UPG1000 & Windshield. Manual
|
|
- Chrystal Martin
- 5 years ago
- Views:
Transcription
1 UPG1000 & Windshield. Manual Short System Description: Photo 1. Complete UPG1000. The full UPG1000 system comes in three main parts. The actual UPG1000 gauge, the Control Box and pedestal and the wind shield (for extreme sites). The UPG1000 (Universal Precipitation Gauge) uses gentle heating to enable it to measure snow. This heat is controlled by a CR800 logger contained in the Control Box attached to the pedestal stand. The heating mechanism is made up of two main sections; the funnel section and the internal heating. There are heater mats and four PRT100 sensors embedded in the funnel which keeps the funnel above a set temperature. Inside the base of the gauge are two sets of ceramic heaters, another PRT100 sensor and another small heater mat (attached to the brass nozzle). This is also set in the logger program to be kept above a set temperature. We send out the gauges as standard with the funnel and internal temperatures both set at a default 3oC in the logger program. This can be changed in the program to fine tune an installation (please contact us for help with this is needed). The gauge outputs an industry standard tipping bucket contact closure pulse output. This equates to 0.1mm of precipitation.
2 Photo 2. Crate 1 UPG1000.
3 =. Photo 3. Crate 2 Pedestal, power & control equipment.
4 Photo 4. Crate 3 wind shield. (Note: crate 3 has been packed in assembly order)
5 Unpack pedestal from crate 2 and fit to your concrete base using the three bolts supplied (Photo 3 & Photo 5). Use pedestal base to mark out hole locations. Put the power supply away for installation later. Photo 5.
6 Next, unpack the top plate and two cross arms from crate 3. Place on the top of the pedestal and fit the cross arms to the plate (as shown in Photo 6). Note: The plate is marked with TOP, FACE A and FACE B. This matches up to the cross arms that are marked FACE A and FACE B. Make sure the cross arms are fitted on the right sides. Also measure the overhang of each arm and make sure they are equal. Note: The top plate will line up with the drain holes once the gauge is attached. Photo 6. Top Plate.
7 Unpack the UPG1000 from crate 1 and remove the funnel (by removing the three nuts). Wire the base by inserting the large power cable through the large gland and the smaller grey output cable through the small gland as shown in photo 7. Wire are shown in photo 8 and wiring notes. Photo 7. Wiring the base.
8 Photo 8. Wiring the base. Wiring notes (looking left to right as above wires in bold to be fitted by user): 7-Way Connector (power and control): Connector (1) (2) (3) (4) (5) (6) (7) Internal parts Red (Temp Sensor) Red (Temp Sensor) White (Temp Sensor) Blue (Heater 1) Blue (Heater 2) Blue (Heater 1) Blue (Heater 2) From Control box (user fitted) Grey (Temp Sensor PT100) Black (Temp Sensor PT100) Yellow/Green (Temp Sensor PT100) Blue (Gnd supply) Black link(1) - Fitted Black link(2) - Fitted Brown (24V supply) 2-Way Connector (Contact Closure Gauge Output): Connector (1) (2) Internal parts Black - Contact Closure (1) White - Contact Closure (2) From Control box (user fitted) Black - Output White Output
9 Next, fit the plastic drains as shown in Photos 9 and 10. Photo 9. Fitting the drains. Photo 10. Fitting the drains.
10 Now, fit the base of the gauge to the top plate using the bolts supplied (Photos 11 and 12). Make sure the gauge is level using the black adjusters (photo 12) and the fitted spirit level. Note: It is advised to check that the gauge is level at the end using a large spirit level across the top of the gauge funnel. Photo 11. Fitting the base. Photo 12. Fitting the base.
11 Fit the funnel to the base, this will also act as projection for when you fit the sides of the wind shield. Photo 13.
12 There two types of side panels, four fixed panels and four removable panels. The fixed panels are marked with numbers; match these numbers with the ones on the end of the cross arms until all four sides are fitted (Photo 14). Photo 14.
13 When the fixed panels are all attached it should look like Photo 15. Photo 15. The remaining four panels have brackets with slots in, these slots fit under the black hand wheels or M6 nuts and washers. The brackets have letters on them; line these up with the letters on the fixed panels (Photo 16). Photo 16.
14 When all four removable panels are fitted it should look like Photo 17. Photo 17. There are four metal guy ropes supplied, these can be fitted from the corners or wrapped around the cross arms depending on the local ground and site conditions. One end of the guy rope is left unterminated so you can shorten as required. Use three wire rope grips on each guy rope (Photo 18). Photo 18.
15 Now that the gauge and shield are all assembled, we need to work on the Control Box attached to the pedestal. The gauge contact closure output is connected to the on-board control data logger (for our own test use), disconnect the wire between DIN rail connectors 11 and 12 and the logger. Then connect your contact closure cable from your logging system to 11 and 12 on the DIN rail (Photo 19). Photo 19.
16 Control Box Wiring notes (pre-wired apart from user outputs (11 and 12)): DIN Connector Description (1) 24V DC (2) DC Ground (3) 24V DC (Funnel Relay) (4) Switched Funnel Heater supply (24V DC ON, 0V DC OFF) (5) Control (Logger) Ground (6) C1 Control (Logger) Funnel Heaters (7) Control (Logger) Ground (8) C2 Control (Logger) Internal Heaters (9) 24V DC (Internal Relay) (10) Switched Internal Heater supply (24V DC ON, 0V DC OFF) (11) Contact Closure Output (1) (12) Contact Closure Output (2)
17 Fit the Power supply as in the DRP-480S-24 Manual then fit the supplied fuse (to the fuse holder above DIN connector 12) and turn the CH100 on (This will start the whole system). Photo 20.
ARG100 Rain Gauge User Manual
ARG100 Rain Gauge User Manual UM-780-001-ARG100 V1.00 PUBLISHED BY Environmental Measurements Limited (EML) 7 Jupiter Court Orion Business Park North Shields NE29 7SE United Kingdom Visit our internet
More informationRS-110 Rainfall Sensor Installation Guide
RS-110 Rainfall Sensor Installation Guide for XR440 and XR5 Data Loggers September 2015 Revision 1.1 1 Disclaimer The following warranty and liability disclaimer apply to this product. PACE SCIENTIFIC
More informationNissan GTR Alpha Fuel System
Nissan GTR Alpha Fuel System Instructions V5 The goal of AMS is to provide the highest quality, best performing products available. By utilizing research and development, and rigorous testing programs
More informationSBS Range Rain Gauge User Manual
SBS Range Rain Gauge User Manual PUBLISHED BY Environmental Measurements Limited (EML) 7 Jupiter Court Orion Business Park North Shields NE29 7SE United Kingdom Visit our internet pages at http://www.emltd.net
More informationKalyx-RG Rain Gauge User Manual
Kalyx-RG Rain Gauge User Manual PUBLISHED BY Environmental Measurements Limited (EML) 7 Jupiter Court Orion Business Park North Shields NE29 7SE United Kingdom Visit our internet pages at http://www.emltd.net
More informationHD [ GB ] Tipping bucket rain gauge
HD 2015 [ GB ] Tipping bucket rain gauge [ GB ] [ GB ] Description The HD2015 is a reliable and sturdy bucket rain gauge, entirely constructed of corrosion resistant materials in order to guarantee its
More informationINSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL HS305
INSTRUCTION MANUAL TIPPING BUCKET RAINGAUGE MODEL HS305 HS305 100-01 CONTENTS Page I General HS305 100-03 II Specification HS305 100-03 III Installation HS305 100-04 IV Test Operation HS305 100-05 V Maintenance
More informationWPS-104 Heater. Installation Instructions
WPS-104 Heater Installation Instructions For 2007 vehicles see page 15 WPS 104 HEATER SYSTEM INSTALLATION INSTRUCTIONS If this is a complete installation of top, windshield and heater system, for ease
More informationWiper motor bolt and spacer. 3. Place relays as shown in picture so you can route the wires.
TSB Fan Relay Kit Please refer to a factory repair manual when working on your car. 1. Disconnect battery cables from the battery. 2. Remove bolt and spacer from wiper motor as shown in the picture. Wiper
More informationQSI (Q-Star) Electronics Owner s Manual
QSI (Q-Star) Electronics Owner s Manual QSI Module (Installs in Plain Cover Plate) QSI2 Shown QSI Module (Installs in Display Mount Cover Plate) QSI2 Shown TABLE OF CONTENTS INTRODUCTION... 2 IMPORTANT
More informationHeaters for diesel D 5 S 12 V D 5 S 24 V A WORLD OF COMFORT
Vehicle Heaters Technical Documentation EN Spare parts list Hydronic II C The spare parts list is only valid for the following engineindependent water heaters Heaters for diesel D 5 S 12 V 25 2506 05 00
More informationProduct Instructions. Mixing Station. Features. Specifications. Materials
Mixing Station The Viega Mixing Station provides supply water temperature modulation when connected to a variety of heat sources such as conventional or condensing boilers, water heaters, or geothermal
More informationContinuous level measuring system NB 4000 Selection list
Table of contents Page Overview P2 Specification / application P3 P4 Options / Accessories P6 Dimensions / materials P7 Spare parts P9 Electrical installation P11 Subject to change. All dimensions in mm
More informationHOBO Data Logging Rain Gauge (RG3 and RG3-M) Manual
HOBO Data Logging Rain Gauge (RG3 and RG3-M) Manual The Data Logging Rain Gauge consists of two major components: a Tipping-Bucket Rainfall Collector, and a HOBO Event/Temperature Data Logger. The collector
More informationHOBO Data Logging Rain Gauge (RG3 and RG3-M) Manual
HOBO Data Logging Rain Gauge (RG3 and RG3-M) Manual The Data Logging Rain Gauge consists of two major components: a Tipping-bucket Rainfall Collector, and a HOBO Event/Temperature Data Logger. The collector
More informationGROB 4V-24 Parts. GrobBandSaw.com
GROB 4V- Parts GrobBandSaw.com 888-550-3116 18 19 20 21 22 5/16-18x1/2 Hex Head Cap Screw ( 14 ) 34 35 36 37 38 39 40 39 41 42 43 44 45 46 17 16 3/8-16x3/4 Hex Head Cap Screw ( 2 ) 31 30 15 5/16-18x1 Hex
More informationUse and Care Instructions for your new T5 Turgo Micro-Hydroelectric Generator
Use and Care Instructions for your new T5 Turgo Micro-Hydroelectric Generator READ THIS FIRST This manual contains important information concerning your new APR T5 Turgo microhydroelectric generator. You
More informationJacobsen 600 Series Ransomes 700 Series
Jacobsen 600 Series Ransomes 700 Series Parts List & Mounting Instructions Jodale Perry Printed: 2004/01 Standard Parts List Qty Description Photo L&R Rear Mounting Brackets L&R Front Mounting Brackets
More informationT-200B SERIES PRECIPITATION GAUGE
GEONOR T-200B SERIES PRECIPITATION GAUGE MANUAL FOR 600-mm, 1000-mm & 1500-mm capacity gauges 1 TABLE OF CONTENTS 1. INTRODUCTION PRECIPITATION GAUGE... 3 1.1. Principle of Operation... 3 1.2. Why is it
More informationExample of Combining Different Types of Heater Control. Heater control. Temperature Controller
Technical Guide for Power s CSM_Power_s_TG_E_5_1 Overview of Power s Example of Combining Different Types of Heater Control Heater control Manual G32X-V2K E5@ series Current output Current output Voltage
More informationHOBO Data Logging Rain Gauge (RG3 and RG3-M) Manual
HOBO Data Logging Rain Gauge (RG3 and RG3-M) Manual The Data Logging Rain Gauge consists of two major components: a Tipping-Bucket Rainfall Collector, and a HOBO Event/Temperature Data Logger. The collector
More informationI. SIM card preparation 3 II. Installation into a vehicle 3. III. Most common issues and their solutions 9 III. Attachments 10
Contents I. SIM card preparation 3 II. Installation into a vehicle 3 1. Placement of the unit 3 2. Connecting the wiring harness 4 2.1 Input - IGNITION 6 2.2 Input ALARM INPUT 6 2.3 Output (switching relay)
More informationSCC 201 E Valid as of E21SE0404 up to E21SE... SCC 201 E
Electrical unit Voltage 3NAC 400V 50-60Hz 1 1 Control panel 2 2 Electrical installation 3 3 Clima Plus 4 4 Steam generator, Bypass 5 5 Hot air heating 6 6 Motor and fan wheel 7 7 Interior cabinet 8 8 Door
More informationThis is the layout of a typical harness form a TPI Camaro.
TPI wiring harness, typical 1986-89: This is the layout of a typical harness form a 1986-88 TPI Camaro. (A) bulkhead conn. through firewall. (B) ecm conn. (C) jct. conn for fuel injectors and cooling fan.
More informationMustang. Installation Manual. Revision 11/16/10
1967-1968 Mustang Installation Manual Revision 11/16/10 I Table of Contents TABLE OF CONTENTS...II WELCOME TO THE TEAM OF CLASSIC INSTRUMENTS!... III REMOVE ORIGINAL INSTRUMENT PANEL...1 DETERMINE SPEEDOMETER
More informationCATALOG OF REPLACEMENT PARTS W32/W32C/625A WRAP STATION ML-44103, ML ML-44105, ML ML-26243
CATALOG OF REPLACEMENT PARTS W32/W32C/625A WRAP STATION W32 W32C 625A HP ML-44103, ML-26320 ML-44105, ML-26331 ML-44069 ML-26243 A product of HOBART CORPORATION 701 S. RIDGE AVENUE TROY, OHIO 45374-0001
More information2016 HONDA 1000 Pioneer PN 3102 Turn signal / horn kit rev nc
2016 Honda 1000 Pioneer STOP - THIS KIT IS DESIGNED SPECIFICALLY FOR 2016 HONDA 1000 PIONEER IF YOUR MACHINE IS NOT THIS MODEL DO NOT PROCEED. THIS KIT DOES NOT WORK ON THE PIONEER 500 nor 700 S. Contact
More informationSCC 62 E Valid as of E62SE0404 up to E62SE...
Electrical unit Voltage 3 NAC 400V 50-60Hz 1 1 Control panel 2 2 Electrical installation 3 3 Clima Plus 4 4 Steam generator, Bypass 5 5 Hot air heating 6 6 Motor and fan wheel 7 7 Interior cabinet 8 8
More informationModel OC-25 Oil Centrifuge with Air Assist Oil Return
PO BOX 7670, Auburn, CA 95604 USA Telephone 530-613-2150 Fax 530-823-7078 Email sales@dieselcraft.com www.dieselcraft.com Model OC-25 Oil Centrifuge with Air Assist Oil Return For Diesel and Gasoline Engines
More informationRain Gauge RG13 and RG13H USER'S GUIDE
Rain Gauge RG13 and RG13H USER'S GUIDE D210220EN-A April 2004 PUBLISHED BY Vaisala Oyj Phone (int.): +358 9 8949 1 P.O. Box 26 Fax: +358 9 8949 2227 FIN-00421 Helsinki Finland Visit our Internet pages
More informationECHO 8 Kit - Installation Manual
ECHO 8 Kit - Installation Manual P/N: 20 2900 81 0828 0A SUBJECT: BENEFITS: EBERSPAECHER CARGO HEAT OPTION (D8LC) Provides comfort heat for working vans and trucks. Protects valuable loads from low temperatures.
More informationANEMOMETER Vaisala WAA252
ANEMOMETER Vaisala WAA252 SIGNAL OUTPUT ELECTRICAL SUPPLY HEATING SUPPLY MODEL IN EOL MANAGER 0...750 Hz square wave 5...15 VDC 10mA typ. 24 VDC
More informationM MA. M MA 125mA M205-2A M MA M MA M MA M MA. M MA 100mA M A 1.6A
Australux 5 x 20mm M205 RATING RATING M205-100MA 100mA M205-1.6A 1.6A M205-125MA 125mA M205- M205-160MA 160mA M205-2. 2. M205-200MA M205-3.1 3.1 M205-250MA M205-4A 4A M205-315MA M205-400MA M205- M205-6.3A
More informationTABLE OF CONTENTS. Contents CONTENTS... PAGE. Jan 2006 COPYRIGHT. Tipping Bucket Rain Gauges User Manual. Tipping Bucket Rain Gauges User Manual
Jan 2006 Contents TABLE OF CONTENTS CONTENTS................ PAGE 1. INTRODUCTION........................... 3 Tipping Bucket, Heated Tipping Bucket Rain Gauges & Rain Gauge That Meets The Requirements
More information500 Series - Service Manual
Manual Exploded View Recommended Parts List Part Number Merrychef EC/RD 501-503 Ovens Description Recommended Minimum Stock Holding & Kits Qty Per Oven Unit 1-10 Ovens 11-50 51-100 Ovens Ovens 1st Aid/To
More informationTYPE 5867 PORTABLE Q METER
IMPORTANT: Please read these instructions carefully before operating instrument SUBJECT TO CHANGE WITHOUT NOTICE This manual superseded all previous versions please keep for future reference TINSLEY, A
More informationUsing the Gratec Gasoline software
Using the Gratec Gasoline software The Gratec Software is a sophisticated yet user friendly program in which configures the Gratec CNG or LPG system to perform with your vehicle. Software version 2.002
More information4. Remove (4) 10mm and (1) 7mm bolt that holds fascia at front corners, on each side
2010 Camaro LS3 1. Disconnect battery ground 2. Remove front wheels 3. Remove (5) push pins and (5) #20 torx screws on inner front wheel well liners and remove liners on each side 4. Remove (4) 10mm and
More informationMALLORY FIRESTORM CD MULTI COIL HARDWARE INSTALLATION - PN 69150C / 69150R
FORM 69150C/R MALLORY FIRESTORM CD MULTI COIL HARDWARE INSTALLATION - PN 69150C / 69150R To ensure you are using the most current instruction sheet, please visit www.malloryfirestorm.com. CAUTION! The
More informationTCM D Single Zone, 24 Volt DC Timer Control Module User s Manual D-M-E Company
TCM-03-024D Single Zone, 24 Volt DC Timer Control Module User s Manual D-M-E Company D-M-E Company TCM-03-024D Page 1 SAFETY D-M-E Company products have been designed to be safe and simple to operate.
More informationInstrument Enclosure Assemblies
Instrument Enclosure Assemblies Standard instrument enclosure Instrument enclosures offer a simple solution for the customer who doesn t have the time to install Signet meters into panels. Whether it s
More informationSOLAR PARK LIGHTS COLOR OPTIONS. Solar Light Area Light
DL-PL12-SOL DL-AL12-SOL Solar Light Area Light The Solar Park Light provides easy, off-the-grid security lighting through renewable energy. It offers a slender design that can be ordered as a complete
More informationContinuous level measuring system. LevelMax. Selection Guide. Overview 2
Table of contents Page Overview 2 ------------------------------------------------------------------- Specification / application 3 ------------------------------------------------------------------- 4
More informationTECHNICAL MANUAL PERGOLAS
EN TECHNICAL MANUAL PERGOLAS Content - Pergolas MIRA 4 Basic Product Specification 5 MIRA 10 Basic Product Specification 11 MIRA 4, MIRA Measurement and assembly 19 Accessories 0 A mark symbolising long
More informationECT SENSOR 2 2P CONNECTOR. Clamp the main wire harness and the ECT sensor 3 wire as shown.
CABLE/ ROUTING VIEWED FROM THE UPPER RIGHT REAR SIDE: Clamp the main wire harness and the ECT sensor 3 wire as shown. After securing the cables and harnesses with the harness band clips, cut the end of
More informationDo isolate the power supply from other high power systems such as Stereos and Alarms
Thank you for purchasing a Smart Ride Air Management System, AIRBAGIT.COM s premier flagship product. This system will meet all of your custom and utility needs and will provide you years of trouble free
More informationTHE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 DPL Building Courthouse Plaza Southwest Dayton, Ohio P.U.C.O. NO. 1
THE DAYTON POWER AND LIGHT COMPANY Original Sheet No. 15 SCHEDULE 1 Schedule of fees and charges used for determining sacrifice value, excess height and/or strength and sale costs of poles. Year % Set
More informationMALLORY FIRESTORM CD MULTI COIL HARDWARE INSTALLATION - PN 69050S / 69050R
FORM 69050S/R MALLORY FIRESTORM CD MULTI COIL HARDWARE INSTALLATION - PN 69050S / 69050R To ensure you are using the most current instruction sheet, please visit www.malloryfirestorm.com. CAUTION! The
More informationCHALLENGER TWIN TURBO SYSTEM INSTALLATION INSTRUCTIONS
CHALLENGER TWIN TURBO SYSTEM INSTALLATION INSTRUCTIONS 1 Verify contents of kits with supplied packing list 1) Unhook the battery. 2) Remove wheel wells & front fascia of vehicle. 3) Remove the catalytic
More informationThank you for purchasing the Craven Speed FlexPod Complete Gauge Pod Kit
Thank you for purchasing the Craven Speed FlexPod Complete Gauge Pod Kit Before You Start Please read instructions completely before installing. These instructions contain the information required to install
More informationHybrid XT Retrofit GE 1.5 SLE Turbines
NRG Retrofit Kits #5388 & #5389 Authors: Technical Services TABLE OF CONTENTS SUMMARY... 3 WARNING AND NOTICES... 3 GROUNDING AND MOUNTING CONSIDERATIONS... 3 TOOLS AND MATERIALS REQUIRED... 4 Materials...
More informationSPARE PARTS LIST. for. Infrared oil heater. Model. Type. EPX5 for 120V 60Hz. May, 2017
SPARE PARTS LIST for Infrared oil heater Model Type EPX5 for 120V 60Hz May, 2017 *PRICES AND SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE* 2017 J.S.O'will, Inc.. Shizuoka Seiki Co. Ltd. All Rights
More informationMETEOROLOGICAL INSTRUMENTS
METEOROLOGICAL INSTRUMENTS INSTRUCTIONS PRECIPITATION GAUGE MODEL 50202 / 50203 R.M. YOUNG COMPANY 2801 AERO PARK DRIVE, TRAVERSE CITY, MICHIGAN 49686, USA TEL: (231) 946-3980 FAX: (231) 946-4772 WEB:
More informationSTORM Guardian. Operator s Handbook
STORM Guardian Operator s Handbook COPYRIGHT The copyright in this document which contains proprietary information is vested in CASELLA. The contents of this document must not be used for purposes other
More information5600 Control Valve. Bypass Piping Boss Inlet & Outlet. Distributor Tube and basket. Brine Well. Brine Line. Over-Flow (Optional) $1.
Brine Well Distributor Tube and basket Safety-Cut Off (Optional) $8.00 extra Air Check Assembly Over-Flow (Optional) $1.00 extra 5600 Control Valve Gravel (Optional) Bypass Piping Boss Inlet & Outlet Brine
More informationINSTRUCTIONS for the Model GVL GLASS-VU LOADER
INSTRUCTIONS for the Model GVL GLASS-VU LOADER Rev.7 06//5 Model: GVL-0 MAGUIRE PRODUCTS INC. Crozerville Road Aston, PA 90 USA 60-59-00 Installing the GVL GlassVu Loader ---General--- Electrical Connection
More informationCrop Link Pro/Lite Flowmeter Wiring Manual
2016-18 Crop Link Pro/Lite Flowmeter Wiring Manual Revised January 1, 2018 Items Covered In This Manual: Page 1: Crop Link Pro/Lite Device Overview Page 2: Netafim/Dwyer Mechanical Flow Meter Wiring Page
More informationSystem components for sample gas sampling
Data Sheet 10/23-5.10 EN Rev. 9 System components for sample gas sampling Modular sample gas probe system FE2 Filter unit Annular heating element Heating sleeve PFE2 Filter unit PFE3 Filter unit Type 40,
More informationDigital Application Sheet
VEHICLE MANUFACTURER MODEL YEAR OF MANUFACTURE ENGINE TYPE TRANSMISSION VOLTAGE LDV SI/006 MAXUS 2006 Euro 4 2.5 CRD Manual, 5 Speed. 2v STONERIDGE DIGITAL KIT FOR THIS VEHICLE: 7800-059 PARTS LIST QUANTITY
More informationVW Surface-Mount Strain Gauge
VW Surface-Mount Strain Gauge 52650399 Copyright 2003 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any
More informationInsulated Crimp Terminals
CONTENTS PVC Insulated ring terminals 3 PVC insulated spade terminals 3 PVC insulated pin terminals 4 PVC insulated blade terminals 4 PVC insulated butt connectors 4 PVC insulated female disconnectors
More informationMODEL HSC-24 AUTOMATIC SNOW/ICE MELTING SYSTEM CONTROL PANEL
MODEL HSC-24 AUTOMATIC SNOW/ICE MELTING SYSTEM CONTROL PANEL DESCRIPTION The Snow Switch Model HSC-24, 24-volt Pavement-Mounted Snow and Ice Sensor reliably detects snow and ice conditions on pavement
More informationSILENCER ACCESSORIES
GLAUNACH THE SILENCER HANDBOOK SILENCER ACCESSORIES CUSTOMISING SILENCERS TO SPECIFIC NEEDS GLAUNACH GMBH 2010 - ALL RIGHTS RESERVED - Part III page 2 of 10 LIFTING LUGS device transport and installation
More informationXtalin Accumulator Monitoring System and. Xtalin Accumulator Balancing System devices
www.xtalin.com lagler@xtalin.com Xtalin Accumulator Monitoring System and Xtalin Accumulator Balancing System devices Datasheet - Public Table of content 1. List of abbreviations... 4 2. List of all AMS
More informationEG / DC2 Conversion Harness
EG / DC2 Conversion Harness Part # KTH-EG-DC2 Applications: 1992-1995 EG Civic / 1994-2001 DC2 Integra Important NOTE: Please read all instructions very carefully as K-Tuned are not responsible for any
More informationOperating Instructions. Pneumatic Control Valve Low Temperature. Type Series GS3
Operating Instructions Pneumatic Control Valve Low Temperature Type 8026 Series GS3 With: Digital Positioner Type 8048 Electro-pneumatic Positioner Type 8047 Pneumatic Positioner Type 8047 Version: 03/2006
More informationCamaro Camaro
Important facts about this kit. 1. The dash panel used in this picture is used by permission of Covan's Classic. We Make Wiring Easy! 2. This kit requires some modification to your original under dash
More informationUser Guide. Panel Mount Digital Tachometer. Model Washington Street Melrose, MA Phone Toll Free
99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com Back to the Extech 461950 Product Page User Guide Panel Mount Digital Tachometer
More informationTurn Signal / Horn Kit PN 7101 by All years Polaris RZR 1000 and RZR 900, 900-4, 900 trail, 900S and 900XC STOP - THIS KIT IS DESIGNED
All years Polaris RZR 1000 and 1000-4 2015 RZR 900, 900-4, 900 trail, 900S and 900XC STOP - THIS KIT IS DESIGNED SPECIFICALLY FOR ALL YEAR AND MODEL POLARIS RZR 1000 AND 1000-4. ALSO THE 2015 POLARIS RZR
More informationInstatherm ACE. The Safest Heating Method! Eliminate the need for heating tapes, immersion heaters and heating mantles P.
ACE For Glass Vessels Borosilicate Glass Fused-to-Glass Conductive Heating Film Integral Outer Insulation Instatherm The Safest Heating Method! Eliminate the need for heating tapes, immersion heaters and
More informationPart Number AEM 4-CH WIDEBAND UEGO CONTROLLER
Part Number 30-2340 AEM 4-CH WIDEBAND UEGO CONTROLLER FIGURE 1. WIRING DIAGRAM AEM Performance Electronics 2205 126 th Street Unit A, Hawthorne, CA. 90250 Phone: (310) 484-2322 Fax: (310) 484-0152 http://www.aemelectronics.com
More informationWe have had a request for instructions on how to replace the 50 AMP CR relay in the A/C electrical box with the upgraded 70 AMP relay.
We have had a request for instructions on how to replace the 50 AMP CR relay in the A/C electrical box with the upgraded 70 AMP relay. This Carolina Thomas Bus Buzz provides instructions as to how we go
More informationSpare parts list ( ) Spare parts list BR/BD 53/40 W EN
Spare parts list (5.970-069.0) Spare parts list BR/BD 53/40 W 17.02.2014 EN Table of contents Spare parts list BR/BD 53/40 W (5.970-069.0)... 3 10 Cover and motor... 4 20 Individual parts... 7 30 Chassis...
More informationMotor Protection. Presented By. Scott Peele PE
Motor Protection Presented By Scott Peele PE Motor Protection Overload on the motor load Fuses Heater Magnetic relay Short Circuit on motor circuit Fuses Breakers Single Phasing Overload Protection NEC
More informationLevel limit switch Series RF 3000 Selection list
Table of content Page Overview P2 Applications P4 ------------------------------------------------------------------------------------------------------------- RF 3100 Standard version P6 -------------------------------------------------------------------------------------------------------------
More informationTop quality for professionals. sales aids and irrigation trays. Page 1
Top quality for professionals sales aids and irrigation trays 4 Page 1 Irrigation trays Irrigation trays, made from black plastic, thick walls, material thickness 5 mm, with grooves and drain with plug
More informationTurny Evo. Autoadapt. Seat lift. Installation manual
Turny Evo Autoadapt Seat lift EN Installation manual Getting seated Turny Evo Thank you for choosing a Turny Evo from Autoadapt! The manual that follows is an integral, important part of the product,
More informationHeiland electronic GmbH TAS
Heiland electronic GmbH TAS Filmprocessor User manual Version 3.5 Content 1 General 3 2 The Product 4 3 Safety regulations 5 4 Installation 6 5 Programming 9 6 Example for film development 12 7 Warranty
More informationINSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL HS305
INSTRUCTION MANUAL TIPPING BUCKET RAIN GAUGE MODEL HS305 QUALITY SYSTEM ISO 9001 2008 CERTIFIED HYQUEST SOLUTIONS PTY. LTD. PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA Phone:(Int.) +612 9601 2022 Fax:
More informationInstallation Instructions. Vitosol 100. Vitosol 100 Type w 2.5 Flat collector for flat roofs and freestanding installation Part No.
Installation Instructions Vitosol 100 Type w 2.5 Flat collector for flat roofs and freestanding installation Part No. 3001 970 Vitosol 100 8/99 Safety instructions This hazard symbol precedes all important
More information1963 GEN IV SUREFIT VINTAGE AIR CONDITIONING INSTALLATION
by Randy Irwin 1963 GEN IV SUREFIT VINTAGE AIR CONDITIONING INSTALLATION Randy Irwin - Technical Writer Randy has been involved in the Chevy parts business for over 30 years. He is a wizard at creating,
More information308E2 CR SB. Mini Hydraulic Excavator with Swing Boom
308E2 CR SB Mini Hydraulic Excavator with Swing Boom Engine Weights Engine Model* Cat C3.3B Operating Weight with Cab 8400 kg 18,519 lb Net Power (ISO 9249) 48.5 kw 65 hp Operating Specifications *Engine
More informationInstructions for the BASIC BCVA Rotary heat exchanger, Sizes
Instructions for the BASIC BCVA Rotary heat exchanger, Sizes 080 120 1. General The BCVA heat recovery unit is a rotary heat exchanger that offers high temperature efficiency. The heat exchanger operates
More information* PLEASE READ INSTRUCTIONS PRIOR TO INSTALLATION
XDP 6.0L Complete EGR Delete Kit w/up-pipe Item Number: XD169 PACKING LIST: 2 - Lined 3/4" Hose Clamps, 1-180 Coolant Tube, 1-3/4 Silicone Hose, 1 - Stainless Steel Up-pipe 1 - EGR Valve Block-Off Plate,
More informationPavement-Mounted Deicing Controller SNOW SWITCH MODEL HSC 24. Installation and Operation Manual
Pavement-Mounted Deicing Controller SNOW SWITCH MODEL HSC 24 MANUAL We Manage Heat Installation and Operation Manual Environmental Technology, Inc. 1850 N Sheridan Street South Bend, Indiana 46628 (574)
More informationMustang. Installation Manual
1967-1968 Mustang Installation Manual I Table of Contents TABLE OF CONTENTS... II WELCOME TO THE TEAM OF CLASSIC INSTRUMENTS!... III REMOVE ORIGINAL INSTRUMENT PANEL... 1 DETERMINE SPEEDOMETER SIGNAL...
More informationBLAST CLEANING MACHINE
TM 9-4940-658-4&P TECHNICAL MANUAL OPERATOR S, ORGANIZATlONAL, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL INCLUDING REPAIR PARTS LIST FOR BLAST CLEANING MACHINE MODELS 5L, 25L, 35W, 00, 200E,
More informationOperating Instructions. Angle Seat Control Valve. Type 7020
Operating Instructions Angle Seat Control Valve Type 7020 With: Digital Positioner Type 8048 Electro-pneumatic Positioner Type 8047 Pneumatic Positioner Type 8047 Version: 02/2006 Manual-7020e.doc Art.-No:
More informationTipping Bucket Assembly for Snow Lysimeters Installation and Use
Tipping Bucket Assembly for Snow Lysimeters Installation and Use SNOWMETRICS Fort Collins, CO 80522 USA 970-482-4279 snow@frii.com snowmetrics.com TABLE OF CONTENTS Introduction 2 Materials and construction
More informationAppliance nomenclature
Appliance unit 075410M 388920 388921 075407M 366544 386162 145897 384584 144688 386368 366405 075442M 075442N 145680 075444M 301476 301474 145886 384605 075443M 384153 366544 388990 367556 075329M 075329N
More informationELECTRIC ACTUATOR MOD. VB015 MAINTENANCE AND INSTALLATION INSTRUCTIONS OF VALBIA ELECTRIC ACTUATORS
ELECTRIC ACTUATOR MOD. VB015 MAINTENANCE AND INSTALLATION INSTRUCTIONS OF VALBIA ELECTRIC ACTUATORS TABLE OF CONTENTS 1.0 - WARNINGS 2.0 - GENERAL DATA 2.1 - Technical characteristics 2.2 - Data on electrical
More informationRSDCOM. Installation and Operation Guide. Commercial Rapid Shutdown Combiner. DOCR Published March 2017 Revision C English
f Commercial Rapid Shutdown Combiner RSDCOM Installation and Operation Guide Models: RSDCOM M-PC-1Z-4F RSDCOM M-PC-1Z-4F-24V RSDCOM M-PC-1Z-5F RSDCOM M-PC-1Z-5F-24V RSDCOM M-FG-2Z-4F RSDCOM M-FG-2Z-4F-24V
More informationData-Logging Rain Gauge PRODUCT MANUAL
Data-Logging Rain Gauge PRODUCT MANUAL Item # 3554WD1 Thank you for purchasing a Spectrum Datalogging Rain Gauge. With proper installation and care, it will give you years of accurate and reliable measurements.
More informationICS Integrated Cleaning System. Rechargeable Battery
ICS 8900 Integrated Cleaning System Rechargeable Battery THANK YOU FOR CHOOSING OUR PRODUCTS Hydro Systems manufactures quality chemical proportioners. Please use this equipment carefully and observe all
More informationSentinel Field Satellite Controller
WARNING HIGH VOLTAGE 115V M AP Sentinel Field Satellite Controller Installation Instructions Important: For your protection and the safety of the product user, please comply with all Caution and Warning
More informationVW Embedment Strain Gauge
VW Embedment Strain Gauge 52650199 Copyright 2003 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any errors
More informationLT2 Sport Lambda Measurement Device. Quick Start Manual
LT2 Sport Lambda Measurement Device Quick Start Manual 1.0 6/10/2014 Table of Contents Table of Contents 1 Getting Started... 3 2 Wiring... 4 3 Heater Control Strategy... 6 4 Lambda Sensor Installation
More information75L & 100L JACKETED ASSEMBLY INSTRUCTIONS FOR PROCESS REACTOR SYSTEMS N. Mill Road Vineland, NJ Phone: Fax:
3800 N. Mill Road Vineland, NJ 08360 Phone: 800.843.1794 Fax: 800.922.4361 ASSEMBLY INSTRUCTIONS FOR 75L & 100L JACKETED PROCESS REACTOR SYSTEMS 1/4 HP Electric Stirrer Motor High Efficiency Condenser
More informationMetro# Description Note Photo Ref# Dust Rubber- 32mm W x 33.5mm OAL
Hitachi Metro# Description Note Photo Ref# 71-82113 Dust Rubber- 32mm W x 33.5mm OAL 16817 71-82116 Dust Rubber- 71-82133 Grommet- Motor 71-82134 Grommet- Motor 71-82135 Grommet- Motor 1.4kw, Low Torque
More informationASSEMBLY INSTRUCTIONS FOR UNJACKETED FILTER REACTOR SYSTEMS
3800 N. Mill Road Vineland, NJ 08360 Phone: 800.843.1794 Fax: 800.922.4361 ASSEMBLY INSTRUCTIONS FOR UNJACKETED FILTER REACTOR SYSTEMS Support Frame with Oversized Rugged S.S. Uprights and Heavy Duty PTFE
More information