Timber Sale Appraisal Family Camp 2 Sale NC
|
|
- Melvyn Fletcher
- 6 years ago
- Views:
Transcription
1 Timber Sale Appraisal Family Camp 2 Sale NC District: N Cascade Date: November 21, 2017 Cost Summary Conifer Hardwood Gross Timber Sale Value $1,142, $0.00 $1,142, Project Work: ($162,400.00) Advertised Value: $980, /04/17 1
2 Timber Sale Appraisal Family Camp 2 Sale NC District: N Cascade Date: November 21, 2017 Timber Description Location: Portions of Section 30, T7S, R3E, W.M. Clackamas County, OR Stand Stocking: 40% Specie Name AvgDBH Amortization (%) Recovery (%) Douglas - Fir Western Hemlock / Fir Volume by Grade 2S 3S 3S 12"+ 4S Douglas - Fir 1, ,794 Western Hemlock / Fir , ,226 12/04/17 2
3 Comments: Pond Values Used: Local Pond Values, September Western redcedar and Other Cedars Stumpage Price = Pond Value minus Logging Cost: $1,325.16/MBF = $1,528.75/MBF - $203.59/MBF Red Alder Stumpage Price = Pond Value minus Logging Cost: $495.71/MBF = $699.30/MBF - $203.59/MBF Maple and Other Hardwoods Stumpage Price = Pond Value minus Logging Cost: $279.34/MBF = $482.93/MBF - $203.59/MBF SCALING COST ALLOWANCE = $5.00/MBF BRANDING AND PAINTING COST ALLOWANCE = $2.00/MBF FUEL COST ALLOWANCE = $3.00/Gallon HAULING COST ALLOWANCE Hauling costs equivalent to $900 daily truck cost. Other Costs (with Profit & Risk to be added): Season 1 Equipment Move-In: Accounted for in Logging Cost Season 1 Equipment Weed Wash: (($120.00/hr loaded transport) + ($22.00/hr X 2 pilots per piece of equipment)) X 2.5 hour wash time = $ X 3 pieces of equipment = $1,230 Season 2 Equipment Move-In: (($120.00/hr loaded transport) + ($22.00/hr x 2 pilots per piece of equipment)) X 4 hour Move-In Cycle = $ X 3 pieces of equipment = $1,968 Season 2 Equipment Weed Wash: (($120.00/hr loaded transport) + ($22.00/hr X 2 pilots per piece of equipment)) X 2.5 hour wash time = $ X 3 pieces of equipment = $1,230 TOTAL Other Costs (with Profit & Risk to be added) = $4, Other Costs (No Profit & Risk added): None. SLASH DISPOSAL COSTS In-Unit Piling: $250/acre x 58 acres = $14,500 Move-In: (($120/hr loaded transport) + ($22/hr x 2 pilots)) X 4 hour Move-In Cycle = $656 X 1 Excavator = $656 Equipment Weed Wash: (($120/hr loaded transport) + ($22/hr X 2 pilot/wash personnel)) X 2.5 hour wash time = $355 X 1 Excavator = $410 Covering Piles: ($8.80/pile x 232 piles) + ($22/hr x 2 covering personnel x 20 hours) = $2, TOTAL Slash Disposal Costs = $18,488 ROAD MAINTENANCE COSTS Move-In: $120/hr loaded transport X 4 hour Move-In Cycle = $480 X 1 Grader = $480 General Road Maintenance: 1.4 miles X $1,100/mile = $1,540 TOTAL Road Maintenance Costs = $2,020/2,226 MBF = $0.91/MBF 12/04/17 3
4 Timber Sale Appraisal Family Camp 2 Sale NC District: N Cascade Date: November 21, 2017 Logging Conditions Combination#: 1 Douglas - Fir % Western Hemlock / Fir % Logging System: Shovel Process: Feller Buncher yarding distance: Medium (800 ft) downhill yarding: No tree size: Mature / Regen Cut (900 Bft/tree), 3-5 logs/mbf loads / day: 8 bd. ft / load: 4600 cost / mbf: $96.14 machines: Feller Buncher w/ Delimber 12/04/17 4
5 Timber Sale Appraisal Family Camp 2 Sale NC District: N Cascade Date: November 21, 2017 Logging Costs Operating Seasons: 2.00 Profit Risk: 8% Project Costs: $162, Other Costs (P/R): $4, Slash Disposal: $18, Other Costs: $0.00 Miles of Road Road Maintenance: $0.91 Dirt Rock (Contractor) Rock (State) Paved Hauling Costs Species $ / MBF Trips/Day MBF / Load Douglas - Fir $ Western Hemlock / Fir $ /04/17 5
6 Timber Sale Appraisal Family Camp 2 Sale NC District: N Cascade Date: November 21, 2017 Logging Road Maint Douglas - Fir Fire Protect Hauling Logging Costs Breakdown Other P/R appl Profit & Risk Slash Disposal Scaling / Brand & Paint Other $96.14 $0.98 $3.94 $71.28 $1.99 $13.95 $8.31 $7.00 $0.00 $ Western Hemlock / Fir $96.14 $0.98 $3.94 $71.28 $1.99 $13.95 $8.31 $7.00 $0.00 $ Specie Amortization Pond Value Stumpage Amortized Douglas - Fir $0.00 $ $ $0.00 Western Hemlock / Fir $0.00 $ $ $ /04/17 6
7 Timber Sale Appraisal Family Camp 2 Sale NC District: N Cascade Date: November 21, 2017 Summary Amortized Specie MBF Value Douglas - Fir 0 $0.00 $0.00 Western Hemlock / Fir 0 $0.00 $0.00 Unamortized Specie MBF Value Douglas - Fir 1,794 $ $977, Western Hemlock / Fir 432 $ $164, Gross Timber Sale Value Recovery: $1,142, Prepared By: Spencer Mitchell Phone: /04/17 7
8 TIMBER SALE SUMMARY Family Camp 2 Contract No Location: Portions of Sections 30, T7S, R3E, W.M., Clackamas County, Oregon. 2. Type of Sale: This timber sale is a 56 acre Modified clear cut with 2 acre of right-of-way. The timber will be sold on a recovery basis at a sealed bid auction. 3. Revenue Distribution: 100% BOF, Clackamas County 4. Sale Acreage: Acres are net of stream buffers and road prisms. Acreage was determined using ESRI ArcMap GIS software. 5. Cruise: The Timber Sale was cruised by O Cruisers in August of For more information see Cruise Report. 6. Timber Description: The Timber Sale Area consists of a medium to well stocked 86 year old Douglas-fir western hemlock stand. The average Douglas-fir DBH is 25 The average western hemlock DBH is 18. The total estimated net per acre Douglas-fir volume is 31 MBF. 7. Volume Summary: See attached document (Timber Sale Notice). 8. Topography and Logging Method: The average elevation for the Timber Sale is 2,800 feet. Slopes within the sale areas range from 5% to 30% and are a North aspect. The Timber Sale Area is 100% ground-based yarding. The average horizontal tractor yarding distance is approximately 600 feet and the maximum is approximately 800 feet. 9. Access: From the town of Scotts Mills, Oregon, continue East over Nowlens Bridge and take an immediate right on Maple Grove Road. Continue on Maple Grove Road for approximately 4.4 miles, and then turn right to continue on Maple Grove Road. Follow Maple Grove Road for approximately 3.0 miles, then turn right on Sawtell Road. Continue on Sawtell Road for approximately 5.2 miles where the road turns to gravel. Continue on Sawtell Road (Also commonly known as Family Camp Road) for approximately 3.2 miles. Stay left to start up the Butte Creek Mainline. Follow the Butte Creek Mainline for approximately.4 miles to the Timber sale area (left side of road). 10. Projects: Project No. 1: Road Construction Project No. 2: Road Improvement Project No. 3: Stockpile Rock Project No. 4: Roadside Brushing $63, $18, $63, $14, Credit for all Projects (rounded) $162, Family Camp Page 1 of 1
9 SUMMARY OF ROAD COSTS FAMILY CAMP 2 TIMBER SALE ROAD CONSTRUCTION: Segments A to A1 B to B2 B3 to B4 C to C1 s Project No. 1 Rocking Length 2"-0 (Culverts) 2"-0 (Roads) 6"-0 Jaw Run Pit Run Construct $ cy 46 cy 133 cy 3 cy $ 6, cy 319 cy 1,086 cy 6 cy $ 38, cy 236 cy $ 6, cy 63 cy 277 cy 3 cy $ 10, cy 477 cy 1,732 cy 12 cy $ 61, EQUIPMENT MOVE IN: $ 4, miles = 0.44 Project No. 1 $ 66, Project No. 2 ROAD IMPROVEMENT: (9-Mile on the BC500 Road) Rocking Segments Length 2"-0 culverts 2"-0 Large Rip Rap Pit Run D to D cy 306 cy 205 cy 6 cy $ 17, s cy 306 cy 205 cy 6 cy EQUIPMENT MOVE THE ROAD: $ 1, miles = 0.13 Project No. 2 $ 18, STOCKPILE ROCK: Stockpile at pit Stockpile at pit Project No Rock Pit Push/Pile Crush only cost 2"-0 Crushed 3,049 cy $ 1.28 $ $42, "-0 Jaw Run 1,768 cy $ 1.28 $ $20, Project No. 3 $63, ROADSIDE BRUSHING: Miles (see Exhibit A Brushing Map) 10.2 Project No. 4 Ave $ per mile Sub-total Costs Move in Cost $ 1, $ 13, $ $ 14, Project No. 4 $ 14, ROCK TOTALS: Quarry Site Stockpile at 720 Pit Roads Culvert Bedding TOTAL ROCK TO CRUSH Rock sizes 2"-0 Crushed 6"-0 Jaw Run Riprap Pit-run 3,049 cy 1,768 cy 783 cy 1,732 cy 205 cy 144 cy 18 cy 3,976 cy 3,500 cy 205 cy 18 cy GRAND TOTAL $ 162, TOTAL CONTRACT CREDIT AMOUNT $ 162, % = $ 32, James Stuart 11/28/2017
10 MOVE-IN COSTS Family Camp 2 (Project Roads) Equipment Hourly rate On site Hrs Cost Lowboy Weedwash Weedwash No. Description per machine to move Cost Time $65/hr Cost 1 Grader $ $ - $ $ $ 1, Rollers & Compactor $ $ - $ $ $ Excavator $ $ - $ $ $ 1, Small backhoe $ $ - $ $ $ - Tractors (D5 - D8) $ $ - $ $ $ - 1 Dump Truck (10 cy +) $ $ - $ $ - $ Loader $ $ - $ $ $ 1, Water Truck (1000 gallon) $ $ - $ $ - $ s $ - $ 4, TOTAL MOVE-IN COSTS ONE TIME = $ 4, James Stuart 11/28/2017
11 MOVE-IN COSTS Family Camp 2 (BC500 Road Repair) Equipment Hourly rate Est Hrs Cost Lowboy Weed No. Description per machine to move to move Cost Wash Cost 1 Grader $ $ $ - $ - motor to site 1 Rollers & Compactor $ $ 0.50 $ $ - $ - motor to site 1 Excavator $ $ 1.00 $ - $ 600 $ - $ Small backhoe $ $ 0.25 $ $ - $ - motor to site Tractors (D5 - D8) $ $ 0.50 $ - $ 600 $ - $ Dump Truck (10 cy +) $ $ 0.25 $ $ - $ - motor to site 1 Loader $ $ 0.25 $ $ - $ - motor to site 1 Water Truck (1000 gallon) $ $ 0.25 $ $ - $ - motor to site s $ $ 1, TOTAL MOVE-IN COSTS ONE TIME = $ 1, James Stuart 11/28/2017
12 PROJECT NO. 1 ROAD - NEW CONSTRUCTION COSTS Sale: Family Camp 2 Road Segment: A to A1 NEW CONSTRUCTION: Construct (includes grubbing & logging) Landing Tailtrack Landing Construction Turnarounds End Haul/Push Turnouts 2-way Junction Culvert bedding Designed Cubic Yards/Station Cost per Pit Run 2"-0 6"-0 Jaw Run Station or Acre Sum $ cy 67 cy $ $ $ - $ - 1 $ $ $ - $ - $ - $ - $ - $ cy 12 cy $ $ cy 24 cy SUB-TOTAL $ 1, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 1-18" x 40' cpp $ $ - 1 $ $ $ $ 1, $ - $ - 0 $ - $ - $ - $ - 0 $ - $ - 0 $ - $ - $ - $ - cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Seed/mulch (average 2-bales per site/pipe) 1 $ $ $ $ Install 6' long steel "T" posts on culverts 1 $ 8.50 $ 8.50 $ $ Install outlet dissipator 1 $ $ SUB-TOTAL $ 1, SURFACING: Turn Two-way Culvert Turn Dissipator Haul & Crush Roads Tailtrack Roads Arounds Junctions Bedding Outs (cy/pipe) Cubic Yards Combined $ Cost 2"-0 34 cy 12 cy 24 cy 70 cy $ $ 1, "-0 Jaw Run 121 cy 12 cy 133 cy $ $ 2, Riprap (8"- 24") $ 9.20 $ - Pit-run 6"+ 3 cy 3 cy $ 9.20 $ SUB-TOTAL $ 3, GRAND TOTAL = $ 6, James Stuart 11/28/2017
13 PROJECT NO. 1 ROAD - NEW CONSTRUCTION COSTS Sale: Family Camp 2 Road Segment: B to B2 NEW CONSTRUCTION: Construct (includes grubbing & logging Landing Tailtrack Landing Construction Turnarounds End Haul/Push Turnouts 2-way Junction Culvert bedding Designed Cubic Yards/Station Cost per Pit Run 2"-0 6"-0 Jaw Run Station or Acre Sum $ cy 54 cy $ $ 9, cy $ $ $ $ $ - $ - $ - $ - $ - $ cy 12 cy $ $ cy 24 cy SUB-TOTAL $ 10, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 1-18" x 40' cpp $ $ - 1 $ $ $ $ 1, " x 30' cpp $ $ - 0 $ - $ $ $ 1, $ - $ - 0 $ - $ - $ - $ - cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Seed/mulch (average 2-bales per site/pipe) 2 $ $ $ $ Install 6' long steel "T" posts on culverts 2 $ 8.50 $ $ $ Install outlet dissipator 2 $ $ SUB-TOTAL $ 3, SURFACING: Turn Two-way Culvert Turn Dissipator Haul & Crush Roads Tailtrack Roads Arounds Junctions Bedding Outs (cy/pipe) Cubic Yards Combined $ Cost 2" cy 12 cy 48 cy 367 cy $ $ 6, "-0 Jaw Run 100 cy 974 cy 12 cy 1,086 cy $ $ 17, Riprap (8"- 24") $ 9.20 $ - Pit-run 6"+ 6 cy 6 cy $ 9.20 $ SUB-TOTAL $ 24, GRAND TOTAL = $ 38, James Stuart 11/28/2017
14 PROJECT NO. 1 ROAD - NEW CONSTRUCTION COSTS Sale: Family Camp 2 Road Segment: B3 to B4 NEW CONSTRUCTION: Construct (includes grubbing & logging) Landing Tailtrack Landing Construction Turnarounds End Haul/Push Turnouts 2-way Junction Culvert bedding Designed Cubic Yards/Station Cost per Pit Run 2"-0 6"-0 Jaw Run Station or Acre Sum $ cy 54 cy $ $ 1, cy $ $ $ $ $ - $ - $ - $ - $ - $ cy 12 cy $ $ SUB-TOTAL $ 2, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 0 $ - $ - 0 $ - $ - $ - $ - 0 $ - $ - 0 $ - $ - $ - $ - 0 $ - $ - 0 $ - $ - $ - $ - cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Seed/mulch (average 2-bales per site/pipe) 0 $ $ - $ - $ - Install 6' long steel "T" posts on culverts 0 $ 8.50 $ - $ - $ - Install outlet dissipator 0 $ $ - SUB-TOTAL $ - SURFACING: Turn Two-way Culvert Turn Dissipator Haul & Crush Roads Tailtrack Roads Arounds Junctions Bedding Outs (cy/pipe) Cubic Yards Combined $ Cost 2"-0 38 cy 12 cy 50 cy $ $ "-0 Jaw Run 50 cy 174 cy 12 cy 236 cy $ $ 3, Riprap (8"- 24") $ 9.20 $ - Pit-run 6"+ $ 9.20 $ - SUB-TOTAL $ 4, GRAND TOTAL = $ 6, James Stuart 11/28/2017
15 PROJECT NO. 1 ROAD - NEW CONSTRUCTION COSTS Sale: Family Camp 2 Road Segment: C to C1 NEW CONSTRUCTION: Construct (includes grubbing & logging) Landing Tailtrack Landing Construction Turnarounds End Haul/Push Turnouts 2-way Junction Culvert bedding Designed Cubic Yards/Station Cost per Pit Run 2"-0 6"-0 Jaw Run Station or Acre Sum $ cy 54 cy $ $ 1, cy $ $ $ $ $ - $ - $ - $ - $ - $ cy 12 cy $ $ cy 24 cy SUB-TOTAL $ 2, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 1-18 x 40' cpp $ $ - 1 $ $ $ $ 1, $ - $ - 0 $ - $ - $ - $ - 0 $ - $ - 0 $ - $ - $ - $ - cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Seed/mulch (average 2-bales per site/pipe) 1 $ $ $ $ Install 6' long steel "T" posts on culverts 1 $ 8.50 $ 8.50 $ $ Install outlet dissipator 1 $ $ SUB-TOTAL $ 1, SURFACING: Turn Two-way Culvert Turn Dissipator Haul & Crush Roads Tailtrack Roads Arounds Junctions Bedding Outs (cy/pipe) Cubic Yards Combined $ Cost 2"-0 51 cy 12 cy 24 cy 87 cy $ $ 1, "-0 Jaw Run 50 cy 215 cy 12 cy 277 cy $ $ 4, Riprap (8"- 24") Pit-run 3 cy 3 cy $ 9.20 $ SUB-TOTAL $ 6, GRAND TOTAL = $ 10, James Stuart 11/28/2017
16 PROJECT NO. 2 ROAD - IMPROVEMENT COSTS Sale: Family Camp 2 Road Segment: D to D1 (BC500 road repair) NEW CONSTRUCTION: Designed Cubic Yards/Station Cost per Riprap 2"-0 Pit Run Soil Station or Acre Sum $ Reconstruct cy $ $ Construct riprap wall cy $ 1, $ 1, Waste Area #1 (40' x 25') 1 $ $ End Haul organic material 200 cy $ 4.64 $ Culvert Bedding 2 24 cy 3 cy SUB-TOTAL $ 3, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 2-24" x 40' cpp $ 2, $ $ $ 2, $ 1, $ 4, cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Seed/mulch (average 2-bales per site/pipe) 2 $ $ $ $ Install 6' long steel "T" posts on culverts 2 $ 8.50 $ $ $ Remove old culverts off State property 2 $ $ Install outlet dissipator 2 $ $ SUB-TOTAL $ 4, SURFACING: Retaining Turn Two-way Culvert Turn Dissipator Haul & Crush Roads Wall Roads Arounds Junctions Bedding Outs (cy/pipe) Cubic Yards Combined $ Cost 2" cy 48 cy 354 cy $ $ 7, "-0 JawRun $ $ - Riprap (8"- 24") 205 cy 205 cy $ 5.48 $ 1, Pit-run 6 cy 6 cy $ 5.24 $ SUB-TOTAL $ 9, GRAND TOTAL = $ 17, James Stuart 11/28/2017
17 Family Camp 2 Pit Name: Butte Creek 720 Pit 2"-0 Crushed only $/cu.yd.==> $ Swell: 1.30 Shrinkage/Compact: 1.16 Drill Pct.: 100% Truck measure 3,976 cy Oversize Pct.: 10% Scalp & Clear Overburden: $ /hr x 4 hrs = $ Drill & Shoot: $ 3.00 /cy x 3,976 cy = $ 11, Sort Oversize: $ 3.75 /cy x 398 cy = $ 1, Load Crusher: $ 1.25 /cy x 3,976 cy = $ 4, Crushing $ 2.50 /cy x 3,976 cy = $ 9, Screening Rock $ 2.30 /cy x 3,976 cy = $ 9, Load Dump Truck: $ 0.90 /cy x 3,976 cy = $ 3, Clean Up Pit $ /hr x 8 hrs = $ 2, Subtotal $ 43, MOVE IN COSTS 3-stage crusher $ 3, $ 3, Move in and set up Drill and Compressor $ 1, $ 1, Move in D-8 (1) $ $ Move in Loaders (1) $ $ Move in Excavator (1) $ $ Move in Trucks (1) $ $ Gradation Tests $ per 3,976 cy = $ Subtotal $ 6, "-0 Jaw Run $/cu.yd.==> $ ESTIMATED TOTAL COST $ 50, Swell: 1.30 Shrinkage/Compact: 1.16 Drill Pct.: 100% Truck measure 3,500 cy Oversize Pct.: 10% Scalp & Clear Overburden: $ /hr x 4 hrs = $ Drill & Shoot: $ 3.00 /cy x 3,500 cy = $10, Sort Oversize: $ 3.75 /cy x 350 cy = $1, Load Crusher: $ 1.25 /cy x 3,500 cy = $4, Crushing $ 2.50 /cy x 3,500 cy = $8, Screening Rock $ 2.30 /cy x 3,500 cy = $8, Load Dump Truck: $ 0.90 /cy x 3,500 cy = $3, Subtotal $36, Riprap & Pit-run $/cu.yd.==> $ 3.28 ESTIMATED TOTAL COST $36, Truck measure 12 cy Rip and Develop $ 2.00 /cy x 12 cy = $24.00 Sort Oversize: $ 3.75 /cy x 1 cy = $4.50 Load Dump Truck: $ 0.90 /cy x 12 cy = $10.80 Subtotal $39.30 ESTIMATED TOTAL COST $39.30 GRAND TOTAL FOR CRUSHING $87, James Stuart 11/28/2017
18 Family Camp 2 (Sale Name) Rates BC720 Pit (Quarry) BC720 (Stockpile) Spread Dump Truck Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) Crushed (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B20 $ $ $ "-0 (Rock Size) 14G (Loader) D8 (Tractor) D10 $ $ $ gal (Water Truck Size) OH25 $ $ $ Hauling Time Computation Grader Rate ($/Hr.) Operator ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ MPH Miles per round trip 0 Minutes Compaction Equipment Rate ($/Hr.) Operator ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH 5 Miles per round trip 12 Minutes Vib. Grid Roller $ $ $ MPH Miles per round trip 0 Minutes Hand Held Compactor $ $ $ MPH 0.8 Miles per round trip 3 Minutes Tractors Rate ($/Hr.) Operator ($/Hr.) 10 MPH 0 Miles per round trip 0 Minutes D4 $ $ $ MPH 0.3 Miles per round trip 4 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 19 Minutes Operator Efficiency Correction (80% Efficiency) 24 Minutes Loader Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) 14G Cat Wheel Loader $ $ $ Time Per Cubic Yard Rate (Min/Load) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) 1.98 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 2.51 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 3.55 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour $ per Hr. Cost of Grader Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Grade and Roll $ 1.42 Cu. Yd. Cost to Load, Haul and Place Cost to Crush Grand Combined $ 5.93 Cu. Yd. $ $ James Stuart 11/28/2017
19 Family Camp 2 (Sale Name) Rates BC 720 Pit (Quarry) BC 720 (Stockpile) Spread Dump Truck Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) Jaw Run (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B20 $ $ $ " (Rock Size) 14G (Loader) D8 (Tractor) D10 $ $ $ gal (Water Truck Size) OH25 $ $ $ Hauling Time Computation Grader Rate ($/Hr.) Operator ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ MPH Miles per round trip 0 Minutes Compaction Equipment Rate ($/Hr.) Operator ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH 5 Miles per round trip 12 Minutes Vib. Grid Roller $ $ $ MPH Miles per round trip 0 Minutes Hand Held Compactor $ $ $ MPH 0.8 Miles per round trip 3 Minutes Tractors Rate ($/Hr.) Operator ($/Hr.) 10 MPH 0 Miles per round trip 0 Minutes D4 $ $ $ MPH 0.3 Miles per round trip 4 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 19 Minutes Operator Efficiency Correction (80% Efficiency) 24 Minutes Loader Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) 14G Cat Wheel Loader $ $ $ Time Per Cubic Yard Rate (Min/Load) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) 1.98 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 2.51 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 3.55 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour $ per Hr. Cost of Grader Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Grade and Roll $ 1.42 Cu. Yd. Cost to Load, Haul and Place Cost to Crush Grand Combined $ 5.93 Cu. Yd. $ $ James Stuart 11/28/2017
20 Family Camp 2 (Sale Name) Rates BC 720 Pit (Quarry) BC 720 (Stockpile) Spread Dump Truck Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) Pit-Run (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B20 $ $ $ "+ (Rock Size) 14G (Loader) D8 (Tractor) D10 $ $ $ OH25 $ $ $ Hauling Time Computation Grader Rate ($/Hr.) Operator ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ MPH Miles per round trip 0 Minutes Compaction Equipment Rate ($/Hr.) Operator ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH 5 Miles per round trip 12 Minutes Vib. Grid Roller $ $ $ MPH Miles per round trip 0 Minutes Hand Held Compactor $ $ $ MPH 0.8 Miles per round trip 3 Minutes Tractors Rate ($/Hr.) Operator ($/Hr.) 10 MPH 0 Miles per round trip 0 Minutes D4 $ $ $ MPH 0.3 Miles per round trip 4 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 19 Minutes Operator Efficiency Correction (80% Efficiency) 24 Minutes Loader Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) 14G Cat Wheel Loader $ $ $ Time Per Cubic Yard Rate (Min/Load) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) 1.98 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 2.51 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 3.55 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour $ per Hr. Cost of Grader Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Grade and Roll $ 1.42 Cu. Yd. Cost to Load, Haul and Place Cost to Crush Grand Combined $ 5.93 Cu. Yd. $ 3.28 $ 9.20 James Stuart 11/28/2017
21 Family Camp 2 (Sale Name) Rates BC720 Pit (Quarry) BC720 (Stockpile) Spread Dump Truck Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) Crushed (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B20 $ $ $ "-0 (Rock Size) 14G (Loader) D8 (Tractor) D10 $ $ $ gal (Water Truck Size) OH25 $ $ $ Hauling Time Computation Grader Rate ($/Hr.) Operator ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ MPH Miles per round trip 0 Minutes Compaction Equipment Rate ($/Hr.) Operator ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH 12 Miles per round trip 29 Minutes Vib. Grid Roller $ $ $ MPH Miles per round trip 0 Minutes Hand Held Compactor $ $ $ MPH 2 Miles per round trip 8 Minutes Tractors Rate ($/Hr.) Operator ($/Hr.) 10 MPH 0 Miles per round trip 0 Minutes D4 $ $ $ MPH 0.6 Miles per round trip 7 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 44 Minutes Operator Efficiency Correction (80% Efficiency) 55 Minutes Loader Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) 14G Cat Wheel Loader $ $ $ Time Per Cubic Yard Rate (Min/Load) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) 4.61 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 5.13 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 7.27 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour $ per Hr. Cost of Grader Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Grade and Roll $ 1.42 Cu. Yd. Cost to Load, Haul and Place Cost to Crush Grand Combined $ 9.65 Cu. Yd. $ $ Haul from the BC720 Pit to the BC500 9-mile James Stuart 11/28/2017
22 Family Camp 2 (Sale Name) Yards End Hauled: cy Rates On site EndHual To nearest waste area Spread and Compact Dump Truck Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) Waste (Type) D10 (Truck) D6 (Grader) Vibratory Roller (Compactor) B20 $ $ $ (Rock Size) (Loader) Cat 325 Excavator (Excavator) D10 $ $ $ (Water Truck Size) Gal/cu.yd OH25 $ $ $ Hauling Time Computation Grader Rate ($/Hr.) Operator ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ MPH Miles per round trip 0 Minutes Compaction Equipment Rate ($/Hr.) Operator ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH Miles per round trip 0 Minutes Vib. Grid Roller $ $ $ MPH Miles per round trip 0 Minutes Hand Held Compactor $ $ $ MPH 0 Miles per round trip 0 Minutes Tractors Rate ($/Hr.) Operator ($/Hr.) 10 MPH 0.2 Miles per round trip 1 Minutes D4 $ $ $ MPH 0.1 Miles per round trip 1 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 2.65 Minutes Time Per Cubic Yard Operator Efficiency Correction (80% Efficiency) 3.31 Minutes Loader Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) 14G Cat Wheel Loader $ $ $ Cat 325 Excavator $ $ $ Hauling Only (per cubic yard) 0.28 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 0.80 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Rate (Min/Load) Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 1.13 per Cu. Yd. Spreading w/dozer 5 Loading Cost Per Cubic Yard $ 1.56 per Cu. Yd. Place with Excavator 6 Spreading Cost Per Cubic Yard Cost of Excavator Per Hour $ per Hr. Cost of Excavator Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Place and Compact $ 1.94 Cu. Yd. Cost to Load, Haul, and Place $ 4.64 Cu. Yd. Delay (Min) Loading Time (Min) James Stuart 11/28/2017
23 Family Camp 2 (BC500 Repair) (Sale Name) BC 510 Rate Capacity Operator Dump Truck (Quarry) BC 510 (Stockpile) Spread ($/Hr.) (cy) ($/Hr.) Pit Run (Rock Type) D10 (Truck) 12-G (Grader) Vibratory R (Compactor) B20 $ $ $ "+ (Rock Size) 14G (Loader) D8 (Tractor) D10 $ $ $ (Water Truck Size) OH25 $ $ $ Rate Operator Grader Hauling Time Computation ($/Hr.) ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ Compaction Rate Operator 35 MPH Miles per round trip 0 Minutes Equipment ($/Hr.) ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Rolle $ $ $ MPH Miles per round trip 0 Minutes Vib. Grid Rolle $ $ $ MPH 5.6 Miles per round trip 17 Minutes Hand Held Co $ $ $ Rate Operator Tractors 15 MPH 0.7 Miles per round trip 3 Minutes ($/Hr.) ($/Hr.) 10 MPH 0 Miles per round trip 0 Minutes D4 $ $ $ MPH 0.2 Miles per round trip 2 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 22 Minutes Rate Capacity Operator Loader Operator Efficiency Correction (80% Efficiency) 28 Minutes ($/Hr.) (cy) ($/Hr.) Case 130 $ $ $ Time Per Cubic Yard 2.32 Rate (Min/Load ) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 2.84 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 4.02 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 1.22 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour $ per Hr. Cost of Grader Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Grade and Roll $ - Cu. Yd. Cost to Load, Haul and Place $ 5.24 Cu. Yd. Cost to Crush $ - Grand Combined $ 5.24 Rates
24 Family Camp 2 (BC500 Repair) (Sale Name) BC 510 Rate Capacity Operator Dump Truck (Quarry) BC 510 (Stockpile) Spread ($/Hr.) (cy) ($/Hr.) Rip Rap (Rock Type) D10 (Truck) 12-G (Grader) Vibratory R (Compactor) B20 $ $ $ " - 24" (Rock Size) 14G (Loader) D8 (Tractor) D10 $ $ $ (Water Truck Size) OH25 $ $ $ Rate Operator Grader Hauling Time Computation ($/Hr.) ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ Compaction Rate Operator 35 MPH Miles per round trip 0 Minutes Equipment ($/Hr.) ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Rolle $ $ $ MPH Miles per round trip 0 Minutes Vib. Grid Rolle $ $ $ MPH 5.6 Miles per round trip 17 Minutes Hand Held Co $ $ $ Rate Operator Tractors 15 MPH 0.7 Miles per round trip 3 Minutes ($/Hr.) ($/Hr.) 10 MPH 0 Miles per round trip 0 Minutes D4 $ $ $ MPH 0.2 Miles per round trip 2 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 22 Minutes Rate Capacity Operator Loader Operator Efficiency Correction (80% Efficiency) 28 Minutes ($/Hr.) (cy) ($/Hr.) Case 130 $ $ $ Time Per Cubic Yard 2.32 Rate (Min/Load ) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 2.84 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 4.02 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 1.46 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour $ per Hr. Cost of Grader Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Grade and Roll $ - Cu. Yd. Cost to Load, Haul and Place $ 5.48 Cu. Yd. Cost to Crush $ - Grand Combined $ 5.48 Rates
25 CRUISE REPORT Family Camp LOCATION: Portions of Section 30, T7S, R3E, W.M., Clackamas County, Oregon. 2. CRUISE DESIGN: The cruise design assumed a Coefficient of Variation of 42.4%, an average stand diameter of 25 inches, a desired sampling error of 11.5% at a 68% confidence level. Pre-cruise plots indicated that approximately 6 trees per plot could be realized with a 40 BAF prism. 3. SAMPLING METHOD: The Timber Sale Area was cruised in August of 2017 with 23 grade plots. Plots were laid out on a 4 chain x 4 chain grid. Plots falling on or near existing roads, no-harvest areas, or riparian management areas were offset 1/2 chain. 4. CRUISE RESULTS 115 trees were measured and graded producing a cumulative Net BF/ACRE sampling error of 9.0%. 5. TREE MEASUREMENT AND GRADING: All grade plot sample trees were measured and graded following Columbia River Log Scale grade rules and favoring 40 foot segments. a) Height Standards: tree heights were measured to the nearest foot. Bole heights were calculated to 25% of DBH. b) Diameter Standards: Diameters were measured outside bark at breast height to the nearest tenth of an inch. c) Form Factors were measured for each grade tree using a form point of 17 feet. 5. DATA PROCESSING a) Volumes and Statistics, Cruise, volume estimates and sampling statistics were derived from Super Ace 2008 cruise software. b) Deductions: A 8 percent volume deduction was used for Douglas-fir and a ten percent volume deduction was used for all other species to account for hidden defect and breakage. 6. Cruisers: The sale was cruised by O cruisers Mitchell and Gehrig.
26 TC PLOGSTVB Log Stock Table - MBF T09S R03E S31 Ty Project: FAMILY2 Acres Page 1 Date 9/26/2017 Time 9:24:42AM Spp S T So Gr Log Gross Def Net % Net Volume by Scaling Diameter in Inches rt de Len MBF % MBF Spc DO 2M DO 2M DO 3M DO 3M DO 3M DO 3M DO 4M DO 4M DO 4M DO 4M DO 4M s DO 2M DO 2M DO 2M 40 1, , DO 3M DO 3M DO 3M DO 3M DO 3M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO O s 1, , All Species 2, ,
27 TC PSTATS PROJECT STATISTICS PROJECT FAMILY2 PAGE DATE 1 9/26/2017 TWP RGE SC TRACT TYPE ACRES PLOTS TREES CuFt BdFt 09S 03E 31 SOUTH S W PLOTS TREES TOTAL ESTIMATED PERCENT TREES TOTAL SAMPLE PER PLOT TREES TREES CRUISE , DBH COUNT REFOREST COUNT BLANKS 100 % STAND SUMMARY SAMPLE TREES AVG BOLE REL BASAL GROSS NET GROSS NET TREES /ACRE DBH LEN DEN AREA BF/AC BF/AC CF/AC CF/AC DOUG FIR ,642 30,929 7,605 7,225 EMLOCK ,088 7,441 1,736 1,649 TOTAL ,730 38,370 9,342 8,874 CONFIDENCE LIMITS OF THE SAMPLE 68.1 TIMES OUT OF 100 THE VOLUME WILL BE WITHIN THE SAMPLE ERROR CL 68.1 SD: 1.0 DOUG FIR EMLOCK COEFF TOTAL 47.1 CL 68.1 SD: 1.0 DOUG FIR EMLOCK SAMPLE TREES - BF # OF TREES REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 44.7 CL 68.1 SD: 1.0 DOUG FIR EMLOCK SAMPLE TREES - CF # OF TREES REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 58.2 CL 68.1 SD: 1.0 DOUG FIR EMLOCK TREES/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 37.7 CL 68.1 SD: 1.0 DOUG FIR EMLOCK BASAL AREA/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 42.4 CL 68.1 SD: 1.0 DOUG FIR EMLOCK NET BF/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,369 30,929 34, ,400 7,441 9,482 COEFF TOTAL ,908 38,370 41, NET CUFT FT/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,414 7,225 8, ,202 1,649 2, ,135 8,874 9,
28 TC PSPCSTGR Species, Sort Grade - Board Foot Volumes (Project) T09S R03E S31 Ty Project: Acres FAMILY Page 1 Date 9/26/2017 Time 9:24:43AM % Percent of Net Board Foot Volume Average Log Logs S So Gr Net Bd. Ft. per Acre Log Scale Dia. Log Length Ln Dia Bd CF/ Per Spp T rt ad BdFt Def% Gross Net Net MBF Ft In Ft Lf /Acre DO 2M ,743 5, DO 3M ,980 1, DO 4M s ,088 7, DO 2M ,034 23,929 1, DO 3M ,949 4, DO 4M ,483 1, DO O ,175 1, s ,642 30,929 1, s ,730 38,370 2,
29 TC PSTNDSUM Stand Table Summary Page 1 Date: 9/26/2017 T09S R03E S31 Ty Project FAMILY2 Time: 9:24:44AM Acres Grown Year: Spc S T DBH Sample Trees FF 16' Tot Av Ht Trees/ Acre BA/ Acre Logs Acre Average Log Net Cu.Ft. Net Bd.Ft. Tons/ Acre Net Cu.Ft. Acre Net Bd.Ft. Acre Tons T o t a l s Cunits MBF , , , , , ,097 1, ,344 1, ,268 1, ,606 1, , , s ,225 30,929 12,572 4,191 1, , , , s ,649 7,441 3, s ,874 38,370 15,794 5,147 2,225
30 ' Fall Creek Fall Creek BC500 ' ' ' ' ' ' ' ' ' "J ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' "J Fall Cr ek ' ' ' ' ' 2800 ' ' ' ' ' ' ' ' ' ' ' ' ' 30 T7S R3E ' ' ' ' ' ' ' ' ' ' ' ' Butte Creek ML ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' 29 ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '' ' ' ' ' ' ' ' ' ' ' ' BC600 ' BC615 BC610 LOGGING MAP Page 1 of 2 Legend "J Survey Monuments Roads 40 ft Contours Index '' ' ' ' '' ' ' Intermediate Timber Sale Boundary GTR New Construct Ground Based Logging Santiam State Forest Streams Fish Nonfish Unknown FOR TIMBER SALE CONTRACT # FAMILY CAMP 2 PORTIONS OF SECTIONS 30, T7S, R3E, W.M. CLACKAMAS COUNTY, OREGON North Cascade District GIS September, 2017 This product is for informational use and may not be suitable for legal, engineering, or surveying purposes. 1:6,000 1 inch = 500 feet ,000 Feet ³ APPROXIMATE NET ACRES AREA 1 AREA 2 TOTAL ACRES (MC) ACRES (R/W) ACRES Map Projection: Oregon Statewide Lambert International Feet, NAD 1983
Timber Sale Appraisal Green 30 Sale NC
Timber Sale Appraisal Green 30 Sale NC-314-2018-71- District: N Cascade Date: December 21, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $1,214,074.40 $0.00 $1,214,074.40 Project Work:
More informationTimber Sale Appraisal Tom Rock Top Sale NC
Timber Sale Appraisal Tom Rock Top Sale NC-341-2019-42- District: N Cascade Date: April 30, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value 2,097,998.56 0.00 2,097,998.56 Project Work:
More informationTimber Sale Appraisal Gravy Train Sale NC
Timber Sale Appraisal Gravy Train Sale NC-341-2018-106- District: N Cascade Date: March 01, 2018 Cost Summary Conifer Hardwood Gross Timber Sale Value $2,308,145.73 $0.00 $2,308,145.73 Project Work: ($243,600.00)
More informationTimber Sale Appraisal Goat Shot Sale WO
Timber Sale Appraisal Goat Shot Sale WO-341-2017-61- District: West Oregon Date: April 10, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $959,801.40 $20,973.11 $980,774.51 Project Work:
More informationTimber Sale Appraisal Lost Hills Sale TL
Timber Sale Appraisal Lost Hills Sale TL-341-2018-102- District: Tillamook Date: February 12, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $481,882.53 $1,152,019.33 $1,633,901.86 Project
More informationTimber Sale Appraisal Franken Fir Sale TL
Timber Sale Appraisal Franken Fir Sale TL-341-2018-103- istrict: Tillamook ate: March 27, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $2,281,800.64 $310,478.32 $2,592,278.96 Project
More informationhttp://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-102-1.pdf http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-63-1.pdf. COST ESTIMATE FOR PACIFICA QUARRY
More informationThis publication is a supplement to Oregon
Tarif Access Tables: A Comprehensive Set EC 1609 April 2013 Steve Bowers, Jim Reeb, and Bob Parker This publication is a supplement to Oregon State University Extension publication EM 9058, Measuring Your
More informationPLEASE NOTE: BATCH TRUCK
Material Prices Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete 1-2 / 2-3 clear $18.00 $30.00
More information6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.
PROJECT 2506; 2017 ANNUAL REPAIR CONTRACT; J.C. DILLON, INC., CONTRACTED SCHEDULE OF ITEMS, QUANTITIES AND COSTS 1 Hour Lowboy Including Both Permits and Paid Driver $75.00 2 Hour Single Axle Dump Truck
More information158 PURDUE ENGINEERING EXTENSION DEPARTMENT
158 PURDUE ENGINEERING EXTENSION DEPARTMENT repaired. With regular maintenance and a small amount of stone added each year, these roads have held up much better than we anticipated. The cost of this type
More informationWoodland owners routinely want to measure property acreage,
FOREST MEASUREMENT EC 1129 Revised April 2004 $2.00 Tools for Measuring Your Forest S. Bowers Contents The tools and how they work... 1 Angle gauge... 1 Clinometer... 2 Combination logger's tape... 2 Compass...
More informationPLEASE NOTE: BATCH TRUCK
Material Prices Portland Sand & Gravel Co. Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete
More informationB.6 Construction Equipment Utilization and Workforce
Appendix B.6 Construction ment Utilization and Workforce B.6 Construction ment Utilization and Workforce To support environmental impact assessments, a preliminary estimate was prepared for construction
More informationADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18
November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed
More informationTable C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data
Appendix C Noise Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Activity Equipment HP Wharf Demolition Landside (A) Wharf Demolition Marine (B) Sheet Pile
More informationWhatcom County Invitation to Bid Bid #17-09
Invitation to Bid NOTICE IS HEREBY GIVEN that sealed bids will be received by Purchasing at their fice in the Whatcom County Administrative Services Finance Office in Whatcom County Courthouse, 311 Grand
More information**Equipment production**
Construction operations And methods **Equipment production** The Equipment that will be covered on the exam and in this section are; Dozers Graders Scrapers Loaders Excavators Cranes(will discuss another
More informationGranite Watershed Mining EIS - Proposed Action. (Umatilla NF and Wallowa-Whitman NF)
Granite Watershed Mining EIS - Action (Umatilla NF and Wallowa-Whitman NF) Altona Belvedear Group Blue Sky/Bull Run Buffalo Group /lode / T. 10 S.- R. 35 E. Sec 03 Quartz Gulch- T. 09 S.- R. 35 E. Sec
More informationAPPENDIX E SCOPE OF WORK EXAMPLE EQUIPMENT LEASING FOR CLEARING OF DEBRIS
Note: This scope of work example may be downloaded from the U.S. Army Corps of Engineer s Internet site at: ftp://ftp.sam.usace.army.mil./pub/op/opr/scopes 1. GENERAL. SCOPE OF WORK FOR RELATED TO [NAME/NATURE
More informationNSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate
AIR EQUIPMENT & TOOLS: Compressors: Gas or Diesel, cfm @ 100 psi Gas or Diesel, cfm @ 100 psi 85-150 cfm $27,272.70 7% $1,909.09 $13.00 $130.00 151-175 cfm $34,848.45 7% $2,439.39 $13.50 $135.00 176-250
More informationAuction Ring 1 -Ramp - North Auction Theatre
Edmonton, AB, CAN - Jun 12, 2018 - Index Summary All times listed are approximate. Day 1 - Tuesday June 12 2018 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction 1-52
More informationAppendix 4-2-C Project Air Emissions Inventory
Appendix A CALPUFF and CALMET Methods and Assumptions Appendix 4-2-C Project Air Emissions Inventory C.1 Introduction For the purposes of estimating effects on air quality associated with the Project,
More informationAuction Ring 1 -Ramp - North Auction Theatre
Edmonton, AB, CAN - Oct 24, 2017 - Index Summary All times listed are approximate. Day 1 - Tuesday October 24 2017 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction
More informationWestern Land Area Programmatic Environmental Assessment. APPENDIX K: Climate
APPENDIX K: Climate Climate Prepared by: KB Environmental Sciences, Inc. December 2017 This page is left intentionally blank. Table of Contents Page 1 Introduction... 1 2 Construction... 1 2.1 On-Road
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More information2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others...
2018 Proposed Budget Table of Contents Appropriation Act. 1 Budget by Fund. 2 Michigan Transportation Funds.. 3 Work Performed for Others.... 4 Construction and Preservation... 5 Primary Construction......
More informationSPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT
SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,
More informationMTB HEAVY & MEDIUM HYDRAULIC BREAKERS
MTB PRODUCT RANGE MTB HEAVY & MEDIUM HYDRAULIC BREAKERS MORE POWER, LESS WASTE MTB Hydraulic Breakers are the result of 40 years experience in hard rock applications and difficult excavation conditions.
More informationThis appendix describes various types of equipment that can
Appendix GENERAL ENGINEER SUPPORT EQUIPMENT This appendix describes various types of equipment that can be used to support general engineer missions. This information is provided to help planners choose
More information150 Equipment. 155 HMA Surfacing and HMA Pavement Recycling Equipment For compaction equipment see section 151 b-e
150 Equipment 2/22/2010 Plate 150 Equipment 151 Compaction Equipment a Sheepsfoot Roller Data 151. 01 b Self-Propelled Pneumatic Roller Data. 02 c Two Axle Tandom Steel Roller Data. 03 d Pull-Type Steel
More informationAppendix D. Noise Calculations
Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 13 T H TO AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationTHE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA MEMORANDUM
ENC. March 1, 2011 MATERIALS MANAGEMENT DEPARTMENT 101 OLD VENICE ROAD OSPREY, FLORIDA 34229 TELEPHONE (941) 486-2183 FAX (941) 486-2188 MEMORANDUM TO: FROM: TITLE: Members of the School Board Lori White,
More informationTYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES
TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended
More informationProvince of Prince Edward Island 2017
Province of Prince Edward Island 2017 Standard Negotiated Rates A B C Trucking Rates Standard Prices - Unbid Jobs Machinery Rental Rates August 16, 2017 Department of Transportation, Infrastructure and
More informationConstruction Emissions Estimates ICTF Modernization Project Long Beach, California
Construction Emissions Estimates ICTF Modernization Project Long Beach, California prepared for: Union Pacific Railroad Company October 2007 prepared by: Sierra Research, Inc. 1801 J Street Sacramento,
More informationHIGHLANDS COUNTY PURCHASING DEPARTMENT "AWARD TABULATION OF SEALED BIDS" ITB No HEAVY EQUIPMENT RENTAL BID OPENING: FEBRUARY 23, 2012
1 Small Bulldozer (Low ground pressure type) Engine: Linder Industrial Machinery Komatsu D31PX-22 $1,000.00 $3,000.00 $1,000.00 Diesel 80 H.P.. Min. Neff Rental Inc. John Deere 450J LGP $1,100.00 $3,100.00
More informationH.1 Construction Emissions
Appendix H. Air Quality Analysis The methods used to calculate emissions of carbon monoxide (CO), volatile organic compounds (VOCs), oxides of nitrogen (NO X ), sulfur oxides (SO X ), particulate matter
More informationMUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION
REPORT NO. TS-07-15 MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION TO: Mayor and Members of Council FROM: Mike LeBlanc, Director of Operations DATE: March 23, 2015 SUBJECT:
More informationWoodlot Licence Harvest Planning Report Woodlot W2069
Woodlot Licence Harvest Planning Report Woodlot W2069 Date : 18 February, 2013 Woodlot Licence# : W2069 Eakins Point Woodlot Forest District : Sunshine Coast District Company : Ministry of Forests, Lands
More informationWashington County Solid Waste & Recycling Garbage and Recycling Collection Services and Rates for Unincorporated Washington County
RESIDENTIAL SERVICE RATES Standard Residential Service Urban customers* receive: Rural customers* receive: one cart for weekly garbage collection one cart** for weekly garbage up to two 96-gallon mixed
More informationWoodlot Licence Harvest Planning Report for W2068
Woodlot Licence Harvest Planning Report for W2068 Date : 5 February, 2013 Woodlot Licence# : W2028 Forest District : Sunshine Coast Company : Ministry of Forests, Lands and Natural Resource Operations
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:
Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationComplete Equipment Fleet
Complete Equipment Fleet Construction ARTICULATED DUMP TRUCKS CRAWLER DOZERS EXCAVATORS 260E 321 hp Rated payload: 53,334 lbs. Heaped capacity: 19.6 cu. yd. 310E 354 hp Rated payload: 62,005 lbs. Heaped
More informationRoads Analysis Report
United States Department of Agriculture U.S. Forest Service April, 2014 Amended September, 2014 August, 2015 Roads Analysis Report Melvin Butte Vegetation Management Project Sisters Ranger District Deschutes
More informationBALCONES QUARRY November 2014
BALCONES QUARRY November 2014 New Braunfels, Texas - 0 - Description of the Facility The Balcones Facility is situated in New Braunfels, Texas and was opened in the mid 1960 s. The geologic structure in
More informationTABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...
Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED
More informationDOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer.
DOZERS Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. Blade is lowered to cut the soil and push the soil in front of blade. It unloads the soil by pushing it over
More informationAgility Service Exchanges
Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01
More informationAGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004)
RULE 8081 AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) 1.0 Purpose The purpose of this rule is to limit fugitive dust emissions from agricultural sources. 2.0 Applicability
More informationWildfires Reported to NICC
Wildfires Reported to NICC In 2017 there were 71,499 wildfires in the U.S., which burned 10,026,086 acres. Fires reported and acres burned were well above the five year average and slightly higher than
More informationBARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY
IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE
More informationAMENDED SOLID WASTE COLLECTION RATE SCHEDULE ANNUAL CPI ADJUSTMENT - SPECIAL RATE INCREASE EFFECTIVE JUNE 1, 2018
Single-Family, Duplex and Tri-Plex Customers (Billed by City - Rates in $ per Customer per Month) current 30-gal solid waste container $ 23.00 $ 23.31 60-gal solid waste container $ 29.14 $ 29.53 90-gal
More information(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,
78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)
MICHIGAN DEPARTMENT OF TRANSPORTATION 03SP502(P) SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) C&T:TEH 1 of 8 C&T:APPR:JFS:MJE:01-28-08 FHWA:APPR:02-01-08 a. Description. Provide
More informationAPPENDIX A AIR QUALITY CALCULATIONS
City of El Segundo January 2008 APPENDIX A AIR QUALITY CALCULATIONS Plaza El Segundo Development Addendum to the Certified EIR SCH No. 2003121037 Page 27 Summary of Plaza el Segundo Results By Phase Total
More informationRegular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY FOLLOW-UP ITEM. 1. Citizen Comments
AGENDA Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY 9:00 a.m. FOLLOW-UP ITEM 1. Citizen Comments 2. Reports from the County Administrator & Staff: a. Collection Staff Activity:
More informationHydraulic power is the key to the utility of many excavators.
CHAPTER Construction Planning, Equipment, and Methods EXCAVATORS Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 8 By Dr. Ibrahim Assakkaf ENCE 420 Construction
More informationfrom OCSD Chemical Treatment Facility. Table SUM-A Maximum Daily Construction by Phase (no mitigation) Phase CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) Combustion Fugitive PM10 Total PM10 PM10
More informationSpecial Specification 7010 Debris Removal and Disposal
Special Specification 7010 Debris Removal and Disposal 1. DESCRIPTION Provide emergency removal and disposal of debris from the highway right of way which is created by a hurricane or other type of natural
More informationCONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO
CONCEPTUAL UTILITY REPORT FOR THE CANYONS PHASE 1 CITY OF CASTLE PINES, CO PREPARED FOR: SHEA HOMES 9380 STATION ST., SUITE 600 LONE TREE, CO 80124 PHONE: 303-791-8180 CONTACT: RYAN MCDERMED PREPARED BY:
More informationVALUE ENGINEERING STUDIES FINAL REPORT. Portsmouth Bypass, Phase 1 SCI PID 19415
VALUE ENGINEERING STUDIES FINAL REPORT Portsmouth Bypass, Phase 1 SCI-823-6.81 PID 19415 PREPARED FOR: Ohio Department of Transportation District 9 650 Eastern Avenue Chillicothe, Ohio 45601 PREPARED BY:
More informationSAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING
SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 20 T H TO AUGUST 25 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606
More informationOn-the-Job Training Program. Overview of Training Programs
On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete
More informationA REPORT TO. Electrical. Mechanical. Civil. Protection & Control. Transmission & Distribution. Telecontrol. System Planning
A REPORT TO THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES Electrical 4v ^c 0:01'1 S0^O c.. ^ '^ W E. G. PIERCY i^ x zoto/off/zq,.'ftrif4^#ft^^,' r Mechanical Civil Protection & Control Transmission &
More informationCedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401
Cedar View Subdivision No. 2 Hillcrest Dr. 81401 Property Information Packet John Renfrow * Jim Renfrow M b f Renfrow Realty Member of: Rocky Mountain Commercial Brokers www.rmcbrokers.com Page 1 Executive
More informationAppendix H: Construction Impacts H-3 Air Quality
Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263
More informationCAT MINI EXCAVATOR ATTACHMENT OPTIONS
CAT MINI EXCAVATOR ATTACHMENT OPTIONS Get Multiple Machines Out of One For more information, visit Cat.com/attachments or contact your local Cat dealer. AEXQ1584-02 March 2018 2018 Caterpillar. All Rights
More informationSouthern Windsor County 2016 Traffic Count Program Summary April 2017
Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationMASTER FEE SCHEDULE. $50 initial minimum charge plus $20 per hour if minimum is exceeded COMMERCIAL RATES. Once per week collection
MASTER SCHEDULE SECTION 1: Refuse/Garbage and Recycling s (C of O Sec. 11.122.7) REFUSE/GARBAGE SERVICE MONTHLY Once per week collection RESIDENTIAL Polycart: $13.00 N/A Additional Polycart $8.39 N/A Single
More informationEXHIBIT 2A RESIDENTIAL SERVICES
EXHIBIT 2A RESIDENTIAL SERVICES Maximum Residential Services Rates Residential Premises CORE SERVICES MAXIMUM RATE SFD CART SERVICE One 64-gallon refuse, one 96-gallon A. recycling, and one 96-gallon green
More informationAnswer Key. Do Not Distribute
2017 Page 1 of 6 STUDENTS DO NOT OPEN THIS TEST OR BEGIN UNTIL INSTRUCTED TO START 2017 Examination for the National Agricultural Technology and Mechanical Systems Career Development Event Name Print Name
More informationATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION
ATTACHMENT I BID SCHEDULE IFB NO. 19-021, CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION Item No. Description Qty Unit Unit Cost Amount Pump Station Site Work 1 Site Demolition / Removals / Haul
More informationKermon Environmental Services, Inc. (OC) TOTAL POINTS. D&J Enterprises, Inc. (OS) CrowderGulf, LLC (OS)
SCORE TABULATION Page 1 of 1 Disaster Debris Removal, Reduction, Disposal and Other Emergency Debris Related Ameri-Green Environmental Bergeron Emergency Services, Inc. D&J Enterprises, Inc. DRC Emergency
More informationDOCUMENTATION WORKBOOK FY 2017
DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2017 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum
More informationMASTER FEE SCHEDULE. SECTION 1: Refuse/Garbage and Recycling Fees (C of O Sec )
MASTER SCHEDULE SECTION 1: Refuse/Garbage and Recycling Fees (C of O Sec. 11.122.7) REFUSE/GARBAGE SERVICE MONTHLY Once per week collection RESIDENTIAL Polycart: $13.00 N/A Additional Polycart $8.39 N/A
More informationExecutive Summary. Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico
: Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico The (ES) presents the main observations, conclusions, and recommendations resulting from the evaluation of the
More informationColumbia County Road Department. Department Presentation June, 2013 By David Hill
Columbia County Road Department Department Presentation June, 2013 By David Hill Columbia County Road Department Presentation: Work Performed Revenues / Expenses Projects Completed / Planned Issues and
More informationTENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016
TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement
More informationCRUSH EVERY JOB 2019 PRODUCT CATALOG AMERICAN-MADE INNOVATION SINCE 1966
AMERICAN-MADE INNOVATION SINCE 1966 2019 PRODUCT CATALOG CRUSH EVERY JOB TM 10685 COLUMBUS PARKWAY, ETNA, OHIO USA 43062 CRUSH EVERY JOB TM That s more than just a catch phrase at Machine. It s how we
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 131 CONTRACT ID: 187503022 PROJECT: C 1875-3-22 CONTRACT: 12153043 AWARD : $3,146,993.47 PROJECTED : $3,149,993.47 ADJ. PROJECTED : $3,149,993.47 CONTRACT:
More informationAPPENDIX F. Air Quality Modeling Results
APPENDIX F Air Quality Modeling Results PHASE 2 NLIP Emissions Summary Unmitigated 2008 Emissions Sutter County Worst-Case lb/day Tons/year Sacramento County Worst-Case lb/day Tons/year ROG NOX PM10 ROG
More informationSERVICES GUIDE CIVIL CONSTRUCTION, TRUCKING & LOGGING SERVICES IN NORTHERN ALBERTA
SERVICES GUIDE CIVIL CONSTRUCTION, TRUCKING & LOGGING SERVICES IN NORTHERN ALBERTA YOUR ONE-STOP SHOP FOR CONSTRUCTION, TRANSPORTATION & LOGGING SERVICES We offer a wide range of civil construction, trucking
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60
More informationProduction Analysis Report
Production Analysis Report March 2010 Cat D9R Mirenco C-Max On vs. Off Study Purpose Study Date The purpose of the study was to conduct economic analysis of dozer production capability, as well as determine
More informationTSP-308 MPK Ferdinand Fassa
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa OUTLINE 1. Introduction 2. Dozer Performance Characteristics Classified on the basis of running gear Blade Dozer Function 3. Dozer Production Estimating 4. Dozer
More informationCONSTRUCTION and OFF ROAD EQUIPMENT
CONSTRUCTION and OFF ROAD EQUIPMENT QUICK REFERENCE GUIDE Vehicle Valuation Services, Inc. 1 South 450 Summit Avenue Suite 185 Oakbrook Terrace, IL 60181 888.475.9975 Fax: 888.475.9935 www.vvsi.com Vehicle
More informationLESSON PLAN. Production Estimations LESSON ID: EEC/EEO-B07 ENGINEER EQUIPMENT WARRANT OFFICER/CHIEF COURSE CID: A16ACN1/A1613E1 REVISED 09/08/2014
UNITED STATES MARINE CORPS ENGINEER EQUIPMENT INSTRUCTION COMPANY MARINE CORPS DETACHMENT 1706E EAST 8 TH STREET FORT LEONARD WOOD MISSOURI 65473-8963 LESSON PLAN Production Estimations LESSON ID: EEC/EEO-B07
More informationMinto North Access Design
Minto North Access Design September 3, 2014 Minto North Access Design September 2, 2014 1 Introduction This document presents an updated plan for creating an access road to the Minto North pit. It shows
More information2011 SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT
SUGGESTED RENTAL RATES FOR CONSTRUCTION EQUIPMENT FOREWARD This edition of the Nova Scotia Road Builders Association Suggested Schedule of Rental Rates for Construction Equipment is presented for the information
More informationSERVICES GUIDE LOGGING, CIVIL CONSTRUCTION & TRUCKING SERVICES IN NORTHERN ALBERTA
SERVICES GUIDE LOGGING, CIVIL CONSTRUCTION & TRUCKING SERVICES IN NORTHERN ALBERTA YOUR ONE-STOP SHOP FOR LOGGING, CONSTRUCTION & TRANSPORTATION SERVICES We offer a wide range of logging, civil construction
More informationFEASIBILITY REPORT. 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY. October 2, 2017
FEASIBILITY REPORT 65 th STREET TRUNK WATER MAIN IMPROVEMENTS INVER GROVE HEIGHTS MINNESOTA DAKOTA COUNTY October 2, 2017 Prepared for: City of Inver Grove Heights 8150 Barbara Avenue Inver Grove Heights,
More informationBUCK FORK N. MYRTLE CULVERT REPLACEMENT OWEB Project #
PROJECT COMPLETION REPORT BUCK FORK N. MYRTLE CULVERT REPLACEMENT OWEB Project # 99-511 Figure 1 Pre-project view, Buck Fork Creek Culvert, outlet end Figure 2 Post-project, Buck Fork Creek Bridge installed
More informationTransfer. CE 431: Solid Waste Management
Transfer CE 431: Solid Waste Management Transfer Stations Transfer stations are the sites on which transfer of waste is carried out, placed on small and then larger vehicles for transportation over long
More informationFurnish separate price quote for: EXCAVATOR
Vendor Name: Contact Person: Street Address: P.O. Box: City, State, Zip Phone #: Toll Free #: Fax #: Email Address: Website: Lano Equipment - Anoka Scott Fahey 6140 Hwy 10 NW Anoka, MN 55303 763-323-1720
More informationATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY
ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY Equipment Use Improve Access Roads (per mile) Bulldozer Grade access roads 1 4 10 Road Grader Grade access roads 1 4 10 Loader Load haul trucks, transport materials
More information(lb/day) Excavation and Installation. NO NO NO NO NO Emission calculations assume that all construction phases overlap.
from the OCSD Pump Station Table Sum-A Maximum Daily Construction by (pre-mitigation) Combustion PM10 Fugitive PM10 Total PM10 CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) (lb/day) (lb/day) (lb/day)
More information