2019 Bond Program. Bond Advisory Committee Rankings. November 12, 2018

Size: px
Start display at page:

Download "2019 Bond Program. Bond Advisory Committee Rankings. November 12, 2018"

Transcription

1 2019 Bond Program Bond Advisory Committee Rankings November 12, 2018

2 2019 Bond Steps to Date Nov 17 Dec 17 BAC members selected by City Council Jan 18 Mar 18 BAC met and developed recommend projects list for City Council, including public input meetings. Apr 18 May 18 City Council selected projects to undergo PER/Preliminary design and cost estimating Jun 18 Oct 18 Public input meetings were held and preliminary designs and cost estimates were completed 2

3 Projects in the Capital 38 Projects in Improvements Development Plan 21 Projects Recommended by the Bond Advisory Committee 3

4 4

5 Projects Still in Preliminary Design Added by City Council Barbarosa Road: FM 1101 to Alves Lane Estimated Construction Cost: $10,000,000 Kohlenberg Road: IH 35 to FM 1101 Estimated Construction Cost: $5,000,000 Goodwin Lane/Conrads Lane Estimated Construction Cost: $15,000,000 5

6 2019 Proposed Bond Cost Estimates Include: Design Construction Furniture, Fixtures and Equipment (FF&E) Technology/Fiber Utilities ROW/Land Acquisition Costs 6

7 Citywide Streets & Sidewalks Year 1 Projects Approved by Council: Kerlick Lane Plum Ave Peach Ave Grape Ave California Blvd Lakeview Blvd North St Central Ave Commerce St Houston Ave Grant Ave Estimated Cost for 5 Year Program: $20 - $25 Million South St Main St Veramendi Ave Comal Ave Magazine St Butcher St Coll St Guenther Ave Oak Run Sidewalks 7

8 Klein Road Phase 2 Phase 1 part of 2013 Bond ¾ mile roadway improvements 4 lane section Improve low water crossing Improve FM 725 intersection 8-10 shared use path and 6 sidewalk $12,000,000 8

9 Fire Station #2 Construction of a new fire station on an existing City owned property on Water Lane to replace the current Fire Station #2 Heavy House 4 Apparatus bays $7,250,000 9

10 Fire Station #3 Construction of a new Fire Station #3 at the same location on Hanz Drive 3 Apparatus Bays $6,500,000 10

11 Comal Cemetery Wall Stabilization Mechanical stabilization of 50ft+ wall along the bank of the Guadalupe River at Comal Cemetery Will prevent catastrophic erosion of bluff wall, address some drainage issues and prevent disturbance of graves $5,000,000 11

12 Phase 1: 150+ Acres 4 Soccer Fields 4 Baseball Fields 4 Softball Fields Sports Complex Concessions Restrooms Shade Structures Parking Phase 1: $29,800,000 Phase 2: $20,000,000 Phase 3: $3,200,000 Total: $53,000,000 12

13 Police Department New police station to replace existing facility Includes: Office space for all divisions, public space, training room, vehicle maintenance bays, evidence storage, gym, etc. Location TBD $35,000,000* *Includes cost of land 13

14 North South Collector New roadway connection IH 35 frontage to August Fields Subdivision Ultimate connection to Alves Ln. Phase 1: 2 lanes Sidewalks Phase 1: $7,400,000 Phase 2: $4,000,000 Total: $11,400,000 14

15 Westside Community Center Expansion Program/multipurpose spaces Adult, young adult and children s collections Study rooms Computer work spaces Drive up book drop $5,100,000 15

16 Transportation Matching Funds Provide matching funds for Metropolitan Planning Organization or other partnership projects related to transportation and/or mobility improvements. $2,000,000 16

17 Public Works Facility Phase 1: Office space for Public Works: Streets/Drainage, Solid Waste and Fleet maintenance Equipment and materials yard and fleet maintenance bays Training room Phase 1: $10,000,000 (2019 Bond)/$10,000,000 (Solid Waste Funds) Phase 2: $3,000,000 Total: $23,000,000 17

18 Southeast Library Branch Adult, young adult and children s collections Community spaces Multipurpose program space Computer work spaces Quiet rooms/study rooms Location TBD $14,000,000* *includes cost of land 18

19 Callen s Castle All Abilities Park A 4 acre park designed to be 100% accessible Phase 1: Park will feature wide sidewalks, fenced areas, restrooms Playground structures and sensory areas $40,000 has been raised for this project by the Foundation Phase 1: $3,000,000 Phase 2: $2,000,000 Total: $5,000,000 19

20 Dry Comal Hike and Bike Trail Trail from Walnut Ave to Landa St (Wurstfest Grounds) 10 concrete path Improved trailheads $1,800,000 20

21 Veteran s Memorial Memorial to honor Comal and Guadalupe County citizens who were KIA or MIA from World War I to present Black granite monument walls Battlefield Cross Contemplation area The Parks Foundation has $40,000 allotted for this project $750,000 21

22 Guadalupe River Properties Park Phase 1: Restrooms Designated parking Trails Pedestrian bridge under Common St. Phase 1: $3,750,000 Phase 2: $750,000 Total: $4,500,000 22

23 Mission Hill Park Phase 1: Vehicular drive Accessible parking Accessible trails Kiosk/signage Phase 2: includes building/tower Phase 1: $2,300,000 Phase 2: $4,000,000 Total: $6,300,000 23

24 Kerlick Park Trail loop Shade structure Natural play area Hillside slide Gaga Ball Court $615,000 24

25 Proposed 2019 Bond Projects STREETS/MOBILITY PER ESTIMATED COSTS PER ESTIMATED COSTS WITH INFLATION AND STAFFING City-Wide Streets & Sidewalks Improvements $ 25,000,000 $ 25,562,500 Klein Road Phase 2 $ 12,000,000 $ 14,114,192 North South Collector (PH 1) $ 7,400,000 $ 8,703,752 Goodwin Lane/Conrads Lane $ 15,000,000 $ 17,642,740 Barbarosa (FM 1101 to Alves Ln) $ 10,000,000 $ 11,761,826 Kohlenberg Road (IH 35 to FM 1101) $ 5,000,000 $ 5,880,913 Transportation Matching Funds (ex. MPO Projects) $ 2,000,000 $ 2,045,000 PARKS & RECREATION $ - Callen's Castle All Abilities Park (PH 1) $ 3,000,000 $ 3,528,548 Comal Cemetery Wall Stabilization $ 5,000,000 $ 5,880,913 Dry Comal Hike and Bike Trail $ 1,800,000 $ 2,117,129 Guadalupe River Properties Park (PH 1) $ 3,750,000 $ 4,410,685 Kerlick Ave Park $ 615,000 $ 723,352 Mission Hill Park (PH 1) $ 2,300,000 $ 2,705,220 Sports Fields Complex (PH 1) $ 29,800,000 $ 35,050,243 Veteran's Memorial $ 750,000 $ 882,137 OTHER MUNICIPAL IMPROVEMENTS $ - Fire Station No. 2 Replacement $ 7,250,000 $ 8,527,324 Fire Station No. 3 Replacement $ 6,500,000 $ 7,645,187 Public Works Municipal Service Center (PH 1: $20M total/half to be funded by Solid Waste) $ 10,000,000 $ 11,761,826 Police Department Facility $ 35,000,000 $ 41,166,393 Southeast Library Branch $ 14,000,000 $ 16,466,557 Westside Community Center Expansion $ 5,100,000 $ 5,998,531 Subtotal $ 201,265,000 $ 232,574,969 PER/Cost Estimating Tax Note $ 3,000,000 $ 3,000,000 Inflation (3%/year) $ 26,781,506 Included Above Project Management/Staffing $ 4,528,463 Included Above TOTAL PROJECT COSTS $ 235,574,969 $ 235,574,969 25

26 Other Funding Sources/Partners Possible Partnerships NBEDC (4B) NBISD NBU TxDOT Alternative Funding Strategies Alamo Area MPO Grants Public Private Partnership Roadway Impact Fees* *Roadway Impact Fees Approx. $3.2 Million available in Service Area 3 Klein Road Phase 2 Approx. $3.8 Million available in Service Area 5 Barbarosa, Kohlenberg, Goodwin/Conrads, NS Collector 26

27 2019 Bond Tentative Timeline Date November 12, 2018 November 12, 2018 Milestone City Council receives BAC rankings, receives public input City Council requests information/provides direction to City staff November 26, 2018 December 3, 2018 December 10, 2018 January 14, 2019 January 28, 2019 February 11, 2019 February 15, 2019 City Council discusses 2019 bond program and provides direction to City staff City Council retreat Evaluate and develop 2019 bond scenarios within fiscal target If ready present final scenario/propositions for 2019 bond. Receive public input Review/discussion of propositions and included projects Review/discuss propositions and projects (if needed) Ordinance authorizing and calling 2019 bond election Deadline for City Council to call May 2019 election 27

28 Questions? 28

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

PUBLIC INFRASTRUCTURE PROJECTS

PUBLIC INFRASTRUCTURE PROJECTS PUBLIC INFRASTRUCTURE PROJECTS FM 664 / OVILLA ROAD WIDENING & IMPROVEMENTS FM 664 / OVILLA ROAD CONNECTS US 287 WITH I-45 (SOURCE: TEXAS DEPARTMENT OF TRANSPORTATION. 2016 FM 664 / OVILLA ROAD WIDENING

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

Appendix C. Cost Estimates

Appendix C. Cost Estimates O Fallon Parks and Recreation Master Plan The cost estimates prepared for the ten year cost projections were estimated in 2010 US Dollars. The previous Implementation Strategies section of this Master

More information

Compressed Natural Gas (CNG) Fueling Station #

Compressed Natural Gas (CNG) Fueling Station # Compressed Natural Gas (CNG) Fueling Station # 2 01-180 New Facility Design and Construct a Compressed Natural Gas (CNG) vehicle fueling station. The station will be used for both City fleet and public

More information

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan

Agenda. Utility Undergrounding Strategies & Laguna Canyon Road Master Plan Utility Undergrounding Strategies & Laguna Canyon Road Master Plan January 17, 2017 City Council Meeting 2 Agenda Progress since March 2016 Status of undergrounding and road widening between El Toro Rd.

More information

Working for Broward. Working for Coral Springs. September, 2016

Working for Broward. Working for Coral Springs. September, 2016 Working for Broward. Working for Coral Springs. September, 2016 Outline What is the Surtax? Why a Surtax? Why Now? Infrastructure Projects Transportation Projects Oversight Committee Ballot Questions What

More information

TRAFFIC CALMING PROGRAM

TRAFFIC CALMING PROGRAM TRAFFIC CALMING PROGRAM PROGRAM BASICS Mount Pleasant Transportation Department 100 Ann Edwards Lane Mt. Pleasant, SC 29465 Tel: 843-856-3080 www.tompsc.com The Town of Mount Pleasant has adopted a traffic

More information

Waco Rapid Transit Corridor (RTC) Feasibility Study

Waco Rapid Transit Corridor (RTC) Feasibility Study Waco Rapid Transit Corridor (RTC) Feasibility Study Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi Mitchell, Project Manager AECOM

More information

Wentzville Parkway South Phase 2 & 2A

Wentzville Parkway South Phase 2 & 2A Wentzville Parkway South Phase 2 & 2A Sponsor Wentzville Project No. RB18-000034 Project Type New Road TOTAL FUNDING Phase 2 Total County Sponsor Federal $10,000,000 $8,000,000 $2,000,000 $0 Phase 2A Total

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

Purpose of Capital Improvement Program

Purpose of Capital Improvement Program 1 Purpose of Capital Improvement Program o To identify capital projects and funding sources. o To strategically plan and prioritize projects within a budget to maximize the efficient use of funds. o Preserve

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Street Lighting Policy. Revision

Street Lighting Policy. Revision Street Lighting Policy Revision 5-2017 Grand Chute Street Lighting Policy - 1 - May 2, 2017 Intent: The intent of this policy is to outline the Town of Grand Chute s standards for the installation and

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

Draft Results and Open House

Draft Results and Open House Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Open House Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System Jimi

More information

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY

Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY Railyard Alternatives & I-280 Boulevard Feasibility Study 1 RAILYARD ALTERNATIVES & I-280 BOULEVARD (RAB) FEASIBILITY STUDY RAB Citizen Working Group Meeting, August 1 st 2016 CITIZEN WORKING GROUP (CWG)

More information

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator

Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator City of Summit Administration Memo To: Mayor Glatt & Members of Common Council From: Christopher Cotter, City Administrator CC: Department Heads & File Date: July 29, 2010 Re: 2010 Capital Improvement

More information

Mobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, October 22, Moving People Through History

Mobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, October 22, Moving People Through History Mobility Program City of St. Augustine Mobility Program Update City Commission Meeting Monday, October 22, 2018 Moving People Through History Program Update: Activity Management Progress to Date Level/Initiative

More information

Fixed Asset Allocations by Budget Unit for FY

Fixed Asset Allocations by Budget Unit for FY 1100 112 Treasurer-Tax Collector Upgrading current business license program for greater Business License Software & Services 8965 Computer Software 1 10,900 10,900 10,900 efficiency for citizens and staff

More information

Proposed City Council Workshop July 16, 2018

Proposed City Council Workshop July 16, 2018 Proposed 2018 City Council Workshop July 16, 2018 1 2018 Program Summary Propositions PROP DESCRIPTION # PROJ BUDGET A STREETS 25 52.0 M B ADDITIONAL STREETS 14 22.0 M C PARKS & RECREATION 6 4.3 M D LIBRARY

More information

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015 SOUTHERN GATEWAY Transportation and Trinity River Project Committee 11 May 2015 Southern Gateway Project History Began in 2001 as a Major Investment Study [ MIS ], Schematic, and Environmental Assessment

More information

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY BACKGROUND Mobility and Accessibility Working Committee Broad representation Transit, Transportation, Planning and Development, Facility

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Region: Year Total Expense Total Revenue Difference , , Prior Years

Region: Year Total Expense Total Revenue Difference , , Prior Years Project Number: 21-200 ADA Door & Restroom Retrofits at Various Facilities - Phase I Renovation or Rehabilitation Year Identified: 2016 Start Date: Est. Completion Date: Upgrade or replace existing entrance

More information

Mobility Corridor Updates. Transit & Active Transportation Projects

Mobility Corridor Updates. Transit & Active Transportation Projects Mobility Corridor Updates Transit & Active Transportation Projects Manjeet Ranu, SEO East San Fernando Valley Transit Corridor Metro Board LPA selection: June 2018 Recently awarded $200 million in Senate

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

City of Palm Coast Next Year Budget Analysis

City of Palm Coast Next Year Budget Analysis Next Year Analysis 43000099 CAPITAL PROJECTS FUND 034000 062000 99001 062000 49010 063000 23009 063000 99009 063000 61534 063000 59003 063000 66006 063000 51007 063000 99008 063000 66010 063000 52005 063000

More information

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting

PORTS-TO-PLAINS. Corridor Planning. Ports-to-Plains Stakeholder Meeting PORTS-TO-PLAINS Corridor Planning Stakeholder Workshop - Agenda 1 Purpose of Stakeholder Workshops 3 2 Rural Transportation System Overview 4 3 Ports-to-Plains 8 4 5 6 7 I-27 Expansion Key Considerations

More information

Mobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, August 27, Moving People Through History

Mobility Program. City of St. Augustine. Mobility Program Update. City Commission Meeting Monday, August 27, Moving People Through History Mobility Program City of St. Augustine Mobility Program Update City Commission Meeting Monday, August 27, 2018 Moving People Through History Program Update: North Florida Safe Streets Summit 2018 Program

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015 1. Provide Storm Shelters at Maize High School - Grades 9-12 - 1,800 students + staff New Construction - North End (6,000 @ $190/SF) $ 1,140,000 - Expand athletic lobby - Concessions/Kitchen - Multipurpose

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering.

ORANGE COUNTY TRAFFIC COMMITTEE. Speed Limit. Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1. Traffic Engineering. ORANGE COUNTY TRAFFIC COMMITTEE SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INITIATED BY: INVESTIGATOR: REQUEST: Speed Limit Sellas Road North/Sellas Road South; Ladera Ranch; TB 952-F1 Traffic Engineering

More information

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES 5.1 INTRODUCTION This chapter of the TMP presents an opinion of probable cost estimates for the proposed Horizon Year roadway network improvements

More information

Public Information Workshop

Public Information Workshop Public Information Workshop Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 29, 2018 Welcome to the Public Information Workshop for Harborview Road Project Development and Environment (PD&E)

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

CONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY

CONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY CONVERSION OF TWO-WAY FRONTAGE ROADS TO ONE-WAY IH 30 in Texarkana Introduction Video Texarkana Two cities Two states One MPO Texarkana IH 30 U.S. Post Office and Court House IH 30 Corridor IH 30 constructed

More information

El Metro Operations Proposed FY Budget

El Metro Operations Proposed FY Budget Laredo Transit Management Inc.- El Metro El Metro Operations Proposed FY 2017-2018 Budget Claudia San Miguel Acting General Manager Mission Statement To provide a safe, reliable, cost effective, and efficient

More information

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX: 435 Martin Street, #3000 BLAINE, WA 98230 BUS: 360.332.8311 FAX: 360.332.8330 www.cityofblaine.com September 10, 2018 To: From: Subject: City Council Department Heads Michael Jones, City Manager Jeffrey

More information

Sales and Use Transportation Tax Implementation Plan

Sales and Use Transportation Tax Implementation Plan Sales and Use Transportation Tax Implementation Plan Transportation is more than just a way of getting from here to there. Reliable, safe transportation is necessary for commerce, economic development,

More information

CITY OF NORWALK, CONNECTICUT

CITY OF NORWALK, CONNECTICUT CITY OF NORWALK, CONNECTICUT April 15, 2015 Harry Rilling, Mayor Members of the Common Council Members of the Board of Estimate and Taxation Members of the Planning Commission I am pleased to present the

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Mobility Management: Caltrain

Mobility Management: Caltrain Mobility Management: Caltrain Community Relations Committee October 4, 2017 Agenda Item 7 Presentation Outline Operating Statistics Ridership On-time Performance Fleet Reliability Capital Program Review

More information

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018

TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County. February 26, 2018 TPA Steering Committee for Tri-Rail Extension to Northern Palm Beach County February 26, 2018 Agenda Review Committee Purpose Review Project Map Discuss Service Alternatives Capital Costs (Stations, Track,

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION

PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION TESTER ROAD WATER MAIN UPGRADE PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION The City will be replacing an aging water main under Tester Road this year. The project will begin

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project 26, 2012 Click to edit Master title January style Community Advisory Committee 1 Community Meeting Schedule for 2012 26-Jan CAC, Final Meeting Feb 22-Mar Community

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

Mobility 2045 Plan Workshop

Mobility 2045 Plan Workshop Mobility 2045 Plan Workshop Regional Transportation Council October 12, 2017 Agenda Mobility Planning Mobility 2045 Innovative Funding and Strategic Partnerships Public Outreach Efforts Next Steps 2 Mobility

More information

Rapid Transit Implementation Working Group #4 February 9, 2017

Rapid Transit Implementation Working Group #4 February 9, 2017 Rapid Transit Implementation Working Group #4 February 9, 2017 Agenda 1. Business Case Update 2. Rapid Transit Master Plan Overview 3. Corridor Concepts 4. Public Consultation Event 5. Schedule Outlook

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 8.b Meeting Date: December 19, 2016 Department: PUBLIC WORKS SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Public Works Director City Manager Approval: File No.: 18.01.79

More information

Public Works Department, Capital Improvement Program Project Tracking

Public Works Department, Capital Improvement Program Project Tracking Community Facilities Name CF-01 Eastshore State Park/Powell Street Bioswale Seeking grant funding. TT CF-02 South Bayfront Bridge and Horton Landing Park CF-03 / - 04 Transit Center Updated plans are being

More information

Freeway Accident Investigation

Freeway Accident Investigation Freeway Accident Investigation Dallas Police Department Dallas County Sheriff s Office October 15, 2007 Freeway Accidents Freeway accidents represent a significant hazard to both citizens and public safety

More information

Total $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800

Total $ 595,800 $ 1,409,700 $ 187,700 $ 180,000 $ 86,500 $ 907,100 $ 3,366,800 Capital Investments - General Fund 1% Sales Tax 2% Sales Tax Occupation Fees in Lieu and/or "2A" CI CE Tax or PEG Contributions Total 2015 Budget - Original H Street Re-build - Phase 2 $ 595,800 $ 184,200

More information

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

Clarksville Street Department. Fiscal Year 2018 Budget Presentation Clarksville Street Department Fiscal Year 2018 Budget Presentation Clarksville Street Department FY 2018 Proposed Budget 4.2% 42.0% Salaries/Benefits 53.8% Operating Expenses Capital Outlay Clarksville

More information

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual - 2023 Proposed Capital Maintenance Improvement Program (CMIP) Fund/Departm ent New Original Amended 2019 2020 2021 2022 2023 FY18-23 110 - City - General Fund Chief Knowledge Office 1 9 AUTO - 1997 -

More information

Dempster Street Road Improvements. Preparing for Construction

Dempster Street Road Improvements. Preparing for Construction Dempster Street Road Improvements Preparing for Construction November 9, 2009 1 Purpose of Tonight s Presentation To inform and update the Village Board, business owners and residents about... 1) Final

More information

Presented to Council November 7, :30 p.m. More images

Presented to Council November 7, :30 p.m. More images Presented to Council November 7, 2016 3:30 p.m. More images 1 1. Capital Projects - 25 Year Forecast 2. Public Works 3. Emergency Services 4. Library 5. Community Centre s 6. Parks & Recreation 7. Administration

More information

Transportation & Traffic Engineering

Transportation & Traffic Engineering Transportation & Traffic Engineering 1) Project Description This report presents a summary of findings for a Traffic Impact Analysis (TIA) performed by A+ Engineering, Inc. for the Hill Country Family

More information

Light Rail Proposal. June 15, 2016 Presentation to Mayor Steve Adler

Light Rail Proposal. June 15, 2016 Presentation to Mayor Steve Adler Light Rail Proposal June 15, 2016 Presentation to Mayor Steve Adler Central Austin CDC Public Education Reach Citywide reach with posting privileges to 18,000 DL accounts Active ATXRail leadership in 27

More information

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN Page 1 of 3 CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN The six-year Capital Improvement Plan (CIP) includes capital projects for 2017 2022. This plan includes capital projects that add

More information

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange

I-820 (East) Project Description. Fort Worth District. Reconstruct Southern I-820/SH 121 Interchange I-820 (East) Project Description Fort Worth District Reconstruct Southern I-820/SH 121 Interchange I-820 from approximately 2,000 feet north of Pipeline Road/Glenview Drive to approximately 3,200 feet

More information

Delaware County Engineer s Office

Delaware County Engineer s Office Delaware County Engineer s Office JANUARY 2017 County Engineer Responsibility Serve as engineer to the Board of County Commissioners and 18 Boards of Township Trustees for roads, bridges and land surveying

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study June 5, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

Rapid Transit and Land-Use Integration a Reality

Rapid Transit and Land-Use Integration a Reality City of Charlotte Rapid Transit and Land-Use Integration a Reality Transportation Oversight Committee Carolyn Flowers CEO Charlotte Area Transit System April 29, 2010 Charlotte Region Statistics Mecklenburg

More information

STH 60 Northern Reliever Route Feasibility Study Report

STH 60 Northern Reliever Route Feasibility Study Report #233087 v3 STH 60 Northern Reliever Route Feasibility Study Report Washington County Public Works Committee Meeting September 28, 2016 1 STH 60 Northern Reliever Route Feasibility Study Hartford Area Development

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

Rail alignment and benefits (rab) study

Rail alignment and benefits (rab) study Rail alignment and benefits (rab) study previously known as railyard alternatives & i-280 boulevard study May 22, 2018 CONNECTING CALIFORNIA 4,300 lane miles + 115 Airport gates would be needed to create

More information

Summary of Funding Sources

Summary of Funding Sources GENERAL SOURCES General Revenue 91221 - EMS Capital Equipment 11,200 15,000 18,000 10,000 54,200 91229 - Replace & Upgrade Air Packs 22,500 22,500 91245 - Garage Door Replacement (Fire) 26,000 26,000 912xx

More information

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis

Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Pacific Electric Right-of-Way / West Santa Ana Branch Corridor Alternatives Analysis Transit Coalition September 26, 2012 2 Study Area Pacific Electric Rightof-Way/West Santa Ana Branch (PEROW/ WSAB) extends

More information

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, FFY Section 2A State Prioritized Reliability s Bridge Program/On-System (NHS) Increase the Cost of Holyoke (600936)

More information

Transportation Sustainability Program

Transportation Sustainability Program Transportation Sustainability Program Photo: Sergio Ruiz San Francisco 2016 Roads and public transit nearing capacity Increase in cycling and walking despite less than ideal conditions 2 San Francisco

More information

INFRASTRUCTURE REPORT CARD FOR NEVADA -2018

INFRASTRUCTURE REPORT CARD FOR NEVADA -2018 INFRASTRUCTURE REPORT CARD FOR NEVADA -2018 August 2018 The National Report Card Infratructure Report Card for - 2018 2014 Infrastructure RC Infratructure Report Card for - 2018 Coming Soon -Fall 2018

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

FY Regional Surface Transportation Program (RSTP) Allocations *

FY Regional Surface Transportation Program (RSTP) Allocations * FY 2015-2020 Regional Surface Transportation Program (RSTP) Allocations * Cost Previous Actual Other Source Total Allocation Jurisdiction/Project Description UPC Estimate Funding Allocation * Projected

More information

AGENDA REPORT. Craig Crowder, Fleet Manager %-

AGENDA REPORT. Craig Crowder, Fleet Manager %- AGENDA REPORT Meeting Date: April 5, 2016 Item Number: D 22 To: Honorable Mayor & City Council From: Chad Lynn, Assistant Director of Public Works Service s1 Craig Crowder, Fleet Manager %- Subject: APPROVAL

More information

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year

More information

TOWNSHIP OF UPPER ST. CLAIR PROPOSED CAPITAL IMPROVEMENT PROGRAM

TOWNSHIP OF UPPER ST. CLAIR PROPOSED CAPITAL IMPROVEMENT PROGRAM TOWNSHIP OF UPPER ST. CLAIR PROPOSED CAPITAL IMPROVEMENT PROGRAM 2019-2023 Table of Contents Schedules Page Summary by Major Category 3 Summary by Funding Source 4 Comparison of Current Plan to Previous

More information

2. ELIGIBILITY REQUIREMENTS

2. ELIGIBILITY REQUIREMENTS Speed Hump Policy 1. GENERAL The purpose of this policy is to provide guidelines for the application of speed humps. A "speed hump" is a gradual rise and fall of pavement surface across the width of the

More information

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance

More information

Dockless Micromobility Regulatory Framework

Dockless Micromobility Regulatory Framework Dockless Micromobility Regulatory Framework Transportation and Municipal Infrastructure Committee February 5, 2019 Dockless Micromobility was introduced at the January 8 th committee meeting TMI committee

More information

Leadership NC. November 8, 2018

Leadership NC. November 8, 2018 v Leadership NC November 8, 2018 Planning for our region s growth The Triangle is one of the fastestgrowing regions in the nation. More than 2 million people are already part of the equation, and the

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express

More information

ANDERSON PROPERTY SITE ANALYSIS

ANDERSON PROPERTY SITE ANALYSIS ANDERSON PROPERTY SITE ANALYSIS Introduction The Montgomery County Department of Transportation (MCDOT) initiated a feasibility study in the fall of 2012 to evaluate the need for transit service expansion

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Community Advisory Group Meeting #3 December 1, 2017 Bedford Park Public Library 1 Meeting Agenda 1. Welcome/Introductions (3 mins) 2. Project Overview and Re-Cap

More information

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014 Presented To: Operations Committee Request for Decision Pedestrian Lighting Standards for Road Right-of-ways Presented: Monday, Mar 17, 2014 Report Date Thursday, Mar 06, 2014 Type: Presentations Recommendation

More information

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors

San Rafael Transit Center. Update. Golden Gate Bridge, Highway & Transportation District Transportation Committee of the Board of Directors Transportation Committee November 17, 2016 Agenda Item No. 5, Update on the San Rafael Transit Center Relocation San Rafael Transit Center Relocation Study Update 11/17/16 Golden Gate Bridge, Highway &

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required

More information

MBTA Key Bus Route. Community Meeting Route 1 - Boston

MBTA Key Bus Route. Community Meeting Route 1 - Boston MBTA Key Bus Route Improvement Program Community Meeting Route 1 - Boston United South End Settlement Agenda Welcome and introductions Safety briefing/accommodations Key Bus Route Program overview Existing

More information

Characterization of Combined Use of County Road Segment

Characterization of Combined Use of County Road Segment Department of Public Works Inyo County, California Characterization of Combined Use of County Road Segment Segment Name: _Lone Pine No. 1_ Purpose: Which of the following does the combined-use segment

More information

SC Highway 41 Existing Conditions

SC Highway 41 Existing Conditions SC Highway 41 Existing Conditions Existing Typical Cross Section purposes only and does not replace the required NEPA process necessary for alignment The NEPA process is anticipated to begin in the next

More information

Proposed Project I 35 Improvements from SH 195 to I 10

Proposed Project I 35 Improvements from SH 195 to I 10 I 35 ROADWAY Proposed Project I 35 Improvements from SH 195 to I 10 The existing I 35 facility from State Highway 195 (SH 195) north of Georgetown to Interstate 10 (I 10) in San Antonio varies from four

More information

ALTERNATIVE PROJECT DELIVERY

ALTERNATIVE PROJECT DELIVERY ALTERNATIVE PROJECT DELIVERY Varuna Singh SH 288 IN HARRIS COUNTY SH 288 in Harris County SEGMENT 1: 8 New Tolled Direct Connectors at SH 288 and Beltway 8 Existing traffic uses frontage roads today to

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized

More information