Timber Sale Appraisal Gravy Train Sale NC

Size: px
Start display at page:

Download "Timber Sale Appraisal Gravy Train Sale NC"

Transcription

1 Timber Sale Appraisal Gravy Train Sale NC District: N Cascade Date: March 01, 2018 Cost Summary Conifer Hardwood Gross Timber Sale Value $2,308, $0.00 $2,308, Project Work: ($243,600.00) Advertised Value: $2,064, /12/18 1

2 Timber Sale Appraisal Gravy Train Sale NC District: N Cascade Date: March 01, 2018 Timber Description Location: Portions of Sections 31 and 32, T7S, R2E, W.M., Marion County, Oregon. Stand Stocking: 20% Specie Name AvgDBH Amortization (%) Recovery (%) Douglas - Fir Volume by Grade 2S 3S & 4S 6"- 11" 3S 12"+ Douglas - Fir 2, ,377 2, ,377 4/12/18 2

3 Comments: Pond Values Used: Local Pond Values, January Western Hemlock and Other Conifers Stumpage Price = Pond Value minus Logging Cost: $468/MBF = $655/MBF - $187/MBF Western redcedar and Other Cedars Stumpage Price = Pond Value minus Logging Cost & Additional Haul Cost: $1,265/MBF = $1,500/MBF - $235/MBF Red Alder and Other Hardwoods Stumpage Price = Pond Value minus Logging Cost: $463/MBF = $650/MBF - $187/MBF SCALING COST ALLOWANCE = $5.00/MBF BRANDING AND PAINTING COST ALLOWANCE = $2.00/MBF FUEL COST ALLOWANCE = $3.00/Gallon HAULING COST ALLOWANCE Hauling costs equivalent to $900 daily truck cost. Other Costs (with Profit & Risk to be added): Season 1 Equipment Move-In: Accounted for in Logging Cost Season 1 Equipment Weed Wash: (($120.00/hr loaded transport) + ($22.00/hr X 2 pilots per piece of equipment)) X 2.5 hour wash time = $ X 3 pieces of equipment = $1,230 Season 2 Equipment Move-In: (($120.00/hr loaded transport) + ($22.00/hr x 2 pilots per piece of equipment)) X 4 hour Move-In Cycle = $ X 3 pieces of equipment = $1,968 Season 2 Equipment Weed Wash: (($120.00/hr loaded transport) + ($22.00/hr X 2 pilots per piece of equipment)) X 2.5 hour wash time = $ X 3 pieces of equipment = $1,230 TOTAL Other Costs (with Profit & Risk to be added) = $4,428 Other Costs (No Profit & Risk added): None. SLASH DISPOSAL COSTS In-Unit Piling: $250/acre x 155 acres = $38,750 Move-In: (($120/hr loaded transport) + ($22/hr x 2 pilots)) X 4 hour Move-In Cycle = $656 X 1 Excavator = $656 Equipment Weed Wash: (($120/hr loaded transport) + ($22/hr X 1 pilot/wash personnel)) X 2.5 hour wash time = $355 X 1 Excavator = $355 Covering Piles: ($12/pile x 465 piles) + ($22/hr x 4 covering personnel x 72 hours) = $11,916 TOTAL Slash Disposal Costs = $51,677 ROAD MAINTENANCE COSTS Move-In: $120/hr loaded transport X 4 hour Move-In Cycle = $480 X 1 Grader = $480 General Road Maintenance: 2.04 miles X $1,100/mile = $2,244 TOTAL Road Maintenance Costs = $2,724/3,377 MBF = $0.80/MBF 4/12/18 3

4 Timber Sale Appraisal Gravy Train Sale NC District: N Cascade Date: March 01, 2018 Logging Conditions Combination#: 1 Douglas - Fir % Logging System: Shovel Process: Feller Buncher yarding distance: Short (400 ft) downhill yarding: No tree size: Mature / Regen Cut (900 Bft/tree), 3-5 logs/mbf loads / day: 8 bd. ft / load: 5000 cost / mbf: $88.45 machines: Feller Buncher w/ Delimber 4/12/18 4

5 Timber Sale Appraisal Gravy Train Sale NC District: N Cascade Date: March 01, 2018 Logging Costs Operating Seasons: 2.00 Profit Risk: 10% Project Costs: $243, Other Costs (P/R): $4, Slash Disposal: $51, Other Costs: $0.00 Miles of Road Road Maintenance: $0.80 Dirt Rock (Contractor) Rock (State) Paved Hauling Costs Species $ / MBF Trips/Day MBF / Load Douglas - Fir $ /12/18 5

6 Timber Sale Appraisal Gravy Train Sale NC Logging Douglas - Fir District: N Cascade Date: March 01, 2018 Road Maint Fire Protect Hauling Logging Costs Breakdown Other P/R appl Profit & Risk Slash Disposal Scaling / Brand & Paint Other $88.45 $0.86 $2.60 $56.16 $1.31 $14.94 $15.30 $7.00 $0.00 $ Specie Amortization Pond Value Stumpage Amortized Douglas - Fir $0.00 $ $ $0.00 4/12/18 6

7 Timber Sale Appraisal Gravy Train Sale NC District: N Cascade Date: March 01, 2018 Summary Amortized Specie MBF Value Douglas - Fir 0 $0.00 $0.00 Unamortized Specie MBF Value Douglas - Fir 3,377 $ $2,308, Gross Timber Sale Value Recovery: $2,308, Prepared By: Spencer Mitchell Phone: /12/18 7

8 Pulp Appraisal Sale Name Gravy Train Species Conifer Stems Per/ac. 23 Acres 149 Stems 3427 BF/Stem, Conversion 10 MBF Per/Species 34 Pond Value Per/MBF $334 Logging + Hauling Costs $ Additional Loading Costs $40.00 Stumpage $ Tons Per/MBF, Conversion 10 Price Per/Ton $10.83 Tons Per/Species 343 Value $3, Price Price/Ton Price/MBF $3, $10.83 $ Less P/R 75% $ $2.71 $27.08 Contract Price ($/MBF) $27.08

9 SUMMARY OF ROAD COSTS GRAVY TRAIN ROAD IMPROVEMENT: Segments A to A1 B to B1 C to C1 D to D1 E to E1 F to F1 G to G1 J to J1 stations miles Project No. 1 Rocking Length Rip Rap 4"-0 Crushed Roads 1.5"-0 Culverts 1.5"-0 Construct $ cy 40 cy 2,503 cy 96 cy $ 58, cy 233 cy $ 5, cy 40 cy 785 cy 48 cy $ 20, cy 40 cy 2,249 cy 72 cy $ 50, cy 218 cy 24 cy $ 6, cy 376 cy $ 7, cy $ 1, cy $ 7, cy 200 cy 6,628 cy 240 cy $ 157, Move-in $ 6, STOCKPILE ROCK: Project No. 2 Project No. 1 $ 163, Bridge Creek Pit Stockpile at pit EXPLORATORY DRILLING: Size of Rock Cubic Yards Stockpile Cost to crush only 1.5"-0 Crushed 5,132 cy $ 1.28 $ $72, Project No. 2 $72, Project No. 3 Move in Project Work Logging for Access Drill Excavator/Dozer 8 $240/hr 16 $160/hr $ 1, $ 1, $ 1, $ 2, $ 6, Project No. 3 $ 6, ROCK TOTALS: Rock sizes Location Rip Rap 8" to 24" 4"-0 Crushed Bridge Creek Pit 39 cy Bridge Creek (put in stockpile) Cedar Creek Stockpile No Crushing 200 cy to Crush 39 cy 1.5"-0 Culverts & Roads 6,868 cy 5,132 cy 12,000 cy TOTAL CONTRACT CREDIT AMOUNT $ 243, Grand $ 243, % = $ 48, James Stuart 04/12/2018

10 PROJECT NO. 1 ROAD IMPROVEMENT COSTS Sale: Gravy Train Road Segment: A to A1 ROAD IMPROVEMENT: Station Designed Cubic Yards/Station Cost per Quantity Riprap 1.5"-0 4"-0 Soil Station or Acre Sum $ Reconstruct cy $ $ 2, Repair Culvert Ends 2 $ $ Landing Construction 1 40 cy $ $ Drivable Waterbar 1 12 cy $ $ Turnout 2 24 cy $ $ End haul road ditch cy $ 4.55 $ 1, Culvert Bedding 4 3 cy 24 cy Added Dissipator 3 3 cy SUB-TOTAL $ 3, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 3-18" x 30' cpp 18" 90 $ 1, $ 1, $ 2, $ 3, " x 40' cpp 24" 40 $ 1, $ $ 1, $ 1, $ 2, cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Sum $ Seed/mulch (average 2-bales per site/pipe) 4 $ $ $ $ Install 6' long steel "T" posts on culverts 6 $ 8.50 $ $ $ Remove old culverts off State property 1 $ $ $ $ SUB-TOTAL $ 6, SURFACING: Water Two-way Culvert Turn Dissipator Haul & Crush Roads Landing Roads Bars Junctions Bedding outs (cy/pipe) Combined $ Cost 1.5"-0 2,443 cy 12 cy 96 cy 48 cy 2,599 cy $ $ 47, "-0 40 cy 40 cy $ 4.13 $ Riprap (8"- 24") 21 cy 21 cy $ $ SUB-TOTAL $ 47, GRAND TOTAL = $ 58, James Stuart 04/12/2018

11 PROJECT NO. 1 ROAD IMPROVEMENT COSTS Sale: Gravy Train Road Segment: B to B1 ROAD IMPROVEMENT: Station Designed Cubic Yards/Station Cost per Quantity Riprap 1.5"-0 4"-0 Soil Station or Acre Sum $ Reconstruct cy $ $ Repair Culvert Ends Landing Construction 1 40 cy $ $ Drivable Waterbar Turnaround End haul ditch & landing cy $ 4.55 $ Culvert Bedding Two-way junction SUB-TOTAL $ CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Sum $ Seed/mulch (average 2-bales per site/pipe) $ Install 6' long steel "T" posts on culverts $ 8.50 Remove old culverts off State property $ SUB-TOTAL SURFACING: Water Two-way Culvert Turn Dissipator Haul & Crush Roads Landing Roads Bars Junctions Bedding outs (cy/pipe) Combined $ Cost 1.5" cy 233 cy $ $ 4, "-0 40 cy 40 cy $ 4.13 $ Riprap (8"- 24") $ SUB-TOTAL $ 4, GRAND TOTAL = $ 5, James Stuart 04/12/2018

12 PROJECT NO. 1 ROAD IMPROVEMENT COSTS Sale: Gravy Train Road Segment: C to C1 ROAD IMPROVEMENT: Station Designed Cubic Yards/Station Cost per Quantity Riprap 1.5"-0 4"-0 Soil Station or Acre Sum $ Reconstruct cy $ $ Repair Culvert Ends Landing Construction 1 40 cy $ $ Drivable Waterbar Turnouts 2 24 cy $ $ End haul ditch cy $ 4.55 $ Culvert Bedding 2 3 cy 24 cy Two-way junction 1 12 cy SUB-TOTAL $ 1, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 1-18" x 30' cpp 18" 30 $ $ $ $ 1, " x 30' cpp 24" 30 $ $ $ $ 1, cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Sum $ Seed/mulch (average 2-bales per site/pipe) 2 $ $ $ $ Install 6' long steel "T" posts on culverts 2 $ 8.50 $ $ $ Remove old culverts off State property 1 $ $ $ SUB-TOTAL $ 3, SURFACING: Water Two-way Culvert Turn Dissipator Haul & Crush Roads Landing Roads Bars Junctions Bedding outs (cy/pipe) Combined $ Cost 1.5" cy 12 cy 48 cy 48 cy 833 cy $ $ 15, "-0 40 cy 40 cy $ 4.13 $ Riprap (8"- 24") 6 cy 6 cy $ $ SUB-TOTAL $ 15, GRAND TOTAL = $ 20, James Stuart 04/12/2018

13 PROJECT NO. 1 ROAD IMPROVEMENT COSTS Sale: Gravy Train Road Segment: D to D1 ROAD IMPROVEMENT: Station Designed Cubic Yards/Station Cost per Quantity Riprap 1.5"-0 4"-0 Soil Station or Acre Sum $ Reconstruct cy $ $ 2, Repair Culvert Ends Landing Construction 1 40 cy $ $ Drivable Waterbar Turnouts 1 12 cy End haul ditch cy $ 4.55 $ Culvert Bedding 3 3 cy 24 cy Two-way junction SUB-TOTAL $ 3, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 2-18" x 30' cpp 18" 60 $ 1, $ 1, $ 1, $ 2, " x 30' cpp 24" 30 $ $ $ $ 1, cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Sum $ Seed/mulch (average 2-bales per site/pipe) 3 $ $ $ $ Install 6' long steel "T" posts on culverts 4 $ 8.50 $ $ $ Remove old culverts off State property 3 $ $ $ SUB-TOTAL $ 4, SURFACING: Water Two-way Culvert Turn Dissipator Haul & Crush Roads Landing Roads Bars Junctions Bedding outs (cy/pipe) Combined $ Cost 1.5"-0 2,237 cy 72 cy 12 cy 2,321 cy $ $ 42, "-0 40 cy 40 cy $ 4.13 $ Riprap (8"- 24") 9 cy 9 cy $ $ SUB-TOTAL $ 42, GRAND TOTAL = $ 50, James Stuart 04/12/2018

14 PROJECT NO. 1 ROAD IMPROVEMENT COSTS Sale: Gravy Train Road Segment: E to E1 ROAD IMPROVEMENT: Station Designed Cubic Yards/Station Cost per Quantity Riprap 1.5"-0 4"-0 Soil Station or Acre Sum $ Reconstruct cy $ $ Repair Culvert Ends Landing Construction Drivable Waterbar Turnaround End haul ditch cy $ 4.55 $ Culvert Bedding 1 3 cy 24 cy Two-way junction SUB-TOTAL $ CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ 1-18" x 30' cpp 18" 30 $ $ $ $ 1, cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Sum $ Seed/mulch (average 2-bales per site/pipe) 1 $ $ $ $ Install 6' long steel "T" posts on culverts 1 $ 8.50 $ 8.50 $ $ Remove old culverts off State property 1 $ $ $ SUB-TOTAL $ 1, SURFACING: Water Two-way Culvert Turn Dissipator Haul & Crush Roads Landing Roads Bars Junctions Bedding outs (cy/pipe) Combined $ Cost 1.5" cy 24 cy 242 cy $ $ 4, "-0 $ 4.13 Riprap (8"- 24") 3 cy 3 cy $ $ SUB-TOTAL $ 4, GRAND TOTAL = $ 6, James Stuart 04/12/2018

15 PROJECT NO. 1 ROAD IMPROVEMENT COSTS Sale: Gravy Train Road Segment: F to F1 ROAD IMPROVEMENT: Station Designed Cubic Yards/Station Cost per Quantity Riprap 1.5"-0 4"-0 Soil Station or Acre Sum $ Reconstruct cy $ $ Repair Culvert Ends Landing Construction 1 40 cy $ $ Drivable Waterbar Turnaround End haul ditch cy $ 4.55 $ Culvert Bedding Two-way junction SUB-TOTAL $ CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Sum $ Seed/mulch (average 2-bales per site/pipe) $ Install 6' long steel "T" posts on culverts $ 8.50 Remove old culverts off State property $ SUB-TOTAL SURFACING: Water Two-way Culvert Turn Dissipator Haul & Crush Roads Landing Roads Bars Junctions Bedding outs (cy/pipe) Combined $ Cost 1.5" cy 376 cy $ $ 6, "-0 40 cy 40 cy $ 4.13 $ Riprap (8"- 24") $ SUB-TOTAL $ 6, GRAND TOTAL = $ 7, James Stuart 04/12/2018

16 PROJECT NO. 1 ROAD IMPROVEMENT COSTS Sale: Gravy Train Road Segment: G to G1 ROAD IMPROVEMENT: Station Designed Cubic Yards/Station Cost per Quantity Riprap 1.5"-0 4"-0 Soil Station or Acre Sum $ Reconstruct cy $ $ Repair Culvert Ends Landing Construction Drivable Waterbar 1 12 cy $ $ Turnaround End haul ditch Culvert Bedding Two-way junction SUB-TOTAL $ CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Sum $ Seed/mulch (average 2-bales per site/pipe) $ Install 6' long steel "T" posts on culverts $ 8.50 Remove old culverts off State property $ SUB-TOTAL SURFACING: Water Two-way Culvert Turn Dissipator Haul & Crush Roads Landing Roads Bars Junctions Bedding outs (cy/pipe) Combined $ Cost 1.5"-0 36 cy 12 cy 48 cy $ $ "-0 $ 4.13 Riprap (8"- 24") $ SUB-TOTAL $ GRAND TOTAL = $ 1, James Stuart 04/12/2018

17 PROJECT NO. 1 ROAD IMPROVEMENT COSTS Sale: Gravy Train Road Segment: J to J1 ROAD IMPROVEMENT: (Only place spot rock to fix pot holes on the worst sections of road. O will allow 216 cy of 1.5"-0. Station Designed Cubic Yards/Station Cost per Quanity Riprap 1.5"-0 4"-0 Soil Station or Acre Sum $ Grade and roll cy $ $ 3, Repair culvert inlets Landing Construction Drivable water bar Turnaround End haul ditch Culvert Bedding Two-way junction SUB-TOTAL $ 3, CULVERTS: Description Type Size Length Cost Bevel Bands Cost Sub Install $ Sum $ cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Install $ Sum $ Seed/mulch (average 2-bales per site/pipe) $ Install 6' long steel "T" posts on culverts $ 8.50 Remove old culverts off State property $ SUB-TOTAL SURFACING: Water Two-way Culvert Turn Dissipator Haul & Crush Roads Landing Roads Bars Junctions Bedding outs (cy/pipe) Combined $ Cost 1.5" cy 216 cy $ $ 3, "-0 $ 4.13 Riprap (8"- 24") $ SUB-TOTAL $ 3, GRAND TOTAL = $ 7, James Stuart 04/12/2018

18 Sale Name:Gravy Train Pit Name: Bridge Creek Pit 1.5"-0 Crushed $/cu.yd.==> $ Swell: 1.30 Shrinkage/Compact: 1.16 Drill Pct.: 100% Truck measure 12,000 cy Oversize Pct.: 25% Log, Stump, Scalp & Clear Overburden: $ /hr x 40 hrs = $ 12, Drill & Shoot: $ 4.00 /cy x 12,000 cy = $ 48, Sort and split oversize rock: $ 4.25 /cy x 3,000 cy = $ 12, Load Crusher: $ 1.25 /cy x 12,000 cy = $ 15, Crushing $ 2.50 /cy x 12,000 cy = $ 30, Screening Rock $ 2.30 /cy x 12,000 cy = $ 27, Clean Up Pit $ /hr x 2 hrs = $ MOVE IN COSTS # of Equip Subtotal $ 145, stage crusher 1 $ 3, $ 3, Move in and set up Drill and Compressor 1 $ 1, $ 1, Move in D-8 1 $ 1, $ 1, Move in Loaders 2 $ 1, $ 2, Move in Excavator 1 $ 1, $ 1, Move in Trucks 1 $ $ Gradation Tests $ per 12,000 cy = $ Subtotal $ 9, Riprap & Pit-run $/cu.yd.==> $ 2.38 ESTIMATED TOTAL COST $ 155, Truck measure 39 cy Rip and Develop $ 2.00 /cy x 39 cy = $78.00 Sort Oversize: $ 3.75 /cy x 4 cy = $14.63 Subtotal $92.63 ESTIMATED TOTAL COST $92.63 GRAND TOTAL FOR CRUSHING $155, James Stuart 04/12/2018

19 (Sale Name) Rates Bridge Creek Pit (Quarry) Bridge Creek (Stockpile) Spread Dump Truck Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) Crushed (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B20 $ $ $ "-0 (Rock Size) 14G (Loader) D8 (Tractor) D10 $ $ $ OH25 $ $ $ Hauling Time Computation Grader Rate ($/Hr.) Operator ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ MPH Miles per round trip 0 Minutes Compaction Equipment Rate ($/Hr.) Operator ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH 4.8 Miles per round trip 12 Minutes Vib. Grid Roller $ $ $ MPH Miles per round trip 0 Minutes Hand Held Compactor $ $ $ MPH 0.3 Miles per round trip 1 Minutes Tractors Rate ($/Hr.) Operator ($/Hr.) 10 MPH 0 Miles per round trip 0 Minutes D4 $ $ $ MPH 0.1 Miles per round trip 1 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 14 Minutes Operator Efficiency Correction (80% Efficiency) 18 Minutes Loader Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) 14G Cat Wheel Loader $ $ $ Time Per Cubic Yard Gravy Train Rate (Min/Load) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) 1.48 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 2.00 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 2.83 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour $ per Hr. Cost of Grader Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Grade and Roll $ 1.42 Cu. Yd. Cost to Load, Haul and Place $ 5.21 Cu. Yd. Cost to Crush $ Grand Combined $ James Stuart 04/12/2018

20 (Sale Name) Rates (Quarry) Cedar Creek (Stockpile) Spread Dump Truck Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) crushed (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B20 $ $ $ " (Rock Size) 14G (Loader) D8 (Tractor) D10 $ $ $ OH25 $ $ $ Hauling Time Computation Grader Rate ($/Hr.) Operator ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ MPH Miles per round trip 0 Minutes Compaction Equipment Rate ($/Hr.) Operator ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH 2.5 Miles per round trip 6 Minutes Vib. Grid Roller $ $ $ MPH 0 Miles per round trip 0 Minutes Hand Held Compactor $ $ $ MPH 0 Miles per round trip 0 Minutes Tractors Rate ($/Hr.) Operator ($/Hr.) 10 MPH 0.1 Miles per round trip 1 Minutes D4 $ $ $ MPH 0 Miles per round trip 0 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 7 Minutes Operator Efficiency Correction (80% Efficiency) 9 Minutes Loader Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) 14G Cat Wheel Loader $ $ $ Time Per Cubic Yard Gravy Train Rate (Min/Load) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) 0.71 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 1.23 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 1.75 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour $ per Hr. Cost of Grader Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Grade and Roll $ 1.42 Cu. Yd. Cost to Load, Haul and Place $ 4.13 Cu. Yd. Rock is in a stockpile Grand Combined $ 4.13 James Stuart 04/12/2018

21 Gravy Train (Sale Name) Rates Bridge Creek Pit Capacity Operator Dump Truck Rate ($/Hr.) (Quarry) (Stockpile) Spread (cy) ($/Hr.) Rip Rap (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B20 $ $ $ "+ 24" (Rock Size) 14G (Loader) Cat 325 Excavator (Excavator) D10 $ $ $ OH25 $ $ $ Operator Grader Rate ($/Hr.) Hauling Time Computation ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ Compaction Operator Rate ($/Hr.) Equipment ($/Hr.) 35 MPH Miles per round trip 0 Minutes 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH 4.8 Miles per round trip 12 Minutes Vib. Grid Roller $ $ $ MPH 0 Miles per round trip 0 Minutes Hand Held Compactor $ $ $ Operator Tractors Rate ($/Hr.) 15 MPH 0.3 Miles per round trip 1 Minutes ($/Hr.) 10 MPH 0 Miles per round trip 0 Minutes D4 $ $ $ MPH 0.1 Miles per round trip 1 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 14 Minutes Capacity Operator Loader Rate ($/Hr.) Operator Efficiency Correction (80% Efficiency) 18 Minutes (cy) ($/Hr.) 14G Cat Wheel Loader $ $ $ Time Per Cubic Yard Cat 325 Excavator $ $ $ Rate (Min/Load) Delay (Min) Loading Time (Min) Hauling Only (per cubic yard) 1.48 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 2.00 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 2.83 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard $ 0.95 per Cu. Yd. Placing with Excavator 6 Spreading Cost Per Cubic Yard Cost of Excavator Per Hour $ per Hr. Cost of Excavator Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour per Hr. Cost of Compaction Equip. Op. Per Hour per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Place and Compact $ Cu. Yd. Cost to Load, Haul and Place $ Cu. Yd. Cost to Crush $ 2.38 Grand Combined $ James Stuart 04/12/2018

22 Gravy Train (Sale Name) Yards End Hauled: cy Rates On site EndHual To nearest waste area Spread and Compact Dump Truck Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) Waste (Type) D10 (Truck) D6 (Grader) Vibratory Roller (Compactor) B20 $ $ $ (Rock Size) (Loader) Cat 325 Excavator (Excavator) D10 $ $ $ (Water Truck Size) Gal/cu.yd OH25 $ $ $ Hauling Time Computation Grader Rate ($/Hr.) Operator ($/Hr.) 50 MPH Miles per round trip 0 Minutes 12-G $ $ $ MPH Miles per round trip 0 Minutes 14-G $ $ $ MPH Miles per round trip 0 Minutes Compaction Equipment Rate ($/Hr.) Operator ($/Hr.) 30 MPH Miles per round trip 0 Minutes Vibratory Roller $ $ $ MPH Miles per round trip 0 Minutes Vib. Grid Roller $ $ $ MPH 0.4 Miles per round trip 1 Minutes Hand Held Compactor $ $ $ MPH 0 Miles per round trip 0 Minutes Tractors Rate ($/Hr.) Operator ($/Hr.) 10 MPH 0.1 Miles per round trip 1 Minutes D4 $ $ $ MPH Miles per round trip 0 Minutes D6 $ $ $ Miles per Round Trip D7 $ $ $ Dump or Spread Time per Round Trip 0 Minutes D8 $ $ $ Hauling Cycle Time for this Setting (100% Efficiency) 2.05 Minutes Operator Efficiency Correction (80% Efficiency) 2.56 Minutes Loader Rate ($/Hr.) Capacity (cy) Operator ($/Hr.) 14G Cat Wheel Loader $ $ $ Cat 325 Excavator $ $ $ Time Per Cubic Yard Rate Delay (Min) Loading (Min/Load) Hauling Only (per cubic yard) 0.21 min/cu.yd Loading Costs Time (Min) Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Time Per Cubic Yard 0.73 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour $ per Hr. Cost of Truck Operator Pre Hour $ per Hr. Dump or Spread Time (Min) Operating Cost Per Hour $ per Hr. Pile Dump 0.25 Operating Cost Per Minute $ 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard $ 1.04 per Cu. Yd. Spreading w/dozer 5 Loading Cost Per Cubic Yard $ 1.56 per Cu. Yd. Place with Excavator 6 Spreading Cost Per Cubic Yard Cost of Excavator Per Hour $ per Hr. Cost of Excavator Operator Per Hour $ per Hr. Cost of Compaction Equip. Per Hour $ per Hr. Cost of Compaction Equip. Op. Per Hour $ per Hr. Operating Cost Per Hour $ per Hr. Cost Per Cubic Yard to Place and Compact $ 1.94 Cu. Yd. Cost to Load, Haul, and Place $ 4.55 Cu. Yd. James Stuart 04/12/2018

23 MOVE-IN COSTS Gravy Train Timber Sale Equipment Transport Hours of Cost Weedwash Weedwash No. Description Cost Transport to move Time Labor $65/hr Cost 1 Grader $ $ 1, $ 1, Rollers & Compactor $ $ 1, $ 1, Excavator $ $ 1, $ $ 1, Small backhoe $ $ 1, $ $ 1, Tractors (D5 - D8) $ $ 1, $ $ 1, Dump Truck (10 cy +) $ 95 1 $ $ Loader $ Road Brusher $ $ Water Truck (1000 gallon) $ 95 1 $ $ s $ 6, TOTAL MOVE-IN COSTS ONE TIME = $ 6, James Stuart 04/12/2018

24 CRUISE REPORT Gravy Train Contract No Locations: Portions of Sections 31 and 32, T7S, R2E, W.M., Marion County, Oregon 2. Cruise Design: The cruise design for areas 1 and 2 are as follows: Area 1: Assumed a Coefficient of Variation of 33.5% an average stand diameter of 28 inches, a desired sampling error of 11% at a 68% confidence level. Pre-cruise plots indicated that approximately 6 trees per plot could be realized with a 20 BAF. The resulting standard error for board foot volume was 5.8% Area 2: Assumed a Coefficient of Variation of 37.6%, an average stand diameter of 33 inches, a desired sampling error of 11% at a 68% confidence level. Pre-cruise plots indicated that approximately 6 trees per plot could be realized with a 20 BAF. The resulting standard error for board foot volume was 8.0% 3. Sampling Methods: Area 1 was cruised in January of 2018 with 33 grade plots. Plots were laid out on a 4 chain x 4 chain grid. Plots falling on or near existing roads, no-harvest areas, or riparian management areas were offset 1/2 chain. Area 2 was cruised in January of 2018 with 23 grade plots. Plots were laid out on a 4 chain x 4 chain grid. Plots falling on or near existing roads, no-harvest areas, or riparian management areas were offset 1/2 chain. 4. Cruise Report: Additional and more specific cruise summaries are included in the SuperAce outputs: Project Statistics, Stand Table Summary, Log Stock Table, and Species, Sort, Grade Table. 5. Tree Measurement and Grading: All grade plot sample trees were measured and graded following Columbia River Log Scale grade rules and favoring 40 foot segments. a) Height Standards: tree heights were measured to the nearest foot. Bole heights were calculated to 25% of DBH. b) Diameter Standards: Diameters were measured outside bark at breast height to the nearest tenth of an inch. c) Form Factors were measured for each grade tree using a form point of 17 feet. 5. Data Processing: a) Volumes and Statistics, Cruise, volume estimates and sampling statistics were derived from Super Ace 2008 cruise software. b) Deductions: An 8 percent volume deduction was used for Douglas-fir and a ten percent volume deduction was used for all other species to account for hidden defect and breakage. c) Acreage: net acres of both units was 155. Due to certain acres having extremely low stocking in Area 2, the cruise was run on a total of 149 net acres. 6. Cruisers: The sale was cruised by O cruisers Mitchell, Taylor and Kaupp.

25

26 TC PSTNDSUM Stand Table Summary Page 1 Date: 2/5/2018 TT7S RR2E S31 Ty Project GRAVY1 Time: 9:18:22AM Acres Grown Year: Spc S T DBH Sample Trees FF 16' Tot Av Ht Trees/ Acre BA/ Acre Logs Acre Average Log Net Cu.Ft. Net Bd.Ft. Tons/ Acre Net Cu.Ft. Acre Net Bd.Ft. Acre Tons T o t a l s Cunits MBF , , ,759 1, ,432 1, ,504 1, ,211 1, , , , , , s ,106 28,332 10,765 3,664 1,700 s ,106 28,332 10,765 3,664 1,700

27 TC PLOGSTVB Log Stock Table - MBF TT7S RR2E S31 Ty Project: GRAVY1 Acres Page 1 Date 2/5/2018 Time 9:18:23AM Spp S T So Gr Log Gross Def Net % Net Volume by Scaling Diameter in Inches rt de Len MBF % MBF Spc DO 2M DO 2M DO 2M DO 2M 40 1, , DO 3M DO 3M DO 3M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M s 1, , All Species 1, ,

28 TC PSTATS PROJECT STATISTICS PROJECT GRAVY1 PAGE DATE 1 2/5/2018 TWP RGE SC TRACT TYPE ACRES PLOTS TREES CuFt BdFt T7S R2 31 GRAVY S W PLOTS TREES TOTAL ESTIMATED PERCENT TREES TOTAL SAMPLE PER PLOT TREES TREES CRUISE , DBH COUNT REFOREST COUNT BLANKS 100 % STAND SUMMARY SAMPLE TREES AVG BOLE REL BASAL GROSS NET GROSS NET TREES /ACRE DBH LEN DEN AREA BF/AC BF/AC CF/AC CF/AC DOUG FIR ,837 28,332 6,295 6,106 TOTAL ,837 28,332 6,295 6,106 CONFIDENCE LIMITS OF THE SAMPLE 68.1 TIMES OUT OF 100 THE VOLUME WILL BE WITHIN THE SAMPLE ERROR CL 68.1 SD: 1.0 DOUG FIR COEFF TOTAL 28.5 CL 68.1 SD: 1.0 DOUG FIR SAMPLE TREES - BF # OF TREES REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,430 1,479 1,529 COEFF TOTAL 24.7 CL 68.1 SD: 1.0 DOUG FIR 3.4 1,430 1,479 1, SAMPLE TREES - CF # OF TREES REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 36.3 CL 68.1 SD: 1.0 DOUG FIR TREES/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 36.7 CL 68.1 SD: 1.0 DOUG FIR BASAL AREA/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 37.6 CL 68.1 SD: 1.0 DOUG FIR NET BF/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,060 28,332 30,604 COEFF TOTAL ,060 28,332 30, NET CUFT FT/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,626 6,106 6, ,626 6,106 6,

29 TC PSPCSTGR Species, Sort Grade - Board Foot Volumes (Project) TT7S RR2E S31 Ty Project: Acres GRAVY Page 1 Date 2/5/2018 Time 9:18:20AM % Percent of Net Board Foot Volume Average Log Logs S So Gr Net Bd. Ft. per Acre Log Scale Dia. Log Length Ln Dia Bd CF/ Per Spp T rt ad BdFt Def% Gross Net Net MBF Ft In Ft Lf /Acre DO 2M ,154 26,784 1, DO 3M ,401 1, DO 4M s ,837 28,332 1, s ,837 28,332 1,

30 TC PSTNDSUM Stand Table Summary Page 1 Date: 2/5/2018 TT7S RR2E S32 Ty Project GRAVY2 Time: 9:35:14AM Acres Grown Year: Spc S T DBH Sample Trees FF 16' Tot Av Ht Trees/ Acre BA/ Acre Logs Acre Average Log Net Cu.Ft. Net Bd.Ft. Tons/ Acre Net Cu.Ft. Acre Net Bd.Ft. Acre Tons T o t a l s Cunits MBF , , ,451 1, ,995 1, , , ,256 1, , ,871 1, s ,856 18,846 12,697 4,321 1,677 s ,856 18,846 12,697 4,321 1,677

31 TC PLOGSTVB Log Stock Table - MBF TT7S RR2E S32 Ty Project: GRAVY2 Acres Page 1 Date 2/5/2018 Time 9:35:12AM Spp S T So Gr Log Gross Def Net % Net Volume by Scaling Diameter in Inches rt de Len MBF % MBF Spc DO 2M DO 2M DO 2M 40 1, , DO 3M DO 3M DO 3M DO 3M DO 3M DO 3M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO O s 1, , All Species 1, ,

32 TC PSTATS PROJECT STATISTICS PROJECT GRAVY2 PAGE DATE 1 2/5/2018 TWP RGE SC TRACT TYPE ACRES PLOTS TREES CuFt BdFt T7S R2 32 GRAVY S W PLOTS TREES TOTAL ESTIMATED PERCENT TREES TOTAL SAMPLE PER PLOT TREES TREES CRUISE , DBH COUNT REFOREST COUNT BLANKS 100 % STAND SUMMARY SAMPLE TREES AVG BOLE REL BASAL GROSS NET GROSS NET TREES /ACRE DBH LEN DEN AREA BF/AC BF/AC CF/AC CF/AC DOUG FIR ,525 18,846 5,006 4,856 TOTAL ,525 18,846 5,006 4,856 CONFIDENCE LIMITS OF THE SAMPLE 68.1 TIMES OUT OF 100 THE VOLUME WILL BE WITHIN THE SAMPLE ERROR CL 68.1 SD: 1.0 DOUG FIR COEFF TOTAL 65.5 CL 68.1 SD: 1.0 DOUG FIR SAMPLE TREES - BF # OF TREES REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 57.2 CL 68.1 SD: 1.0 DOUG FIR SAMPLE TREES - CF # OF TREES REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 36.2 CL 68.1 SD: 1.0 DOUG FIR TREES/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 32.3 CL 68.1 SD: 1.0 DOUG FIR BASAL AREA/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 33.5 CL 68.1 SD: 1.0 DOUG FIR NET BF/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,749 18,846 19,943 COEFF TOTAL ,749 18,846 19, NET CUFT FT/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,580 4,856 5, ,580 4,856 5,

33 TC PSPCSTGR Species, Sort Grade - Board Foot Volumes (Project) TT7S RR2E S32 Ty Project: Acres GRAVY Page 1 Date 2/5/2018 Time 9:35:13AM % Percent of Net Board Foot Volume Average Log Logs S So Gr Net Bd. Ft. per Acre Log Scale Dia. Log Length Ln Dia Bd CF/ Per Spp T rt ad BdFt Def% Gross Net Net MBF Ft In Ft Lf /Acre DO 2M ,475 15,120 1, DO 3M ,965 1, DO 4M DO O ,543 1, s ,525 18,846 1, s ,525 18,846 1,

34 TIMBER SALE SUMMARY Gravy Train Contract No Location: Portions of Sections 31 and 32, T7S, R2E, W.M., Marion County, Oregon 2. Type of Sale: This timber sale is a 2 unit, 155 acre regeneration harvest. The timber will be sold on a recovery basis at a sealed bid auction. 3. Revenue Distribution: 100% BOF, Marion County 4. Sale Acreage: Acres are net of stream buffers and road prisms. Acreage was determined using ESRI ArcMap GIS software. 5. Cruise: The Timber Sale was cruised by O Cruisers in January of For more information see Cruise Report. 6. Timber Description: The Timber Sale Area consists of medium stocked 80 year old Douglas-fir. The average Douglas-fir DBH is 30. The total estimated net per acre Douglas-fir volume is 22 MBF. 7. Volume Summary: See attached document (Timber Sale Notice). 8. Topography and Logging Method: The average elevation for the Timber Sale is 2,100 feet. Slopes within the sale areas range from 5% to 30% and are a Southwest aspect. The Timber Sale Areas are 100% ground-based yarding. The average horizontal tractor yarding distance is approximately 600 feet and the maximum is approximately 800 feet. 9. Access: The Timber Sale Areas are located southeast of Silverton, Oregon within Department of Forestry lands on the North Cascade District. Access to the Timber Sale Areas is as follows: from the town of Silverton, Oregon, continue southeast on Highway 214 approximately 9.7 miles, then turn left onto the Grade Road. Continue along the Grade Road approximately 6.5 miles to the intersection of the A-120 and Grade Rd. Continue up the A-120 for.5 miles and then onto Bridge Creek Rd. for approximately 1 mile until you reach the intersection of the A100 Rd. (A gate key or combination will be needed for acess and can be checked out at the O office in Lyons). Continue on the A100 for 1 mile until you reach the Y intersection of Cedar Creek Rd. To access Area 2 continue left on the A100 Rd. for approximately 1 mile, and to access Area 1 continue straight onto Cedar Creek Rd. for approximately.5 miles until you reach timber sale boundary signs. 10. Projects: Project No. 1: Road Improvement Project No. 2: Stockpile Project No. 3: Exploratory Drilling $163, $72, $6, Credit for all Projects (rounded) $243, Gravy Train Page 1 of 1

35 1800 Bridge Creek 30 CC CC Cedar Creek South Fork CC E-33.1 CC100 )))))))) ) )) ))))))))))))))) )))))))))))))))) )))))))))) )))) ))))))))))))) AREA 1 Cedar Creek Road 8-2E-4.1 CC T7S R2E A106A A106C A Little Abiqua Creek AREA 2 A106B )))))) )) )))) ))))) Abiqua 100 )) Brooks Creek 2000 T8S R2E Legend )))))))) Buffer ' ' Timber Sale Boundary ))) ' ' ))))))) ))) ' ' ' ' Roads GTR Santiam State Forest Streams Fish Nonfish Sections Townships 40 ft Contours Contour Type Index Intermediate EXHIBIT A LOGGING MAP FOR TIMBER SALE CONTRACT # GRAVY TRAIN PORTIONS OF SECTIONS 31,32, T7S, R2E, W.M. MARION COUNTY, OREGON ,500 2,250 3,000 Map Projection: Oregon Statewide Lambert International Feet, NAD 1983 Feet. North Cascade District GIS January, 2018 This product is for informational use and may not be suitable for legal, engineering, or surveying purposes. APPROXIMATE NET ACRES AREA 1 AREA 2 TOTAL ACRES (MC) ACRES (MC) ACRES

Timber Sale Appraisal Tom Rock Top Sale NC

Timber Sale Appraisal Tom Rock Top Sale NC Timber Sale Appraisal Tom Rock Top Sale NC-341-2019-42- District: N Cascade Date: April 30, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value 2,097,998.56 0.00 2,097,998.56 Project Work:

More information

Timber Sale Appraisal Green 30 Sale NC

Timber Sale Appraisal Green 30 Sale NC Timber Sale Appraisal Green 30 Sale NC-314-2018-71- District: N Cascade Date: December 21, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $1,214,074.40 $0.00 $1,214,074.40 Project Work:

More information

Timber Sale Appraisal Family Camp 2 Sale NC

Timber Sale Appraisal Family Camp 2 Sale NC Timber Sale Appraisal Family Camp 2 Sale NC-341-2018-70- District: N Cascade Date: November 21, 2017 Cost Summary Conifer Hardwood Gross Timber Sale Value $1,142,448.66 $0.00 $1,142,448.66 Project Work:

More information

Timber Sale Appraisal Goat Shot Sale WO

Timber Sale Appraisal Goat Shot Sale WO Timber Sale Appraisal Goat Shot Sale WO-341-2017-61- District: West Oregon Date: April 10, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $959,801.40 $20,973.11 $980,774.51 Project Work:

More information

Timber Sale Appraisal Lost Hills Sale TL

Timber Sale Appraisal Lost Hills Sale TL Timber Sale Appraisal Lost Hills Sale TL-341-2018-102- District: Tillamook Date: February 12, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $481,882.53 $1,152,019.33 $1,633,901.86 Project

More information

Timber Sale Appraisal Franken Fir Sale TL

Timber Sale Appraisal Franken Fir Sale TL Timber Sale Appraisal Franken Fir Sale TL-341-2018-103- istrict: Tillamook ate: March 27, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $2,281,800.64 $310,478.32 $2,592,278.96 Project

More information

http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-102-1.pdf http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-63-1.pdf. COST ESTIMATE FOR PACIFICA QUARRY

More information

**Equipment production**

**Equipment production** Construction operations And methods **Equipment production** The Equipment that will be covered on the exam and in this section are; Dozers Graders Scrapers Loaders Excavators Cranes(will discuss another

More information

Woodland owners routinely want to measure property acreage,

Woodland owners routinely want to measure property acreage, FOREST MEASUREMENT EC 1129 Revised April 2004 $2.00 Tools for Measuring Your Forest S. Bowers Contents The tools and how they work... 1 Angle gauge... 1 Clinometer... 2 Combination logger's tape... 2 Compass...

More information

This publication is a supplement to Oregon

This publication is a supplement to Oregon Tarif Access Tables: A Comprehensive Set EC 1609 April 2013 Steve Bowers, Jim Reeb, and Bob Parker This publication is a supplement to Oregon State University Extension publication EM 9058, Measuring Your

More information

158 PURDUE ENGINEERING EXTENSION DEPARTMENT

158 PURDUE ENGINEERING EXTENSION DEPARTMENT 158 PURDUE ENGINEERING EXTENSION DEPARTMENT repaired. With regular maintenance and a small amount of stone added each year, these roads have held up much better than we anticipated. The cost of this type

More information

B.6 Construction Equipment Utilization and Workforce

B.6 Construction Equipment Utilization and Workforce Appendix B.6 Construction ment Utilization and Workforce B.6 Construction ment Utilization and Workforce To support environmental impact assessments, a preliminary estimate was prepared for construction

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

Woodlot Licence Harvest Planning Report Woodlot W2069

Woodlot Licence Harvest Planning Report Woodlot W2069 Woodlot Licence Harvest Planning Report Woodlot W2069 Date : 18 February, 2013 Woodlot Licence# : W2069 Eakins Point Woodlot Forest District : Sunshine Coast District Company : Ministry of Forests, Lands

More information

Woodlot Licence Harvest Planning Report for W2068

Woodlot Licence Harvest Planning Report for W2068 Woodlot Licence Harvest Planning Report for W2068 Date : 5 February, 2013 Woodlot Licence# : W2028 Forest District : Sunshine Coast Company : Ministry of Forests, Lands and Natural Resource Operations

More information

APPENDIX E SCOPE OF WORK EXAMPLE EQUIPMENT LEASING FOR CLEARING OF DEBRIS

APPENDIX E SCOPE OF WORK EXAMPLE EQUIPMENT LEASING FOR CLEARING OF DEBRIS Note: This scope of work example may be downloaded from the U.S. Army Corps of Engineer s Internet site at: ftp://ftp.sam.usace.army.mil./pub/op/opr/scopes 1. GENERAL. SCOPE OF WORK FOR RELATED TO [NAME/NATURE

More information

Western Land Area Programmatic Environmental Assessment. APPENDIX K: Climate

Western Land Area Programmatic Environmental Assessment. APPENDIX K: Climate APPENDIX K: Climate Climate Prepared by: KB Environmental Sciences, Inc. December 2017 This page is left intentionally blank. Table of Contents Page 1 Introduction... 1 2 Construction... 1 2.1 On-Road

More information

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Appendix C Noise Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Activity Equipment HP Wharf Demolition Landside (A) Wharf Demolition Marine (B) Sheet Pile

More information

Granite Watershed Mining EIS - Proposed Action. (Umatilla NF and Wallowa-Whitman NF)

Granite Watershed Mining EIS - Proposed Action. (Umatilla NF and Wallowa-Whitman NF) Granite Watershed Mining EIS - Action (Umatilla NF and Wallowa-Whitman NF) Altona Belvedear Group Blue Sky/Bull Run Buffalo Group /lode / T. 10 S.- R. 35 E. Sec 03 Quartz Gulch- T. 09 S.- R. 35 E. Sec

More information

Whatcom County Invitation to Bid Bid #17-09

Whatcom County Invitation to Bid Bid #17-09 Invitation to Bid NOTICE IS HEREBY GIVEN that sealed bids will be received by Purchasing at their fice in the Whatcom County Administrative Services Finance Office in Whatcom County Courthouse, 311 Grand

More information

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32. PROJECT 2506; 2017 ANNUAL REPAIR CONTRACT; J.C. DILLON, INC., CONTRACTED SCHEDULE OF ITEMS, QUANTITIES AND COSTS 1 Hour Lowboy Including Both Permits and Paid Driver $75.00 2 Hour Single Axle Dump Truck

More information

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete 1-2 / 2-3 clear $18.00 $30.00

More information

Auction Ring 1 -Ramp - North Auction Theatre

Auction Ring 1 -Ramp - North Auction Theatre Edmonton, AB, CAN - Oct 24, 2017 - Index Summary All times listed are approximate. Day 1 - Tuesday October 24 2017 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction

More information

HIGHLANDS COUNTY PURCHASING DEPARTMENT "AWARD TABULATION OF SEALED BIDS" ITB No HEAVY EQUIPMENT RENTAL BID OPENING: FEBRUARY 23, 2012

HIGHLANDS COUNTY PURCHASING DEPARTMENT AWARD TABULATION OF SEALED BIDS ITB No HEAVY EQUIPMENT RENTAL BID OPENING: FEBRUARY 23, 2012 1 Small Bulldozer (Low ground pressure type) Engine: Linder Industrial Machinery Komatsu D31PX-22 $1,000.00 $3,000.00 $1,000.00 Diesel 80 H.P.. Min. Neff Rental Inc. John Deere 450J LGP $1,100.00 $3,100.00

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Appendix D. Noise Calculations

Appendix D. Noise Calculations Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Portland Sand & Gravel Co. Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Special Specification 7010 Debris Removal and Disposal

Special Specification 7010 Debris Removal and Disposal Special Specification 7010 Debris Removal and Disposal 1. DESCRIPTION Provide emergency removal and disposal of debris from the highway right of way which is created by a hurricane or other type of natural

More information

APPENDIX A AIR QUALITY CALCULATIONS

APPENDIX A AIR QUALITY CALCULATIONS City of El Segundo January 2008 APPENDIX A AIR QUALITY CALCULATIONS Plaza El Segundo Development Addendum to the Certified EIR SCH No. 2003121037 Page 27 Summary of Plaza el Segundo Results By Phase Total

More information

Appendix 4-2-C Project Air Emissions Inventory

Appendix 4-2-C Project Air Emissions Inventory Appendix A CALPUFF and CALMET Methods and Assumptions Appendix 4-2-C Project Air Emissions Inventory C.1 Introduction For the purposes of estimating effects on air quality associated with the Project,

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

Auction Ring 1 -Ramp - North Auction Theatre

Auction Ring 1 -Ramp - North Auction Theatre Edmonton, AB, CAN - Jun 12, 2018 - Index Summary All times listed are approximate. Day 1 - Tuesday June 12 2018 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction 1-52

More information

Washington County Solid Waste & Recycling Garbage and Recycling Collection Services and Rates for Unincorporated Washington County

Washington County Solid Waste & Recycling Garbage and Recycling Collection Services and Rates for Unincorporated Washington County RESIDENTIAL SERVICE RATES Standard Residential Service Urban customers* receive: Rural customers* receive: one cart for weekly garbage collection one cart** for weekly garbage up to two 96-gallon mixed

More information

H.1 Construction Emissions

H.1 Construction Emissions Appendix H. Air Quality Analysis The methods used to calculate emissions of carbon monoxide (CO), volatile organic compounds (VOCs), oxides of nitrogen (NO X ), sulfur oxides (SO X ), particulate matter

More information

Complete Equipment Fleet

Complete Equipment Fleet Complete Equipment Fleet Construction ARTICULATED DUMP TRUCKS CRAWLER DOZERS EXCAVATORS 260E 321 hp Rated payload: 53,334 lbs. Heaped capacity: 19.6 cu. yd. 310E 354 hp Rated payload: 62,005 lbs. Heaped

More information

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others...

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others... 2018 Proposed Budget Table of Contents Appropriation Act. 1 Budget by Fund. 2 Michigan Transportation Funds.. 3 Work Performed for Others.... 4 Construction and Preservation... 5 Primary Construction......

More information

150 Equipment. 155 HMA Surfacing and HMA Pavement Recycling Equipment For compaction equipment see section 151 b-e

150 Equipment. 155 HMA Surfacing and HMA Pavement Recycling Equipment For compaction equipment see section 151 b-e 150 Equipment 2/22/2010 Plate 150 Equipment 151 Compaction Equipment a Sheepsfoot Roller Data 151. 01 b Self-Propelled Pneumatic Roller Data. 02 c Two Axle Tandom Steel Roller Data. 03 d Pull-Type Steel

More information

BUCK FORK N. MYRTLE CULVERT REPLACEMENT OWEB Project #

BUCK FORK N. MYRTLE CULVERT REPLACEMENT OWEB Project # PROJECT COMPLETION REPORT BUCK FORK N. MYRTLE CULVERT REPLACEMENT OWEB Project # 99-511 Figure 1 Pre-project view, Buck Fork Creek Culvert, outlet end Figure 2 Post-project, Buck Fork Creek Bridge installed

More information

MTB HEAVY & MEDIUM HYDRAULIC BREAKERS

MTB HEAVY & MEDIUM HYDRAULIC BREAKERS MTB PRODUCT RANGE MTB HEAVY & MEDIUM HYDRAULIC BREAKERS MORE POWER, LESS WASTE MTB Hydraulic Breakers are the result of 40 years experience in hard rock applications and difficult excavation conditions.

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 13 T H TO AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

CONSTRUCTION and OFF ROAD EQUIPMENT

CONSTRUCTION and OFF ROAD EQUIPMENT CONSTRUCTION and OFF ROAD EQUIPMENT QUICK REFERENCE GUIDE Vehicle Valuation Services, Inc. 1 South 450 Summit Avenue Suite 185 Oakbrook Terrace, IL 60181 888.475.9975 Fax: 888.475.9935 www.vvsi.com Vehicle

More information

Appendix H: Construction Impacts H-3 Air Quality

Appendix H: Construction Impacts H-3 Air Quality Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263

More information

This appendix describes various types of equipment that can

This appendix describes various types of equipment that can Appendix GENERAL ENGINEER SUPPORT EQUIPMENT This appendix describes various types of equipment that can be used to support general engineer missions. This information is provided to help planners choose

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

Construction Emissions Estimates ICTF Modernization Project Long Beach, California

Construction Emissions Estimates ICTF Modernization Project Long Beach, California Construction Emissions Estimates ICTF Modernization Project Long Beach, California prepared for: Union Pacific Railroad Company October 2007 prepared by: Sierra Research, Inc. 1801 J Street Sacramento,

More information

Hydraulic power is the key to the utility of many excavators.

Hydraulic power is the key to the utility of many excavators. CHAPTER Construction Planning, Equipment, and Methods EXCAVATORS Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 8 By Dr. Ibrahim Assakkaf ENCE 420 Construction

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION 03SP502(P) SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) C&T:TEH 1 of 8 C&T:APPR:JFS:MJE:01-28-08 FHWA:APPR:02-01-08 a. Description. Provide

More information

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION REPORT NO. TS-07-15 MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION TO: Mayor and Members of Council FROM: Mike LeBlanc, Director of Operations DATE: March 23, 2015 SUBJECT:

More information

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,

More information

Municipal District of Taber Synchronized With The Alberta Township System

Municipal District of Taber Synchronized With The Alberta Township System Municipal District of Taber Synchronized With The Alberta Township System The Alberta Township System The Alberta Township System is another Name for the Dominion Land Survey System that was developed

More information

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Southern Windsor County 2016 Traffic Count Program Summary April 2017 Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern

More information

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate AIR EQUIPMENT & TOOLS: Compressors: Gas or Diesel, cfm @ 100 psi Gas or Diesel, cfm @ 100 psi 85-150 cfm $27,272.70 7% $1,909.09 $13.00 $130.00 151-175 cfm $34,848.45 7% $2,439.39 $13.50 $135.00 176-250

More information

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62:

DRIVEWAY STANDARDS EXHIBIT A. The following definition shall replace the definition of driveway in Section 62: 1365 S. Camino del Rio Durango, CO 81303 970-382-6363 DRIVEWAY STANDARDS Resolution 2014-40 EXHIBIT A The following definition shall replace the definition of driveway in Section 62: Driveway means a roadway,

More information

Appendix E3. Open Pit Pioneering and Pre-production

Appendix E3. Open Pit Pioneering and Pre-production Appendix E3 Open Pit Pioneering and Pre-production File Note From: George Dermer To: File Date: January 11, 2012 Re: KSM Mitchell Pit Mine Pre-Production and Start-up plan Summary: Pre-Production mining

More information

Minto North Access Design

Minto North Access Design Minto North Access Design September 3, 2014 Minto North Access Design September 2, 2014 1 Introduction This document presents an updated plan for creating an access road to the Minto North pit. It shows

More information

Province of Prince Edward Island 2017

Province of Prince Edward Island 2017 Province of Prince Edward Island 2017 Standard Negotiated Rates A B C Trucking Rates Standard Prices - Unbid Jobs Machinery Rental Rates August 16, 2017 Department of Transportation, Infrastructure and

More information

SERVICES GUIDE CIVIL CONSTRUCTION, TRUCKING & LOGGING SERVICES IN NORTHERN ALBERTA

SERVICES GUIDE CIVIL CONSTRUCTION, TRUCKING & LOGGING SERVICES IN NORTHERN ALBERTA SERVICES GUIDE CIVIL CONSTRUCTION, TRUCKING & LOGGING SERVICES IN NORTHERN ALBERTA YOUR ONE-STOP SHOP FOR CONSTRUCTION, TRANSPORTATION & LOGGING SERVICES We offer a wide range of civil construction, trucking

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

Reduced Tire Inflation Pressure-A Solution for Marginal-Quality Road Construction Rock in Southeast Alaska

Reduced Tire Inflation Pressure-A Solution for Marginal-Quality Road Construction Rock in Southeast Alaska TRANS PORTA TJON RESEARCH RECORD 1291 Reduced Tire Inflation Pressure-A Solution for Marginal-Quality Road Construction Rock in Southeast Alaska BILL POWELL AND BRUCE BRUNETTE When marginal-quality rock

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer.

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. DOZERS Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. Blade is lowered to cut the soil and push the soil in front of blade. It unloads the soil by pushing it over

More information

Production Analysis Report

Production Analysis Report Production Analysis Report March 2010 Cat D9R Mirenco C-Max On vs. Off Study Purpose Study Date The purpose of the study was to conduct economic analysis of dozer production capability, as well as determine

More information

Work Tool Attachments

Work Tool Attachments Work Tool Attachments PRODUCT LINE Americas North Skid Steer, Multi Terrain & Compact Track Loaders 226B3 246D 259D 272D XHP 287D 297D XHP 236D 247B3 262D 277D 289D 299D 242D 257D 272D 279D 297D 299D XHP

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

SERVICES GUIDE LOGGING, CIVIL CONSTRUCTION & TRUCKING SERVICES IN NORTHERN ALBERTA

SERVICES GUIDE LOGGING, CIVIL CONSTRUCTION & TRUCKING SERVICES IN NORTHERN ALBERTA SERVICES GUIDE LOGGING, CIVIL CONSTRUCTION & TRUCKING SERVICES IN NORTHERN ALBERTA YOUR ONE-STOP SHOP FOR LOGGING, CONSTRUCTION & TRANSPORTATION SERVICES We offer a wide range of logging, civil construction

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway

General Decision Number: MN /04/2011 MN15. State: Minnesota. Construction Type: Highway 1of 5 General Decision Number: MN100015 02/04/2011 MN15 State: Minnesota Construction Type: Highway Counties: Dodge, Fillmore, Freeborn, Goodhue, Houston, Mower, Olmsted, Rice, Steele, Wabasha and Winona

More information

New Weight Limits on Roads

New Weight Limits on Roads New Weight Limits on Roads Minnesota s Truck Weight 2018 Education Program Minnesota Assn. of Townships Greg Hayes / Tom Nelson A Minnesota educational project to safeguard public roadways through voluntary

More information

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES...

TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS...4 POTENTIAL FUNDING SOURCES... Transportation Impact Fee Study September 2014 TABLE OF CONTENTS EXECUTIVE SUMMARY...1 INTRODUCTION...3 PROJECTED FUTURE GROWTH...3 ROADWAY IMPROVEMENT PROJECTS......4 POTENTIAL FUNDING SOURCES...7 PROPOSED

More information

Roads Analysis Report

Roads Analysis Report United States Department of Agriculture U.S. Forest Service April, 2014 Amended September, 2014 August, 2015 Roads Analysis Report Melvin Butte Vegetation Management Project Sisters Ranger District Deschutes

More information

Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY FOLLOW-UP ITEM. 1. Citizen Comments

Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY FOLLOW-UP ITEM. 1. Citizen Comments AGENDA Regular Meeting PULASKI COUNTY Mon. August 18, 2003 PUBLIC SERVICE AUTHORITY 9:00 a.m. FOLLOW-UP ITEM 1. Citizen Comments 2. Reports from the County Administrator & Staff: a. Collection Staff Activity:

More information

LESSON PLAN. Production Estimations LESSON ID: EEC/EEO-B07 ENGINEER EQUIPMENT WARRANT OFFICER/CHIEF COURSE CID: A16ACN1/A1613E1 REVISED 09/08/2014

LESSON PLAN. Production Estimations LESSON ID: EEC/EEO-B07 ENGINEER EQUIPMENT WARRANT OFFICER/CHIEF COURSE CID: A16ACN1/A1613E1 REVISED 09/08/2014 UNITED STATES MARINE CORPS ENGINEER EQUIPMENT INSTRUCTION COMPANY MARINE CORPS DETACHMENT 1706E EAST 8 TH STREET FORT LEONARD WOOD MISSOURI 65473-8963 LESSON PLAN Production Estimations LESSON ID: EEC/EEO-B07

More information

Bulldozer Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour

Bulldozer Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour Cost Per Hour 6100 Wedgwood Road, Medina, Ohio 44256 mark@albrechttrucking.com Belsole3@frontier.com jeremy@crossroadsasphalt.com jhowell806@aol.com marksconstruction@zoominternet.net terry.triner@melwaypaving.com treemasters.jeff@gmail.com

More information

Answer Key. Do Not Distribute

Answer Key. Do Not Distribute 2017 Page 1 of 6 STUDENTS DO NOT OPEN THIS TEST OR BEGIN UNTIL INSTRUCTED TO START 2017 Examination for the National Agricultural Technology and Mechanical Systems Career Development Event Name Print Name

More information

Transfer. CE 431: Solid Waste Management

Transfer. CE 431: Solid Waste Management Transfer CE 431: Solid Waste Management Transfer Stations Transfer stations are the sites on which transfer of waste is carried out, placed on small and then larger vehicles for transportation over long

More information

Wildfires Reported to NICC

Wildfires Reported to NICC Wildfires Reported to NICC In 2017 there were 71,499 wildfires in the U.S., which burned 10,026,086 acres. Fires reported and acres burned were well above the five year average and slightly higher than

More information

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses?

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses? Do Standard Trip Generation Rates Overstate Impact of Commercial Uses? Presented by: Tindale-Oliver & Associates, Inc. Presentation Overview 1 2 3 4 5 Introduction Trip Characteristics Database TOA Demand

More information

THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA MEMORANDUM

THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA MEMORANDUM ENC. March 1, 2011 MATERIALS MANAGEMENT DEPARTMENT 101 OLD VENICE ROAD OSPREY, FLORIDA 34229 TELEPHONE (941) 486-2183 FAX (941) 486-2188 MEMORANDUM TO: FROM: TITLE: Members of the School Board Lori White,

More information

BACKHOE PRICING INFO

BACKHOE PRICING INFO Price quote for: VENDOR NAME BACKHOE PRICING INFO Ziegler Cat MAKE AND MODEL Caterpillar 416F2 Spec # Description Price 1.0 Price for base unit: $ 62,460.00 2.0 OPERATOR ENVIRONMENT Use this section to

More information

Executive Summary. Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico

Executive Summary. Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico : Solid Waste Management Program Analysis and Recommendations for Silver City, New Mexico The (ES) presents the main observations, conclusions, and recommendations resulting from the evaluation of the

More information

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES: TransWest Express Transmission Project TABLE OF CONTENTS 7.0 DESIGN OPTIONS... 7-1 7.1 OVERVIEW OF DESIGN OPTIONS... 7-1 7.2 DESIGN OPTIONS PURPOSE AND NEED AND DESIGN CHARACTERISTICS... 7-4 7.2.1 Design

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60

More information

Project Location. Purpose and Need for Action. File Code: 1950 Date: September 14, Dear Interested Party,

Project Location. Purpose and Need for Action. File Code: 1950 Date: September 14, Dear Interested Party, United States Department of Agriculture Forest Service Idaho Panhandle National Forests Sandpoint Ranger District 1602 Ontario Street Sandpoint, ID 83864 File Code: 1950 Date: September 14, 2016 Dear Interested

More information

Cedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401

Cedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401 Cedar View Subdivision No. 2 Hillcrest Dr. 81401 Property Information Packet John Renfrow * Jim Renfrow M b f Renfrow Realty Member of: Rocky Mountain Commercial Brokers www.rmcbrokers.com Page 1 Executive

More information

LOW VOLUME ROADS The Backbone of Your County Road System

LOW VOLUME ROADS The Backbone of Your County Road System 2018 Far West County Judges & Commissioners Assn. Conference September 11-14, 2018 LOW VOLUME ROADS The Backbone of Your County Road System County Commissioners continue to face ever-increasing challenges

More information

COPPER RUN PRELIMINARY PLANS FOR LITTLE CREEK HUNDRED, KENT COUNTY DELAWARE COPPER RUN GENERAL NOTES. DATA COLUMN PyA FgA SITE.

COPPER RUN PRELIMINARY PLANS FOR LITTLE CREEK HUNDRED, KENT COUNTY DELAWARE COPPER RUN GENERAL NOTES. DATA COLUMN PyA FgA SITE. PRELIMINARY PLANS FOR LITTLE CREEK HUNDRED, KENT COUNTY DELAWARE DATA COLUMN PyA FgA GENERAL NOTES N SITE N FaA N LOCATION MAP SCALE: 1"=000' SITE SOILS MAP SCALE: 1"=00' TRIP GENERATION - FORK BRANCH

More information

EFFECT OF TRUCK PAYLOAD WEIGHT ON PRODUCTION

EFFECT OF TRUCK PAYLOAD WEIGHT ON PRODUCTION EFFECT OF TRUCK PAYLOAD WEIGHT ON PRODUCTION BY : Cliff Schexnayder Sandra L. Weber Brentwood T. Brook Source : Journal of Construction Engineering & Management / January/February 1999 Introduction : IDEAS

More information

Snow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site

Snow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site Snow Dump Sites Understanding What to Do with Collected Snow Québec City Among cities with a population of 500,000 or more, Québec City ranks second in the world for the highest snowfall, behind Sapporo,

More information

PM2.5 (lb/day) PM2.5 (ton/yr) PM2.5 (lb/day)

PM2.5 (lb/day) PM2.5 (ton/yr) PM2.5 (lb/day) AIR QUALITY ATTACHMENT - SSJID Retail Electric Service Plan Summary of Construction Emissions :Project without Border-Area Service Plan NOx PM10 PM2.5 CO ROG SOx CO2 On-Road Crew and Workers 27.46 1.50

More information

Appendix C Noise and Vibration Worksheets

Appendix C Noise and Vibration Worksheets PUBLIC WORKS BUREAU OF ENGINEERING Appendix C Noise and Vibration Worksheets Central Outfall Sewer at 59 th Street Page C-1 CEQA Initial Study and 4 th Avenue Project January 2012 Receptor Noise Level

More information

CAT MINI EXCAVATOR ATTACHMENT OPTIONS

CAT MINI EXCAVATOR ATTACHMENT OPTIONS CAT MINI EXCAVATOR ATTACHMENT OPTIONS Get Multiple Machines Out of One For more information, visit Cat.com/attachments or contact your local Cat dealer. AEXQ1584-02 March 2018 2018 Caterpillar. All Rights

More information

AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004)

AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) RULE 8081 AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) 1.0 Purpose The purpose of this rule is to limit fugitive dust emissions from agricultural sources. 2.0 Applicability

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 20 T H TO AUGUST 25 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

APPENDIX F. Air Quality Modeling Results

APPENDIX F. Air Quality Modeling Results APPENDIX F Air Quality Modeling Results PHASE 2 NLIP Emissions Summary Unmitigated 2008 Emissions Sutter County Worst-Case lb/day Tons/year Sacramento County Worst-Case lb/day Tons/year ROG NOX PM10 ROG

More information

TSP-308 MPK Ferdinand Fassa

TSP-308 MPK Ferdinand Fassa Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa OUTLINE 1. Introduction 2. Dozer Performance Characteristics Classified on the basis of running gear Blade Dozer Function 3. Dozer Production Estimating 4. Dozer

More information