1 Pre Proposal Meeting Hold Bay 4 Reconstruction and Reconfiguration July 10, 2018
2 Hold Bay 4 Reconstruction and Reconfiguration Project Overview HOLD BAY 4 4 POSITIONS 2
3 Site Access, Haul Routes, and Storage STAGING AREA A STAGING AREA B GATE D EGRESS GATE A INGRESS 3
4 General Construction Phasing / Sequencing 4
5 Overview of Project Elements PHASE ONE 5 RELOCATE EXISTING AOA FENCE AND GATE F2 RELOCATE EXISTING VEHICLE SERVICE ROAD (EAST MAINTENANCE ROAD) RELOCATE EXISTING FUEL TRUCK PARKING SITE IMPROVEMENTS FOR GLYCOL COLLECTION TANKS CONSTRUCTION OF NEW BLAST FENCE CONSTRUCTION OF UTILITIES IN AIR CARGO AREA CONSTRUCTION OF HIGH MAST LIGHT POLES Phase Two CONSTRUCTION OF HOLD BAY 4 AND TAXILANE WHISKEY RELOCATION OF MWAA DEICING TANKS CONSTRUCTION OF REMAINING UTILITIES ERECTION OF TWO 85,000 GALLON GLYCOL COLLECTION TANKS CONSTRUCTION OF GLYCOL COLLECTION DRAINAGE NETWORK, INCLUDING LIFT STATION, PIPING, AND ASSOCIATED ELECTRICAL AND COMMUNICATION FEEDS
6 Phase 2 Work Restrictions TWs Z & K TW Z 45 CCD CLOSURE TW K NIGHTTIME CLOSURE ( ) 6
7 Hold Bay 4 Pavement Demolition 7
8 Hold Bay 4 Miscellaneous Demolition 8
9 Fuel Truck Parking and Glycol Tank Relocation EXISTING TANK CONFIGURATION PROPOSED FUEL TRUCK PARKING AND TANK CONFIGURATION 9
10 Vehicle Service Road EXISTING VSR RELOCATED VEHICLE SERVICE ROAD Gate D Gate F2 10
11 PCC Pavement Typical Section 11
12 AOA Fencing and Gate F2 Relocation EXISTING AOA FENCE SHALL NOT BE REMOVED UNTIL AFTER THE INSTALLATION OF NEW AOA FENCE AND GATE F2 AS SHOWN ON THE PLANS WORK SHALL BE COMPLETED IN 30 CCD NEW GATE F2 TO BE CONSTRUCTED IN LOCATION SHOW AOA FENCE AND GATE F2 BLAST FENCETO HAVE 12 CONCRETE SPREAD FOOTING 12
13 JET BLAST FENCE BARRIER 13
14 Utility Relocations 14
15 Apron High Mast Lighting High Mast Lighting Details: FOUR (4) HIGH MAST LIGHT POLES INCORPORATION OF HIGH MAST LIGHTING ACCESSORIES, INCLUDING LOWERING DEVICES AND RECEPTACLES DUAL LED OBSTRUCTION LIGHTS WILL BE ON TOP OF ALL HIGH MAST LIGHT POLES DISCONNECT SWITCHES WILL BE INSTALLED AT ALL HIGH MAST LIGHT POLE BASES 15
16 Electrical and Control Plan Details COMBINED POWER AND CONTROL EQUIPMENT RACK FOR GLYCOL VALVES, COLLECTION TANK, LIFT STATION AUTOMATED VALVES WITH LOCAL MANUAL CONTROL LIFT STATION WILL BE CONNECTED TO BUILDING AUTOMATION SYSTEM (BAS) AT AIR CARGO FACILITY BAS SYSTEM INTEGRATION BY OTHERS 16
17 Glycol Collection System TANK SPECIFICATIONS: SIZE: 85,000 GALLON Glycol Lift Station W/ Two 10 HP Submersible Pumps DIMENSIONS: 20 DIA., 36 H MATERIAL: CARBON STEEL ROOF: SELF SUPPORTED CONE Diversion Structure EXTERIOR COLOR: WHITE ALARMS: High Level Alarm (90%) High Level Shutoff (95%) TANK REQUIREMENTS: 8 CONCRETE BERM FOR SECONDARY CONTAINMENT LOW LEVEL INDICATOR AT TANK TRUCK LOADING AREA (THOMAS AVE.) Two (2) 85,000 Gallon Glycol Collection Tanks 6 LINE W/ 4 DIA. HOSE PUMPED INTO TRUCKS 17
18 Rammed Aggregate Piers Basis of Design: 2.5 DIA, 5.5 Spacing, 40 ft Deep* * Specialty Contractor will submit their own performance based design an which may differ in diameter, spacing and depth. 18
19 Glycol Lift Station Plan LIFT STATION SPECIFICATIONS: TWO 10 Hp SUBMERSIBLE PUMPS Glycol Lift Station 8 x 10 x 10 DEEP SUMP PUMPS 200 GPM LEAD LAG PUMP CCONFIGURATION FLOAT TYPE LEVEL SWITCHES LOCAL POWER AND CONTROL EQUIPMENT RACK HARD WIRED CONNECTION TO BUILDING AUTOMATION SYSTEM (BAS) 19
20 Taxiway Lighting and Signage Plan AIRFIELD LIGHTING AND SIGNAGE DETAILS: SURFACE MOUNTED TAXIWAY CENTERLINE REFLECTORS L 852T IN PAVEMENT TAXIWAY EDGE LIGHTS WITH L 868 BASE CANS L 861T ELEVATED TAXIWAY EDGE LIGHTS W/ L 867 BASE CANS ALONG TAXIWAY ZULU (Z) 20 THREE L 858 INTERNALLY ILLUMINATED GUIDANCE SIGNS WITH LED LAMPS TWO SURFACE PAINTED TAXIWAY GUIDANCE SIGNS L 810 LED OBSTRUCTION LIGHTS SPACED EVERY 25 FEET ALONG BLAST FENCE
21 Thank You
SPAS Concepts Preliminary Rough Order of Magnitude Cost Estimates
Appendix G LAX SPECIFIC PLAN AMENDMENT STUDY REPORT SPAS Concepts Preliminary Rough Order of Magnitude Estimates 2011/2012 Prepared for: Los Angeles World Airports One World Way Los Angeles, California
More informationCode Requirements on Aboveground Storage Tanks Dispensing Fuels At Motor Vehicle Fuel-Dispensing Stations
Code Requirements What follows is a detailed chart developed by Steel Tank Institute s executive vice president, Wayne Geyer, P.E. Fire codes play a prominent role in tank purchase decisions. As such,
More informationI-405 Sepulveda Pass Improvements Project
I-405 Sepulveda Pass Improvements Project Community Meeting November 15, 2012 1 Wilshire Segment Overview of Wilshire Segment There are a total of 23 bridges being constructed on this project; almost half
More informationWaste and Recycling Disposal Service Requirements for New Residential Developments
Waste and Recycling Disposal Service Requirements for New Residential Developments Introduction This document applies to all residential building/development applications and outlines the minimum design
More informationSOLID WASTE AND RECYCLING ENCLOSURE STANDARDS
SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS Kitsap County Public Works July 2019 If you have any questions regarding the Standards or have recommendations for improvement, please contact: Sarah Olson
More informationPublic Works & Utilities Department Memorandum
Public Works & Utilities Department Memorandum To: Land Development Owners, Engineers, and Contractors From: Public Works and Utilities Date: March 21, 2016 Subject: Solid Waste Facilities The information
More informationTerminal Alternatives
Chapter 5 Terminal Alternatives Missoula International Airport Master Plan Update Prepared for Missoula County Airport Authority OCTOBER 2008 Contents Section Page 5 Terminal Alternatives...5-1 5.1 Terminal
More informationCapital Improvement Program
7 INTRODUCTION The (CIP) involves the compilation of a schedule of recommended development projects, and their probable costs, that are based on the fi ndings of the demand forecasts and facility requirements
More information800 Access Control, R/W Use Permits and Drive Design
Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled
More informationMETRO Magnolia Transit Center - Bid Tab
Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's
More informationAPPENDIX C: COSTS BACK-UP
APPENDIX C: COSTS BACK-UP SECTION 2010-2015 Executive Recap DESCRIPTION MAC LTCP PLAN RANGE LOW HIGH Humphrey Terminal Expansion - Phase I (Add 17 Gates) $224,077,000 - $263,620,000 OTHER PHASE SCOPE
More informationTable of Contents. Division III: Sign Control ARTICLE 1 GENERAL SIGN REGULATIONS...1
Table of Contents : Sign Control ARTICLE 1 GENERAL SIGN REGULATIONS...1 Section 1 1 GENERAL PROHIBITION...1 Section 1 2 COMPUTATION OF SIGN AREA ALLOWANCE...1 Section 1 3 SIGNS NOT TO BE HAZARDOUS...1
More informationAPPENDIX C AIR QUALITY
C.1 CONSTRUCTION APPENDIX C AIR QUALITY Construction activities associated with the Proposed Action are set to begin July 2020 and be completed by May 2023. Potential sources of construction emissions
More informationELECTRICAL TECHNICAL PAPER 22 AIRFIELD/HELIPORT/HELIPAD PORTABLE LIGHTING REQUIREMENTS IN A THEATER OF OPERATIONS (TO) (FOR ARMY ONLY)
ELECTRICAL TECHNICAL PAPER 22 AIRFIELD/HELIPORT/HELIPAD PORTABLE LIGHTING REQUIREMENTS IN A THEATER OF OPERATIONS (TO) (FOR ARMY ONLY) This Technical Paper provides U.S. Army policy for portable lighting
More informationGreater Cleveland Regional Transit Authority. Bus Stop Design Guidelines
Greater Cleveland Regional Transit Authority Bus Stop Design Guidelines Contents Purpose... I Bus Stop Design & Location... 1 Bus Stop Planning... 1 Bus Stop Safety & Consolidation... 1 As Needed Basis...
More informationPort of Grays Harbor Capital Improvement Plan
Marine Terminals Communication Equipment VHF Radio 3,000 3,000 3,000 3,000 3,000 Deeper Draft Deeper Draft Phase 2 4,713,000 1,172,000 Jet Array Jet Array Renovation 200,000 200,000 200,000 200,000 200,000
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line
More informationHowever, due to the location, all garage parkers will need to continue to use the South end garage for entrance and exit.
We apologize for any inconvenience that this construction may cause and appreciate your patience while we work hard to improve The Crescent for our customers. Effective Tuesday, July 28 Shoring for the
More informationPERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL
PERMIT FOR INSTALLATION ON COUNTY RIGHTS-OF-WAY: ACCESS DRIVEWAYS RESIDENTIAL Submit To Martin County Judge s Office P.O. Box 1330 Stanton Texas 79782-1330 mhernandez@co.martin.tx.us APPLICATION: Permittee
More informationCharter Township of Plymouth Zoning Ordinance No. 99 Page 164 Article 15: VP Vehicular Parking District Amendments:
Charter Township of Plymouth Zoning Ordinance No. 99 Page 164 PURPOSE ARTICLE XV VP VEHICULAR PARKING DISTRICT Vehicular Parking Districts (VP) are designed to accommodate off-street parking for the exclusive
More informationOn-Demand Mobile Fueling
2017 NFPA Conference & Expo On-Demand Mobile Fueling Andrew Henning Supervising Deputy State Fire Marshal CAL FIRE Andrew Klein Principal A S Klein Engineering Lynne Kilpatrick Fire Marshal Sunnyvale Public
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationCode Requirements for ASTs at Motor Vehicle-Dispensing Stations
Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2008 edition of NFPA 30A, and the 2006 International Fire Code (IFC). Please
More informationGLYCOL FEED SYSTEMS OPERATION & MAINTENANCE MANUAL
GLYCOL FEED SYSTEMS OPERATION & MAINTENANCE MANUAL PLEASE RECORD THE FOLLOWING DATA (Information is located on the product label or packing slip) Model Number: Date Code: Installation Date: Installation
More informationTHE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 DPL Building Courthouse Plaza Southwest Dayton, Ohio P.U.C.O. NO. 1
THE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 SCHEDULE 1 Schedule of fees and charges used for determining sacrifice value, excess height and/or strength and sale costs of poles. Year % Set
More informationSTATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:
Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION
More informationFREQUENTLY ASKED QUESTIONS
THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on
More informationFTS/FTC TAXIWAY LIGHTING. Taxiway Centerline, Stop Bar and Intersection Inset Light MEDIUM-INTENSITY. Compliance with Standards.
Taxiway Centerline, Stop Bar and Intersection Inset Light MEDIUM-INTENSITY Compliance with Standards FAA: Fittings for straight sections in compliance with FAA L-852A and L-852C specification, AC150/5345-46
More informationVSPS PACKAGE BOOSTER SYSTEM (END SUCTION PUMP DESIGN) FEATURES T Y P E
PACKAGE BOOSTER SYSTEM (END SUCTION PUMP DESIGN) PACKAGED PUMP SYSTEM WITH CAPACITIES TO 300GPM, PRESSURE BOOST TO 100PSI* WITH UP TO 25HP ON EACH PUMP AVAILABLE IN DUPLEX, AND TRIPLEX CONFIGURATION, AND
More informationCode Requirements for ASTs at Motor Vehicle-Dispensing Stations
Code Requirements for ASTs at Motor Vehicle-Dispensing Stations This table compares aboveground storage tank requirements in the 2015 edition of, to the 2015 International Fire Code (). Please note that
More informationDESCRIPTION QUANTITY PRICE TOTAL
GENERAL 1 TRAFFIC CONTROL LS 1 $40,000 $40,000 $8,500.00 $8,500.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $15,000.00 $15,000.00 2 MOBILIZATION LS 1 $557,000 $557,000 $629,500.00 $629,500.00 $350,000.00
More informationSPECIFICATIONS SEWAGE/SUMP DUPLEX SYSTEM ZOELLER COMPANY SUBMERSIBLE SEWAGE OR DEWATERING PUMPS
Product information presented here reflects conditions at time of publication. Consult factory regarding discrepancies or inconsistencies. MAIL TO: P.O. BOX 16347 Louisville, KY 40256-0347 SHIP TO: 3649
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More informationNORTH COUNTY FIRE AUTHORITY POLICY & PROCEDURE MANUAL OPERATIONS
PURPOSE: This policy and procedure describes the actions to be taken in the event of an emergency resulting from a fire, explosion, spill, or any unplanned sudden or non sudden release of hazardous waste
More information(Please type or use black ink)
(Please type or use black ink) PNIPUG ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT NOTICE OF PROPOSED UST NEW INSTALLATION OR UPGRADE (Use a separate form for each separate place of operation) Date of
More informationProvide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.
UNDERGROUND STORAGE TANK SYSTEM INSTALLATION/UPGRADE SUPPLEMENT For use by Unidocs Member Agencies or where approved by your Local Jurisdiction Authority Cited: California Fire (CFC); Chapter 6.7, Health
More informationMulti-Tank Submersible Pump Install Manual
Multi-Tank Submersible Pump Install Manual Automated Fuel Maintenance System FTI-5A FUEL TECHNOLOGIES INTERNATIONAL LLC Replacement Manuals Available on Website: www.fueltechnologiesinternational.com 03/01/2011
More informationWinning Bid US Petroleum Equipment Walts Petroleum Northwest Petroleum Petro-Chemical Systems Kimberly Green Bay Wausau Fond Du Lac
Minimum Specifications/Questionnaire Bid Results for One (1) New Fuel Dispensing System-Larrabee Shop Winning Bid PERMIT FEES, FORMS, PLANS and NOTIFICATIONS Secure all necessary state and local permits
More informationSOUTH ACCESS TO THE GOLDEN GATE BRIDGE DOYLE DRIVE DOYLE DRIVE. Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009
DOYLE DRIVE Doyle Drive Presentation Golden Gate Bridge Board Meeting July 24, 2009 Presentation Overview Introduction Project Acceleration Construction Contracts Construction Activities Lane and Road
More informationParking Areas and Driveways for Single and Two Family Dwellings
Building Information BURNABY PLANNING AND BUILDING DEPARTMENT Parking Areas and Driveways for The purpose of this brochure is to explain to owners, designers and builders the parking and driveway requirements
More informationIAH Terminal Redevelopment Program and HAS Infrastructure Division. Industry Day. December 6 th, 2016
IAH Terminal Redevelopment Program and HAS Infrastructure Division Industry Day December 6 th, 2016 2016 Agenda 10:00 am Introductory Comments Mr. Jason McLemore, Deputy Assistant Director, HAS Office
More informationPublic Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street
Public Meeting: Metropolitan Washington Airports Authority (MWAA) TNC (Transportation Network Company) Lot on S. Eads Street Department of Environmental Services, Transportation Division Sept. 27, 2018
More informationW&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)
W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE
More informationTruck Traffic Impact Analysis
Truck Traffic Impact Analysis FOR Proposed Demolition Project AT 3300 Panorama Drive Morro Bay, CA Prepared for Rhine LP & CVI Group, LLC Prepared by 1998 Santa Barbara Avenue, Suite 200 San Luis Obispo,
More informationTable Station Elements
The overall layout of the station in the Preferred Alternative (Modified Alternative 2) is described in Table 7.5-1. Table 7.5-1 Station Elements Ground Level Mezzanine Level Platform Level Existing/Upgraded
More information7 Single Family Service
7 Single Family Service 7. General The location of the service entrance on the Customer s premises is an important consideration. For clearance and location information see section 5 (Clearances). Consult
More informationPUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES
PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES 3rd EDITION - 01/2006 Foreword This publication, together with the
More informationPLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153
PLEASE SUBMIT THE CORRECT PERMIT FEE WITH PAGES 1 & 3 OF APPLICATION TO: OCONTO COUNTY HIGHWAY DEPT, P.O. BOX 138, OCONTO, WI 54153 APPLICATION/PERMIT TO INSTALL ACCESS DRIVEWAY TO A COUNTY TRUNK HIGHWAY
More informationNMSU FIRE DEPARTMENT FIRE PUMP ACCEPTANCE TEST
Date Documents Submitted: Log No.: File No.: Plan Examiner: Permit No.: Property Information Building Name: Building Address: Building Manager's Name: Building Manager's Phone: Fax: System Designer/Contractor
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationThe Airport s busiest months are October through May. There are NO sprinkled structures on the property - This includes the hangars
Frogmore International is a regional airport for public and limited commercial air traffic The airport is open daily 0700 to 1900 (7am-7pm) *Note: Airplanes can however takeoff/land 24hrs a day The airport
More informationCOST ESTIMATES: Curb-Running
COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway
More informationAppendix "A" Transit Bus Stop Accessibility Criteria & Guidelines
Appendix "A" Transit Bus Stop Accessibility Criteria & Guidelines Public Works Department, Transportation Division January 2014 Transit Bus Stop Accessibility Criteria & Guidelines These criteria and guidelines
More informationSeasonPak Packaged Air-Cooled Water Chiller
Installation Manual IM 676 Group: Chiller Part Number: 594920Y Date: July 1996 Supersedes: None SeasonPak Packaged Air-Cooled Water Chiller Models ALR 032E Through 185E 1996 McQuay International Table
More informationSIGN PLACEMENT CONDITIONS AND REQUIREMENTS
SIGN PLACEMENT CONDITIONS AND REQUIREMENTS 1. Where possible, no signboard shall be closer than twenty-five (25) feet from the centerline of tangent main track. Applications will be accepted and reviewed
More informationCITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity
202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207
More informationOPERATIONAL ADVICE NOTICE (OAN) OAN 110/2018 MAN-TP T2 FUEL HYDRANT SHUTDOWN
OAN 110/2018 MAN-TP T2 FUEL HYDRANT SHUTDOWN OAN REF:- 110/2018 DATE OF ISSUE:- 01/11/18 EFFECTIVE DATE:- 17/11/18 MANUAL REFERENCE(S):- N/A EXPIRY DATE:- 23/11/18 PLEASE ENSURE THIS INFORMATION IS PROMULGATED
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationSee NT POWERCOS , Classification Based On Service Size.
Newmarket-Tay Power Distribution Ltd. Conditions of Service Number: NT POWER COS 310 01 Issue Date: July, 2007 Next Review Date: February, 2020 Residential 1. Preamble This section covers all items that
More informationORDINANCE NO
ORDINANCE NO. 07-5424 AN ORDINANCE OF THE CITY OF BILLINGS, PROVIDING THAT THE BILLINGS, MONTANA CITY CODE BE AMENDED BY REVISING SECTION 6-1208; PROVIDING CHANGES TO CERTAIN CURB CUT LENGTHS AND REGULATIONS.
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More informationAppendix D. Airside and Landside Pavement Inventories
Appendix D Airside and Landside Pavement Inventories Runway 5-23 2010 2" Mill and 2" Bituminous Surface Course Overlay 2001 2" Bituminous Surface Overlay 1984 2" Bituminous Surface Course Partial Overlay
More informationNight Work Specification
Night Work Specification 1.0 Hours of Work The contractor is advised that most work for this contract will be carried out during night time hours. For the purposes of this contract night is defined as
More informationMOTOR VEHICLE ORIENTED BUSINESSES.
ARTICLE 23. MOTOR VEHICLE ORIENTED BUSINESSES. Sec. 25-23.1. Conditional Use. Motor vehicle oriented businesses (MVOB) shall require a Conditional Use Permit in all districts as indicated in Appendix B,
More informationSAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards
SAN JOAQUIN COUNTY FIRE CHIEFS ASSOCIATION Fire Apparatus Access Road Standards The California Fire Code, adopted by S.J.Co. Ordinance No. 4178 effective as of November 8, 2002 requires that fire apparatus
More informationSection 6H.01 Typical Applications
December 27, 2010 Draft Page 6H-1 Section 6H.01 Typical Applications Support: 01 Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. 02 The needs and control of all
More informationCOMMERCIAL QUICK REFERENCE
COMMERCIAL QUICK REFERENCE PROVO CITY POWER STANDARDS ELECTRICAL ENGINEERING UPDATED: 2016 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTIFICATION. 18" MIN. OF TAIL. (NEUTRAL CONDUCTOR MUST BE WHITE OR
More informationSPECIAL SPECIFICATION 7506 High Pressure Waterblasting System
2004 Specifications CSJ 6199-06-001 SPECIAL SPECIFICATION 7506 High Pressure Waterblasting System 1. Description of Work. Furnish a high pressure waterblasting system for removing paint, thermoplastic,
More informationSUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71
BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,
More informationKEEPING HOUSTON AIRPORTS OPENING DAY FRESH
KEEPING HOUSTON AIRPORTS OPENING DAY FRESH Devon Tiner, P.E., PMP Assistant Director Asset Engineering June 9, 2016 VISION AND MISSION STATEMENT MISSION: WE EXIST TO CONNECT PEOPLE, BUSINESSES, CULTURES
More informationCTA Capital Construction Update December 12, 2006
Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction
More informationHILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.
PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013
NOTIFICATION OF ADDENDUM ADDENDUM NO. 2 DATED 5/03/2013 Control 6237-93-001 Project RMC - 623793001 Highway US0075 County DALLAS Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationADDENDUM #1. A. Alternate Bid Item #3A - The procurement and installation of a new 12,000 gallon UL 2085 rated AGT tank for
ADDENDUM #1 The Plymouth Airport Commission is committed to fulfilling the New Fuel Farm Facility project within the scope of the permit, not exceeding our funding and to satisfy the time constraint associated
More information2017 CATALOG East Main Street Mesa, AZ
01 2017 CATALOG 9502 East Main Street Mesa, AZ 85207 888 964.1488 480 986.1488 sales@ruralelectric.com www.ruralelectric.com 02 ABOUT US Since 1964 Rural Electric has been providing electrical contracting
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationCITY OF BEVERLY HILLS STAFF REPORT
Meeting Date: July 7, 2011 To: From: Subject: CITY OF BEVERLY HILLS STAFF REPORT Honorable Mayor & City Council Pamela Mottice Muller, Director of Emergency Management 405 Closure Attachments: 1. 1-405
More informationTHORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E
THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause
More informationGENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK
GENERAL NOTES AND REQUIREMENTS FOR PLUMBING AND ELECTRICAL WORK SCALE: 1"=20'-0" OUTDOOR EQUIPMENT STORAGE YARD HISTORIC SITE USE PLAN PARKING LOT AND EQUIPMENT CIRCULATION AREA 11. LOAD'G SPACE 4. 3.
More informationReport Date: May 18, 2012 Contact: Al Zacharias Contact No.: RTS No.: 9587 VanRIMS No.: Meeting Date: June 12, 2012
A5 ADMINISTRATIVE REPORT Report Date: May 18, 2012 Contact: Al Zacharias Contact No.: 604.873.7214 RTS No.: 9587 VanRIMS No.: 08-2000-21 Meeting Date: June 12, 2012 TO: FROM: SUBJECT: Vancouver City Council
More informationOhio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director
Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion
More informationJob-site Internal Traffic control Planning
ITCP Sample 1 AJAX Job-site Internal Traffic control Planning Date presented: The night of 12/7/17 Area: State Road 70 @ US 41 Job # 372117 Job site procedures Be highly visible o Daytime Operations minimum
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: 3/8/2011 RE: BID/RFP #: RFP-DOT-10/11-9031-LG BID/RFP TITLE: FURNISH AND INSTALL EMERGENCY GENERATOR POWER SYSTEM AT CARYVILLE OPENING DATE: March
More informationFocus on the engineering & permitting requirements for installing a new fuel facility at the Port of Olympia;
Port of Olympia Marine Fueling Station Project Fuel Dock Design Overview KPFF Consulting Engineers April 8, 2015 Fueling Station ti Feasibility Analysis Focus on the engineering & permitting requirements
More informationspas Specific Plan Amendment Study
Los Angeles International Airport spas Specific Plan Amendment Study 2012 Page 1 LAXSPAS_Book.indd 1 Page 2 LAXSPAS_Book.indd 2 Table of Contents 4 Message from the Executive Director 5 About the Study
More informationSPECIFICATIONS SEWAGE/SUMP DUPLEX SYSTEM ZOELLER COMPANY SUBMERSIBLE SEWAGE OR DEWATERING PUMPS
Your Peace of Mind is Our Top Priority Product information presented here reflects conditions at time of publication. Consult factory regarding discrepancies or inconsistencies. MAIL TO: P.O. BOX 16347
More informationARQUA STATION DF4 + DF7
The Arqua Station DF4 + DF7 is a complete system to provide fresh tap or filtered water to public spaces. This technical pack includes: Assembly and Installation guide Care and Maintenance For more information,
More informationAirport Safety. Given by: Robert Bassey. IESALC Conference, October 24, 2016 San Diego, CA
Airport Safety Technology Research & Development Given by: Robert Bassey IESALC Conference, October 24, 2016 San Diego, CA LED Runway Closure Marker Study 2 LED Lighted X Testing 3 LED Lighted X Testing
More informationFuel Storage Dec 2016
Fuel Storage Dec 2016 1 Table of Contents SECTION I. ABOVEGROUND SMALL TANKS (1,100 GALLONS OR LESS)...3 Siting a new aboveground tank or tanks...3 Understanding fuel tank types....3 Where to find the
More informationCity of Casselberry Planning Division
City of Casselberry Planning Division 95 Triplet Lake Drive, Casselberry, Florida 32707 Telephone (407) 262-7700, Ext. 1106 Fax (407) 262-7763 Email: ehanna@casselberry.org SIGN REGUALTIONS SEE ULDR Article
More informationWater Supply & Fire Apparatus Access Requirements
Moses Lake Fire Department rd 701 E 3 AVE Moses Lake WA 98837 www.cityofml.com Water Supply & Fire Apparatus Access Requirements This brochure is provided as a resource only. The items listed are the requirements
More informationPERMANENT RESIDENTIAL UNDERGROUND SERVICE
CITY OF RICHLAND ENERGY SERVICES DEPARTMENT 505 Swift Boulevard, MS-21 Richland, WA 99352 Telephone (509) 942-7403 Fax (509) 942-7405 PERMANENT RESIDENTIAL UNDERGROUND SERVICE A. INTRODUCTION This guide
More informationCITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES
CITY OF PORTSMOUTH DEPARTMENT OF PUBLIC WORKS (DPW) DRIVEWAY RULES AND PROCEDURES The purpose of a driveway permit is to secure access from a private property to the public right-of-way. It is required
More informationMEYER MATE 9.0 CU FT. SPREADER
MEYER MATE 9.0 CU FT. SPREADER General Specifications Overall Height: 41.25" Overall Width: 49.5" Overall Depth: 32" Weight Empty: 140 lbs. Spreading Width: Minimum 3 Maximum 30 Spreading Material: Dry
More informationFUEL SYSTEM GUIDELINES RURAL AIRPORTS LEASING AND PROPERTY MANAGEMENT DEPARTMENT OF TRANSPORTATION, STATE OF ALASKA
FUEL SYSTEM GUIDELINES RURAL AIRPORTS LEASING AND PROPERTY MANAGEMENT DEPARTMENT OF TRANSPORTATION, STATE OF ALASKA The following information should be used for tank placement or upgrade on state owned
More informationBUS STOP DESIGN & PLANNING GUIDE
BUS STOP DESIGN & PLANNING GUIDE Prepared by the Operations and Planning Departments 2011 PURPOSE OF GUIDE The design of passenger waiting areas plays a significant role in a person s decision of whether
More informationExposition Corridor Transit Project
Exposition Corridor Transit Project Phase 2 Environmental Planning Community Meeting June 9, 2008 Exposition Corridor Transit Project Phase 2 AGENDA Remaining Grade Crossing Recommendations June 9, 2008
More informationDRIVEWAY GUIDE. Transportation, Engineering and Development (T.E.D.) Business Group
DRIVEWAY GUIDE June 2017 TABLE OF CONTENTS Definitions Building Requirements Material Standards Drainage Administrative Requirements Zoning Requirements Yard Requirements Design Requirements Public Ways
More informationEarthsafe Systems, Inc. Page 1
ESS.WP.531. YQA Fuel Transfer Your Questions Answered (47) Fuel Transfer Systems earth safe Fuel Systems for Critical Power. 5.1 What types of pumps are used for fuel transfer? Fuel transfer pumps are
More informationTRASH RACK CLEANING MACHINE
TRASH RACK CLEANING MACHINE 1 SCOPE The work includes the design, manufacturing, supply, transportation, handling, storage, installation (including 1 st and 2 nd Stage embedded parts and any other necessary
More information