Timber Sale Appraisal Tom Rock Top Sale NC

Size: px
Start display at page:

Download "Timber Sale Appraisal Tom Rock Top Sale NC"

Transcription

1 Timber Sale Appraisal Tom Rock Top Sale NC District: N Cascade Date: April 30, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value 2,097, ,097, Project Work: (127,300.00) Advertised Value: 1,970, /02/18 1

2 Timber Sale Appraisal Tom Rock Top Sale NC District: N Cascade Date: April 30, 2018 Timber Description Location: Portions of Sections 7 and 8 T10S, R3E, W.M., Linn County, OR Stand Stocking: 60% Specie Name AvgDBH Amortization (%) Recovery (%) Douglas - Fir Western Hemlock / Fir Volume by Grade 2S 3S & 4S 6"- 11" SM & Better Total Douglas - Fir 2, ,243 Western Hemlock / Fir Total 2, ,284 5/02/18 2

3 Comments: Pond Values Used: Local Pond Values, April, Western redcedar and Other Cedars Stumpage Price = Pond Value minus Logging Cost: 1,023.00/MBF = 1,350.00/MBF /MBF - 50/MBF Additional haul Red Alder and Other Hardwoods Stumpage Price = Pond Value minus Logging Cost: /MBF = /MBF /MBF BRANDING AND PAINTING COST ALLOWANCE = 2.00/MBF FUEL COST ALLOWANCE = 3.00/Gallon HAULING COST ALLOWANCE Hauling costs equivalent to 900 daily truck cost. Other Costs (with Profit & Risk to be added): Season 1 Equipment Move-In: Accounted for in Logging Cost Season 1 Equipment Weed Wash: ((120.00/hr loaded transport) + (22.00/hr X 2 pilots per piece of equipment)) X 2.5 hour wash time = X 4 pieces of equipment = 1, Season 2 Equipment Move-In: ((120.00/hr loaded transport) + (22.00/hr x 2 pilots per piece of equipment)) X 4 hour Move-In Cycle = X 4 pieces of equipment = 2, Season 2 Equipment Weed Wash: ((120.00/hr loaded transport) + (22.00/hr X 2 pilots per piece of equipment)) X 2.5 hour wash time = X 4 pieces of equipment = 1, Total Intermediate Support Cost Intermediate support: each = 1, TOTAL Other Costs (with Profit & Risk to be added) = 6, Other Costs (No Profit & Risk added): None. SLASH DISPOSAL COSTS Covering Piles: (12.00/pile x 6 piles) + (22/hr x 2 covering personnel x 1.5 hours) = TOTAL Slash Disposal Costs = ROAD MAINTENANCE COSTS Move-In: 120/hr loaded transport X 4 hour Move-In Cycle = 480 X 1 Grader = 480 General Road Maintenance: 6 miles X 1,100/mile + (move in 480) = 7,080 TOTAL Road Maintenance Costs = 7,080/ 3,284 MBF = /02/18 3

4 Timber Sale Appraisal Tom Rock Top Sale NC District: N Cascade Date: April 30, 2018 Logging Conditions Combination#: 1 Douglas - Fir % Western Hemlock / Fir % Logging System: Cable: Medium Tower >40 - <70 Process: Stroke Delimber yarding distance: Long (1,500 ft) downhill yarding: No tree size: Mature / Regen Cut (900 Bft/tree), 3-5 logs/mbf loads / day: 6 bd. ft / load: 5000 cost / mbf: machines: Log Loader (A) Stroke Delimber (A) Tower Yarder (Medium) 5/02/18 4

5 Timber Sale Appraisal Tom Rock Top Sale NC District: N Cascade Date: April 30, 2018 Logging Costs Operating Seasons: 2.00 Profit Risk: 10% Project Costs: 127, Other Costs (P/R): 6, Slash Disposal: Other Costs: 0.00 Miles of Road Road Maintenance: 2.16 Dirt Rock (Contractor) Rock (State) Paved Hauling Costs Species / MBF Trips/Day MBF / Load Douglas - Fir Western Hemlock / Fir /02/18 5

6 Timber Sale Appraisal Tom Rock Top Sale NC Logging Douglas - Fir District: N Cascade Date: April 30, 2018 Road Maint Fire Protect Hauling Logging Costs Breakdown Other P/R appl Profit & Risk Slash Disposal Scaling / Brand & Paint Other Western Hemlock / Fir Total Specie Amortization Pond Value Stumpage Amortized Douglas - Fir Western Hemlock / Fir /02/18 6

7 Timber Sale Appraisal Tom Rock Top Sale NC District: N Cascade Date: April 30, 2018 Summary Amortized Specie MBF Value Total Douglas - Fir Western Hemlock / Fir Unamortized Specie MBF Value Total Douglas - Fir 3, ,081, Western Hemlock / Fir , Gross Timber Sale Value Recovery: 2,097, Prepared By: Wyatt Taylor Phone: /02/18 7

8 Pulp Appraisal Sale Name Tom Rock Top Species All Species Stems Per/ac. 59 Acres 98 Total Stems 5782 BF/Stem, Conversion 10 Total MBF Per/Species 58 Pond Value Per/MBF Logging + Hauling Costs Additional Loading Costs Stumpage Tons Per/MBF, Conversion 10 Price Per/Ton Total Tons Per/Species 578 Total Value 6, Total Price Price/Ton Price/MBF 6, Total Less P/R 75% 1, Contract Price (/MBF) 29.28

9 SUMMARY OF ROAD COSTS TOM ROCK TOP Project No. 1 NEW CONSTRUCT: Segments B to B1 Total stations Total miles Rocking Length Rip Rap 6"-0 Jaw Run Roads 1.5"-0 Culverts 1.5"-0 Construct cy 331 cy 121 cy 24 cy 11, Move-in 6, Project No. 1 18, Project No. 2 ROAD IMPROVEMENT: Segments A to A2 A3 to A4 Total stations Rocking Length Rip Rap 6"-0 Jaw Run Roads 1.5"-0 Culverts 1.5"-0 Construct cy 108 cy 977 cy 72 cy 24, cy 567 cy 24 cy 12, cy 108 cy 1,543 cy 96 cy STOCKPILE ROCK: Total miles 1.28 Project No. 2 36, Project No. 3 Tom Rock Pit Stockpile at pit Stockpile at pit Size of Rock Cubic Yards Stockpile Cost to Crush only Total 1.5"-0 Crushed 4,215 cy , "-0 Jaw Run 1,561 cy , Project No. 3 72, TOTAL CONTRACT CREDIT AMOUNT 127, Grand Total 127, % = 25, ROCK TOTALS: Location Tom Rock Pit Stockpiled Roads & Culverts TOTAL to Crush Rock sizes Rip Rap 6"-0 Jaw Run Roads 1.5"-0 1,561 cy 4,215 cy 15 cy 439 cy 1,785 cy 15 cy 2,000 cy 6,000 cy James Stuart 05/02/2018

10 MOVE-IN COSTS TOM ROCK TOP Equipment Hourly rate On site Hrs Cost Lowboy Weedwash Weedwash Total No. Description per machine to move Cost Time 65/hr Cost 1 Grader Rollers & Compactor Excavator , Small backhoe Tractors (D5 - D8) , Dump Truck (10 cy +) Loader Water Truck (1000 gallon) Totals , TOTAL MOVE-IN COSTS ONE TIME = 6, James Stuart 05/02/2018

11 PROJECT NO. 1 New Construct Sale: Tom Rock Top Road Segment: B to B1 ROAD BETTERMENT: Station Designed Cubic Yards/Station Cost per Quanity Riprap 1.5"-0 6" jaw run Soil Station or Acre Sum Reconstruct cy 60 cy , Landing Tailtrack Landing Construction 0 - Turn out - Turnaround - End haul road ditch - Culvert Bedding 1 3 cy 24 cy Two-way junction - SUB-TOTAL 2, CULVERTS: Total Description Type Size Length Cost Bevel Bands Cost Sub Total Install Sum 1-18" x 40 cpp 18" , cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Total Install Sum Seed/mulch (average 2-bales per site/pipe) Install 6 long steel "T" posts on culverts Remove old culverts off State property Install outlet dissipator SUB-TOTAL 1, SURFACING: Turn Two-way Culvert Turn Dissipator Haul & Crush Roads Tailtrack Roads Arounds Junctions Bedding outs (cy/pipe) Total Combined Cost 1.5" cy 24 cy 145 cy , "-0 JawRun 331 cy 331 cy , Riprap (8"- 24") 3 cy 3 cy SUB-TOTAL 7, GRAND TOTAL = 11, James Stuart 05/02/2018

12 PROJECT NO. 2 ROAD - IMPROVEMENT COSTS Sale: Tom Rock Top Road Segment: A to A2 ROAD BETTERMENT: Station Designed Cubic Yards/Station Cost per Quanity Riprap 1.5"-0 6" jaw run Soil Station or Acre Sum Reconstruct cy Landing Tailtrack 2 54 cy - - Landing Construction Turn out - Turnaround - End haul road ditch cy Culvert Bedding 3 3 cy 24 cy Two-way junction - SUB-TOTAL 1, CULVERTS: Total Description Type Size Length Cost Bevel Bands Cost Sub Total Install Sum 3-18" x 30 cpp 18" 90 1, , , , cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Total Install Sum Seed/mulch (average 2-bales per site/pipe) Install 6 long steel "T" posts on culverts Remove old culverts off State property Install outlet dissipator SUB-TOTAL 3, SURFACING: Turn Two-way Culvert Turn Dissipator Haul & Crush Roads Tailtrack Roads Arounds Junctions Bedding outs (cy/pipe) Total Combined Cost 1.5" cy 72 cy 1,049 cy , "-0 JawRun 108 cy 108 cy , Riprap (8"- 24") 9 cy 9 cy SUB-TOTAL 18, GRAND TOTAL = 24, James Stuart 05/02/2018

13 PROJECT NO. 2 ROAD - IMPROVEMENT COSTS Sale: Tom Rock Top Road Segment: A3 to A4 ROAD BETTERMENT: Station Designed Cubic Yards/Station Cost per Quanity Riprap 1.5"-0 6" jaw run Soil Station or Acre Sum Reconstruct cy Landing Tailtrack - - Landing Construction - Turn out - Turnaround 1 54 cy End haul road ditch cy Culvert Bedding 1 3 cy 24 cy Two-way junction - SUB-TOTAL CULVERTS: Total Description Type Size Length Cost Bevel Bands Cost Sub Total Install Sum 1-18" x 40 cpp 18" , cpp = corrigated plastic pipe cmp = corrigated metal pipe Quantity Cost Sub Total Install Sum Seed/mulch (average 2-bales per site/pipe) Install 6 long steel "T" posts on culverts Remove old culverts off State property Install outlet dissipator SUB-TOTAL 1, SURFACING: Turn Two-way Culvert Turn Dissipator Haul & Crush Roads Tailtrack Roads Arounds Junctions Bedding outs (cy/pipe) Total Combined Cost 1.5" cy 54 cy 24 cy 591 cy , "-0 JawRun Riprap (8"- 24") 3 cy 3 cy SUB-TOTAL 9, GRAND TOTAL = 12, James Stuart 05/02/2018

14 Tom Rock Top Pit Name: Tom Rock (4-mile) 1.5"-0 Crushed /cu.yd.==> Swell: 1.30 Shrinkage/Compact: 1.16 Drill Pct.: 100% Truck measure 6,000 cy Oversize Pct.: 25% Scalp & Clear Overburden: /hr x 4 hrs = 1, Drill & Shoot: 3.00 /cy x 6,000 cy = 18, Sort and split oversize rock: 4.25 /cy x 1,500 cy = 6, Load Crusher: 1.25 /cy x 6,000 cy = 7, Crushing 2.50 /cy x 6,000 cy = 15, Screening Rock 2.30 /cy x 6,000 cy = 13, Clean Up Pit /hr x 2 hrs = MOVE IN COSTS Subtotal 62, stage crusher 3, , Move in and set up Drill and Compressor 1, , Move in D-8 (1) Move in Loaders (1) Move in Excavator (1) Move in Trucks (1) Gradation Tests per 6,000 cy = Subtotal 6, "-0 Jaw Run /cu.yd.==> ESTIMATED TOTAL COST 69, Swell: 1.30 Shrinkage/Compact: 1.16 Drill Pct.: 100% Truck measure 2,000 cy Oversize Pct.: 25% Scalp & Clear Overburden: /hr x 4 hrs = Drill & Shoot: 3.00 /cy x 2,000 cy = 6, Sort and split oversize: 4.25 /cy x 500 cy = 2, Load Crusher: 1.25 /cy x 2,000 cy = 2, Crushing 2.50 /cy x 2,000 cy = 5, Screening Rock 2.30 /cy x 2,000 cy = 4, Subtotal 20, Riprap & Pit-run /cu.yd.==> 2.38 ESTIMATED TOTAL COST 20, Truck measure 15 cy Rip and Develop 2.00 /cy x 15 cy = Sort Oversize: 3.75 /cy x 2 cy = 5.63 Subtotal ESTIMATED TOTAL COST GRAND TOTAL FOR CRUSHING 90, James Stuart 05/02/2018

15 (Sale Name) Rates Tom Rock (Quarry) Tom Rock (Stockpile) Spread Dump Truck Rate (/Hr.) Capacity (cy) Operator (/Hr.) Total Crushed (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B /2" - 0 (Rock Size) 14G (Loader) D8 (Tractor) D OH Hauling Time Computation Grader Rate (/Hr.) Operator (/Hr.) Total 50 MPH Miles per round trip 0 Minutes 12-G MPH Miles per round trip 0 Minutes 14-G MPH Miles per round trip 0 Minutes Compaction Equipment Rate (/Hr.) Operator (/Hr.) Total 30 MPH Miles per round trip 0 Minutes Vibratory Roller MPH 1.7 Miles per round trip 4 Minutes Vib. Grid Roller MPH 0.5 Miles per round trip 2 Minutes Hand Held Compactor MPH 0 Miles per round trip 0 Minutes Tractors Rate (/Hr.) Operator (/Hr.) Total 10 MPH 0 Miles per round trip 0 Minutes D MPH 0.3 Miles per round trip 4 Minutes D Total Miles per Round Trip D Dump or Spread Time per Round Trip 0 Minutes D Total Hauling Cycle Time for this Setting (100% Efficiency) 9 Minutes Operator Efficiency Correction (80% Efficiency) 12 Minutes Loader Rate (/Hr.) Capacity (cy) Operator (/Hr.) Total 14G Cat Wheel Loader Time Per Cubic Yard Tom Rock Top Rate (Min/Load) Delay (Min) Total Loading Time (Min) Hauling Only (per cubic yard) 0.98 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Total Time Per Cubic Yard 1.50 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour per Hr. Cost of Truck Operator Pre Hour per Hr. Dump or Spread Time (Min) Total Operating Cost Per Hour per Hr. Pile Dump 0.25 Operating Cost Per Minute 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard 2.13 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour per Hr. Cost of Grader Operator Per Hour per Hr. Cost of Compaction Equip. Per Hour per Hr. Cost of Compaction Equip. Op. Per Hour per Hr. Total Operating Cost Per Hour per Hr. Cost Per Cubic Yard to Grade and Roll 1.42 Cu. Yd. Total Cost to Load, Haul and Place 4.51 Cu. Yd. Cost to Crush Grand Total Combined James Stuart 05/02/2018

16 (Sale Name) Rates Tom Rock (Quarry) Tom Rock (Stockpile) Spread Dump Truck Rate (/Hr.) Capacity (cy) Operator (/Hr.) Total Jaw Run (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B " (Rock Size) 14G (Loader) D8 (Tractor) D OH Hauling Time Computation Grader Rate (/Hr.) Operator (/Hr.) Total 50 MPH Miles per round trip 0 Minutes 12-G MPH Miles per round trip 0 Minutes 14-G MPH Miles per round trip 0 Minutes Compaction Equipment Rate (/Hr.) Operator (/Hr.) Total 30 MPH Miles per round trip 0 Minutes Vibratory Roller MPH 1.7 Miles per round trip 4 Minutes Vib. Grid Roller MPH 0.5 Miles per round trip 2 Minutes Hand Held Compactor MPH 0 Miles per round trip 0 Minutes Tractors Rate (/Hr.) Operator (/Hr.) Total 10 MPH 0 Miles per round trip 0 Minutes D MPH 0.3 Miles per round trip 4 Minutes D Total Miles per Round Trip D Dump or Spread Time per Round Trip 0 Minutes D Total Hauling Cycle Time for this Setting (100% Efficiency) 9 Minutes Operator Efficiency Correction (80% Efficiency) 12 Minutes Loader Rate (/Hr.) Capacity (cy) Operator (/Hr.) Total 14G Cat Wheel Loader Time Per Cubic Yard Tom Rock Top Rate (Min/Load) Delay (Min) Total Loading Time (Min) Hauling Only (per cubic yard) 0.98 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Total Time Per Cubic Yard 1.50 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour per Hr. Cost of Truck Operator Pre Hour per Hr. Dump or Spread Time (Min) Total Operating Cost Per Hour per Hr. Pile Dump 0.25 Operating Cost Per Minute 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard 2.13 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour per Hr. Cost of Grader Operator Per Hour per Hr. Cost of Compaction Equip. Per Hour per Hr. Cost of Compaction Equip. Op. Per Hour per Hr. Total Operating Cost Per Hour per Hr. Cost Per Cubic Yard to Grade and Roll 1.42 Cu. Yd. Total Cost to Load, Haul and Place 4.51 Cu. Yd. Cost to Crush Grand Total Combined James Stuart 05/02/2018

17 (Sale Name) Rates Tom Rock (Quarry) Tom Rock (Stockpile) Spread Dump Truck Rate (/Hr.) Capacity (cy) Operator (/Hr.) Total Pit-Run (Rock Type) D10 (Truck) 12-G (Grader) Vibratory Roller (Compactor) B "+ 24" (Rock Size) 14G (Loader) D8 (Tractor) D OH Hauling Time Computation Grader Rate (/Hr.) Operator (/Hr.) Total 50 MPH Miles per round trip 0 Minutes 12-G MPH Miles per round trip 0 Minutes 14-G MPH Miles per round trip 0 Minutes Compaction Equipment Rate (/Hr.) Operator (/Hr.) Total 30 MPH Miles per round trip 0 Minutes Vibratory Roller MPH 1.7 Miles per round trip 4 Minutes Vib. Grid Roller MPH 0.5 Miles per round trip 2 Minutes Hand Held Compactor MPH 0 Miles per round trip 0 Minutes Tractors Rate (/Hr.) Operator (/Hr.) Total 10 MPH 0 Miles per round trip 0 Minutes D MPH 0.3 Miles per round trip 4 Minutes D Total Miles per Round Trip D Dump or Spread Time per Round Trip 0 Minutes D Total Hauling Cycle Time for this Setting (100% Efficiency) 9 Minutes Operator Efficiency Correction (80% Efficiency) 12 Minutes Loader Rate (/Hr.) Capacity (cy) Operator (/Hr.) Total 14G Cat Wheel Loader Time Per Cubic Yard Tom Rock Top Rate (Min/Load) Delay (Min) Total Loading Time (Min) Hauling Only (per cubic yard) 0.98 min/cu.yd Loading Costs Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Total Time Per Cubic Yard 1.50 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour per Hr. Cost of Truck Operator Pre Hour per Hr. Dump or Spread Time (Min) Total Operating Cost Per Hour per Hr. Pile Dump 0.25 Operating Cost Per Minute 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard 2.13 per Cu. Yd. Spreading w/grader 5 Loading Cost Per Cubic Yard 0.95 per Cu. Yd. Spreading Cost Per Cubic Yard Cost of Grader Per Hour per Hr. Cost of Grader Operator Per Hour per Hr. Cost of Compaction Equip. Per Hour per Hr. Cost of Compaction Equip. Op. Per Hour per Hr. Total Operating Cost Per Hour per Hr. Cost Per Cubic Yard to Grade and Roll 1.42 Cu. Yd. Total Cost to Load, Haul and Place 4.51 Cu. Yd. Cost to Crush 2.38 Grand Total Combined 6.88 James Stuart 05/02/2018

18 Tom Rock Top (Sale Name) Total Yards End Hauled: cy Rates On site EndHual To nearest waste area Spread and Compact Dump Truck Rate (/Hr.) Capacity (cy) Operator (/Hr.) Total Waste (Type) D10 (Truck) D6 (Grader) Vibratory Roller (Compactor) B (Rock Size) (Loader) Cat 325 Excavator (Excavator) D (Water Truck Size) Gal/cu.yd OH Hauling Time Computation Grader Rate (/Hr.) Operator (/Hr.) Total 50 MPH Miles per round trip 0 Minutes 12-G MPH Miles per round trip 0 Minutes 14-G MPH Miles per round trip 0 Minutes Compaction Equipment Rate (/Hr.) Operator (/Hr.) Total 30 MPH Miles per round trip 0 Minutes Vibratory Roller MPH Miles per round trip 0 Minutes Vib. Grid Roller MPH 0.4 Miles per round trip 1 Minutes Hand Held Compactor MPH 0 Miles per round trip 0 Minutes Tractors Rate (/Hr.) Operator (/Hr.) Total 10 MPH 0.1 Miles per round trip 1 Minutes D MPH Miles per round trip 0 Minutes D Total Miles per Round Trip D Dump or Spread Time per Round Trip 0 Minutes D Total Hauling Cycle Time for this Setting (100% Efficiency) 2.05 Minutes Operator Efficiency Correction (80% Efficiency) 2.56 Minutes Loader Rate (/Hr.) Capacity (cy) Operator (/Hr.) Total 14G Cat Wheel Loader Cat 325 Excavator Time Per Cubic Yard Total Rate Delay (Min) Loading (Min/Load) Hauling Only (per cubic yard) 0.21 min/cu.yd Loading Costs Time (Min) Delay Time (while loading = loading time per cubic yard) 0.52 min/cu.yd Crushed Rock Total Time Per Cubic Yard 0.73 min/cu.yd Pit-Run/Jaw-Run Rock Rip Rap Rock Hauling Cost Per Cubic Yard Computation Fill Material Cost of Truck Per Hour per Hr. Cost of Truck Operator Pre Hour per Hr. Dump or Spread Time (Min) Total Operating Cost Per Hour per Hr. Pile Dump 0.25 Operating Cost Per Minute 1.42 per Min. Truck Spread 0.5 Cost Per Cubic Yard 1.04 per Cu. Yd. Spreading w/dozer 5 Loading Cost Per Cubic Yard 1.56 per Cu. Yd. Place with Excavator 6 Spreading Cost Per Cubic Yard Cost of Excavator Per Hour per Hr. Cost of Excavator Operator Per Hour per Hr. Cost of Compaction Equip. Per Hour per Hr. Cost of Compaction Equip. Op. Per Hour per Hr. Total Operating Cost Per Hour per Hr. Cost Per Cubic Yard to Place and Compact 1.94 Cu. Yd. Total Cost to Load, Haul, and Place 4.55 Cu. Yd. James Stuart 05/02/2018

19 TC PSTATS TWP RGE SC TRACT TYPE 10S 03E 07 SOUTH 0001 PROJECT STATISTICS PAGE PROJECT TOMRKTOP DATE ACRES PLOTS 37 TREES 191 CuFt S 1 4/6/2018 BdFt W PLOTS TREES TOTAL ESTIMATED PERCENT TREES TOTAL SAMPLE PER PLOT TREES TREES CRUISE , DBH COUNT REFOREST COUNT BLANKS 100 % STAND SUMMARY SAMPLE TREES AVG BOLE REL BASAL GROSS NET GROSS NET TREES /ACRE DBH LEN DEN AREA BF/AC BF/AC CF/AC CF/AC DOUG FIR ,908 33,086 7,733 7,733 WHEMLOCK TOTAL ,374 33,505 7,850 7,850 CONFIDENCE LIMITS OF THE SAMPLE 68.1 TIMES OUT OF 100 THE VOLUME WILL BE WITHIN THE SAMPLE ERROR CL 68.1 SD: 1.0 DOUG FIR WHEMLOCK TOTAL 51.5 CL 68.1 SD: 1.0 DOUG FIR WHEMLOCK TOTAL 43.6 CL 68.1 SD: 1.0 DOUG FIR WHEMLOCK COEFF SAMPLE TREES - BF # OF TREES REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF SAMPLE TREES - CF # OF TREES REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF TOTAL 36.9 CL 68.1 SD: 1.0 DOUG FIR WHEMLOCK TOTAL 29.9 CL 68.1 SD: 1.0 DOUG FIR WHEMLOCK TOTAL 32.6 CL 68.1 SD: 1.0 DOUG FIR WHEMLOCK TOTAL TREES/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF BASAL AREA/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH COEFF NET BF/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,256 33,086 34, ,712 33,505 35, COEFF NET CUFT FT/ACRE # OF PLOTS REQ. INF. POP. VAR.% S.E.% LOW AVG HIGH ,318 7,733 8, ,446 7,850 8,

20 CRUISE REPORT Tom Rock Top Contract No Locations: Portions of Sections 7 and 8, T10S, R3E, W.M., Linn County, Oregon 2. Cruise Design: The cruise design for the timber sale area is as follows: Sale Area: Assumed a Coefficient of Variation of 32.6% an average stand diameter of 23 inches, a desired sampling error of 11% at a 68% confidence level. The resulting standard error for board foot volume was 5.4% 3. Sampling Methods: The sale area was cruised in February and March of 2018 with 17 grade and 20 count plots. Plots were laid out on a 4.5 chain x 5 chain grid. Plots falling on or near existing roads, no-harvest areas, or riparian management areas were offset 1/2 chain. Plots 1-9 and were cruised with a 40 BAF and Plots and were cruised with a 28 BAF (27.78 rounded up). The use of different BAF s was required to obtain an accurate cruise due to the stands varying density. 4. Cruise Report: Additional and more specific cruise summaries are included in the SuperAce outputs: Project Statistics, Stand Table Summary, Log Stock Table, and Species, Sort, Grade Table. 5. Tree Measurement and Grading: All grade plot sample trees were measured and graded following Columbia River Log Scale grade rules and favoring 40 foot segments. a) Height Standards: Total tree heights were measured to the nearest foot. Bole heights were calculated to 25% of DBH. b) Diameter Standards: Diameters were measured outside bark at breast height to the nearest tenth of an inch. c) Form Factors were measured for each grade tree using a form point of 17 feet. 5. Data Processing: a) Volumes and Statistics, Cruise, volume estimates and sampling statistics were derived from Super Ace 2008 cruise software. b) Deductions: A 10 percent volume deduction was used for all species to account for hidden defect and breakage. c) Acreage: The total timber sale area is 98 acres net. 6. Cruisers: The sale was cruised by O cruisers Mitchell, Taylor and Kaupp.

21 TC PSTNDSUM Stand Table Summary Page 1 Date: 4/6/2018 T10S R03E S07 Ty Project TOMRKTOP Time: 10:13:59AM Acres Grown Year: Spc S T DBH Sample Trees FF 16 Tot Av Ht Trees/ Acre BA/ Acre Logs Acre Average Log Net Cu.Ft. Net Bd.Ft. Tons/ Acre Net Cu.Ft. Acre Net Bd.Ft. Acre Tons T o t a l s Cunits MBF ,408 1, ,023 2, ,161 2, ,643 2, ,453 1, ,000 4,282 2, ,736 1, ,670 1, ,083 1, ,786 1, , Totals ,733 33,086 21,597 7,578 3,242 WH WH WH Totals Totals ,850 33,505 21,966 7,693 3,284

22 TC PLOGSTVB Log Stock Table - MBF T10S R03E S07 Ty Project: TOMRKTOP Acres Page 1 Date 4/6/2018 Time 10:13:57AM Spp S T So Gr Log Gross Def Net % Net Volume by Scaling Diameter in Inches rt de Len MBF % MBF Spc DO SM DO SM DO 2M DO 2M DO 2M DO 2M DO 2M DO 2M 40 2, , DO 3M DO 3M DO 3M DO 3M DO 3M DO 3M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M DO 4M Totals 3, , WH DO 2M WH DO 3M WH DO 4M WH DO 4M WH Totals Total All Species 3, ,

23 TC PSPCSTGR Species, Sort Grade - Board Foot Volumes (Project) T10S R03E S07 Ty Project: Acres TOMRKTOP Page 1 Date 4/6/2018 Time 10:13:58AM % Percent of Net Board Foot Volume Average Log Logs S So Gr Net Bd. Ft. per Acre Total Log Scale Dia. Log Length Ln Dia Bd CF/ Per Spp T rt ad BdFt Def% Gross Net Net MBF Ft In Ft Lf /Acre DO SM DO 2M ,134 26,989 2, DO 3M ,410 4, DO 4M Totals ,908 33,086 3, WH DO 2M WH DO 3M WH DO 4M WH Totals Totals ,374 33,505 3,

24 Shepherds Pit 1 Translator Hill Road A4 E A2 E A1 E Tom Rock A E Tom Rock Road A3 E B1 E B E Tom Rock 600 Legend E Project Points 1 Rockpits ÑÜ Stockpile Sites New Construction Corridors HaulRoute Timber Sale Boundary LOGGING MAP Tom Rock Top GTR TIMBER SALE CONTRACT # Stream Buffer PORTIONS OF SECTIONS 7 AND 8 T10S, R3E, W.M. Santiam State Forest LINN COUNTY, OR 1:6,500 1 inch = 542 feet ,000 Feet Area 1 Total. Approximate Net Acres 98 Acres (MC) 98 Acres This product is for informational use and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes.

Timber Sale Appraisal Green 30 Sale NC

Timber Sale Appraisal Green 30 Sale NC Timber Sale Appraisal Green 30 Sale NC-314-2018-71- District: N Cascade Date: December 21, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $1,214,074.40 $0.00 $1,214,074.40 Project Work:

More information

Timber Sale Appraisal Gravy Train Sale NC

Timber Sale Appraisal Gravy Train Sale NC Timber Sale Appraisal Gravy Train Sale NC-341-2018-106- District: N Cascade Date: March 01, 2018 Cost Summary Conifer Hardwood Gross Timber Sale Value $2,308,145.73 $0.00 $2,308,145.73 Project Work: ($243,600.00)

More information

Timber Sale Appraisal Family Camp 2 Sale NC

Timber Sale Appraisal Family Camp 2 Sale NC Timber Sale Appraisal Family Camp 2 Sale NC-341-2018-70- District: N Cascade Date: November 21, 2017 Cost Summary Conifer Hardwood Gross Timber Sale Value $1,142,448.66 $0.00 $1,142,448.66 Project Work:

More information

Timber Sale Appraisal Goat Shot Sale WO

Timber Sale Appraisal Goat Shot Sale WO Timber Sale Appraisal Goat Shot Sale WO-341-2017-61- District: West Oregon Date: April 10, 2017 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $959,801.40 $20,973.11 $980,774.51 Project Work:

More information

Timber Sale Appraisal Lost Hills Sale TL

Timber Sale Appraisal Lost Hills Sale TL Timber Sale Appraisal Lost Hills Sale TL-341-2018-102- District: Tillamook Date: February 12, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $481,882.53 $1,152,019.33 $1,633,901.86 Project

More information

Timber Sale Appraisal Franken Fir Sale TL

Timber Sale Appraisal Franken Fir Sale TL Timber Sale Appraisal Franken Fir Sale TL-341-2018-103- istrict: Tillamook ate: March 27, 2018 Cost Summary Conifer Hardwood Total Gross Timber Sale Value $2,281,800.64 $310,478.32 $2,592,278.96 Project

More information

http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-102-1.pdf http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-63-1.pdf. COST ESTIMATE FOR PACIFICA QUARRY

More information

This publication is a supplement to Oregon

This publication is a supplement to Oregon Tarif Access Tables: A Comprehensive Set EC 1609 April 2013 Steve Bowers, Jim Reeb, and Bob Parker This publication is a supplement to Oregon State University Extension publication EM 9058, Measuring Your

More information

**Equipment production**

**Equipment production** Construction operations And methods **Equipment production** The Equipment that will be covered on the exam and in this section are; Dozers Graders Scrapers Loaders Excavators Cranes(will discuss another

More information

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32.

6 Hour Backhoe Loader (CAT 415F2/ 415F2 IL, 416F/ 416F2, 420F/420F IT, 420F2/ 420F2 IT, 430F/430F IT, 430F2/ 430F2 IT, 450F or Equiva $32. PROJECT 2506; 2017 ANNUAL REPAIR CONTRACT; J.C. DILLON, INC., CONTRACTED SCHEDULE OF ITEMS, QUANTITIES AND COSTS 1 Hour Lowboy Including Both Permits and Paid Driver $75.00 2 Hour Single Axle Dump Truck

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete 1-2 / 2-3 clear $18.00 $30.00

More information

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data

Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Appendix C Noise Table C-1. POLB Middle Harbor Redevelopment Construction/Demolition Activities and Noise Data Activity Equipment HP Wharf Demolition Landside (A) Wharf Demolition Marine (B) Sheet Pile

More information

Woodland owners routinely want to measure property acreage,

Woodland owners routinely want to measure property acreage, FOREST MEASUREMENT EC 1129 Revised April 2004 $2.00 Tools for Measuring Your Forest S. Bowers Contents The tools and how they work... 1 Angle gauge... 1 Clinometer... 2 Combination logger's tape... 2 Compass...

More information

MTB HEAVY & MEDIUM HYDRAULIC BREAKERS

MTB HEAVY & MEDIUM HYDRAULIC BREAKERS MTB PRODUCT RANGE MTB HEAVY & MEDIUM HYDRAULIC BREAKERS MORE POWER, LESS WASTE MTB Hydraulic Breakers are the result of 40 years experience in hard rock applications and difficult excavation conditions.

More information

PLEASE NOTE: BATCH TRUCK

PLEASE NOTE: BATCH TRUCK Material Prices Portland Sand & Gravel Co. Saturday Hours are seasonal: April - September ½ Yard One Yard Crushed Asphalt ¾ minus $15.00 $25.00 Crushed Concrete ¾- minus $15.00 $25.00 Crushed Concrete

More information

B.6 Construction Equipment Utilization and Workforce

B.6 Construction Equipment Utilization and Workforce Appendix B.6 Construction ment Utilization and Workforce B.6 Construction ment Utilization and Workforce To support environmental impact assessments, a preliminary estimate was prepared for construction

More information

Woodlot Licence Harvest Planning Report Woodlot W2069

Woodlot Licence Harvest Planning Report Woodlot W2069 Woodlot Licence Harvest Planning Report Woodlot W2069 Date : 18 February, 2013 Woodlot Licence# : W2069 Eakins Point Woodlot Forest District : Sunshine Coast District Company : Ministry of Forests, Lands

More information

APPENDIX E SCOPE OF WORK EXAMPLE EQUIPMENT LEASING FOR CLEARING OF DEBRIS

APPENDIX E SCOPE OF WORK EXAMPLE EQUIPMENT LEASING FOR CLEARING OF DEBRIS Note: This scope of work example may be downloaded from the U.S. Army Corps of Engineer s Internet site at: ftp://ftp.sam.usace.army.mil./pub/op/opr/scopes 1. GENERAL. SCOPE OF WORK FOR RELATED TO [NAME/NATURE

More information

Woodlot Licence Harvest Planning Report for W2068

Woodlot Licence Harvest Planning Report for W2068 Woodlot Licence Harvest Planning Report for W2068 Date : 5 February, 2013 Woodlot Licence# : W2028 Forest District : Sunshine Coast Company : Ministry of Forests, Lands and Natural Resource Operations

More information

Western Land Area Programmatic Environmental Assessment. APPENDIX K: Climate

Western Land Area Programmatic Environmental Assessment. APPENDIX K: Climate APPENDIX K: Climate Climate Prepared by: KB Environmental Sciences, Inc. December 2017 This page is left intentionally blank. Table of Contents Page 1 Introduction... 1 2 Construction... 1 2.1 On-Road

More information

Whatcom County Invitation to Bid Bid #17-09

Whatcom County Invitation to Bid Bid #17-09 Invitation to Bid NOTICE IS HEREBY GIVEN that sealed bids will be received by Purchasing at their fice in the Whatcom County Administrative Services Finance Office in Whatcom County Courthouse, 311 Grand

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

H.1 Construction Emissions

H.1 Construction Emissions Appendix H. Air Quality Analysis The methods used to calculate emissions of carbon monoxide (CO), volatile organic compounds (VOCs), oxides of nitrogen (NO X ), sulfur oxides (SO X ), particulate matter

More information

Granite Watershed Mining EIS - Proposed Action. (Umatilla NF and Wallowa-Whitman NF)

Granite Watershed Mining EIS - Proposed Action. (Umatilla NF and Wallowa-Whitman NF) Granite Watershed Mining EIS - Action (Umatilla NF and Wallowa-Whitman NF) Altona Belvedear Group Blue Sky/Bull Run Buffalo Group /lode / T. 10 S.- R. 35 E. Sec 03 Quartz Gulch- T. 09 S.- R. 35 E. Sec

More information

APPENDIX A AIR QUALITY CALCULATIONS

APPENDIX A AIR QUALITY CALCULATIONS City of El Segundo January 2008 APPENDIX A AIR QUALITY CALCULATIONS Plaza El Segundo Development Addendum to the Certified EIR SCH No. 2003121037 Page 27 Summary of Plaza el Segundo Results By Phase Total

More information

Appendix 4-2-C Project Air Emissions Inventory

Appendix 4-2-C Project Air Emissions Inventory Appendix A CALPUFF and CALMET Methods and Assumptions Appendix 4-2-C Project Air Emissions Inventory C.1 Introduction For the purposes of estimating effects on air quality associated with the Project,

More information

HIGHLANDS COUNTY PURCHASING DEPARTMENT "AWARD TABULATION OF SEALED BIDS" ITB No HEAVY EQUIPMENT RENTAL BID OPENING: FEBRUARY 23, 2012

HIGHLANDS COUNTY PURCHASING DEPARTMENT AWARD TABULATION OF SEALED BIDS ITB No HEAVY EQUIPMENT RENTAL BID OPENING: FEBRUARY 23, 2012 1 Small Bulldozer (Low ground pressure type) Engine: Linder Industrial Machinery Komatsu D31PX-22 $1,000.00 $3,000.00 $1,000.00 Diesel 80 H.P.. Min. Neff Rental Inc. John Deere 450J LGP $1,100.00 $3,100.00

More information

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate

NSRBA 2017 EQUIPMENT DESCRIPTION. Purchase Price 2017 Monthly Rental % Monthly Rate Hourly Rate Daily Rate AIR EQUIPMENT & TOOLS: Compressors: Gas or Diesel, cfm @ 100 psi Gas or Diesel, cfm @ 100 psi 85-150 cfm $27,272.70 7% $1,909.09 $13.00 $130.00 151-175 cfm $34,848.45 7% $2,439.39 $13.50 $135.00 176-250

More information

Transfer. CE 431: Solid Waste Management

Transfer. CE 431: Solid Waste Management Transfer CE 431: Solid Waste Management Transfer Stations Transfer stations are the sites on which transfer of waste is carried out, placed on small and then larger vehicles for transportation over long

More information

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer.

DOZERS. Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. DOZERS Tractor equipped with a front mounted earthmoving blade is known as bulldozer or dozer. Blade is lowered to cut the soil and push the soil in front of blade. It unloads the soil by pushing it over

More information

Appendix D. Noise Calculations

Appendix D. Noise Calculations Appendix D Noise Calculations Summary of Boating Activity Changes Associated with each Alternative Peak Day Boating Trips Structure Existing With Alt increase with alt 2 increase with alt 3 increase with

More information

THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA MEMORANDUM

THE SCHOOL BOARD OF SARASOTA COUNTY, FLORIDA MEMORANDUM ENC. March 1, 2011 MATERIALS MANAGEMENT DEPARTMENT 101 OLD VENICE ROAD OSPREY, FLORIDA 34229 TELEPHONE (941) 486-2183 FAX (941) 486-2188 MEMORANDUM TO: FROM: TITLE: Members of the School Board Lori White,

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/08/17 Comp. Dt: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 4308-34 Contract ID: Contract Description: Contract Location: Recommendation: 170004 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

BALCONES QUARRY November 2014

BALCONES QUARRY November 2014 BALCONES QUARRY November 2014 New Braunfels, Texas - 0 - Description of the Facility The Balcones Facility is situated in New Braunfels, Texas and was opened in the mid 1960 s. The geologic structure in

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. District(s): 8 30=047 Start Dt: 05/01/17 Comp. Dt: Letting: 17030200 Letting Dt: March 02, 2017 9:30 A.M. State Proj.: 5101-14 Contract ID: Contract Description: Contract Location: Recommendation: 170020 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

Auction Ring 1 -Ramp - North Auction Theatre

Auction Ring 1 -Ramp - North Auction Theatre Edmonton, AB, CAN - Jun 12, 2018 - Index Summary All times listed are approximate. Day 1 - Tuesday June 12 2018 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction 1-52

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 13 T H TO AUGUST 18 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

Washington County Solid Waste & Recycling Garbage and Recycling Collection Services and Rates for Unincorporated Washington County

Washington County Solid Waste & Recycling Garbage and Recycling Collection Services and Rates for Unincorporated Washington County RESIDENTIAL SERVICE RATES Standard Residential Service Urban customers* receive: Rural customers* receive: one cart for weekly garbage collection one cart** for weekly garbage up to two 96-gallon mixed

More information

Auction Ring 1 -Ramp - North Auction Theatre

Auction Ring 1 -Ramp - North Auction Theatre Edmonton, AB, CAN - Oct 24, 2017 - Index Summary All times listed are approximate. Day 1 - Tuesday October 24 2017 Auction Ring 1 -Ramp - North Auction Auction Ring Auction Ring 1 -Ramp - North Auction

More information

158 PURDUE ENGINEERING EXTENSION DEPARTMENT

158 PURDUE ENGINEERING EXTENSION DEPARTMENT 158 PURDUE ENGINEERING EXTENSION DEPARTMENT repaired. With regular maintenance and a small amount of stone added each year, these roads have held up much better than we anticipated. The cost of this type

More information

320E L. Hydraulic Excavator

320E L. Hydraulic Excavator 320E L Hydraulic Excavator Engine Drive Engine Model Cat C6.6 ACERT Maximum Travel Speed 5.6 km/h 3.5 mph Net Power SAE J1349 114 kw 153 hp Maximum Drawbar Pull 205 kn 46,086 f Gross Power SAE J1995 122

More information

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION

MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION REPORT NO. TS-07-15 MUNICIPALITY OF THAMES CENTRE COMMUNITY SERVICES & DEVELOPMENT TRANSPORTATION TO: Mayor and Members of Council FROM: Mike LeBlanc, Director of Operations DATE: March 23, 2015 SUBJECT:

More information

Special Specification 7010 Debris Removal and Disposal

Special Specification 7010 Debris Removal and Disposal Special Specification 7010 Debris Removal and Disposal 1. DESCRIPTION Provide emergency removal and disposal of debris from the highway right of way which is created by a hurricane or other type of natural

More information

Kermon Environmental Services, Inc. (OC) TOTAL POINTS. D&J Enterprises, Inc. (OS) CrowderGulf, LLC (OS)

Kermon Environmental Services, Inc. (OC) TOTAL POINTS. D&J Enterprises, Inc. (OS) CrowderGulf, LLC (OS) SCORE TABULATION Page 1 of 1 Disaster Debris Removal, Reduction, Disposal and Other Emergency Debris Related Ameri-Green Environmental Bergeron Emergency Services, Inc. D&J Enterprises, Inc. DRC Emergency

More information

Construction Emissions Estimates ICTF Modernization Project Long Beach, California

Construction Emissions Estimates ICTF Modernization Project Long Beach, California Construction Emissions Estimates ICTF Modernization Project Long Beach, California prepared for: Union Pacific Railroad Company October 2007 prepared by: Sierra Research, Inc. 1801 J Street Sacramento,

More information

Production Analysis Report

Production Analysis Report Production Analysis Report March 2010 Cat D9R Mirenco C-Max On vs. Off Study Purpose Study Date The purpose of the study was to conduct economic analysis of dozer production capability, as well as determine

More information

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT

SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT SPECIFICATIONS AND DOCUMENTS FOR PURCHASE OF ROAD MATERIALS AND RENTAL OF CERTAIN PIECES OF CONSTRUCTION EQUIPMENT (Gravel, Crushed Rock, Sand, Road Oils, Recycled Aggregate, Bituminous Milling, Sealcoating,

More information

Province of Prince Edward Island 2017

Province of Prince Edward Island 2017 Province of Prince Edward Island 2017 Standard Negotiated Rates A B C Trucking Rates Standard Prices - Unbid Jobs Machinery Rental Rates August 16, 2017 Department of Transportation, Infrastructure and

More information

from OCSD Chemical Treatment Facility. Table SUM-A Maximum Daily Construction by Phase (no mitigation) Phase CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) Combustion Fugitive PM10 Total PM10 PM10

More information

This appendix describes various types of equipment that can

This appendix describes various types of equipment that can Appendix GENERAL ENGINEER SUPPORT EQUIPMENT This appendix describes various types of equipment that can be used to support general engineer missions. This information is provided to help planners choose

More information

150 Equipment. 155 HMA Surfacing and HMA Pavement Recycling Equipment For compaction equipment see section 151 b-e

150 Equipment. 155 HMA Surfacing and HMA Pavement Recycling Equipment For compaction equipment see section 151 b-e 150 Equipment 2/22/2010 Plate 150 Equipment 151 Compaction Equipment a Sheepsfoot Roller Data 151. 01 b Self-Propelled Pneumatic Roller Data. 02 c Two Axle Tandom Steel Roller Data. 03 d Pull-Type Steel

More information

Hydraulic power is the key to the utility of many excavators.

Hydraulic power is the key to the utility of many excavators. CHAPTER Construction Planning, Equipment, and Methods EXCAVATORS Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 8 By Dr. Ibrahim Assakkaf ENCE 420 Construction

More information

(lb/day) Excavation and Installation. NO NO NO NO NO Emission calculations assume that all construction phases overlap.

(lb/day) Excavation and Installation. NO NO NO NO NO Emission calculations assume that all construction phases overlap. from the OCSD Pump Station Table Sum-A Maximum Daily Construction by (pre-mitigation) Combustion PM10 Fugitive PM10 Total PM10 CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) (lb/day) (lb/day) (lb/day)

More information

APPENDIX F. Air Quality Modeling Results

APPENDIX F. Air Quality Modeling Results APPENDIX F Air Quality Modeling Results PHASE 2 NLIP Emissions Summary Unmitigated 2008 Emissions Sutter County Worst-Case lb/day Tons/year Sacramento County Worst-Case lb/day Tons/year ROG NOX PM10 ROG

More information

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others...

2018 Proposed Budget. Table of Contents. Appropriation Act. 1. Budget by Fund. 2. Michigan Transportation Funds.. 3. Work Performed for Others... 2018 Proposed Budget Table of Contents Appropriation Act. 1 Budget by Fund. 2 Michigan Transportation Funds.. 3 Work Performed for Others.... 4 Construction and Preservation... 5 Primary Construction......

More information

CRUSH EVERY JOB 2019 PRODUCT CATALOG AMERICAN-MADE INNOVATION SINCE 1966

CRUSH EVERY JOB 2019 PRODUCT CATALOG AMERICAN-MADE INNOVATION SINCE 1966 AMERICAN-MADE INNOVATION SINCE 1966 2019 PRODUCT CATALOG CRUSH EVERY JOB TM 10685 COLUMBUS PARKWAY, ETNA, OHIO USA 43062 CRUSH EVERY JOB TM That s more than just a catch phrase at Machine. It s how we

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

Power Ditchers Spring Tensioned - BELT DRIVE

Power Ditchers Spring Tensioned - BELT DRIVE EMLINGER MANUFACTURING COMPANY, INC. 16394 U.S. 224 - P.O. Box 299 Kalida, Ohio 45853 419/532-3647 800/537-7370 www.remlingermfg.com ECONOMICAL TO OWN EASY TO OPERATE Series 400 - Center Cut & Offset Power

More information

TSP-308 MPK Ferdinand Fassa

TSP-308 MPK Ferdinand Fassa Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa OUTLINE 1. Introduction 2. Dozer Performance Characteristics Classified on the basis of running gear Blade Dozer Function 3. Dozer Production Estimating 4. Dozer

More information

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses?

Do Standard Trip Generation Rates Overstate Impact of Commercial Uses? Do Standard Trip Generation Rates Overstate Impact of Commercial Uses? Presented by: Tindale-Oliver & Associates, Inc. Presentation Overview 1 2 3 4 5 Introduction Trip Characteristics Database TOA Demand

More information

BACKHOE PRICING INFO

BACKHOE PRICING INFO Price quote for: VENDOR NAME BACKHOE PRICING INFO Ziegler Cat MAKE AND MODEL Caterpillar 416F2 Spec # Description Price 1.0 Price for base unit: $ 62,460.00 2.0 OPERATOR ENVIRONMENT Use this section to

More information

BUCK FORK N. MYRTLE CULVERT REPLACEMENT OWEB Project #

BUCK FORK N. MYRTLE CULVERT REPLACEMENT OWEB Project # PROJECT COMPLETION REPORT BUCK FORK N. MYRTLE CULVERT REPLACEMENT OWEB Project # 99-511 Figure 1 Pre-project view, Buck Fork Creek Culvert, outlet end Figure 2 Post-project, Buck Fork Creek Bridge installed

More information

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES

TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES TYPICAL DRIVEWAY CONSTRUCTION PER DOUGLAS COUNTY REGULATIONS AND POLICIES This document is a summary of the Douglas County regulations and policies for constructing residential driveways. It is intended

More information

TRACTOR: LOADER-BACKHOE

TRACTOR: LOADER-BACKHOE Seq. #726612 Price quote for: TRACTOR: LOADERBACKHOE Vendor Name: Contact Person: Street Address: P.O. Box: City, State, Zip Phone #: Toll Free #: Fax #: Email Address: Ziegler Inc. Jeff Drake, Richard

More information

CAT MINI EXCAVATOR ATTACHMENT OPTIONS

CAT MINI EXCAVATOR ATTACHMENT OPTIONS CAT MINI EXCAVATOR ATTACHMENT OPTIONS Get Multiple Machines Out of One For more information, visit Cat.com/attachments or contact your local Cat dealer. AEXQ1584-02 March 2018 2018 Caterpillar. All Rights

More information

CONSTRUCTION and OFF ROAD EQUIPMENT

CONSTRUCTION and OFF ROAD EQUIPMENT CONSTRUCTION and OFF ROAD EQUIPMENT QUICK REFERENCE GUIDE Vehicle Valuation Services, Inc. 1 South 450 Summit Avenue Suite 185 Oakbrook Terrace, IL 60181 888.475.9975 Fax: 888.475.9935 www.vvsi.com Vehicle

More information

BACKHOE PRICING INFO

BACKHOE PRICING INFO Price quote for: VENDOR NAME BACKHOE PRICING INFO Ziegler Cat MAKE AND MODEL Caterpillar 420F2 Spec # Description Price 1.0 Price for base unit: $ 71,490.00 2.0 OPERATOR ENVIRONMENT Use this section to

More information

Appendix G. Energy Worksheets

Appendix G. Energy Worksheets Appendix G Energy Worksheets Westfield North County Energy Calculations Summary of Energy Use During Construction Existing Project Without Project Features Project With Project Features Diesel Off Road

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

Appendix H: Construction Impacts H-3 Air Quality

Appendix H: Construction Impacts H-3 Air Quality Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263

More information

CITY OF LOGAN RESOLUTION 18-21

CITY OF LOGAN RESOLUTION 18-21 CITY OF LOGAN RESOLUTION 18-21 A RESOLUTION BY THE CITY OF LOGAN APPROVING AN ADJUSTMENT OF SOLID WASTE COLLECTION AND DISPOSAL FEES AND MANDATORY CURBSIDE RECYCLING. WHEREAS, the Solid Waste Advisory

More information

LESSON PLAN. Production Estimations LESSON ID: EEC/EEO-B07 ENGINEER EQUIPMENT WARRANT OFFICER/CHIEF COURSE CID: A16ACN1/A1613E1 REVISED 09/08/2014

LESSON PLAN. Production Estimations LESSON ID: EEC/EEO-B07 ENGINEER EQUIPMENT WARRANT OFFICER/CHIEF COURSE CID: A16ACN1/A1613E1 REVISED 09/08/2014 UNITED STATES MARINE CORPS ENGINEER EQUIPMENT INSTRUCTION COMPANY MARINE CORPS DETACHMENT 1706E EAST 8 TH STREET FORT LEONARD WOOD MISSOURI 65473-8963 LESSON PLAN Production Estimations LESSON ID: EEC/EEO-B07

More information

Appendix A. Fuels Treatment. Understory Treatment

Appendix A. Fuels Treatment. Understory Treatment Walker Reduction Project treatments for the Walker Reduction Project, legend follows. 001 38 PCT HP OB HAND RI, 10% 002 71 CT WF MP NT GROUND RI, 10% 003 34 FUELS_REDUX MP UB MECH/HAND 10% 004 25 NT NT

More information

PM2.5 (lb/day) PM2.5 (ton/yr) PM2.5 (lb/day)

PM2.5 (lb/day) PM2.5 (ton/yr) PM2.5 (lb/day) AIR QUALITY ATTACHMENT - SSJID Retail Electric Service Plan Summary of Construction Emissions :Project without Border-Area Service Plan NOx PM10 PM2.5 CO ROG SOx CO2 On-Road Crew and Workers 27.46 1.50

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 HIGHWAY: FM 3301 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 05/10/13 75 CONTRACT ID: 349701008 PROJECT: STP 2012(033)HES CONTRACT: 09113205 AWARD : $1,297,485.60 PROJECTED : $1,307,485.60 ADJ. PROJECTED : $1,307,485.60

More information

AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004)

AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) RULE 8081 AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) 1.0 Purpose The purpose of this rule is to limit fugitive dust emissions from agricultural sources. 2.0 Applicability

More information

On-the-Job Training Program. Overview of Training Programs

On-the-Job Training Program. Overview of Training Programs On-the-Job Training Program Overview of Training Programs The training programs are as follows: Code Training Program Hours (Up to) 901 Carpenter, Rough 1040 902 Concrete Finisher (Paving) 1040 903 Concrete

More information

Southern Windsor County 2016 Traffic Count Program Summary April 2017

Southern Windsor County 2016 Traffic Count Program Summary April 2017 Southern Windsor County 2016 Traffic Count Program Summary April 2017 The Southern Windsor County Regional Planning Commission (the RPC ) has been monitoring traffic at 19 locations throughout the southern

More information

Snow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site

Snow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site Snow Dump Sites Understanding What to Do with Collected Snow Québec City Among cities with a population of 500,000 or more, Québec City ranks second in the world for the highest snowfall, behind Sapporo,

More information

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY Equipment Use Improve Access Roads (per mile) Bulldozer Grade access roads 1 4 10 Road Grader Grade access roads 1 4 10 Loader Load haul trucks, transport materials

More information

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing.

The cost estimation methodology used to update the charges and credits is the same methodology the Company utilized in the prior year s filing. LISA D. NORDSTROM Lead Counsel lnordstrom@idahopower.com December 28, 2018 Public Utility Commission of Oregon Filing Center 201 High Street SE, Suite 100 P.O. Box 1088 Salem, Oregon 97301 Re: Tariff Advice

More information

Air Quality Calculations

Air Quality Calculations EIS for Proposed Modernization and Expansion of TBR Appendix J Air Quality Calculations EIS for Proposed Modernization and Expansion of TBR This page left blank intentionally. Table 1 Summary of Constructions

More information

Answer Key. Do Not Distribute

Answer Key. Do Not Distribute 2017 Page 1 of 6 STUDENTS DO NOT OPEN THIS TEST OR BEGIN UNTIL INSTRUCTED TO START 2017 Examination for the National Agricultural Technology and Mechanical Systems Career Development Event Name Print Name

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: FM 3151 COUNTY: 12/02/2015 ESTIMATE PAID: AWARD DATE: 12/17/2015 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 131 CONTRACT ID: 187503022 PROJECT: C 1875-3-22 CONTRACT: 12153043 AWARD : $3,146,993.47 PROJECTED : $3,149,993.47 ADJ. PROJECTED : $3,149,993.47 CONTRACT:

More information

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING

SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING SAMSON CREE NATION MATRIX SOLUTIONS INC. PARTNERSHIP ABORIGINAL CONSTRUCTION MONITORING WEEKLY REPORT SPREAD 1 AUGUST 20 T H TO AUGUST 25 TH Suite 600, 214-11 Ave. SW Calgary, AB, Canada T2R 0K1 T 403.237.0606

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT 402-1(a-e) 99 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BITUMINOUS SURFACE TREATMENT These Special Provisions revise, amend, and where in conflict, supersede applicable sections of the

More information

FULL-LINE PRODUCT BROCHURE

FULL-LINE PRODUCT BROCHURE FULL-LINE PRODUCT BROCHURE HYDRAULIC IMPACT HAMMERS Rammer hydraulic impact hammers (Compact ) Carrier 108 200 400-1,900 3-8 154 4.09 1,800-4,000 211 250 400-1,900 4-11 220 4.69 2,600-5,700 315 350 400-1,900

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Bid Opportunity No. 74-2004 Page 1 of 8 PART E - SPECIFICATIONS GENERAL E1. GENERAL E1.1 These shall apply to the Work. E2. EQUIPMENT AND TRUCK CLASS GROUPINGS E2.1 Minimum for Dump

More information

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES:

TABLE OF CONTENTS FIGURES: MAP EXHIBITS: TABLES: TransWest Express Transmission Project TABLE OF CONTENTS 7.0 DESIGN OPTIONS... 7-1 7.1 OVERVIEW OF DESIGN OPTIONS... 7-1 7.2 DESIGN OPTIONS PURPOSE AND NEED AND DESIGN CHARACTERISTICS... 7-4 7.2.1 Design

More information

The purpose of this meeting was to open tenders for Hired Equipment Rental for the period June 1, 2016 to May 30, 2017.

The purpose of this meeting was to open tenders for Hired Equipment Rental for the period June 1, 2016 to May 30, 2017. Minutes Corporation of the Town of Kirkland Lake Tender Opening Council Chambers, Town Hall May 3, 2017 2:00 p.m. Attendance Steve Ranta, Roads Foreman Jo Ann Ducharme, Clerk Dixit Patel, Designer/Env.

More information

REVIEW FOR FINAL EXAM

REVIEW FOR FINAL EXAM REVIEW FOR FINAL EXAM A. J. Clark School of Engineering Department of Civil Engineering by Dr. Ibrahim A. Assakkaf Spring 2002 ENCE 420 - Construction Equipment and Methods Department of Civil Engineering

More information

Cedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401

Cedar View Subdivision No. 2 Hillcrest Dr. Montrose, Colorado 81401 Cedar View Subdivision No. 2 Hillcrest Dr. 81401 Property Information Packet John Renfrow * Jim Renfrow M b f Renfrow Realty Member of: Rocky Mountain Commercial Brokers www.rmcbrokers.com Page 1 Executive

More information

Complete Equipment Fleet

Complete Equipment Fleet Complete Equipment Fleet Construction ARTICULATED DUMP TRUCKS CRAWLER DOZERS EXCAVATORS 260E 321 hp Rated payload: 53,334 lbs. Heaped capacity: 19.6 cu. yd. 310E 354 hp Rated payload: 62,005 lbs. Heaped

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) MICHIGAN DEPARTMENT OF TRANSPORTATION 03SP502(P) SPECIAL PROVISION FOR PAVEMENT RIDE QUALITY (IRI ACCEPTANCE CRITERIA) C&T:TEH 1 of 8 C&T:APPR:JFS:MJE:01-28-08 FHWA:APPR:02-01-08 a. Description. Provide

More information

New Weight Limits on Roads

New Weight Limits on Roads New Weight Limits on Roads Minnesota s Truck Weight 2018 Education Program Minnesota Assn. of Townships Greg Hayes / Tom Nelson A Minnesota educational project to safeguard public roadways through voluntary

More information

MASTER FEE SCHEDULE. SECTION 1: Refuse/Garbage and Recycling Fees (C of O Sec )

MASTER FEE SCHEDULE. SECTION 1: Refuse/Garbage and Recycling Fees (C of O Sec ) MASTER SCHEDULE SECTION 1: Refuse/Garbage and Recycling Fees (C of O Sec. 11.122.7) REFUSE/GARBAGE SERVICE MONTHLY Once per week collection RESIDENTIAL Polycart: $13.00 N/A Additional Polycart $8.39 N/A

More information

Chapter 2: Approaches to Problem Solving Lecture notes Math 1030 Section A

Chapter 2: Approaches to Problem Solving Lecture notes Math 1030 Section A Section A.1: You Can t Add Apples and Oranges Definition of units The units of a quantity describe what is measured or counted. We cannot add or subtract numbers with different units, but we can multiply

More information

DOCUMENTATION WORKBOOK FY 2017

DOCUMENTATION WORKBOOK FY 2017 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2017 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016

TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B. Tender No.: NG16-19 ADDENDUM #1. October 31, 2016 TENDER FOR COUNTY ROAD 44 MULTI-USE PATHWAY PHASE 1A & 1B Tender No.: NG16-19 ADDENDUM #1 October 31, 2016 A copy of this addendum must be enclosed with your tender. Failure to comply with this requirement

More information

EQUIPMENT LINE CARD RENT-CAT

EQUIPMENT LINE CARD RENT-CAT EQUIPMENT LINE CARD 1-800-RENT-CAT WE RENT MORE THAN JUST CAT You work hard to run your business. Let us work hard to help you. Our machines have the productivity, durability and safety you need to get

More information