Late Starter. Tuesday, November 6, 2018

Size: px
Start display at page:

Download "Late Starter. Tuesday, November 6, 2018"

Transcription

1 Late Starter Tuesday, Please note the following item(s) was not included with your agenda as this item(s) was received after the agenda package was printed. Planning and Works Committee Report TES-RTS-18-09, ION Vehicle and Testing Update (Information) Page

2 Region of Waterloo Transportation and Environmental Services Rapid Transit To: Chair Tom Galloway and Members of the Planning and Works Committee Date: File Code: A02-30/PW Subject: ION Vehicle and Testing Update Recommendation: For information. Summary: Bombardier and GrandLinq continue to make progress on the ION vehicles, the installation of specialized equipment and system testing. The current status of the fourteen Region of Waterloo light rail vehicles is as follows: Eleven vehicles are in Waterloo o Four have specialized on-board equipment (502, 511, 512 and 513) o Two are in the latter stages of having on-board specialized equipment (503 and 504) o Five are allocated to system testing, training activities and modifications on a rotating basis Three vehicles are in Kingston o 510 is scheduled to be shipped shortly and has the on-board specialized equipment o Installation of the on-board specialized equipment on the other trains (501 and 514) has started Significantly, no vehicles are yet fully ready for service, in that they have not yet achieved Preliminary Acceptance Certificate (PAC). PAC is a prerequisite to Final Acceptance Certificate (Region takes ownership of vehicle) and start of service. Some open items (unresolved) are permissible but require both the agreement from the Region and also a detailed plan for how the open item is to be resolved Page 1 of 9

3 Testing of vehicles and control systems is continuing but has been delayed by the later than originally scheduled arrival of vehicles and typical problems associated with testing a brand new vehicle and system. Training of drivers continues as scheduled and training of maintenance staff has started. While the Region of Waterloo, Bombardier and GrandLinq have made considerable effort to achieve start of service in December 2018, based on the above noted information it will not be possible to start service by that date. Until the Region has available all fourteen Bombardier vehicles in the required condition to start service, it is difficult to accurately predict the start of service. According to Bombardier s current schedule, all fourteen vehicles are scheduled to be ready in early February Assuming that the vehicles are ready in early February and that GrandLinq has d all of the necessary system testing, training and safety certification onschedule, start of service would be in the spring of GRT and ION cooperation and coordination continues to ensure that when service starts customers have a seamless and reliable transportation system. To prepare for start of service, the Region s public outreach program to provide information to residents on the ION train system continues in particular how to stay safe around the ION vehicles. The program will continue throughout the fall and winter until service starts. Report: As requested by Council on April 18, 2018, Region staff are providing this update on ION LRT vehicles and testing status for the period September 17, 2018 to vember 2, This update provides a status of vehicles in Waterloo and Kingston, testing and training status on the Project and events that are scheduled for this fall. Waterloo Vehicles Eleven vehicles are currently in Waterloo Region. The status of these vehicles is as follows: Four have specialized on-board equipment (502, 511, 512 and 513) Two are in the latter stages of having on-board specialized equipment (503 and 504) Five are allocated to system testing, training activities and modifications on a rotating basis. On-board specialized equipment needs to be on these vehicles. To begin service, vehicles must go through an acceptance process. This process has started with a demonstration burn-in starting in late August 2018 in Waterloo. Significantly, no vehicles are yet fully ready for service, in that they have not yet achieved Preliminary Acceptance Certificate (PAC) Page 2 of 9

4 Kingston Vehicles Three vehicles are in Kingston o 510 is scheduled to be shipped shortly and has the on-board specialized equipment o Installation of the on-board specialized equipment on the other trains (501, 510 and 514) has started These vehicles are not required to support the current testing or driver training in Waterloo and there has been no impact to the schedule from these vehicles remaining in Kingston. The Kingston facility was designed for vehicle assembly and is the best location for making the required modifications (upgrades) to the trains. The staff that assembled the train are best able to make modifications to the train. Table 1 summarizes the current status of all the vehicles. On-Board Equipment Installation Prior to going into service, it is necessary to install certain specialized on-board equipment on each of the vehicles. As part of the Project, GrandLinq is responsible for ensuring the finished vehicle integrates seamlessly with the built system. On-board equipment includes radios, antennas and on-board systems to control gates, crossings, and traffic signals. This also allows the vehicles to communicate with the ION Control Centre. With this equipment, ION can run at service speeds and at consistent times throughout operations. The Region has finalized an agreement with Bombardier to install GrandLinq s on-board equipment and to make the necessary onboard modifications to accommodate the equipment on each train. All of the trains are in the process of being retrofitted. On-board equipment installation is the next vital step to getting to service start. After the equipment is, extensive testing needs to be d by GrandLinq to ensure the system is working correctly. Following installation of on-board equipment, the vehicles go through an acceptance process. The first step is to achieve a Preliminary Acceptance Certificate (PAC). To achieve a Preliminary Acceptance Certificate (PAC) on any vehicle, the following needs to be : Qualification Testing on Pilot Vehicles (in Kingston); Vehicles are fully assembled; Modifications are d on the vehicles. Modifications are constantly being implemented to ensure reliability of the vehicle fleet; and Each vehicle is inspected and s routine tests. Routine tests are done on every vehicle to make sure all the components of the vehicle work properly Page 3 of 9

5 Currently technical open (unresolved) items are holding up issuance of a Preliminary Acceptance Certificate. These items range from quality issues to pending modifications. Each open item requires a detailed plan showing how the issue will be resolved, to the Region s satisfaction. The next step following Preliminary Acceptance is to achieve Final Acceptance Certificate on the vehicle. Once this is, the vehicle is ready to carry passengers. The first vehicle with PAC and on-board specialized equipment was scheduled to arrive on August 31, This vehicle is very close to achieving PAC now. To achieve a Final Acceptance Certificate on any vehicle, the following needs to be after a Preliminary Acceptance: Check and Acceptance Tests (these checks and tests are done after vehicle arrives to ensure it is still in PAC condition); 600 kilometer burn-in test to make sure there are no reliability issues on the vehicle; and Finalization of documentation and safety certification Following issuance of the Final Acceptance Certificate, the Region takes ownership of the vehicle and the vehicle is provided to GrandLinq to commence start of service. Testing Status Prior to revenue service, a significant amount of testing needs to be d by Bombardier and GrandLinq. Bombardier is completing qualification testing on pilot vehicles in Kingston. In addition, Bombardier is doing some additional qualification testing in the Region. These tests are to show the vehicle performs correctly to the specifications. At the same time, GrandLinq is completing System Integration Testing in Waterloo Region. System Integration Testing tests both the built infrastructure and the vehicle to ensure they are functioning together as designed. This testing has been ongoing with vehicles that do not have the specialized equipment. Approximately half of the 86 tests have been d this way. The next System Integration Tests require vehicles with on-board equipment. With the arrival of vehicle 511, GrandLinq has started the remaining system integration tests. While this testing has been going well and to date only relatively minor issues have been identified, there are still a significant number of tests to. Successful completion of these tests is required to safety approve the system and is critical to starting service. GrandLinq is also completing rework activities to correct construction related deficiencies through this reporting period Page 4 of 9

6 Bombardier has started dry run tests for burn-in on some vehicles. These dry run tests will not count to official burn in mileage, but will help identify any vehicle reliability issues as soon as possible. The next major step to improve the function and reliability of the vehicles is the issuance of the next software upgrade. Table 2 shows the current status of testing. Training Status GrandLinq/Keolis continues training on the first of three sets of train operators. Once trained, drivers will be supporting the ongoing testing and burn in programme and system demonstration tests as well as ongoing driving to maintain skill levels. There are currently 10 drivers being trained. Four vehicles have been allocated specifically for the training and qualification of GrandLinq/Keolis Operators. Two to three of the vehicles are being used everyday for training these drivers and it has become commonplace for three vehicles to be operating on the ION route during the same time throughout the day. A fourth vehicle serves as a hot spare available for replacing one of the other training vehicles if required. Training of drivers has been delayed by vehicle reliability issues (it is expected that the next computer software upgrade will resolve the issues). The Bombardier vehicles are complex vehicles that require routine maintenance as well as any necessary repairs or emergency repairs. Training of the staff that will be doing these repairs is continuing. These staff are currently helping to support the vehicles during the testing programme. Schedule and start of service The most recent schedule called for start of service in December As noted in the previous update report (September 19, 2018), this schedule was based on receiving all fourteen Bombardier vehicles with specialized equipment and the vehicles approved for service by the end of December The September report also noted that a number of issues could impact the schedule, including delivery of ready for service vehicles, system integration and/or testing issue, driver and mechanic training and safety certification. Although progress has been made since the September report, several items have been delayed which has impacted the overall schedule. Installation of the specialized equipment is taking longer than anticipated in the September report and achieving PAC approval has also been delayed. The trains that have been delivered have had unanticipated minor issues that have impacted their availability for driver and system testing. These issues are being addressed (or will be) but the overall schedule has been impacted. The driver training and mechanic training has been impacted by reduced availability of vehicles. Safety certification while progressing is also taking longer than was anticipated in the September report. Completion of all this work is not keeping up Page 5 of 9

7 with the aggressive schedule required to start service in December Installation of the specialized equipment on the final vehicle is now anticipated to be by early February. Following the completion of the installations there are still required tests and demonstrations to compete prior to going into full service. Based on the current schedule for the delivery of Bombardier vehicles and GrandLinq s schedule for system integration testing, and driver and mechanic training, it is expected that service would start in spring Regional staff will continue to closely monitor Bombardier s and GrandLinq s progress and schedule, and will work diligently with them to get the system into service as soon as it is feasible and safe to do so. Staff will also exercise all financial and legal mechanisms available to the Region to expedite the schedule and minimize any negative impacts on the Region. Starting service in spring 2019 aligns with the start of spring service for Grand River Transit and will allow the LRT service to integrate smoothly into the overall transit network. Events An ION vehicle has been present at some upcoming community events, with further events scheduled. The vehicle is parked at an ION station during these events, providing residents an opportunity to view and board a vehicle. At these events, ION staff provide safety information, service information and answer questions from residents and visitors. GRT staff also provide information on network changes and light rail integration. These events include: September 6 Waterloo Fest (Waterloo Public Square station) Complete September 19 University of Waterloo station (University of Waterloo station) Complete October 4 Oktoberfest (Waterloo Public Square station) Complete October 5 Oktoberfest (Kitchener City Hall) Complete October 26 UW convocation (University of Waterloo station) Complete vember 24 The ION train will visit a number of stations throughout the ION route. Specific details will be provided closer to the date. December 7 Christkindl Market (Kitchener City Hall station) During the first five events, over 2,835 residents and visitors boarded and toured the ION vehicle. Regional staff will continue to look for opportunities to engage with residents in order to provide information on ION service and safety. Information on future events will continue to be shared through these updates. These events have been reviewed, approved and timed to not impact any testing or training that could impact start of service Page 6 of 9

8 Corporate Strategic Plan: The report supports Focus Area 3.1 of Council s Strategic Focus: Develop an implementation plan for light rail transit including corridor and station area planning. Financial Implications: The approved capital budget for the LRT project totals $868 million, with funding provided by the Federal Government ($265 million), Provincial government ($325 million) with the balance funded by the Region including the repayment over the next 30 years of $131 million of funding provided by GrandLinq. The RT project and some Grand River Transit service improvements are funded though annual property tax increases in the three cities until 2019 and related fare revenue. Currently it is anticipated that the schedule changes and associated costs can all be accommodated within the approved rapid transit funding strategy. As has been noted in previous reports the Region will seek to recover from Bombardier any additional costs incurred as a result of the delays in vehicle delivery. Other Department Consultations/Concurrence: This report was prepared with input from Corporate Services. Attachments: Table 1: Current Status of Light Rail Vehicles Table 2: Testing Status Prepared By: Thomas Schmidt, Commissioner, Transportation and Environmental Services Approved By: Thomas Schmidt, Commissioner, Transportation and Environmental Services Page 7 of 9

9 Table 1: Current Status of Light Rail Vehicles All vehicles are currently owned by Bombardier and have not been accepted by the Region. Vehicle Number Location 501 Kingston 502 Waterloo 503 Waterloo 504 Waterloo 505 Waterloo 506 Waterloo 507 Waterloo 508 Waterloo Waiting for parts. 509 Waterloo 510 Kingston 511 Waterloo 512 Waterloo 513 Waterloo 514 Kingston Current Status Specialized On-board equipment installation ongoing Inspection by Region scheduled for: vember 8 and 9, Inspection by scheduled for Region: vember 15 and 16, Inspection by scheduled for Region: vember 20 and 21, Vehicle used for system testing, training, and undergoing modifications. Vehicle used for system testing, training, and undergoing modifications. Vehicle used for system testing, training, and undergoing modifications. Vehicle used for system testing, training, and undergoing modifications. Inspection by Region d on October 25 and 26, Vehicle used for system integration testing with on-board equipment turned on. Vehicle used for system integration testing with on-board equipment turned on. Vehicle used for system integration testing with on-board equipment turned on. Specialized On-board equipment installation starting in vember GrandLinq On-board Equipment Installation 35% 100% 94% 51% 100% 100% 100% 100% PAC Page 8 of 9

10 Table 2: Testing Status Location Test Status tes Kingston Bombardier Qualification On going Multi (coupled) vehicle testing is ongoing. Waterloo Region Bombardier Qualification On going Towed multi-vehicle testing. Will resume with two car operational testing once Kingston testing. Next planned tests include Wayside information uploading system to allow vehicle diagnostics to be transmitted to the control centre from terminal stations. Waterloo Region GrandLinq System Integration On going Testing started on vehicles with specialized onboard equipment. Testing will include Radios, Automatic Train Protection (allows train to run faster on railway right of ways), Traffic Signal Priority, Automatic Vehicle Location, and Track Switch System and on-board systems to control gates, crossings, and traffic signals. Waterloo Region Vehicle Burn-in t started Planned to be started once reliability modifications are d on vehicles. Waterloo Region Vehicle Burn-in Dry-run On hold. Software upgrades are required. Waterloo Region Simulation / Demonstration t started System is run as if it was in service, but will not be picking up passengers. Last step in test process, all other tests need to be d first Page 9 of 9

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit

TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit S REGION OF WATERLOO TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit TO: Chair Jim Wideman and Members of the Planning and Works Committee DATE: FILE CODE: A02-30/PW SUBJECT: NORTHFIELD DRIVE AT

More information

MEMORANDUM. TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit. Date: May 24, Summary

MEMORANDUM. TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit. Date: May 24, Summary TRANSPORTATION AND ENVIRONMENTAL SERVICES Rapid Transit Date: May 24, 2016 MEMORANDUM To: From: Subject: File No: Chair Tom Galloway and Planning and Works Committee Thomas Schmidt Revised Bombardier Vehicle

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

Precision Station Stopping Progress Update

Precision Station Stopping Progress Update Washington Metropolitan Area Transit Authority Precision Station Stopping Progress Update Presented to: The Board of Directors; Customer Service, Operations and Safety Committee By PlanninghDevelopmenthEngineeringhConstruction

More information

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE September 7, 2016 REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT ON COMPRESSED NATURAL GAS TRANSIT FLEET UPDATE PURPOSE To update Council on Kamloops

More information

Merger of the generator interconnection processes of Valley Electric and the ISO;

Merger of the generator interconnection processes of Valley Electric and the ISO; California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson Vice President, Policy & Client Services Date: August 18, 2011 Re: Decision on Valley Electric

More information

Region of Waterloo Transportation and Environmental Services Rapid Transit

Region of Waterloo Transportation and Environmental Services Rapid Transit Region of Waterloo Transportation and Environmental Services Rapid Transit To: Chair Jim Wideman and Members of the Planning and Works Committee Date: September 30, 2014 File Code: A02-30/PW Subject: ION

More information

VAN NESS AVENUE BUS RAPID TRANSIT

VAN NESS AVENUE BUS RAPID TRANSIT VAN NESS AVENUE BUS RAPID TRANSIT Commission of the Environment Policy Committee May 22, 2014 Peter Gabancho Project Manager III Capital Programs & Construction SFMTA 1 Conceptual Visual Simulation Center-Running

More information

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council:

Update on Community or Heritage Rail Project (Project Manager Services) The Engineering Department recommends that Council: Corporate NO: R279 Report COUNCIL DATE: DECEMBER 18, 2006 REGULAR COUNCIL TO: Mayor & Council DATE: December 15, 2006 FROM: General Manager, Engineering FILE: 8710-20 (Heritage) SUBJECT: Update on Community

More information

6 York Region Transit (YRT/Viva) On-board Security Camera System Upgrade Contract Award

6 York Region Transit (YRT/Viva) On-board Security Camera System Upgrade Contract Award Clause 6 in Report No. 11 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 25, 2015. 6 York Region Transit (YRT/Viva)

More information

Federal Gas Tax Program. Transportation Committee May 7, 2014

Federal Gas Tax Program. Transportation Committee May 7, 2014 5.2 Federal Gas Tax Program Transportation Committee May 7, 2014 Federal Gas Tax Transfer Program Original head agreement signed in 2005 (Canada-BC-UBCM) Purpose: provide local governments with stable,

More information

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, 2006 SUBJECT: Scarborough Rt Strategic Plan RECOMMENDATIONS It is recommended that the Commission: 1. Endorse

More information

CITY of GUELPH Transit Growth Strategy and Plan, Mobility Services Review. ECO Committee

CITY of GUELPH Transit Growth Strategy and Plan, Mobility Services Review. ECO Committee CITY of GUELPH Transit Growth Strategy and Plan, Mobility Services Review ECO Committee July 19, 2010 1 Study Purpose Vision and growth strategy for Guelph Transit, ensuring broad consultation Operational

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

DRAFT Subject to modifications

DRAFT Subject to modifications TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M DRAFT To: Council Members AGENDA ITEM 7A From: Date: Subject: Staff September 17, 2010 Council Meeting High Speed Rail Update Introduction The

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Mississauga Transit 2009 Budget

Mississauga Transit 2009 Budget Mississauga Transit 2009 Budget Budget Committee Presentation December 2, 2008 Revenue Ridership Forecasted 2008 Total Rides Including transfers 11% growth in the last 24 months Transit Service Area Business

More information

The Regional Municipality of York. Purchase of Six Battery Electric Buses

The Regional Municipality of York. Purchase of Six Battery Electric Buses 1. Recommendations The Regional Municipality of York Committee of the Whole Transportation Services January 10, 2019 Report of the Commissioner of Transportation Services Purchase of Six Battery Electric

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS 2018 What is the More MARTA Atlanta program? The More MARTA Atlanta program is a collaborative partnership between MARTA and the City of Atlanta to develop and implement a program

More information

Public and Fleet Electric Vehicle Charging Infrastructure Strategy

Public and Fleet Electric Vehicle Charging Infrastructure Strategy CoQuitlam For Council Our File: 11-5210-01/000/2018-1 Doc#: 3187569.V3 To: From: Subject: For: City Manager General Manager, Engineering and Public Works Public and Fleet Electric Vehicle Charging Infrastructure

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT Supports Item No. 1 T&T Committee Agenda May 13, 2008 CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: April 29, 2008 Author: Don Klimchuk Phone No.: 604.873.7345 RTS No.: 07283 VanRIMS No.: 13-1400-10

More information

Item No Halifax Regional Council June 21, 2016

Item No Halifax Regional Council June 21, 2016 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.2.2 Halifax Regional Council June 21, 2016 TO: Mayor Savage and Members of Halifax Regional Council SUBMITTED BY: Councillor Tim Outhit, Chair,

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 27, 2012 SUBJECT: NOTICE OF AWARD PROCUREMENT AUTHORIZATION - ARTICULATED BUSES INFORMATION ITEM RECOMMENDATION

More information

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE

5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE 5 RAPID TRANSIT NETWORK PLAN PRINCIPLES, METROLINX BUSINESS CASE, AND ALTERNATIVE FINANCE AND PROCUREMENT ANALYSIS UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the

More information

Valley Metro: Past, Present and Future. September 11, 2014

Valley Metro: Past, Present and Future. September 11, 2014 Valley Metro: Past, Present and Future September 11, 2014 Valley Metro Who are We? Two Boards of Directors Regional Public Transportation Authority Fund and operate regional transit services Valley Metro

More information

Modernising the Great Western railway

Modernising the Great Western railway Report by the Comptroller and Auditor General Department for Transport and Network Rail Modernising the Great Western railway HC 781 SESSION 2016-17 9 NOVEMBER 2016 4 Key facts Modernising the Great Western

More information

Feasibility of Establishing an E85 Fuelling Station in Oshawa

Feasibility of Establishing an E85 Fuelling Station in Oshawa (Oshawa Report To: From: Subject: Strategic Initiatives Committee Bob Duignan City Manager Item: SIC-09-54 File: B-1100-0082 Feasibility of Establishing an E85 Fuelling Station in Oshawa PUBLIC REPORT

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: Resolution: Yes No TITLE: LRT and Streetcar Interoperability Study PURPOSE: To brief the

More information

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION

10/4/2016. October 6, Item #1 CITIZENS PARTICIPATION October 6, 2016 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 WELCOME 2 Item #4 TRAC ROADWAY RECOMMENDATIONS UPDATE Item #4 Completed Jurisdiction Presentations Boulder City August

More information

DART Priorities Overview

DART Priorities Overview City of Dallas Transportation and Trinity River Project Committee DART Priorities Overview Gary C. Thomas President/Executive Director August 10, 2015 City of Dallas Transportation & Trinity River Committee

More information

Rate Review 2017 Off-Street Municipal Parking Facilities

Rate Review 2017 Off-Street Municipal Parking Facilities PA3.2 REPORT FOR ACTION Rate Review 2017 Off-Street Municipal Parking Facilities Date: August 31, 2017 To: Board of Directors, Toronto Parking Authority From: Acting President, Toronto Parking Authority

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

New York State and EVs

New York State and EVs New York State and EVs Adam Ruder June 23, 2015 2 ChargeNY In the 2013 State of the State Address, Gov. Cuomo outlined a plan to: Install more than 2,500 new public and workplace charging stations statewide

More information

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min Gas Advisory Board Draft Agenda Meeting No. 1 Location: Parmelia Hilton, Swan B Room 14 Mill Street, Perth WA 6000 Date: 20 December 2011 Time: 11:15am 12:15pm Item Subject Responsible Time 1. WELCOME

More information

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA )

National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA ) National Treasury Presentation to the Standing Committee on Finance: South African Airways SOC Ltd ( SAA ) Presenter: National Treasury 18 November 2015 90 day Action Plan In November 2014, the Ministers

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: September 30, 2010 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT - LOW FLOOR LIGHT RAIL VEHICLE OPTIONS: SURFACE VEHICLE SAFETY

More information

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including:

The purpose of this report is to respond to the Notice of Motion CS-16-51, Generators for Fire Halls and Recreation Facilities, including: Public Report To: From: Report Number: Community Services Committee Ron Diskey, Commissioner, Community Services Department CS-17-18 Date of Report: March 24, 2017 Date of Meeting: March 30, 2017 Subject:

More information

Transportation 2040: Plan Performance. Transportation Policy Board September 14, 2017

Transportation 2040: Plan Performance. Transportation Policy Board September 14, 2017 Transportation 2040: Plan Performance Transportation Policy Board September 14, 2017 Today Background Plan Performance Today s Meeting Background Board and Committee Direction 2016-2017 Transportation

More information

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action

MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Recommend to Board. Final Action MOTION NO. M2018-160 Purchase of Thirteen 42-foot Double Deck Expansion Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations Committee PROPOSED ACTION 12/06/2018 12/20/2018 Recommend to Final

More information

MOTION NO. M Light Rail Vehicle Oil-less Rotary Scroll Air Compressor Upgrade PROPOSED ACTION

MOTION NO. M Light Rail Vehicle Oil-less Rotary Scroll Air Compressor Upgrade PROPOSED ACTION MOTION NO. M2017-152 Light Rail Vehicle Oil-less Rotary Scroll Air Compressor Upgrade MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION 12/07/2017 Final

More information

Electric Vehicle Charging Station Installation and Eco-Pass Updates. Report Prepared by: A. Rolston, Parking Operations Coordinator

Electric Vehicle Charging Station Installation and Eco-Pass Updates. Report Prepared by: A. Rolston, Parking Operations Coordinator Report to Council Date: File: 1862-01 To: From: Subject: City Manager D. Duncan, Manager, Parking Services Electric Vehicle Charging Station Installation and Eco-Pass Updates Report Prepared by: A. Rolston,

More information

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition

Open House. Highway212. Meetings. Corridor Access Management, Safety & Phasing Plan. 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition Welcome Meetings 5:30 to 6:30 p.m. - Southwest Corridor Transportation Coalition 6:30 to 8:00 p.m. - Open House Why is Highway 212 Project Important? Important Arterial Route Local Support Highway 212

More information

An Asset Management Plan for Transit And Access Transit Fleet

An Asset Management Plan for Transit And Access Transit Fleet Header Title ATTACHMENT 1 Building Better Transit: An Asset Management Plan for Transit And Access Transit Fleet 2 June 2016 Transit & Access Transit Fleet INTRODUCTION The Saskatoon Transit fleet is currently

More information

CREATING CONNECTIONS IN WATERLOO REGION

CREATING CONNECTIONS IN WATERLOO REGION CREATING CONNECTIONS IN WATERLOO REGION GORD TROUGHTON, DIRECTOR, CORRIDOR INFRASTRUCTURE CHRIS BURKE, DIRECTOR, SERVICE PLANNING ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS METROLINX

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee

More information

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study

Northeast Corridor Alternatives Analysis. Public Involvement Round 2 Input on Alternatives for Further Study Northeast Corridor Alternatives Analysis Public Involvement Round 2 Input on Alternatives for Further Study Feb. 7-9, 2012 Agenda Review project background Progress summary Recommended alternatives for

More information

Electric Multiple Unit Procurement Update

Electric Multiple Unit Procurement Update Electric Multiple Unit Procurement Update Board of Directors August 7, 2014 Context* * The proposed project is not yet approved pending environmental clearance. 2 1 Status April 2014 - JPB update on EMU

More information

Commuter Rail Update. October 25, 2018

Commuter Rail Update. October 25, 2018 Commuter Rail Update October 25, 2018 2 page page 3 State of Commuter Rail Network, July 2014 The 2014 Commuter Rail network had multiple issues and a history of neglect & under-investment FIRST UP? UPGRADES

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

Transit Project Delivery Status Report. Significant Issues

Transit Project Delivery Status Report. Significant Issues Item 1 Transit Project Delivery Status Report Significant Issues Presented By K.N. Murthy Executive Director Construction Committee 1 I-405 Sepulveda Pass Closure Construction Committee I-405 Sepulveda

More information

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982 Subject MINISTERIAL BRIEFING NOTE Rapid Transit in Auckland Date 1 November 2017 Briefing number BRI-1133 Contact(s) for telephone discussion (if required) Name Position Direct line Cell phone 1 st contact

More information

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup

Exhibit A Sound Transit Board Resolution R Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Exhibit A Sound Transit Board Resolution R2016-07 Selecting the bicycle, pedestrian, and parking access improvements to be built for the Puyallup Access Improvement Project. RESOLUTION NO. R2016-07 Selecting

More information

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018

MARTA s blueprint for the future. COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 MARTA s blueprint for the future COFFEE AND CONVERSATION Kyle Keahey, More MARTA Atlanta Dec. 5, 2018 TODAY S AGENDA About MARTA Economic development/local impact More MARTA Atlanta program Program summary/timeline

More information

Mountain View Automated Guideway Transit Feasibility Study Community Meeting September 25, 2017

Mountain View Automated Guideway Transit Feasibility Study Community Meeting September 25, 2017 Mountain View Automated Guideway Transit Feasibility Study Community Meeting September 25, 2017 Jim Lightbody, City of Mountain View Jenny Baumgartner, Lea+Elliott Eileen Goodwin, Apex Strategies 1 Agenda

More information

Municipal fleets and plug-in vehicles in Indianapolis

Municipal fleets and plug-in vehicles in Indianapolis Municipal fleets and plug-in vehicles in Indianapolis Will St.Clair Vice President Vision Fleet Manuel Mendez Project Manager Indianapolis Office of Audit and Performance June 17, 2015 Copyright 2014 by

More information

Transit Vehicle (Trolley) Technology Review

Transit Vehicle (Trolley) Technology Review Transit Vehicle (Trolley) Technology Review Recommendation: 1. That the trolley system be phased out in 2009 and 2010. 2. That the purchase of 47 new hybrid buses to be received in 2010 be approved with

More information

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update MEETING DATE: August 31, 2005 SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update RECOMMENDATION It is recommended that the Commission: i) Receive for information

More information

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010

ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 ACT Canada Sustainable Mobility Summit Planning Innovations in Practice Session 6B Tuesday November 23, 2010 Presentation Outline Context t of Mississauga i City Centre Implementing Paid Parking and TDM

More information

Final Administrative Decision

Final Administrative Decision Final Administrative Decision Date: August 30, 2018 By: David Martin, Director of Planning and Community Development Subject: Shared Mobility Device Pilot Program Operator Selection and Device Allocation

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

Elko County Enhanced 911 Advisory Committee Five-Year Master Plan (v.1.3.1) March 9, 2017

Elko County Enhanced 911 Advisory Committee Five-Year Master Plan (v.1.3.1) March 9, 2017 Elko County Enhanced 911 Advisory Committee Five-Year Master Plan (v.1.3.1) March 9, 2017 Plan Summary: This Five-Year Master Plan is intended to serve as a guide to be referenced by Elko County Enhanced

More information

Evaluating Stakeholder Engagement

Evaluating Stakeholder Engagement Evaluating Stakeholder Engagement Peace River October 17, 2014 Stakeholder Engagement: The Panel recognizes that although significant stakeholder engagement initiatives have occurred, these efforts were

More information

The ION Story. November 2015

The ION Story. November 2015 The ION Story November 2015 Planning For The Future The Region of Waterloo has been planning for rapid transit for more than a decade ION will: Limit urban sprawl; ease traffic congestion Protect environmentally-sensitive

More information

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based

More information

Public Works and Infrastructure Committee. p:/2015/clusterb/tra/northyork/pw15086

Public Works and Infrastructure Committee. p:/2015/clusterb/tra/northyork/pw15086 PW9.10 STAFF REPORT ACTION REQUIRED Car-Share Parking in Permit Parking Areas Date: October 22, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation

More information

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting

Alternative and Renewable Fuel and Vehicle Technology Program. Advisory Committee Meeting Alternative and Renewable Fuel and Vehicle Technology Program Advisory Committee Meeting December 4, 2012 California Energy Commission Hearing Room A 1 Meeting Agenda 10:00 Introductions and Opening Remarks

More information

4 YORK REGION TRANSIT COMPUTER AIDED DISPATCH/AUTOMATIC VEHICLE LOCATION SYSTEM FOR CONVENTIONAL TRANSIT BUSES - UPDATE

4 YORK REGION TRANSIT COMPUTER AIDED DISPATCH/AUTOMATIC VEHICLE LOCATION SYSTEM FOR CONVENTIONAL TRANSIT BUSES - UPDATE 4 YORK REGION TRANSIT COMPUTER AIDED DISPATCH/AUTOMATIC VEHICLE LOCATION SYSTEM FOR CONVENTIONAL TRANSIT BUSES - UPDATE The Transit Committee recommends: 1. The presentation by Rajeev Roy, Manager, Transit

More information

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion

MOTION NO. M Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion MOTION NO. M2016-66 Purchase of Thirty-two Double Deck Buses for Increased Passenger Capacity, Bus Replacement and Service Expansion MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations Committee 07/07/16

More information

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES TRANSIT GRADE: C- WHAT YOU SHOULD KNOW ABOUT TRANSIT FACILITIES California needs robust, flexible and reliable transit systems to reduce peak congestion on our highways, provide options for citizens who

More information

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report Office of Transportation Bureau of Traffic Management 1997 Downtown Parking Meter District Rate Report Introduction The City operates approximately 5,600 parking meters in the core area of downtown. 1

More information

The UK s Industrial Strategy; the Automotive Sector Deal

The UK s Industrial Strategy; the Automotive Sector Deal The UK s Industrial Strategy; the Automotive Sector Deal Mike Hawes, SMMT LowCVP - 12 April 2018 What is SMMT? Targeted networking in UK and internationally National and international events Reliable automotive

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

congestion management program

congestion management program congestion management program 2550 Rail Vehicle Program March 2012 11-0319tr 2010 lacmta Q U A R T E R LY P R O J E C T S TAT U S R E P O R T 255O RAIL VEHICLE PROGRAM QUARTERLY PROJECT STATUS REPORT THE

More information

That an annual one-week curbside battery collection program BE REFERRED to the 2019 budget process for consideration.

That an annual one-week curbside battery collection program BE REFERRED to the 2019 budget process for consideration. Page 1 Subject: Curbside Battery Collection Report to: Waste Management Planning Steering Committee Report date: Monday, Recommendations That an annual one-week curbside battery collection program BE REFERRED

More information

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS

NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS NOTICE OF REGULARLY SCHEDULED BOARD MEETINGS NEW JERSEY TRANSIT CORPORATION NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT MORRIS, INC. TO WHOM IT MAY

More information

SUCCESSFUL GAS TO POWER PLANT DEVELOPMENT CTRG, MOZAMBIQUE

SUCCESSFUL GAS TO POWER PLANT DEVELOPMENT CTRG, MOZAMBIQUE SUCCESSFUL GAS TO POWER PLANT DEVELOPMENT CTRG, MOZAMBIQUE Africa Utility Week Cape Town Kribs Govender Vice President Business Development Power & Gas 13 May 2015 Forward-looking statements Forward-looking

More information

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014 Midtown Corridor Alternatives Analysis Policy Advisory Committee Meeting February 12, 2014 Today s Agenda Introductions Outreach efforts and survey results Other updates since last meeting Evaluation results

More information

Car Sharing at a. with great results.

Car Sharing at a. with great results. Car Sharing at a Denver tweaks its parking system with great results. By Robert Ferrin L aunched earlier this year, Denver s car sharing program is a fee-based service that provides a shared vehicle fleet

More information

Commuter Rail Vehicle Technology Analysis

Commuter Rail Vehicle Technology Analysis Commuter Rail Vehicle Technology Analysis May, 2007 Commuter Rail Vehicle Technology Analysis 1 Purpose: To present the results of the, and double deck ( dd) analysis Including: Description of the Vehicles

More information

Report for Action. Wilson Bus Garage - Upgrades. Summary. Date: March 20, 2018 To: TTC Board From: Chief Capital Officer

Report for Action. Wilson Bus Garage - Upgrades. Summary. Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Report for Action Wilson Bus Garage - Upgrades Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary The purpose of this report is to obtain authorization for the award of Contract No.

More information

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue.

On June 11, 2012, the Park Board approved the installation of three electric vehicle charging stations along Beach Avenue. January 8, 2017 TO: Park Board Chair and Commissioners FROM: General Manager Vancouver Board of Parks and Recreation SUBJECT: Electric Vehicle Charging Stations New Park Board Locations RECOMMENDATION

More information

METRO CNG Program Phase I Update. Customer Service Committee April 2014

METRO CNG Program Phase I Update. Customer Service Committee April 2014 METRO CNG Program Phase I Update Customer Service Committee April 2014 METRO CNG Program Background Bus purchase Short term solutions Long term plans Bus purchase options 2 METRO CNG Program April 2011

More information

Developing Toronto s Transit Network Plan to Public Information Meeting June 21, 2016

Developing Toronto s Transit Network Plan to Public Information Meeting June 21, 2016 Developing Toronto s Transit Network Plan to 2031 Public Information Meeting June 21, 2016 March 2016 City Council Direction SmartTrack: Approved SmartTrack/GO Regional Express Rail (RER) Integration options

More information

INTRADEPARTMENTAL CORRESPONDENCE. The Honorable Board of Police Commissioners ^ECUTIVE DIRECTOR

INTRADEPARTMENTAL CORRESPONDENCE. The Honorable Board of Police Commissioners ^ECUTIVE DIRECTOR INTRADEPARTMENTAL CORRESPONDENCE ibpd # l&'0lo4 April 4, 2018 1.10 TO: RICHARD in, TEFANK The Honorable Board of Police Commissioners ^ECUTIVE DIRECTOR FROM: Chief of Police SUBJECT: PUBLIC SAFETY MOTION

More information

St. Catharines Transit Commission Accessibility Plan. St. Catharines Transit Commission Accessibility Plan

St. Catharines Transit Commission Accessibility Plan. St. Catharines Transit Commission Accessibility Plan St. Catharines Transit Commission 2013-2018 Accessibility Plan 1 2013-2018 ST. CATHARINES TRANSIT ACCESSIBILITY PLAN The following document is the St. Catharines Transit s Accessibility Plan for the next

More information

Toronto Police Service Annual Report: Parking Enforcement Unit 2017 Parking Ticket Issuance. Andy Pringle, Chair, Toronto Police Services Board

Toronto Police Service Annual Report: Parking Enforcement Unit 2017 Parking Ticket Issuance. Andy Pringle, Chair, Toronto Police Services Board STAFF REPORT ACTION REQUIRED GM26.7 Toronto Police Service Annual Report: Parking Enforcement Unit 2017 Parking Ticket Issuance Date: March 12, 2018 To: From: Government Management Committee Andy Pringle,

More information

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS

1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS 1 YORK REGION TRANSIT EXTENSION OF EXISTING DIAL-A-RIDE PILOT PROJECT AND STOCK TRANSPORTATION SCHOOL BUS CONTRACTS The Transit Committee recommends the adoption of the recommendations contained in the

More information

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION

2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION 2018 American Zero Emission Bus Conference INNOVATIVE CLEAN TRANSIT PROPOSED REGULATION L o s A n g e l e s S e p t e m b e r 1 0 th & 11 th 1 General Considerations of Staff Proposal Achieve zero emission

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 8.b Meeting Date: December 19, 2016 Department: PUBLIC WORKS SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Public Works Director City Manager Approval: File No.: 18.01.79

More information

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 CTfastrak Expansion Stakeholder Meeting #4 Manchester Town Hall June 3, 2016 Today s Agenda Phase I Update 2016 Service Plan Implementation Schedule & Cost Update Phase II Services Timeline Market Analysis

More information

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses

MOTION NO. M Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MOTION NO. M2018-161 Purchase of Thirty-one Articulated Hybrid Diesel Expansion and Replacement Buses MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION

More information

CIF # City of Barrie. Large Curbside Containers. Final Report. Final Project Report, September City of Barrie. CIF Project # 801.

CIF # City of Barrie. Large Curbside Containers. Final Report. Final Project Report, September City of Barrie. CIF Project # 801. Final Report CIF #801.5 City of Barrie Large Curbside Containers Final Project Report, September 2015 City of Barrie CIF 801.5 City of Barrie: Large Curbside Containers, September 2015 1 CIF Project #

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

Commuter Rail Vehicle Technology Analysis

Commuter Rail Vehicle Technology Analysis Commuter Rail Vehicle Technology Analysis May, 2007 Commuter Rail Vehicle Technology Analysis 1 Purpose: To present the results of the EMU, DMU and DMU double deck (DMU dd) analysis Including: Description

More information

ATAS TAXIS. Goals. Responsibilities. Accomplishments: What got done?

ATAS TAXIS. Goals. Responsibilities. Accomplishments: What got done? Goals 1. Industry Reports: Taxi fares and gate fees, the appropriate number of medallions to serve the public convenience and necessity, solutions for peak time and neighborhood taxi service and the opportunities

More information

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL

THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL PRIOR PRINTER'S NO. PRINTER'S NO. THE GENERAL ASSEMBLY OF PENNSYLVANIA HOUSE BILL No. Session of 0 INTRODUCED BY M. QUINN, TAYLOR, BRIGGS, V. BROWN, HARPER, HENNESSEY, W. KELLER, KIM, KORTZ, MARSICO, MATZIE,

More information

The Engineering Department recommends Council receive this report for information.

The Engineering Department recommends Council receive this report for information. CORPORATE REPORT NO: R161 COUNCIL DATE: July 23, 2018 REGULAR COUNCIL TO: Mayor & Council DATE: July 19, 2018 FROM: General Manager, Engineering FILE: 8740-01 SUBJECT: Surrey Long-Range Rapid Transit Vision

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Procurement Authorization Amendment Purchase of 18 Forty Foot Low Floor Clean Diesel City Buses Date: July 29, 215 To: From: TTC Board Chief Executive Officer Summary This

More information