1 Signal Power Supply Monitoring & Restoration

2 Automatic Supply Restoration (ASR) systems operate in two ways: Protection based systems that handle a fault in real time. Post fault restoration systems that deal with a fault after power has been lost. Schneider Electric Advanced Services Rail signal power solutions V4 2

3 Schneider post fault ASR system On loss of power our Automatic Supply Restoration system automatically restores power from failed.. to restored automatically within 15 seconds (this time is unaffected by the number of FSPs in a feeder) Schneider Electric Advanced Services Rail signal power solutions V4 3

4 Our history with post fault ASR systems We have been working with electricity supply companies since the 1990 s. Most 33kV & 11kV networks in developed countries use some form of Post Fault restoration. Seeboard s 33kV network automated by Schneider using pole mounted switchgear Schneider Electric Advanced Services Rail signal power solutions V4 4

5 Automatic Supply Restoration ASR monitoring a feeder section with normal current readings ASR identifies a feeder section with a current imbalance (infeed current not equal to outfeed current) Schneider Electric Advanced Services Rail signal power solutions V4 5

6 Automatic Supply Restoration: Stage 1 The infeed and outfeed currents are continuously monitored at each FSP by Fault Passage Recorder (FPR) units 16A 16A 13A 13A 8A 8A Automatic Supply Restoration 17A 6A 6A 0A Signals on with healthy supply A near short circuit fault occurs between FSP3 & FSP4. The fault presents itself as a 55A current imbalance. The current readings at the time of the fault are stored by the FPR units. 55A Fault 72A 71A 71A 68A 68A 63A 8A 6A 6A 0A Fault causes PSP to trip and signal lose supply Schneider Electric Advanced Services Rail signal power solutions V4 6

7 Automatic Supply Restoration: Stage 2 Within ~50ms, the fault causes the circuit breaker at PSP 1 to trip Fault Tripped The ASR locates the faulty section from the current readings stored by the FPRs at the time of the fault occurrence. It then isolates the faulty section by opening the contactors immediately upstream and downstream. Fault is now isolated Tripped Schneider Electric Advanced Services Rail signal power solutions V4 7

8 Automatic Supply Restoration: Stage 3 The ASR then resets and closes the circuit breaker in PSP1 And finally the ASR closes the normally open circuit breaker in PSP2. All signals are now restored to supply. Schneider Electric Advanced Services Rail signal power solutions V4 8

9 User Interface There is a user friendly Touch Screen HMI Interface at each PSP The same view & control facilities are available on any PC via Network Rail s FTN Schneider Electric Advanced Services Rail signal power solutions V4 9

10 Schneider Post Fault Automatic Supply Restoration. Points for discussion. Commissioning no track side settings plug & play can be commissioned from the feeder s PSP or remotely No design change whenever the number of FSPs is changed. You can deploy the system at phase 1 of your project. No tripping elements along the feeder so you can optimize your PSP protection settings to suit your design. Easy to operate & easy to understand for the maintainer. Can be maintained in-house. When a fault occurs, the system identifies all of the L1 & L2 faults, so preventative maintenance can be undertaken High availability and reliability No risk of nuisance trip, because there are no tripping elements in the system. The system does not need high speed, low latency communications, and thus is able to operate using Network Rail s FTN network as a diverse communications route. Lower lifetime cost, standard components, no asset register of settings, low spares holding. All the ASR equipment fitted in the FSPs are identical, and can be easily swapped no specialist skills are required to set up the replacement equipment. No threshold settings are required, no effect from points heating machine inrush or traction power surges. The system never operates until AFTER the power is lost. The system only compares the DIFFERENCE between current values along the feeder. (Kirchhoff's current laws) Schneider Electric Advanced Services Rail signal power solutions V4 10

GA PLUS Ordering Information. Earth Leakage Motor Protection Relay Kits

GA PLUS Ordering Information. Earth Leakage Motor Protection Relay Kits PLUS Ordering Information Earth Leakage Motor Protection Relay Kits About The NewElec Earth Leakage relay provides earth leakage protection also known as ground fault protection designed to protect personnel

More information

Industry Automation Control Components

Industry Automation Control Components Industry Automation Control Components SIRIUS 3RV2 Motor Starter Protectors SIRIUS 3RV21 Motor Starter Protectors can be easily and flexibly combined with other SIRIUS devices to reduce space requirements

More information

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment.

A system fault contribution of 750 mva shall be used when determining the required interrupting rating for unit substation equipment. General Unit substations shall be 500 kva minimum, 1500 kva maximum unless approved otherwise by the University. For the required configuration of University substations see Standard Electrical Detail

More information

EDS SUBSTATION LVAC SUPPLIES

EDS SUBSTATION LVAC SUPPLIES Document Number: EDS 08-1112 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1112 SUBSTATION LVAC SUPPLIES The standard details the requirements and options for the provision of LVAC

More information

Short-circuit current limiter S800-SCL-SR

Short-circuit current limiter S800-SCL-SR Short-circuit current limiter S800-SCL-SR 2 ABB Short-circuit current limiter S800-SCL-SR Self-resetting current limiting module S800-SCL-SR is ABB s innovative self-resetting current limiting module which

More information

Study and operate the protection features associated with the neutral plans with manual troubleshooting. S.L.T.-TR22 Bench

Study and operate the protection features associated with the neutral plans with manual troubleshooting. S.L.T.-TR22 Bench Study and operate the protection features associated with the neutral plans with manual troubleshooting S.L.T.-TR22 Bench 1. Presentation of the kit This bench illustrates the rationale underlying the

More information

Mar H: SUPPLEMENTAL PARALLELING GEAR (16315-H)

Mar H: SUPPLEMENTAL PARALLELING GEAR (16315-H) 2101 Commonwealth Blvd, Suite B Ann Arbor, MI 48105-5759 www.med.umich.edu/facilities/plan/ 263010-H: SUPPLEMENTAL PARALLELING GEAR (16315-H) Related Sections Basis Guideline: N/A For an explanation of

More information

TABLE OF CONTENTS Page:

TABLE OF CONTENTS Page: TABLE OF CONTENTS Page: 1. LINETROLL 111K OVERVIEW... 2 2. FUNCTIONAL DESCRIPTION... 3 2.1. Adaptive detector... 3 2.2. Operation criteria... 3 2.2.1 Inrush blocking time 2.2.2 Fault current passage 2.2.3

More information

UniSec Maintenance solutions

UniSec Maintenance solutions DISTRIBUTION SOLUTIONS UniSec Maintenance solutions ABB supports you to improve the reliability, safety and efficiency of your electrical equipment UniSec Maintenance solutions Table of contents 004 00

More information

Grounding Of Standby & Emergency Power Systems

Grounding Of Standby & Emergency Power Systems July / August 2007 ELECTRICAL LINE 53 Grounding Of Standby & Emergency Power Systems By Andrew Cochran Power continuity is essential in many industrial and commercial installations where a trip out due

More information

Double earth fault in a PSP during back to back launching sequence

Double earth fault in a PSP during back to back launching sequence Double earth fault in a PSP during back to back launching sequence Jean-Louis DROMMI EDF Hydro Engineering Center, France Pump Storage Scheme, back to back launching Electricité de France Hydro Department

More information

Presented By: Bob Uluski Electric Power Research Institute. July, 2011

Presented By: Bob Uluski Electric Power Research Institute. July, 2011 SMART DISTRIBUTION APPLICATIONS &THEIR INTEGRATION IN A SMART GRID ENVIRONMENT Presented By: Bob Uluski Electric Power Research Institute July, 2011 Key Smart Distribution Applications What are the major

More information

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant

2013 Grid of the Future Symposium. Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited Plant 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Utilizing Single Phase Operation Scheme on Untransposed 765kV lines for a Stability-Limited

More information

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System This document is intended to be a general overview of PG&E s current technical

More information

Zone Selective Interlocking

Zone Selective Interlocking Application Paper AP02602002EN Supersedes 08/2003 Zone Selective Interlocking Contents Description.... Page What is Zone Selective Interlocking?... 3 What is the purpose of Zone Selective Interlocking?....3

More information

Eng. Samuel Ndirangu Chief Manager ICT Kenya Power Kenya

Eng. Samuel Ndirangu Chief Manager ICT Kenya Power Kenya Eng. Samuel Ndirangu Chief Manager ICT Kenya Power Kenya Improving operational efficiency of the Mombasa electrical distribution network through deployment of a Distribution Automation System (DAS) Eng.

More information

B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE

B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE B-03 ELECTRICIAN TRAINING SKILL DEVELOPMENT GUIDE Duty B: Power Distribution (600V and below) B-03: Troubleshoot 480V System Issued 06/01/98 Task Preview Troubleshoot 480V System The 480V distribution

More information

AutoLink Frequently Asked Questions

AutoLink Frequently Asked Questions Rev. 3 October 2013 Page 1 of 8 AutoLink Frequently Asked Questions October 2013 1 Rev. 3 October 2013 Page 2 of 8 Table of Contents 1 Background... 4 1.1 What is the AutoLink Single Phase Electronic Sectionalizer?...

More information

Gas Insulated Metal-clad Switchgear, HMGS!

Gas Insulated Metal-clad Switchgear, HMGS! Medium Voltage HMGS-G10 HYUNDAI Medium Voltage Gas Insulated Metal-clad Switchgear, HMGS! SF6 Gas Insulated Metal-clad Switchgear is an integrated assembly of vacuum circuit breaker, 3-position switch,

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

MULTI 9 System Catalog IEC Rated C60N/H/L Circuit Breakers

MULTI 9 System Catalog IEC Rated C60N/H/L Circuit Breakers IEC Rated C60N/H/L Circuit Breakers Standard Features Fast Closing Allows increased withstand to the high inrush currents of some loads Trip-free mechanism: Contacts cannot be held in the on position when

More information

Zone Selective Interlock Module. For GE Circuit Breakers

Zone Selective Interlock Module. For GE Circuit Breakers GE Zone Selective Interlock Module For GE Circuit Breakers Table of Contents 1. Introduction... 4 What is Zone-Selective Interlocking (ZSI)?...4 What is a Zone-Selective Interlock Module?...4 2. Description...

More information

THORNE & DERRICK UK TEL FAX TEL FAX

THORNE & DERRICK UK TEL FAX TEL FAX Rail solutions Powering the Railway Here at Schneider Electric we understand that secure power supplies are essential to the modern railway. That s why making us your supply partner will keep you on the

More information

Substation Concepts for the Future

Substation Concepts for the Future Anders Sjoelin, ABB Power Systems IEEE Substations ti Committee Meeting Substation Concepts for the Future April 26, 2012 Slide 1 Reminder Anything that is in the world when you re born is normal and ordinary

More information

Shippensburg University

Shippensburg University Shippensburg University 1871 Old Main Drive Shippensburg, PA 17257 SUPPLEMENT 1 Electrical Coordination Study Professional: Entech Engineering, Inc. 4 South Fourth Street P.O. Box 32 Reading, PA 19603

More information

Shared Learning. SL027/18 Selection of Suitable Circuit Protection. 18-Jun-18 / 1

Shared Learning. SL027/18 Selection of Suitable Circuit Protection. 18-Jun-18 / 1 Shared Learning SL027/18 Selection of Suitable Circuit Protection 18-Jun-18 / 1 Background For a number of reasons the design process associated with the selection of circuit protective devices for signalling

More information

Low voltage Direct Current Network. Compact NSX DC PV. Circuit breakers and switch disconnectors for solar application.

Low voltage Direct Current Network. Compact NSX DC PV. Circuit breakers and switch disconnectors for solar application. Low voltage Direct Current Network Compact NSX DC PV Circuit breakers and switch disconnectors for solar application Catalogue 2012 Compact NSX DC PV A complete DC offer for solar application from 80

More information

EPS-ECONOMY PUMP STARTER

EPS-ECONOMY PUMP STARTER EPS-ECONOMY PUMP STARTER NEMA 1 & 3R ENCLOSURES franklinwater.com EPS-ECONOMY PUMP STARTER - 1 & 3 PHASE, 50/60HZ, 200-600 VAC, 1-80A The enhanced Franklin Electric Economy Pump Starter (EPS) provides

More information

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5

UBC Technical Guidelines Section Edition Commissioning of Electrical Systems Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Building Operations Electrical Technical Support.2 UBC Energy & Water Services 2.0 REQUIREMENTS FOR COMMISSIONING AND TESTING 2.1 Testing.1 Unit

More information

Application Engineering Europe

Application Engineering Europe Date of last update: Feb-12 Ref: D7.8.4/0112-0212/E Application Engineering Europe CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS 1/17 1 Introduction CoreSense is an ingredient brand name for

More information

Air-insulated switchgear UniGear type ZS1

Air-insulated switchgear UniGear type ZS1 Air-insulated switchgear UniGear type ZS1 ABB Power Technologies / 1-7074 D 12-03-2003 - Air-insulated switchgear UniGear type ZS1 ABB Power Technologies / 2-7075 D 1 2-03-2003 - Rated voltage kv 12 17.5

More information

PBA Series Prelube Controls

PBA Series Prelube Controls VARNA Products Engineered Innovation PBA Series Prelube Controls Simple, Compact, Industrial Full featured control for running prelube from the control or from a remote station Easy internal wiring connections

More information

Transformer Protection

Transformer Protection Transformer Protection Course No: E01-006 Credit: 1 PDH Andre LeBleu, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 info@cedengineering.com

More information

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian Shunt Capacitor Bank Protection in UHV Pilot Project Qing Tian 2012-5 INTRODUCTION State Grid Corp. of China, the largest electric power provider in the country, has first build a 1000 kv transmission

More information

Smart Grid Automation and Centralized FISR

Smart Grid Automation and Centralized FISR Smart Grid Automation and Centralized FISR March 21, 2016 Mike Colby Senior Engineer Distribution Control Center Smart Grid Automation and Centralized FISR Remote Controlled Devices & Communication Distribution

More information

A21M. Introduction: Functional Overview: Key Protection & Control Functions:

A21M. Introduction: Functional Overview: Key Protection & Control Functions: Introduction: ASHIDA has designed economical & reliable Multifunction A21M Protection & Control System. The simple and compact construction of A21 series, A21M relay provides integrated Protection, Control

More information

NEXT STEP B) SAFETY :

NEXT STEP B) SAFETY : SUMMARY : EVOLUTION OF MV/LV SUBSTATIONS COMPACT SUBSTATIONS J. M. Solans, C. Prevé, R. Farrán, R. Muñoz. SCHNEIDER ELECTRIC S.A. - SPAIN INTRODUCTION The recent liberalisation of the electricity supply

More information

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category General Title Reference Number PMP 01 (RIC Standard: EP 00 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards and

More information

DP INNOVATION. A Novel Solution to Common Mode Failures in DP Class 2 Power Plant

DP INNOVATION. A Novel Solution to Common Mode Failures in DP Class 2 Power Plant DP INNOVATION A Novel Solution to Common Mode Failures in DP Class 2 Power Plant Dr. Steven Cargill Noble Denton Consultants, Ltd October 7-8, 2008 Return to Session Directory A Novel Solution to Common

More information

SF 6 gas insulated RMU SafePlus 24 kv. ABB SafePlus 24 kv SF6 gas insulated RMU 1

SF 6 gas insulated RMU SafePlus 24 kv. ABB SafePlus 24 kv SF6 gas insulated RMU 1 SF 6 gas insulated RMU SafePlus 24 kv 25.03.2010 SafePlus 24 kv SF6 gas insulated RMU 1 Secondary distribution 400 kv Transmission substation Transformer 40-70 kv 130 kv Main Substation Secondary distribution

More information

WELCOME TO THE WORLD OF COMPLETE AUTOMATION. Innovative MCS Starter Solutions. MCS Starters and the New Mounting System 141A

WELCOME TO THE WORLD OF COMPLETE AUTOMATION. Innovative MCS Starter Solutions. MCS Starters and the New Mounting System 141A WELCOME TO THE WORLD OF COMPLETE AUTOMATION Innovative MCS Starter Solutions MCS Starters and the New Mounting System 141A Welcome to the Wide World of Allen-Bradley Starters Innovative solutions for state

More information

CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS

CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS Date of last update: Apr-15 Ref: D7.8.4/0112-0415/E Application Engineering Europe CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS CoreSense Diagnostics for Stream Refrigeration Compressors...

More information

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering

School of Electrical and Information Engineering. ELEC High Voltage. University of Sydney. Dr Keith Mitchell. Engineering University of Sydney School of Electrical and Information Engineering Dr Keith Mitchell ELEC 5205 - High Voltage Engineering ELEC 5205 - High Voltage Engineering 3. Switchgear Types of Power System Switchgear

More information

Rated Impulse withstand voltage U imp Main circuit Between terminals, AC3500V for 1 minute 12kV terminal group to earth Control circuits

Rated Impulse withstand voltage U imp Main circuit Between terminals, AC3500V for 1 minute 12kV terminal group to earth Control circuits 7 Technical Data Dielectric strength Circuit Withstand voltage (at 50/60 Hz) Rated Impulse withstand voltage U imp Main circuit Between terminals, AC3500V for 1 minute 12kV terminal group to earth Control

More information

Quick Start Guide TS 910 & TS 920

Quick Start Guide TS 910 & TS 920 Quick Start Guide TS 910 & TS 920 DANGER HAZARD OF ELECTRICAL SHOCK, EXPLOSION, OR ARC FLASH Read and understand this quick start guide before installing and operating the transfer switch The installer

More information

David Park, EPMV ABB South Africa / Africa Channel Partner event, 2016 ABB Africa Channel Partner event Medium Voltage Apparatus

David Park, EPMV ABB South Africa / Africa Channel Partner event, 2016 ABB Africa Channel Partner event Medium Voltage Apparatus David Park, EPMV ABB South Africa / Africa Channel Partner event, 2016 ABB Africa Channel Partner event Medium Voltage Apparatus Slide 1 Technical Session 10 Solutions for reliable power supply through

More information

Model Number Structure

Model Number Structure Solid State Relays (Single-phase) G3PB New Single-phase Solid State Relays with Compact Size for Heater Control Slim models with a thickness of only 22.5 mm are also available. Compact design achieved

More information

Standby Power Systems

Standby Power Systems Source: Power Quality in Electrical Systems Chapter 13 Standby Power Systems The term standby power systems describes the equipment interposed between the utility power source and the electrical load to

More information

Industrial Chargers and

Industrial Chargers and Industrial Chargers and DC Systems SPR - Single Phase Rectifier TPR - Three Phase Rectifier 12V 250V 5A 1000A Designed for all Industrial applications Oil & Gas, Petrochemicals Offshore, Onshore, Pipelines

More information

TIME REQUIREMENT GUIDE (TRG)

TIME REQUIREMENT GUIDE (TRG) CAT SWITCHGEAR TIME REQUIREMENT GUIDE (TRG) This warranty repair time requirement guide is designed to: Provide detailed guidance on troubleshooting Determine possible solutions Guide the technician to

More information

1489-M Circuit Breakers

1489-M Circuit Breakers Dual terminals provide wiring/bus bar flexibility and clamp from both sides to improve connection reliability Terminal design helps prevent wiring misses Scratch- and solventresistant printing Suitable

More information

Submittal Data Information

Submittal Data Information Effective: NOVEMBER 3, 2014 JOB CONTRACTOR ITEM NO. Submittal Data Information TDX - Taco Duplex Starter ENGINEER REP. 301-2693 Supersedes: NEW TDX - TACO DUPLEX STARTER 1Ø, 230V, 1/10-15HP 3Ø, 200-460V,

More information

ZX1.5-R. Gas-insulated medium voltage for railway application DISTRIBUTION SOLUTIONS. Gas-insulated medium voltage for railway application ZX1.

ZX1.5-R. Gas-insulated medium voltage for railway application DISTRIBUTION SOLUTIONS. Gas-insulated medium voltage for railway application ZX1. DISTRIBUTION SOLUTIONS ZX1.5-R Gas-insulated medium voltage for railway application Safety and reliability 20% footprint saving Easy operation Complete solution ZX1.5-R Gas-insulated medium voltage for

More information

A comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear

A comparison of metal-enclosed load interrupter (ME) switchgear and metal-clad (MC) switchgear Robert J. Gustin Eaton Fellow Application Engineer, P. E. Southfield, Michigan Definitions Metal-enclosed load interrupter switchgear type ME Metal-enclosed switchgear is defined in ANSI C37.20.3-1987,

More information

Agility in energy Ahead of the challenge, ahead of the change

Agility in energy Ahead of the challenge, ahead of the change European Utility Week Vienna, November 3-5, 2015 Agility in energy Ahead of the challenge, ahead of the change Go-ahead application for existing distribution grids combines availability and efficiency

More information

COMPLETE SOLUTIONS FOR POWER PROTECTION

COMPLETE SOLUTIONS FOR POWER PROTECTION COMPLETE SOLUTIONS FOR POWER PROTECTION GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES Modular protection P. 8 RX 3 MCBs 63 A 4500 & 6000 P. 18 DX 3 -IS isolating switches P. 9 RX

More information

KD LV Motor Protection Relay

KD LV Motor Protection Relay 1. Protection Features KD LV Motor Protection Relay Overload (for both cyclic and sustained overload conditions) Locked rotor by vectorial stall Running stall / jam Single phasing / Unbalance Earth leakage

More information

Dead Tank Circuit Breaker 145PM40-C Compact design with enhanced reliability

Dead Tank Circuit Breaker 145PM40-C Compact design with enhanced reliability Dead Tank Circuit Breaker 145PM40-C Compact design with enhanced reliability ABB innovations for changing demands ABB (www.abb.com) is a leader in power and automation technologies that enables utility

More information

Axpert-CSS AMTECH DRIVES Axpert-CSS Amtech

Axpert-CSS AMTECH DRIVES Axpert-CSS Amtech The Axpert-CSS is a range of Combination Soft Starter panels offered by AMTECH DRIVES. We also offer the module unit as an individual product, named as Axpert-Opti torque Soft Starter. This is only the

More information

DPX moulded case circuit breakers

DPX moulded case circuit breakers BREAKING AND PROTECTION DEVICES 10 / 2011 DPX moulded case circuit breakers DPX moulded case circuit breakers offer optimum solutions for the protection requirements of commercial and industrial installations.

More information

T300MVi JK OEM POWER CELLS MEDIUM VOLTAGE VACUUM CONTACTOR. Reliability in motion. Reliability in motion

T300MVi JK OEM POWER CELLS MEDIUM VOLTAGE VACUUM CONTACTOR. Reliability in motion. Reliability in motion MEDIUM VOLTAGE VACUUM CONTACTOR T300MVi JK OEM POWER CELLS Reliability in motion Reliability in motion 400 AMPERE AT 2300-6600 VOLTS (7200 VOLT MAX) DRAWOUT AND FIXED APPLICATIONS JK OEM PART NUMBER DESCRIPTION

More information

INVITATION TO TENDER MR 84/2016. SUPPLY and Install 110V DC BATTERY BANKS and CHARGERS for Rarawai, Sabeto and Lautoka Switching Station

INVITATION TO TENDER MR 84/2016. SUPPLY and Install 110V DC BATTERY BANKS and CHARGERS for Rarawai, Sabeto and Lautoka Switching Station INVITATION TO TENDER MR 84/2016 SUPPLY and Install 110V DC BATTERY BANKS and CHARGERS for Rarawai, Sabeto and Lautoka Switching Station Fiji Electricity Authority seeks reputable Manufacturer/Supplier

More information

Variable Frequency Drive Basics

Variable Frequency Drive Basics Variable Frequency Drive Basics Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Variable Frequency Drives are

More information

5. OVERCURRENT RELEASE (OCR)

5. OVERCURRENT RELEASE (OCR) 5. OVERCURRENT RELEASE (OCR) Options available for the type AR ACBs include a highly reliable, multi-functional overcurrent release (OCR) with a built-in 8- bit microprocessor. This OCR is supplied with

More information

schneider-electric.com/sg K60 Circuit Breakers The affordable way to stay safe from electrocution and electrical overloads schneider-electric.

schneider-electric.com/sg K60 Circuit Breakers The affordable way to stay safe from electrocution and electrical overloads schneider-electric. K0 Circuit Breakers The affordable way to stay safe from electrocution and electrical overloads Overview K0 Circuit Breaker Technical Specification MCB RCCB K0 Circuit Breaker K0N K0H ID K Number of poles

More information

Compact NR630. NR100F to NR630F

Compact NR630. NR100F to NR630F Low voltage switchgear Compact NR NR100F NR630F The Compact NS range has revolutionised the world of moulded-case circuit breakers. For installations not requiring the high performance levels of the NS

More information

TDX - Taco Duplex Starter with

TDX - Taco Duplex Starter with Energy Management TDX - Taco Duplex Starter with Smartstart The TDX extends the life of your pumps by alternating control. It comes standard with underload protection, a enhanced class 10 electronic overload

More information

Bulletin 1489 Circuit Breakers. Selection Guide

Bulletin 1489 Circuit Breakers. Selection Guide Bulletin 1489 s Selection Guide Bulletin 1489-A Overview/Description Bulletin 1489-A s Energy-limiting design protects downstream components better than conventional breakers during short circuits Field-mountable

More information

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001 CLP POWER HONG KONG LIMITED SUPPLY March 2001 ADVISORY SERVICE Advice concerning matters relating to the supply of electricity may be obtained free of charge from the Company. OTHER COMPANY PUBLICATIONS

More information

Sitras SCS, -RCI, -FFP, -TTU

Sitras SCS, -RCI, -FFP, -TTU Sitras SCS, -RCI, -FFP, -TTU control system for traction power supply Remote control interface Frame fault protection Transfer trip unit siemens.com/rail-electrification The Sitras SCS station control

More information

Sectionalizing. Rick Seeling. Pete Malamen. Introduction Philosophy. Three Phase Reclosers High-Side Protection Specific Applications

Sectionalizing. Rick Seeling. Pete Malamen. Introduction Philosophy. Three Phase Reclosers High-Side Protection Specific Applications Sectionalizing Rick Seeling Introduction Philosophy Pete Malamen Three Phase Reclosers High-Side Protection Specific Applications History Early 1970 s Small Substation Transformers

More information

Switchgear Arrangement, Torque Requirements, Insulation Systems & Maintenance Intervals. Mike Schmaderer

Switchgear Arrangement, Torque Requirements, Insulation Systems & Maintenance Intervals. Mike Schmaderer Switchgear Arrangement, Torque Requirements, Insulation Systems & Maintenance Intervals Mike Schmaderer Questions Feel free to interrupt There are no dumb questions Just what exactly is Switchgear? The

More information

ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS

ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS 104660-ELE-PT-E-2003 Senior Electrical Protection & Commissioning Engineer Holds a B. Sc. in Electrical Power & Machines Engineering and has about 14 years hands-on experience in low, medium voltage and

More information

Life cycle services for protection and control relays Full support from start to finish

Life cycle services for protection and control relays Full support from start to finish Life cycle services for protection and control relays Full support from start to finish The main purpose of the protection and control relay is to protect both human lives and equipment as well as ensure

More information

EE064D: Circuit Breakers & Switchgears: Design, Testing, Commissioning, Maintenance, Repair & Troubleshooting

EE064D: Circuit Breakers & Switchgears: Design, Testing, Commissioning, Maintenance, Repair & Troubleshooting EE064D: Circuit Breakers & Switchgears: Design, Testing, Commissioning, Maintenance, Repair & Troubleshooting EE064-D Rev.002 CMCT COURSE OUTLINE Page 1 of 7 Training Description: This intensive five-day

More information

INSTALLATION & OPERATING MANUAL RW SERIES WALL-MOUNT RECTIFIERS

INSTALLATION & OPERATING MANUAL RW SERIES WALL-MOUNT RECTIFIERS INSTALLATION & OPERATING MANUAL RW SERIES WALL-MOUNT RECTIFIERS WWW.UNIPOWERTELECOM.COM Manual No. RW-1 2008 UNIPOWER Corp. 01/24/08 rw-man All Rights Reserved UNIPOWER Telecom, Division of UNIPOWER Corporation

More information

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor

Secondaries. arc flash note Introduction. By Mike Lang, engineer and. Services Supervisor Reducing Arc Flash Energies on Transformer Secondaries arc flash note 6 By Mike Lang, principal field engineer and Dave Komm, Technical Services Supervisor 1. Introduction Arc flash incident energy calculations

More information

AME. Rectifier - Battery charger. Industrial applications: Key features:

AME. Rectifier - Battery charger. Industrial applications: Key features: Rectifier - Battery charger AME VRLA batteries, flooded battery or Ni/Cd with output voltage from 24, 48, 110, 220 Vdc up to 150A Industrial applications: Oil&Gas (Petrochemicals Offshore, Onshore, Pipelines);

More information

Residual Current Circuit-breaker (RCCB) FH 200 Series

Residual Current Circuit-breaker (RCCB) FH 200 Series Residual Current Circuit-breaker (RCCB) FH 200 Series Bi-directional cylindrical terminal ensure higher safety of connecting operations, making them easier. Test pushbutton to verify the correct functioning

More information

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL SYSTEMS AND CONSTRUCTION NQF LEVEL 4 NOVEMBER 2009

NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL SYSTEMS AND CONSTRUCTION NQF LEVEL 4 NOVEMBER 2009 NATIONAL CERTIFICATE (VOCATIONAL) ELECTRICAL SYSTEMS AND CONSTRUCTION NQF LEVEL 4 NOVEMBER 2009 (12041034) 12 November (Y-Paper) 13:00 16:00 This question paper consists of 6 pages. (12041034) -2- NC730(E)(N12)V

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

(with Class-1 AC resistive load) 3. G3PB-215B-2N-VD kW max. (25 A) G3PB-225B-3N-VD 2. G3PB-225B-2N-VD kw max. (35 A) G3PB-235B-3N-VD 2

(with Class-1 AC resistive load) 3. G3PB-215B-2N-VD kW max. (25 A) G3PB-225B-3N-VD 2. G3PB-225B-2N-VD kw max. (35 A) G3PB-235B-3N-VD 2 Solid-state Contactor (New Heat Sink Construction) G3PB Space and working time saved with new heat sink construction. Series now includes 480-VAC models to allow use in a greater range of applications.

More information

Wilo-Control SC-Fire Jockey

Wilo-Control SC-Fire Jockey Pioneering for You Wilo-Control SC-Fire Jockey de en fr Einbau- und Betriebsanleitung Installation and operating instructions Notice de montage et de mise en service nl Inbouw- en bedieningsvoorschriften

More information

Specification for 70mm pole pitch Air circuit breaker up to 1600 A

Specification for 70mm pole pitch Air circuit breaker up to 1600 A Specification for 70mm pole pitch Air circuit breaker up to 1600 A Protective device for low voltage electrical installation Last update :2011-07-08-1 - Table of contents: 1 General...3 2 Compliance with

More information

PGR-8800 ARC-FLASH RELAY

PGR-8800 ARC-FLASH RELAY Arc-Flash Relay PGR-8800 PGR-8800 ARC-FLASH RELAY REVISION 3-C-040816 ARC-FLASH RELAY PGR-8800 SERIES Document Number: PM-1400-EN www.littelfuse.com 2016 Littelfuse 1/86 This page intentionally left blank.

More information

FUSERBLOC CD. The universal Fuse Combination Switch FROM 20 TO 1250 A. Industrial Switching & Protection Systems

FUSERBLOC CD. The universal Fuse Combination Switch FROM 20 TO 1250 A. Industrial Switching & Protection Systems FUSERBLOC CD The universal Fuse Combination Switch FROM 20 TO 1250 A SOCOMEC GROUP SWITCHING PROTECTION & UPS Industrial Switching & Protection Systems SWITCHING FUSERBLOC CD THE UNIVERSAL FUSE COMBINATION

More information

NPS/003/016 Technical Specification for 48V and 110V Battery and Charger Systems

NPS/003/016 Technical Specification for 48V and 110V Battery and Charger Systems Version:- 2.1 Date of Issue:- August 2016 Page 1 of 28 NPS/003/016 Technical Specification for 48V and 110V Battery and Charger Systems 1. Purpose The purpose of this document is to detail the technical

More information

EPS-ECONOMY PUMP STARTER

EPS-ECONOMY PUMP STARTER EPS-ECONOMY PUMP STARTER 1 & 3 Phase, 50/60Z, 200-600 VAC, 1-80A The enhanced Franklin Electric Economy Pump Starter (EPS) provides a simple and dependable starting option with a wide electronic overload

More information

Functions provided by measuring relays in railway equipment

Functions provided by measuring relays in railway equipment Functions provided by measuring relays in railway equipment 1-Current relays -Minimum current relays (During normal operation, if the current is present these relays are in operating position and switch

More information

Effective discrimination of protective devices

Effective discrimination of protective devices Effective discrimination of protective devices In the event of a fault occurring on an electrical installation only the protective device nearest to the fault should operate,leaving other healthy circuits

More information

Arc flash hazard mitigation

Arc flash hazard mitigation Low Voltage Products Arc flash hazard mitigation Each year more than 2,000 people are treated in burn centers with severe arc flash injuries. ABB designs and manufactures products and solutions to provide

More information

Cat/DCG-6D1I/07-08/03/Ver 1 Page 2/10

Cat/DCG-6D1I/07-08/03/Ver 1 Page 2/10 Cat/DCG-6D1I/07-08/03/Ver 1 Page 2/10 Index 1.1 Introduction 1.2 Salient Feature of the DGC-6D 1.2.1 Protection & Supervision 1.2.2 Measurement & Display 1.2.3 LED Indications 1.2.4 Timer 1.3 Function

More information

GJL 100 A Molded Case Circuit Breaker GJL 75 A Motor Circuit Protector

GJL 100 A Molded Case Circuit Breaker GJL 75 A Motor Circuit Protector GJL 100 A Molded Case Circuit Breaker GJL 75 A Motor Circuit Protector Catalog 0500CT9702R409 2009 Class 525/580 CONTENTS Description............................................. Page General Characteristics...................................

More information

Texas A&M Microgrid and Electrical System Study. Cushing Memorial Library & Archives

Texas A&M Microgrid and Electrical System Study. Cushing Memorial Library & Archives Texas A&M Microgrid and Electrical System Study Cushing Memorial Library & Archives Introduction of Texas A&M Microgrid Study Purpose Why are we studying the TAMU electrical system? Process How do we want

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 26 13 13 MEDIUM VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General

More information

VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines

VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines Installation and Users Manual For the following Prelube Kits: VARNA Products P/N 6423 Kit for 208 VAC 3 Phase VARNA Products

More information

Installation and Operation Smart-UPS SUA500PDR

Installation and Operation Smart-UPS SUA500PDR Installation and Operation Smart-UPS SUA500PDR Mount the UPS on DIN Rail This unit is designed to mount on a heavy duty DIN rail or on the back panel of an enclosure. For details on DIN rail installation

More information

Medium Voltage Distribution Catalogue Flusarc Make the most of your energy

Medium Voltage Distribution Catalogue Flusarc Make the most of your energy Medium Voltage Distribution Catalogue 2012 Flusarc 40.5 Make the most of your energy Flusarc switchgear 40.5 kv - 630 A - 20 ka General contents Overview 3 General characteristics 7 Description 11 Installation

More information

Supply, testing, installation and commissioning of 5 ky A UPS system as per the following specification:

Supply, testing, installation and commissioning of 5 ky A UPS system as per the following specification: Supply, testing, installation and commissioning of 5 ky A UPS system as per the following specification: 1 Capacity 5 ky A UPS system with APFC system 2 Input supply Suitable for400±15% Y, 3 phase, 50

More information