1 from OCSD Chemical Treatment Facility. Table SUM-A Maximum Daily Construction by Phase (no mitigation) Phase CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) Combustion Fugitive PM10 Total PM10 PM10 (lb/day) (lb/day) (lb/day) Construction Maximum Daily SCAQMD Threshold (lbs/day) Significant NO NO NO NO NO assume all phases overlap. Table SUM-B Maximum Daily Operational Activity Chemical Deliveries Maximum Daily SCAQMD Threshold (lb/day) Significant CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) Combustion Fugitive PM10 Total PM10 PM10 (lb/day) (lb/day) (lb/day) E E NO NO NO NO NO DRD395.xls/ /Summary

2 Table 1-1 Heavy Construction Equipment Exhaust Emission Factors CO VOC NO X SO X PM 10 CO VOC NO X SO X PM 10 Fuel Use Fuel Use Equipment Type Fuel Horsepower Load Factor lb/bhp-hr lb/bhp-hr lb/bhp-hr lb/bhp-hr lb/bhp-hr lb/hr lb/hr lb/hr lb/hr lb/hr gal/bhp-hr gal/hr Front End Loader Diesel Excavator Diesel Crane Diesel Source: SCAQMD CEQA Air Quality Handbook, November 1993, Tables A9-8-B, A9-8-C, A9-8-D and A9-3-E. Table 1-2 On Road Mobile Emission Factors from California ARB EMFAC2002 Scenario Year 2006 (Model Years 1965 to 2005) Vehicle Type CO Factor VOC Emission Factor NOx SOx PM10 Construction Workers Commuting Light Duty Trucks Heavy Diesel Trucks E Table 1-3 Fugitive Emission Factors for Construction Activities Activity PM10 Storage Pile Emptying/Truck Filling* lbs/ton Graded Surface* 26.4 lb/acre/day Storage Piles - Wind Erosion** 42.8 lb/acre/day *SCAQMD CEQA Air Quality Handbook, November Table 9-9 **SCAQMD CEQA Air Quality Handbook, November Table 9-9-E. G=7.5, H=10, I=100 and J=0.5 Table 1-4 Fugitive Emission Factors for On-Road Trucks and Employee Vehicles Emission Source Type Passenger Vehicle/On Paved Roadways Trucks on Paved Roadways Light Duty Trucks on Unpaved Roads* Factor (lb/vmt) Dump Truck and Delivery Vehicles on Unpaved Roads** * calculated from SCAQMD CEQA Air Quality Handbook, November Table A9-9-D. G=14. H=15, J=4 tons, I=4 and K=10. ** calculated from SCAMD CEQA Air Quality Handbook, November Table A9-9-D, G=14, H=15, J=8.5 tons, I=6, and K=10. DRD395.xls/ / E-Factors

3 Heavy Construction Equipment Combustion Calculations by phase TABLE 2-1 Construction Phase (lb/day) Unit Number Hour/day Operation CO ROC NOx SOx PM-10 Front-end Loader Excavator Crane Totals (lb/day) DRD395.xls/ /Heavy Comb Calcs by Phase

4 Vehicle TABLE 3-1 Construction Parameters Total Number of Trips Distance Traveled per Trip Source Number of Vehicles CO VOC Construction Workers Commuting Peak Day, lbs/day NOx SOx Combustion PM10 Fugitive PM Light Duty Trucks On-site Daily Delivery Trucks Dump Trucks on-site 3, Dump Trucks off-site 4, Concrete Truck Totals (lb/day) Construction workers' commute is assumed to be 20 miles. 2. Light Duty Contractor staff trucks and management trucks are assumed to travel 5 miles on-site per day. 3. Dump truck on-site travel is assumed to be 1 mile per visit. 4. Dump truck off-site travel is the distance to the closest landfill, Brea Olinda Landfill, which is located approximately 10 miles away. 5. Concrete Truck is assumed to make two trips per day 6. Dump truck trips assume a 20 cubic yard haul capacity, 5 days of aperation, and a total of 154 cubic yards. DRD395.xls/ /On-Road Vehicle

5 Table 4-1 Site Grading PM10 Excavation and Grading Phase Total Graded Surface Area 0.2 Acres Length of Phase 5 days Maximum acres/day graded 0.2 acre/day Emission Rate 26.4 lb PM10/acre/day Total PM lb/day Source: SCAQMD CEQA Air Quality Handbook, November 1993, Table A9-9 Grading is not expected to occur during other phases. Table 4-2 Soil Hauling and Pile Filling Total Amount of Soil to Move 154 Cubic Yards Table 4-3 Soil Movement and Pile Filling by Phase Phase Days Cubic Yards Moved Tons Moved Average Tons Moved Per Day Excavation and Grading Totals Calculation assumes a soil density of 1.45 g/cubic cm Table 4-4 Soil Hauling and Pile Filling Daily PM-10 by Phase Phase (lb/day) Excavation and Grading 0.83 Table 4-5 Wind Erosion from Storage Piles Applies to "Clearing and Grubbing" and "Excavation and Grading" phases Acres to be covered by storage piles per day 0.2 acres Pre-Mitigated PM lbs PM10/day DRD395.xls/ /Construction Fugitive Emis

6 Operational Table 5-1 Operational Associated with the Project (lbs/day) Total Number of Number of Distance Traveled Source Vehicles Trips per Trip Combustion PM10 CO VOC NOx SOx Delivery Trucks Totals (lbs/day) Operational emissions assume the delivery truck travels 10 miles to and from the site during each delivery. Fugitive PM10 DRD395.xls/ /Operation

(lb/day) Excavation and Installation. NO NO NO NO NO Emission calculations assume that all construction phases overlap.

(lb/day) Excavation and Installation. NO NO NO NO NO Emission calculations assume that all construction phases overlap. from the OCSD Pump Station Table Sum-A Maximum Daily Construction by (pre-mitigation) Combustion PM10 Fugitive PM10 Total PM10 CO (lb/day) ROC (lb/day) NOx (lb/day) SOx (lb/day) (lb/day) (lb/day) (lb/day)

More information

APPENDIX A AIR QUALITY CALCULATIONS

APPENDIX A AIR QUALITY CALCULATIONS City of El Segundo January 2008 APPENDIX A AIR QUALITY CALCULATIONS Plaza El Segundo Development Addendum to the Certified EIR SCH No. 2003121037 Page 27 Summary of Plaza el Segundo Results By Phase Total

More information

PM2.5 (lb/day) PM2.5 (ton/yr) PM2.5 (lb/day)

PM2.5 (lb/day) PM2.5 (ton/yr) PM2.5 (lb/day) AIR QUALITY ATTACHMENT - SSJID Retail Electric Service Plan Summary of Construction Emissions :Project without Border-Area Service Plan NOx PM10 PM2.5 CO ROG SOx CO2 On-Road Crew and Workers 27.46 1.50

More information

Appendix E3 Emissions Worksheets UPDATED

Appendix E3 Emissions Worksheets UPDATED Appendix E3 Emissions Worksheets UPDATED POLLUTANT EMISSIONS FROM LOCOMOTIVE DELIVERY OF CONSTRUCTION EQUIPMENT FUEL CONSUMPTION RATE (TON MILES/GAL): 400 LINE HAUL EMISSION FACTORS (g/bhp hr) PM10 HC

More information

APPENDIX F. Air Quality Modeling Results

APPENDIX F. Air Quality Modeling Results APPENDIX F Air Quality Modeling Results PHASE 2 NLIP Emissions Summary Unmitigated 2008 Emissions Sutter County Worst-Case lb/day Tons/year Sacramento County Worst-Case lb/day Tons/year ROG NOX PM10 ROG

More information

The Village at Playa Vista. Appendix E-6. Alternative Analysis

The Village at Playa Vista. Appendix E-6. Alternative Analysis The Village at Playa Vista Appendix E-6 Alternative Analysis E-6a Remaining Existing Specific Plan Operations Summary Electricity and Natural Gas Usage URBEMIS2002 Output Files Miscellaneous Sources Emissions

More information

Construction Emissions Estimates ICTF Modernization Project Long Beach, California

Construction Emissions Estimates ICTF Modernization Project Long Beach, California Construction Emissions Estimates ICTF Modernization Project Long Beach, California prepared for: Union Pacific Railroad Company October 2007 prepared by: Sierra Research, Inc. 1801 J Street Sacramento,

More information

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS Revision 2 Page 1 of 7 January 2018 ExxonMobil Production Company, a division of Exxon Mobil Corporation (ExxonMobil

More information

APPENDIX B. Air Quality Analysis Methodology

APPENDIX B. Air Quality Analysis Methodology APPENDIX B Air Quality Analysis Methodology THIS PAGE INTENTIONALLY LEFT BLANK Appendix B: Air Quality Analysis B.1 AIR QUALITY ANALYSIS This Appendix contains data and assumptions used to calculate emissions

More information

H.1 Construction Emissions

H.1 Construction Emissions Appendix H. Air Quality Analysis The methods used to calculate emissions of carbon monoxide (CO), volatile organic compounds (VOCs), oxides of nitrogen (NO X ), sulfur oxides (SO X ), particulate matter

More information

APPENDIX C AIR QUALITY

APPENDIX C AIR QUALITY C.1 CONSTRUCTION APPENDIX C AIR QUALITY Construction activities associated with the Proposed Action are set to begin July 2020 and be completed by May 2023. Potential sources of construction emissions

More information

Appendix G. Energy Worksheets

Appendix G. Energy Worksheets Appendix G Energy Worksheets Westfield North County Energy Calculations Summary of Energy Use During Construction Existing Project Without Project Features Project With Project Features Diesel Off Road

More information

Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400

Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400 Middle Harbor Project: Draft EIS/EIR LA Chamber of Commerce June 26, 2008, APM Maersk HQ Pier 400 Richard D. Cameron Director of Environmental Planning, Port of Long Beach CEQA/NEPA Process Summary The

More information

AND LIVESTOCK OPERATIONS

AND LIVESTOCK OPERATIONS (Adopted February 14, 1997)(Amended December 11, 1998) (Amended September 10, 1999)(Amended April 2, 2004) RULE 1186. PM 10 EMISSIONS FROM PAVED AND UNPAVED ROADS, AND LIVESTOCK OPERATIONS (a) (b) Purpose

More information

Emission Reduction Credit Availability/Cost/Efforts Taken in South Coast

Emission Reduction Credit Availability/Cost/Efforts Taken in South Coast Emission Reduction Credit Availability/Cost/Efforts Taken in South Coast Los Angeles Area Chamber of Commerce Environment Committee Meeting November 28, 27, Wednesday L.A. Area Chamber of Commerce Headquarters

More information

Air Quality Memorandum

Air Quality Memorandum ` WESTSIDE SUBWAY EXTENSION PROJECT Air Quality Memorandum December 0 Air Quality Memorandum Table of Contents.0 INTRODUCTION....0 PROJECT DESCRIPTION... 3.0 ENVIRONMENTAL IMPACT/ENVIRONMENTAL CONSEQUENCES...

More information

Final Environmental Assessment Transition of Expeditionary EA-6B Prowler Squadrons to EA-18G Growler. Appendix D Air Emissions Calculations

Final Environmental Assessment Transition of Expeditionary EA-6B Prowler Squadrons to EA-18G Growler. Appendix D Air Emissions Calculations Final Environmental Assessment Transition of Expeditionary EA-6B Prowler Squadrons to EA-18G Growler Appendix D Air Emissions Calculations D-1 October 2012 Final Environmental Assessment Transition of

More information

AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004)

AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) RULE 8081 AGRICULTURAL SOURCES (Adopted November 15, 2001; Amended September 16, 2004) 1.0 Purpose The purpose of this rule is to limit fugitive dust emissions from agricultural sources. 2.0 Applicability

More information

Appendix D. China Shipping Past Performance Review

Appendix D. China Shipping Past Performance Review Appendix D China Shipping Past Performance Review August 214 CHINA SHIPPING PERFORMANCE REVIEW ANALYSIS This technical memorandum describes the findings of a review of air quality impacts from operations

More information

Air Quality Calculations

Air Quality Calculations EIS for Proposed Modernization and Expansion of TBR Appendix J Air Quality Calculations EIS for Proposed Modernization and Expansion of TBR This page left blank intentionally. Table 1 Summary of Constructions

More information

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily 5.8 TRAFFIC, ACCESS, AND CIRCULATION This section describes existing traffic conditions in the project area; summarizes applicable regulations; and analyzes the potential traffic, access, and circulation

More information

Appendix C Noise and Vibration Worksheets

Appendix C Noise and Vibration Worksheets PUBLIC WORKS BUREAU OF ENGINEERING Appendix C Noise and Vibration Worksheets Central Outfall Sewer at 59 th Street Page C-1 CEQA Initial Study and 4 th Avenue Project January 2012 Receptor Noise Level

More information

Snow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site

Snow Dump Sites. APWA & PNS North American Snow Conference. April Designing a new snow dump site. Designing a new snow dump site Snow Dump Sites Understanding What to Do with Collected Snow Québec City Among cities with a population of 500,000 or more, Québec City ranks second in the world for the highest snowfall, behind Sapporo,

More information

Appendix 4-2-C Project Air Emissions Inventory

Appendix 4-2-C Project Air Emissions Inventory Appendix A CALPUFF and CALMET Methods and Assumptions Appendix 4-2-C Project Air Emissions Inventory C.1 Introduction For the purposes of estimating effects on air quality associated with the Project,

More information

BACT Determination Information

BACT Determination Information DRAFT - ASSIGNED TO S SMAQMD CLEARINGHOUSE CATEGORY: IC ENGINE SPARK - PRIME Size: Small Emitter (PTE < 10 lb/day) DEGASSING - IC ENGINE Determination Number: 173 Determination Date: 3/7/2018 Equipment

More information

MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR)

MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) MITIGATION LIST USS IOWA PROJECT ENVIRONMENTAL IMPACT REPORT (EIR) Prepared by: ENVIRONMENTAL MANAGEMENT DIVISION LOS ANGELES HARBOR DEPARTMENT With Assistance From: RBF CONSULTING Contact: ENVIRONMENTAL

More information

VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT. RULE 55 FUGITIVE DUST (Adopted 6/10/08) A. Applicability

VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT. RULE 55 FUGITIVE DUST (Adopted 6/10/08) A. Applicability VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 55 FUGITIVE DUST (Adopted 6/10/08) A. Applicability The provisions of this rule shall apply to any operation, disturbed surface area, or man-made condition

More information

B.6 Construction Equipment Utilization and Workforce

B.6 Construction Equipment Utilization and Workforce Appendix B.6 Construction ment Utilization and Workforce B.6 Construction ment Utilization and Workforce To support environmental impact assessments, a preliminary estimate was prepared for construction

More information

SAN PEDRO BAY PORTS YARD TRACTOR LOAD FACTOR STUDY Addendum

SAN PEDRO BAY PORTS YARD TRACTOR LOAD FACTOR STUDY Addendum SAN PEDRO BAY PORTS YARD TRACTOR LOAD FACTOR STUDY Addendum December 2008 Prepared by: Starcrest Consulting Group, LLC P.O. Box 434 Poulsbo, WA 98370 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY...2 1.1 Background...2

More information

ORDINANCE 742 (AS AMENDED THROUGH 742.

ORDINANCE 742 (AS AMENDED THROUGH 742. ORDINANCE 742 (AS AMENDED THROUGH 742.1) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE No. 742 RELATING TO THE CONTROL OF FUGITIVE DUST AND THE CORRESPONDING PM10 EMISSION IN THE COACHELLA

More information

Alternative 3 Air Quality and Climate Change Calculations

Alternative 3 Air Quality and Climate Change Calculations Alternative 3 Air Quality and Climate Change Calculations 10/15/2009 07:40:06 PM Urbemis 2007 Version 9.2.4 Combined Summer Emissions Reports (Pounds/Day) File Name: Z:\Alan Sako\112.23 OVOV\Alternatives\OVOV

More information

A IR Q UALITY A PPENDIX

A IR Q UALITY A PPENDIX A P P E N D I X B A IR Q UALITY A PPENDIX... CO EWP Petaluma East Washington Place, Petaluma CARBON MONOXIDE ANALYSIS PM Peak Hour Assumes worst case of all intersections based on total volume, LOS and

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

APPENDIX A AIR QUALITY AND GREENHOUSE GAS EMISSIONS MODEL OUTPUTS

APPENDIX A AIR QUALITY AND GREENHOUSE GAS EMISSIONS MODEL OUTPUTS APPENDIX A AIR QUALITY AND GREENHOUSE GAS EMISSIONS MODEL OUTPUTS This page intentionally left blank. a 2002 Project Emission Calculations LSA ASSOCIATES, INC. TRUCK AND PASSENGER CAR EMISSIONS - OARB

More information

Effective [one year after date of adoption] the provisions of this rule shall apply to:

Effective [one year after date of adoption] the provisions of this rule shall apply to: VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 55.1 PAVED ROADS AND PUBLIC UNPAVED ROADS (Adopted / / ) A. Applicability Effective [one year after date of adoption] the provisions of this rule shall

More information

Appendix E. Mobile Energy Calculations

Appendix E. Mobile Energy Calculations Appendix E Mobile Energy Calculations Operational Fuel Use Summary Fuel Type Fleet Mix (%) Gallons per Mile Annual VMT Gallons Gasoline 97.25% 0.04 221,696 5,486,315 Diel 2.75% 0.12 17,954 Not: 1. Fleet

More information

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District Best Available Control Technology (BACT) Guideline 2.1.1* Last Update 3/17/1997 Soil Remediation Operation - Thermal Oxidizer NOx 1. Natural gas with low NOx burner 2. Water injection (valid only for vapor

More information

Methods to Find the Cost-Effectiveness of Funding Air Quality Projects

Methods to Find the Cost-Effectiveness of Funding Air Quality Projects Methods to Find the Cost-Effectiveness of Funding Air Quality Projects For Evaluating Motor Vehicle Registration Fee Projects and Congestion Mitigation and Air Quality Improvement (CMAQ) Projects Emission

More information

La Canada Flintridge Parents for Healthy Air November 1, 2018 Presented by Elizabeth Krider, Ph.D., Esther Kornfeld and Tamar Tujian

La Canada Flintridge Parents for Healthy Air November 1, 2018 Presented by Elizabeth Krider, Ph.D., Esther Kornfeld and Tamar Tujian Concerns regarding the Devil s Gate Sediment Removal Project 1. New science demands new assessment of health risks to 3,000 sensitive receptors nearby. a. Air pollution is the new tobacco health crisis,

More information

Authority to Construct/Permit to Operate 13963

Authority to Construct/Permit to Operate 13963 Authority to Construct/Permit to Operate 13963 Page 1 of 10 EQUIPMENT OWNER: Goleta Valley Cottage Hospital 320420 EQUIPMENT OPERATOR: Goleta Valley Cottage Hospital EQUIPMENT LOCATION: 351 S. Patterson

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

Emergency Generators & Fire Pump

Emergency Generators & Fire Pump Emergency Generators & Fire Pump Facility ID No.: 3301500025 Telephone No.: 773-6881 Table 1 Emission Factors lbs/1000 gallons Fuel/Sulfur Emission Factor Source Size Diesel 0.4% S AP-42, Chaper 3.3-1,

More information

ORDINANCE NO. The City Council of the City of Desert Hot Springs, California, does hereby find and ordain as follows:

ORDINANCE NO. The City Council of the City of Desert Hot Springs, California, does hereby find and ordain as follows: ORDINANCE NO. AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DESERT HOT SPRINGS APPROVING REVISED REGULATIONS CONCERING THE CONTOL OF FUGITIVE DUST (PM10) FROM MAN-MADE AND OTHER SPECIFIED SOURCES, REPLACING

More information

The regulatory limits for the project include those prescribed via the Imperial County municipal code.

The regulatory limits for the project include those prescribed via the Imperial County municipal code. August 18, 2015 Dear Sharyn Del Rosario, HDR evaluated potential impacts from construction noise associated with the SEPV Dixieland East and West Solar Farm Projects (Project) and this letter memo provides

More information

Figure 4.1 presents the distribution of the 1,343 pieces of equipment inventoried at the Port for 2006.

Figure 4.1 presents the distribution of the 1,343 pieces of equipment inventoried at the Port for 2006. SECTION 4 CARGO HANDLING EQUIPMENT This section presents emissions estimates for the cargo handling equipment source category, including source description (4.1), geographical delineation (4.2), data and

More information

SOUTHWEST WASTE MANAGEMENT AUTHORITY.

SOUTHWEST WASTE MANAGEMENT AUTHORITY. SOUTHWEST WASTE MANAGEMENT AUTHORITY www.company.com Members Town of Shaunavon Town of Eastend RM of White Valley No. 49 RM of Grassy Creek No. 78 RM of Arlington No. 79 RM of Bone Creek No. 108 History

More information

Methods to Find the Cost-Effectiveness of Funding Air Quality Projects

Methods to Find the Cost-Effectiveness of Funding Air Quality Projects Methods to Find the Cost-Effectiveness of Funding Air Quality Projects For Evaluating Motor Vehicle Registration Fee Projects and Congestion Mitigation and Air Quality Improvement (CMAQ) Projects Emission

More information

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR

APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Lake Wohlford Dam Replacement Project EIR APPENDIX J LAKE WOHLFORD DAM REPLACEMENT PROJECT TRAFFIC IMPACT ANALYSIS (DAM REPLACEMENT) Replacement Project EIR Appendices TRAFFIC IMPACT ANALYSIS LAKE WOHLFORD DAM Escondido, California December 19,

More information

TSP-308 MPK Ferdinand Fassa

TSP-308 MPK Ferdinand Fassa Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa OUTLINE 1. Introduction 2. Dozer Performance Characteristics Classified on the basis of running gear Blade Dozer Function 3. Dozer Production Estimating 4. Dozer

More information

Diesel Rules Compliance Update. Presented by Sean Edgar, Project Manager

Diesel Rules Compliance Update. Presented by Sean Edgar, Project Manager Diesel Rules Compliance Update Presented by Sean Edgar, Project Manager www.cleanfleets.net December 7, 2011 Goals for Today The Final Offroad and Onroad Rules How to Report and know what the Rules require

More information

Western Land Area Programmatic Environmental Assessment. APPENDIX K: Climate

Western Land Area Programmatic Environmental Assessment. APPENDIX K: Climate APPENDIX K: Climate Climate Prepared by: KB Environmental Sciences, Inc. December 2017 This page is left intentionally blank. Table of Contents Page 1 Introduction... 1 2 Construction... 1 2.1 On-Road

More information

Appendix H: Construction Impacts H-3 Air Quality

Appendix H: Construction Impacts H-3 Air Quality Appendix H: Construction Impacts H-3 Air Quality Rockland Landing-Reconstruction of the South Broadway Bridge Nonroad s Engine Size (hp) Compressors - surface tools 275 2 1 8 10% 0.043 0.045 1.107 0.263

More information

Compressed Natural Gas. It gets easier after the first billion miles

Compressed Natural Gas. It gets easier after the first billion miles Compressed Natural Gas It gets easier after the first billion miles Los Angeles Metro s Plans for Implementation of Near Zero Low NOx Engines and RCNG John Drayton Director of Vehicle Technology Los Angeles

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization DRAFT REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

California s Emission Reduction Plan for Ports and International Goods Movement

California s Emission Reduction Plan for Ports and International Goods Movement California s Emission Reduction Plan for Ports and International Goods Movement Alternative Maritime Power Conference Los Angeles Harbor Hotel April 24, 2006 California Environmental Protection Agency

More information

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM

APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM APPENDIX G TRAFFIC STUDY TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM To: From: Date: Subject: Jerry Flores - AECOM Brian A. Marchetti, AICP September 9, 5 DRAFT Traffic Study LABOE Channel 5 Studio Relocation

More information

Construction Noise Worksheets

Construction Noise Worksheets Appendix F Construction Noise Worksheets Al Larson Boat Shop Improvement Project Draft EIR January 2012 ADP# 080627-072 SCH# 2010091041 This page left intentionally blank ADP# 080627-072 SCH# 2010091041

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION SIC Code: 4911 (Energy Production) DATE: 06/17/2005 Page 1 of 6 DATE APPLICATION RECEIVED: March 31, 2004 (Application # FY04-0427) FACILITY DESCRIPTION Pinetree-Bethlehem (the Permittee) operates a 17.1

More information

Estimation of Average Trip Lengths To and From Century City Center Century City, California

Estimation of Average Trip Lengths To and From Century City Center Century City, California MEMORANDUM TO: FROM: LSA Associates, Inc. Jonathan Chambers, P.E. DATE: October 6, 2014 RE: Estimation of Average Trip Lengths To and From Century City Center Century City, California Ref: J1076 This memorandum

More information

Traffic and Transportation

Traffic and Transportation H Traffic and Transportation DRAFT MEMORANDUM Date: To: Tamseel Mir and Chad Beckstrom, From: Amanda Heinke and Netai Basu Subject: Construction Traffic Impact Analysis for the Taylor Yard Bikeway/Pedestrian

More information

Appendix D Noise Data

Appendix D Noise Data Appendix D Noise Data Construction Noise Summary Lmax (dba) at Various Leq (dba) at Various Construction Phase 50 100 200 400 800 1,600 3,200 6,400 50 100 200 400 800 1,600 3,200 6,400 Phase 1 Decommissioning

More information

GENERAL INPUTS Date: 21-Sep-18 Comments/Source Version: 17 LNG Plant Operation LNG Product - End use share Scenario A Scenario B Check

GENERAL INPUTS Date: 21-Sep-18 Comments/Source Version: 17 LNG Plant Operation LNG Product - End use share Scenario A Scenario B Check GENERAL INPUTS Date: 21-Sep-18 Comments/Source Version: 17 LNG Plant Operation LNG Product - End use share Scenario A Scenario B Check LNG Production End use share gal/day lb/day Mgal/ year tonne/ year

More information

This addendum responds to initial questions submitted by vendors.

This addendum responds to initial questions submitted by vendors. 5761 Keyo Building Orono, ME 04469-5761 Main:207-581-2712 ldd/tdy:207-973-3262 www.maine.edu REQUEST FOR PROPOSALS #014-19 University of Southern Maine Snow Removal & Sanding Services RESPONSE ADDENDUM

More information

AMERICAN ASSOCIATION OF PORT AUTHORITIES

AMERICAN ASSOCIATION OF PORT AUTHORITIES AMERICAN ASSOCIATION OF PORT AUTHORITIES E N V I R O N M E N T C O M M I T T E E M E E T I N G N O V E M B E R 1 4, 2 0 1 7 WILLIAM M. GUERRY Partner Environmental 2 Volkswagen ( VW ) Settlements 3 Environmental

More information

DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD

DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD ENVIRON International Corporation Draft Report DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD Prepared for BNSF Railway 2650 Lou Menk Drive Fort Worth, TX 76131-2830

More information

SECTION GREEN CONSTRUCTION POLICY SPECIFICATIONS

SECTION GREEN CONSTRUCTION POLICY SPECIFICATIONS SECTION 01 35 66 GREEN CONSTRUCTION POLICY SPECIFICATIONS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Contractor s responsibilities and obligations relative to the Los Angeles County Metropolitan Transportation

More information

PEMS Sampling for Victoria

PEMS Sampling for Victoria PEMS Sampling for Victoria Jarett Spinhirne Cyril Durrenberger Elena McDonald-Buller David Allen The University of Texas at Austin Background Emission inventory development and refinement is a critical

More information

DOCUMENTATION WORKBOOK FY 2017

DOCUMENTATION WORKBOOK FY 2017 DOCUMENTATION WORKBOOK SPECIFIC TASK TRAINING PROGRAM Conducted by the ILLINOIS CENTER FOR TRANSPORTATION (ICT) AND IDOT BUREAU OF CONSTRUCTION FY 2017 WORKBOOK TABLE OF CONTENTS Workbook Page 1... Maximum

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM August 26, 2014 SUBJECT: Veterans Affairs Medical Center Oakland Facility University Drive C Pittsburgh, PA 15240 Allegheny County Synthetic Minor

More information

Hydraulic power is the key to the utility of many excavators.

Hydraulic power is the key to the utility of many excavators. CHAPTER Construction Planning, Equipment, and Methods EXCAVATORS Sixth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering 8 By Dr. Ibrahim Assakkaf ENCE 420 Construction

More information

DRAFT AUTHORITY TO CONSTRUCT

DRAFT AUTHORITY TO CONSTRUCT A/C NO.: 25780 ISSUED BY: DATE ISSUED: TBD JORGE DEGUZMAN DATE EXPIRES: ISSUED TO: TBD PRIME DATA CENTERS DBA SVO BUILDING ONE LLC LOCATION: 2407 AK ST., MCCLELLAN PARK, CA 95652 DESCRIPTION: IC ENGINE

More information

According to the City Code Enforcement Officer (Stu Alward) when the program was initiated, approximately 25 years ago, the original intent was to

According to the City Code Enforcement Officer (Stu Alward) when the program was initiated, approximately 25 years ago, the original intent was to 2016 According to the City Code Enforcement Officer (Stu Alward) when the program was initiated, approximately 25 years ago, the original intent was to assist Senior Citizens with items that were to large

More information

ERC Project Assessment Documentation: Replacement of Lawn and Garden Equipmen with Electric Powered Equipment 11/26/2013 NOx

ERC Project Assessment Documentation: Replacement of Lawn and Garden Equipmen with Electric Powered Equipment 11/26/2013 NOx ERC Assessment Documentation: Replacement of Lawn and Garden Equipmen with Electric Powered Equipment /26/203 NOx Name Replace Gasoline Electric Electric. Replace Gasoline Leaf Blower with ERC Cost Effectiveness

More information

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization

Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Appendix B Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization REPORT Traffic Impact Analysis, Asphalt Plant No. 1 Replacement and Modernization Prepared for City of Los Angeles

More information

2030 Multimodal Transportation Study

2030 Multimodal Transportation Study 2030 Multimodal Transportation Study City of Jacksonville Planning and Development Department Prepared by Ghyabi & Associates April 29,2010 Introduction Presentation Components 1. Study Basis 2. Study

More information

Appendix Q Traffic Study

Appendix Q Traffic Study Appendices Appendix Q Traffic Study Crummer Site Subdivision Draft EIR City of Malibu Appendices This page intentionally left blank. The Planning Center April 2013 TRAFFIC IMPACT ANALYSIS Photo z here

More information

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant OffiCIAL FILE COPY SOUTHWEST REGIONAL OFFICE MEMO TO FROM THROUGH DATE Air Quality Permit File SOOP # 32-00311 Lindy Paving, Inc. I Homer City Plant Sheila A. Shaffer~ Air Quality Engineering S~ecialist

More information

**Equipment production**

**Equipment production** Construction operations And methods **Equipment production** The Equipment that will be covered on the exam and in this section are; Dozers Graders Scrapers Loaders Excavators Cranes(will discuss another

More information

VILLASPORT ATHLETIC CLUB AND SPA Draft Environmental Impact Report. Volume I

VILLASPORT ATHLETIC CLUB AND SPA Draft Environmental Impact Report. Volume I VILLASPORT ATHLETIC CLUB AND SPA Draft Environmental Impact Report Volume I SCH No. 2014092038 Prepared for: City of Roseville Planning Department 311 Vernon Street Roseville, California 95746 Prepared

More information

PALOS VERDES URBAN VILLAGE

PALOS VERDES URBAN VILLAGE PALOS VERDES URBAN VILLAGE Mitigated Negative Declaration Prepared for: Community Redevelopment Agency 354 S. Spring Street, Suite 800 Los Angeles, CA 90013 W. Ono Ujor 213-977-1725 September 2006 PALOS

More information

Agility Service Exchanges

Agility Service Exchanges Roads - Unpaved 618-7112-01 Shaping Miles 618-7113-01 Re-stabilization Square Yard 618-7114-01 Dust Palliative-Bit/Calcium Chloride/Other Square Yard 618-7114-02 Dust Palliative-Spot Square Yard 618-7115-01

More information

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach ABSTRACT The California Environmental Quality Act (CEQA) review process requires projects to mitigate their significant impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD or District)

More information

Pavement Thickness Design Parameter Impacts

Pavement Thickness Design Parameter Impacts Pavement Thickness Design Parameter Impacts 2012 Municipal Streets Seminar November 14, 2012 Paul D. Wiegand, P.E. How do cities decide how thick to build their pavements? A data-based analysis Use same

More information

http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-102-1.pdf http://www.dir.ca.gov/oprl/pwd/determinations/northern/nc-023-63-1.pdf. COST ESTIMATE FOR PACIFICA QUARRY

More information

4.7 Construction Surface Transportation

4.7 Construction Surface Transportation 4.7.1 Introduction The traffic analysis presented in this section addresses the construction traffic impacts specific to the proposed Project. The construction traffic impacts were analyzed for both the

More information

5.9 TRANSPORTATION AND TRAFFIC

5.9 TRANSPORTATION AND TRAFFIC 5.9 TRANSPORTATION AND TRAFFIC This section evaluates transportation- and traffic-related impacts that have the potential to result from the construction and operation of the Project. Information and analysis

More information

3.8 TRANSPORTATION, CIRCULATION AND PARKING

3.8 TRANSPORTATION, CIRCULATION AND PARKING 3.8 TRANSPORTATION, CIRCULATION AND PARKING This section provides an overview of traffic, circulation and parking impacts and evaluates the construction and operational impacts associated with the Proposed

More information

Performance Measure Summary - Large Area Sum. Performance Measures and Definition of Terms

Performance Measure Summary - Large Area Sum. Performance Measures and Definition of Terms Performance Measure Summary - Large Area Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Medium Area Sum. Performance Measures and Definition of Terms

Performance Measure Summary - Medium Area Sum. Performance Measures and Definition of Terms Performance Measure Summary - Medium Area Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

Performance Measures and Definition of Terms

Performance Measures and Definition of Terms Performance Measure Summary - All 471 Areas Sum There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Leak Detector, Red Jacket #FX1V

Leak Detector, Red Jacket #FX1V ITEM 1 SUBMERSIBLE REMOTE PUMPS A. 2. Manufacturer EACH Red Jacket Red Jacket 4. Effective date of schedule EACH Oct. 3, 2005 July 1, 2006 B. Red Jacket Equipment 1. Leak Detector, Red Jacket #FX1V 215.00

More information

Appendix H TRAFFIC IMPACT ANALYSIS

Appendix H TRAFFIC IMPACT ANALYSIS Appendix H TRAFFIC IMPACT ANALYSIS Teichert Boca Quarry Expansion Traffic Impact Analysis Prepared for Teichert Aggregates Prepared by TRANSPORTATION CONSULTANTS, INC. LSC Transportation Consultants, Inc.

More information

Dallas Intermodal Terminal 2006 Baseline and Projected 2009 and 2012 Emissions Inventory DRAFT FINAL REPORT

Dallas Intermodal Terminal 2006 Baseline and Projected 2009 and 2012 Emissions Inventory DRAFT FINAL REPORT Dallas Intermodal Terminal 2006 Baseline and Projected 2009 and 2012 Emissions Inventory DRAFT FINAL REPORT Prepared for: City of Dallas And The Texas Commission on Environmental Quality Prepared by: Eastern

More information

San Joaquin Valley Unified Air Pollution Control District

San Joaquin Valley Unified Air Pollution Control District San Joaquin Valley Unified Air Pollution Control District Guidelines for Expedited Application Review (GEAR) Emergency Internal Combustion Engines Approved by: Signed Date: 12/18/97 Seyed Sadredin Revised

More information

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject:

MEMORANDUM. Project Description. Operational Trip Generation. Construction Trip Generation. Date: August 12, 2014 TG: To: From: Subject: MEMORANDUM Date: August 12, 2014 TG: 13329.01 To: From: Subject: Jeremy Krout EPD Solutions Inc. Rafik Albert EPD Solutions Inc. Rawad Hani Transpo Group AP North Lake Solar Project Traffic Scoping The

More information

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS

Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Comprehensive Regional Goods Movement Plan and Implementation Strategy Goods Movement in the 2012 RTP/SCS Annie Nam Southern California Association of Governments September 24, 2012 The Goods Movement

More information

Performance Measure Summary - Austin TX. Performance Measures and Definition of Terms

Performance Measure Summary - Austin TX. Performance Measures and Definition of Terms Performance Measure Summary - Austin TX There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information

Performance Measure Summary - Pittsburgh PA. Performance Measures and Definition of Terms

Performance Measure Summary - Pittsburgh PA. Performance Measures and Definition of Terms Performance Measure Summary - Pittsburgh PA There are several inventory and performance measures listed in the pages of this Urban Area Report for the years from 1982 to 2014. There is no single performance

More information