1 Page 1 of 8 Opened: 10/11/17 Agency: Enterprise Technology Services Responses: 3 Purchasing Agent: Randy Plunkett Declinations: 0 SUMMARY Tabulation of Bids Services Ste. 11 & 26 and Consulting Item Commodity Code(s) No. Description Total Price Total Price Total Price Group 2 (Outside Plant Cabling) Miscellaneous Parts and Materials on "pass-thru" $ 1,609, $ 2,102, $ - $ 75, $ 75, $ - Non-County Permts and Fees on "pass-thru" $ 10, $ 10, $ - Specialized Subcontractor Fees on "pass-thru" $ 40, $ 40, $ - Total Group 2: $ 1,735, $ 2,228, No Bid AWD AWD - Recommendation for Award

2 Page 2 of 8 Services BLD B MOT: Traffic Control Officer 120 hour $95.00 $11, $65.00 $7, BLD B MOT: Work Zone Signs F&I 30 day $0.60 $18.00 $0.35 $10.50 BLD B MOT: Barrier Wall Temporary 1000 linear foot $5.50 $5, $10.00 $10, BLD B MOT: Barrier Wall Temporary Low Profile 1000 linear foot $5.50 $5, $41.00 $41, BLD B MOT: Portable Changeable Message Sign 10 each $60.00 $ $24.00 $ BLD B MOT: Portable Regulatory Sign 10 each $60.00 $ $6.50 $65.00 BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B Install Single Fiber Cable Existing Conduit of One Fiber Cable linear foot $1.00 $100, $0.90 $90, Install Fiber Cable Existing Conduit of Two Fiber Cable linear foot $1.45 $29, $1.75 $35, Install Fiber Cable Existing Conduit of Three Fiber Cable 5000 linear foot $1.75 $8, $2.60 $13, Install Single Fiber Cable New Conduit linear foot $1.00 $150, $0.90 $135, Install Two Fiber Cable New Conduit linear foot $1.45 $29, $1.75 $35, Strand Armored Fiber Cable Corning Altos Lite or Equal 3000 linear foot $1.25 $3, $0.45 $1, Strand Armored Fiber Cable Corning Altos Lite or Equal 3000 linear foot $2.10 $6, $0.50 $1, Strand Armored Fiber Cable Corning Altos Lite or Equal linear foot $0.65 $65, $0.65 $65, Strand Armored Fiber Cable Corning Altos Lite or Equal linear foot $0.70 $17, $0.70 $17, Strand Armored Fiber Cable Corning Altos Lite or Equal 3000 linear foot $1.15 $3, $1.15 $3,450.00

3 Page 3 of 8 Services BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B BLD B Strand Armored Fiber Cable Corning Altos Lite or Equal 3000 linear foot $1.50 $4, $1.70 $5, Closet Connector Housing Corning or Equal 10 each $ $1, $1, $10, Closet Connector Housing Corning or Equal 10 each $ $2, $1, $16, Closet Connector Housing Corning or Equal 10 each $ $2, $4, $42, Closet Connector Housing Panels Corning or Equal 10 each $75.00 $ $80.00 $ Closet Connector Housing Panels Corning or Equal 10 each $ $1, $ $1, Closet Connector Housing Panels Corning or Equal 10 each $98.00 $ $95.00 $ SC Fiber Connector Single Mode Corning or Equal 300 each $15.25 $4, $18.50 $5, SC Fiber Connector Multi-Mode 50 Corning or Equal 150 each $13.50 $2, $18.50 $2, SC Fiber Connector Multi-Mode 62.5 Corning or Equal 150 each $9.50 $1, $18.50 $2, Fiber Closure Kit Coyote Runt or Equal 20 each $ $2, $ $3, Fiber Splice Tray Coyote Runt or Equal 60 each $27.50 $1, $31.50 $1, Fiber Closure Coyote PUP or Equal 20 each $ $4, $ $7, Spider Fan Out Kit 6 Fiber Corning or Equal 50 each $15.25 $ $70.00 $3, Spider Fan Out Kit 12 Fiber Corning or approved equal 50 each $15.75 $ $71.50 $3,575.00

4 Page 4 of 8 Services BLD B Splice Case 3M or Equal 10 each $ $3, $ $3, BLD B Water-Blocked Tube Cable 4 Tubes Sumitomo FutureFlex or Equal 1000 linear foot $2.00 $2, $1.30 $1, BLD B Water-Blocked Tube Cable 7 Tubes Sumitomo FutureFlex or Equal linear foot $2.50 $25, $1.85 $18, BLD B Water-Blocked Tube Cable 19 Tubes Sumitomo FutureFlex or Equal 1000 linear foot $5.75 $5, $3.55 $3, BLD B Plenum OFNP Rated Tube Cable 2 Tubes Sumitomo FutureFlex or Equal 1000 linear foot $2.35 $2, $2.20 $2, BLD B Plenum OFNP Rated Tube Cable 4 Tubes Sumitomo FutureFlex or Equal 1000 linear foot $4.00 $4, $3.70 $3, BLD B Plenum OFNP Rated Tube Cable 7 Tubes Sumitomo FutureFlex or Equal 1000 linear foot $7.95 $7, $6.25 $6, BLD B Outdoor/Indoor Rated Tube Cable 4 Tubes Sumitomo FutureFlex or Equal 1000 linear foot $5.25 $5, $2.55 $2, BLD B Outdoor/Indoor Rated Tube Cable 7 Tubes Sumitomo FutureFlex or Equal 1000 linear foot $5.50 $5, $3.35 $3, BLD B Fiber Bundles-Single Mode Fiber 12 fibers Sumitomo or Equal 2000 linear foot $1.15 $2, $0.85 $1, BLD B Fiber Bundles-Single Mode Fiber 24 fibers Sumitomo or Equal 2000 linear foot $2.15 $4, $1.70 $3,400.00

5 Page 5 of 8 Services BLD B Fiber Bundles Multi-Mode Fiber Fibers Sumitomo or Equal 500 linear foot $2.60 $1, $2.10 $1, BLD B Fiber Bundles Multi-Mode Fiber 12 Fibers Corning Altos or Equal 2000 linear foot $1.05 $2, $3.15 $6, BLD B Fiber Bundles Multi-Mode Fiber 24 Fibers Corning Altos or Equal 2000 linear foot $1.75 $3, $5.90 $11, BLD B Installation of Air Blown Fiber Bundles linear foot $1.25 $12, $1.00 $10, BLD B Directional Bore for One-(1) 2 inch Pipe (450 ft. or more) linear foot $11.75 $352, $14.00 $420, BLD B Directional Bore for Two-(2) 2 inch Pipe (450 ft. or more) 3500 linear foot $14.00 $49, $18.00 $63, BLD B Directional Bore for Three-(3) 2 inch Pipe (450 ft. or more) 2500 linear foot $16.00 $40, $28.50 $71, BLD B Directional Bore for One-(1) 2 inch Pipe (Less than 450 ft.) 5000 linear foot $12.75 $63, $16.00 $80, BLD B Directional Bore for Two-(2) 2 inch Pipe (Less than 450 ft.) 3500 linear foot $15.00 $52, $20.00 $70, BLD B Directional Bore for Three-(3) 2 inch Pipe (Less than 450 ft.) 1000 linear foot $17.00 $17, $36.00 $36, BLD B Directional Bore for One-(1) 4 inch Pipe (450 ft. or more) 2000 linear foot $15.50 $31, $24.00 $48, BLD B Directional Bore for Two-(2) 4 inch Pipe (450 ft. or more) 2000 linear foot $22.00 $44, $32.00 $64, BLD B Directional Bore for One-(1) 4 inch Pipe (Less than 450 ft.) 2000 linear foot $18.00 $36, $29.50 $59, BLD B Directional Bore for Two-(2) 4 inch Pipe (Less than 450 ft.) 2000 linear foot $26.50 $53, $42.75 $85, BLD B Missile Bore 500 linear foot $15.00 $7, $14.00 $7,000.00

6 Page 6 of 8 Services BLD B Asphalt Cut Removal & Restoration (2 inch) 500 square foot $12.00 $6, $16.00 $8, BLD B Asphalt Cut Removal & Restoration (4 inch) 500 square foot $14.50 $7, $18.75 $9, Underground Access Structure BLD B (Manhole) Precast (concrete) 5 each $6, $31, $15, $75, Quazite Tier 15 Pull Box BLD B x36x30 5 each $1, $6, $1, $9, BLD B Quazite Tier 15 Pull Box 48x48x36 5 each $2, $11, $4, $22, BLD B Quazite Tier 15 Pull Box 36x60x36 20 each $1, $38, $4, $84, BLD B Precast Polymer Concrete Pull Box 24x36x30 5 each $1, $5, $1, $9, BLD B Precast Polymer Concrete Pull Box 36x60x36 5 each $1, $7, $4, $22, BLD B Precast Polymer Concrete Pull Box 48x48x36 5 each $1, $9, $4, $21, BLD B " Galvanized Ridgid Conduit 100 linear foot $55.00 $5, $6.50 $ BLD B Mobilization Regular Hours 3 each $ $1, $2, $6, BLD B Mobilization Other Hours 3 each $ $2, $2, $7, BLD B Sod Replacement 1000 square foot $1.75 $1, $1.25 $1, BLD B Trenching 1000 linear foot $9.50 $9, $6.00 $6, BLD B Optical Fiber Splices 500 each $32.50 $16, $30.00 $15, BLD B Fiber Termination 500 each $17.50 $8, $27.50 $13, BLD B Concrete Sidewalk Removal and Replacement 50 each $1, $60, $ $26, BLD B Backhoe with Operator Regular Hours 100 hour $ $10, $ $19,000.00

7 Page 7 of 8 Services BLD B BLD B BLD B BLD B BLD B BLD B Backhoe with Operator Other Hours 100 hour $ $17, $ $21, Fiber Splice Technician Regular Hours 200 hour $38.50 $7, $85.00 $17, Fiber Splice Technician Other Hours 100 hour $56.50 $5, $95.00 $9, Additional Labor (Unskilled) Regular Hours 200 hour $32.00 $6, $65.00 $13, Additional Labor (Unskilled) Other Hours 200 hour $48.00 $9, $85.00 $17, Professional Services- Engineering Permit Drawings linear foot $1.95 $19, $2.00 $20, SUBTOTAL (GROUP 2) $1,609, $2,102, Parts and Materials on "Pass- Thru" AL $75, $75, Non-County Agency Permits and Fees on "Pass-Thru" AL $10, $10, Specialized Subcontractor Fees on "Pass-Thru" AL $40, $40, TOTAL (GROUP 2) $1,735, $2,228, NO BID AWD

8 No Bids Fisk Electric Broward County Board of County Commissioners Scope of work is not in line with our core competencies. BLD B1 Page 8 of /11/2017 BidSync p. 254

Exhibit 4 Page 1 of 6

Exhibit 4 Page 1 of 6 $85.00 (10.53) $100.00 66.67 Other Price Sources N2113654B1 awarded 8/22/17 T1368213B1 awarded 1/19/16 G1298502B1 awarded 6/15/15 J1387002B1 awarded 7/6/16 J1387002B1 awarded 7/6/16 J1387002B1 awarded

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount R J Grondin & Sons - Gorham, ME $1,436,720.00 Shaw Brothers Construction, Inc. - Gorham, ME $1,476,398.83 Pratt & Sons, Inc. - Minot, ME $1,733,615.00 Page 1 of 13 R J Grondin

More information

Boulder Valley SD Fiber Optic Network Estimates

Boulder Valley SD Fiber Optic Network Estimates Boulder Valley SD Fiber Optic Network Estimates East Ring Budgetary Estimate $5,534,074 West Ring Budgetary Estimate $4,470,483 Total Operational Network $10,004,557 Bond Fund $10,600,000 Remaining Budget

More information

Federal Project No.: OC-095-1(348)

Federal Project No.: OC-095-1(348) Order : N83 Schedule of Items Page: 2 Oversight/State Project : (NFO)0095-127-857, C501 Federal Project : OC-095-1(348) 0010 513 00100 MOBILIZATION LUMP SUM LUMP SUM 0020 517 00101 CONSTRUCTION SURVEYING

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Sargent Corporation - Stillwater, ME $29,888,765.79 Reed & Reed, Inc. - Woolwich, ME $34,900,974.90 Page 1 of 25 Sargent Corporation Stillwater, ME 201.11 CLEARING AC 4.00

More information

Maine Turnpike Authority

Maine Turnpike Authority Interchange 44 Barrier Toll Plaza Open Road Tolling Conversion Mile 44.3 201.11 CLEARING 3.50 AC 202.071 REMOVING ASBESTOS CONTAINING MATERIALS, TOLL BOOTH LAB TOPS 1.00 LS 202.081 REMOVING EXISTING BUILDING

More information

ADDENDUM No. 1 Prospective Bidders

ADDENDUM No. 1 Prospective Bidders Page 1 of 1 Attachment to Addendum # 1 Revised Itemized Bid ADDENDUM No. 1 TO: Prospective Bidders FROM: Gregory Tate, Construction Contracts Administrator DATE: January 24, 2019 PROJECT: Traffic Signal

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $1,309,765.25 Scott Construction Corporation - Portland, ME $1,528,840.00 Wyman & Simpson Inc. - Richmond, ME $1,674,845.00 Page 1 of 10 CPM

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC CONTROL STANDARDS Supplement to O.D.O.T. TRAFFIC ENGINEERING MANUAL November 26, 2013 Revisions to the June 22, 2011 edition are noted by a vertical line

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 140123 PID 82645 LOR- SR 0057 19.42 Federal Type: INTERCHANGE Letting Date: 4/17/2014 Completion Date: 7/15/2016

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Estimated Quantity 202-00019 Removal of Inlet 15 EA 202-00035 Removal of Pipe 121 LF 202-00200 Removal of Sidewalk 1,057 SY 202-00203 Removal of Curb and Gutter 2,142 LF 202-00206 Removal of Concrete Curb Ramp 320 SY 202-00207

More information

CONNECTING POINT COMPUTER CONTRACT PRICING SHEET EXPIRES: OCTOBER 31, 2018

CONNECTING POINT COMPUTER CONTRACT PRICING SHEET EXPIRES: OCTOBER 31, 2018 Description Unit Cost Number of Runs or Items CATEGORY 5 ENHANCED UNIT RUNS INSTALLATION Category 5E UTP 4 Pair (Plenum or Non Plenum) Unit Run Installation per Foot 0.30 X = Dual Category 5E (Plenum or

More information

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b

More information

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG.

CITY OF BURLINGTON SHARON AVENUE SANITARY SEWER IMPROVEMENTS - PHASE 1 - REBID CITY OFFICIALS. STEVE SEXTON Mayor JAMES STAVIG. SKAGIT COUNTY WASHINGTON CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY JAMES STAVIG City Council RICK DEGLORIA JOE DEGLORIA CHRIS LOVING BILL ASLETT EDIE EDMUNDSON City Council DON ERICKSON SEWER DEPARTMENT

More information

METRO Magnolia Transit Center - Bid Tab

METRO Magnolia Transit Center - Bid Tab Section A - GENERAL ITEMS A-1 01505 Mobilization LS 1 $ 100,000.00 $ 100,000.00 A-2 -- Payment and Performance Bonds LS 1 A-3 01310 Document Control LS 1 A-4 01311 CPM Schedule LS 1 A-5 01590 Engineer's

More information

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,

Fertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1, BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

Section 1 COYOTE Closure Series

Section 1 COYOTE Closure Series COYOTE Closure Series: Section Section COYOTE Closure Series Table of Contents Page COYOTE Closure Overview...-2 COYOTE Splice Tray & Closure Capacity Charts...-4 COYOTE Closure...-7 COYOTE PUP Closure...-9

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Shaw Brothers Construction, Inc. - Gorham, ME $659,771.50 R J Grondin & Sons - Gorham, ME $690,828.50 Gendron & Gendron - Lewiston, ME $753,187.00 Gordon Contracting - Sangerville,

More information

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary Construction Contract Bid Evaluation Summary I. Lowest responsive, responsible bidder: Eastman Aggregate Enterprises, LLC (Primary) and Rio Bak Corporation (Secondary) II. Bidders, ranked from lowest to

More information

ANSI Tier Selection and Placement in Non-Deliberate Vehicular Traffic Applications

ANSI Tier Selection and Placement in Non-Deliberate Vehicular Traffic Applications ANSI Tier Selection and Placement in Non-Deliberate Vehicular Traffic Applications SELECTION MAP Working Together to Increase Safety & Reliability The ANSI standard defines loading requirements for enclosures

More information

Closure End Plates and Accessories

Closure End Plates and Accessories COYOTE Origin of the Species COYOTE Closure Shell Kits 80805258 6.0" (152) x 22.0" (559) COYOTE Shell Kit 80805259 8.5" (216) x 22.0" (559) COYOTE Shell Kit Transition and Buffer Tube Storage Compartments

More information

City of Grand Island Tuesday, February 13, 2018 Council Session

City of Grand Island Tuesday, February 13, 2018 Council Session City of Grand Island Tuesday, February 13, 2018 Council Session Item G-7 #2018-34 - Approving Certificate of Final Completion for the Construction of North Interceptor Phase I; Project No. 2012-S-6 Staff

More information

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING

ALABAMA DEPARTMENT OF TRANSPORTATION DATE : 06/14/13 PAGE : VENDOR RANKING PAGE : 001-1 VENDOR RANKING CONTRACT TIME : 09/01/13 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : IM-I059(370) for constructing the Ramp Widening and Auxiliary Lane (Grade, Drain, Base, Pave and

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Liddell Brothers, Inc. - Halifax, MA $1,590,213.00 Northeast Traffic Control Services, Inc. - Plymouth, MA $1,932,117.00 Page 1 of 5 Liddell Brothers, Inc. Halifax, MA 202.2061

More information

SOLE SOURCE/SOLE BRAND REQUEST

SOLE SOURCE/SOLE BRAND REQUEST Page 1 of 11 B~. WARD COUNTY FLORIDA DATE: June 06, 2017 TO: Brenda J. Billingsley, Director, Purchasing Division ~ THRU: Alan W. Garcia, Director, Water & Wastewater Service~~~ FROM: Mark Darmanin, Director,

More information

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724

Austin Constructors, LLC S FM N. Richey 9810 FM 969. Pasadena, TX Austin, TX 78724 National Power Rodding Corp. 9810 FM 969 Austin, TX 78724 Austin Constructors, LLC. 7907 S FM 973 Item No. Estimate Qty Unit of Issue Description Unit Price Total Unit Price Total Unit Price 103.1 125.00

More information

Federal Project No.: STP-5128(388)

Federal Project No.: STP-5128(388) Order : M48 Schedule of Items Page: 2 Oversight/State Project : (NFO) 0460-129-105, C501 Federal Project : STP-5128(388) 0010 513 00100 0020 517 00101 MOBILIZATION CONSTRUCTION SURVEYING (CONSTRUCTION)

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated

More information

COYOTE Splice Case. Value conscious and benefit-packed: The COYOTE Splice. 2-2 (440)

COYOTE Splice Case. Value conscious and benefit-packed: The COYOTE Splice. 2-2 (440) COYOTE Splice Case Value conscious and benefit-packed: The COYOTE Splice The combines the field-proven performance of the PREFORMED Splice Case (stainless steel) with the high capacity and craft-friendly

More information

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director Project No. 100281 PID 77255 LUC-IR-475-14.18 Federal Type: MAJOR RECONSTRUCTION Letting Date: 6/3/2010 Completion

More information

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , ,

(1 ) Active Construction Inc River Road East Tacoma, WA AMOUNT , , , 78th Avenue Eastl184th Street EastlCRP 5661 I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, March 3, 2017 County Engine (1 ) Active Construction

More information

COYOTE Splice Case. Value conscious and benefit-packed: The COYOTE Splice 2-2

COYOTE Splice Case. Value conscious and benefit-packed: The COYOTE Splice 2-2 COYOTE Splice Case Value conscious and benefit-packed: The COYOTE Splice The combines the field-proven performance of the PREFORMED Splice Case (stainless steel) with the high capacity and craft-friendly

More information

Eagle Mountain-Saginaw Independent School District REQUEST FOR COMPETITIVE SEALED PROPOSALS (RFCSP)

Eagle Mountain-Saginaw Independent School District REQUEST FOR COMPETITIVE SEALED PROPOSALS (RFCSP) Eagle Mountain-Saginaw Independent School District REQUEST FOR COMPETITIVE SEALED PROPOSALS (RFCSP) RFCSP Number: 1718-005-2023 RFCSP Title: Cabling Infrastructure Job Order Contract Due Date: February

More information

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY

BARRETT ROAD (C.R. 178) ROADWAY RESURFACING FROM LEWIS ROAD TO SPAFFORD ROAD IN OLMSTED TOWNSHIP, OHIO ITEMIZED UNIT PRICE BID ROADWAY IZED PRICE BID DESCRIPTION PRICE BID ROADWAY 1 201 11000 CLEARING AND GRUBBING 1 - - LUMP 2 202 23000 PAVEMENT REMOVED NR SQ YD 20 3 202 35100 PIPE REMOVED, 24" AND UNDER NR FT 134 4 202 58000 MANHOLE

More information

2150 F&I 4" PVC pipe LF 100 $ F&I 6" PVC pipe LF 100 $ F&I 8" PVC pipe LF 100 $ 90.00

2150 F&I 4 PVC pipe LF 100 $ F&I 6 PVC pipe LF 100 $ F&I 8 PVC pipe LF 100 $ 90.00 1 of 5 2100 F&I 4" ductile iron pipe LF 200 $ 143.00 $28,600.00 2102 F&I 6" ductile iron pipe LF 200 $ 135.00 $27,000.00 2104 F&I 8" ductile iron pipe LF 200 $ 141.00 $28,200.00 2105 F&I 10" ductile iron

More information

The Capital Grid Project:

The Capital Grid Project: The Capital Grid Project: Building Tomorrow s Energy Grid Today Lamond- Riggs Citizens Association October 2, 2017 Agenda Welcome How Safe, Clean, and Affordable Energy is Delivered Our Current System

More information

COYOTE 28" GLC (Ground Level Closure) Complete Assembly Installation

COYOTE 28 GLC (Ground Level Closure) Complete Assembly Installation NOVEMBER 2016 COYOTE 28" GLC (Ground Level Closure) Complete Assembly Installation Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED

More information

Special Specification 7193 Traffic Management Maintenance

Special Specification 7193 Traffic Management Maintenance Special Specification Traffic Management Maintenance 1. DESCRIPTION Maintain, furnish, install, modify, repair, replace, or remove components of a Traffic Management System. For the purpose of this contract

More information

Section 1 COYOTE Closure Series

Section 1 COYOTE Closure Series COYOTE Closure Series: Section Section COYOTE Closure Series Table of Contents Page COYOTE Closure Overview...-2 COYOTE LCC (Low Count Closure)...-4 COYOTE Aerial Drop Closure...-5 COYOTE In-Line RUNT...-6

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Company Name Dartmouth St. Base Bid Sch. Yale St. Base Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. Alternate Bid Sch. 4 Total COUNTY'S ESTIMATE,87,.50,444,6.00 9,400.00 9,400.00 800.00,00.00

More information

MoDOT 2016 UNIT BID PRICES Northwest District

MoDOT 2016 UNIT BID PRICES Northwest District MoDOT 2016 UNIT BID PRICES Northwest District 2013000 CLEARING AND GRUBBING ACRE 7.95 20 1926.49132 20000 1 159 2022010 REMOVAL OF IMPROVEMENTS L.S. 1.00 56 24479.13304 201719 750 56 2024043 REMOVAL OF

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2017021 TRACS No. Project No. County District Gross

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE.

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS Engineering Division PROJECT NO INCA STREET MULTI-USE PATH 38 TH AVE. TO 43 RD AVE. 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 9 EA 202-00019 Removal of Inlet 8 EA 202-00034 Removal of Pipe (6 Inch) 196 LF 202-00035 Removal of Pipe (18 Inch) 10 LF 202-00036 Removal

More information

Section 1 COYOTE Closure Series

Section 1 COYOTE Closure Series COYOTE Closure Series: Section Section COYOTE Closure Series Table of Contents Page COYOTE Closure Overview...-2 COYOTE GLC (Ground Level Closure)...-4 COYOTE Dome Closure...-9 COYOTE In-Line RUNT...-0

More information

Federal Project No.: NHPP-967-7(083)

Federal Project No.: NHPP-967-7(083) Order : N20 Schedule of Items Page: 2 Oversight/State Project : (NFO)9999-967-430,N501 Federal Project : NHPP-967-7(083) 0010 ATTD 00124 ROCK EXCAVATION CY 0020 302 504 00525 CONCRETE CLASS A3 MISC. CY

More information

Maine Turnpike Authority

Maine Turnpike Authority York Toll Plaza Mile 8.8 201.11 Clearing 17.00 AC 202.15 Removing Existing Manhole or Catch Basin 22.00 EA 202.151 Abandoning Existing Manhole or Catch Basin 10.00 EA 202.16 Removing Existing Pipe 575.00

More information

Fiber Cables & Hardware

Fiber Cables & Hardware Fiber Cables & Hardware Quiktron has been the premier manufacturer of high performance fiber optic cables since 1994. Whether you are looking for standard or custom fiber cables, Quiktron can provide the

More information

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM

2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM ADDENDUM NO. 1 March 17, 2015 2015 PAVEMENT MAINTENANCE SECTION 15-PVMTC-05-GM SCHEDULE OF PRICES (BLR 12000a) Replace the schedule of prices with the attached pages. SUMMARY OF QUANTITIES Replace the

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 110146 PID 82278 HAM-IR-75-5.58 Federal Type: INTERCHANGE Letting Date: 5/5/2011 Completion Date: 7/31/2014 Contract

More information

CITY OF ESTHERVILLE, IOWA MISCELLANEOUS FEES & CHARGES. At Sewer Main.. $

CITY OF ESTHERVILLE, IOWA MISCELLANEOUS FEES & CHARGES. At Sewer Main.. $ CITY OF ESTHERVILLE, IOWA MISCELLANEOUS FEES & CHARGES Revised 4-6-09 UTILITY FEES Sanitary Sewer Taps: At Manhole... $ 400.00... At Sewer Main.. $ 500.00... All excavation, labor and materials by property

More information

COYOTE Closure. Origin of the Species. Key Features: PATENTED 1-14

COYOTE Closure. Origin of the Species. Key Features: PATENTED 1-14 COYOTE Closure Origin of the Species Size L (cm) W (cm) H (cm) 6.0" x 22" 22" (56) 8½" (22) 7" (18) 8.5" x 22" 22" (56) 10-3/4" (27) 9¼" (24) PATENTED Setting the bar against which all other fi ber closures

More information

JANUARY 2015 NOMENCLATURE. TOOLS REQUIRED 3/8" & 7/16" Can wrench or socket 1/4 Nut driver or screwdriver Snips Fiber optic cable opening tools

JANUARY 2015 NOMENCLATURE. TOOLS REQUIRED 3/8 & 7/16 Can wrench or socket 1/4 Nut driver or screwdriver Snips Fiber optic cable opening tools JANUARY 2015 COYOTE Dome Closure 6-1/2" x 17" Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED TM product before application. 1 2

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/01/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : MILL & OVERLAY, GRADING, BIT SURFACING, BR NO 02038 ETC CONTRACT LOCATION: LOCATED ON TH 47 FROM 153RD AVE NW IN RAMSEY TO 180TH LANE NW AND AT FORD BROOK IN BURNS TOWNSHIP

More information

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max: Letting: 17012700 Letting Dt: January 27, 2017 9:30 A.M. State Proj.: 1401-171 Contract ID: Contract Description: Contract Location: Recommendation: 170002 STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

COYOTE Dome Closure 6.5" x 22" Kits. COYOTE Dome Closure 6.5" x 22" for Buffer Tube Applications. Includes: (2) Grommets, (1) Buffer

COYOTE Dome Closure 6.5 x 22 Kits. COYOTE Dome Closure 6.5 x 22 for Buffer Tube Applications. Includes: (2) Grommets, (1) Buffer JANUARY 2015 COYOTE Dome Closure 6.5" x 22" Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application. 1 2 3 6

More information

Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.

Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application. 5 NOVEMBER 2010 COYOTE Dome 9.5 x 28 Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application. 1. 7. 2. 4. 10.

More information

CT Consultants, Inc.

CT Consultants, Inc. Cost 1 202 AHRESTY DRIVE REMOVAL 1 LS 2 202 EXISTING SILO DEMOLISHED AND REMOVED, AS PER PLAN 1 LS 3 203 EXCAVATION (NOT INCLUDING UNDERCUT) 2,372 CY 4 203 EMBANKMENT 3,306 CY 5 204 PROOF ROLLING 10 HRS

More information

Section 1 COYOTE Closure Series

Section 1 COYOTE Closure Series COYOTE Closure Series: Section 1 Section 1 COYOTE Closure Series Table of Contents COYOTE Closure Overview...1-2 COYOTE In-Line RUNT...1-4 COYOTE Terminal Closure...1-6 COYOTE Dome Closure...1-10 COYOTE

More information

Oaks Commerce Center

Oaks Commerce Center Mansour Edlin Consulting 1515 Mockingbird Lane Charlotte, NC 28209 Oaks Commerce Center Water & Sanitary Sewer Improvements Phase I - Concept Utility Plan Gravity Sanitary Sewer A1 Connect to Existing

More information

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS CITY OF SAN ANTONIO DEPT. OF CAPITAL IMPROVEMENTS MANAGEMENT SERVICES N. NEW BRAUNFELS AVE. SIDEWALK PROJECT FROM RITTIMAN

More information

PROJECT TITLE: Ruhrpumpen Vertical Turbine Pumps Maintenance and Repair Services SOLE SOURCE/SOLE BRAND REQUEST

PROJECT TITLE: Ruhrpumpen Vertical Turbine Pumps Maintenance and Repair Services SOLE SOURCE/SOLE BRAND REQUEST Page 1 of 10 B~~WARD COUNTY FLORIDA DATE: November 01, 2016 TO: Brenda J. Billingsley, Director, Purchasing Division M THRU: Alan W. Garcia, P.E., Director, Water and Wastewater Service~ FROM: Mark Darmanin,

More information

Federal Project No.: HSIP-5A27(567)

Federal Project No.: HSIP-5A27(567) Order : A11 Schedule of Items Page: 2 Oversight/State Project : (NFO)0001-020-S82,C501 Federal Project : HSIP-5A27(567) 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING

More information

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT

CLAY COUNTY MISSOURI HIGHWAYS AND TRANSPORTATION COMMISSION PLANS FOR PROPOSED STATE HIGHWAY NOT TO SCALE LENGTH OF PROJECT DI E INDE OF SHEETS TYPICAL SECTIONS (TS) ( SHEET)--- QUANTITIES (QU) (7 SHEETS)--------- 3 PLAN-PROFILE (PP)------------------ REFERENCE POINTS (RP)-------------- COORDINATE POINTS (CP)------------- CULVERT

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170559 PID 102381 SCI-US 52-19.01 Federal Type: TWO LANE RESURFACING Letting Date: 11/2/2017 Completion Date:

More information

2, total unit $ total unit $ total unit $ total $

2, total unit $ total unit $ total unit $ total $ BD TABULATON Bid No. : 697 North Bay Trail-1st Street North Project No. 0901-212 Engineering &Capital mprovements Department, City of 1. Petersburg, Florida Bid date: February 26,2010 ",,>,',-, t~..4":;

More information

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT The County of Hancock, Maine is seeking bids from qualified firms for the purchase and installation of at least a 20KW backup generator

More information

Page 1 of KA

Page 1 of KA Page 1 of 10 5 Contact the Area Engineer at 620-384-7821 for RAP sample location. Page 2 of 10 SS-1HP or approved alternate shall be used for Tack. Page 3 of 10 Ú City limit or Urban boundary No Centerline

More information

CANTON COMMUNITY REQUEST FOR BOARD ACTION

CANTON COMMUNITY REQUEST FOR BOARD ACTION CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: April 11, 2017 AGENDA ITEM #G-6 ITEM: Consider Approval of a Budget Amendment & Award of a Contract to J. Ranck Electric Inc. for the Pedestrian

More information

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000.

HILLS MATERIALS COMPANY UNIT COST TOTAL COST UNIT COST TOTAL COST UNIT COST $294, $294, $74, $74, $35, $35,000. PROJECT NAME: Anamosa Street Reconstruction - Midway Street to Miiwuakee Street PROJECT NUMBER: PROJECT NO. 07-1473 / CIP NO. 50559 LET DATE: April 11, 2017 LOW BID AMOUNT: $3,941,397.20 ENGINEER'S ESTIMATE

More information

Volition Fiber Optic Cable

Volition Fiber Optic Cable Volition Fiber Optic Cable The Volition Network Solution from 3M includes horizontal and backbone cable with 62.5/125 µm and 50/125 µm multimode fiber, and 9/125 µm single-mode fiber. The horizontal cable

More information

COYOTE. Retrofit Closure. Refinement of the Breed. COYOTE Retrofit Closure. The ideal Closure for replacement or expansion 1-29

COYOTE. Retrofit Closure. Refinement of the Breed. COYOTE Retrofit Closure. The ideal Closure for replacement or expansion 1-29 COYOTE Retrofit Closure COYOTE Closure Series: Section 1 Refinement of the Breed The ideal Closure for replacement or expansion The COYOTE Retrofi t Closure contains a ver sa tile Fiber Management System

More information

COYOTE Dome Closure 9.5" x 28" with Transition Tray for High Density Splice Applications

COYOTE Dome Closure 9.5 x 28 with Transition Tray for High Density Splice Applications OCTOBER 2017 COYOTE Dome Closure 9.5" x 28" with Transition Tray for High Density Splice Applications Be sure to read and completely understand this procedure before applying product. Be sure to select

More information

MARCH COYOTE 9.5 x 19 (292 mm x 509 mm) Terminal Dome Closure Kits

MARCH COYOTE 9.5 x 19 (292 mm x 509 mm) Terminal Dome Closure Kits MARCH 2012 COYOTE 9.5 x 19 (292 mm x 509 mm) Terminal Dome Closure Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before

More information

DELETE first sentence of first paragraph that reads: REPLACE with the following:

DELETE first sentence of first paragraph that reads: REPLACE with the following: To Bidder of Record: SAN ANTONIO WATER SYSTEM Addendum 2 To Construction Documents For 2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB NO. 12-5001 SAWS SEWER JOB NO. 12-5501 Solicitation

More information

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

Architect s Guide for Detailing & Specifying Access Floor Air Plenums

Architect s Guide for Detailing & Specifying Access Floor Air Plenums Access Floors Architect s Guide for Detailing & Specifying Access Floor Air Plenums Access Floors to the Power of 1 Access floor air plenum integrity begins with proper design and specification. 2 Architect

More information

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18

ADDENDUM #2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 November 29, 2018 ADDENDUM 2 WATERSHED IMPROVEMENTS ON AN ANNUAL CONTRACT RP031-18 Q1. Do contractors not need to be on the Watershed Improvements Pre-Qualifications List to submit on the RP031-18 Watershed

More information

INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY

INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY INLAND NORTHWEST REGIONAL PAVEMENT CUT POLICY Howard Hamby Spokane County Road Maintenance Administrator PAVEMENT CUT FAILURES 1. Sloughing 2. Poor Compaction 3. Poor

More information

No Thoroughfare. Gated Private Road Ahead

No Thoroughfare. Gated Private Road Ahead No Thoroughfare Gated Private Road Ahead 1 Think: Safety and Security In our Community 2 Mainlands Secondary Entrance Barrier Gate Proposal Technology and Cost Study (as Prepared by Gate Committee on April

More information

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY

ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY ATTACHMENT E: CONSTRUCTION EQUIPMENT SUMMARY Equipment Use Improve Access Roads (per mile) Bulldozer Grade access roads 1 4 10 Road Grader Grade access roads 1 4 10 Loader Load haul trucks, transport materials

More information

County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total)

County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total) County of Los Angeles Department of Public Works Construction Division BID SUMMARY (sorted by Unit Price Total) 1 CONSTRUCTION SCHEDULE 1 $2,000.00 LS $2,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 130407 PID 88799 AUG-VA-VAR-BRIDGES Federal Type: BRIDGE REPAIR Letting Date: 7/18/2013 Completion Date: 8/31/2014

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 08/12/2015 ESTIMATE PAID: AWARD DATE: 08/14/2015 ESTIMATE PERIOD: 209,750.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 650 365.00 CONTRACT ID: 628798001 PROJECT: RMC - 628798001 CONTRACT: 08151502 AWARD : $276,487.00 PROJECTED : $276,487.00 ADJ. PROJECTED :

More information

Volition. Fiber Optic Cable. 3Innovation

Volition. Fiber Optic Cable. 3Innovation Volition Fiber Optic Cable Tough enough to take it. Easy to handle. Tough enough to take it. Easy to handle. The Volition Network Solution from 3M includes horizontal and backbone cable with 62.5/125 µm

More information

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS

RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II This section discusses the City of Palo Alto's requirements for establishing electric service to new or upgraded residential installations. The same requirements apply to both underground and

More information

CITY OF STANDARD SPECIFICATIONS

CITY OF STANDARD SPECIFICATIONS CITY OF Published May 4, 2016 CALIFORNIA Stephan Kiefer, Community Development Director Cheri Sheets, City Engineer CITY OF LIVERMORE 1052 South Livermore Avenue Livermore, CA 94550 4DEV0001.doc 03/12

More information

COYOTE 9.5" x 19" (292 mm x 509 mm) Dome Closure

COYOTE 9.5 x 19 (292 mm x 509 mm) Dome Closure AUGUST 2012 COYOTE 9.5" x 19" (292 mm x 509 mm) Dome Closure Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.

More information

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director Project No. 170607 PID 85146 CUY-SR 21-10.04L Federal Type: BRIDGE REPLACEMENT (1 BRIDGE) Letting Date: 12/14/2017 Completion

More information

Opti-Guard Splice Enclosure

Opti-Guard Splice Enclosure Opti-Guard Splice Enclosure The Opti-Guard Splice Enclosure from AFL offers an impressive spectrum of features which makes it the best selection for your splice protection needs. Its unique and flexible

More information

COYOTE Terminal Dome Closure 6.5" x 22"

COYOTE Terminal Dome Closure 6.5 x 22 FEBRUARY 2015 COYOTE Terminal Dome Closure 6.5" x 22" Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.

More information

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E Each bidder shall bid each item of the Base Bid Schedule and Alternate A Bid Schedule. Failure to bid an item shall be just cause

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

COYOTE 9.5" x 19" (292 mm x 509 mm) Cross-Connect Dome Closure

COYOTE 9.5 x 19 (292 mm x 509 mm) Cross-Connect Dome Closure AUGUST 2013 COYOTE 9.5" x 19" (292 mm x 509 mm) Cross-Connect Dome Closure Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED TM product

More information

3000SC Fiber Optic Splice Closure

3000SC Fiber Optic Splice Closure 3000SC Fiber Optic Splice Closure Protect All Of Your Fiber Optic Splices From Harsh Outside Plant Environments Product Description Our 3000SC Fiber Optic Splice Closure is a sealed, reinforced thermoplastic

More information

SOLFLO MAX LINEAR COLLECTION Linear catch basin connected with double bell outlet with integrated gasket and clips (DBIGC)

SOLFLO MAX LINEAR COLLECTION Linear catch basin connected with double bell outlet with integrated gasket and clips (DBIGC) LINEAR CAPTURE Perpendicular collection across the full width of a drainage surface such as a parking deck, street or sloped residential driveway. Excavation area and depth are less than for conventional

More information

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71

SUBTOTAL SITE WORK & DEMOLITION (UTILITIES) $180, $348, $319,943.71 BASE BID 1.00 GENERAL CONDITIONS 1.01 Mobilization (Maximum 5% of Base Bid) LS 1 84,000.00 $ 84,000.00 100,000.00 $ 100,000.00 85,000.00 $ 85,000.00 1.02 Bonding, Insurance, Permits (including Plumbing,

More information