1 RT 15 ( Girard Avenue) Light Rail Renewal Program

2 SEPTA s RT 15 Girard Avenue Renewal Program Infrastructure Rehabilitate and upgrade 8.2 miles of line infrastructure Overhead power line replacement Upgraded power supply and distribution systems Island platforms for passenger loading Traffic control striping and signage Traffic signalization enhancement Streetscape improvement Building improvement at Callowhill Shop Vehicle Procurement Remanufacture PCC Cars Capital Spares Publication and Training Diagnostic Test Equipment

3 Girard Avenue Light Rail Infrastructure Renewal Program

4 History of Rt. 15 Route 1859: Horse car service commenced along portions of the line Route electrified and extended to 9.5 miles WW II 82 cars scheduled in rush hour 1955 One person operation initiatited 1992 Diesel buses replaced PCC fleet 2004 PCCII fleet replaced buses

5 Girard Avenue Light Rail Infrastructure Excavation and removal of existing track and rail along Girard AvenueA

6 Girard Avenue Light Rail Infrastructure Installation of New Rail

7 Girard Avenue Light Rail Infrastructure Concrete encasement of rail structure

8 Girard Avenue Light Rail Infrastructure Pedestrian Island Construction

9 Girard Avenue Light Rail Infrastructure Rotary 1890 s Converter at Mt. Vernon Substation replaced

10 Girard Avenue Light Rail Infrastructure COST Infrastructure Signalization Streetscapes Subtotal Construction $45.7 mil. $6.4 mil. $0.5 mil. $52.6 mil.

11 The Original Plan for New Streetcars Breda Skoda

12 Comparison of New ALRV and Remanufactured PCC ALRV PCC Cost per Car (millions) $ $1.2 Total Cost (millions) $ $21.6 Vehicle Life (years) /- Seats per Vehicle Cost Per Seat (thousands) Number of Vehicles Flexibility All Routes Route 15 Only

13 Alternative Option Remanufacture of PCC Cars to Year 2000 Standards

14 PCC Car waits its turn for remanufacture

15 Project Highlights Extensive Shell Reconstruction New Door Panels, Rebuilt Door Motors New Wheelchair Lift New HVAC Refurbished Interior Lighting Refurbished Seating New Auxiliary Power System New Trucks New AC Propulsion New Interior Linings New Cab Console

16 Typical roof-to to-side structure damage

17 Side wall cross brace supports were added prior to removing the old carlines.

18 Typical high levels of corrosion was also found in the step well area

19 Grit blasting was performed 100%

20 A welder attaches the carline to the roof - rail

21 Welder works on repairs to contoured roof section.

22 First half of the roof is applied to the side of the car.

23 First half of the roof is in place.

24 With the roof in place, carbody repairs continue

25 Modifications for securing new equipment boxes is worked out.

26 Propulsion Inverter is getting ready to be installed

27 With structural repairs complete, the carbody gets its first water test.

28 Interior work starts with floors, insulation and wiring.

29 Interior lining being installed

30 Interior lining with air diffusers

31 Ducts, interior linings and seats are added.

32 Electric locker subassembly is prepared for installation

33 Propulsion Computer (Vossloh( Kiepe) ) installed in Electric Locker

34 New trucks are fabricated, assembled and await installation.

35 Fresh out of the paint booth and back in the shop for final assembly.

36 Completed Pilot Car at Brookville Equipment Corporation

37 Pilot car 2320 arrives at Elmwood Depot.

38 Proud two person drive team after successful unloading off trailer.

39 Not everything goes as planned (Pilot car at 40 th & Girard Island)

40 Wheelchair lift in Operation

41 Interior View

CRRMA BOARD PRESENTATION

CRRMA BOARD PRESENTATION CRRMA BOARD PRESENTATION El Paso Streetcar Construction Status Report Gilbert Gardner August 9, 2017 El Paso Streetcar Infrastructure Construction Status Report AGENDA Progress Summary SBE Progress Construction

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: June 24, 2013 SUBJECT: NEW STREETCAR IMPLEMENTATION PLAN INFORMATION ITEM RECOMMENDATION It is recommended that the Board receive the

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

Capital Needs Assessment Riders Advisory Council July2, 2008

Capital Needs Assessment Riders Advisory Council July2, 2008 Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair

More information

Trip Report - Brookville ex-septa PCC Overhaul, May 2016 Update

Trip Report - Brookville ex-septa PCC Overhaul, May 2016 Update Trip Report - Brookville ex-septa PCC Overhaul, May 2016 Update 5/17/2016 Joseph Flores Kevin Sheridan 1. Introduction Joseph Flores and Kevin Sheridan visited Brookville Equipment Co. in Brookville PA,

More information

EMERGING REQUIREMENTS

EMERGING REQUIREMENTS Page of 0 EMERGING REQUIREMENTS EXTERNALLY INITIATED PLANT RELOCATIONS THESL distributes electricity to residential, commercial, and industrial customers via overhead and underground infrastructure. This

More information

APTA Rail Conference 2017 Mark L. Dorn Design Manager for Oklahoma City MAPS 3 Modern Streetcar Jacobs/AECOM Team

APTA Rail Conference 2017 Mark L. Dorn Design Manager for Oklahoma City MAPS 3 Modern Streetcar Jacobs/AECOM Team APTA Rail Conference 2017 Mark L. Dorn Design Manager for Oklahoma City MAPS 3 Modern Streetcar Jacobs/AECOM Team with permission from: Oklahoma City General Information: Founded: April 22, 1889 (10,000

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Peter Gabancho Project Manager III Capital Programs & Construction SFMTA Shari Tavafrashti Principal Engineer SFCTA 1 Project Purpose and Need Improve transit reliability,

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

The Future of Rail in Maryland. Kevin B. Quinn, Jr. Administrator

The Future of Rail in Maryland. Kevin B. Quinn, Jr. Administrator The Future of Rail in Maryland Kevin B. Quinn, Jr. Administrator The Future of Rail in Maryland Rolling Stock Metro Railcar Replacement Under the project, MDOT MTA is replacing the metro fleet with 78

More information

Electric buses Solutions portfolio

Electric buses Solutions portfolio Electric buses Solutions portfolio new.abb.com/ev-charging new.abb.com/grid/technology/tosa Copyright 2017 ABB. All rights reserved. Specifications subject to change without notice. 9AKK107045A5045 / Rev.

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

Chapter 4 : THEME 2. Transportation

Chapter 4 : THEME 2. Transportation Chapter 4 : THEME 2 Strengthen connections to keep the Central Area easy to reach and get around 55 Figure 4.2.1 Promote region-wide transit investments. Metra commuter rail provides service to the east,

More information

Streetcar and Light Rail Design Differences. March 2015

Streetcar and Light Rail Design Differences. March 2015 Streetcar and Light Rail Design Differences March 2015 How Are Streetcar and Light Rail Different? The design differences between streetcar and light rail are tied to the distinctions in the markets served

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED Insert TTC logo here STAFF REPORT ACTION REQUIRED Overhaul of 30 Canadian Light Rail Vehicles (CLRV) and Maintaining non-overhauled Streetcars in a State of Good Repair Date: March 23, 2016 To: From: TTC

More information

79 companies/16 countries Turnover 2010: million 29% buses (Jonckheere, Berkhof, Bova, Kusters) employees 70% export Export to 116

79 companies/16 countries Turnover 2010: million 29% buses (Jonckheere, Berkhof, Bova, Kusters) employees 70% export Export to 116 1 79 companies/16 countries Turnover 2010: 1.300 million 29% buses (Jonckheere, Berkhof, Bova, Kusters) 7.126 employees 70% export Export to 116 countries Recent order Dubai 518 buses 2 I - Phileas =Tram

More information

The $600 Million Rebirth of San Diego Trolley

The $600 Million Rebirth of San Diego Trolley The $600 Million Rebirth of San Diego Trolley E. Wayne Terry Chief Operating Officer MTS Rail APTA Rail Conference - 2010 1919 San Diego and Arizona Eastern Railroad The Bones of the Original South and

More information

Peninsula Corridor Electrification Project (PCEP)

Peninsula Corridor Electrification Project (PCEP) Peninsula Corridor Electrification Project (PCEP) Q2 Quarterly Update #13 October 1 December 31, 2017 JPB Board Meeting February 1, 2018 Agenda Item # 8b Electrification - Infrastructure Progression of

More information

PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR

PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR CIP Title FINAL2:Layout 1 7/27/17 3:35 PM Page 9 PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 218 FY 218-222 Capital Improvement Program Description FY 217 FY 218 FY 219 FY 22 FY 221 FY 222

More information

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000.

Transit Agency Project Description Estimated Project Cost SEPTA - Philadelphia North Wales and Fox Chase Station Improvements $3,015,000. Urban Transit Agencies SEPTA - Philadelphia Elwyn-Wawa Service Restoration Project $7,300,000 SEPTA - Philadelphia Construction of New Signage $4,792,000 SEPTA - Philadelphia New Tunnel Lighting $2,044,800

More information

Light Rail Performance Initiatives Update. February 4, 2014

Light Rail Performance Initiatives Update. February 4, 2014 Light Rail Performance Initiatives Update February 4, 2014 On June 4, 2013, initiatives to improve light rail performance were outlined On-Time Performance up from 47% in May to 51% in January, driven

More information

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015 Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8

More information

PRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015

PRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015 PRASA Challenges & Opportunities Standing Committee on Appropriations 25 th March 2015 Agenda A Introduction to PRASA B Funding Allocation and Spending Performance C Strategic Plan D Rail Modernisation

More information

Presentation to the Board of Directors on Rail Fleet Rehabilitation and Restoration Programs SAN FRANCISCO, CALIFORNIA

Presentation to the Board of Directors on Rail Fleet Rehabilitation and Restoration Programs SAN FRANCISCO, CALIFORNIA Presentation to the Board of Directors on Rail Fleet Rehabilitation and Restoration Programs 06 07 2011 SAN FRANCISCO, CALIFORNIA 1 BACKGROUND FLEET SIZE Light Rail Vehicles (LRV): 151 Breda Cars Historic

More information

FACT SHEET. US 192 Alternatives Analysis Modal Technologies. Alternative Description/Overview

FACT SHEET. US 192 Alternatives Analysis Modal Technologies. Alternative Description/Overview FACT SHEET US 192 Alternatives Analysis Modal Technologies Bus Alternative Description/Overview Bus systems typically operate in mixed traffic and have minimal station infrastructure. Bus service typically

More information

GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY FFY 2017 GRANT PROGRAM PROJECT DESCRIPTIONS

GREATER CLEVELAND REGIONAL TRANSIT AUTHORITY FFY 2017 GRANT PROGRAM PROJECT DESCRIPTIONS Section 5307 Capital Formula (OH-2017-XXXX) Information Technology Program This program is to purchase ADP hardware, ADP software and third party support for the upgrade of our Network Infrastructure,

More information

SEPTA Public Open House. FY 2019 Capital Budget Development January 24, 2018

SEPTA Public Open House. FY 2019 Capital Budget Development January 24, 2018 SEPTA Public Open House FY 2019 Capital Budget Development January 24, 2018 SEPTA Public Open House FY 2019 Capital Budget Development January 24, 2018 FY 2018 Capital Budget and 12-Year Capital Program

More information

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report REVISIONS 1. Table 39: New Public Investments for Operation and Maintenance Costs 2. Appendix A-10: Passenger Rail Service - Operations

More information

1.0 Detailed Definition of Alternatives

1.0 Detailed Definition of Alternatives 1.0 Detailed Definition of Alternatives 1.1 Introduction This chapter provides supplemental information on the four alternatives, including both physical and operational characteristics (e.g. service plans)

More information

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at

Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at Overview Georgia Department of Transportation 2006 Fact Sheet Lovejoy to Atlanta Rail Line visit the website at www.garail.com Commuter rail service between Lovejoy and Atlanta is ready for implementation:

More information

Streetcar and Light Rail Design Differences. February 2015

Streetcar and Light Rail Design Differences. February 2015 Streetcar and Light Rail Design Differences February 2015 How Are Streetcar and Light Rail Different? The design differences between streetcar and light rail are tied to the distinctions in the markets

More information

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions

City of Alameda Capital Improvement Projects Fiscal Years Proposed Project Descriptions Drainage Southshore Lagoon Dredging $525,000 74 Prepare drawings and design deepening or removal of sediment from lagoons. Marina Village Park $580,500 70 Resolve the drainage issue in the Marina Village

More information

COST ESTIMATES: Curb-Running

COST ESTIMATES: Curb-Running COST ESTIMATES: Curb-Running PROJECT FEASIBILITY COST ESTIMATE SUMMARY Geary Bus Rapid Transit Study Alternative: Side Lane (Curb Running) Date: 4/12/07 Percent Cost Total Project Capital Outlay I- Roadway

More information

Zero-Emission Long-Haul Trucking Technologies

Zero-Emission Long-Haul Trucking Technologies Zero-Emission Long-Haul Trucking Technologies Hengbing Zhao Lew Fulton STEPS Presentation May 23, 2017 Purpose of this Study To review zero emission trucking technologies and compare them in terms of the

More information

Downtown Transit Connector. Making Transit Work for Rhode Island

Downtown Transit Connector. Making Transit Work for Rhode Island Downtown Transit Connector Making Transit Work for Rhode Island 3.17.17 Project Evolution Transit 2020 (Stakeholders identify need for better transit) Providence Core Connector Study (Streetcar project

More information

7000 Series Railcar Program Overview

7000 Series Railcar Program Overview Finance, Administration and Oversight Committee Information Item IV-B November 6, 2008 7000 Series Railcar Program Overview Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

passenger rail bus

passenger rail bus Founded in 1918 OEM of rail vehicles Manufactured over 4,200 rail vehicles Produced 66 vehicles with Energy Storage Systems 68 Streetcars running in USA 1927 28 passenger rail bus Established American

More information

An Asset Management Plan for Transit And Access Transit Fleet

An Asset Management Plan for Transit And Access Transit Fleet Header Title ATTACHMENT 1 Building Better Transit: An Asset Management Plan for Transit And Access Transit Fleet 2 June 2016 Transit & Access Transit Fleet INTRODUCTION The Saskatoon Transit fleet is currently

More information

Manufacturing operating and maintaining different rolling stock

Manufacturing operating and maintaining different rolling stock Manufacturing operating and maintaining different rolling stock Business model with a corporate centre and three different activity areas Renfe-Operadora Railway transport operator in Spain PASSENGERS:

More information

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions

Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions Midtown Corridor Alternatives Analysis Capital Cost Estimation Methodology and Assumptions 1/3/2014 Prepared by the SRF Consulting Group Team for Table of Contents Introduction... 1 Alternatives Overview...

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates Capital and Strategic Planning Committee Item III - A May 10, 2018 FY2018 Third Quarter Capital Program Updates Page 4 of 44 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Beyond the Pilot Depot Considerations for a Transition to 100% ZEB Fleet

Beyond the Pilot Depot Considerations for a Transition to 100% ZEB Fleet Beyond the Pilot Depot Considerations for a Transition to 100% ZEB Fleet Cliff Henke, Senior Analyst, Transit and Rail WSP USA, Los Angeles Outline Current Projects Approach Strategies Challenges Lessons

More information

BART Wheel Profile Change

BART Wheel Profile Change BART Wheel Profile Change Cylindrical to Modified Tapered Ben Holland, P.E., Manager Vehicle Systems Engineering Rolling Stock & Shops Gregory Shivy Principal Track Engineer Maintenance & Engineering 1

More information

MDOT Metro Region. Jim Schultz, P.E. Manager of Planning

MDOT Metro Region. Jim Schultz, P.E. Manager of Planning MDOT Metro Region Jim Schultz, P.E. Manager of Planning Presentation Overview Part 1: I-75 Reconstruction Monroe County Part 2: Gordie Howe International Bridge Part 3: M1 Rail Streetcar Project I-75 Reconstruction

More information

Attachment 1 - City of Toronto Priority Projects for Phase 1: Federal Public Transit Infrastructure Fund (PTIF)

Attachment 1 - City of Toronto Priority Projects for Phase 1: Federal Public Transit Infrastructure Fund (PTIF) EX20.4 Attachment 1 Attachment 1 - City of Toronto Priority Projects for Phase 1: Federal Public Transit Infrastructure Fund () Project Title Toronto Transit Commission Led Projects Bridges/ Structures

More information

Strategic Planning for Metro s Transition to Zero Emission Buses. October 2017

Strategic Planning for Metro s Transition to Zero Emission Buses. October 2017 Strategic Planning for Metro s Transition to Zero Emission Buses October 2017 Requirements and Guidelines/Guiding Principles Continue to replace Aging Bus Fleet (~200 Buses per Year) Upgrade current CNG

More information

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 7,300 buses powered by electric

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 7,300 buses powered by electric New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 7,300 buses powered by electric North America, and is the only bus manufacturer to offer all three types of zero

More information

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1 BUSINESS REVIEW TOP CONTRACTORS 1 ENR NEW YORK TOP CONTRACTORS 18 ENR TOP 100 DESIGN-BUILD FIRMS 66 ENR TOP 400 CONTRACTORS 215 Corporate

More information

Traffic Management Paint Shop Signage GaragE Electrical Engineering

Traffic Management Paint Shop Signage GaragE Electrical Engineering Traffic Management Paint Shop Signage GaragE Electrical Engineering Ignatemq uidunt aditteuga. Nam, que postectaquos Ignatemq uidunt aditteuga. Nam, que postectaquos Company profile Fulton Hogan More Than

More information

Introduction to PrimoveCity. Gaëtan Bilodeau, P.Eng. Business Development - PRIMOVE December 2011

Introduction to PrimoveCity. Gaëtan Bilodeau, P.Eng. Business Development - PRIMOVE December 2011 Introduction to PrimoveCity Gaëtan Bilodeau, P.Eng. Business Development - PRIMOVE December 2011 Content Introduction to Bombardier Primove 2 Bombardier Overview Corporate office based in Montréal, Canada

More information

Late Starter. Tuesday, November 6, 2018

Late Starter. Tuesday, November 6, 2018 Late Starter Tuesday, Please note the following item(s) was not included with your agenda as this item(s) was received after the agenda package was printed. Planning and Works Committee Report TES-RTS-18-09,

More information

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY SEPTA s Broad Street Subway Propulsion Control Box Retrofit William J. Brown Jr., Sr. Project Designer Philadelphia, PA 2013 Rail Conference Title of

More information

BERLIN, Grid compatible flash charging technology E-Mobility Integration Symposium

BERLIN, Grid compatible flash charging technology E-Mobility Integration Symposium BERLIN, 23.10.2017 Grid compatible flash charging technology E-obility Integration Symposium Shaping urban mobility e-bus solutions, infrastructure and tools ABB s portfolio Depot-Charging DC fast-charging

More information

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 6,400 buses powered by electric motors and batteries in

New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 6,400 buses powered by electric motors and batteries in New Flyer has 50 years of experience manufacturing zero-emission buses, has delivered over 6,400 buses powered by electric motors and batteries in North America, and is the only bus manufacturer to offer

More information

Greater Cleveland Regional Transit Authority. Joe Calabrese - General Manager

Greater Cleveland Regional Transit Authority. Joe Calabrese - General Manager Greater Cleveland Regional Transit Authority Joe Calabrese - General Manager RTA Ridership by Mode! 500 Buses - 75 %! 60 Heavy Rail Vehicles - 10%! 24 RTV s (BRT) - 8%! 48 Light Rail Vehicles - 6%! Paratransit

More information

City of El Paso: Sun Metro Legislative Agenda Briefing

City of El Paso: Sun Metro Legislative Agenda Briefing Tiger V TOD Operational 2017 City of El Paso: Sun Metro Legislative Agenda Briefing March 2016 Sun Metro FY 2016/17 Legislative Agenda First and foremost, thanks for the new transportation bill: Fixing

More information

Transit Vehicle (Trolley) Technology Review

Transit Vehicle (Trolley) Technology Review Transit Vehicle (Trolley) Technology Review Recommendation: 1. That the trolley system be phased out in 2009 and 2010. 2. That the purchase of 47 new hybrid buses to be received in 2010 be approved with

More information

Savannah Riverfront Trolley Project Plans. Savannah Riverfront Trolley

Savannah Riverfront Trolley Project Plans. Savannah Riverfront Trolley Project Plans Why Savannah? 6 Million annual visitors and many go to River Street River Street cobblestones inhibit walking the whole street Narrow sidewalks limit ADA access Businesses at both ends of

More information

APRIL Air Pollution Research in London Transport Group. July 2018

APRIL Air Pollution Research in London Transport Group. July 2018 APRIL Air Pollution Research in London Transport Group July 2018 Agenda SSE Enterprise overview Introduction Global perspective on e-bus market London targets to decarbonise its bus fleet and progress

More information

What IS BRT, Really? Not BRT and RNY

What IS BRT, Really? Not BRT and RNY What IS BRT, Really? 2007 Winter TexITE Meeting Presented by Jeff Arndt, TTI Not BRT and RNY 1 What is Bus Rapid Transit? A flexible, rubber-tired from of rapid transit that combines stations, vehicles,

More information

Tempe Streetcar. March 2, 2016

Tempe Streetcar. March 2, 2016 Tempe Streetcar March 2, 2016 Tempe Profile 40 sq. miles, highest density in state University Town, center of region Imposed growth boundaries (density increase) Mixed use growth/intensifying land use

More information

El Metro Operations Proposed FY Budget

El Metro Operations Proposed FY Budget Laredo Transit Management Inc.- El Metro El Metro Operations Proposed FY 2017-2018 Budget Claudia San Miguel Acting General Manager Mission Statement To provide a safe, reliable, cost effective, and efficient

More information

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016

RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016 RETAIL BASE BUILDING REQUIREMENTS DATE: 02/04/2016 Overview The following requirements outline the guidelines for designers and project delivery teams in the planning, design and infrastructure requirements

More information

Glengowrie Depot Upgrade. Nick Marciano, Manager Tram Maintenance, PTS

Glengowrie Depot Upgrade. Nick Marciano, Manager Tram Maintenance, PTS Glengowrie Depot Upgrade Nick Marciano, Manager Tram Maintenance, PTS Introduction Nick Marciano Took up role of Tram Maintenance Manager in June 2009. Prior to that: 35 years in manufacturing starting

More information

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta

Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta Proposal for September 2006 Start of Commuter Rail from Lovejoy on the Macon Line to Atlanta Overview Commuter rail service between Lovejoy and Atlanta is ready for implementation: $87.08 Million is in

More information

Briefing on Metro Matters Projects

Briefing on Metro Matters Projects Planning, Development and Real Estate Committee Board Information Item III-A March 27, 2008 Briefing on Metro Matters Projects Washington Metropolitan Area Transportation Authority Board Action/Information

More information

Briefing on Metro Matters Projects

Briefing on Metro Matters Projects Customer Services, Operations, and Safety Committee Board Information III-D March 13, 2008 Briefing on Metro Matters Projects Washington Metropolitan Area Transportation Authority Board Action/Information

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

UPGRADING THE AMTRAK KEYSTONE CORRIDOR

UPGRADING THE AMTRAK KEYSTONE CORRIDOR UPGRADING THE AMTRAK KEYSTONE CORRIDOR Mark A. Wurpel Director Project Initiation & Development Amtrak 2005 AREMA Conference & Exposition Chicago, Illinois ABSTRACT: Upgrading the Amtrak Keystone Corridor

More information

SEPTA s Broad Street Subway Propulsion Control Box Retrofit Post Installation, Realized, & Hidden Benefits

SEPTA s Broad Street Subway Propulsion Control Box Retrofit Post Installation, Realized, & Hidden Benefits SEPTA s Broad Street Subway Propulsion Control Box Retrofit Post Installation, Realized, & Hidden Benefits William J. Brown, Jr. Southeastern Pennsylvania Transportation Authority (SEPTA) Philadelphia,

More information

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING CIP_215 Title Pages 216:Layout 1 6/22/15 1:48 PM Page 19 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Rain or Shine WORK By Kent Pulver FY 216-22 Capital Improvement Program Description FY 215

More information

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network: Richmond North of Oxford Street Richmond Row Dundas Street

More information

Emerging Technologies for new generation EMUs

Emerging Technologies for new generation EMUs Emerging Technologies for new generation EMUs Technology for new generation AC/DC EMUs in Mumbai Page 1 Septermber 2008 Industry Sector, Mobility Division What is an EMU? It is an Electrical Multiple Unit

More information

50 years experience in offering tailor made solutions to suit every customer s need.

50 years experience in offering tailor made solutions to suit every customer s need. Digital Brochure 50 years experience in offering tailor made solutions to suit every customer s need. Mages Group was established in 1960 by Mr William Mages and has since grown to become one of the South

More information

FY Capital Improvement Plan

FY Capital Improvement Plan FY2016-2025 Capital Improvement Plan June 2015 The Des Moines Area Regional Transit Authority s Capital Improvement Program (CIP) is a 10-year framework that provides direction and guidance for the agency

More information

THE LEADING PARTS & SERVICE PORTFOLIO

THE LEADING PARTS & SERVICE PORTFOLIO THE LEADING PARTS & SERVICE PORTFOLIO CUSTOM TRUCK ONE SOURCE Custom Truck One Source (Custom Truck) is the first true single-source provider of specialized truck and heavy equipment solutions. With sales,

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

Customer Services, Operations, and Safety Committee Board Information Item III-D May 13, 2010 Rail Fleet Plan

Customer Services, Operations, and Safety Committee Board Information Item III-D May 13, 2010 Rail Fleet Plan Customer Services, Operations, and Safety Committee Board Information Item III-D May 13, 2010 Rail Fleet Plan Page 54 of 96 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

TRAIN, BUS & TRANSIT

TRAIN, BUS & TRANSIT TRAIN, BUS & TRANSIT Input Metra 1 Metra does not want to add parking because of space; maxed out on number of cars per train. Developments on Rt. 59 will affect. 2 Should do studies regarding what the

More information

Winnipeg Transit Bus Maintenance Garage Expansion Project

Winnipeg Transit Bus Maintenance Garage Expansion Project Winnipeg Transit Bus Maintenance Garage Expansion Project Thank you for your interest in this project! We invite you to review information on the display boards, meet project team members to share your

More information

Precision Station Stopping Progress Update

Precision Station Stopping Progress Update Washington Metropolitan Area Transit Authority Precision Station Stopping Progress Update Presented to: The Board of Directors; Customer Service, Operations and Safety Committee By PlanninghDevelopmenthEngineeringhConstruction

More information

Dismantling the Streetcar System:

Dismantling the Streetcar System: Dismantling the Streetcar System: What Have We Learned? By John Hillegass 42 Line - Courtesy of National Capital Trolley Museum Historic Context DC Streetcar System Agenda Analysis Plan to Convert to Buses

More information

Putting electric buses at the core of public transport

Putting electric buses at the core of public transport Civitas Forum,Torres Vedras, 27 th Sep 2017 Putting electric buses at the core of public transport Aida Abdulah UITP R&I Decarbonasing public transport Quality of life of citizens ensuring quality of service

More information

NEWSLETTER CONSTRUCTION PROGRESS IN THIS ISSUE:

NEWSLETTER CONSTRUCTION PROGRESS IN THIS ISSUE: Issue 4 Fall 2016 IN THIS ISSUE: Construction Progress Western Stations Downtown Stations Queen and Rideau Streetscaping Eastern Stations Where We ve Been Where We re Going Stage 2 Update CONSTRUCTION

More information

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives

Preliminary Definition of Alternatives. 3.0 Preliminary Definition of Alternatives 3.0 What preliminary alternatives are being evaluated? The alternatives for the East San Fernando Valley Transit Corridor project that were considered for screening include the No Build Alternative, Transportation

More information

București tram funds allocated

București tram funds allocated București tram funds allocated Photo: Gabriel Dumitriu 25 Jul 2016 ROMANIA: An amendment to the București city budget for 2016 has allocated 7 3m to transport authority RATB. Most of this will be used

More information

H 5760 S T A T E O F R H O D E I S L A N D

H 5760 S T A T E O F R H O D E I S L A N D LC00 01 -- H 0 S T A T E O F R H O D E I S L A N D IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 01 A N A C T RELATING TO MOTOR AND OTHER VEHICLES - DEFINITIONS AND GENERAL CODE PROVISIONS - ANTIQUE MOTOR

More information

Report for Action. Wilson Bus Garage - Upgrades. Summary. Date: March 20, 2018 To: TTC Board From: Chief Capital Officer

Report for Action. Wilson Bus Garage - Upgrades. Summary. Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Report for Action Wilson Bus Garage - Upgrades Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary The purpose of this report is to obtain authorization for the award of Contract No.

More information

Time (secs) Distance (feet) Accel (mphps) , , , , ,388 0.

Time (secs) Distance (feet) Accel (mphps) , , , , ,388 0. EQUIPMENT Locomotive Hauled vs. Diesel Multiple Units Ohio Rail Development Commission November 19, 2009 Presentation Outline Typical Characteristics Locomotive-hauled equipment DMU Performance Performance

More information

CTA Capital Construction Update May 17, 2007

CTA Capital Construction Update May 17, 2007 Block 37 Signals Project Brown Line Howard CTA Capital Construction Update May 17, 2007 1 Capital Construction Update Agenda Howard Station Reconstruction Brown Line Capacity Expansion Project Block 37

More information

CATA Bus Rebuild Projects: Why and How?

CATA Bus Rebuild Projects: Why and How? CATA Bus Rebuild Projects: Why and How? Mark Kutzer, Director of Maintenance Centre Area Transportation Authority (CATA) 2081 W. Whitehall Road, State College, PA 16801 mkutzer@catabus.com (814) 238-2282

More information

Metropolitan Council Metro Transit Project Description Budget Year

Metropolitan Council Metro Transit Project Description Budget Year Metropolitan Council Metro Transit Project Description Budget Year ADA Pad Bus Garage Maintenance Shop Cleaning and Painting Hoist Replacement Program Redundant Power Program Drivers Rest Room Program

More information

Janice Fortunato Senior Director Business Partnerships

Janice Fortunato Senior Director Business Partnerships Janice Fortunato Senior Director Business Partnerships What are Megaprojects? They are large-scale projects distinguished by cost, complexity and the potential impact on the community. Collectively, these

More information

NYCT OPERATING EXPERIENCE WITH HYBRID TRANSIT BUSES

NYCT OPERATING EXPERIENCE WITH HYBRID TRANSIT BUSES New York City Transit Department of Buses NYCT OPERATING EXPERIENCE WITH HYBRID TRANSIT BUSES APTA/EPRI/EVAA Electric Bus Workshop October 10, 2002 Outline Overview of NYCT Bus Operations Overview of NYCT

More information

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs

SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs SFMTA Energy Use by Vehicle Type: Transit Investments vs Life Cycle Costs Peter Brown Project Manager, Long Range Planning Sustainable Streets Division 10 17 2011 Lake Arrowhead, California Outline of

More information

CTA Blue Line Study Area

CTA Blue Line Study Area 1 CTA Blue Line Study Area HISTORY OF THE CTA BLUE LINE / I-290 SYSTEM Blue Line / I-290 infrastructure is 55 years old First integrated transit / highway facility in the U.S. PROJECT STUDY AREA EXISTING

More information

Grasshopper Vision. Accelerate the adoption of sustainable practices by creating accessible and affordable products for everyone.

Grasshopper Vision. Accelerate the adoption of sustainable practices by creating accessible and affordable products for everyone. Meeting Objective 1. Who are we? 2. Review Commercial Solar Industry 3. Who are the ideal candidates for solar? 4. Key Site Conditions 5. Typical Upfront and On-going Costs Grasshopper Vision Accelerate

More information

Practices for Energy Sustainability Enhancement in Metro Systems

Practices for Energy Sustainability Enhancement in Metro Systems GREEN TRANSPORTATION Saturday June 4, 2016 - Athens, Hellas George Leoutsakos MSc,DIC,PhD, Deputy Engineering Manager ATTIKO METRO SA gleoutsakos@ametro.gr Elias Chronopoulos MSc,DIC,PhD, Rolling Stock

More information