1 Materials Testing Canada Inc. R-Solutions Spike Hole Plugging Compound Static and Dynamic Load Tests Presented to: 100 South Santa Fe Dr. Denver, Colorado Attn: Walter Vizcaino, Date Issued 03 March 2005 Report Number Version Number 1 Number of pages (text, including cover) 5 Number of Appendices 3 Number of Appendix Pages (including cover) A1:4/A2:2/A3:4 Bodycote Materials Testing Canada Inc. 121 Boul. Hymus, Pointe Claire, Qc H9R 1E6 This report may not be reproduced except in its entirety without permission from Bodycote Materials Testing Canada Inc. Report refers only to items tested as indicated.
2 Introduction In accordance with the request from R-Solutions and Bodycote OS # , Bodycote Materials Testing Canada Inc., Rail/Mechanical Dept., has completed a static and dynamic test program on a spike hole treated wood tie. The test program combines the Bodycote standard test procedure for spike hole filler plus a rail roller over test criteria supplied by the BNSF Railway. Tests were conducted at the Bodycote Materials Testing Inc., Rail Products test facility in Pointe Claire, Québec, Canada. Test Preparation Two new wood ties (oak or maple) were prepared by R-Solutions according to the requirements of the BNSF test criteria. The full BNSF test program can be found in Appendix 2. The dynamic tests were performed on an MTS dynamic load frame with 110 kip maximum capacity. LVDT transducer were used to monitor the tie plates. The tie was prepared according to the BNSF test. The spike holes were cut to a specified slot pattern (see Appendix 2). The purpose of the slotted holes was to allow a direct load from the spike to the spike hole filler material itself during the test without direct support from the wood. That way the spike hole filler materials resistance to lateral loading as well as spike pull out could be monitored throughout the test. The holes at one end were filled dry after cutting. The holes at the opposite end were wet with 10ml of water before filling with compound. Both ties were prepared in this manner before shipping to Bodycote. The first tie was set up for the dynamic test and an R-Solutions representative witnessed the start-up of the test. Test Procedures Dynamic Test A cyclic load was applied simultaneously to both rail heads using a dynamic loading pattern as follows: Inclined Load Severe Service Fatigue Test Load per rail, Lateral = 16,900 lbs. max. 260 lbs. min. Vertical = 32,500 lbs. max. 500 lbs. min. Load Ratio L/V = 0.52 constant Test angle = 27.5 per arm A cyclic load was applied to the gauge corners of each rail and components were monitored. The target was 1,000,000 cycles Page 2 of 5 03 March 2005
3 Deflection measurements were taken on the gauge side of each tie plate using an LVDT transducer connected to a brush recorder to monitor plate lateral movement throughout the test. Lateral movement in this test is an indication of spike filler material failure under load. Roller-Over Test The second tie was used for the rollover test. The rollover test was performed according to the BNSF requirements (See Appendix 2). The tie plate used for the rollover test was equipped with an anti-rollover shoe fitted to the gauge side of the plate. This shoe was bolted through one of the line spike holes, leaving the second hole free for spiking. Load was applied 5/8 below the running surface on the side of the rail head. The test was terminated when the rail rolled over (pulling away from the tie plate and unable to sustain load.) Spike Insertion Extraction Test Spike insertion / extraction values were recorded were possible to add information to the test. There were due to the requirements of the BNSF protocol, there were not enough unused filled holes to perform the full Bodycote spike hole procedure. Test Results Dynamic Test The dynamic test ran uninterrupted for 742,150 cycles. At that point the tie plate on end A (dry end) cracked under the field side rail edge. After discussions with R-Solutions, the tie plate was replaced, spiking into the original holes without refilling with compound. Plate deflection on end A (dry end) at startup was 0.015, increasing slightly to by 742,150 cycles, when the plate broke. Similarly, end B (wet end) started at deflection and reached deflection by 742,150 cycles. After replacing the tie plate on end A, the tests was restarted and successfully completed the 1,000,000 cycles required. The tie plate on end A partially cracked at 970,800 cycles. was allowed to run out to the million cycles without replacement. The deflection on end A did not change significantly after re-spiking over the remaining cycles (0.020 at 970,800 cycles). Deflections on end B increased to at 1,000,000 cycles. These numbers indicate that the re-spiked tie plate did not experience a significant change in deflection despite having the spikes pulled and then re-spiked. The average pullout force on the end A spikes was 3763 lbs. after 742,150 cycles. Average pullout of end A after 1,000,000 cycles was 2970 lbs. Average pullout on end B (wet) after 1,000,000 cycles was 3120 lbs Page 3 of 5 03 March 2005
4 Roll-Over Test Two tests were conducted for this phase of the test program. Results are listed below: Dry holes: Wet holes: 21,520 lbs. force at roll-over. 15,410 lbs. force at roll-over. The rollover test could not be conducted on the dynamic tested tie since BNSF preferred the use of an anti-rollover shoe on the gauge side of the rail during the rollover test. This equipment was not provided for the dynamic test. Tables 1. Before Dynamic Test Initial Insertion Forces (Dynamic test) D=Dry W=Wet F=Field Side G=Gauge Side Location Load, lbs Location Load, lbs DG WG DG WG DF WF DF WF Broken Plate Replacement Load to Extract Load to Re-Inset Location Load, lbs Location Load, lbs. DG DG DG DG DF DF DF DF Extraction after Dynamic Cycling. Load to Extract Load to Extract Location Load, lbs Location Load, lbs DG WG DG WG DF WF DF WF Page 4 of 5 03 March 2005
5 Conclusions Dynamic deflection of the tie plate (lateral movement under cyclic load) was the same for both wet and dry holes. The difference between wet and dry spike pullout forces after 1,000,000 cycles was 5%. The difference between the dry hole pullout forces on the cracked plate at 742,150 cycles and the re-spiked holes at 1,000,000 cycles was 26.7% The difference in rollover values between wet and dry was 40% (based on one sample per test only) * * * This report refers only to the specific samples, instrumentation or other information used and referred to in said report, and is limited by the tests and/or analyses performed Page 5 of 5 03 March 2005
6 APPENDIX 1: Test Photographs Appendix 1, Page 1 of 4 03 March 2005
7 Figure 1 General test set-up, dynamic. Figure 2 Close-up of rail seat showing transducer positions(arrows) Appendix 1, Page 2 of 4 03 March 2005
8 Figure 3 Spike hole filler pattern (typical). Figure 4 Cracked plate (field side rail edge) Appendix 1, Page 3 of 4 03 March 2005
9 Figure 5- Setup for Rollover test. Figure 6- Typical rollover results Appendix 1, Page 4 of 4 03 March 2005
10 Appendix II BNSF Test Requirement Appendix 2, Page 1 of 2 03 March 2005
11 BNSF Tie Plugging Compound Test Procedure (This document is intended to outline procedures preferred by BNSF when testing tie plugging compounds and is to be approved by BNSF before use.) Dynamic Tie Test Two ties are set up in this manner (ID Tie 1 and Tie 2). A straight tie with no twist is required for the test. Slots are cut for each spike using a 3/4 x 1.25 x 4.5 hole pattern spaced to standard North American track gauge spacing on each of the ties. The spiking pattern is as shown in the graphic above; two line spikes staggered, two anchor spikes staggered. One end of the tie is set up by shooting the plugging material into dry slots to the above configuration. The opposite end of the tie is set up by first pouring 10ml of water into the slot before shooting with plugging compound Run the dynamic load test on Tie1 to 1 million cycles. Measure rail head and tie plate lateral movement throughout the test. After 1 million cycles, perform the rail rollover test (see below). Rollover Test Following the dynamic test, the individual ends are prepared for lateral load rollover testing as follows: Cut the tie to fit the lateral rollover test jig. Insert the tie section so that the load head is positioned to apply a load ~5/8 below the rail head running surface. Set a transducer on the side of the rail head, 5/8 below the running surface. Apply a load to the rail head until rail rollover occurs, recording deflection and load on the data acquisition system. Perform this test on both wet and dry ends of the tie. Prepare curves from data. In addition to the rollover on the dynamic test tie (Tie 1), perform the same test on each end of the untested tie (Tie 2) Appendix 2, Page 2 of 2 03 March 2005
12 Appendix 3 Extra Test Work Appendix 3, Page 1 of 4 03 March 2005
13 In addition to the work outlined in the foregoing report, R-Solutions requested the additional testing: roll-over test on virgin wood. insertion/extraction tests on the dynamic tested holes. Results Rollover in virgin wood = 30,000 lbs +. Note: Test was stopped at 30,000 lbs before rollover occurred due to a concern over breaking the test rail. Insertion/Extraction The following graph illustrates the results of the 10 cycle spike insertion/extraction test after 1 million cycles dynamic loading. Comparison of Wet and Dry Hole Spike Insert/Extract after 1 Milllion Dynamic Load Cycles Load, lbs Insert/Extract cycles DG1-Ins DG1-Ext WG1-Ins WG1-Ext DG2-Ins DG2-Ext WG2-Ins WG2-Ext DF1-Ins DF1-Ext WF1-Ins WF1-Ext Appendix 3, Page 2 of 4 03 March 2005
14 Insertion Extraction after 1,000,000 cycles per hole. C Dry: DG1 Wet: WG1 Cycle # Insert Extract Cycle# Insert Extract C Dry: DG2 Wet: WG2 Cycle # Insert Extract Cycle# Insert Extract Dry: DF1 Wet: WF1 Cycle # Insert Extract Cycle# Insert Extract
15 Comparison of Wet and Dry Hole Spike Insert/Extract after 1 Milllion Dynamic Load Cycles Load, lbs Insert/Extract cycles DG1-Ins DG1-Ext WG1-Ins WG1-Ext DG2-Ins DG2-Ext WG2-Ins WG2-Ext DF1-Ins DF1-Ext WF1-Ins WF1-Ext
STATUS OF NHTSA S EJECTION MITIGATION RESEARCH. Aloke Prasad Allison Louden National Highway Traffic Safety Administration
STATUS OF NHTSA S EJECTION MITIGATION RESEARCH Aloke Prasad Allison Louden National Highway Traffic Safety Administration United States of America Stephen Duffy Transportation Research Center United States
More informationCourseware Sample F0
Career & Technical Education Mechanical Training System Courseware Sample 36891-F0 AB CAREER & TECHNICAL EDUCATION MECHANICAL TRAININ SYSTEM COURSEWARE SAMPLE by the Staff of Lab-Volt (Quebec) Ltd Copyright
More informationHIGH TEMPERATURE SUSTAINED LOAD TEST ON A COMPRESSION DEAD-END CONNECTOR INSTALLED ON 1020 KCMIL, ACCC/TW DRAKE CONDUCTOR
To: AFL 104 Hidden Lake Circle Duncan, SC 29334 USA 4 HIGH TEMPERATURE SUSTAINED LOAD TEST ON A COMPRESSION DEAD-END CONNECTOR INSTALLED ON 1020 KCMIL, ACCC/TW DRAKE CONDUCTOR Kinectrics North America
More informationmga research corporation
mga research corporation UNDERGROUND TECHNOLOGIES MAN-HOLE CONSTRUCTION VERTICAL STATIC LOAD TEST SERIES (PO# 11521) 446 executive drive troy, mi 48083 248 / 577-5001 fax 248 / 577-5025 www.mgaresearch.com
More informationInspection & Maintenance of Spring Rail Frogs
Inspection & Maintenance of Spring Rail Frogs Leslie Strezo, BNSF Railway Spring Rail Frog Importance of Inspection Safety Prevents derailments If spring is not tight enough or force is not strong enough,
More informationTEST METHODS CONCERNING TRANSPORT EQUIPMENT
PART IV TEST METHODS CONCERNING TRANSPORT EQUIPMENT - 403 - CONTENTS OF PART IV Section Page 40. INTRODUCTION TO PART IV... 407 40.1 PURPOSE... 407 40.2 SCOPE... 407 41. DYNAMIC LONGITUDINAL IMPACT TEST
More informationDassault Systèmes Automotive Powertrain Assembly Analysis with Abaqus
Automotive Powertrain Assembly Analysis with Abaqus R 6.11 About this Course Course objectives Upon completion of this course you will be able to: Simulate engine assembly and operation conditions including
More informationTest Report For: EMECO INDUSTRIES INC Bar Stool
4700 Broadmoor SE, Suite 200 Kentwood, MI 49512 Telephone: 616-- 656-- 7401 Facsimile: 616-- 656-- 2022 www.intertek-- etlsemko.com EMECO INDUSTRIES INC P.O. No. N / A Page 1 of 18 Test Report For: EMECO
More informationPENTAGON PROTECTION USA
PENTAGON PROTECTION USA Shock Tube Testing for Window Systems March 2009 San Antonio, Texas ABS Consulting Project Number 2127174 ABSG Consulting, Inc. 14607 San Pedro, Suite 215 San Antonio, TX 78232
More informationETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy
ETAP Implementation of Mersen s Medium Voltage Controllable Fuse to Mitigate Arc Flash Incident Energy ETAP 17 Goodyear, Suite 100 Irvine, CA 92618 White Paper No.001.14-2016 Albert Marroquin, PE Member
More informationReport Number BTC 12024F
Report Number BTC F A FIRE RESISTANCE TEST ON A GYPROC GYPWALL PARTITION INCORPORATING A DOUBLE LAYER OF mm SOUNDBLOC EACH SIDE OF S STUDS, CONDUCTED IN ACCORDANCE WITH BS EN 4:999. Test Date: 9 th June
More informationTime-Dependent Behavior of Structural Bolt Assemblies with TurnaSure Direct Tension Indicators and Assemblies with Only Washers
Time-Dependent Behavior of Structural Bolt Assemblies with TurnaSure Direct Tension Indicators and Assemblies with Only Washers A Report Prepared for TurnaSure, LLC Douglas B. Cleary, Ph.D., P.E. William
More informationList of Figures Figure 1: Wabtec Railway Electronics SBU as received... 3
Table of Contents 1.0 INTRODUCTION... 1 1.1 Description of Occurrence... 1 1.2 Engineering Services Requested... 1 1.3 Parts Received... 1 2.0 EXAMINATION AND DATA EXTRACTION... 1 3.0 CONCLUSION... 2 -i-
More informationTilted Disc Check Valve Hydrostatic and Cycle Test Report
Tilted Disc Check Valve Hydrostatic and Cycle Test Report VAL-MATIC VALVE AND MANUFACTURING CORP. 905 RIVERSIDE DR. ELMHURST, IL. 60126 TEL. 630/941-7600 FAX. 630/941-8042 Copyright 1995 Val-Matic Valve
More informationTitle: Fire Resistance Test In Accordance With BS EN : 1999 On A Glazed Screen Assembly. WF Report No: , Issue 2. Prepared for: Date:
Title: Fire Resistance Test In Accordance With BS EN 1364-1: 1999 On A Glazed Screen Assembly WF Report No: 164311, Prepared for: AGC Flat Glass Europe. Chaussee de la Hulpe 166 1170 Brussels. Date: 19
More informationVehicle Dynamic Simulation Using A Non-Linear Finite Element Simulation Program (LS-DYNA)
Vehicle Dynamic Simulation Using A Non-Linear Finite Element Simulation Program (LS-DYNA) G. S. Choi and H. K. Min Kia Motors Technical Center 3-61 INTRODUCTION The reason manufacturers invest their time
More informationSHOCK ABSORBER/DAMPER TESTING MACHINE
SHOCK ABSORBER/DAMPER TESTING MACHINE Dampening force of a shock absorber is directly proportional to velocity and this parameter needs to be precisely controlled. A small variation of 1mm in a stroke
More informationA Derailment Investigation Leads to Broken Spikes. Brad Kerchof Research & Tests
A Derailment Investigation Leads to Broken Spikes Brad Kerchof Research & Tests 1 Google Earth image of the derailment site Vandergrift, PA, January 2014 8.3 curve, river grade (0.3% descending to 0%)
More informationSECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES
SECTION 8 RAIL FREIGHT VEHICLE UNDERFRAME AND BODY STRUCTURES ROA MANUAL SCHEDULE OF AMENDMENTS SECTION 8 AMENDMENT NUMBER PAGES AMENDED AMENDMENT SUMMARY DATE ISSUED Portions of this Section of the ROA
More informationReview Paper on Design and Development of Coupling Torque Endurance Test Machine with Variable Torque and Chamber Adjustment
Review Paper on Design and Development of Coupling Torque Endurance Test Machine with Variable Torque and Chamber Adjustment 1. Mr. Borude S.C.(P.G. Student, JSPM s ICOER, Pune), 2.Prof. Biradar N.S.(HOD
More informationOptimal Control Strategy Design for Extending. Electric Vehicles (PHEVs)
Optimal Control Strategy Design for Extending All-Electric Driving Capability of Plug-In Hybrid Electric Vehicles (PHEVs) Sheldon S. Williamson P. D. Ziogas Power Electronics Laboratory Department of Electrical
More informationINME 4011 Term Project Guideline
INME 4011 Term Project Guideline Each team consists of four students (maximum). The projects are described in the attached document. First part of the project includes the calculation of the shaft diameter
More informationFMVSS 121 Brake Performance and Stability Testing
FMVSS 121 Brake Performance and Stability Testing FINAL REPORT - Revision A SwRI Project No. 03-05190 Prepared for Mr. Bill Washington Air Brake Systems 4356 E. Valley Road Mount Pleasant, MI 48804-0293
More informationAppendix X New Features in v2.4 B
Appendix X New Features in v2.4 B Version 2.4B adds several features, which we have grouped into these categories: New Suspension Types or Options The program now allows for solid front axles and for several
More informationCrashworthiness Evaluation. Roof Strength Test Protocol (Version III)
Crashworthiness Evaluation Roof Strength Test Protocol (Version III) July 2016 CRASHWORTHINESS EVALUATION ROOF STRENGTH TEST PROTOCOL (VERSION III) Supporting documents for the Insurance Institute for
More informationCHAPTER 4 : RESISTANCE TO PROGRESS OF A VEHICLE - MEASUREMENT METHOD ON THE ROAD - SIMULATION ON A CHASSIS DYNAMOMETER
CHAPTER 4 : RESISTANCE TO PROGRESS OF A VEHICLE - MEASUREMENT METHOD ON THE ROAD - SIMULATION ON A CHASSIS DYNAMOMETER 1. Scope : This Chapter describes the methods to measure the resistance to the progress
More informationMain bearing C 18-1/7. Remark): Both types of stud bolt and jack bolt have been adopted on the ship, which delivered before on March 2002.
Main bearing 1132 1.1 Structure Jack bolt type Remark): Both types of stud bolt and jack bolt have been adopted on the ship, which delivered before on March 2002. 8 ~ 12Cyl Stud bolt Jack bolt No. Name
More informationCPD Actuators. Powerful, Maintenance-Free Roller Screw Actuators COMPATIBLE WITH VIRTUALLY ANY SERVO MOTOR
CPD Actuators Powerful, Maintenance-Free Roller Screw Actuators COMPATIBLE WITH VIRTUALLY ANY SERVO MOTOR CMC Roller Screw Actuators The CPD Series Advantage Maintenance Free Oil lubrication is the accepted
More informationTRAFFIC SURVEY REPORT HARVINGTON PT1 (CREST HILL)
TRAFFIC SURVEY REPORT HARVINGTON PT1 ( HILL) October 20-24th 2014 Conducted voluntarily by the residents of Harvington Village. This report has been prepared in light of the planning application W14/01788/OU
More informationSession #604 Interchanging Locomotives
Session #604 Interchanging Locomotives The Alignment Control Coupler Controversy David L. Powell Vice President - Motive Power Genesee & Wyoming Inc. ASLRRA 2014 Centennial Connections April 24, 2014 -
More informationReport Number BTC 12261F
Report Number BTC 6F A FIRE RESISTANCE TEST ON A 5m HIGH X m WIDE GYPROC SHAFTWALL SYSTEM INCORPORATING A 6mm METAL STUD FRAMEWORK CLAD WITH A DOUBLE LAYER OF 5mm GYPROC FIRELINE, EXPOSED TO THE FIRE FROM
More informationQuantification of Lateral Forces in Concrete Crosstie Fastening Systems
in Concrete Crosstie Fastening Systems Transportation Research Board 94 th Annual Meeting Washington D.C. 13 January 21 Brent Williams, Donovan Holder, Marcus Dersch, Riley Edwards, and Christopher Barkan
More informationALD3 Diaphragm Valve Technical Report
ALD Diaphragm Valve Technical Report Scope This technical report provides data on Swagelok ALD normally closed diaphragm valves. The report covers: helium seat leak testing valve flow consistency analysis
More informationRailway Transportation Safety Investigation Report R17Q0088
Railway Transportation Safety Investigation Report R17Q0088 CROSSING COLLISION VIA Rail Canada Inc. Passenger train P60321-25 Mile 77.2, Canadian National Railway Company La Tuque Subdivision Hervey-Jonction,
More information3M Brand Composite Conductor Connector Current Cycle Qualification Test for 795 kcmil Compression Connectors
3M Brand Composite Conductor Connector Current Cycle Qualification Test for 7 kcmil Compression Connectors 3M Company Purchase Orders 0000797063 and 0000866974 NEETRAC Project Number: 03-071 September,
More informationApollo Tilt Wheelchair 18" and 20" Instruction Manual
Apollo Tilt Wheelchair 18" and 20" Instruction Manual Table of Contents Contents Table of Contents... 2 Introduction... 3 Warning... 4 Safety Guidelines... 5 Parts of the Tilt Wheelchair... 6 Setup & Operation...
More informationCHECK AND CALIBRATION PROCEDURES FOR FATIGUE TEST BENCHES OF WHEEL
STANDARDS October 2017 CHECK AND CALIBRATION PROCEDURES FOR FATIGUE TEST BENCHES OF WHEEL E S 3.29 Page 1/13 PROCÉDURES DE CONTRÔLE ET CALIBRAGE DE FATIGUE BANCS D'ESSAIS DE ROUE PRÜFUNG UND KALIBRIERUNG
More informationPrinciples of Doubly-Fed Induction Generators (DFIG)
Renewable Energy Principles of Doubly-Fed Induction Generators (DFIG) Courseware Sample 86376-F0 A RENEWABLE ENERGY PRINCIPLES OF DOUBLY-FED INDUCTION GENERATORS (DFIG) Courseware Sample by the staff
More information8296 Portable Monitor Operating & Maintenance Instructions
8296 Portable Monitor Operating & Maintenance Instructions PHYSICAL: 1302 WEST BEARDSLEY AVE ELKHART, IN 46514 WWW.ELKHARTBRASS.COM MAILING: P.O. BOX 1127 ELKHART, IN 46515 1-574-295-8330 1-800-346-0250
More informationBLAST CAPACITY ASSESSMENT AND TESTING A-60 OFFSHORE FIRE DOOR
BLAST CAPACITY ASSESSMENT AND TESTING Final Report December 11, 2008 A-60 OFFSHORE FIRE DOOR Prepared for: JRJ Alum Fab, Inc. Prepared by: Travis J. Holland Michael J. Lowak John R. Montoya BakerRisk Project
More informationAutomotive NVH with Abaqus. About this Course
Automotive NVH with Abaqus R 6.12 About this Course Course objectives Upon completion of this course you will be able to: Perform natural frequency extractions Perform sound radiation analyses (acoustics)
More information2015 HBM ncode Products User Group Meeting
March 4-5, 2015 Livonia, MI (USA) March 4-5, 2015 Strain Analysis for determining fan fatigue life Ensuring life of a generator set radiator fan Livonia, MI (USA) March 4-5, 2015 Livonia, MI (USA) Agenda
More informationCharacterization and Refinery Processing of Partially-upgraded Bitumen
CCQTA-COQA Joint Meeting in Edmonton, 2016 Characterization and Refinery Processing of Partially-upgraded Bitumen Tomoki Kayukawa JGC Corporation 1 Outline Background Properties of Partially Upgraded Product
More informationAn Introduction to Fatigue Testing Equipment, Test Setup & Data Collection
An Introduction to Fatigue Testing Equipment, Test Setup & Data Collection Lisa Goodwin Servohydraulic Sales Specialist & Market Manager - Instron The difference is measurable 1 Themes.. Certainty of Measurement
More informationABSTRACT INTRODUCTION
Wind tunnel investigation of waste air re-entry with wall ventilation P. Broas Technical Research Centre of Finland, Ship Laboratory, Tekniikantie 12, SF-02150, Espoo, Finland ABSTRACT A wind tunnel investigation
More informationA Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk
A Recommended Approach to Pipe Stress Analysis to Avoid Compressor Piping Integrity Risk by: Kelly Eberle, P.Eng. Beta Machinery Analysis Calgary, AB Canada keberle@betamachinery.com keywords: reciprocating
More informationInternal Combustion Engines
Thermochemistry & Fuels Lecture 4 1 Outline In this lecture we will discuss the properties and characteristics of diesel fuels: Cetane number and index Viscosity and cold behaviour Flash point Sulphur
More informationTEST REPORT. Rendered to: HOMELAND VINYL PRODUCTS, INC. For: PVC Guardrail System Utilizing New Nylon/PVC Rail Mounting Bracket
TEST REPORT Rendered to: HOMELAND VINYL PRODUCTS, INC. For: PVC Guardrail System Utilizing New Nylon/PVC Rail Mounting Bracket Report No: Report Date: 10/31/12 130 Derry Court York, PA 17406-8405 phone:
More informationMethanol in Biodiesel by EN14110 with the HT3 and Versa Automated Headspace Analyzers. Versa HT3. Application Note. Abstract.
Methanol in Biodiesel by EN14110 with the HT3 and Versa Automated Headspace Analyzers Application Note Abstract Versa With the rising prices of fossil fuels, more emphasis is being put on renewable resources
More informationAircraft Tyres. Richard Skiba. Skiba, R. (1999). Aircraft Tyres: Differences Between Aircraft and Automotive Tyres, Pacific Flyer, September.
Aircraft Tyres Richard Skiba Skiba, R. (1999). Aircraft Tyres: Differences Between Aircraft and Automotive Tyres, Pacific Flyer, September. Skiba, R. (2000). Aircraft Tyres', Gyro News, Vol.14, No. 3,
More informationASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: GLASSCRAFT DOOR COMPANY Houston, Texas
Architectural Testing ASTM E 1886 and ASTM E 1996 TEST REPORT Report No.: A6458.01 801 18 Rendered to: GLASSCRAFT DOOR COMPANY Houston, Texas PRODUCT TYPE: Fiberglass In Swing Glazed Double Doors SERIES/MODEL:
More informationASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: GLASSCRAFT DOOR COMPANY Houston, Texas
Architectural Testing ASTM E 1886 and ASTM E 1996 TEST REPORT Report No.: A6839.01 801 18 Rendered to: GLASSCRAFT DOOR COMPANY Houston, Texas PRODUCT TYPE: In Swing Fiberglass Double Doors with Speak Easy
More informationReport of Test Results on a Solid Surface Panel. Tested In Accordance With ASTM F462 Slip Resistance
Report of Test Results on a Solid Surface Panel Tested In Accordance With ASTM F462 Slip Resistance Prepared For: Grifform Innovations P.O. Box 258 Glide, OR 97443 Prepared By: Home Innovation Research
More informationASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: GLASSCRAFT DOOR COMPANY Houston, Texas
Architectural Testing ASTM E 1886 and ASTM E 1996 TEST REPORT Report No.: A6457.01 801 18 Rendered to: GLASSCRAFT DOOR COMPANY Houston, Texas PRODUCT TYPE: In Swing Fiberglass Door with Side Lites SERIES/MODEL:
More informationCopyright Statement FPC International, Inc
Copyright Statement All rights reserved. All material in this document is, unless otherwise stated, the property of FPC International, Inc. Copyright and other intellectual property laws protect these
More informationAutomotive NVH with Abaqus. Abaqus 2018
Automotive NVH with Abaqus Abaqus 2018 About this Course Course objectives Upon completion of this course you will be able to: Perform natural frequency extractions Perform sound radiation analyses (acoustics)
More informationROAD RESEARCH LABORATORY. Ministry of Transport RRL REPORT NO. 3
ROAD RESEARCH LABORATORY Ministry of Transport RRL REPORT NO. 3 VEHIICLE IMPACT TESTS ON A HEDGE OF ROSA MULTIFLORA JAPONICA by I.B. Laker HARMONDSWORTH ROAD RESEARCH LABORATORY 1966 CONTENTS Page Abstract
More informationMaintenance and installation guide
Swirl diffuser DAL 358 M A D E I N CANADA Maintenance and installation guide KEEP THIS GUIDE nadklima.com Québec NAD Klima (head office) 144 Léger, Sherbrooke (Qué) J1L 1L9 (819) 780-0111 1 866 531-1739
More informationROHRBACK COSASCO SYSTEMS TEST REPORT
ROHRBACK COSASCO SYSTEMS TEST REPORT Subject: RSL Retriever 2500 psi Debris Test Report Issued By: Rohrback Cosasco Systems, Santa Fe Springs, CA USA Date: June 6, 2012 E-mail: services@cosasco.com Website:
More informationHigh Load Capacity Cylindrical Roller Bearings
NTN TECHNICAL REVIEW No.7426 New Product High Load Capacity Cylindrical Roller Bearings Takuya OZU NTN has developed high load capacity cylindrical roller bearings appropriate for gearbox of wind turbines
More informationUnited States Stove Company Project # Model: KP60 AKA: AP60, VG60 Type: Pellet-Fired Room Heater May 31, 2018
United States Stove Company Project # 18-409 AKA: AP60, VG60 Type: Pellet-Fired Room Heater May 31, 2018 ASTM E2779 Standard Test Method for Determining Particulate Matter Emissions from Pellet Heaters
More informationTest Report No.: AJHL FT Date: JUN.02, 2016 Page 1 of 5
Test Report No.: AJHL1605004946FT Date: JUN.02, 2016 Page 1 of 5 The following sample(s) was / were submitted and identified on behalf of the client as: Sample Description OFFICE CHAIR Type/Style K-106AH
More informationAnalysis of Petroleum Samples Using the Teledyne Leeman Labs
APPLICATION NOTE: TECHNOLOGY: INDUSTRY: AN1802 ICP Petroleum Analysis of Petroleum Samples Using the Teledyne Leeman Labs Prodigy Plus ICP-OES John Condon, Applications Chemist and Bruce MacAllister, Applications
More informationTech Tip: Trackside Tire Data
Using Tire Data On Track Tires are complex and vitally important parts of a race car. The way that they behave depends on a number of parameters, and also on the interaction between these parameters. To
More informationInternational DT 466, DT 570 and HT 570 Turbo Repair
A NAVISTAR COMPANY International DT 466, DT 570 and HT 570 Turbo Repair Study Guide TMT-121008 Study Guide International DT 466, DT 570 and HT 570 Turbo Repair TMT-121008 2010 Navistar, Inc. 4201 Winfield
More informationAutomotive Powertrain Assembly Analysis with Abaqus
Automotive Powertrain Assembly Analysis with Abaqus Seminar Lecture 1 Lecture 2 Lecture 3 Lecture 4 Lecture 5 Lecture 6 Introduction and Motivation Contact Gaskets and Bolt Loading Thermal Stress Analysis
More informationModel 8. Power Wheel. Planetary Gear Drive
Model 8 Power Wheel Planetary Gear Drive CONTENTS Introduction 3 Model 8 Wheel Drives - Double Reduction 4-5 Model 8 Wheel Drives w/a2 Series Integral Parking Brake - Double Reduction 6-7 Model 8 Shaft
More informationPROFILING OF PULSATION AND VIBRATION IN COMPLEX RECIPROCATING COMPRESSOR FACILITIES
PROFILING OF PULSATION AND VIBRATION IN COMPLEX RECIPROCATING COMPRESSOR FACILITIES Bryan Fofonoff, P.Eng. Beta Machinery Analysis Ltd., 300, 1615 10 th Ave. SW., Calgary, AB, Canada, T3C 0J7 ABSTRACT
More informationWhite Paper. Phone: Fax: Advance Lifts, Inc. All rights reserved.
White Paper TURNTABLE AppLicATioN GUidE This section covers the full range of turntables manufactured by Advance Lifts. The basic information necessary to select an appropriate turntable for an application
More informationSLED TEST PROCEDURE FOR ASSESSING KNEE IMPACT AREAS
EUROPEAN NEW CAR ASSESSMENT PROGRAMME (Euro NCAP) SLED TEST PROCEDURE FOR ASSESSING KNEE IMPACT AREAS CONTENTS 1 INTRODUCTION...2 2 PREREQUISITES FOR KNEE MAPPING...3 3 HARDWARE SETUP...4 4 VALIDATION
More information--> Buy True-PDF --> Auto-delivered in 0~10 minutes. GB/T Translated English of Chinese Standard: GB/T
Translated English of Chinese Standard: GB/T25978-2018 www.chinesestandard.net Buy True-PDF Auto-delivery. Sales@ChineseStandard.net ICS 43.020 NATIONAL STANDARD OF THE PEOPLE S REPUBLIC OF CHINA GB T
More informationAPPLICANT: EMECO DATE: Mar 10, ELM AVE HANOVER, PA, USA
APPLICANT: EMECO DATE: Mar 10, 2011 805 ELM AVE HANOVER, PA, 17331 USA ATTN: MAGNUS BREITLING THIS IS TO SUPERSEDE REPORT NO. SZHH00526912 DATED SEP 20, 2010 SAMPLE DESCRIPTION: TWO (2) PIECES OF SUBMITTED
More informationCylindrical roller bearings for large electric motors
Cylindrical roller bearings for large electric motors Cylindrical roller bearings are typically used in belt or gear driven medium- to largesized electric motors, where heavy radial loads prevail. These
More informationUSER S MANUAL CAUTION. Visit our website at. new products, prizes, fitness tips, and much more!
Patent Pending Model No. 831.159730 Serial No. The serial number is found in the location shown below. Write the serial number in the space above. USER S MANUAL Serial Number Decal SEARS, ROEBUCK AND CO.
More informationTable Top Robot (TTR)
Table Top Robot (TTR) APPENDIX SOFTWARE GEAR HEADS POWER SUPPLIES & SHUNTS IP 65 MODELS & CONNECTIVITY PERIPHERALS CONNECTIVITY LINEAR SYSTEMS MOTOR SPECIFICATIONS OVERVIEW T T R 1-2 - 1 5-5 B - C - 1
More informationRAILWAY OCCURRENCE REPORT
RAILWAY OCCURRENCE REPORT CN NORTH AMERICA DERAILMENT TRAIN NO. 380-06 MILE 8.7, YORK SUBDIVISION MARKHAM, ONTARIO 06 MARCH 1994 REPORT NUMBER R94T0072 Transportation Safety Board of Canada Bureau de la
More informationHybrid Architectures for Automated Transmission Systems
1 / 5 Hybrid Architectures for Automated Transmission Systems - add-on and integrated solutions - Dierk REITZ, Uwe WAGNER, Reinhard BERGER LuK GmbH & Co. ohg Bussmatten 2, 77815 Bühl, Germany (E-Mail:
More informationW-VACiMB FIXED SECONDARY TERMINAL BLOCK OEM CONVERSION TYPE #2 RING-TYPE TERMINAL BLOCK
W-VACiMB FIXED SECONDARY TERMINAL BLOCK OEM CONVERSION TYPE #2 RING-TYPE TERMINAL BLOCK 1 of 41 PLEASE READ These instructions are provided so that an OEM can officially convert a W-VACiMB Mining Breaker
More informationPermanent Magnet DC Motor
Renewable Energy Permanent Magnet DC Motor Courseware Sample 86357-F0 A RENEWABLE ENERGY PERMANENT MAGNET DC MOTOR Courseware Sample by the staff of Lab-Volt Ltd. Copyright 2011 Lab-Volt Ltd. All rights
More informationTEST REPORT. Ceram Reference: (QT21489/2/SL)/Ref: 1.0A. Tensile and Frictional Tests on the Fast Fit BeamClamp Systems.
TEST REPORT Ceram Reference: 121557 (QT21489/2/SL)/Ref: 1.0A Project Title: Tensile and Frictional Tests on the Fast Fit BeamClamp Systems Client: Kee Safety Limited For The Attention of: Mr Phil Higgs
More informationBRISTLE BLASTING SURFACE PREPARATION METHOD FOR MAINTENANCE. Neil Wilds
Paper No. 09004 2009 BRISTLE BLASTING SURFACE PREPARATION METHOD FOR MAINTENANCE Neil Wilds International Paint Ltd., Protective Coatings Stoneygate Lane, Gateshead Tyne and Wear, NE10 0JY United Kingdom
More informationSTRYKER VEHICLE ADVANCED PROPULSION WITH ONBOARD POWER
2018 NDIA GROUND VEHICLE SYSTEMS ENGINEERING AND TECHNOLOGY SYMPOSIUM POWER & MOBILITY (P&M) TECHNICAL SESSION AUGUST 7-9, 2018 - NOVI, MICHIGAN STRYKER VEHICLE ADVANCED PROPULSION WITH ONBOARD POWER Kevin
More informationJRS Dynamic Rollover Test Chevrolet Malibu
Page 1 of 61 JRS Dynamic Rollover Test 2009 Chevrolet Malibu Sponsored By: Automotive Safety Research Institute Charlottesville, VA. Vehicle Donated by: State Farm Insurance Company Chicago, IL. Introduction
More informationStopping Accuracy of Brushless
Stopping Accuracy of Brushless Features of the High Rigidity Type DGII Series Hollow Rotary Actuator The DGII Series hollow rotary actuator was developed for positioning applications such as rotating a
More informationZD500DX. Deluxe Hot Tip Desoldering Station. (self-contained)
ZD500DX Deluxe Hot Tip Desoldering Station (self-contained) COMPLIES WITH MIL-S-45743E, MIL-STD-2000-1B, WS6536E AND ESD SPEC, DOD-STD-1686, DOD-HDBK-263 UL listed MADE IN U.S.A. Instruction manual ZD500DX
More informationExercise 7. Thyristor Three-Phase Rectifier/Inverter EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Thyristor three-phase rectifier/inverter
Exercise 7 Thyristor Three-Phase Rectifier/Inverter EXERCISE OBJECTIVE When you have completed this exercise, you will know what a thyristor threephase rectifier/limiter (thyristor three-phase bridge)
More informationPRESENTATION. Ignition Risk of Biomass Dust Layers. The Fuel and Energy Research Forum. - Washing Pre-treatment on Low Temperature Ignition of Biomass
The Fuel and Energy Research Forum PRESENTATION Ignition Risk of Biomass Dust Layers - Washing Pre-treatment on Low Temperature Ignition of Biomass Yee Sing Chin Jenny M Jones Slide 1 of 19 Background/Introduction
More informationLarge Electric Motor Reliability: What Did the Studies Really Say? Howard W Penrose, Ph.D., CMRP President, MotorDoc LLC
Large Electric Motor Reliability: What Did the Studies Really Say? Howard W Penrose, Ph.D., CMRP President, MotorDoc LLC One of the most frequently quoted studies related to electric motor reliability
More informationAIR-INS inc. 1320, boul. Lionel-Boulet, Varennes (Québec) J3X 1P7 Tél. : (450) Fax : (450)
1320, boul. Lionel-Boulet, Varennes (Québec) J3X 1P7 Tél. : (450) 652-0838 Fax : (450) 652-7588 info@air-ins.com FORCED-ENTRY RESISTANCE TESTS AS PER THE ASTM F476-84(2002) TESTING PROCEDURE ON AN ENTRANCE
More informationCHAPTER 6 MECHANICAL SHOCK TESTS ON DIP-PCB ASSEMBLY
135 CHAPTER 6 MECHANICAL SHOCK TESTS ON DIP-PCB ASSEMBLY 6.1 INTRODUCTION Shock is often defined as a rapid transfer of energy to a mechanical system, which results in a significant increase in the stress,
More informationSony SH800 Cell Sorter
DanStem and NNF CPR Flow Cytometry Core Facility Sony SH800 Cell Sorter Quick Reference Guide Introduction to Sony SH800 The SH800 is a simple, ready-to-use, cell sorter developed by Sony Corporation Main
More informationTire Pressure Monitoring System (TPMS) Introduction. Indicator light (telltale) More information: In this section you ll find information about:
Tire Pressure Monitoring System (TPMS) Introduction In this section you ll find information about: Indicator light (telltale) Your vehicle's Tire Pressure Monitoring System (TPMS) uses the Anti-lock Brake
More informationGuide units FEN/FENG for ISO cylinders
Key features At a glance The guide units FEN and FENG protect ISO cylinders against torsion when these are subjected to high torque loads. They offer high precision guidance for workpiece handling and
More informationSERVICE MANUAL / PARTS LIST
SERVICE MANUAL / PARTS LIST APPLIANCE CLAMP SOFT TOUCH MODEL #113210 PATENT NO. 9,630,821 CONTENT: PAGE 1 Lift Truck Requirements General Installation Procedures General Inspection & Maintenance 2-5 Clamp
More informationMPL Technology Hopper Applied Top of Rail Lubrication Test
MPL Technology Hopper Applied Top of Rail Lubrication Test Letter Report No. P-12-038 Prepared for MPL Technology, Inc. by Scott Gage and Steve Luna Transportation Technology Center, Inc. a subsidiary
More informationResearch Title DYNAMIC MODELING OF A WIND-DIESEL-HYDROGEN HYBRID POWER SYSTEM
Research Title DYNAMIC MODELING OF A WIND-DIESEL-HYDROGEN HYBRID POWER SYSTEM Presenter: Md. Maruf-ul-Karim Supervisor: Dr. Tariq Iqbal Faculty of Engineering and Applied Science Memorial University of
More informationUnderstanding FRA's Alternative Crashworthiness Compliance Approach. Marcin Taraszkiewicz, PE CH2M HILL, Principal Technologist Baltimore, MD
Understanding FRA's Alternative Crashworthiness Compliance Approach Marcin Taraszkiewicz, PE CH2M HILL, Principal Technologist Baltimore, MD Discussion Topics Introduction Key Facts Case Study: TEX Rail
More informationEuropean Tyre and Rim Technical Organisation RETREADED TYRES IMPACT OF CASING AND RETREADING PROCESS ON RETREADED TYRES LABELLED PERFORMANCES
European Tyre and Rim Technical Organisation RETREADED TYRES IMPACT OF CASING AND RETREADING PROCESS ON RETREADED TYRES LABELLED PERFORMANCES Content 1. Executive summary... 4 2. Retreaded tyres: reminder
More informationArticle: Sulfur Testing VPS Quality Approach By Dr Sunil Kumar Laboratory Manager Fujairah, UAE
Article: Sulfur Testing VPS Quality Approach By Dr Sunil Kumar Laboratory Manager Fujairah, UAE 26th September 2017 For over a decade, both regional ECA and global sulphur limits within marine fuels have
More informationThe goal of the study is to investigate the effect of spring stiffness on ride height and aerodynamic balance.
OptimumDynamics - Case Study Investigating Aerodynamic Distribution Goals Investigate the effect of springs on aerodynamic distribution Select bump stop gap Software OptimumDynamics The case study is broken
More information