1 Failure of Transformer Cable box A case study Presented by Janardan Choudhary, Executive Director (O&M) 1
2 INTRODUCTION The 280 MW Dhauliganga Power Station, NHPC Ltd, situated at remote place of Pithoragarh in Uttarakhand, India, was commissioned in x 70 MW power is generated at 11 KV voltage level and stepped up to 220 KV level through twelve single phase bank of generator transformer and the power evacuation is done through two 220 KV line. Unit is connected to a bank of 3 nos. Single phase transformer, 29 MVA, 11 KV/220 KV/ 3, OFWF. LV side of transformer bank is directly connected to generator through isolated phase busduct and high voltage terminal of the transformer is connected to 220 KV GIS by 220KV XLPE cable through High Voltage Cable Box (HVCB). 2
3 DESCRIPTION OF EVENT On 22/08/2016 all four units were running on full load (280 MW). At 13:29 hrs Unit#2 got tripped on XLPE cable differential protection of R-phase. The oil from the HVCB splashed & spilled all over the transformer The XLPE cable connected to one side of HVCB got detached from the bushing and fell apart. The sprinkler fire protection system operated and fire got extinguished promptly without much spreading of fire. From the event list it was observed that PRV and Buchholz relay of HVCB and Buchholz relay of main transformer were also operated during the event. 3
4 DESCRIPTION OF EVENTS- Extent of damage Cable box, insulated copper flexible cable (connecting XLPE cable and HV bushing of transformer), HV bushing of transformer and XLPE cable end termination were damaged beyond repair. Transformer also got severly damaged Radius of outer winding, i.e. HV winding, increased due to huge tensile stress caused by electromechanical force. Looseness of sector and support, deformation of lower & upper winding end support and coil clamping rings were also observed Complete Core assembly is decided to be replaced 4
5 Damaged and detached XLPE Cable XLPE Cable 5
6 XLPE cable detached from Oil to Air Bushing installed at HVCB 6
7 Damaged Flexible link inside the HVCB 7
8 RESTORATION OF UNIT The oil of the R-phase transformer of Unit#2 got contaminated with the HVCB oil which was subjected to high energy arc. The transformer was subject to huge electromagnetic force. All oil from the HVCB got drained out. Therefore, after fault DGA of HVCB oil could not be done. DGA of main transformer showed higher hydrocarbon gas content which DGA of Transformer Oil was due to mixing of HVCB oil. Gases After Before o So faulty transformer along with bushing fault and XLPE cables could not be used immediately. o To avoid further generation/capacity loss, the faulty transformer along with all other affected equipment were replaced with the spare one available at site. (ppm) fault 1. H₂ H₂O CO₂ CO C₂H₄ C₂H₆ CH₄ C₂H₂ Total down time was 21 days (including two weeks taken for arranging modified flexible link). 8
9 ANALYSIS & ROOT CAUSE Detailed investigation on damaged HVCB and connection of flexible link was checked in healthy transformer. It was observed that the flexible copper link (connecting XLPE cable and HV bushing of transformer) was not as per drawing. As per drg., the end connection should form L shape to maintain proper clearance to ground 9
10 ANALYSIS & ROOT CAUSE Existing connection: The end connection of existing link was provided with a socket bolted with connector of bushings horizontally. Horizontal Connection With time, the bend at both ends near socket joints loses rigidity (firmness) resulting into increased sag near the midpoint of the flexible link.. 10
11 ANALYSIS & ROOT CAUSE The sag in the existing link led to the reduced clearance with ground near halfway of the link (approx. 4 mm). As a result, Partial discharge might have started, which got ultimately converted into an arcing ground with HVCB bottom and failure. HVCB bottom side 11
12 PREVENTIVE ACTION Following measures were carried out to ensure the overall insulation level of flexible copper link within HVCB : Extra insulation (craft paper & paper board) was applied on flexible copper link to increase its rigidity. Modification in connection of link with the connector of the bushings. By above measures, appropriate clearnce of link to ground (HVCB bottom) was maintained over entire the span. Vertical Connection Modified rigid flexible link having L shaped end connectors was connected vertically with the connector of the bushings. 12
13 PREVENTIVE ACTION With modification in end connection and extra insulation, clearance between flexible copper link and HVCB surface is made uniform throughout its span All flexible links for the balance transformers has been planned to be replaced in phased manner. However, tightness of the flexible link at end connection and proper clearance with HVCB bottom has been ensured in all transformers. The depletion of oil level over time in HVCB shall also adversely affect the overall insulation level of flexible copper link. Therefore, regular monitoring of oil level in HVCB and its top up as required has been ensured. 13
14 RECOMMENDATIONS The transformer having oil filled HVCB must be type tested and installation/commissioning should be done as per approved drawing. Suitable alternative solution should be explored to minimise the use of oil filled High Voltage Cable Box for high voltage transformer to minimise such type of faults. 14
15 THANK YOU 15
Alstom Grid provides smart, efficient and environmentally-friendly solutions to deliver electricity reliably across the world GRID
Alstom Grid provides smart, efficient and environmentally-friendly solutions to deliver electricity reliably across the world GRID Maintenance & Onsite Repair of Transformers NTPC O&M Conference IPS 2013,
More informationISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements
Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner
More informationLEARNING BY FAILURES A TRANSFORMER CASE STUDY A QUALITY PRESPECTIVE
LEARNING BY FAILURES A TRANSFORMER CASE STUDY A QUALITY PRESPECTIVE A K Sharma, GM (IS) Nishith Mehta DGM (IS) M Misbahul Islam, Sr Manager (IS) Amit Kumar, Manager (IS) NTPC, Regional Inspection Office,
More informationPOWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010
POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010 PREPARED BY: Electricity System Operations Planning and Performance FINAL Disclaimer (a) Purpose - This report
More informationCHAPTER 4 PROTECTION REQUIREMENTS
CHAPTER 4 PROTECTION REQUIREMENTS CHAPTER 4 PROTECTION REQUIREMENTS 4.1 General Means of protection for automatic disconnection against phase and earth faults shall be provided on the customer main switch.
More informationABB PTTR SPAIN. Zaragoza. The product: Cast coil transformers
ABB PTTR SPAIN Zaragoza. The product: Cast coil transformers ABB BA Transformers - 1-5/7/2007 Dry Type Vacuum Cast Coil Transformer INTRODUCTION ABB BA Transformers - 2 - Product Portfolio II Dry Type
More informationPRAGATI ENGINEERING COLLEGE
Report on Industrial Visit to Power Grid 765/400 KV (GIS) Sub-Station No. of days of Visit : Two days Date(s) of Visit : 19 th September, 2017& 7 th October, 2017 Faculty In-charges : 4 Members 1. Mr.S.Ashokreddy,
More informationDouble earth fault in a PSP during back to back launching sequence
Double earth fault in a PSP during back to back launching sequence Jean-Louis DROMMI EDF Hydro Engineering Center, France Pump Storage Scheme, back to back launching Electricité de France Hydro Department
More informationPNO Condenser Bushings from 52 kv to 420 kv Oil-to-air - Oil-Impregnated Paper
GE Grid Solutions PNO Condenser Bushings from 52 kv to 420 kv Oil-to-air - Oil-Impregnated Paper PNO bushings are capacitance graded bushings with an oil impregnated paper core. PNO bushings are conform
More informationUBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5
Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Building Operations Electrical Technical Support.2 UBC Energy & Water Services 2.0 REQUIREMENTS FOR COMMISSIONING AND TESTING 2.1 Testing.1 Unit
More informationA system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.
General Unit substations shall be 500 kva minimum, 1500 kva maximum unless approved otherwise by the University. For the required configuration of University substations see Standard Electrical Detail
More informationSchool of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering
University of Sydney School of Electrical and Information Engineering Dr Keith Mitchell ELEC 5205 - High Voltage Engineering ELEC 5205 - High Voltage Engineering 3. Switchgear Types of Power System Switchgear
More informationNexans Switzerland. Global expert in cables and cabling system. Cossonay Production Plant
P o w e r C a b l e A c c e s s o r i e s Global expert in cables and cabling system Formed from Alcatel Cables and Components, Nexans inherits 100 years professional experience in manufacturing cables
More informationCONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation
CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent
More information56-SDMS-07 REV. 01 SPECIFICATIONS FOR
56-SDMS-07 REV. 01 SPECIFICATIONS FOR UNIT SUBSTATIONS UP TO 36 kv ALUMINUM TRANSFORMER ALUMINUM BUS BARS LVDP This specification is property of SEC and subject to change or modification without any notice
More informationUniPack compact secondary substations (CSS) upto 36 kv For safe, reliable and space saving power distribution solutions
UniPack compact secondary substations (CSS) upto 36 kv For safe, reliable and space saving power distribution solutions ABB a global leader ABB is a global leader in power and automation technologies that
More informationDistribution transformers Efficiency over life-cycle
Distribution transformers Efficiency over life-cycle ABB a global leader ABB is a global leader in Power and Automation technologies that enable utility and industry customers to improve performance while
More informationTransformers for Power Applications
Power Applications for Power Applications Tamini designs power transformers for the distribution, transmission and production of electricity from both conventional and renewable sources. The Company s
More informationVOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS
VOLUME: IIIC SCHEDULE IIIC/4 11 KV AND 3.3 KV SWITCHGEARS A. 11 KV SWITCHGEAR 1.0 SWITCHGEAR ASSEMBLY 1.1 Make : 1.2 Type : 1.3 Reference Standard : 1.4 Voltage (Nom./Max.) KV : 1.5 Phase, Frequency No,Hz.
More informationRetrofit for gas-insulated high voltage switchgear (GIS) - 8D1 and 8D2
Retrofit for gas-insulated high voltage switchgear (GIS) - 8D1 and 8D2 Table of Contents 1 Introduction... 4 2 Description of retrofit circuit-breaker 8DN8... 5 3 Technical data for retrofit circuit-breaker
More informationPretest Module 29 High Voltage Unit 1
Pretest Module 29 High Voltage Unit 1 1. Is a person qualified to work on high-voltage installations when this module is completed? 2. What is the code definition of high-voltage? 3. What is the IEEE definition
More informationChapter 6 Generator-Voltage System
Chapter 6 Generator-Voltage System 6-1. General The generator-voltage system described in this chapter includes the leads and associated equipment between the generator terminals and the low-voltage terminals
More informationDETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI
DETAILS OF THE EXPRESSION OF INTEREST(EOI) NO.: PL.G03.EOI.09.001 Date: 29/05/2009 For Annual Operation and Maintenance Service Contract of HT/LT Panels,Motors,Transformers,UPS,Air Conditiners,Lightings
More informationMaximum temp. rise in oil by 40 thermometer above design ambient (deg C) specified time Short circuit rating (Sec) for As per IS 2026
TECHNICAL PERTICULAR FOR 1.6 MVA 6.6/0.433 KV SERVICE TRANSFORMER 1.00.00 GENERAL 1.01.00 Service SERVICE 1.02.00 Make ASHOK/VOLTAMP/DANKE/CGL 1.03.00 Type CORE 1.04.00 Location OUTDOOR 1.05.00 Specification
More informationWarning. Document ref: A October 2015
Sentry Door Curtain Installation, Operation & Maintainance Instructions Dunham-Bush Ltd, Downley Road, Havant, Hampshire, P09 2JD Tel. 023 9247 7700 Email. info@dunham-bush.co.uk Document ref: 128-000-001-A
More informationEnergy Transmission & Distribution Services - Italy. SVEPPI laboratory...our services for your success. Answers for energy.
Energy Transmission & Distribution Services - Italy SVEPPI laboratory...our services for your success. Answers for energy. ...our services for your success ENERGY - T&D Services Experience teaches us that
More informationMOBILE SUBSTATION DESIGN Brad Bozich & Vitor Vieira 2755 Northwoods Parkway Norcross, Georgia
MOBILE SUBSTATION DESIGN Brad Bozich & Vitor Vieira 2755 Northwoods Parkway Norcross, Georgia 30071 678.982.8928 brad.bozich@efacec.com SCOPE This document is intended to help define the main parameters
More informationwww. ElectricalPartManuals. com lncoming-6900 through 69,000 volts Outgoing-2400 through 13,800 volts Ratings:
PRIMARY UNIT SUBSTATIONS SECTION 2701 PRIMARY UNIT SUBSTATIONS Ratings: lncoming-6900 through 69,000 volts Outgoing-2400 through 13,800 volts PAGE 1 ---JUNE 1, 1959 DESIGNED AND BUILT TO MEET YOUR OWN
More informationRefurbishment & Upgrade of the Celilo HVdc Converter Station
1 Refurbishment & Upgrade of the Celilo HVdc Converter Station Mark A Reynolds, PE Sr. Project Manager, POWER Engineers mark.reynolds@powereng.com Karl A Mitsch, P.E. Sr. Project Manager USDOE Bonneville
More informationTRANSFORMERS UP TO 750 kv
Electric Co. Ltd. TRANSFORMERS UP TO 750 kv CONTENTS General... 2 Products... 3 Construction...4 Magnetic core... 4 Windings...5 Frame structure... 6 Connections...6 Tap changer and motor drive...7 Tank...
More informationBharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT
An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli 620014, TAMIL NADU, INDIA CAPITAL EQUIPMENT / MATERIALS MANAGEMENT ENQUIRY NOTICE INVITING TENDER Phone:
More informationVEIKI-VNL Electric Large Laboratories Ltd. H-1158-Budapest, Vasgolyó utca 2-4. HUNGARY
VEIKI-VNL Electric Large Laboratories Ltd. H-1158-Budapest, Vasgolyó utca 2-4. HUNGARY VEIKI-VNL Ltd. VEIKI-VNL Electric Large Laboratories Ltd. is an independent accredited testing member laboratory of
More informationElectrical Systems - Course 135 COMPOSITE ELECTRICAL PROTECTIVE SCHEMES: PART II
135 05-1 Electrical Systems - Course 135 COMPOSITE ELECTRICAL PROTECTIVE SCHEMES: PART II TURBINE-GENERATOR: rhipping AND ALARM CIRCUITS i.o' I titrodljction Following on from Lessons 135.03-1 and 135.04-1,
More informationLEAP - Life Expectancy Analysis Program For Electrical Rotating Machines. Marcio Gennari ABB Brazil Automation Products Machines Service Osasco
LEAP - Life Expectancy Analysis Program For Electrical Rotating Machines Marcio Gennari ABB Brazil Automation Products Machines Service Osasco LEAP - Introduction ABB India (excellence center in insulation
More information4Electrically propelled vessels
4Electrically propelled vessels The Boat Safety Scheme Essential Guide For more technical information The requirements in this chapter have been informed by, and may refer to, the following technical references,
More informationZF SERIES HV GAS INSULATED SWITCHGEAR (GIS) tgood.com. Energy. Fast.
ZF SERIES HV GAS INSULATED SWITCHGEAR (GIS) tgood.com Energy. Fast. TGOOD produces over 5000 switchgear units annually for projects around the globe PRODUCT OVERVIEW High performance alternative to air
More informationKey features. DESIGNS: - Conservator type - Hermetically sealed
Package Substations OTDS manufactures a large range of oil filled hermitically sealed and conservator type transformers to be used in conjunction with our package substations. We are able to utalise the
More informationCharacteristics of LV circuit breakers Releases, tripping curves, and limitation
Characteristics of LV circuit breakers Releases, tripping curves, and limitation Make, Withstand & Break Currents A circuit breaker is both a circuit-breaking device that can make, withstand and break
More informationMEDIUM VOLTAGE PRODUCTS. Fault Current Limiters I S. -limiter and FC-Protector The worldʼs fastest switching devices
MEDIUM VOLTAGE PRODUCTS The worldʼs fastest switching devices 2 FAULT CURRENT LIMITERS THE WORLDʼ S FASTETST SWITCHING DEVICES The worldʼs fastest switching devices ABBʼs fault current limiters disconnect
More informationTransformer Protection
Transformer Protection Course No: E01-006 Credit: 1 PDH Andre LeBleu, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 info@cedengineering.com
More informationUNIT 6: BATTERIES, UPS AND CABLES
UNIT 6: BATTERIES, UPS AND CABLES 6.1 Batteries 6.1.1 Introduction i. Definition of Batteries: Stores chemical energy in cells and converts them into electrical energy in the form of direct current (D.C);
More informationDIAMOND ROLLER CHAIN. For Agricultural and Construction Equipment
DIAMOND ROLLER CHAIN For Agricultural and Construction Equipment FABRICATION While roller chain would appear to be a simple product, the number of components in a ten foot section of 40 pitch chain totals
More informationDr Joerg Friedel Product Application Specialist Shell Technology Centre Hamburg, Germany
Dr Joerg Friedel Product Application Specialist Shell Technology Centre Hamburg, Germany An inhibited transformer oil based on Shell gas-to-liquids (GTL) technology The evolution of hydrocarbon transformer
More informationMECHANICAL INTEGRITY CHECKING OF GENERATOR STATOR OVERHANG BY NATURAL FREQUENCY MEASUREMENT
MECHANICAL INTEGRITY CHECKING OF GENERATOR STATOR OVERHANG BY NATURAL FREQUENCY MEASUREMENT R.K.Bhatnagar, A.K.Mukherjee, National Thermal Power Corp., India akmukherjee04@ntpceoc.co.in INTRODUCTION Reliable
More informationANNEXURE-I : LIST OF ITEMS H.O. PURCHASE ITEM LIST:
Sr. Item Description No. (A) Material Management Cell 1 Meters(All types) 2 GSM Modem ANNEXURE-I : LIST OF ITEMS H.O. PURCHASE ITEM LIST: 3 Metering Cubicles 4 L.T. Distribution Box 5 L.T. XLPE Cable 6
More informationBHARAT ALUMINIUM COMPANY LTD. SPECIFICATIONS FOR SYNCHRONOUS GENERATOR GENERAL Make : Jinan Power Equipment Factory Type : WX2
BHARAT ALUMINIUM COMPANY LTD. SPECIFICATIONS FOR SYNCHRONOUS GENERATOR 1.00.00 GENERAL 1.01.00 Make : Jinan Power Equipment Factory 1.02.00 Type : WX21Z-073LLT 1.03.00 Reference Standard : GB/T7064-2002
More informationNo. of Single leaf Sector Gates 2 Clear span of opening 7.0m Cylinder rebate size. Sill level inner gate Gate crest level - inner.
YARINGA MARINA SINGLE LEAF SECTOR GATES 1.1 Leading Particulars No. of Single leaf Sector Gates 2 Clear span of opening 7.0m Cylinder rebate size To suit Sector gate depth above sill - 6.5m outer Sill
More informationSeptember 2008 TEC, INTELLIGENT MONITORING SYSTEM
September 2008 TEC, INTELLIGENT MONITORING SYSTEM ABB BU Transformers - 1-10/9/2008 TEC, philosophy ABB BU Transformers - 2 - TEC was launched by ABB in year 2002 to improve transformers performance. More
More informationOil Circuit Breakers
ČESKÉ VYSOKÉ UČENÍ TECHNICKÉ V PRAZE Fakulta elektrotechnická Katedra elektrických pohonů a trakce K13114 BE1M 14 ESP Electrical apparatuses and machines Oil Circuit Breakers BE1M14 SSP Electrical apparatuses
More informationHigh Voltage Bushing Wells for Pad Mounted Distribution Transformers Technical Guide
1ZUA2761-500 rev. 5, 6 April 2010 High Voltage Bushing Wells for Pad Mounted Distribution Transformers Technical Guide 1ZUA2761-500 rev. 5, 6 April 2010 2 / 9 Table of contents 1 Description... 3 2 Ratings...
More informationCLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS
CLARK PUBLIC UTILITIES TECHNICAL SPECIFICATIONS THREE-PHASE PADMOUNTED TRANSFORMERS Originated 1/85 Revised 6/95 Revised 6/02 Revised 11/05 Revised 4/08 Revised 11/09 Revised 1/12 Revised 11/12 Revised
More information33kV Connection up to 90MVA
Electricity Specification 217 Issue 2 December 2007 33kV Connection up to 90MVA Contents 1 Scope 2 General 3 Connection Arrangements 4 Equipment Records 5 Documentation 6 Documents Referenced 7 Keywords
More informationDESIGN CONSIDERATIONS FOR APPLICATION OF SHUNT CAPACITORS IN HEAVY HATER PLANT (TUTICORIN)
DESIGN CONSIDERATIONS FOR APPLICATION OF SHUNT CAPACITORS IN HEAVY HATER PLANT (TUTICORIN) -A.R. Subraaanian -R.A.A. Palani -J. Thomson A new 3.3 K.V. 4200 KVAR auto switching capacitor bank has been installed
More informationPOWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012
POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012 PREPARED BY: System Performance and Commercial DATE: 7 March 2013 FINAL Disclaimer Purpose This
More informationMedium and high pressure pumps
Screw pumps Medium and high pressure pumps Installation and Start-up Instruction This instruction is valid for all standard high pressure pumps: E4, D4 and D6 Contents Page Pump identification 2 Installation
More informationExtensible Unit - VCE2a
ELECTRICAL INDUSTRIAL COMPANY (EICo) LUCY SWITCHGEAR Extensible Unit - VCE2a (Sabre) Electrical Industrial Company (EICo) Lucy Switchgear Extensible Unit VCE2a Front Panel: ELECTRICAL INDUSTRIAL COMPANY
More informationCGMCOSMOS. Reliable innovation. Personal solutions. Fully gas insulated modular and compact (RMU)system.
MV Switchgear for CGMCOSMOS Fully gas insulated modular and compact (RMU)system Up to 24 kv Up to 27 kv mediumvoltage mediumvoltageag AG Langackerstrasse Langackerstrasse 25 25 CH CH 6330 6330 Cham Cham
More informationINTRODUCTION. The plug-in connection on the cables and lightning arrestors, allows for easy installation and replacement.
INTRODUCTION The Power Systems 44 kv MiniSub TM is the most compact system at this voltage available. Utilizing a deadfront termination and lightning arrestor setup, it eliminates the line top or side
More information/ I S S : / S T S I
Agenda Electrical Transformers (Quality Control) Order Obtaining BIS Licence Requirements of Guidelines / IS 1180-1: 1: 2014 / STI Concerns in Getting BIS Licence Experience with BEE Regulations Recommendations
More informationPOWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012
POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL
More informationPRILIMINARY REPORT ON THE ACCIDENT AT RANTAMBE 132 KV SWITCHYARD 21 ST FEBRUARY 2011
PRILIMINARY REPORT ON THE ACCIDENT AT RANTAMBE 132 KV SWITCHYARD 21 ST FEBRUARY 2011 DGM (MAHAWELI COMPLEX OFFICE) CEYLON ELECTRICITY BOARD MAHAWELI COMPLEX 07 th MARCH 2011 1 Detail of Accident The bus
More informationSmall wonder. Station service voltage transformers for small power requirements
Small wonder Station service voltage transformers for small power requirements MATHEW PAUL An estimated 1.3 billion people worldwide have no access to electricity. In small communities, this is often due
More information2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited
More informationSICOP. Bimetal Overload Relays Type 3UA5/6 & 3UC5/6. Introduction. Application
s SICOP Bimetal Overload Relays Type 3UA5/6 & 3UC5/6 Introduction The bimetal overload relays type 3UA5/6 & 3UC5/6 relays are indigenously manufactured and bring to the users a whole range of benefits,
More informationSPECIFICATION FOR PI
Page 1 of 10 Indoor type Rectifier transformer unit with core/shell type construction is required. The Rectifier transformer shall be designed/ sized as per IEEE std. C57.18.10 and C57.110. I. Scope of
More informationTECHNICAL SPECIFICATION OF 11KV SF6 / VCB METAL ENCLOSED, INDOOR (PANEL TYPE) / OUTDOOR RING MAIN UNIT (RMU). (IEC standard equipment)
TECHNICAL SPECIFICATION OF 11KV SF6 / VCB METAL ENCLOSED, INDOOR (PANEL TYPE) / OUTDOOR RING MAIN UNIT (RMU). (IEC standard equipment) 1 SCOPE OF SUPPLY This specification covers design, manufacture, shop
More informationOFFSHORE WIND FEASIBILITY STUDY APPENDICES Appendix C.2 Subsea Cable Data Sheets
OFFSHORE WIND FEASIBILITY STUDY APPENDICES 10-7 10.3.2 Appendix C.2 Subsea Cable Data Sheets Design data for TFVA 36 kv 3x1x240 mm 2 KQ Metallic Laying up Inner sheath Bedding Armor Diameter of conductor
More informationCable arrangement 15 Preparation for cable installation. 15 Installation of the cables 16 Finishing of the cable installation. 17 Examples.
Transportation and storage.. 3 General. 3 Unpacking at installation site....... 3 Transfer of cubicles at installation site... 3 Weight.. 4 Temporary storage. 4 Erection at site 5 General. 5 The switchgear
More informationCAST RESIN TRANSFORMERS
MODEL TAM CAST RESIN - TAM TYPE Epoxy cast resin dry-type transformers are recommended to operate in places that require security, the materials used in its construction are hard to combust and are self-extinguishable
More informationSWITCHGEAR DIVISION PRODUCT PROFILES
SWITCHGEAR DIVISION PRODUCT PROFILES Metal-Enclosed Load-Interrupter Switchgear Product Profiles Three-Phase, Group-Operated Load-Interrupter Switches with Fuses in Single and Multi-Bay Assemblies Manual,
More informationHigh Voltage and Extra High Voltage Cables
High Voltage and Extra High Voltage Cables GUIDE TO THE SELECTION OF EHV AND HV CABLES EHV and HV cables are specially designed on the basis of the project data. To determine appropriate design of a high
More informationProduct Specifications for Phase Over Phase GOABS(r)
1. General a) This specification covers the design, manufacture, and shipment of phase-over-phase, 1-way, 2-way, 3-way, and 4-way, gang-operated disconnecting switches, both air-break and load-break, for
More informationS P E C I F I C A T I O N
T E N D E R S P E C I F I C A T I O N NO: BHE/PW/PUR/KKT-ELE/627 FOR HANDLING AT SITE STORES/STORAGE YARD, TRANSPORTATION TO SITE OF WORK, COMPLETE ERECTION, CHECKING OF CALIBRATION, TESTING, COMMISSIONING
More informationFuji Electric. Oil immersed. Transformer FTU08A1-E-0024
Fuji Electric Oil immersed Transformer 1 FTU08A1-E-0024 History Fuji Electric (T&D Business) 1923 Established Fuji Electric Manufacturing Co.,Ltd. 1962 Started operation of Chiba factory (transformer)
More informationFinal Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description
Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing
More informationZX1.5-R. Gas-insulated medium voltage for railway application DISTRIBUTION SOLUTIONS. Gas-insulated medium voltage for railway application ZX1.
DISTRIBUTION SOLUTIONS ZX1.5-R Gas-insulated medium voltage for railway application Safety and reliability 20% footprint saving Easy operation Complete solution ZX1.5-R Gas-insulated medium voltage for
More informationINSTRUCTION MANUAL OIL SEALED ROTARY VACUUM PUMP MODEL PKS-016 PKS-030 PKS-070
INSTRUCTION MANUAL OIL SEALED ROTARY VACUUM PUMP MODEL PKS-016 PKS-030 PKS-070 Components division ULVAC, Inc. Table of Contents 1. Inspection 4 2. Mounting 5 3. Oil filling 5 4. Electrical connections
More informationPUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4
PUB NLH 174 Island Interconnected System Supply Issues and Power Outages Page 1 of 4 1 2 3 4 5 6 7 8 9 Q. Please describe Hydro s terminal station and substation inspections policies and practices. In
More informationZX2.2 Gas-insulated medium voltage switchgear
ZX2.2 Gas-insulated medium voltage switchgear 2 Brochure ZX2.2 Power engineering from ABB Solutions for the future As a technology group with global operations, ABB supplies the solutions of the future
More informationACCESSORIES FOR LPOF, HPPT AND XLPE HIGH VOLTAGE CABLE SYSTEMS PRODUCT CATALOGUE
ACCESSORIES FOR LPOF, HPPT AND XLPE HIGH VOLTAGE CABLE SYSTEMS PRODUCT CATALOGUE hvgrid-tech designs and manufactures high voltage cable accessories for all types of cable systems, ranging from 69 kv to
More informationPower & Control Cables. U o. /U 0.6/1 kv - IEC
Power & Control Cables U o /U 0.6/1 kv - IEC 60502-1 2 KERPEN GmbH & Co. KG 07.2005 Printing errors excepted. Subject to alteration List of Contents Introduction Page B1 Construction Page B3 Use Page B4
More informationAIR INSULATED EXTENDABLE SWITCHGEAR UP TO 12KV GUIDE
AIR INSULATED EXTENDABLE SWITCHGEAR UP TO 12KV GUIDE Certificate Number FM35831 APPLICATION Typical Uses and Classification The MSGair switchgear is used in transformer and switching substations mainly
More informationLarge Air Cooled Generator Failure
Large Air Cooled Generator Failure Henry Tarnecky AVP - Sr. Engineering Specialist, FM Global 2017 IRIS Rotating Machinery Conference FM Global Basics Commercial/Industrial Property Insurer Mutual Co.,
More informationThese installation and maintenance instructions must be read in full and completely understood before the installation!
These installation and maintenance instructions must be read in full and completely understood before the installation! 1. General information on the installation and maintenance instructions These instructions
More information*(1(5$/7(&+1,&$/63(&,),&$7,2162) +9/9 ',675,%87,2175$16)250(56
T *(1(5$/7(&+1,&$/63(&,),&$7,2162) +9/9 ',675,%87,2175$16)250(56 TUNISIE TRANSFORMATEUR S.A :ULWWHQE\ M. BOUMALLA Adel Checked by : Mll. LAOUINI Radhia Approved by : M.LARIBI Mohamed Kamel %XVLQHVV'HSDUWPHQW,PP(O+DELE%XUHDX1ƒ%ORF%/HV%HUJHVGXODF$RXLQD
More informationGenerator Termination Bus-bar Arrangement - Design requirements: Utility Perspective
Generator Termination Bus-bar Arrangement - Design requirements: Utility Perspective D. K. Chaturvedi (NTPC) Harshvardhan Senghani (NTPC) K Venugopal (CS Electric) This paper appraise user on the termination
More information100 MW Wind Generation Project
A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility
More informationP2 : About Us. P3 : Elsewedy Transformers. P4 : Why Elsewedy Dry Type Transformer? P6 : Cast Resin Dry Transformers. P7 : Technical Data Sheets
P2 : About Us P3 : Elsewedy Transformers P4 : Why Elsewedy Dry Type Transformer? P6 : Cast Resin Dry Transformers P7 : Technical Data Sheets P8 : Transformer s Outline Drawing P9 : Accessories About Us
More informationCar Battery Charger Instructions for Use
BATTERY CHARGER 12Volt 4Amp FOR INDOOR USE ONLY Power Details: Input: 230-240Vac; 50Hz; 52W Output: 12V DC; 2.8A Maximum Charge Rate: 4A RMS Read these instructions before operating this car battery charger
More informationIEC Separable Connectors 36 kv and 42 kv, 630A and 1250A Front T-Body / Coupling (Rear) T-Body Connector
www.chardongroup.com IEC Separable Connectors 36 kv and 42 kv, 630A and 1250A Front T-Body / Coupling (Rear) T-Body Connector Application Chardon Front T-Body / Coupling (Rear) T-Body connectors are fully
More informationSignal Power Supply Monitoring & Restoration
Signal Power Supply Monitoring & Restoration Automatic Supply Restoration (ASR) systems operate in two ways: Protection based systems that handle a fault in real time. Post fault restoration systems that
More informationInstallation Operation Maintenance. LSSN Butterfly Valve AGA Approved 50MM - 150MM. QAD#IM6055.REVA
LSSN Butterfly Valve Installation Operation Maintenance Licence Number: 5326 www.challengervalves.com.au 1 Index 1. INTRODUCTION 1.1 Design Features 3 1.2 Flange and Pipe Compatibility 4 1.3 Operating
More informationTamini is the leading Italian company in the world for the design and production of industrial, power and special transformers.
Power Tamini is the leading Italian company in the world for the design and production of industrial, power and special transformers. Founded in 1916 in Milan, it supplies its products to the most important
More informationElectrical Safety. Presented By- C S Chakraverty. L&T Construction ( MMH ) Head- E&I Operation
Electrical Safety Presented By- C S Chakraverty Head- E&I Operation L&T Construction ( MMH ) Objective of the session Create an awareness about importance of electrical safety in our day today activities,
More informationAC/DC Arc Furnace and Ladle Furnace Transformers
AC/DC Arc Furnace and Ladle Furnace Transformers Specification parameter Specify the requirements for 1. Environmental condition and standards Applicable standard Electrical standard Mechanical standard
More informationTransmission Corporation of Telangana, Jawaharlal Nehru Technological University Hyderabad
ENHANCEMENT OF POWER TRANSFER CAPABILITY OF TRANSMISSION LINES USING HTLS CONDUCTOR 1 M.SHESHAGIRI, 2 B.V.SANKER RAM Transmission Corporation of Telangana, Jawaharlal Nehru Technological University Hyderabad
More informationNXPLUS C Single busbar. Maintenance-free for lifetime
NXPLUS C Single busbar Maintenance-free for lifetime Energy Distribution Welcome! Page 2 Content Overview Technical data Typicals Panel design Circuit-Breaker panel Busbar Operation Metering Low-voltage
More informationField Experience & Reliability Tests for the New EasyDry Condenser Bushing LUKAS MUGGLI
Field Experience & Reliability Tests for the New EasyDry Condenser Bushing LUKAS MUGGLI T. Schütte, ABB Schweiz Ltd, High Voltage Components, Bushings, 2015-10-19 INMR2015 - Munich Field experience and
More informationFR-N1X1G1. Low voltage - Energy, cabling, signalling and control
Low voltage - Energy, cabling, signalling and control FR-N1X1G1 Construction: NF C 32-323 NF C 32-323/1 Fire propagation: NF EN 60332-3-24 NF C 32-070 C1 IEC 60332-3-24 C Flame propagation: NF EN 60332-1-2
More informationDesign specifications
Design specifications Design To relevant standards: IEC, VDE, DIN, ISO, EN With squirrel-cage or slipring rotor Degree of protection IP 55 / IP 65 Cooling method IC511, suitable for both indoor and outdoor
More information