Metropolitan Council Metro Transit Project Description Budget Year

Size: px
Start display at page:

Download "Metropolitan Council Metro Transit Project Description Budget Year"

Transcription

1 Metropolitan Council Metro Transit Project Description Budget Year ADA Pad Bus Garage Maintenance Shop Cleaning and Painting Hoist Replacement Program Redundant Power Program Drivers Rest Room Program Energy Enhancements Mill & Overlay Park & Ride Lots Operations Support Center Roof Replacement Parallel Hoists Bus Stop Sign Implementation Lake St. Station Refurbishment Painting of Storage Tanks at East Metro Garage Concrete ADA Pads Installed at Select Bus Stop Locations $50,000 per year 2016, 2017, 2018 Cleaning and painting $200,000 per year 2016, 2017, 2018 of interior bus garage maintenance space Replace hoists at $250,000 per year 2016, 2017, 2018 various garages Provide redundant $500,000 per year 2016, 2017 power to facilities Repair existing, TBD 2017, 2018 construct new rest room facilities Lighting Retrofits at $1M per year 2016, 2017, 2018 various facilities Concrete and asphalt $500,000 per year 2017, 2018 repairs to P&R lots Replace existing roof $300, New hoist at South Garage and East Metro Garage Installation of upgraded bus stop signs and information at all bus stops Interior and Exterior Refurbishment of Lake St. Rail Station Painting of rusted storage tanks $500, $3M 2016, 2017 $700, $50,

2 North Minneapolis Bus Shelter Electrical Connections Brooklyn Park & Brooklyn Center Bus Shelter Electrical Connections North Minneapolis Bus Stop Concrete Brooklyn Park & Brooklyn Center Bus Stop Concrete OHB Non-Revenue Shop Operations Support Center (OSC) Remodel Heywood 2 Garage Building Demolition Heywood Garage Windshield Washer Liquid Storage System Heywood Campus Parking Lot Overhaul Base Trash Compactor Overhaul Base Front Landscape and Lot Ruter Garage Overhead Door Replacement South Garage Door Replacement Green Line OMF Storage Room Modifications Mill and Overlay of Four Park & Ride Lots Concrete flatwork and electrical connections for preparation of bus Concrete flatwork and electrical connections for preparation of bus Concrete flatwork for preparation of bus Concrete flatwork for preparation of bus Miscellaneous improvements in the Non-Revenue Vehicle shop area Remodel of OSC to add training rooms, expand money machine repair room Building demolition, soil remediation Construction of an enclosed liquid storage system Construction of 200 stall parking lot off N. 8 th Ave Installation of new trash compactor Paving and landscaping Replacement of existing overhead door Replacement of existing overhead door Installation of a roll-up door & construction of walls beneath the mezzanine at the Green Line OMF Concrete and asphalt repairs to four P&R lots $700, $200, $50, $35, $100, , 2017 $500, /2017 $1M 2016 $160, $1,200, $40, $25, $100, $100, $85, $250,

3 Nicollet Station Side Platform Downtown St. Paul US Bank Shelter Passenger Facility Downtown East Platform Painting Marquette & 2 nd Shelter Painting LRT Spur Track Modification Transit Stores Remodel Nicollet Mall Bus Shelters Mall of America Transit Station Blue Line Paver Replacement Public Facility Security I94 and Manning Ave Park & Ride MSP Tunnel Grouting OHB Office Remodel Metro Transit Police Department Headquarters Heywood 2 Garage Addition of Windscreening, Cameras, and Message Signage to Nicollet Station Side Platform Refurbishment of interior waiting space Various rust removal and painting, sign replacement, concrete repair, and general cleaning of DTE Station Various rust removal and painting of shelters Install Turnout on Blue Line north of Lake Street Station. Remodel interior of transit stores Custom bus shelters and amenities for Nicollet Mall Renovation of transit station Replacement of 5 Downtown Station Tactile Pavers Security systems installation at park and ride lots/ramps 550 parking space structured ramp Grouting of the MSP Tunnel Remodel and expansion of Garage Maintenance Management offices Police facility and secured parking for vehicles Construction of 350,000 sq. ft. bus garage $1 M 2016 $500, $250, TBD 2016 $400, $125, /2017 TBD 2016/2017 $25M 2016/2017 $500,000 per year 2017 $400, $4M 2017 $250, $500,000 1Q 2017 $20M 2017 $85 M 2017

4 Metro Transit Public Facilities Building Remodel Real Time Signs Heywood Garage Transportation Area Remodel existing office/warehouse building Real Time Information Signs at high ridership locations Building addition and remodel of current bus garage $800, $1 M 2017 $14.5 M 2017 Orange Line Construction 35W South BRT Line $100M 2018 C Line Construction Penn Avenue BRT Line $21 M 2018 Southwest LRT (Metro LRT Line Overall Project Green Line Extension) Estimate $1.79B METRO Blue Line Extension (Bottineau LRT) LRT Line Overall Project Estimate: $1.49B Environmental Services Mound Area L39/L40 New Lift Station $15M 2016 Hopkins L87 New Lift Station $ Crystal L30 Electrical, Mechanical, Structural rehab Blue Lake Int. Rehab Replace & Rehab Sewer $ and manholes Blue Lake Misc. Process & Structural Hastings WWTP Bldg Replace & Rehab Roofs Roofs Empire WWTP Roads Reconstruct & Rehab Plant Roads Seneca WWTP Solids Replace Sludge $ Processing Thickeners Mound Interceptor Replace 5500LF of 36 $ gravity sewer Hastings WWTP Facility additions and improvements Minneapolis Int. Replace structure, new $ tunnel, add odor control St Paul Area Int. Rehab Gravity Sewer $ Phases Rehab(CIPP) Minneapolis Int. Rehab Gravity Sewer Rehab (CIPP) Minneapolis Int. Rehab Gravity Sewer Rehab (CIPP) Bloomington Int. Rehab Gravity Sewer Rehab $ North Area Rehab Phase 9 & 10 Gravity Sewer Rehab (CIPP) $

5 Richfield Int. Rehab Gravity Sewer Rehab $ Woodbury L73 Impr. Access for pump removal and maint. Empire WWTP Solids Replace sludge equip. $ Processing and facility rehab Metro WWTP Vector Add Waste Facility $ Waste Receiving Metro WWTP Fuel Tank removal and $ Storage and Parking parking expansion Metro WWTP Gravity Rehab & Replace odor Thickener Order Control control facility Blue Lake Solids Scum handling & $ Processing Impr. digester gas equipment Metro WWTP Solids Ash Handling $ Processing improvements & Equip Rehab. Metro WWTP Service New office space $ Bldg Galphin Lake Interceptor Gravity Sewer $ St Bonifacious Forcemain New 16 forcemain $ (17,000 LF) St Bonifacious Lift Station New Lift Station L24 $ Lake Street Siphon Rehab Gravity Sewer Rehab $ Mound L38 Forcemain New 24 Forcemain $ (16,000 LF) Minneapolis 1-MN-310 Basset Creek Gravity $ Rehab Sewer Rehab Elm Creek Int. Rehab 42 Gravity Sewer Rehab $ Int. 4BP541 Rehab Gravity Sewer Rehab $ Int Rehab Gravity Sewer Rehab $ Int Rehab Gravity Sewer Rehab $ Int Rehab Manhole Rehab $ Brooklyn Park Lift Station Electrical, Mechanical, $ Coon Rapids Lift Station Electrical, Mechanical, $ Hopkins Forcemain New Dual Forcemain $ Meter Electrical, Mechanical, $ Waconia Forcemain West Forcemain Replacement $ Waconia Lift Station Electrical, Mechanical, $ Metro WWTP Electrical System and odor control Replacement of Electrical distribution equipment $

6 Metro WWTP Wastewater Reuse System Metro WWTP Sludge Storage Tank Mixing Excelsior Lift Station Imp. Upgrade Treatment and Distribution Equipment $ New Mixing Equipment $ Electrical, Mechanical, $ Lake Virginia Lift Station Electrical, Mechanical, $ Imp. Bloomington Lift Station New Lift Station $ Champlin Lift Station Electrical, Mechanical, $ Chaska Forcemain Rehab Dual Forcemain System $ Rehab Metro WWTP Aeration System Rehab Replace piping, valves, diffusers, and related $ equip Metro WWTP HVAC Replace & Upgrade $ System Rehab HVAC Systems Metro WWTP Addition of in-plant Wi- $ Instrumentation & Fi Control Richfield Int. Rehab Gravity Sewer Rehab $ Minneapolis Int. Rehab Rehab interceptors, $ shafts, and gates St Paul Int. Rehab Rehab interceptors, $ shafts, and gates North Area Int. Rehab Gravity Sewer Rehab $ Orono Forcemain New Forcemain $ Prior Lake Int. Rehab Gravity Sewer Rehab $ Doing Business with the Council

Transitways. Chapter 4

Transitways. Chapter 4 4 Transitways Figure 4-1: Hiawatha LRT Train at the Lake Street/Midtown Station The 23 Transportation Policy Plan identifies a network of transitway corridors to be implemented by 23. Transitways recommended

More information

I-394 Corridor Performance

I-394 Corridor Performance Population Trends Corridor Context The corridor runs from edge of Hennepin County to downtown Minneapolis and serves the cities of Delano, Independence, Medina, and Wayzata. City Population 2000 2010 2,088

More information

Fremont. Emerson. Plymouth. Ramp A/7th St Transit Center 8th/7th St & Hennepin 8th/7th St & Nicollet 8th/7th St & 3rd Ave 8th/7th St & Park

Fremont. Emerson. Plymouth. Ramp A/7th St Transit Center 8th/7th St & Hennepin 8th/7th St & Nicollet 8th/7th St & 3rd Ave 8th/7th St & Park Brooklyn Center Transit Center BROOKLYN CENTER Xerxes & 56th Ave Brooklyn & 51st Ave 44th Ave & Penn-Oliver Fremont & 42nd Ave Fremont & Dowling Fremont & 35th Ave Fremont/Emerson & Lowry Fremont/Emerson

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

I-35W & Lake Street Station

I-35W & Lake Street Station I-35W & Lake Street Station 2017 CMAQ Funding Proposal April 16, 2014 Charles Carlson Metro Transit BRT/Small Starts Project Office www.metrotransit.org/orangeline Addressing Corridor Challenges 7+ Hours/day

More information

Metropolitan Council Transit Capital Improvement Plan. September 23, 2009

Metropolitan Council Transit Capital Improvement Plan. September 23, 2009 1 Metropolitan Council 2010-2015 Transit Capital Improvement Plan September 23, 2009 2 Current Situation Capital facilities require longer range view Recent infusion of UPA, CTIB, and State funds have

More information

Committee Report. Transportation Committee. Business Item No

Committee Report. Transportation Committee. Business Item No Committee Report Business Item No. 2015-280 Transportation Committee For the Metropolitan Council meeting of December 9, 2015 Subject: METRO Blue Line Extension (Bottineau Light Rail Transit) Revised Scope

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

I-20 East Transit Initiative

I-20 East Transit Initiative I-20 East Transit Initiative PRELIMINARY ORDER OF MAGNITUDE CAPITAL COST ESTIMATING METHODOLOGY Technical Memorandum December 2011 Prepared for: Metropolitan Atlanta Rapid Transit Authority Atlanta, GA

More information

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process

Extending TRACKS. Preliminary design plan review underway. Public comment and approval process in May & June. Municipal Consent Process Extending TRACKS Issue 5 Spring 2014 Preliminary design plan review underway Public comment and approval process in May & June Residents and businesses along the Southwest LRT (METRO Green Line Extension)

More information

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions 1/3/2014 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Alternatives Overview...

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

US 10 Corridor Performance

US 10 Corridor Performance Corridor Context The corridor runs northwest 18 miles from I-35W to the edge of Anoka County. The corridor connects the cities of Ramsey, Anoka,, Mounds View, and Blaine. Current Corridor Characteristics

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: February 12, 2014 TO: FROM: PREPARED BY: SUBJECT: REQUESTED ACTION: RECOMMENDED MOTION: ACTION TRANSMITTAL 2014-14 Transportation

More information

Detailed Definition of Alternatives

Detailed Definition of Alternatives West Broadway Transit Study Detailed Definition of Alternatives 9/4/2015 DRAFT Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 2040 No-Build Alternative... 1 Build Alternatives...

More information

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No

I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P B SEH No TECHNICAL MEMORANDUM TO: FROM: Transit Advisory Group Jeff Rhoda DATE: RE: I-494/I-35 Interchange Vision Layout Development - BRT Station Concepts S.P. 2785-330B SEH No. 123252 04.00 I-494/I-35W Interchange

More information

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance

More information

Bi-County Transitway/ Bethesda Station Access Demand Analysis

Bi-County Transitway/ Bethesda Station Access Demand Analysis Bi-County Transitway/ Bethesda Station Access Demand Analysis Prepared for: Washington Metropolitan Area Transit Authority Office of Planning and Project Development May 2005 Prepared by: in conjunction

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS

2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS 2 EXISTING ROUTE STRUCTURE AND SERVICE LEVELS In the Study Area, as in most of the Metro Transit network, there are two distinct route structures. The base service structure operates all day and the peak

More information

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM

BAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM Board of Commissioners 229 Rehoboth Avenue P.O. Box 1163 Rehoboth Beach, Delaware 19971 City of Rehoboth Beach Telephone 302-227-6181 www.cityofrehoboth.com THE COMMISSIONERS OF REHOBOTH BEACH Special

More information

Midtown Corridor Alternatives Analysis Initial Screening Analysis

Midtown Corridor Alternatives Analysis Initial Screening Analysis Midtown Corridor Alternatives Analysis Initial Screening Analysis 7/24/2013 Prepared by the SRF Consulting Group Team for Table of Contents Purpose... 1 Initial Screening Analysis Methodology... 1 Screening...

More information

FFYs Transportation Improvement Program

FFYs Transportation Improvement Program For Public Review Table 2: Draft Amendment One Summary: Five-Year MBTA Programming Overall Changes in Funding in TIP Project Proposed Change Explanation Section/Funding Source From To Difference Five Year

More information

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete.

CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM 2010 PROJECTS. 1) Replace bricked areas of sidewalks with stamped concrete. CITY OF LUDINGTON THREE YEAR CAPITAL IMPROVEMENT PROGRAM CITY PROPERTY DOWNTOWN (General Fund) 2010 2012 2010 PROJECTS 1) Replace bricked areas of sidewalks with stamped concrete. $ 10,000 SIDEWALK CONSTRCTION

More information

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014

Arterial Bus Rapid Transit. System Policy Oversight Committee April 7, 2014 Arterial Bus Rapid Transit System Policy Oversight Committee April 7, 2014 1 Meeting Agenda Welcome and Introductions A Line - Project Status Shelter and Pylon Development Arterial BRT Branding Update

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

Amend the 2013 Capital Budget (annual appropriation) by increasing appropriation as follows: Metro Transit Carry Forward $ 167,225,299

Amend the 2013 Capital Budget (annual appropriation) by increasing appropriation as follows: Metro Transit Carry Forward $ 167,225,299 Transportation Committee Business Item: 2013-43 Meeting date: Transportation February 25, 2013 Management February 27, 2013 For the Council Meeting of March 6, 2013 ADVISORY INFORMATION Date: February

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status

QUARTERLY REPORT st QUARTER. Quarter for Advert. / Contract Award Phase Status or) STREET RESURFACING, WATER MAIN AND SEWER 1 ERGB Construction Engr Phase III $ 150,000 $ 723,804 1/11/16 Const Phase Status 2 ERGB Improvements $ 150,000 $ 11,173,776 2016 1Q Const Finalizing lighting

More information

The $600 Million Rebirth of San Diego Trolley

The $600 Million Rebirth of San Diego Trolley The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and

More information

City of Freeport Water & Sewer Capital Improvement Program FY2019-FY2024

City of Freeport Water & Sewer Capital Improvement Program FY2019-FY2024 City of Freeport Water & Sewer Capital Improvement Program FY2019-FY2024 Current Issues $210 million in depreciated water & sewer assets are in need of replacement Many items: Production Wells, Treatment

More information

East Allen County Schools Facilities History Calendar Years October 5, 2015

East Allen County Schools Facilities History Calendar Years October 5, 2015 East Allen County Schools Facilities History Calendar Years 2007 2015 October 5, 2015 Heritage Attendance Area Heritage Jr./Sr. High School (includes K-12) 2007: Repaved Front Student Parking Lot; and

More information

2015 ANNUAL REGIONAL PARK-AND-RIDE SYSTEM REPORT

2015 ANNUAL REGIONAL PARK-AND-RIDE SYSTEM REPORT ANNUAL REGIONAL PARK-AND-RIDE SYSTEM REPORT Prepared for: Metropolitan Council Metro Transit Minnesota Valley Transit Authority SouthWest Transit Maple Grove Transit Plymouth Metrolink Northstar Corridor

More information

Hennepin County Transit Oriented Development Program. The Ellipse, St. Louis Park, 2009

Hennepin County Transit Oriented Development Program. The Ellipse, St. Louis Park, 2009 Hennepin County Transit Oriented Development Program The Ellipse, St. Louis Park, 2009 What is Transit Oriented Development (TOD)? Development within walking distance of transit Typically ¼ to ½ mile 10

More information

METRO Orange Line BRT American Boulevard Station Options

METRO Orange Line BRT American Boulevard Station Options METRO Orange Line BRT American Boulevard Station Options Bloomington City Council Work Session November 18, 2013 Christina Morrison BRT/Small Starts Project Office Coordinating Planning and Design AMERICAN

More information

Metro Transit Service Improvement Plan

Metro Transit Service Improvement Plan Metro Transit Service Improvement Plan CTS Conference May 21, 2015 Cyndi Harper Manager of Route Planning What is the Service Improvement Plan (SIP)? Bus service expansion plan Builds on existing network

More information

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants

West LRT. Alignment Update and Costing Report May Calgary Transit Transportation Planning Clifton ND Lea Consultants West LRT Alignment Update and Costing Report 2006 May Calgary Transit Transportation Planning Clifton ND Lea Consultants West LRT Update Background The service area for West LRT is generally described

More information

Metropolitan Council Budget Overview SFY

Metropolitan Council Budget Overview SFY Metropolitan Council Budget Overview SFY 2016-2017 H T t ti C itt House Transportation Committee February 4, 2015 Transit connects us to the places that matter Transportation Needs Grow as the Region Grows

More information

Transit Operations Plans Report

Transit Operations Plans Report Transit Operations Plans Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates TABLE OF CONTENTS 1.0

More information

More than $9 Million coming to Central Valley for transportation

More than $9 Million coming to Central Valley for transportation More than $9 Million coming to Central Valley for transportation From free bus service to electric buses Part of overall $97 Million awarded to public transportation projects A total of 152 local public

More information

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description 2017 CAPITAL BUDGET FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153 - WINTER RECOVER/SNOW

More information

Current Corridor Characteristics. MN 62 Corridor Performance

Current Corridor Characteristics. MN 62 Corridor Performance Corridor Context The corridor runs 12 miles between I-494 and MN 55 south of Minneapolis. The corridor serves as an important East-West connection for the Metro area. A portion of the corridor has been

More information

Tracking the Blue Line Extension

Tracking the Blue Line Extension BROOKLYN PARK CRYSTAL ROBBINSDALE GOLDEN VALLEY MINNEAPOLIS Tracking the Blue Line Extension Issue 3 July 2015 Upcoming open houses will set stage for preliminary design plans People who want to influence

More information

Summary of Approved Funding Sources

Summary of Approved Funding Sources GENERAL SOURCES General Revenue 91213 - Major Fire Apparatus Refurbishment 90,000 117,000 110,000 138,000 147,800 150,000 752,800 91221 - EMS Capital Equipment 7,200 11,200 15,000 18,000 51,400 91229 -

More information

Key Transfer Stations - Technical Memo

Key Transfer Stations - Technical Memo DOCUMENT 5 October 2008 Key - Technical Memo 1.0 INTRODUCTION In May 2008 Council approved a Primary Rapid Transit Network which includes both Light Rail Transit (LRT) and Bus Rapid Transit (BRT) corridors.

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

Capital Needs Assessment Riders Advisory Council July2, 2008

Capital Needs Assessment Riders Advisory Council July2, 2008 Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair

More information

I-225 Rail Line Iliff and Florida Stations Information Meeting

I-225 Rail Line Iliff and Florida Stations Information Meeting I-225 Rail Line Iliff and Florida Stations Information Meeting May 15, 2013 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager Chris Hinton I-225 Rail Line Deputy Project

More information

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY

I-20 EAST TRANSIT INITIATIVE Tier 1 and Tier 2 Alternatives Screening Report EXECUTIVE SUMMARY EXECUTIVE SUMMARY The purpose of this report is to document the results of the Tier 1 and Tier 2 Screening of alternatives for the I-20 East Transit Initiative. The two-tier screening process presented

More information

Highway Transitway Corridor Study

Highway Transitway Corridor Study Highway Transitway Corridor Study Technical Memorandum 3: Corridor Concepts and Evaluation Prepared for: Metropolitan Council May 2014 SRF No. 7994 Table of Contents Introduction... 1 Concept Development...

More information

O-Train Light Rail Transit Stage 2 Look Ahead

O-Train Light Rail Transit Stage 2 Look Ahead National Capital Heavy Construction Association January 15, 2018 O-Train Light Rail Transit Stage 2 Look Ahead John Manconi, General Manager Transportation Services Department City of Ottawa 1 3 Current

More information

I-35W Past, Present, and Future: METRO Orange Line

I-35W Past, Present, and Future: METRO Orange Line I-35W Past, Present, and Future: METRO Orange Line 2018 State Public Transportation Partnerships Conference Charles Carlson Director, BRT Projects Metro Transit Charles.Carlson@metrotransit.org Metro Transit:

More information

City of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT

City of Lawrence, Kansas Proposed Capital Improvement Plan PROJECTS & FUNDING SOURCES BY DEPARTMENT City of Lawrence, Kansas Proposed Capital Improvement Plan 2019 2023 thru PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project # City Manager's Office Affordable Housing General Fund Transfer CI05

More information

Metro Transit Arterial Transitway Corridors Study

Metro Transit Arterial Transitway Corridors Study Metro Transit Arterial Transitway Corridors Study Technical Memorandum #3 Corridor Mode Development 2/1/2012 Prepared by the SRF Consulting Group Team Table of Contents Introduction... 1 Concept Plans...

More information

Extending TRACKS. Peer reviews, advanced design next for Southwest LRT

Extending TRACKS. Peer reviews, advanced design next for Southwest LRT Extending TRACKS Issue 7 Fall 2014 Peer reviews, advanced design next for Southwest LRT A new chapter is beginning for the planned METRO Green Line Extension (Southwest Light Rail Transit Project), following

More information

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015

Transportation Committee Revised Project Scope and Cost Estimate. November 23, 2015 Transportation Committee Revised Project Scope and Cost Estimate November 23, 2015 1 Today s Topics Revised Project Scope Revised Cost Estimate Municipal Approval Action 2 3 Revised Project Scope Project

More information

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN

Twin Cities Minnesota Zone Meeting Xcel Energy. May 11, 2005 Bloomington, MN Twin Cities Minnesota Zone Meeting Xcel Energy May 11, 2005 Bloomington, MN Overview of Presentation Xcel Energy Projects: Aldrich to St Louis Park 115 kv line Eden Prairie to Edina 115 kv line Eden Prairie

More information

D Line Station Plan: Table of Contents

D Line Station Plan: Table of Contents Final Station Plan This document identifies D Line station locations for approval by the Metropolitan Council in summer 2018. It is a final revision of the D Line Station Plan previously published for

More information

2015 Capital Improvement Plan

2015 Capital Improvement Plan 2015 Capital Improvement Plan 15 Unallocated 2014 s Grants/ Donations Prior Year Special Assessment New 48" Intake Improvement and Zebra Mussel Control 690,000 690,000 690,000 - Alley Paving 980,000 280,000

More information

Stittsville OC Transpo Services

Stittsville OC Transpo Services Stittsville OC Transpo Services Transportation Services Department March 22, 2018 0 Ottawa s Transit Challenge 1 1 What s Coming in 2018 O-Train Network 2 2 Confederation Line - Alignment 3 3 VEHICLE AND

More information

CITY OF BELLEVILLE 2017 Capital Budget

CITY OF BELLEVILLE 2017 Capital Budget CITY OF BELLEVILLE 2017 Capital Budget Proposed Financing COMBINED SERVICES 1.001 Bridge St W Coleman to Highland Design EDS 73 300.0 150.0 150.0 1.002 University Ave McFarland Dr to Tice Cres EDS 65 1,900.0

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

Highway 55 Commuter Bus Survey Results

Highway 55 Commuter Bus Survey Results Highway 55 Commuter Bus Survey Results Survey sent to 1,000 residents City received 121 responses 1. How likely are you to ride the bus between Medina and downtown Minneapolis? Very Likely 46 38% Somewhat

More information

Tracking the Blue Line Extension

Tracking the Blue Line Extension BROOKLYN PARK CRYSTAL ROBBINSDALE GOLDEN VALLEY MINNEAPOLIS Tracking the Blue Line Extension Issue 4 December 2015 Metropolitan Council approves refined 11-station scope and $1.496 billion cost estimate

More information

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update Los Angeles Community College District PROGRAM MANAGEMENT SERVICES College Strategic Execution Plan Update District Citizens Oversight Committee October 9, 205 Los Angeles City College Strategic Execution

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

48 th and Chicago D Line Stop - September 13 th, 2018 Open House Materials

48 th and Chicago D Line Stop - September 13 th, 2018 Open House Materials 48 th and Chicago D Line Stop - September 13 th, 2018 Open House Materials Page 1: Table of Contents Page 2-3: Metro Transit Postcard: sent to station area Page 4-10: E-Newsletters Page 11-16: Meeting

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole December 1, 016 City Council December 19, 016 Agenda Item: Bids for City Project No. 7551 Lift Station No. 17 & 17A Rehabilitation Submitted by:

More information

Watauga County Schools Capital Improvement Plan 2015

Watauga County Schools Capital Improvement Plan 2015 Watauga County Schools Capital Improvement Plan 2015 WATAUGA COUNTY SCHOOLS CAPITAL IMPROVEMENT PLAN 2015 In an effort to meet the standards of the North Carolina Building Code and North Carolina Public

More information

CITY OF STANDARD SPECIFICATIONS

CITY OF STANDARD SPECIFICATIONS CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12

More information

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual - 2023 Proposed Capital Maintenance Improvement Program (CMIP) Fund/Departm ent New Original Amended 2019 2020 2021 2022 2023 FY18-23 110 - City - General Fund Chief Knowledge Office 1 9 AUTO - 1997 -

More information

Business Advisory Committee. July 7, 2015

Business Advisory Committee. July 7, 2015 Business Advisory Committee July 7, 2015 1 Today s Topics Outreach Update TI #1 and 2: Target Field Station Connection to I-94: Recommendation 85 th Station Configuration 93 rd Station Configuration DEIS

More information

WAKE TRANSIT PLAN Summer 2018

WAKE TRANSIT PLAN Summer 2018 WAKE TRANSIT PLAN Summer 2018 Planning for growth WAKE COUNTY s population already exceeds ONE MILLION and grows by more than 60 people a day. That s 23,000 people a year or basically another Morrisville.

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

City of Fernandina Beach, Florida Annual Budget

City of Fernandina Beach, Florida Annual Budget General Fund (001) Finance KRONOS PAYROLL SOFTWARE 100% 50,000 50,000 X Human Resources KRONOS HR MODULE 100% 50,000 50,000 X NEW PHONE SYSTEM-VARIOUS GENERAL FUND DEPARTMENTS Non-Departmental 100% 125,000

More information

Port of Grays Harbor Capital Improvement Plan

Port of Grays Harbor Capital Improvement Plan Marine Terminals Communication Equipment VHF Radio 3,000 3,000 3,000 3,000 3,000 Deeper Draft Deeper Draft Phase 2 4,713,000 1,172,000 Jet Array Jet Array Renovation 200,000 200,000 200,000 200,000 200,000

More information

Recommended Station Plan

Recommended Station Plan Recommended Station Plan Comments on this recommended D Line Station Plan can be submitted to dline@metrotransit.org through June 8, 2018. This document identifies D Line station locations recommended

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner

Metro Transit Update. Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office. John Dillery, Senior Transit Planner Metro Transit Update Christina Morrison, Senior Planner Metro Transit BRT/Small Starts Project Office John Dillery, Senior Transit Planner Metro Transit Service Development May 16, 2013 1 Transit Planning

More information

Capital Improvement Plan

Capital Improvement Plan Capital Improvement Plan 2019 2023 City of Kaukauna December 17, 2018 Prepared By: John W. Sundelius, P.E., M.P.A. Director of Public Works/City Engineer Projects and items that appear in the CIP are not

More information

Fixed Asset Allocations by Budget Unit for FY

Fixed Asset Allocations by Budget Unit for FY 1100 112 Treasurer-Tax Collector Upgrading current business license program for greater Business License Software & Services 8965 Computer Software 1 10,900 10,900 10,900 efficiency for citizens and staff

More information

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014 Midtown Corridor Alternatives Analysis Policy Advisory Committee Meeting February 12, 2014 Today s Agenda Introductions Outreach efforts and survey results Other updates since last meeting Evaluation results

More information

City of Lawrence, Kansas DRAFT Recommended Projects PROJECTS & FUNDING SOURCES BY DEPARTMENT

City of Lawrence, Kansas DRAFT Recommended Projects PROJECTS & FUNDING SOURCES BY DEPARTMENT City of Lawrence, Kansas DRAFT Recommended Projects 217 thru 221 PROJECTS & FUNDING SOURCES BY DEPARTMENT Department Project# Priority Citizen Input 217 218 219 22 221 Rotary Arboretum restroom CI1 n/a

More information

Federal Transit Administration Scope & Activity Line Item Codes

Federal Transit Administration Scope & Activity Line Item Codes Page 1 of 9 SCOPE CODE CHART SCOPE CODES Category Capital Description Bus Rolling Stock Bus Transitways / Lines Bus Station Stops & Terminals Bus Support Equip / Facilities Bus Electification / Power Dist.

More information

Appendix I- Agency Scoping Meeting

Appendix I- Agency Scoping Meeting Appendix I- Agency Scoping Meeting October 15, 2008 Agency Scoping Meeting Agency Central Corridor Project Office (CCPO) City of Eden Prairie City of Minneapolis City of Minneapolis Environmental Protection

More information

Tempe Streetcar. March 2, 2016

Tempe Streetcar. March 2, 2016 Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use

More information

Business Advisory Committee. November 3, 2015

Business Advisory Committee. November 3, 2015 Business Advisory Committee November 3, 2015 1 Today s Topics DEIS Cost Estimate 2 Assumptions Revised Cost Estimate Revised Project Scope Cost Estimate Overview Position Statement Discussion Municipal

More information

SOUTHWEST TRANSIT SEPTEMBER 2017 RIDER SURVEY. 1. What city do you live in? 2. How many years have you been a rider on SWT?

SOUTHWEST TRANSIT SEPTEMBER 2017 RIDER SURVEY. 1. What city do you live in? 2. How many years have you been a rider on SWT? SOUTHWEST TRANSIT TOTAL # OF 2017 SURVEY PARTICIPANTS SEPTEMBER 2017 RIDER SURVEY 1313 1. What city do you live in? Eden Prairie 573 43.74% Richfield 3 0.23% Chaska 218 16.64% St. Bonifacius 3 0.23% Chanhassen

More information

Chapter 2. Description of the Regional Transit System

Chapter 2. Description of the Regional Transit System Chapter 2. Description of the Regional Transit System Characteristics of the Transit System There are currently five modes of public transit service in the Twin Cities area: commuter rail service, light-rail

More information

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016 RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016 Overview The following requirements outline the guidelines for designers and project delivery teams in the planning, design and infrastructure requirements

More information

Chapter 4 : THEME 2. Transportation

Chapter 4 : THEME 2. Transportation Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,

More information

GODURHAM PROGRESS REPORT

GODURHAM PROGRESS REPORT GODURHAM PROGRESS REPORT OVERVIEW OPERATIONS & PERFORMANCE With the service enhancements, total revenue hours increased In 2016, GoDurham connected 5.9 million passengers to jobs, education and health

More information

PARKING. VA NWIHCS Employee Parking Changes Beginning April 2, 2018

PARKING. VA NWIHCS Employee Parking Changes Beginning April 2, 2018 OMAHA VA CAMPUS PARKING page 2 OFF-SITE PARKING page 3 Lot and Shuttle Center Mall VA NWIHCS Employee Changes Beginning April 2, 2018 For the most up to date information, click on the Button on the NWIHCS

More information

AIRPORT MODERNIZATION PLAN SUMMARY

AIRPORT MODERNIZATION PLAN SUMMARY AIRPORT MODERNIZATION PLAN SUMMARY New Passenger Concourse A new passenger concourse has been designed to accommodate the Airport s 3 million plus passengers. Amenities include a new state-of-the-art consolidated

More information

Navigating in Different Rivers

Navigating in Different Rivers Navigating in Different Rivers Suburban TOD Julie Jones, Planning Manager, City of Fridley Julie Farnham, Senior Planner, City of Bloomington Kersten Elverum, Director of Planning & Development, City of

More information

City of Des Moines. Operating Budget & Governmental CIP. January 22, 2018

City of Des Moines. Operating Budget & Governmental CIP. January 22, 2018 City of Des Moines Operating Budget & Governmental CIP January 22, 2018 Preliminary FY2019 Total Budget by Fund Operating Budget General & Road Use Tax Funds General Fund Budget General Fund Source & Use

More information

I-225 Rail Line 2 nd /Abilene Station Design Public Meeting

I-225 Rail Line 2 nd /Abilene Station Design Public Meeting I-225 Rail Line 2 nd /Abilene Station Design Public Meeting Jan. 29, 2014 FasTracks and I-225 Rail Line Update Chuck Culig I-225 Rail Line Project Manager 2 The RTD FasTracks Plan 122 miles of rail 18

More information

Management Committee. Information Item

Management Committee. Information Item Information Item Management Committee Meeting date: Wednesday, August 26, 2015 Subject: Summary of Second Quarter 2015 Procurements District(s), Member(s): All Policy/Legal Reference: Council Policy 3-3

More information

2008 Max Vehicles in Service: 1,475 Total

2008 Max Vehicles in Service: 1,475 Total Chapter 8. Capital Resources This chapter looks at five transit capital resource categories: (1) vehicles operated during peak periods, (2) support facilities, (3) park-and-ride facilities, (4) technology

More information

Background Information for MPRB Community Advisory Committee for 2010 Southwest Light Rail Transit Project DEIS Comment Letter Section 2

Background Information for MPRB Community Advisory Committee for 2010 Southwest Light Rail Transit Project DEIS Comment Letter Section 2 Background Information for MPRB Community Advisory Committee for 2010 Southwest Light Rail Transit Project DEIS Comment Letter Section 2 1 2. SW LRT Corridor Overview Source: http://www.southwesttransitway.org/home.html

More information