1 Pre Proposal Meeting Hold Bay 4 Reconstruction and Reconfiguration July 10, 2018

2 Hold Bay 4 Reconstruction and Reconfiguration Project Overview HOLD BAY 4 4 POSITIONS 2

3 Site Access, Haul Routes, and Storage STAGING AREA A STAGING AREA B GATE D EGRESS GATE A INGRESS 3

4 General Construction Phasing / Sequencing 4

5 Overview of Project Elements PHASE ONE 5 RELOCATE EXISTING AOA FENCE AND GATE F2 RELOCATE EXISTING VEHICLE SERVICE ROAD (EAST MAINTENANCE ROAD) RELOCATE EXISTING FUEL TRUCK PARKING SITE IMPROVEMENTS FOR GLYCOL COLLECTION TANKS CONSTRUCTION OF NEW BLAST FENCE CONSTRUCTION OF UTILITIES IN AIR CARGO AREA CONSTRUCTION OF HIGH MAST LIGHT POLES Phase Two CONSTRUCTION OF HOLD BAY 4 AND TAXILANE WHISKEY RELOCATION OF MWAA DEICING TANKS CONSTRUCTION OF REMAINING UTILITIES ERECTION OF TWO 85,000 GALLON GLYCOL COLLECTION TANKS CONSTRUCTION OF GLYCOL COLLECTION DRAINAGE NETWORK, INCLUDING LIFT STATION, PIPING, AND ASSOCIATED ELECTRICAL AND COMMUNICATION FEEDS

6 Phase 2 Work Restrictions TWs Z & K TW Z 45 CCD CLOSURE TW K NIGHTTIME CLOSURE ( ) 6

7 Hold Bay 4 Pavement Demolition 7

8 Hold Bay 4 Miscellaneous Demolition 8

9 Fuel Truck Parking and Glycol Tank Relocation EXISTING TANK CONFIGURATION PROPOSED FUEL TRUCK PARKING AND TANK CONFIGURATION 9

10 Vehicle Service Road EXISTING VSR RELOCATED VEHICLE SERVICE ROAD Gate D Gate F2 10

11 PCC Pavement Typical Section 11

12 AOA Fencing and Gate F2 Relocation EXISTING AOA FENCE SHALL NOT BE REMOVED UNTIL AFTER THE INSTALLATION OF NEW AOA FENCE AND GATE F2 AS SHOWN ON THE PLANS WORK SHALL BE COMPLETED IN 30 CCD NEW GATE F2 TO BE CONSTRUCTED IN LOCATION SHOW AOA FENCE AND GATE F2 BLAST FENCETO HAVE 12 CONCRETE SPREAD FOOTING 12

13 JET BLAST FENCE BARRIER 13

14 Utility Relocations 14

15 Apron High Mast Lighting High Mast Lighting Details: FOUR (4) HIGH MAST LIGHT POLES INCORPORATION OF HIGH MAST LIGHTING ACCESSORIES, INCLUDING LOWERING DEVICES AND RECEPTACLES DUAL LED OBSTRUCTION LIGHTS WILL BE ON TOP OF ALL HIGH MAST LIGHT POLES DISCONNECT SWITCHES WILL BE INSTALLED AT ALL HIGH MAST LIGHT POLE BASES 15

16 Electrical and Control Plan Details COMBINED POWER AND CONTROL EQUIPMENT RACK FOR GLYCOL VALVES, COLLECTION TANK, LIFT STATION AUTOMATED VALVES WITH LOCAL MANUAL CONTROL LIFT STATION WILL BE CONNECTED TO BUILDING AUTOMATION SYSTEM (BAS) AT AIR CARGO FACILITY BAS SYSTEM INTEGRATION BY OTHERS 16

17 Glycol Collection System TANK SPECIFICATIONS: SIZE: 85,000 GALLON Glycol Lift Station W/ Two 10 HP Submersible Pumps DIMENSIONS: 20 DIA., 36 H MATERIAL: CARBON STEEL ROOF: SELF SUPPORTED CONE Diversion Structure EXTERIOR COLOR: WHITE ALARMS: High Level Alarm (90%) High Level Shutoff (95%) TANK REQUIREMENTS: 8 CONCRETE BERM FOR SECONDARY CONTAINMENT LOW LEVEL INDICATOR AT TANK TRUCK LOADING AREA (THOMAS AVE.) Two (2) 85,000 Gallon Glycol Collection Tanks 6 LINE W/ 4 DIA. HOSE PUMPED INTO TRUCKS 17

18 Rammed Aggregate Piers Basis of Design: 2.5 DIA, 5.5 Spacing, 40 ft Deep* * Specialty Contractor will submit their own performance based design an which may differ in diameter, spacing and depth. 18

19 Glycol Lift Station Plan LIFT STATION SPECIFICATIONS: TWO 10 Hp SUBMERSIBLE PUMPS Glycol Lift Station 8 x 10 x 10 DEEP SUMP PUMPS 200 GPM LEAD LAG PUMP CCONFIGURATION FLOAT TYPE LEVEL SWITCHES LOCAL POWER AND CONTROL EQUIPMENT RACK HARD WIRED CONNECTION TO BUILDING AUTOMATION SYSTEM (BAS) 19

20 Taxiway Lighting and Signage Plan AIRFIELD LIGHTING AND SIGNAGE DETAILS: SURFACE MOUNTED TAXIWAY CENTERLINE REFLECTORS L 852T IN PAVEMENT TAXIWAY EDGE LIGHTS WITH L 868 BASE CANS L 861T ELEVATED TAXIWAY EDGE LIGHTS W/ L 867 BASE CANS ALONG TAXIWAY ZULU (Z) 20 THREE L 858 INTERNALLY ILLUMINATED GUIDANCE SIGNS WITH LED LAMPS TWO SURFACE PAINTED TAXIWAY GUIDANCE SIGNS L 810 LED OBSTRUCTION LIGHTS SPACED EVERY 25 FEET ALONG BLAST FENCE

21 Thank You

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates

SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California

More information

Code Requirements on Aboveground Storage Tanks Dispensing Fuels At Motor Vehicle Fuel-Dispensing Stations

Code Requirements on Aboveground Storage Tanks Dispensing Fuels At Motor Vehicle Fuel-Dispensing Stations Code Requirements What follows is a detailed chart developed by Steel Tank Institute s executive vice president, Wayne Geyer, P.E. Fire codes play a prominent role in tank purchase decisions. As such,

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half

More information

Waste and Recycling Disposal Service Requirements for New Residential Developments

Waste and Recycling Disposal Service Requirements for New Residential Developments Waste and Recycling Disposal Service Requirements for New Residential Developments Introduction This document applies to all residential building/development applications and outlines the minimum design

More information

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS

SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS Kitsap County Public Works July 2019 If you have any questions regarding the Standards or have recommendations for improvement, please contact: Sarah Olson

More information

Public Works & Utilities Department Memorandum

Public Works & Utilities Department Memorandum Public Works & Utilities Department Memorandum To: Land Development Owners, Engineers, and Contractors From: Public Works and Utilities Date: March 21, 2016 Subject: Solid Waste Facilities The information

More information

Terminal Alternatives

Terminal Alternatives Chapter 5 Terminal Alternatives Missoula International Airport Master Plan Update Prepared for Missoula County Airport Authority OCTOBER 2008 Contents Section Page 5 Terminal Alternatives...5-1 5.1 Terminal

More information

Capital Improvement Program

Capital Improvement Program 7 INTRODUCTION The (CIP) involves the compilation of a schedule of recommended development projects, and their probable costs, that are based on the fi ndings of the demand forecasts and facility requirements

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

APPENDIX C: COSTS BACK-UP

APPENDIX C: COSTS BACK-UP APPENDIX C: COSTS BACK-UP SECTION 2010-2015 Executive Recap DESCRIPTION MAC LTCP PLAN RANGE LOW HIGH Humphrey Terminal Expansion - Phase I (Add 17 Gates) $224,077,000 - $263,620,000 OTHER PHASE SCOPE

More information

Table of Contents. Division III: Sign Control ARTICLE 1 GENERAL SIGN REGULATIONS...1

Table of Contents. Division III: Sign Control ARTICLE 1 GENERAL SIGN REGULATIONS...1 Table of Contents : Sign Control ARTICLE 1 GENERAL SIGN REGULATIONS...1 Section 1 1 GENERAL PROHIBITION...1 Section 1 2 COMPUTATION OF SIGN AREA ALLOWANCE...1 Section 1 3 SIGNS NOT TO BE HAZARDOUS...1

More information

APPENDIX C AIR QUALITY

APPENDIX C AIR QUALITY C.1 CONSTRUCTION APPENDIX C AIR QUALITY Construction activities associated with the Proposed Action are set to begin July 2020 and be completed by May 2023. Potential sources of construction emissions

More information

ELECTRICAL TECHNICAL PAPER 22 AIRFIELD/HELIPORT/HELIPAD PORTABLE LIGHTING REQUIREMENTS IN A THEATER OF OPERATIONS (TO) (FOR ARMY ONLY)

ELECTRICAL TECHNICAL PAPER 22 AIRFIELD/HELIPORT/HELIPAD PORTABLE LIGHTING REQUIREMENTS IN A THEATER OF OPERATIONS (TO) (FOR ARMY ONLY) ELECTRICAL TECHNICAL PAPER 22 AIRFIELD/HELIPORT/HELIPAD PORTABLE LIGHTING REQUIREMENTS IN A THEATER OF OPERATIONS (TO) (FOR ARMY ONLY) This Technical Paper provides U.S. Army policy for portable lighting

More information

Greater Cleveland Regional Transit Authority. Bus Stop Design Guidelines

Greater Cleveland Regional Transit Authority. Bus Stop Design Guidelines Greater Cleveland Regional Transit Authority Bus Stop Design Guidelines Contents Purpose... I Bus Stop Design & Location... 1 Bus Stop Planning... 1 Bus Stop Safety & Consolidation... 1 As Needed Basis...

More information

Port of Grays Harbor Capital Improvement Plan

Port of Grays Harbor Capital Improvement Plan Marine Terminals Communication Equipment VHF Radio 3,000 3,000 3,000 3,000 3,000 Deeper Draft Deeper Draft Phase 2 4,713,000 1,172,000 Jet Array Jet Array Renovation 200,000 200,000 200,000 200,000 200,000

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line

More information

However, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.

However, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit. We apologize for any inconvenience that this construction may cause and appreciate your patience while we work hard to improve The Crescent for our customers. Effective Tuesday, July 28 Shoring for the

More information

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL

PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee

More information

Charter Township of Plymouth Zoning Ordinance No. 99 Page 164 Article 15: VP Vehicular Parking District Amendments:

Charter Township of Plymouth Zoning Ordinance No. 99 Page 164 Article 15: VP Vehicular Parking District Amendments: Charter Township of Plymouth Zoning Ordinance No. 99 Page 164 PURPOSE ARTICLE XV VP VEHICULAR PARKING DISTRICT Vehicular Parking Districts (VP) are designed to accommodate off-street parking for the exclusive

More information

On-Demand Mobile Fueling

On-Demand Mobile Fueling 2017 NFPA Conference & Expo On-Demand Mobile Fueling Andrew Henning Supervising Deputy State Fire Marshal CAL FIRE Andrew Klein Principal A S Klein Engineering Lynne Kilpatrick Fire Marshal Sunnyvale Public

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2008 edition of NFPA 30A, and the 2006 International Fire Code (IFC). Please

More information

GLYCOL FEED SYSTEMS OPERATION & MAINTENANCE MANUAL

GLYCOL FEED SYSTEMS OPERATION & MAINTENANCE MANUAL GLYCOL FEED SYSTEMS OPERATION & MAINTENANCE MANUAL PLEASE RECORD THE FOLLOWING DATA (Information is located on the product label or packing slip) Model Number: Date Code: Installation Date: Installation

More information

THE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 DPL Building Courthouse Plaza Southwest Dayton, Ohio P.U.C.O. NO. 1

THE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 DPL Building Courthouse Plaza Southwest Dayton, Ohio P.U.C.O. NO. 1 THE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 SCHEDULE 1 Schedule of fees and charges used for determining sacrifice value, excess height and/or strength and sale costs of poles. Year % Set

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

FTS/FTC TAXIWAY LIGHTING. Taxiway Centerline, Stop Bar and Intersection Inset Light MEDIUM-INTENSITY. Compliance with Standards.

FTS/FTC TAXIWAY LIGHTING. Taxiway Centerline, Stop Bar and Intersection Inset Light MEDIUM-INTENSITY. Compliance with Standards. Taxiway Centerline, Stop Bar and Intersection Inset Light MEDIUM-INTENSITY Compliance with Standards FAA: Fittings for straight sections in compliance with FAA L-852A and L-852C specification, AC150/5345-46

More information

VSPS PACKAGE BOOSTER SYSTEM (END SUCTION PUMP DESIGN) FEATURES T Y P E

VSPS PACKAGE BOOSTER SYSTEM (END SUCTION PUMP DESIGN) FEATURES T Y P E PACKAGE BOOSTER SYSTEM (END SUCTION PUMP DESIGN) PACKAGED PUMP SYSTEM WITH CAPACITIES TO 300GPM, PRESSURE BOOST TO 100PSI* WITH UP TO 25HP ON EACH PUMP AVAILABLE IN DUPLEX, AND TRIPLEX CONFIGURATION, AND

More information

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2015 edition of, to the 2015 International Fire Code (). Please note that

More information

DESCRIPTION QUANTITY PRICE TOTAL

DESCRIPTION QUANTITY PRICE TOTAL GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00

More information

SPECIFICATIONS SEWAGE/SUMP DUPLEX SYSTEM ZOELLER COMPANY SUBMERSIBLE SEWAGE OR DEWATERING PUMPS

SPECIFICATIONS SEWAGE/SUMP DUPLEX SYSTEM ZOELLER COMPANY SUBMERSIBLE SEWAGE OR DEWATERING PUMPS Product information presented here reflects conditions at time of publication. Consult factory regarding discrepancies or inconsistencies. MAIL TO: P.O. BOX 16347 Louisville, KY 40256-0347 SHIP TO: 3649

More information

SITE PLANS ASSISTED LIVING REDEVELOPMENT

SITE PLANS ASSISTED LIVING REDEVELOPMENT SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE

More information

NORTH COUNTY FIRE AUTHORITY POLICY & PROCEDURE MANUAL OPERATIONS

NORTH COUNTY FIRE AUTHORITY POLICY & PROCEDURE MANUAL OPERATIONS PURPOSE: This policy and procedure describes the actions to be taken in the event of an emergency resulting from a fire, explosion, spill, or any unplanned sudden or non sudden release of hazardous waste

More information

(Please type or use black ink)

(Please type or use black ink) (Please type or use black ink) PNIPUG ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT NOTICE OF PROPOSED UST NEW INSTALLATION OR UPGRADE (Use a separate form for each separate place of operation) Date of

More information

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext. UNDERGROUND STORAGE TANK SYSTEM INSTALLATION/UPGRADE SUPPLEMENT For use by Unidocs Member Agencies or where approved by your Local Jurisdiction Authority Cited: California Fire (CFC); Chapter 6.7, Health

More information

Multi-Tank Submersible Pump Install Manual

Multi-Tank Submersible Pump Install Manual Multi-Tank Submersible Pump Install Manual Automated Fuel Maintenance System FTI-5A FUEL TECHNOLOGIES INTERNATIONAL LLC Replacement Manuals Available on Website: www.fueltechnologiesinternational.com 03/01/2011

More information

Winning Bid US Petroleum Equipment Walts Petroleum Northwest Petroleum Petro-Chemical Systems Kimberly Green Bay Wausau Fond Du Lac

Winning Bid US Petroleum Equipment Walts Petroleum Northwest Petroleum Petro-Chemical Systems Kimberly Green Bay Wausau Fond Du Lac Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Larrabee Shop Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local permits

More information

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009

SOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road

More information

Parking Areas and Driveways for Single and Two Family Dwellings

Parking Areas and Driveways for Single and Two Family Dwellings Building Information BURNABY PLANNING AND BUILDING DEPARTMENT Parking Areas and Driveways for The purpose of this brochure is to explain to owners, designers and builders the parking and driveway requirements

More information

IAH Terminal Redevelopment Program and HAS Infrastructure Division. Industry Day. December 6 th, 2016

IAH Terminal Redevelopment Program and HAS Infrastructure Division. Industry Day. December 6 th, 2016 IAH Terminal Redevelopment Program and HAS Infrastructure Division Industry Day December 6 th, 2016 2016 Agenda 10:00 am Introductory Comments Mr. Jason McLemore, Deputy Assistant Director, HAS Office

More information

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street

Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Department of Environmental Services, Transportation Division Sept. 27, 2018

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

Truck Traffic Impact Analysis

Truck Traffic Impact Analysis Truck Traffic Impact Analysis FOR Proposed Demolition Project AT 3300 Panorama Drive Morro Bay, CA Prepared for Rhine LP & CVI Group, LLC Prepared by 1998 Santa Barbara Avenue, Suite 200 San Luis Obispo,

More information

Table Station Elements

Table Station Elements The overall layout of the station in the Preferred Alternative (Modified Alternative 2) is described in Table 7.5-1. Table 7.5-1 Station Elements Ground Level Mezzanine Level Platform Level Existing/Upgraded

More information

7 Single Family Service

7 Single Family Service 7 Single Family Service 7. General The location of the service entrance on the Customer s premises is an important consideration. For clearance and location information see section 5 (Clearances). Consult

More information

PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES

PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES 3rd EDITION - 01/2006 Foreword This publication, together with the

More information

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153

PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 APPLICATION/PERMIT TO INSTALL ACCESS DRIVEWAY TO A COUNTY TRUNK HIGHWAY

More information

NMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST

NMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST Date Documents Submitted: Log No.: File No.: Plan Examiner: Permit No.: Property Information Building Name: Building Address: Building Manager's Name: Building Manager's Phone: Fax: System Designer/Contractor

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

The Airport s busiest months are October through May. There are NO sprinkled structures on the property - This includes the hangars

The Airport s busiest months are October through May. There are NO sprinkled structures on the property - This includes the hangars Frogmore International is a regional airport for public and limited commercial air traffic The airport is open daily 0700 to 1900 (7am-7pm) *Note: Airplanes can however takeoff/land 24hrs a day The airport

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines

Appendix A Transit Bus Stop Accessibility Criteria & Guidelines Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines Public Works Department, Transportation Division January 2014 Transit Bus Stop Accessibility Criteria & Guidelines These criteria and guidelines

More information

SeasonPak Packaged Air-Cooled Water Chiller

SeasonPak Packaged Air-Cooled Water Chiller Installation Manual IM 676 Group: Chiller Part Number: 594920Y Date: July 1996 Supersedes: None SeasonPak Packaged Air-Cooled Water Chiller Models ALR 032E Through 185E 1996 McQuay International Table

More information

SIGN PLACEMENT CONDITIONS AND REQUIREMENTS

SIGN PLACEMENT CONDITIONS AND REQUIREMENTS SIGN PLACEMENT CONDITIONS AND REQUIREMENTS 1. Where possible, no signboard shall be closer than twenty-five (25) feet from the centerline of tangent main track. Applications will be accepted and reviewed

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

OPERATIONAL ADVICE NOTICE (OAN) OAN 110/2018 MAN-TP T2 FUEL HYDRANT SHUTDOWN

OPERATIONAL ADVICE NOTICE (OAN) OAN 110/2018 MAN-TP T2 FUEL HYDRANT SHUTDOWN OAN 110/2018 MAN-TP T2 FUEL HYDRANT SHUTDOWN OAN REF:- 110/2018 DATE OF ISSUE:- 01/11/18 EFFECTIVE DATE:- 17/11/18 MANUAL REFERENCE(S):- N/A EXPIRY DATE:- 23/11/18 PLEASE ENSURE THIS INFORMATION IS PROMULGATED

More information

STANDARD DRAWING INDEX

STANDARD DRAWING INDEX ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard

More information

See NT POWERCOS , Classification Based On Service Size.

See NT POWERCOS , Classification Based On Service Size. Newmarket-Tay Power Distribution Ltd. Conditions of Service Number: NT POWER COS 310 01 Issue Date: July, 2007 Next Review Date: February, 2020 Residential 1. Preamble This section covers all items that

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation

More information

Appendix D. Airside and Landside Pavement Inventories

Appendix D. Airside and Landside Pavement Inventories Appendix D Airside and Landside Pavement Inventories Runway 5-23 2010 2" Mill and 2" Bituminous Surface Course Overlay 2001 2" Bituminous Surface Overlay 1984 2" Bituminous Surface Course Partial Overlay

More information

Night Work Specification

Night Work Specification Night Work Specification 1.0 Hours of Work The contractor is advised that most work for this contract will be carried out during night time hours. For the purposes of this contract night is defined as

More information

MOTOR VEHICLE ORIENTED BUSINESSES.

MOTOR VEHICLE ORIENTED BUSINESSES. ARTICLE 23. MOTOR VEHICLE ORIENTED BUSINESSES. Sec. 25-23.1. Conditional Use. Motor vehicle oriented businesses (MVOB) shall require a Conditional Use Permit in all districts as indicated in Appendix B,

More information

SAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards

SAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards SAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards The California Fire Code, adopted by S.J.Co. Ordinance No. 4178 effective as of November 8, 2002 requires that fire apparatus

More information

Section 6H.01 Typical Applications

Section 6H.01 Typical Applications December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all

More information

COMMERCIAL QUICK REFERENCE

COMMERCIAL QUICK REFERENCE COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR

More information

SPECIAL SPECIFICATION 7506 High Pressure Waterblasting System

SPECIAL SPECIFICATION 7506 High Pressure Waterblasting System 2004 Specifications CSJ 6199-06-001 SPECIAL SPECIFICATION 7506 High Pressure Waterblasting System 1. Description of Work. Furnish a high pressure waterblasting system for removing paint, thermoplastic,

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information

KEEPING HOUSTON AIRPORTS OPENING DAY FRESH

KEEPING HOUSTON AIRPORTS OPENING DAY FRESH KEEPING HOUSTON AIRPORTS OPENING DAY FRESH Devon Tiner, P.E., PMP Assistant Director Asset Engineering June 9, 2016 VISION AND MISSION STATEMENT MISSION: WE EXIST TO CONNECT PEOPLE, BUSINESSES, CULTURES

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013

NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 Control 6237-93-001 Project RMC - 623793001 Highway US0075 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned

More information

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for

ADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for ADDENDUM #1 The Plymouth Airport Commission is committed to fulfilling the New Fuel Farm Facility project within the scope of the permit, not exceeding our funding and to satisfy the time constraint associated

More information

2017 CATALOG East Main Street Mesa, AZ

2017 CATALOG East Main Street Mesa, AZ 01 2017 CATALOG 9502 East Main Street Mesa, AZ 85207 888 964.1488 480 986.1488 sales@ruralelectric.com www.ruralelectric.com 02 ABOUT US Since 1964 Rural Electric has been providing electrical contracting

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

CITY OF BEVERLY HILLS STAFF REPORT

CITY OF BEVERLY HILLS STAFF REPORT Meeting Date: July 7, 2011 To: From: Subject: CITY OF BEVERLY HILLS STAFF REPORT Honorable Mayor & City Council Pamela Mottice Muller, Director of Emergency Management 405 Closure Attachments: 1. 1-405

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

GENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK

GENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK GENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK SCALE: 1"=20'-0" OUTDOOR EQUIPMENT STORAGE YARD HISTORIC SITE USE PLAN PARKING LOT AND EQUIPMENT CIRCULATION AREA 11. LOAD'G SPACE 4. 3.

More information

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012

Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012 A5 ADMINISTRATIVE REPORT Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: 604.873.7214 RTS No.: 9587 VanRIMS No.: 08-2000-21 Meeting Date: June 12, 2012 TO: FROM: SUBJECT: Vancouver City Council

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

Job-site Internal Traffic control Planning

Job-site Internal Traffic control Planning ITCP Sample 1 AJAX Job-site Internal Traffic control Planning Date presented: The night of 12/7/17 Area: State Road 70 @ US 41 Job # 372117 Job site procedures Be highly visible o Daytime Operations minimum

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 3/8/2011 RE: BID/RFP #: RFP-DOT-10/11-9031-LG BID/RFP TITLE: FURNISH AND INSTALL EMERGENCY GENERATOR POWER SYSTEM AT CARYVILLE OPENING DATE: March

More information

Focus on the engineering & permitting requirements for installing a new fuel facility at the Port of Olympia;

Focus on the engineering & permitting requirements for installing a new fuel facility at the Port of Olympia; Port of Olympia Marine Fueling Station Project Fuel Dock Design Overview KPFF Consulting Engineers April 8, 2015 Fueling Station ti Feasibility Analysis Focus on the engineering & permitting requirements

More information

spas Specific Plan Amendment Study

spas Specific Plan Amendment Study Los Angeles International Airport spas Specific Plan Amendment Study 2012 Page 1 LAXSPAS_Book.indd 1 Page 2 LAXSPAS_Book.indd 2 Table of Contents 4 Message from the Executive Director 5 About the Study

More information

SPECIFICATIONS SEWAGE/SUMP DUPLEX SYSTEM ZOELLER COMPANY SUBMERSIBLE SEWAGE OR DEWATERING PUMPS

SPECIFICATIONS SEWAGE/SUMP DUPLEX SYSTEM ZOELLER COMPANY SUBMERSIBLE SEWAGE OR DEWATERING PUMPS Your Peace of Mind is Our Top Priority Product information presented here reflects conditions at time of publication. Consult factory regarding discrepancies or inconsistencies. MAIL TO: P.O. BOX 16347

More information

ARQUA STATION DF4 + DF7

ARQUA STATION DF4 + DF7 The Arqua Station DF4 + DF7 is a complete system to provide fresh tap or filtered water to public spaces. This technical pack includes: Assembly and Installation guide Care and Maintenance For more information,

More information

Airport Safety. Given by: Robert Bassey. IESALC Conference, October 24, 2016 San Diego, CA

Airport Safety. Given by: Robert Bassey. IESALC Conference, October 24, 2016 San Diego, CA Airport Safety Technology Research & Development Given by: Robert Bassey IESALC Conference, October 24, 2016 San Diego, CA LED Runway Closure Marker Study 2 LED Lighted X Testing 3 LED Lighted X Testing

More information

Fuel Storage Dec 2016

Fuel Storage Dec 2016 Fuel Storage Dec 2016 1 Table of Contents SECTION I. ABOVEGROUND SMALL TANKS (1,100 GALLONS OR LESS)...3 Siting a new aboveground tank or tanks...3 Understanding fuel tank types....3 Where to find the

More information

City of Casselberry Planning Division

City of Casselberry Planning Division City of Casselberry Planning Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Telephone (407) 262-7700, Ext. 1106 Fax (407) 262-7763 Email: ehanna@casselberry.org SIGN REGUALTIONS SEE ULDR Article

More information

Water Supply & Fire Apparatus Access Requirements

Water Supply & Fire Apparatus Access Requirements Moses Lake Fire Department rd 701 E 3 AVE Moses Lake WA 98837 www.cityofml.com Water Supply & Fire Apparatus Access Requirements This brochure is provided as a resource only. The items listed are the requirements

More information

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

PERMANENT RESIDENTIAL UNDERGROUND SERVICE CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide

More information

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES

CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required

More information

MEYER MATE 9.0 CU FT. SPREADER

MEYER MATE 9.0 CU FT. SPREADER MEYER MATE 9.0 CU FT. SPREADER General Specifications Overall Height: 41.25" Overall Width: 49.5" Overall Depth: 32" Weight Empty: 140 lbs. Spreading Width: Minimum 3 Maximum 30 Spreading Material: Dry

More information

FUEL SYSTEM GUIDELINES RURAL AIRPORTS LEASING AND PROPERTY MANAGEMENT DEPARTMENT OF TRANSPORTATION, STATE OF ALASKA

FUEL SYSTEM GUIDELINES RURAL AIRPORTS LEASING AND PROPERTY MANAGEMENT DEPARTMENT OF TRANSPORTATION, STATE OF ALASKA FUEL SYSTEM GUIDELINES RURAL AIRPORTS LEASING AND PROPERTY MANAGEMENT DEPARTMENT OF TRANSPORTATION, STATE OF ALASKA The following information should be used for tank placement or upgrade on state owned

More information

BUS STOP DESIGN & PLANNING GUIDE

BUS STOP DESIGN & PLANNING GUIDE BUS STOP DESIGN & PLANNING GUIDE Prepared by the Operations and Planning Departments 2011 PURPOSE OF GUIDE The design of passenger waiting areas plays a significant role in a person s decision of whether

More information

Exposition Corridor Transit Project

Exposition Corridor Transit Project Exposition Corridor Transit Project Phase 2 Environmental Planning Community Meeting June 9, 2008 Exposition Corridor Transit Project Phase 2 AGENDA Remaining Grade Crossing Recommendations June 9, 2008

More information

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group

DRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group DRIVEWAY GUIDE June 2017 TABLE OF CONTENTS Definitions Building Requirements Material Standards Drainage Administrative Requirements Zoning Requirements Yard Requirements Design Requirements Public Ways

More information

Earthsafe Systems, Inc. Page 1

Earthsafe Systems, Inc. Page 1 ESS.WP.531. YQA Fuel Transfer Your Questions Answered (47) Fuel Transfer Systems earth safe Fuel Systems for Critical Power. 5.1 What types of pumps are used for fuel transfer? Fuel transfer pumps are

More information

TRASH RACK CLEANING MACHINE

TRASH RACK CLEANING MACHINE TRASH RACK CLEANING MACHINE 1 SCOPE The work includes the design, manufacturing, supply, transportation, handling, storage, installation (including 1 st and 2 nd Stage embedded parts and any other necessary

More information