement Program (CIP) is

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

Appendix C. Cost Estimates

Appendix C. Cost Estimates O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master

More information

Capital Improvement Program Overview

Capital Improvement Program Overview Capital Improvement Program Overview A Capital Improvement Plan (CIP) is a multiyear plan that provides a planned and programmed approach to utilizing the City s financial resources in the most efficient

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

City of Fernandina Beach, Florida Annual Budget

City of Fernandina Beach, Florida Annual Budget General Fund (001) Finance KRONOS PAYROLL SOFTWARE 100% 50,000 50,000 X Human Resources KRONOS HR MODULE 100% 50,000 50,000 X NEW PHONE SYSTEM-VARIOUS GENERAL FUND DEPARTMENTS Non-Departmental 100% 125,000

More information

Equipment Management Department. Council Budget Presentation

Equipment Management Department. Council Budget Presentation Equipment Management Department Council Budget Presentation Presented: March 15, 2012 Council Inquiries 1. Please provide a brief summary of shifts in your department s operating budget and staffing levels

More information

2019 Bond Program. Bond Advisory Committee Rankings. November 12, 2018

2019 Bond Program. Bond Advisory Committee Rankings. November 12, 2018 2019 Bond Program Bond Advisory Committee Rankings November 12, 2018 2019 Bond Steps to Date Nov 17 Dec 17 BAC members selected by City Council Jan 18 Mar 18 BAC met and developed recommend projects list

More information

Public Works Department, Capital Improvement Program Project Tracking

Public Works Department, Capital Improvement Program Project Tracking Community Facilities Name CF-01 Eastshore State Park/Powell Street Bioswale Seeking grant funding. TT CF-02 South Bayfront Bridge and Horton Landing Park CF-03 / - 04 Transit Center Updated plans are being

More information

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY BACKGROUND Mobility and Accessibility Working Committee Broad representation Transit, Transportation, Planning and Development, Facility

More information

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM Board of Commissioners 229 Rehoboth Avenue P.O. Box 1163 Rehoboth Beach, Delaware 19971 City of Rehoboth Beach Telephone 302-227-6181 www.cityofrehoboth.com THE COMMISSIONERS OF REHOBOTH BEACH Special

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020

Highlands County Board of County Commissioners Adopted Capital Financial Strategy FY 2010/2011 thru 2019/2020 CFS SUMMARY Updated: 01/18/2011 CATEGORY / PROJECT NAME FY10-11 FY11-12 FY12-13 FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19 FY19-20 LOCAL OPTION SALES TAX SUMMARY LOCAL OPTION SALES TAX 6,700,000 6,834,000

More information

Informational Pre-Budget and CIP Council Workshop

Informational Pre-Budget and CIP Council Workshop Informational Pre-Budget and CIP Council Workshop Mike Tubbs June 20, 2012 Fleet and Facilities Maintenance Fleet Mission Statement To provide City departments with safe, reliable and economically sound

More information

CAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment

CAPITAL OUTLAY. Improvements other than buildings. Furniture & Office Equipment CAPITAL OUTLAY Capital Outlay Item expenditures for fixed assets such as equipment, remodeling, minor building improvements, and vehicles may be funded from the operating budget or shortterm financing.

More information

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT

Town of Middletown, RI Capital Improvement Program PROJECTS & FUNDING SOURCES BY DEPARTMENT Town of Middletown, RI Capital Improvement Program FY '4 FY '8 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority 0 - School Department FY '4 FY '5 FY '6 FY '7 FY '8 Floor Strippers/Burnishers

More information

City of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

City of Monroe, Wisconsin Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT City of Monroe, Wisconsin Capital Improvement Plan FY '13 FY '17 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority Administration Replace Computer AD-15-01 3 Administration Administration

More information

Burlington Capital Improvement Plan: FY FY 2023

Burlington Capital Improvement Plan: FY FY 2023 General Government 135 Town Accountant Financial Software Package Upgrade 150,000 subtotal 0 0 0 0 150,000 0 0 0 0 0 145 Treasurer/Collector Printer Replacement 155 MIS Software Upgrade Information Systems

More information

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete.

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete. CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM CITY PROPERTY DOWNTOWN (General Fund) 2010 2012 2010 PROJECTS 1) Replace bricked areas of sidewalks with stamped concrete. $ 10,000 SIDEWALK CONSTRCTION

More information

Connect. Thrive. Develop. KC Streetcar Riverfront Extension & Multi-Modal Feasibility Study

Connect. Thrive. Develop. KC Streetcar Riverfront Extension & Multi-Modal Feasibility Study Connect. Thrive. Develop. Why go to the Riverfront? KC Streetcar is a proven catalyst for development & connecting people to Downtown. < $2 billion in adjacent development: new businesses, hotels, apartments

More information

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets.

Wappingers Central School District. Capital Project Description. Capital Project Scopes. Project Schedules. Project Budgets. Capital Project Description Capital Project Scopes Project Schedules Project Budgets Next Steps Page 1 Project Scope: Facilities Improvements District Wide Facilities Renovations Correct Drainage Issues

More information

CITY OF EDEN PRAIRIE CAPITAL IMPROVEMENT PLAN

CITY OF EDEN PRAIRIE CAPITAL IMPROVEMENT PLAN 2017 2026 CITY OF EDEN PRAIRIE CAPITAL IMPROVEMENT PLAN City of Eden Prairie 2017-2026 Capital Improvement Plan Table of Contents CAPITAL IMPROVEMENT PLAN & REPORTS Capital Improvement Plan Introduction...

More information

CITY OF NORWALK, CONNECTICUT

CITY OF NORWALK, CONNECTICUT CITY OF NORWALK, CONNECTICUT April 15, 2015 Harry Rilling, Mayor Members of the Common Council Members of the Board of Estimate and Taxation Members of the Planning Commission I am pleased to present the

More information

FIVE-YEAR CAPITAL IMPROVEMENT PLAN

FIVE-YEAR CAPITAL IMPROVEMENT PLAN FIVE-YEAR CAPITAL IMPROVEMENT PLAN 147 OVERVIEW Purpose of the Capital Improvement Plan A Capital Improvement Plan (CIP) is a guide to efficiently and effectively provide for public infrastructure and

More information

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0 TSPLOST 2018 Project Statements from Submitted Projects Project # 01, 01 Airport Capital Improvements Program (CIP) Matching Funds, will include the construction of numerous FAA and GDOT funded projects

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status or) STREET RESURFACING, WATER MAIN AND SEWER 1 ERGB Construction Engr Phase III $ 150,000 $ 723,804 1/11/16 Const Phase Status 2 ERGB Improvements $ 150,000 $ 11,173,776 2016 1Q Const Finalizing lighting

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014

Aurora Line/I-225 Rail Project Update Public Meeting. June 4, 2014 Aurora Line/I-225 Rail Project Update Public Meeting June 4, 2014 FasTracks and I-225 Rail Line Update Danielle Smith I-225 Rail Line Design/Build Coordination Manager 2 The RTD FasTracks Plan 122 miles

More information

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis

More information

Compressed Natural Gas (CNG) Fueling Station #

Compressed Natural Gas (CNG) Fueling Station # Compressed Natural Gas (CNG) Fueling Station # 2 01-180 New Facility Design and Construct a Compressed Natural Gas (CNG) vehicle fueling station. The station will be used for both City fleet and public

More information

SEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A

SEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A PROJECT LIST as (Draft) Description Additional Campuses Initial Spent as 943 Acquisition of 535 Old County Rd., San Carlos 3,407,259 3,407,259 3,407,259 3,407,259 0 closed 944 Acquisition of 150 Jefferson

More information

Chapter 7: Corridor Visions

Chapter 7: Corridor Visions Chapter 7: Corridor Visions (see also Appendix 7 for Details) January 24, 2008 NOTE: This document has been prepared using Federal funding from the United States Department of Transportation. The United

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

More than $9 Million coming to Central Valley for transportation

More than $9 Million coming to Central Valley for transportation More than $9 Million coming to Central Valley for transportation From free bus service to electric buses Part of overall $97 Million awarded to public transportation projects A total of 152 local public

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Metropolitan Council Metro Transit Project Description Budget Year

Metropolitan Council Metro Transit Project Description Budget Year Metropolitan Council Metro Transit Project Description Budget Year ADA Pad Bus Garage Maintenance Shop Cleaning and Painting Hoist Replacement Program Redundant Power Program Drivers Rest Room Program

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013

Building our future, together. Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Building our future, together Steering Committee Presentation for the Comprehensive Plan Update April 23, 2013 Vision In 2030, the City of Tyler will be nationally known for its commitment to community,

More information

PUBLIC FACILITIES DIRECTORY

PUBLIC FACILITIES DIRECTORY PUBLIC FACILITIES DIRECTORY PROPOSED TOWN INFRASTRUCTURE PROJECT DIRECTORY 2002 Town Beautification E 6 2105 Old Library Re-use E 8 2103 HVAC Upgrades Old Library E 10 2302 Building Replacement at Corporation

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary Help shape your community investment in Wake Transit Fiscal Year 2019 Draft Work Plan Summary Wake County, growth and transit The Triangle is one of the fastest-growing regions in the nation. Wake County

More information

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION

DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION DIXIE TIP CONCEPT REPORT APPLICATION FY 2015 (Due November 6, 2013) PROJECT INFORMATION 1) TITLE: Old Hwy 91 (Swiss Village, Santa Clara to 200 East, Ivins) 2) DESCRIPTION: This joint Ivins/Santa Clara

More information

Greater Cleveland Regional Transit Authority. Joe Calabrese - General Manager

Greater Cleveland Regional Transit Authority. Joe Calabrese - General Manager Greater Cleveland Regional Transit Authority Joe Calabrese - General Manager RTA Ridership by Mode! 500 Buses - 75 %! 60 Heavy Rail Vehicles - 10%! 24 RTV s (BRT) - 8%! 48 Light Rail Vehicles - 6%! Paratransit

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

LEED v4 Building Design and Construction Quiz #3 LT

LEED v4 Building Design and Construction Quiz #3 LT LEED v4 Building Design and Construction Quiz #3 LT 1. How are walking and bicycling distance measured? A. Straight-line radius from a main building entrance B. Straight-line radius from any building entrance

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

1 Downtown LRT Connector: Draft Concept

1 Downtown LRT Connector: Draft Concept Downtown LRT Connector: Draft Concept Plan November 2010 We re moving forward. Get involved. On June 21, 2010, City Council approved a street-level downtown LRT route, including a connector for the future

More information

Dixie Transportation Planning Office

Dixie Transportation Planning Office A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation

More information

CTA Blue Line Study Area

CTA Blue Line Study Area CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

Region: Year Total Expense Total Revenue Difference , , Prior Years

Region: Year Total Expense Total Revenue Difference , , Prior Years Project Number: 21-200 ADA Door & Restroom Retrofits at Various Facilities - Phase I Renovation or Rehabilitation Year Identified: 2016 Start Date: Est. Completion Date: Upgrade or replace existing entrance

More information

Proposed City Council Workshop July 16, 2018

Proposed City Council Workshop July 16, 2018 Proposed 2018 City Council Workshop July 16, 2018 1 2018 Program Summary Propositions PROP DESCRIPTION # PROJ BUDGET A STREETS 25 52.0 M B ADDITIONAL STREETS 14 22.0 M C PARKS & RECREATION 6 4.3 M D LIBRARY

More information

FFYs Transportation Improvement Program

FFYs Transportation Improvement Program For Public Review Table 2: Draft Amendment One Summary: Five-Year MBTA Programming Overall Changes in Funding in TIP Project Proposed Change Explanation Section/Funding Source From To Difference Five Year

More information

Total $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800

Total $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800 Capital Investments - General Fund 1% Sales Tax 2% Sales Tax Occupation Fees in Lieu and/or "2A" CI CE Tax or PEG Contributions Total 2015 Budget - Original H Street Re-build - Phase 2 $ 595,800 $ 184,200

More information

Recommended Transportation. Capital Improvement Program

Recommended Transportation. Capital Improvement Program Recommended 2018-2022 Transportation Capital Improvement Program 1 Overview 2017 Review 2018-2022 Considerations 2018-2022 Recommended CIP 2 Limited Resources are Directed to the Highest Priority Number

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

CEDAR AVENUE TRANSITWAY Implementation Plan Update

CEDAR AVENUE TRANSITWAY Implementation Plan Update CEDAR AVENUE TRANSITWAY Implementation Plan Update EECUTIVE SUMMARY DECEMBER 2015 Executive Summary In 2013, the Twin Cities metropolitan area s first bus rapid transit (BRT) line, the METRO Red Line,

More information

Chapter 4 : THEME 2. Transportation

Chapter 4 : THEME 2. Transportation Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,

More information

Town of Yarmouth Capital Improvement Plan FY FY2025

Town of Yarmouth Capital Improvement Plan FY FY2025 Town of Yarmouth Capital Improvement Plan FY2016 - FY2025 CONTENTS PAGE Narrative Overview 1 Recommendations for 2015 Annual Town Meeting 3 Facility Plan: Big Ticket Items FY2016 - FY2025 7 Capital Improvement

More information

Making Mobility Better, Together

Making Mobility Better, Together Making Mobility Better, Together Austin Transportation Department Gordon Derr, P.E., for Robert J. Spillar, P.E Director, Austin Transportation Department 1 AUSTIN TRANSPORTATION DEPARTMENT Our Mission

More information

City of Chico FY Annual Budget Capital Projects Summary - Sorted by Fund

City of Chico FY Annual Budget Capital Projects Summary - Sorted by Fund 17020 510 Open Space Management Plan 001 10,150 5,150 27027 601 Broom Sweeper (1N) 001 37,614 27089 300 Upgrade Dispatch Radios 001 77,000 27097 510 Zoning District Study 001 1,800 28018 601 Water Truck

More information

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by 2. Assessment of Current Conditions and Needs In order to prepare a plan to reach the vision desired by the residents of Texarkana, it is first necessary to ascertain the current situation. Since there

More information

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200 PITTSBURGH SCHOOL DISTRICT 2017/2023 CAPITAL PROGRAM The following is the proposed 2017 / 2023 Capital Program. These projects have been identified as a result of Board Actions, input from Facilities,