Primary Electrical Distribution System Analysis

Size: px
Start display at page:

Download "Primary Electrical Distribution System Analysis"

Transcription

1 Primary Electrical Ditribution Sytem Analyi Technical Report for the 2011 Campu Mater Plan THE UNIVERSITY OF NORTH CAROLINA AT PEMBROKE 5624 Executive Center Drive Suite 200 Charlotte, North Carolina N.C. Licene F-0474 Project No June /27/11

2 Table of Content Executive Summary page 1 Detailed Analyi Exiting Primary Electrical Sytem page 3 Future Electrical Ditribution Plan page 4 Summary of Projected Future Load page 5 Graph of Electrical Sytem Load Projection page 6 Appendix Detailed Electrical Load Projection Ditribution Sytem Load Hitory Appendix A-1 Ditribution Sytem Load Hitory Allocation Appendix A-2 Projected Electrical Demand Load Appendix A-4 Campu Map Exiting Primary Electrical Ditribution Sytem Map Appendix B-1 Mater Plan - Electrical Map Appendix B-2 Table of Content

3 EXECUTIVE SUMMARY Exiting Primary Electrical Sytem The exiting primary electrical ditribution ytem conit of a ingle kv, 3-phae delivery from Progre Energy. The power then leave the ubtation to a network of underground circuit that erve mot of the campu facilitie. There are ome facilitie on campu that are erved from Progre Energy. The campu electrical ytem had major upgrade in 2005 and 2009 and i in good condition with the exception of four (4) 15 kv pad mounted witche and five (5) pad mounted tranformer. Future Electrical Ditribution Plan The maximum recorded electrical demand load wa in September of 2010 of 5,011 kw peak which i 44% of the capacity of the main campu ditribution witchgear. The future electrical load projection are baed on the 2011 Campu Mater Plan. New load will be added to the campu ditribution ytem when the propoed future building are placed into ervice. In addition, ome of the facilitie that are currently erved from eparate Progre Energy meter can be witched to the UNC Pembroke campu electrical ditribution ytem to ave operating energy cot. In order to erve the new projected and tranferred load, additional electrical ditribution equipment will be required at the ubtation. Thi ubtation equipment i needed to upport more campu circuit in the future. Additional underground circuit will be required along with new 15 kv pad mounted witche in trategic area of the campu. See Appendix B for the propoed ytem addition. The main Univerity owned main witchgear ha adequate capacity to provide power for the planned campu expanion including the tranfer of ome exiting load that are United Engineering Group, Inc. Page 1

4 currently erved from Progre Energy. With the current plan the main witchgear i projected to be at 94% capacity in the future with the load projected. The main campu electrical infratructure i in good condition with the exception of the few witche and tranformer that were identified for replacement. The Univerity ha taken good tep to put thi reliable and afe ytem in place. Main UNC Pembroke Subtation and Switchgear United Engineering Group, Inc. Page 2

5 DETAILED ANALYSIS Exiting Campu Ditribution Sytem The exiting primary electrical ditribution ytem conit of a ingle kv, 3-phae delivery from Progre Energy. The Univerity owned ubtation equipment adjacent to the Progre Energy equipment i pad mounted fued witchgear rated at 600 amp operating at kv, giving the ubtation a capacity of 12,959 kva. The campu witchgear i compried of four (4) fued ditribution bay with 200 amp fue erving underground circuit for the campu. See the Appendix for a campu map howing the circuit. The witchgear ha proviion to add two (2) future fued ditribution bay. The main witchgear i manufactured by S&C and wa intalled in The main kv witchgear feed a erie of 15 kv rated pad mounted fued witche via ingle conductor 15 kv cable that are intalled underground concrete encaed ductbank. The pad mounted witche intern erve oil filled pad mounted tranformer near each of the building on campu. The econdary voltage of the tranformer are mixed between 208 volt, 3-phae; 480 volt, 3-phae and 240 volt, 1-phae. The 15 kv underground cable were intalled in 2005 and There are five (5) tranformer that were identified for replacement: School of Buine, North Reidence Hall, Belk Reidence Hall, Wet Reidence Hall and Jacob Hall. There are twenty-three (23) pad mounted witche rated at 15 kv located throughout the campu. Many of the pad mounted witche were replaced or repaired in 2005 and There are four (4) witche that were intalled in 1973 that are at their end of life, in poor condition and need to be replaced. S-7 D.F. Lowery S&C Model PMH-13 S-9 Livermore Library S&C Model PMH-9 S-12 Wet Reidence Hall S&C Model PMH-6 S-14 Given Performing Art S&C Model PMH-6 United Engineering Group, Inc. Page 3

6 Future Electrical Ditribution Plan The future electrical load projection are baed on the Campu Mater Plan a preented within thi report and outlined in the table below. The projection are baed on the campu hitorical data from Progre Energy. The maximum recorded electrical demand load wa in September of 2010: Peak kw Peak kvar kva Amp PF 5,011 2,704 5, *Main Subtation Switchgear Rating = 600 Amp => 44% of capacity at max load With the projected future load, there will need to be two fued witch bay added to the witch gear line up at ome time baed on the chedule of contruction. Alo new underground circuit will be required to upport the future building. See the Appendix B for the propoed circuit location a hown on the campu map. With the new building and load tranfer, new 15 kv pad mounted witche will be required to erve the tranformer for the repective facilitie. Propoed future witche are indicated on the campu map included in the Appendix B. Where facilitie are tranferred from Progre Energy to the campu ditribution ytem new tranformer may be required or purchaed from Progre Energy. The main Univerity owned witchgear ha adequate capacity to provide power for the planned campu expanion including the tranfer of ome exiting load that are currently erved from Progre Energy. With the current plan the main witchgear i projected to be at 94% capacity with the planned contruction and tranfer of the propoed Progre Energy Load. The main campu electrical infratructure i in good condition with the exception of the few witche and tranformer that were identified for replacement. The Univerity ha taken good tep to put thi reliable and afe ytem in place. United Engineering Group, Inc. Page 4

7 Summary of Projected Future Load Projected Electrical Demand for kv Medium Voltage Ditribution Sytem Exiting Demand Bae Load (kva) = 5,694 5,011 kw * kv kva kva kva * Amp Future Facility Bae Load Added Load Total Load Total Load Under Contruction 5,694 1,275 6, Info Common 6, , GPAC Lobby Addition 7, , Viitor' Center 7, , Buine School 7, , Reidence Hall 8, , Academic A 8, , Academic B 8, , Academic C 9, , Future Houing 9, , Tranfer Belk Athletic to Campu Grid 10, , Tranfer Pinchback from Prog Energy 10, , Tranfer Univ Village to Campu Grid 10, , Tranfer Univ Courtyard to Campu Grid 11, , Subtation Capacity 12, United Engineering Group, Inc. Page 5

8 *See Appendix A for Load VA per quare foot aumption United Engineering Group, Inc. Page 6

9 APPENDIX A DETAILED ELECTRICAL LOAD PROJECTIONS UNC Pembroke Bulk Electrical Load Projection kv Medium Voltage Ditribution Sytem Load Hitory Building * KW Watt per KVA SF Demand SF Demand Exiting Total Sytem Load 1,115,921 5, ,694 (le building erved from Progre Energy) * Highet Progre Energy billing demand September 2010 Peak Peak KW KVAR KVA PF Sep ,011 2,704 5, Projected Future Campu Load Exiting Demand + 20% Total * Total Projected Demand Load Watt / SF Watt / SF Watt / SF VA / SF = Power Factor * United Engineering Group, Inc. Appendix A-1

10 12.47 kv Medium Voltage Ditribution Sytem Load Hitory Allocation Bldg No. Name Size % Contribution Electrical Load Allocation (note 3) kva Load 001 OLD MAIN 35, % 35, MOORE HALL 24, % 24, MUSIC ANNEX 2, % 2, LOCKLEAR 21, % 21, LIVERMORE LIBRARY 52, % 52, OXENDINE SCIENCE BLD 92, % 92, NURSING 3, % 3, CHANCELLORS RES 6,418 75% 4, GUEST HOUSE % WEST HALL 39, % 39, D F LOWRY 20, % 20, WELLONS HALL 18, % 18, JACOBS HALL 24, % 24, STUDENT HEALTH SVCS 5, % 5, BUSINESS ADMIN 35, % 35, BELK HALL 39, % 39, NORTH HALL 39, % 39, ENGLISH E. JONES BLD 125, % 125, GIVENS PERF ARTS CTR 43, % 43, EDUCATION BUILDING 33, % 33, DIAL HUMANITIES 31, % 31, JAMES CHAVIS CENTER 69, % 69, LUMBEE HALL 49, % 49, PINE HALL 82, % 82, WEST OFFICE BLDG 1,680 0% PINCBECK MAINT. 67,264 0% REGIONAL CENTER 11, % 11, BIOTECH ADDITION 4, % 4, UNIV. VILLAGE I 21,555 0% UNIV. VILLAGE II 21,555 0% UNIV. VILLAGE III 21,555 0% 0 0 United Engineering Group, Inc. Appendix A-2

11 12.47 kv Medium Voltage Ditribution Sytem Load Hitory Allocation (continued) 055 UNIV VILLAGE IV 21,555 0% UNIV. VILLAGE V 21,555 0% UNIV VILLAGE COMMONS 5,000 0% SRMC 7, % 7, INTERNATIONAL HOUSE 2,070 0% INTERNATIONAL APT 880 0% SIRIUS 1,904 0% MIMOSA 1,904 0% WELTON LOWRY LEASE 1,875 0% AUXILARY SERVICES 48, % 48, SAMPSON CLASSROOM 30, % 30, CATON FIELD HOUSE 27,000 0% OAK RESIDENCE HALL 89, % 89, MAGNOLIA HOUSE 2,201 0% CHAVIS ANNEX 17, % 17, CARTER HALL 11,961 0% FOOTBALL PRESSBOX 3,216 0% DOGWOOD OFFICE BLDG 2,300 0% MAX LOWRY LEASE 1,600 0% CYPRESS HALL (note 2) 122,775 5% 6, ALLIED HEALTH (note 2) 87,500 7% 6, ,554,346 1,115,921 5,694 kva Load /SF = W/f VA/f kv Note: 1) 0% contribution indicate that load i not on campu ytem and i erved by Progre Energy 2) Building under contruction and power utilization i for contruction 3) Building area allocation that i allocated for electrical load on campu grid United Engineering Group, Inc. Appendix A-3

12 Projected Electrical Demand for kv Medium Voltage Ditribution Sytem VA / SF kva SF Demand Demand Under Contruction Cypre Hall 122, le Cypre contruction load -6 Allied Health 87, le Allied Health contruction load -6 1,275 Info Common 150, Demolih Wellon Reidence Hall -95 Demolih Jacob Reidence Hall GPAC Lobby Addition 15, Viitor' Center 25, Buine School 60, Reidence Hall 66, Demolih Wet Reidence Hall Academic A 71, Academic B 89, Academic C 54, Future Houing 44, United Engineering Group, Inc. Appendix A-4

13 Projected Electrical Demand for kv Medium Voltage Ditribution Sytem (continued) Tranfer Belk Athletic to Campu Grid Caton Field Houe 27, Football Prebox G.P. Johnon Stadium Aume operation & Lighting i non coincident with peak Aume operation & Lighting i non coincident with peak Tranfer Pinchbeck to Campu Grid Pinchbeck Maintenance Complex 67, Tranfer Univ Village to Campu Grid UNIV. VILLAGE I 21, UNIV. VILLAGE II 21, UNIV. VILLAGE III 21, UNIV VILLAGE IV 21, UNIV. VILLAGE V 21, UNIV VILLAGE COMMONS 5, Tranfer Univ Courtyard to Campu Grid Univerity Courtyard Apartment 150, (etimated area) TOTAL FUTURE PROJECTION 1,143,214 SF 6,530 kva kv United Engineering Group, Inc. Appendix A-5

14 UNCP Primary Electrical Ditribution 12,470 Volt Sytem Exiting Primary Electrical Circuit Circuit 4 Circuit 3 Progre Energy Subtation Circuit 2 Circuit 1 United Engineering Group, Inc. Appendix B-1

15 Mater Plan - Electrical New 15kV Switch, Typ. In Contruction: A. Cypre Hall 122,775 gf B. Allied Health 87,500 gf Future: 1. Info Common 2. GPAC Lobby Addition 3. Viitor Center 4. New Buine School 5. Future Reidence Hall 6. Long term Academic A 7. Long term Academic B 8. Long term Academic C 9. Future Houing Extend Circuit d New Circuit a b A 5 c B Tranfer from Progre Energy to Campu Sytem: a. Belk Athletic Complex & Playing Field b. Pinchbeck Complex & Playing Field c. Univerity Village Houing d. Univerity Courtyard Houing 1 United Engineering Group, Inc. Appendix B-2

3.2 Steer Design. A. Concept Development & Selection Process. B. Configuration Summary

3.2 Steer Design. A. Concept Development & Selection Process. B. Configuration Summary 3. Steer Deign A. Concept Development & Selection Proce The teering ytem for the RP1 motor module ha undergone ignificant deign improvement. The team elected to move forward with a timing belt drive ytem

More information

Computer Aided Spur Gear Design and Analysis

Computer Aided Spur Gear Design and Analysis 66 Computer Aided Spur Gear Deign and Analyi Edward M. Vavrek Purdue Univerity North Central I. Introduction Thi paper decribe a pur gear analyi program written in viual baic. The program i ued to ait

More information

Equivalent Circuit of Induction Motor Referred to Stator Side

Equivalent Circuit of Induction Motor Referred to Stator Side Electrical Machine IV Code: CECE 437 http://bu.edu.eg/taff/emadattwa3 Equivalent Circuit of Induction Motor Referred to Stator Side Fig. 3: eqt. circuit of induction motor per phae at any lip referred

More information

SIVACON The Versatile Low-Voltage Switchboard

SIVACON The Versatile Low-Voltage Switchboard Control & Ditribution Ditribution Board & Motor Control Center SIVACON The Veratile Low-Voltage Switchboard SIVACON A&D CD DM PM, 1004 Power Ditribution Board 1 Control & Ditribution Ditribution Board

More information

Frequency Control of Isolated Power System with Wind Farm by Using Flywheel Energy Storage System

Frequency Control of Isolated Power System with Wind Farm by Using Flywheel Energy Storage System Frequency Control of Iolated Power Sytem with Wind Farm by Uing Flywheel Energy Storage Sytem 4 Rion Takahahi Kitami Intitute of Technology Japan. Introduction For the recent expanion of renewable energy

More information

Soil Resistivity Structure and Its Implication on the Pole Grid Resistance for Transmission Lines

Soil Resistivity Structure and Its Implication on the Pole Grid Resistance for Transmission Lines Soil Reitivity Structure and It Implication on the Pole Grid Reitance for Tranmiion Line M. Naereddine, J. Rizk, and G. Naerddine Abtract High Voltage (HV) tranmiion line are widely pread around reidential

More information

Comparison between Induction Motor and Transformer An induction motor is considered as a transformer with a rotating short-circuited secondary.

Comparison between Induction Motor and Transformer An induction motor is considered as a transformer with a rotating short-circuited secondary. Comparion between Induction Motor and Tranformer An induction motor i conidered a a tranformer with a rotating hort-circuited econdary. The tator winding correpond to tranformer primary and the rotor winding

More information

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. College Strategic Execution Plan Update Los Angeles Community College District PROGRAM MANAGEMENT SERVICES College Strategic Execution Plan Update District Citizens Oversight Committee October 9, 205 Los Angeles City College Strategic Execution

More information

International Conference on Transportation and Development

International Conference on Transportation and Development International Conference on Tranportation and Development 2018 156 Modeling Freight Tranportation a a Sytem-of-Sytem to Determine Adoption of Emerging Vehicle Technologie A. Guerrero de la Peña 1 ; N.

More information

Synchronous Motors. Chapter (11) Introduction Construction

Synchronous Motors. Chapter (11) Introduction Construction Chapter (11) Synchronou Motor Introduction It may be recalled that a d.c. generator can be run a a d.c. motor. In like manner, an alternator may operate a a motor by connecting it armature winding to a

More information

PULSATION & VIBRATION CONTROL FOR SMALL RECIPROCATING COMPRESSORS

PULSATION & VIBRATION CONTROL FOR SMALL RECIPROCATING COMPRESSORS PULSATION & VIBRATION CONTROL FOR SMALL RECIPROCATING COMPRESSORS N. Sackney B. Fofonoff Beta Machinery Analyi Ltd. Calgary AB, Canada, T3C J7 ABSTRACT Low horepower (below 4) reciprocating natural ga

More information

Dep. Arquitectura de Computadores y Automática Universidad Complutense de Madrid Av. Complutense S/N, Madrid, Spain SPAIN

Dep. Arquitectura de Computadores y Automática Universidad Complutense de Madrid Av. Complutense S/N, Madrid, Spain SPAIN Modelling and imulation of the fuel tranfer for CoG poition control in an Aircraft J. M. GIRON-SIERRA., J.F. JIMENEZ, C. C. INSAURRALDE, M. A. SEMINARIO, B. HIGHAM (), R. A. MELVILLE () Dep. Arquitectura

More information

The Courtyard Building - 2nd & 3rd Floor For Sale

The Courtyard Building - 2nd & 3rd Floor For Sale Executive Summary PROPERTY SUMMARY Sale Price: $2,011,000 Subject Property SqFt: 36,575 SF Price Per SF: $54.98 Parking Spaces: 226 Building Renovated: 2016 Zoning: Sea Pines Commercial Market: Hilton

More information

THE CITY UNIVERSITY OF NEW YORK OVERVIEW OF FIVE-YEAR CAPITAL BUDGET REQUEST (Dollars Expressed in Thousands)

THE CITY UNIVERSITY OF NEW YORK OVERVIEW OF FIVE-YEAR CAPITAL BUDGET REQUEST (Dollars Expressed in Thousands) THE CITY UNIVERSITY OF NEW YORK OVERVIEW OF FIVE-YEAR CAPITAL BUDGET REQUEST (Dollars Expressed in Thousands) Senior Colleges 2001-02 2002-03 2003-04 2004-05 2005-06 Bonded $231,745 $170,455 $295,664 $215,669

More information

S&C Remote Supervisory PMH Pad-Mounted Gear Outdoor Distribution (14.4 kv and 25 kv) INSTRUCTIONS. For Operation

S&C Remote Supervisory PMH Pad-Mounted Gear Outdoor Distribution (14.4 kv and 25 kv) INSTRUCTIONS. For Operation Outdoor Ditribution (14.4 kv and 25 kv) INSTRUCTIONS For Operation Thi publication contain intruction for operation of fue and manual Mini-Rupter Switche in S&C Remote Superviory PMH Pad-Mounted Gear.

More information

MEBS Utilities services M.Sc.(Eng) in building services Department of Electrical & Electronic Engineering University of Hong Kong

MEBS Utilities services M.Sc.(Eng) in building services Department of Electrical & Electronic Engineering University of Hong Kong MEBS 6000 00 Utilitie ervice Joint peed torque characteritic of electric motor and mechanical load Electric motor exhibit a variety of peed-torque characteritic that are uitable for a wide range of load

More information

Ultracapacitor Based Ride Through System for Control Power Supplies in High Power Converters

Ultracapacitor Based Ride Through System for Control Power Supplies in High Power Converters 16th NATIONAL POWER SYSTEMS CONFERENCE, 15th-17th DECEMBER, 2010 447 Ultracapacitor Baed Ride Through Sytem for Control Power Supplie in High Power Converter Anand Vivek Ravi Department of Electrical Engineering

More information

HIGH PROFILE RETAIL SPACE ON ICONIC GREEN BAY ROAD

HIGH PROFILE RETAIL SPACE ON ICONIC GREEN BAY ROAD LEASE OVERVIEW AVAILABLE SF: LEASE RATE: YEAR BUILT: 2017 ZONING: MARKET: 2,000-6,200 SF $29.00 SF/Yr (NNN) Village Center Pedestrian Commercial West Chicago PROPERTY DESCRIPTION Incredible retail lease

More information

Modelling and Force Tracking Control of Hydraulic Actuator for an Active Suspension System

Modelling and Force Tracking Control of Hydraulic Actuator for an Active Suspension System Modelling and Force Tracking Control of Hydraulic Actuator for an Active Supenion Sytem Y. M. Sam and K. Hudha Faculty of Electrical Engineering, Malayia Univerity of Technology, 81310 Skudai, Johor -

More information

A Combined Diesel-Engine Gas-Turbine System for Distributed Power Generation

A Combined Diesel-Engine Gas-Turbine System for Distributed Power Generation A Combined ieel-engine Ga-urbine for itributed Power Generation Mohamed M. El-Awad, Mohamed A. Siraj Abtract hi paper preent a combined dieel-engine gaturbine ytem that enable ditributed power generation

More information

New Construction, Mixed Use Opportunity 6351 Crawfordsville Rd, Indianapo-

New Construction, Mixed Use Opportunity 6351 Crawfordsville Rd, Indianapo- 6351 Crawfordsville Rd, Indianapo- 100 S Chauncey Ave, West Lafayette, IN 47906 Completed State Street Project Property Highlights: - New construction, mixed use development located on Purdue University

More information

SERVICE MANUAL R410A (Exploded View)

SERVICE MANUAL R410A (Exploded View) Internal Ue Only http://biz.lgervice.com Sytem Outdoor Unit R410A SERVICE MANUAL R410A (Exploded View) MODEL : ARUN Serie CAUTION Before Servicing the unit, read the afety precaution in General SVC manual.

More information

Study on Battery Fast Charge and Discharge Model and its Parameters

Study on Battery Fast Charge and Discharge Model and its Parameters Send Order for Reprint to reprint@benthamcience.ae The Open Electrical & Electronic Engineering Journal, 204, 8, 367-37 367 Open Acce Study on Battery Fat Charge and Dicharge Model and it Parameter Lun-qiong

More information

5/16/2017. SCCE Higher Education Conference June 5, Stacie Tronto, Chief Audit Officer ECU Joe Oringel, Managing Director Visual Risk IQ

5/16/2017. SCCE Higher Education Conference June 5, Stacie Tronto, Chief Audit Officer ECU Joe Oringel, Managing Director Visual Risk IQ SCCE Higher Education Conference June 5, 2017 Stacie Tronto, Chief Audit Officer ECU Joe Oringel, Managing Director Viual Rik IQ 1 Agenda UNC Sytem background Eat Carolina Univerity Sytem Policy Requirement

More information

5/16/2017. The UNC System

5/16/2017. The UNC System SCCE Higher Education Conference June 5, 2017 Stacie Tronto, Chief Audit Officer ECU Joe Oringel, Managing Director Viual Rik IQ 1 Agenda UNC Sytem background Eat Carolina Univerity Sytem Policy Requirement

More information

Simulation Studies of Waiting Time Approximation for the Multi Priority Dual Queue (MPDQ) with Finite Waiting Room and Non-Preemptive Scheduling

Simulation Studies of Waiting Time Approximation for the Multi Priority Dual Queue (MPDQ) with Finite Waiting Room and Non-Preemptive Scheduling Simulation Studie of aiting Time Approximation for the Multi Priority Dual Queue (MPDQ) with Finite aiting Room and Non-Preemptive Scheduling ANTHONY BEDFORD PANLOP ZEEPHONGSEKUL Department of Statitic

More information

Target Setting for Inefficient DMUs for an Acceptable Level of Efficient Performance

Target Setting for Inefficient DMUs for an Acceptable Level of Efficient Performance Global Journal of Pure and Applied Mathematic. ISSN 0973-1768 Volume 13, Number 6 (2017), pp. 1893-1902 Reearch India Publication http://www.ripublication.com Target Setting for Inefficient DMU for an

More information

Solar recharging stations - selling hours of solar lighting in the evenings

Solar recharging stations - selling hours of solar lighting in the evenings 1 Solar recharging tation - elling hour of olar lighting in the evening The olar lantern ervice of Sunlabob uing commercial charging tation in the village May 2008 Summary Village entrepreneur rent large

More information

New Construction, Mixed Use Opportunity 6351 Crawfordsville Rd, Indianapo-

New Construction, Mixed Use Opportunity 6351 Crawfordsville Rd, Indianapo- 635 Crawfordsville Rd, Indianapo- 00 S Chauncey Ave, West Lafayette, IN 47906 Completed State Street Project Property Highlights: - New construction, mixed use development located on Purdue University

More information

Electric Linear Actuator IQL Series

Electric Linear Actuator IQL Series Electric inear Actuator IQ Serie BS E IS 9: IQ IEAR EETRI ATUATR I-tork control deign, produce and provide high quality electric actuator and ervice related to indutrial valve automation and control. IQ

More information

THE CITY UNIVERSITY OF NEW YORK OVERVIEW OF FIVE-YEAR CAPITAL BUDGET REQUEST (Dollars Expressed in Thousands)

THE CITY UNIVERSITY OF NEW YORK OVERVIEW OF FIVE-YEAR CAPITAL BUDGET REQUEST (Dollars Expressed in Thousands) THE CITY UNIVERSITY OF NEW YORK OVERVIEW OF FIVE-YEAR CAPITAL BUDGET REQUEST (Dollars Expressed in Thousands) Senior Colleges 2000-01 2001-02 2002-03 2003-04 2004/05 Bonded $200,686 $208,686 $152,538 $271,456

More information

Study of an electric vehicle drive dynamic testing system with energy recovery

Study of an electric vehicle drive dynamic testing system with energy recovery Available online at www.ciencedirect.com Procedia Engineering 23 (2011) 608 615 2011 International Conference on Power Electronic and Engineering Application (PEEA 2011) Study of an electric vehicle drive

More information

2. A 50 Hz, 6 pole, 3 phase induction motor runs at 970 rpm. Find slip. Rotor Speed, N r =970 r.p.m 120f. Synchronous Speed, N s 1000

2. A 50 Hz, 6 pole, 3 phase induction motor runs at 970 rpm. Find slip. Rotor Speed, N r =970 r.p.m 120f. Synchronous Speed, N s 1000 1 Unit 3 - Induction Motor PAT - A 1. Why the rotor lot are lightly kewed in quirrel cage IM? (or)why are the clot on the cage rotor of induction motor uually kewed? The rotor bar are not parallel to the

More information

McDonald (45) Date of Patent: Oct. 7, (54) LITHIUM ION BATTERY COOLING SYSTEM (56) References Cited

McDonald (45) Date of Patent: Oct. 7, (54) LITHIUM ION BATTERY COOLING SYSTEM (56) References Cited (12) United tate Patent U008852772B2 (10) Patent No.: U 8,852,772 B2 McDonald (45) Date of Patent: Oct. 7, 2014 (54) LITHIUM ION BATTERY COOLING YTEM (56) Reference Cited COMPRIING DELECTRICFLUID U.. PATENT

More information

Investigation of the Idea of Active Suspension System Application in Hybrid Electric Vehicles

Investigation of the Idea of Active Suspension System Application in Hybrid Electric Vehicles Invetigation of the Idea of Active Supenion Sytem Application in Hybrid Electric Vehicle Seyedmohen Hoeini, Ruhed Abdolah, and Amir Khani Abtract - Thi paper decribe the idea of application of active upenion

More information

Although it is a company with more

Although it is a company with more The ART of Tug Deign ROBERT G. ALLAN P.ENG. Although it i a company with more than a century of corporate hitory, when Kotug introduced the Rotor Tug concept they were really put onto centre tage in the

More information

Employee Compensation 2014 Band 60, ,999.99

Employee Compensation 2014 Band 60, ,999.99 Employee Compensation 2014 60,000.00-74,999.99 Accessibility Counsellor (1) Administrator Officer (1) Advisor (2) Analyst (5) Application Architect (1) Archivist 1 (1) Assistant Dean, Arts (1) Assistant

More information

3VF2 Circuit-Breakers

3VF2 Circuit-Breakers Circuit-Breaker - and -pole, up to Technical data or other circuit-breaker Specification IEC 0 97, EN 0 97 ax. rated current I n to Rated inulation voltage U i ain current path uxiliary circuit Rated impule

More information

FACILITY NAME, SIZE, AND RENTAL RATES - Effective - July 2017

FACILITY NAME, SIZE, AND RENTAL RATES - Effective - July 2017 FACILITY NAME, SIZE, AND - Effective - July 2017 ROOM TYPE / General Classroom Space 15-35 45 65 25 35-60 60 90 25 60-125 75 110 25 125-200 110 145 25 200 + 145 180 50 Art Gallery North Gallery 1,800 s/f

More information

Floor Map[Bldg. S] Floor Map[GLOBAL SQUARE/ B2F]

Floor Map[Bldg. S] Floor Map[GLOBAL SQUARE/ B2F] Floor Map[Bldg. S] 2F S t r a g e r o o m C o n t r o l r o o m S t r a g e r o o m S 2 0 2 c l a s s r o o m S 2 0 1 c l a s s r o o m E n t r a n c e H a l l R e c e p t i o n H o t - w a t e r s e r

More information

F A C I L I T I E S M A S T E R P L A N

F A C I L I T I E S M A S T E R P L A N SWOT / Preliminary Options M a y 4, 2 0 1 5 M o d i f i e d VP Administrative Services F A C I L I T I E S M A S T E R P L A T I M E L I E 2014 ovember Education / Facility Master Plan kick-off 2015 February

More information

HHBO-B. High Voltage Fuses to British Standards. Fuses for protection of oil insulated transformer mains

HHBO-B. High Voltage Fuses to British Standards. Fuses for protection of oil insulated transformer mains High Voltage Fue to Britih Standard Application Range Type Fue for protection of oil inulated tranformer main Medium voltage SIBA fue according to Britih Standard are current-limiting Back-Up fue for the

More information

FY11 OPERATING BUDGET

FY11 OPERATING BUDGET FY11 OPERATING BUDGET YEAR ENDING JUNE 30, 2011 TABLE OF CONTENTS Resolution...1 2 Budget Summary All Funds...3 4 Operating Fund...5 11 Designated Funds Summary...12 13 Dedicated Student Fees...14 15

More information

New Construction, Mixed Use Opportunity 6351 Crawfordsville Rd, Indianapo-

New Construction, Mixed Use Opportunity 6351 Crawfordsville Rd, Indianapo- 6351 Crawfordsville Rd, Indianapo- 100 S Chauncey Ave, West Lafayette, IN 47906 Completed State Street Project Property Highlights: - New construction, mixed use development located on Purdue University

More information

Which US President was most responsible for the development of the US Interstate System?

Which US President was most responsible for the development of the US Interstate System? EE 30 Midterm Sample Quetion Short Anwer Which US Preident wa mot reponible for the deelopment of the US Intertate Sytem? Eienhower What metric i ued to calculate interection Leel of Serice? Etimated aerage

More information

Optimum Sway Control for Overhead Traveling Cranes

Optimum Sway Control for Overhead Traveling Cranes Optimum Sway Control for Overhead Traveling Crane KAMAL A. KHANDAKJI, K. P. ZDROZIS Department of Electrical Engineering, Tafila Technical Univerity Tafila, JORDAN; drkhandakji@yahoo.com Department of

More information

RTDF ROOT CAUSE OF UNDESIRED HOSE SEPARATIONS AND A SOLUTION

RTDF ROOT CAUSE OF UNDESIRED HOSE SEPARATIONS AND A SOLUTION Proceeding of the ASME 29 Rail Tranportation Diviion all Conference RTD29 ctober 19-21, 29, ort Worth, Texa, USA RTD29-1824 RT CAUSE UNDESIRED HSE SEPARATINS AND A SLUTIN Edgardo Jimenez Product Engineer

More information

Double flank gear roll inspection machines. The simple functional inspection

Double flank gear roll inspection machines. The simple functional inspection Double flank gear roll inpection machine The imple functional inpection URM-WZ E 11 2013 General Information The baic principle of the double flank gear roll inpection i that a mater gear (nearly perfect

More information

EXHIBIT A ORDINANCE NO. O CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE

EXHIBIT A ORDINANCE NO. O CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE ORDINANCE NO. O-2017-14 CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE AVAILABILITY This schedule is closed to new customers. Available to Residential Consumers being

More information

East Falls Business Unit Crosswalk Mapping

East Falls Business Unit Crosswalk Mapping New 011 Employee Benefits - East Falls 00000 General 032 Corporate Services East Falls 10200 Chief Financial Officer 032 Corporate Services East Falls 10210 Business Office 032 Corporate Services East

More information

Electrical Power Electric power electrical electric power Electric power electric electric

Electrical Power Electric power electrical electric power Electric power electric electric Power Calculations Electrical Power Electric power is the rate at which electrical energy is transferred by an electric circuit. The SI unit of power is the watt, one joule per second. Electric power is

More information

Elevator Serial Number. Manufacturer (Controller)

Elevator Serial Number. Manufacturer (Controller) Line Item Building Name # 1 Millican Hall 0001 1 07758 Dover Simplex Hydraulic 3 E&G Main 2 Library 0002 1 33687 General Duplex Hydraulic 5 E&G Main 3 Library 0002 2 04654 Dover Duplex Hydraulic 5 E&G

More information

Employee Compensation 2016 Band 60, ,999.99

Employee Compensation 2016 Band 60, ,999.99 Employee Compensation 2016 60,000.00-74,999.99 Accessibility Counsellor (1) Administrator (2) Administrator Officer (1) Advisor (2) Analyst (2) Application Architect (1) Assistant Dean, Humber College

More information

Chain & Flite Conveyors

Chain & Flite Conveyors Chain & Flite Conveyor High-Glo Polyeter Powder Coating 262 162-A 166-A FLEXIBLE PAYMENT PLANS AVAILABLE. ASK FOR DETAILS. 262 Elevate up to 40 for intallation veratility. Trough Width Bottom: 10 (254

More information

Cat.4b/ / 2010 / 2015 / / 2060 / 2070 Series

Cat.4b/ / 2010 / 2015 / / 2060 / 2070 Series F e t o o n S y t e m Cat.4b/52 2005 / 2010 / 2015 / 2020 2050 / 2060 / 2070 Serie w w w. v a e l. c o m. Vael I beam cable carrying and tranfer ytem work reproductively with energy and data tranfer ytem

More information

103 Pa.P.U.C. 554, 2008 WL (Pa.P.U.C.) Re Trans-Allegheny Interstate Line Company

103 Pa.P.U.C. 554, 2008 WL (Pa.P.U.C.) Re Trans-Allegheny Interstate Line Company 103 Pa.P.U.C. 554, 2008 WL 5786507 (Pa.P.U.C.) Application 110172 et al. Pennylvania Public Utility Commiion November 13, 2008; entered December 12, 2008 ORDER granting a certificate of public convenience

More information

ELECTRICAL PANELBOARD SCHEDULES AND RISER DIAGRAM EP09.01

ELECTRICAL PANELBOARD SCHEDULES AND RISER DIAGRAM EP09.01 TPL P 400 MB PP PL G PL PL P P 75G HB H H OREBOAR 50 00 50 00 GENERAL RIER NOTE:. WHEREVER THE LENGTH OF THE EONARY ONUTOR OF ANY TRANFORMER EE TEN FEET, AN ENLOE IRUIT BREAKER OR FUE IONNET I REQUIRE

More information

ROCKLIN UNIFIED SCHOOL DISTRICT ADDENDUM NUMBER 1 TO THE BID DOCUMENTS Amendment Date: January 25, 2019

ROCKLIN UNIFIED SCHOOL DISTRICT ADDENDUM NUMBER 1 TO THE BID DOCUMENTS Amendment Date: January 25, 2019 ROCKLIN UNIFIED SCHOOL DISTRICT ADDENDUM NUMBER 1 TO THE BID DOCUMENTS Amendment Date: January 25, 2019 E-rate Year 22 RFP 2019-115 Cabling Fiber Optic Infrastructure, 4 Sites A. This Amendment shall be

More information

The New Evolution compact. A One-of-a-kind Elevator, with a Shallow 300 mm Recess.

The New Evolution compact. A One-of-a-kind Elevator, with a Shallow 300 mm Recess. The New Evolution compact. A One-of-a-kind Elevator, with a Shallow 300 mm Rece. Revolutionary: Only 300 mm haft rece. A Company of ThyenKrupp Elevator ThyenKrupp Aufzüge TK Evolution compact rie above

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 H DATE: August 10, 2017 ****************************************************************************** SUBJECT: SDSU Pugsley Center Renovation

More information

OPTIMAL PLUG-IN HYBRID ELECTRIC VEHCILE DESIGN AND ALLOCATION FOR DIVERSE CHARGING PATTERNS

OPTIMAL PLUG-IN HYBRID ELECTRIC VEHCILE DESIGN AND ALLOCATION FOR DIVERSE CHARGING PATTERNS Proceeding of the 29 ASME International Deign Engineering Technical Conference and Computer and Information in Engineering Conference IDETC/CIE 29 Augut 3 to September 2, 29, San Diego, California, USA

More information

Installation Planning (or what I didn t learn at meter school)

Installation Planning (or what I didn t learn at meter school) NWEMS Harris nstitute of echnical raining nstallation Planning (or what didn t learn at meter school) Presented by Brad Harris nstallation #1 A three phase commercial customer has the following installation

More information

Mechanical, Electrical, Technology Engineering Firm

Mechanical, Electrical, Technology Engineering Firm Mechanical, Electrical, Technology Engineering Firm Established 1995 Current staff of forty-five Twenty engineers (12 registered P.E. s) Three Registered Communications Distribution Designers - RCDD s

More information

Employee Compensation 2015 Band 60, ,999.99

Employee Compensation 2015 Band 60, ,999.99 Employee Compensation 2015 60,000.00-74,999.99 Accessibility Counsellor (1) Administrator (2) Administrator Officer (1) Advisor (1) Analyst (9) Application Architect (1) Assistant Director, Facilities

More information

Fault Behavior of Wind Turbines. Sulla, Francesco. Published: Link to publication

Fault Behavior of Wind Turbines. Sulla, Francesco. Published: Link to publication Fault Behavior of Wind Turbine Sulla, Franceco Publihed: 1-1-1 Link to publication Citation for publihed verion (APA): Sulla, F. (1). Fault Behavior of Wind Turbine General right Copyright and moral right

More information

equipment transformers single-phase

equipment transformers single-phase equipment tranformer connection trip upplied up to 450 V (except at.no 428 46) 428 40 + 428 99 428 41 upplied with connection trip 428 75 427 92 IP 2X or XX up to 450 V (up to 310 V in 12-24 V) - IK 04

More information

Shippensburg University

Shippensburg University Shippensburg University 1871 Old Main Drive Shippensburg, PA 17257 SUPPLEMENT 1 Electrical Coordination Study Professional: Entech Engineering, Inc. 4 South Fourth Street P.O. Box 32 Reading, PA 19603

More information

ANALYSIS AND ACTIVE/REACTIVE POWER CONTROL OF DOUBLY FED INDUCTION GENERATOR (DYNAMIC MODELLING)

ANALYSIS AND ACTIVE/REACTIVE POWER CONTROL OF DOUBLY FED INDUCTION GENERATOR (DYNAMIC MODELLING) International Journal of Engineering Reearch and Application (IJERA) ISSN: 2248-9622 ANALYSIS AND ACTIVE/REACTIVE POWER CONTROL OF DOUBLY FED INDUCTION GENERATOR (DYNAMIC MODELLING) Dr.K.Chandra Sekhar,

More information

Design Study of Doubly-Fed Induction Generators for a 2MW Wind Turbine

Design Study of Doubly-Fed Induction Generators for a 2MW Wind Turbine WIND ENGINEERING VOLUME 33, NO. 5, 29 PP 497 58 497 Deign Study of Doubly-Fed Induction Generator for a 2MW Wind Turbine Rebecca Todd, Mike Barne and Alexander C. Smith School of Electrical & Electronic

More information

Prior Lake - Savage Area Schools Prior Lake, MN

Prior Lake - Savage Area Schools Prior Lake, MN Prior Lake - Savage Area Schools Prior Lake, MN Elementary Boundary Change Options A-1 and B-1: March 12 th, 2019 Report created by TeamWorks International, Inc 7037 20th Avenue S. Centerville, MN 55038

More information

JEFFERSON COLLEGE COURSE SYLLABUS HRA101 ELECTRICITY FOR HVAC. 5 Credit Hours. Prepared by: William Kaune. Revised Date: March 17, 2014

JEFFERSON COLLEGE COURSE SYLLABUS HRA101 ELECTRICITY FOR HVAC. 5 Credit Hours. Prepared by: William Kaune. Revised Date: March 17, 2014 JEFFERSON COLLEGE COURSE SYLLABUS HRA101 ELECTRICITY FOR HVAC 5 Credit Hours Prepared by: William Kaune Revised Date: March 17, 2014 Dena McCaffrey, Ed.D., Dean, Career & Technical Education HRA101 Electricity

More information

Individual and Global Optimization of Switched Flux Permanent Magnet Motors

Individual and Global Optimization of Switched Flux Permanent Magnet Motors 3 Journal of International Conference on Electrical Machine and Sytem, Vol., No., pp.3~39, Individual and Optimization of Switched Flux Permanent Magnet Motor Z.Q. Zhu *, X. Liu ** Abtract With the aid

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

WP9LM. Specifications. WARP9 - Large, magnetic revision 10/20/16 kl_wp9lm_spec.pdf. Type: Job: Catalog number: Approvals: Date: Page: 1 of 5

WP9LM. Specifications. WARP9 - Large, magnetic revision 10/20/16 kl_wp9lm_spec.pdf. Type: Job: Catalog number: Approvals: Date: Page: 1 of 5 Catalog number: WP9LM reviion 10/20/16 kl_wp9lm_pec.pdf Approval: / / / / Mtg. Fixture Electrical Module Finih Option See page 4-5 See page 2 See page 3 Select pole from Kim Pole Catalog. If pole i provided

More information

Employee Compensation 2017 Band 60, ,999.99

Employee Compensation 2017 Band 60, ,999.99 Employee Compensation 2017 60,000.00-74,999.99 Aboriginal R&D Strategic Lead (1) Accessibility Counsellor (1) Administrator (2) Administrator Officer (1) Advisor (2) Alumni Advacnement Officer (2) Analyst

More information

Loss Reduction for Matrix Converter with Hybrid Six-step Operation in Flywheel Energy Storage System

Loss Reduction for Matrix Converter with Hybrid Six-step Operation in Flywheel Energy Storage System Lo Reduction for Matrix Conerter with Hybrid Six-tep Operation in Flywheel Energy Storage Sytem IEEE PEDS 217, Honolulu, USA 12 15 December 217 Jun-ichi Itoh, Takumi Mauda Nagaoka Unierity of Technology

More information

CLIF NOTES SERIES (Competent Leveraging of Information and Facts) ELECTRICAL

CLIF NOTES SERIES (Competent Leveraging of Information and Facts) ELECTRICAL CLIF NOTES SERIES (Competent Leveraging of Information and Facts) ELECTRICAL What basic information do you need to know about electrical systems in buildings and why? The Capital Partners Electrical CLIF

More information

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015

MAIZE SCHOOLS USD #266 COST DATA / BOND ISSUE PROJECT DESCRIPTION MARCH 2015 1. Provide Storm Shelters at Maize High School - Grades 9-12 - 1,800 students + staff New Construction - North End (6,000 @ $190/SF) $ 1,140,000 - Expand athletic lobby - Concessions/Kitchen - Multipurpose

More information

SYSTEM PROTECTION SYSTEM PROTECTION. Underground Electric Distribution Standards I. FUSE COORDINATION

SYSTEM PROTECTION SYSTEM PROTECTION. Underground Electric Distribution Standards I. FUSE COORDINATION I. FUSE COORDINATION I.1. GENERAL I.1.1. The purpose of protective coordination is to provide isolation of a fault as close to the fault as possible so that a minimum of customers will be affected. The

More information

Steady State Operability Characteristics of an Adiabatic Fixed-Bed Reactor for Methanol Dehydration

Steady State Operability Characteristics of an Adiabatic Fixed-Bed Reactor for Methanol Dehydration Iran. J. Chem. Chem. Eng. Reearch Note Vol. 30, No. 4, 2011 Steady State Operability Characteritic of an Adiabatic Fixed-Bed Reactor for Methanol Dehydration Fari, Mohammad; Mazinani, Saeid; Jahanmiri,

More information

Report on the Annual Progress of the. Statewide Energy Partnership (SEP) Program. Legislative Report. February 2016

Report on the Annual Progress of the. Statewide Energy Partnership (SEP) Program. Legislative Report. February 2016 Report on the Annual Progress of the Statewide Energy Partnership (SEP) Program Legislative Report Budget and Capital Resources December 2009 UNIVERSITY of CALIFORNIA Office of the President UNIVERSITY

More information

Generation Interconnection Facilities Study For

Generation Interconnection Facilities Study For Generation Interconnection Facilities Study For Prepared for: Prepared by: SCE&G Transmission Planning May 27, 2015 TABLE OF CONTENTS General Discussion... Page 3 Generator Interconnection Specifications...

More information

Group 3: Pricing from 1 April 2018 and load management

Group 3: Pricing from 1 April 2018 and load management Group 3: Pricing from 1 April 2018 and load management This document is intended to provide background to Network Tasman s Group 3 pricing, in particular the Regional Coincident Peak Demand (RCPD) price,

More information

Power and Light Cord Reels

Power and Light Cord Reels Power and Light Reel Triple Receptacle Power Reel LED Light Reel reelcraft.com Star Tire & Automotive, Columbia City, IN McGUIRE AIR COMPRESSORS www.hoereel.biz 1-888-9-9999 McGUIRE AIR COMPRESSORS www.hoereel.biz

More information

LOTS LOCATION PARKING DESIGNATION COLLEGE AVE STREET RED/BLUE UMW DECALS AND RESIDENTS LIVING ON COLLEGE AVENUE

LOTS LOCATION PARKING DESIGNATION COLLEGE AVE STREET RED/BLUE UMW DECALS AND RESIDENTS LIVING ON COLLEGE AVENUE LOTS LOCATION PARKING DESIGNATION COLLEGE AVE STREET RED/BLUE UMW DECALS AND RESIDENTS LIVING ON COLLEGE AVENUE Commuter, faculty, staff along with residents living on College Ave authorized to park on

More information

Festoon Systems for I-Beams Program

Festoon Systems for I-Beams Program Fetoon Sytem for I-Beam Program 0314 0320 0325 00 2 Content Cable Trolley for Flat Cable Program 0314 4 Fetoon Sytem for Flat Cable... 4 4 Wheel Platic Trolley... 4 3 Wheel Platic Trolley... 5 2 Wheel

More information

CEE nd Midterm Examination (50 minutes)

CEE nd Midterm Examination (50 minutes) CEE 30 nd Midterm, Fall 009 CEE 30 nd Midterm Examination (50 minute) Pleae write your name on thi cover. Pleae write you lat name on all other exam page You are allowed to ue one 8.5 by heet of note..

More information

Single-Phase Motors. Chapter (9) Introduction. 9.1 Types of Single-Phase Motors. 9.2 Single-Phase Induction Motors

Single-Phase Motors. Chapter (9) Introduction. 9.1 Types of Single-Phase Motors. 9.2 Single-Phase Induction Motors Chapter (9) Single-Phae Motor Introduction A the name ugget, thee motor are ued on ingle-phae upply. Singlephae motor are the mot familiar of all electric motor becaue they are extenively ued in home appliance,

More information

Power Reducer Box. Sunny WebBox PLC. Inverter unit. Fig. 1: SMA Sunny GEU STP STP 15000TLEE-10

Power Reducer Box. Sunny WebBox PLC. Inverter unit. Fig. 1: SMA Sunny GEU STP STP 15000TLEE-10 Unit Certificate FGH-E-212-8 Duly igned copy no. 1; Page 2 of 7 Section A of the certificate: General Layout Diagram Mater decoupling protection I> >, U>, U

More information

SEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A

SEQUOIA UNION HIGH SCHOOL DISTRICT MEASURE A PROJECT LIST as (Draft) Description Additional Campuses Initial Spent as 943 Acquisition of 535 Old County Rd., San Carlos 3,407,259 3,407,259 3,407,259 3,407,259 0 closed 944 Acquisition of 150 Jefferson

More information

Wegmans Fairfax Joseph B. Lookup Electrical System Existing Conditions Report & Building Load Summary Report. Appendix Tech Assignment # 2

Wegmans Fairfax Joseph B. Lookup Electrical System Existing Conditions Report & Building Load Summary Report. Appendix Tech Assignment # 2 Wegmans Fairfax Joseph B. Lookup Electrical System Existing Conditions Report & Building Load Summary Report Appendix Tech Assignment # 2 I Wegmans Fairfax Joseph B. Lookup Electrical System Existing Conditions

More information

THE PUBLIC SERVICE COMMISSION OF WYOMING

THE PUBLIC SERVICE COMMISSION OF WYOMING NAME: Powder River Energy Corporation WY PSC Tariff No. 7 ADDRESS:, Sundance, WY 82729 THE PUBLIC SERVICE COMMISSION OF WYOMING TARIFF RATE RIDER 5th Revised Sheet No. 1 Cancels 4th Revised Sheet No. 1

More information

Locational Marginal Pricing (LMP) in Deregulated Electricity Market

Locational Marginal Pricing (LMP) in Deregulated Electricity Market Locatal Marginal Pricing () in Deregulated Electricity Market ABSTRACT The deregulat of electricity market ha a very large impact on almot all the power ytem around the world. Competitive market are complex

More information

brem RADIATORS FOR ARCHITECTURE

brem RADIATORS FOR ARCHITECTURE brem RADIATORS FOR ARCHITECTURE Brem radiator and towel rail are made uing different ize of teel tube or are tranformed into plate. Welding i carried out by ophiticated automatic ytem the weld are all

More information

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY

TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY TEN YEAR PLANNING GUIDE SHASTA LAKE ELECTRIC UTILITY 2011-2020 P+ PowerPlus Engineering A Department of STAR Energy Services, LLC TEN YEAR PLANNING GUIDE 2011-2020 SHASTA LAKE ELECTRIC UTILITY CITY OF

More information

Managing Energy at Your Small Drinking Water System A Workshop Series for North Carolina Utilities

Managing Energy at Your Small Drinking Water System A Workshop Series for North Carolina Utilities Managing Energy at Your Small Drinking Water System A Workshop Series for North Carolina Utilities Workshop 1 Tuesday, 11/29/16 Land-of-Sky Regional Council, Asheville, NC Facilitators Dawn Nall (SW EFC)

More information

Water side Economizer WC chiller

Water side Economizer WC chiller Appendices Water side Economizer WC chiller Power Loading Lighting Load W/ft^2 Area (ft^2) W kw 3.5 48152 168532 Water Cooled Chiller kw/ton 0.7 UA Supply Fan BHP kw wall 1069 58 43 window 3642 roof 295

More information

Three-Phase Induction Motor Preliminar Design Assisted by CAD Software based on Brazilian Standards

Three-Phase Induction Motor Preliminar Design Assisted by CAD Software based on Brazilian Standards Three-Phae Induction Motor Preliminar Deign Aited by CAD Software baed on Brazilian Standard Victor de Paula Brandão Aguiar 2, Ricardo Silva Thé Ponte, Tobia Rafael Fernande Neto Department of Electrical

More information

Rotrex TM E-charger. Technical Datasheet. Prototype Status v1.5 (June 2015) updates and changes:

Rotrex TM E-charger. Technical Datasheet. Prototype Status v1.5 (June 2015) updates and changes: Rotrex TM E-charger Technical Dataheet Page 1 of 7 Prototype Statu v1. (June 201) update and change: NEW IP67/IP6 mobile inverter available in the 60A range (~40kW @ 60VDC), with bigger power range to

More information

Torque of Induction Motor under Running Condition (T r )

Torque of Induction Motor under Running Condition (T r ) Torque of Induction Motor under unning Condition T r It i the torque developed by the motor under running condition i.e., at lip. From figure, the rotor circuit/phae at lip. Let, E =E : rotor e.m.f/phae

More information