1 Vertex Plus, Vertex V60, Solus & Cardio Camera Site Planning Document Rev B Sec 1: Room Requirements Sec 2: Room Layouts Sec 3: Anchor Details Sec 4: Gantry Cables Sec 5: Shipping Information Sec 6: Floor Loading ADAC Laboratories 540 Alder Dr. Milpitas, CA 95035

2 Disclaimer Adac Laboratories reserves the right to revise this publication and to make changes from time to time in the content hereof without obligation of Adac Laboratories to notify any person or organization of such revision or changes. About This Document This document provides site planning information for customers purchasing a Vertex Plus, Vertex V60, Solus or Cardio camera (all with Semi-automatic Collimator Storage Units). The document provides information for facility engineers, structural engineers, site planners and architects. i

3 Section 1 Room Requirements General Information Vertex Plus, Vertex V60, Solus and Cardio cameras consist of a ring-shaped Gantry, a Semi-automatic Collimator Storage Unit, a two End Stands, an Atlas Electronics Rack, an Acquisition Terminal and a Processing Terminal (also called a Pegasys Ultra). At the beginning of an installation, ADAC installers will pour a thin (approximately 1/2") self-leveling epoxy pad and then mount two rails on the pad. Installers will then place the Gantry so it will translate along the rails. Installers will also place Head and Foot End Stands at the ends of the epoxy pad. Those End Stands will support a Patient Table which passes through the center ring of the Gantry. The installers will align the Patient Table to the center of the Gantry ring and anchor the End Stands. See illustration on page 1-3. The Gantry supports two gamma radiation sensitive Detectors from which the system collects images of patients who have been injected with small amounts gamma emitting radionuclides. For Emission Computed Tomography (ECT) studies, the two Detectors rotate around a patient lying on the Patient Table. For Total Body Studies, the two detectors remain above and below the Patient Table while the Gantry scans the length of the patient. Camera Models All Vertex-type cameras are similar in appearance and weight. The differences between the cameras are the following: Solus Cameras - the detectors are always 180 apart (detectors on opposite sides of the gantry s supporting ring). Cardio Cameras - the detectors are 90 apart during clinical operation. Vertex Plus and Vertex V60 Cameras - the detectors may be either 180 or 90 apart. Patient Table Customers may order either a normal or short Patient Table. However, if room size permits, Solus, Vertex Plus and Vertex V60 cameras usually come with a Normal table. Cardio cameras often come with a short table (11" shorter). 1-1

4 Section 1: Room Requirements As Section 2 will indicate, the length of the Patient Table determines the length of the epoxy pad. Site Planners must locate the pad so patients can access the Patient Table from the front of the epoxy pad when the Gantry is near the Head End Stand. Semi-automatic Collimator Storage Unit The Collimator Storage Unit may contain up to eight collimators (four pairs). Collimators are 21" x 26" (53cm x 66cm) sheets of lead of various thicknesses weighing between 110 and 295 lbs (50 and 134 kg). ADAC installers will position the Collimator Storage Unit on the epoxy pad at a specific location behind the Head End Stand. Prior to performing clinical studies, the operator must transfer Collimators from the Collimator Storage Unit to the Head End Stand and then to each of the Detectors on the Gantry. Atlas Electronics Rack A separate Atlas Electronics Rack controls the movements and the image acquisition functions of the Gantry. As Section 4 illustrates, cables run from the Atlas Electronics Rack to the Gantry, the Head End Stand, the Foot End Stand, the Acquisition Terminal and the Processing Terminal (Pegasys Ultra). All components of the camera except the Processing Terminal receive power from the Atlas Electronics Rack. Air Conditioning Requirements All Vertex-type camera have the following heat loads: Atlas, Gantry, End Stands and Acquisition Terminal: 6,000 BTU/hr 420 Cal/sec 1,800 watts Pegasys Ultra: 1,300 BTU/hr 90 Cal/sec 380 watts 6.0 KVA UPS (Solus option) 1,771 BTU/hr 124 Cal/sec 519 watts The camera room HVAC system must maintain the temperature between F (16-24 C) with less than 10 F (6 C) variation per hour. Humidity must be between 20% - 75%. These requirements are 24 hours per day, 7 days per week. 1-2

5 Section 1: Room Requirements Collimator Storage Unit Detector #1 Gantry Epoxy Pad Patient Table Head End Stand Rear Rail Detector #2 Front of Pad Front Rail Foot End Stand Vertex-type Gantry, Collimator Storage Unit and Patient Table. 1-3

6 Section 1: Room Requirements Room Size Requirements Room size requirements depend on whether the customer purchases a normal or short Patient Table. The short table is 11" shorter than the normal one. Depending on room size, site planners may place the Atlas Electronics Rack either: 1. behind the pad, or 2. at either end of the pad. These options affect room size as shown below. Section 2 illustrates these options. Normal Patient Table Location of Atlas Electronics Minimum Recommended Rack Width x Length Width x Length Option #1 12' x 15' 14' x 16' (behind pad) (365 x 457 cm) (427 x 488 cm) Option #2 11' x 17' 13' x 18' (end of pad) (335 x 518 cm) (396 x 549 cm) Short Patient Table Location of Atlas Electronics Minimum Recommended Rack Width x Length Width x Length Option #1 12' x 14' 14' x 15' (behind pad) (365 x 427 cm) (427 x 457 cm) Option #2 11' x 16' 13' x 17' (end of pad) (335 x 488 cm) (396 x 518 cm) For equipment access and space efficiency, Option 2 (Atlas Electronics Rack at one end of the pad) is slightly better. 1-4

7 Section 1: Room Requirements Equipment Sizes Gantry W: 42", D: 60", H: 74" 4,320 lbs (weight is without Collimators) (107 x 152 x 188cm) (1,960 kg) 74" 42" 60" Collimator Storage Unit W: 33", D: 26", H: 61" 253 lbs (weight is without Collimators) (84 x 66 x 155cm) (115 kg) Head End Stand W: 27", D: 16", H: 55"-76" 461 lbs (69 x 41 x cm) (209 kg) Foot End Stand W: 14", D: 12", H: 37"-58" 222 lbs (36 x 30 x cm) (101 kg) Processing Terminal (Pegasys Ultra) W: 8", D: 20", H: 18" 45 lbs (20 x 51 x 46cm) (20 kg) Acquisition Terminal W: 33", D: 30", H: 55" 185 lbs (mobile) (84 x 76 x 140cm) (84 kg) Atlas Electronics Rack W: 34", D: 22", H: 34" 211 lbs (86 x 56 x 86cm) (96 kg) 6.0 KVA UPS (option) W: 19", D: 29", H: 14" 294 lbs (APC, Inc.) (48 x 73 x 36cm) (133 kg) Printer (option) W: 17", D: 21", H: 12" 60 lbs (Condonics Inc) (43 x 53 x 30cm) (27 kg) Important: Unless the floor is a ground-level, reinforced concrete slab poured on grade, a licensed structural engineer must evaluate floor loading capacity. To evaluate floor loading, a structural engineer will need the data in Section 6 of this document. See Section 5 for shipping information. 1-5

8 Section 1: Room Requirements Power Requirements Atlas Electronics Rack. The power requirements for the Atlas Electronics Rack (which provides power to the Gantry, End Stands and Acquisition Terminal) are as follows: Atlas Electronics Rack with Vertex Plus, Vertex V60, Cardio or Solus with 6 KVA UPS without UPS Voltage/Current Requirement: V, 30 A V, 30 A Peak current: 27 amp 27 amp Steady state current: 7 amp 7 amp Phase: Single Phase Single Phase Receptacle: NEMA L6-30 NEMA L6-30 dedicated dedicated line (only international sites needing to meet IEC-601 will be hardwired) 1-6

9 Section 1: Room Requirements Processing Terminal (Pegasys Ultra). The power requirements for the standalone Processing Terminal are as follows: Processing Terminal (Pegasys Ultra) Voltage: Current: Receptacle: 115 V (U.S.) 220 V (International) 10 A - at 115 V (U.S.) 5 A - at 220 V (International) NEMA 5-20 (dedicated line not required) 1-7

10 Section 1: Room Requirements Pad Dimensions Long (Normal) Patient Table If customers order a normal-sized Patient Table, ADAC installers will pour a thin (approximately 1/2" thick) self-leveling epoxy pad with these dimensions: 13" (33cm) minimum Vertex Plus, Solus or Cardio with Semi-Automatic Collimator Unit (long table) 60" 49" (152cm) (124cm) 3" (7.6 cm) minimum 34.25" (87 cm) 176" (447 cm) Short Patient Table If customers order a short Patient Table, ADAC installers will pour a thin (approximately 1/2" thick) self-leveling epoxy pad with these dimensions: 13" (33cm) minimum Vertex Plus, Solus or Cardio with Semi-Automatic Collimator Unit (short table) 60" 49" (152cm) (124cm) 3" (7.6 cm) minimum 34.25" (87cm) 165" (419 cm) 1-8

11 Option VAC, 30 Amp single phase UPS power 25" 64cm 19" x 29" 48cm x 73cm UPS Section 2: Room Layouts Vertex Plus, Vertex V60, Solus or Cardio with Normal Patient Table and UPS 15'-0", 457cm shown (16' recommended) Atlas Electronics Rack 34" x 22" 86cm x 56cm 2" cable 1" cable The UPS will power the Atlas Electronics Rack and the Gantry. 12'-0" 365cm shown (14" recommended) 60" 152cm Phone line Semi-Auto Collimator Storage Unit Head End Stand Gantry 33" x 30" 84cm x 76cm Patient Table Epoxy Pad Foot End Stand 49" 124cm 115 VAC 15 Amp Nema " x 30" 122cm x 76cm Video Formatter 1" cable Option 2 4" (10cm) 13" 33cm Pegasys Ultra (desk top) Acquisition Terminal (mobile) 14'-8" 447cm 17'-0", 518cm (18' recommended) VAC, 30 Amp single phase UPS power 11'-0" 335cm shown (13' recommended) 60" 152cm Phone line Semi-Auto Collimator Storage Unit Head End Stand Gantry 33" x 30" 84cm x 76cm Patient Table 2" cable 1" cable Foot End Stand Epoxy Pad UPS Atlas Electronics Rack 19" x 29" 48cm x 73cm 34" x 22" 86cm x 56cm 49" 124cm 115 VAC 15 Amp Nema " x 30" 122cm x 76cm Video Formatter 1" cable Pegasys Ultra (desk top) Acquisition Terminal (mobile) 10/20/00 4" (10cm) 14'-8" 447cm 2-1

12 Vertex Plus, Vertex V60, Solus or Cardio with Short Patient Table and UPS Option VAC, 30 Amp single phase UPS power 25" 64cm 19" x 29" 48cm x 73cm UPS 14'-0", 427cm shown (15' recommended) Atlas Electronics Rack 34" x 22" 86cm x 56cm 2" cable 1" cable The UPS will power the Atlas Electronics Rack and the Gantry. 12'-0" 365cm shown (14' recommended) 60" 152cm Semi-Auto Collimator Storage Unit Head End Stand Gantry Patient Table Foot End Stand 49" 124cm Phone line 33" x 30" 84cm x 76cm Epoxy Pad 115 VAC 15 Amp Nema 5-20 Video Formatter 48" x 30" 122cm x 76cm 1" cable Option 2 3" (8cm) 13" 33cm Pegasys Ultra (desk top) Acquisition Terminal (mobile) 13'-9" 419cm 16'-0", 488cm shown (17' recommended) VAC, 30 Amp single phase UPS power 11'-0" 335cm shown (13' recommended) 60" 152cm Phone line Semi-Auto Collimator Storage Unit Head End Stand Gantry 33" x 30" 84cm x 76cm Patient Table 2" cable Epoxy Pad 1" cable Foot End Stand UPS Atlas Electronics Rack 19" x 29" 48cm x 73cm 34" x 22" 86cm x 56cm 49" 124cm 115 VAC 15 Amp Nema 5-20 Video Formatter 48" x 30" 122cm x 76cm 1" cable 10/20/00 4" (10cm) Pegasys Ultra (desk top) Acquisition Terminal (mobile) 13'-9", 419cm 2-2

13 Vertex Plus, Vertex V60, Solus or Cardio with Normal Patient Table w/o UPS VAC single phase 30 Amp 15'-0", 457cm shown (16' recommended) Option 1 25" 64cm Atlas Electronics Rack 34" x 22" 86cm x 56cm 2" cable 1" cable 12'-0" 365cm shown (14" recommended) 60" 152cm Phone line 115 VAC 15 Amp 4 plex, or 220v,7 amp international Semi-Auto Collimator Storage Unit Head End Stand Gantry 48" x 30" 122cm x 76cm Video Formatter 1" cable 33" x 30" 84cm x 76cm Patient Table Epoxy Pad Foot End Stand 49" 124cm 4" (10cm) Pegasys Ultra (desk top) Acquisition Terminal (mobile) 14'-8" 447cm Option 2 13" 33cm 17'-0", 518cm (18' recommended) VAC single phase 30 Amp 60" 152cm Semi-Auto Collimator Storage Unit Gantry Patient Table 2" cable 1" cable Atlas Electronics Rack 34" x 22" 86cm x 56cm 49" 124cm 11'-0" 335cm shown (13' recommended) 10/11/00 Phone line 115 VAC 15 Amp 4 plex, or 220v,7 amp international 4" (10cm) Head End Stand 48" x 30" 122cm x 76cm Video Formatter 1" cable Pegasys Ultra (desk top) 33" x 30" 84cm x 76cm Acquisition Terminal (mobile) 14'-8" 447cm 2-3 Foot End Stand Epoxy Pad Note: This drawing shows minimum room sizes. Larger rooms are preferable. If room size permits, locate the Pegasys Ultra further from gantry.

14 Vertex Plus, Vertex V60, Solus or Cardio with Short Patient Table w/o UPS VAC single phase 30 Amp 14'-0", 427cm shown (15' recommended) Option 1 25" 63cm Atlas Electronics Rack 34" x 22" 86cm x 56cm 2" cable 1" cable 12'-0" 365cm shown (14' recommended) 60" 152cm Semi-Auto Collimator Storage Unit Head End Stand Gantry Patient Table Foot End Stand 49" 124cm Phone line 115 VAC 15 Amp, or 220v, 7 Amp International (4 plex) Video Formatter 48" x 30" 122cm x 76cm 1" cable 33" x 30" 84cm x 76cm Epoxy Pad 3" (8cm) Pegasys Ultra (desk top) Acquisition Terminal (mobile) 13'-9" 419cm Option 2 13" 33cm 16'-0", 488cm shown (17' recommended) VAC single phase 30 Amp 60" 152cm Semi-Auto Collimator Storage Unit Gantry Patient Table 2" cable 1" cable Atlas Electronics Rack 34" x 22" 86cm x 56cm 49" 124cm 11'-0" 335cm shown (13' recommended) 10/11/00 Phone line 115 VAC 15 Amp, or 220v, 7 Amp International (4 plex) 4" (10cm) Head End Stand Video Formatter Pegasys Ultra (desk top) 48" x 30" 122cm x 76cm 1" cable 33" x 30" 84cm x 76cm Acquisition Terminal (mobile) 13'-9", 419cm 2-4 Foot End Stand Epoxy Pad Note: This drawing shows minimum room sizes. Larger rooms are preferable. If room size permits, locate the Pegasys Ultra further from gantry.

15 Section 3 Anchor Details Anchor Plans - Non-seismic Areas In non-seismic areas, ADAC installers will use 1/2" concrete anchors to floor-mount the Collimator Storage Unit and End Stands, and use 1/4" concrete anchors for the rails. Anchor Plans - Seismic Areas In seismic areas, ADAC installers will use 1/2" concrete anchors to floor-mount the Collimator Storage Unit, End Stands and rails. Additionally, in seismic areas, installers will place a 5/8" spacer under each rail. The spacers elevate the rail so four Gantrymounted brackets on each corner of the Gantry will engage the rail and resist Gantry overturn moments. Anchor Specifications 5/8" Spacer,,,,,,,,,,,,,,,,,,,,,, ADAC installers will use the following anchor for the Collimator Storage Unit, End Stands and, in seismic areas, the rails: Manufacturer Model Diameter ICBO # Embedment Ramset/Red Head Trubolt 1/2" " Pad Gantry-mounted Bracket Rail Anchor California OSHPD Information The California Office of Statewide Health Planning and Development (OSHPD) has pre-approved ADAC s Vertex-type camera anchorage. The Vertex pre-approval application number is R Customers may obtain a copy of the Vertex OSHPD pre-approval package from ADAC s Order Entry Department (800/ ext 3265). 3-1

16 Section 3: Anchor Details Anchor Hole Patterns After anchoring the rails and putting the Gantry on the rails, ADAC installers will (1) place the Head and Foot End Stands at the ends of the epoxy pad, (2) place the Patient Table on the End Stands, (3) align the Patient Table to the center of the Gantry ring, and (4) anchor the End Stands to the concrete floor. In the four diagrams that follow, some dimensions are given with a tolerance of ± 0.5". This is to allow for centering the Patient Table with respect to the Gantry. As shown in the following drawings, some anchor locations depends on whether the site must meet California seismic requirements and the length of the Patient Table. Long Patient Table Non-seismic (5 anchors per rail) ~36.4" (92.5cm) ~34.5" (87.6cm) 12.5" (31.8cm) 6.25" (15.9cm) Head End Stand Foot End Stand ~8.63" (21.9cm) 18" (45.7cm) Pad 4.38" (11.1cm) 8.75" (22.2cm) ~161.4" (410cm) 11.65" (29.6cm) Head and Foot End Stand ~1.75" (4.45cm) ~2.5" (6.35cm) 29.3" (74.4cm) 20" (50.8cm) Collimator Storage Rear Rail Front Rail ~12.7" (32.3cm) 1.6" (4cm) 43.2" (110cm) 36" (91cm) Pad 63.5" (161cm) 63.5" (161cm) Collimator Storage and Rail 3-2

17 Section 3: Anchor Details Short Patient Table Non-seismic (5 anchors per rail) ~36.4" (92.5cm) ~34.5" (87.6cm) 12.5" (31.8cm) 6.25" (15.9cm) Head End Stand Foot End Stand ~8.63" (21.9cm) 18" (45.7cm) Pad 4.38" (11.1cm) 8.75" (22.2cm) ~150.4" (382cm) - Short Table 11.65" (29.6cm) Head and Foot End Stand ~1.75" (4.45cm) ~2.5" (6.35cm) 29.3" (74.4cm) 20" (50.8cm) Collimator Storage Rear Rail Front Rail ~12.7" (32.3cm) 1.6" (4cm) 43.2" (110cm) 36" (91cm) Pad 63.5" (161cm) 63.5" (161cm) Collimator Storage and Rail 3-3

18 Section 3: Anchor Details Long Patient Table Seismic (12 anchors per rail) ~36.4" (92.5cm) ~34.5" (87.6cm) 12.5" (31.8cm) 6.25" (15.9cm) Head End Stand Foot End Stand ~8.63" (21.9cm) 18" (45.7cm) Pad 4.38" (11.1cm) 8.75" (22.2cm) ~161.4" (410cm) 11.65" (29.6cm) Head and Foot End Stand ~1.75" (4.45cm) ~2.5" (6.35cm) 29.3" (74.4cm) 20" (50.8cm) Collimator Storage Rear Rail Front Rail ~14.5" (36.8cm) 41.3" (105cm) ~35.3" (89.6cm) Pad 10X 12" (=120") 10X ~30.5cm (=304.8cm) 8" (20.3cm) Collimator Storage and Rail 3-4

19 Section 3: Anchor Details Short Patient Table Seismic (12 anchors per rail) ~36.4" (92.5cm) ~34.5" (87.6cm) 12.5" (31.8cm) 6.25" (15.9cm) Head End Stand Foot End Stand ~8.63" (21.9cm) 18" (45.7cm) Pad 4.38" (11.1cm) 8.75" (22.2cm) ~150.4" (382cm) - Short Table 11.65" (29.6cm) Head and Foot End Stand ~1.75" (4.45cm) ~2.5" (6.35cm) 29.3" (74.4cm) 20" (50.8cm) Collimator Storage Rear Rail Front Rail ~14.5" (36.8cm) 41.3" (105cm) ~35.3" (89.6cm) Pad 10X 12" (=120") 10X ~30.5cm (=304.8cm) 8" (20.3cm) Collimator Storage and Rail 3-5

20 Section 3: Anchor Details 3-6

21 Section 4 Gantry Cables Gantry Cable Lengths Vertex-type Cameras have the cable lengths shown below. One cable connects the Gantry, Electronics Rack and both End Stands. That cable comes in only one length. The lengths of its four segments are shown. NEMA L6-30 Plug Power Cord NEMA L6-30 Receptacle (hospital provided) 14' (4.3m) Gantry 20' (6m) 25' (7.6m) 2" (5 cm) diameter (must be placed on floor) 20' (6m) Head End Stand NEMA L6-30 Receptacle (hospital provided) 2" (5 cm) diameter (typically placed on floor) 20' (6m) 1" (2.5 cm) diameter (typically placed on floor) Foot End Stand NEMA 5-20 Plug 9.5' (2.9m) 5/16" (8mm) dia Power Cord Atlas Electronics Rack 25', 50', 75' or 100' (7.6m, 15m, 23m, 30m) long 1" (2.5cm) dia with 3" (7.6cm) non-removable plugs on each end. Typically placed on floor, but may be pushed through 2" (5cm) round conduit by removing plug housing. Ethernet (various lengths)) Pegasys Ultra (desk top) Acquisition Terminal (mobile) Note: ADAC installers will perform all cable connections, but hospital personnel must run cables through walls, ceilings and conduits (if required). 4-1

22 Section 4: Gantry Cables 4-2

23 Section 5 Shipping Information Gantry (Shipping Size and Weight) The shipping weight of a Vertex-type Gantry is: Gantry: 4,320 lbs (1,960 Kg) 70" 178cm Crate: 396 lbs (180 Kg) 55" 140cm Total: 4,716 lbs (2,139 Kg) The crated size of the Gantry is shown on the right. Top View For specific rigger information, contact your field service engineer who can obtain ADAC document " 206cm Side View Gantry (Moving Size and Weight) The weight of the Gantry on the wheels ADAC uses to transport the Gantry within a hospital is: Gantry: 4,320 lbs (1,960 Kg) 45.5" 116cm Wheels 4 x 70 lbs (4 x 32 Kg) (est) Total: 4,600 lbs (2,087 Kg) (est) The size of the Gantry on wheels is shown on the right. Top View 17" worst wheel position (shown) 14" best (all 4 corners) 74" 188cm 1 ADAC FS Engineers may obtain document from the Field Service Technical Publication option in the ADAC Internal Home Page " 226cm Side View

24 Section 5: Shipping Information Small Door Oenings A Vertex-type gantry can go through doors smaller than 45.5" (116cm) but it requires a lot of effort. Below are the steps a field service engineer can do to get a Vertex-type gantry through three categories of smaller door openings. 45.5" 116cm 43.5" " ( cm) Door Top View Before installing the rear foot-side transport wheel, route the umbilical cable between that transport wheel and the foot side of the gantry. Raise the gantry 4" - 5" (10-13cm) above the floor. Remove the unbilical cable hub from the gantry and, without damaging the individual wires, pull about 6" (15cm) of wire from the gantry. Bend the wires down and temporarily place the hub under the gantry. While going through the door, on a one-wheel-at-a-time basis, remove a front and then a rear twheel. Be careful to balance the gantry while it is resting on three wheels " " ( cm) Door Prepare the gantry and umbilical cable as above. Remove the E-stop switches from both sides of the gantry by pulling on the retaining clip/wire on the inside of the ganty. (To avoid damage, remove the E-stop switches even if it appears unnecessary.) While going through the door, replace the front and then the rear transport wheels with a 4-wheel dolly. This requires extra field service help " " ( cm) Door Measure the opening very accurately. The opening must not be less than 41.75"! Remove the E-stop switches as above. Disconnect and remove the umbilical cord from the gantry. Disconnect the lower end of the ring cables and place them in the center of the gantry. Remove all gantry covers that cover (even partially) the sides of the gantry. Remove all screws that protrude from the gantry sides. While going through the door, replace the front and then the rear wheels with a 4-wheel dolly. Small Weight Capacity Elevators If an Elevator does not have the capacity to lift a Vertex gantry, three options exist: 1. Position the elevator car above the destination or below the entry floor. Use riggers to lift the gantry up the elevator shaft. Typically riggers do this by placing a beam and hoist one floor above the destination floor. 2. Have riggers place the gantry in the elevator car, and "assist" the elevator mechanism to lift the extra load. Again, riggers typically do this by placing a beam and hoist at least one floor above the destination floor. 3. Use riggers to pass the gantry through a wall or window. If using options 1 or 2, riggers need to check the weight capacity of the threshold in front of the elevator door. Sometimes riggers will have to place a steel plate over the threshold to dissipate the load. Reducing the weight of a gantry by removing a detector is time consuming and requires factory personnel to work on-site. Field service engineers must obtain approval for this procedure from the Field Service Installation Manager. 5-2

25 Section 6 Floor Loading General Floor Loading Information Unless the floor is a reinforced concrete slab poured on grade, a licensed structural engineer must evaluate floor loading capacity using the data in this section. Refer to Section 1 of this document for explanations of the Vertex-type Gantry, Patient Table and Semi-automatic Collimator Storage Unit functions. The numbers below summarize the floor loads that this section describes in detail. Load of ADAC Load of equipment on Gantry Collimator Pad (moving) Storage Wt Area Load Wt Area Load Wt Area Load Collimators lbs sq ft psf lbs sq ft psf lbs sq ft psf 2 VXGP only full set of 8 5, , , , , kg sq m kg/m 2 kg sq m kg/m 2 kg sq m kg/m 2 2 VXGP only full set of 8 2, , , ,274 2, , ,638 In the above summary, the Two VXGP only calculations assumes the customer only purchases two light-weight VXGP collimators. The full set of eight assumes the customer purchases pairs of VXGP collimators, and pairs of MEGP, HEGP and UHGP Collimators; further, this assumes the pair of light-weight collimators are on the Gantry, and the other three pairs are in the Collimator Storage Unit. The Load of ADAC equipment on Pad includes both the Gantry and Collimator Storage loads. This section presents floor loading calculations starting with the entire area of a typically sized room. The section then looks at the loads under specific parts of the camera (Pad, Gantry, Collimator Storage Unit and Table End Stands). The data in the rest of this section assumes a full set of eight collimators. The calculations in this appendix pertain to Vertex Plus, Vertex V60, Solus and Cardio cameras. 6-1

26 Section 6: Floor Loading Room Floor Loading Components Weight (lbs) PegUltra & Monitor 75 Acquisition Terminal 185 Atlas Electronic Rack 211 Gantry w/o Collimators 4,320 Head End Stand 461 Foot End Stand 222 empty Collimator Storage 253 Patient Table 20 Patient 300 Technologists 400 ( ) UPS (optional) 294 Total 6,741 lbs Room (long table) Room (short table) UPS Semi-auto Collimator Storage Unit Area = 12 x 15 = 180 sq ft = 12 x 14 = 168 sq ft 15 (long table) 14 (short table) Atlas Electronic Rack Gantry 12 Head End Stand Foot End Stand PegUtlra & Monitor Acquisition Terminal Room Floor Loading (long table, w/o collimators) = 6, = 37 lbs/ft 2 Room Floor Loading (short table, w/o collimators) = 6, = 40 lbs/ft 2 Components Weight PegUltra & Monitor 75 Acquisition Terminal 185 Atlas Electronic Rack 211 Gantry w/o Collimators 4,320 Head End Stand 461 Foot End Stand 222 empty Collimator Storage 253 Patient Table 20 Patient 300 Technologists 400 ( ) UPS (optional) 294 Collimators in Storage Unit: VXGP 220 (2 x 110) MEGP 436 (2 x 218) HEGP 470 (2 x 235) Collimators on Detectors: UHGP 590 (2 x 295) Total 8,457 lbs Room Floor Loading (long table, worst case, w/collimators) = 8, = 47 lbs/ft 2 Room Floor Loading (short table, worst case, w/collimators) = 8, = 50 lbs/ft 2 Note: Even if a customer does not order all collimators, ADAC recommends that structural engineers assume the worst case (all collimators purchased). 6-2

27 Sectin 6: Floor Loading Pad Floor Loading The camera and some other components sit on an epoxy pad. The figures below describe floor loading on the pad assuming (1) no collimators, and (2) a full set of collimators. Components Weight Gantry w/o Collimators 4,320 Head End Stand 461 Foot End Stand 222 empty Collimator Storage 253 Patient Table 20 Patient 300 Total 5,576 lbs Area Pad (long table) = (49 x x 11)/144 = 62.5 sq ft Pad (short table) = (49 x x 11)/144 = 58.8 sq ft (long table) 165 (short table) Pad Floor Loading (long table, w/o collimators) = 5, = 89 lbs/ft 2 Pad Floor Loading (short table, w/o collimators) = 5, = 95 lbs/ft 2 Components Weight Gantry w/o Collimators 4,320 Head End Stand 461 Foot End Stand 222 empty Collimator Storage 253 Patient Table 20 Patient 300 Collimators in Storage Unit: VXGP 220 (2 x 110) MEGP 436 (2 x 218) HEGP 470 (2 x 235) Collimators on Detectors: UHGP 590 (2 x 295) Total 7,292 lbs Pad Floor Loading (long table, worst case, w/collimators) = 7, = 117 lbs/ft 2 Pad Floor Loading (short table, worst case, w/collimators) = 7, = 124 lbs/ft 2 Note: 1. Even if a customer does not order the heaviest collimators (UHGP), ADAC recommends that structural engineers assume that as a worst case. 6-3

28 Section 6: Floor Loading Gantry Floor Loading (moving component) The gantry moves along the pad. The figures below describe the average load under the part of the pad that the gantry occupies at any instant of time. Components Weight Gantry w/o Collimators 4,320 Total 4,320 lbs Area Gantry = (60 x 41.75)/144 = 17.4 sq ft 60 Gantry = in Distance of Travel Gantry Floor Loading (w/o collimators) = 4, = 248 lbs/ft 2 Components Weight Gantry 4,320 UHGP 590 (2 x 295) Total 4,910 lbs Gantry Floor Loading (worst case, w/heaviest collimators) = 4, = 282 lbs/ft 2 Note: 1. Even if a customer does not order the heaviest collimators (UHGP), ADAC recommends that structural engineers assume that as a worst case. 6-4

29 Sectin 6: Floor Loading Gantry Wheel Moving Point Loads The gantry rides on four wheels. The load on the front and rear wheels depends on the position of the detectors. The figures below describe the point loads at different detector positions. Load bearing points are two 3" diameter by 1.75" wide steel wheels in front, and two 3.75" diameter by 0.75" wide steel wheels in the rear. Wheels roll on a 1/4" thick by 3" wide steel rail. Four point loads are in rectangular 35" x 44" pattern that moves " along the length of the pad The two detectors rotate about a point in the center of the gantry ring. On Solus cameras, the two heads are always 180 apart. Center of Gantry Ring On Cardio and Vertex Plus cameras, the operator may put the two heads at either 180 or 90 apart. Front Rear Detectors 180 Apart While in the 90 position, the operator may rotate the detectors about the center of the gantry ring. These various positions (and the presence or absense of collimators) affect gantry wheel moving point loads. The worst case moving point loads are when both detectors are over either the front or rear wheels. Calculations of moving point loads over front and rear wheels appear on the next four pages. Detectors 90 Apart and Both Over Front Wheels Detectors 90 Apart and Both Over Rear Wheels 6-5

30 Section 6: Floor Loading Gantry Wheel Point Load Weight (both detectors over front wheels) Components Weight (lbs) Gantry and Detectors 4,320 Detectors 1,260 (2 x 630) Heaviest Collimators UHGP 590 (2 x 295) C. G. Detectors C. G. Gantry These calculations are for Cardio and Vertex cameras only. Weight on each of two front wheels: Front Wheel Point Load (distance between wheels) = 0.5 [( ) x (gantry w/o detector wt) + ( ) x (detector + collimator wt)] = 0.5 [( ) x ( ) + ( ) x ( )] = 1,292 lbs w/o collimators = 0.5 [( ) x ( ) + ( ) x ( )] = 1,575 lbs w/heaviest C. G. Detectors C. G. Gantry Weight on each of two rear wheels: (distance between wheels) Rear Wheel Point Load = 0.5 [( ) x (gantry w/o detector wt) + ( ) x (detector + collimator wt)] = 0.5 [( ) x ( ) + ( ) x ( )] = 868 lbs w/o collimators = 0.5 [( ) x ( ) + ( ) x ( )] = 880 lbs w/heaviest 6-6

31 Sectin 6: Floor Loading Gantry Wheel Point Load Weight (both detectors over rear wheels) Components Weight (lbs) Gantry and Detectors 4,320 Detectors 1,260 (2 x 630) Heaviest Collimators UHGP 590 (2 x 295) C. G. Detectors C. G. Gantry These calculations are for Cardio and Vertex cameras only. Weight on each of two front wheels: Front Wheel Point Load (distance between wheels) = 0.5 [( ) x (gantry w/o detector wt) + ( ) x (detector + collimator wt)] = 0.5 [( ) x ( ) + ( ) x ( )] = 886 lbs w/o collimators = 0.5 [( ) x ( ) + ( ) x ( )] = 979 lbs w/heaviest C. G. Detectors C. G. Gantry Weight on each of two rear wheels: (distance between wheels) Rear Wheel Point Load = 0.5 [( ) x (gantry w/o detector wt) + ( ) x (detector + collimator wt)] = 0.5 [( ) x ( ) + ( ) x ( )] = 1,274 lbs w/o collimators = 0.5 [( ) x ( ) + ( ) x ( )] = 1,476 lbs w/heaviest 6-7

32 Section 6: Floor Loading Gantry Wheel Point Load Calculations for Solus Cameras (or Vertex Plus cameras with Detectors at 180 Positions) Components Weight (lbs) Gantry and Detectors 4,320 Detectors 1,260 (2 x 630) C. G. Detectors Heaviest Collimators UHGP 590 (2 x 295) C. G. Gantry Weight on each of two front wheels Front Wheel Point Load (distance between wheels) = 0.5 [( ) x (gantry w/o detector wt) + ( ) x (detector + collimator wt)] = 0.5 [( ) x ( ) + ( ) x ( )] = 1,089 lbs w/o collimators = 0.5 [( ) x ( ) + ( ) x ( )] = 1,277 lbs w/heaviest C. G. Detectors C. G. Gantry Weight on each of two rear wheels (distance between wheels) Rear Wheel Point Load = 0.5 [( ) x (gantry w/o detector wt) + ( ) x (detector + collimator wt)] = 0.5 [( ) x ( ) + ( ) x ( )] = 1,071 lbs w/o collimators = 0.5 [( ) x ( ) + ( ) x ( )] = 1,178 lbs w/heaviest 6-8

33 Sectin 6: Floor Loading Summary of Gantry Wheel Point Loads (Moving Gantry) Front Detectors Over Front Wheels Rear Detectors Over Rear Wheels Cardio/Vertex Plus Front Wheel Rear Wheel Front Wheel Rear Wheel Point Load Point Load Point Load Point Load No Collimators 1,292 lbs 868 lbs 886 lbs 1,274 lbs Heaviest Collimators 1,575 lbs 880 lbs 979 lbs 1,476 lbs Detectors at 180 in Any Rotation Solus (or Vertex Plus at 180 ) Front Front Wheel Point Load Rear Rear Wheel Point Load No Collimators 1,089 lbs 1,070 lbs Heaviest Collimators 1,277 lbs 1,178 lbs Rear Wheel (1 of 2) Travel distance = inches Front Wheel (1 of 2)

34 Section 6: Floor Loading Semi-automatic Collimator Storage Unit Floor Loading Components Weight Weight of Collimator Storage Unit without collimators = 253 Total = 253 lbs Area Unit = (32.5 x 26)/144 = 5.87 sq ft /8 Semi-Auto Collimator Storage Unit Floor Loading (w/o collimators) = = 43 lbs/ft 2 Components Weight Weight of Collimator Storage Unit without collimators = 253 Weight of collimators (worse case) LEHR = 220 (2 x 110) MEGP = 436 (2 x 218) HEGP = 470 (2 x 235) UHGP = 590 (2 x 295) Total =1,969 lbs Semi-Auto Collimator Storage Unit Floor Loading (with all collimators) = 1, = 336 lbs/ft

35 Sectin 6: Floor Loading Semi-automatic Collimator Storage Unit Point Loads The Semi-Automatic Collimator Storage Unit sits on four 5/8" bolts welded to two 3 x 26 x 1/2" steel plates. The plates sit on the pad. The figures below describe the point loads on these four bolts. 2-5/ Rear /8 5/8" bolt welded to 1/2" steel plate (4X) Front Front Rear 5/8" bolt welded to 1/2" steel plate (4X) 3 x 26 x 1/2" steel plate (2X) Pad Side View Components Weight Weight of Collimator Storage Unit without collimators = 253 Total = 253 lbs Semi-Automatic Collimator Storage Unit Point Loads (w/o collimators) = = 63 lbs Components Weight Weight of Collimator Storage Unit without collimators = 253 Weight of collimators (worse case) LEHR = 220 (2 x 110) MEGP = 436 (2 x 218) HEGP = 470 (2 x 235) UHGP = 590 (2 x 295) Total =1,969 lbs Semi-Automatic Collimator Storage Unit Point Loads (with all collimators) = 1,969 4 = 492 lbs 6-11

36 Section 6: Floor Loading End Stand Floor Loading To mount Collimators on the Detectors, the operator slides one Collimator at a time from the Storage Unit to Head End Stand, and then to the Detector. While the operator is making this transfer, patients cannot be on the table. Since Collimators are heavier than half a normal patient s weight, the worse case floor loading for the Head End Stand includes the weight of the heaviest Collimator. The Foot End Stand is not involved in Collimator transfers, but carries half the pateint's weight. Head End Stand (16 x 27) Foot End Stand (12 x 14) Head End Stand Weight without collimator = 461 Weight of one collimator (during collimator loading) = 295 (worst case) Total = 756 lbs Area head end stand base = 3 sq ft [(16 x 27) /144] Head End Stand Floor Load = 252 psf Foot End Stand Weight = 222 1/2 weight of patient = 150 (worst case) Total = 372 lbs Area foot end stand base = 1.17 sq ft [(12 x 14) /144] Foot End Stand Floor Load = 319 psf 6-12

37 Sectin 6: Floor Loading End Stand Moments Since the Head End Stand is out of balance during Collimator transfers and the Foot End Stand is out of balance when a patient is being imaged, the moments shown below apply. Collimator (295 lbs) Carriage (48 lbs) Transport Mechanism (125 lbs) Lift Mechanism (193 lbs) Base Plate (95 lbs) Anchor Point Head End Stand Moments: 7-3/ / Over Turn Moment = [(295+48) x 21] + (125 x 1.5) = 7,391 lb-in Righting Moment = [(95 x 13.5) + (193 x 7.375)] x 0.85 = 2,300 lb-in Required Holding Force (max) = [(9,176-2,706) ] = 201 lbs (on 3 anchors) Half Patient Weight (150 lbs) Foot End Stand Moments: Lift Mechanism (222 lbs) Anchor Point 5.75 Over Turn Moment = (150 x 13) = 1,950 lb-in Righting Moment = (222 x 5.75) x 0.85 = 1,085 lb-in Required Holding Force (max) = [(1,950-1,085) 12.22] = 71 lbs (on 2 anchors) Note: ADAC will provide and install anchors meeting this requirement, as long as the institution s concrete is sufficiently strong. The above calculations do not include seismic loads. Seismic load calculations are the responsibility of the institution s structural engineer. Structural engineers may obtain an Earthquake Pre-approval Package from ADAC s Order Entry office (800/ x 3265). 6-13

38 Section 6: Floor Loading Maximum Floor Deflection ECT Studies. For ECT studies (where the detectors rotate around the patient and the Gantry is on the left half of the rails and does not move along the rails), the floor must not deflect more than the specfication shown below. The deflection shall be calculated from where one wheel rests on an ADAC rail to where another wheel rests on the same rail, while a load of 1,192 lbs moves between the front and rear rails. ECT Situation #1 Structural support ECT Situation #2 Gantry Adac rear rail Adac front rail Structural support In this situation, if the detectors are 90 apart, the left front wheel will deflect more than the right front wheel. This will create an out-of-plane situation and the detectors will rotate in a helical fashion. The maximum deflection must not exceed 0.080". Structural support ECT Situation #3 Gantry Structural support Adac rear rail Adac front rail In this situation, the maximum deflection may not exceed 0.150". The rails will stay parallel and both front wheels will deflect the same amount even if the detectors are 90 apart. The plane between the wheels will be maintained as the detectors rotate around the patient. Gantry Adac rear rail Adac front rail In this situation, if the detectors are 90 apart, the front and rear deflections will vary as the detectors rotate around the patient. The maximum deflection must not exceed 0.080". Total Body Studies. For Total Body studies (where detectors are above and below the body, and the Gantry translates along the rails), the deflection may not exceed 0.100" in 35" anywhere along either rail as the Gantry translates the length of the rails. 6-14

TELETOM PREINSTALLATION MANUAL

TELETOM PREINSTALLATION MANUAL TELETOM PREINSTALLATION MANUAL MANUAL ORGANIZATION SAFETY CONTENTS SECTION 1 INTRODUCTION...1-1 DESCRIPTION...1-1 PRE-INSTALLATION RESPONSIBILITIES...1-2 BERCHTOLD RESPONSIBILITIES...1-2 OWNER RESPONSIBILITIES...1-3

More information

OPTEVA 923 IN LOBBY TELLER (ILT) PLAN mm (60") WIDE PLAN - STAND ALONE FRONT VIEW SIDE VIEW PAGE 1 OF 5 CALL NOTE:

OPTEVA 923 IN LOBBY TELLER (ILT) PLAN mm (60) WIDE PLAN - STAND ALONE FRONT VIEW SIDE VIEW PAGE 1 OF 5 CALL NOTE: OPTEVA 9 IN LOBBY TELLER (ILT) mm ( ") U.L. SAFE L4 CALL -8-999-6 CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND INFORMATION. PLEASE SEE PLANNING AND SITE PREPARATION GUIDE

More information

OPTEVA 378 ENHANCED CASH RECYCLER TERMINAL FRONT LOAD LOBBY UNIT PLAN VIEW FRONT VIEW SIDE VIEW

OPTEVA 378 ENHANCED CASH RECYCLER TERMINAL FRONT LOAD LOBBY UNIT PLAN VIEW FRONT VIEW SIDE VIEW L00 CALL -800--600 OPTEVA 8 ENHANCED CASH RECYCLER TERMINAL WITH mm ( ") UL SAFE 4 ( 6 ") 4 ( 6 ") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND INFORMATION. PLEASE SEE PLANNING

More information

FREE STANDING WORK STATION JIB CRANE

FREE STANDING WORK STATION JIB CRANE SECTION 14661 FREE STANDING WORK STATION JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

SEISMIC RESTRAINTS Multi-Directional Bracing For Electrical Conduit, Cable Tray And Mechanical Piping Systems

SEISMIC RESTRAINTS Multi-Directional Bracing For Electrical Conduit, Cable Tray And Mechanical Piping Systems SEISMIC RESTRAINTS Multi-Directional Bracing For Electrical Conduit, Cable Tray And Mechanical Piping Systems SYSTEMS THAT MAKE SENSE INTRODUCTION INTRODUCTION What is Seismic Bracing? Seismic forces are

More information

CHAPTER 1C PREPARING FOR INSTALLATION

CHAPTER 1C PREPARING FOR INSTALLATION CPI Canada Inc. Preparing for Installation 1C CHAPTER 1C PREPARING FOR INSTALLATION CONTENTS: 1C.1.0 INTRODUCTION... 1C-2 1C.2.0 GENERATOR POWER REQUIREMENTS... 1C-2 1C.2.1 32 kw Single Phase... 1C-2 1C.2.2

More information

Battery Technology for Data Centers and Network Rooms: Site Planning

Battery Technology for Data Centers and Network Rooms: Site Planning Battery Technology for Data Centers and Network Rooms: Site Planning White Paper # 33 Executive Summary The site requirements and costs for protecting information technology and network environments are

More information

330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT. 330mm (13") MAXIMUM WALL THICKNESS IN AREA OF UNIT (30 HEIGHT NOTE SEE W ALL OPENING

330mm (13) MAXIMUM WALL THICKNESS IN AREA OF UNIT. 330mm (13) MAXIMUM WALL THICKNESS IN AREA OF UNIT (30 HEIGHT NOTE SEE W ALL OPENING L08 CALL -800--600 R DIEBOLD 0 FULL FUNCTION TERMINAL 40mm ( 6") CEN I SAFE - " OR " DISPLAY THROUGH THE WALL 0mm (") SAFE CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND INFORMATION.

More information

203mm (8") MAXIMUM WALL THICKNESS IN AREA OF UNIT. 203mm (8") MAXIMUM WALL THICKNESS IN AREA OF UNIT (30 HEIGHT NOTE SEE W ALL OPENING

203mm (8) MAXIMUM WALL THICKNESS IN AREA OF UNIT. 203mm (8) MAXIMUM WALL THICKNESS IN AREA OF UNIT (30 HEIGHT NOTE SEE W ALL OPENING L0 CALL -800--600 R DIEBOLD 0 FULL FUNCTION THROUGH THE WALL 0mm ( VESTIBULE TERMINAL 40mm ( 6") CEN I SAFE - " OR " DISPLAY CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND

More information

JOHANSON DIELECTRICS INC Bledsoe Street, Sylmar, Ca Phone (818) Fax (818)

JOHANSON DIELECTRICS INC Bledsoe Street, Sylmar, Ca Phone (818) Fax (818) Impact of Pad Design and Spacing on AC Breakdown Performance John Maxwell, Vice President of Engineering, Johanson Dielectrics Inc. Enrique Lemus, Quality Engineer, Johanson Dielectrics Inc. 15191 Bledsoe

More information

5. Contractor Information 3M Model 2300 Series System Layout Checklist

5. Contractor Information 3M Model 2300 Series System Layout Checklist 5. Contractor Information 3M Model 2300 Series System Layout Checklist This checklist contains the information necessary to provide the environment required to successfully install your new Model 2300

More information

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG DC Electric Vibrators Operating Instructions Global External 12-Volt DC Electric Vibrators Intermittent Use Only Models: CEG-1800-12 CEG-2200-12 CEG-2800-12 CEG-3600-12 CEG-4200-12 INDUSTRIAL ELECTRIC

More information

fischer Bolt anchor FAZ II The power anchor for highest demands.

fischer Bolt anchor FAZ II The power anchor for highest demands. fischer Bolt anchor FAZ II The power anchor for highest demands. Bolt anchor FAZ II For highest demands. Powerful and flexible. The distinctive holds the expansion clip in position even with reinforcement

More information

Installation Instructions Capacity 10,000 lbs. (100 Series Lift)

Installation Instructions Capacity 10,000 lbs. (100 Series Lift) Installation Instructions Capacity 10,000 lbs. (100 Series Lift) IMPORTANT Reference ANSI/ALI ALIS, Safety Requirements for Installation and Service of Automotive Lifts before installing lift. OPERATING

More information

Installation Instructions

Installation Instructions page 1 of 7 Description These feeds are designed for installation in shielded standard types of parabolic antennas. The feed is designed for positive metal-to-metal contact between the feed and the reflector,

More information

Series 2, 3, 4 Steel Cable Ladder Steel Cable Ladder, Series 2, 3, 4 & 5

Series 2, 3, 4 Steel Cable Ladder Steel Cable Ladder, Series 2, 3, 4 & 5 Cable Ladder with Slotted Rung (shown with alternating slot orientation) Cable Ladder with Slotted Rung (shown with continuous slot down - also available with continuous slot up) HDS-1 Steel Cable Ladder,

More information

TEK Brief July Is there a difference in installation requirements between communications cables with and without the LP designation?

TEK Brief July Is there a difference in installation requirements between communications cables with and without the LP designation? BECAUSE YOUR BUSINESS RUNS THROUGH US TEK Brief July 2016 LP Cabling: Frequently Asked Questions Table of Contents Introduction Prior to the beginning of the review cycle of the 2017 National Electrical

More information

Installation Manual. Talon Series. Portable Vehicle Scale by Fairbanks Scales, Inc. All rights reserved.

Installation Manual. Talon Series. Portable Vehicle Scale by Fairbanks Scales, Inc. All rights reserved. Installation Manual Talon Series Portable Vehicle Scale 2007-2012 by Fairbanks Scales, Inc. All rights reserved 51158 Revision 5 12/12 Disclaimer Every effort has been made to provide complete and accurate

More information

All images and other materials are protected by United States copyright law and may not be reproduced, distributed, transmitted, displayed, published

All images and other materials are protected by United States copyright law and may not be reproduced, distributed, transmitted, displayed, published All images and other materials are protected by United States copyright law and may not be reproduced, distributed, transmitted, displayed, published or broadcast without the prior written permission from

More information

Harding Steel Tri-Lift

Harding Steel Tri-Lift Harding Steel Tri-Lift World Class Lifts since 1968 Harding Steel Tri-Lift Density Security Economy Tri-Lift System Description System Description: The Harding Steel Tri-Lift parking system is a 4-post

More information

Fiber Optic Above-Ground) Cross-Connect Enclosure (ACE) Model ACE-200DS Installation Guide)

Fiber Optic Above-Ground) Cross-Connect Enclosure (ACE) Model ACE-200DS Installation Guide) Fiber Optic Above-Ground) Cross-Connect Enclosure (ACE) Model ACE-200DS Installation Guide) 13536-A Figure 1. ACE-200DS Enclosure With OCM-HD Panels Content Page INTRODUCTION... 2 1 PRODUCT DESCRIPTION...

More information

fischer Bolt anchor FAZ II

fischer Bolt anchor FAZ II fischer Bolt anchor FAZ II The power anchor for highest demands NEW Bolt anchor FAZ II For highest demands Powerful and flexible The distinctive edge holds the expansion clip in position even with reinforcement

More information

SCAN OPTICS SO-5800 MICROSCOPE ASSEMBLY MANUAL

SCAN OPTICS SO-5800 MICROSCOPE ASSEMBLY MANUAL SCAN OPTICS SO-5800 MICROSCOPE ASSEMBLY MANUAL SO-5800 Ophthalmic Microscope Assembly Manual Page 2 of 25 CONTENTS INTRODUCTION... 3 PACKING LIST... 5 MECHANICAL ASSEMBLY... 6 Floor stand base and pillar...

More information

SECTION HVAC POWER VENTILATORS

SECTION HVAC POWER VENTILATORS SECTION 233423 HVAC POWER VENTILATORS 1. PART 1 GENERAL 1.1. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Preinstallation Worksheet 3M Detection Systems Please complete this form and fax it to 3M at

Preinstallation Worksheet 3M Detection Systems Please complete this form and fax it to 3M at Preinstallation Worksheet 3M Detection Systems Please complete this form and fax it to 3M at 1-800-795-9091. Today s date Sales consultant Account name Key contact name Phone No. Installation location

More information

PIP REEE003 Guidelines for General Purpose Non-Lubricated Flexible Couplings

PIP REEE003 Guidelines for General Purpose Non-Lubricated Flexible Couplings September 2016 Machinery PIP REEE003 Guidelines for General Purpose Non-Lubricated Flexible Couplings PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry

More information

KRANE-KING Jib & Gantry Cranes Gantries Free Standing Jibs Tension & Cantilevered Jibs Hoists

KRANE-KING Jib & Gantry Cranes Gantries Free Standing Jibs Tension & Cantilevered Jibs Hoists KRANE-KING Jib & Gantry Cranes Gantries Pages H.4 - H.17 Free Standing Jibs Pages H.18 - H.30 Tension & Cantilevered Jibs Pages H.31 - H.35 Hoists Pages H.36 - H.42 Index to Krane-King Jib & Gantry Cranes

More information

Installation Manual. Rev

Installation Manual. Rev Installation Manual ChargePro 620 Charging Station is a trademark of SemaConnect, Inc. All other products or services mentioned are the trademarks, service marks, registered trademarks or registered service

More information

Lifting height 5.5" - 72" with adapters " Height overall 165" Width between columns 122" Drive through 109" Width overall 151.

Lifting height 5.5 - 72 with adapters  Height overall 165 Width between columns 122 Drive through 109 Width overall 151. Model Number TP12KC-D Capacity 12,000 lbs. Lifting height 5.5" - 72" with adapters 79.625" Height overall 165" Width between columns 122" Drive through 109" Width overall 151.125" Arm extension 37.5" -

More information

Creating An Accessible World ELVORON CPL.

Creating An Accessible World ELVORON CPL. Creating An Accessible World ELVORON CPL Design And Planning Guide www.garaventalift.com Please note: Dimensions provided in this Guide are for REFERENCE ONLY and should not be used for site preparation

More information

System Specifications

System Specifications Symbia E and S System Specifications www.siemens.com/mi Gantry Specifications Gantry Dimensions Symbia E Symbia S Height 193.0 cm (6 ft 4 in) 225 cm (7 ft 4.7 in) Width 167.6 cm (5 ft 6 in) 225 cm (7 ft

More information

Series 1 Steel - Straight Sections

Series 1 Steel - Straight Sections Series 1 Steel - Straight Sections Series 1 Steel H-1 B-Line series Cable Tray Systems Series 1 Steel - ccessories & Fittings Series 1 Steel How The Service dvisor Works We know that your time is important!

More information

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide

RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input Vac Output Vac User Guide RT Series Step Down Transformer for RT Series UPS 6-10kVA UL Input 208-240 Vac Output 208-120 Vac User Guide UNLESS SPECIFICALLY AGREED TO IN WRITING, SELLER (A) MAKES NO WARRANTY AS TO THE ACCURACY, SUFFICIENCY

More information

Conveyor Belt Monitoring

Conveyor Belt Monitoring Conveyor Belt Monitoring Boosting safety and efficiency of conveyor belts Maximum conveyor belt safety and efficiency Conveyor belts are subjected to exceptionally high stress. Apart from countless bends,

More information

WAVETRAX USER MANUAL

WAVETRAX USER MANUAL WAVETRAX USER MANUAL 107719-2A0 WAVETRAX User Manual Document Number 107719-1A0 Copyright 2001, Telect, Inc., All Rights Reserved. Telect and Connecting the Future are registered trademarks of Telect,

More information

ALVARADO (1029 mm) 25 (635 mm) 36.5 (927.1 mm)

ALVARADO (1029 mm) 25 (635 mm) 36.5 (927.1 mm) ALVARADO EDCX Bullnose Waist High Turnstile Technical Specifications Dimensions Unit Height: Unit Width: Unit Depth: 40.5 (1029 mm) 25 (635 mm) 36.5 (927.1 mm) Materials Cabinet: Formed and welded 14 gauge

More information

Advanced Torque Products

Advanced Torque Products Advanced Torque Products Torque Cart Operation Manual 1 Click It or Risk It How many times do you believe the average operator uses a click-style torque wrench over the course of a day? Every time a torque

More information

4.5 COMPOSITE STEEL AND CONCRETE

4.5 COMPOSITE STEEL AND CONCRETE 4.5 COMPOSITE STEEL AND CONCRETE 4.5.1 RULES OF THUMB 4.5 Composite Steel and Concrete (1/11) Typical starting point Overall concrete depth 130mm (Grade 30) Depth of profiled decking 60mm Size beam with

More information

Midwest Roadside Safety Facility

Midwest Roadside Safety Facility 22860 900" D D 914 36" 1000 39 3/8" SOIL AND TARMAC CUT-OUT CONCRETE TARMAC BRIDGE DECK B PLAN VIEW C A C 15 20 [3/4"] Deck Gap BRIDGE DECK A 3900 153 1/ Impact 30V 45720 1800" 34290 13" 11430 4" RAIL

More information

SECTION LIFT ARM PARKING GATES

SECTION LIFT ARM PARKING GATES St. Anthony of Padua Catholic Church Phase I The Woodlands, Texas JRA Proj. No. 15004 Issued for Bidding - 1/20/2016 SECTION 11 12 33.13 LIFT ARM PARKING GATES PART 1 - GENERAL 1.01 SUMMARY A. Section

More information

Installation Instructions

Installation Instructions Installation Instructions 2-Post Capacity 12,000 lbs. OPERATING CONDITIONS Lift is not intended for outdoor use and has an operating ambient temperature range of 41-104 F (5-40 C) IMPORTANT Reference ANSI/ALI

More information

Model APS 3B Snow and Ice Melting Control

Model APS 3B Snow and Ice Melting Control We manage heat Model APS 3B Snow and Ice Melting Control 120 VAC Part Number 17708 208-240 VAC Part Number 17539 Installation and Operation Manual 1850 N Sheridan Street South Bend, Indiana 46628 (574)

More information

(1032 mm) 30.5 (775 mm) 44 ( mm)

(1032 mm) 30.5 (775 mm) 44 ( mm) ALVARADO EDCX-EK Waist High Turnstile Technical Specifications Dimensions Unit Height: Unit Width: Unit Depth: 40.625 (1032 mm) 30.5 (775 mm) 44 (1117.6 mm) Materials Cabinet: Formed and welded 14 gauge

More information

PET Phantom - NEMA IEC/2001

PET Phantom - NEMA IEC/2001 PET Phantom - NEMA IEC/2001 2000 NEMA Standards, ideal for whole-body PET. Simulation of whole-body imaging using PET and camera-based coincidence imaging techniques Evaluation of reconstructed image quality

More information

GF-SERIES GLOBALFRAME CABINET SYSTEM

GF-SERIES GLOBALFRAME CABINET SYSTEM P R O D U C T D ATA S H E E T GF-SERIES GLOBALFRAME CABINET SYSTEM K E Y F E AT U R E S Cost-effective cabinet solution adaptable to server, network and mixed-use applications Available in two configurations

More information

AIM LED LIGHT (wall mount)

AIM LED LIGHT (wall mount) AIM LED LIGHT (wall mount) Installation Manual AIM LED LIGHT (wall mount) INTRODUCTION Lights in the AIM Series are designed to give the professional health care market superior performance, reliability

More information

Created: 4/23/2003 Page: 1 of 12. Abstract

Created: 4/23/2003 Page: 1 of 12. Abstract Collimators and Transport Solenoid Shielding Reference Design Document No: Created: 4/23/2003 Page: 1 of 12 MECO-MUB-03-002 Modified: 10/13/03 Version: 1.01 Prepared by: M. Hebert, V. Tumakov Approved

More information

LeTourneau Technologies JC-52KP Jib Crane Specifications, 3/11. Note: Optional equipment may be shown in photo.

LeTourneau Technologies JC-52KP Jib Crane Specifications, 3/11. Note: Optional equipment may be shown in photo. JC-52KP Jib Crane Standard Boom Length: 120' (36.58 m) Lift Capacity: 52,000 lbs. (23,587 kgs) Optional Boom Length: 100' (30.48 m) Lift Capacity: 56,000 lbs. (25,402 kgs) Optional Boom Length: 150' (45.72

More information

L kw Distributed Energy Storage System Unit (SU50)

L kw Distributed Energy Storage System Unit (SU50) Code No. LIT-101001 Issued August 2018 L2000 50 kw Distributed Energy Storage System Unit (SU50) 1 Table of Contents Introduction... 3 Features and Benefits... 4 Everything in One Box... 4 Quick Installation...

More information

Internal Joist Mount: ACC120. extension column. Cathedral Ceiling Adapter: ACC556. Mounts to cathedral or vaulted ceilings 120 (+60 ) of adjustment

Internal Joist Mount: ACC120. extension column. Cathedral Ceiling Adapter: ACC556. Mounts to cathedral or vaulted ceilings 120 (+60 ) of adjustment Ceiling Plates Ceiling Plate: CMJ470(W), CMJ480(W), CMJ490(W) Internal Joist Mount: ACC120 Round Ceiling Plate: ACC570(S)(W), ACC571 Mounts to wood joists or structural concrete ceiling (requires concrete

More information

QJY245DS~DA. Two Post Lift Installation & Adjustment Manual

QJY245DS~DA. Two Post Lift Installation & Adjustment Manual QJY245DS~DA Two Post Lift Installation & Adjustment Manual Table of Contents 1. Warning 2 2. Summary 2 3. Use 2 4. Mainly technology parameter 2 5. Basic structure of the production 3 6. Safety device

More information

FD 120 Card Cutter MAINTENANCE MANUAL. MyBinding.com 5500 NE Moore Court Hillsboro, OR Toll Free: Local: /2011

FD 120 Card Cutter MAINTENANCE MANUAL. MyBinding.com 5500 NE Moore Court Hillsboro, OR Toll Free: Local: /2011 FD 120 Card Cutter 5/2011 MAINTENANCE MANUAL SAFETY PRECAUTIONS Always observe the cautions and warnings given below to prevent personal injury or property damage. The degree of danger and damage that

More information

MODEL SIT -6E PAVEMENT-MOUNTED SNOW AND ICE SENSOR

MODEL SIT -6E PAVEMENT-MOUNTED SNOW AND ICE SENSOR MODEL SIT -6E PAVEMENT-MOUNTED SNOW AND ICE SENSOR DESCRIPTION The Snow Switch Model SIT 6E Pavement-Mounted Snow and Ice Sensor reliably detects snow and ice conditions on pavement surfaces when used

More information

DP140e. Installation & Operations Manual

DP140e. Installation & Operations Manual Installation & Operations Manual DP140e System Engineering International SEI Incorporated 5115 Pegasus Court, Suite Q Frederick, MD 21704 Phone 301-694-9601 / 800-765-4SEI Fax 301-694-9608 Web http//www.seipower.com

More information

Air Mod-Kit Changing out the 7 poly wheels on the rear of the T78 to 8.5 rubber air tires TRIKKE

Air Mod-Kit Changing out the 7 poly wheels on the rear of the T78 to 8.5 rubber air tires TRIKKE Air Mod-Kit Changing out the 7 poly wheels on the rear of the T78 to 8.5 rubber air tires. T78-CS Air Mod-Kit Disclaimer This document was written by Trikke Tampa. It s of our own opinion and example of

More information

BEARINGS. Function of Bearings

BEARINGS. Function of Bearings BEARINGS Dr. AZ Department of Civil Engineering Brawijaya University Function of Bearings Bridge bearings are used to transfer forces from the superstructure to the substructure, allowing the following

More information

EMC Compatible enclosure assembly

EMC Compatible enclosure assembly EMC Compatible enclosure assembly 1 The definition of electromagnetic compatibility (EMC) is the ability of an electrical device to function satisfactorily in its electromagnetic environment without adversely

More information

Albany RR1000. Mechanical Installation Manual. PN: 6410T0029 Version - Rev: 04/23/2014. ASSA ABLOY Entrance Systems

Albany RR1000. Mechanical Installation Manual. PN: 6410T0029 Version - Rev: 04/23/2014. ASSA ABLOY Entrance Systems PN: 6410T0029 Version - Rev: 04/23/2014 Mechanical Installation Manual Albany RR1000 ASSA ABLOY Entrance Systems High Performance Door Solutions Tel: (770) 338-5000 975A Old Norcross Road Fax: (770) 388-5024

More information

Base Power Infeed Installation for Training Tables with Modular Table Power System

Base Power Infeed Installation for Training Tables with Modular Table Power System Base Power Infeed Installation for Training Tables with Modular Table Power System Topic Table of Contents General Safety Warnings Base Power Infeed Usage Electrical Circuits Base Power Infeed - 0 Amp

More information

Cetra Assembly Instructions

Cetra Assembly Instructions 99877 Revision F- Complete Series Master Packet If you have any questions concerning these instructions, please call Kimball Office Customer Service. 0 Kimball International, Inc. T 800.8.88 F 8.8.800

More information

SPACESAVER EC-300 A ELECTRICS

SPACESAVER EC-300 A ELECTRICS INSTALLATION INSTRUCTIONS SPACESAVER EC-300 A ELECTRICS SECTION I TOP MOUNTED ELECTRICS SECTION II FACE PANEL MOUNTED ELECTRICS SECTION III ZFS INSTALLATION INSTRUCTIONS This symbol indicates a connection

More information

Instructions for 2-row monitoring only

Instructions for 2-row monitoring only Installation Instructions for CaseIH cotton picker models: Instructions for 2-row monitoring only Ensure the model numbers shown above correspond to the machine model. If you receive the incorrect installation

More information

APPLICATION NOTE QuickStick 100 Power Cable Sizing and Selection

APPLICATION NOTE QuickStick 100 Power Cable Sizing and Selection APPLICATION NOTE QuickStick 100 Power Cable Sizing and Selection Purpose This document will provide an introduction to power supply cables and selecting a power cabling architecture for a QuickStick 100

More information

Phoenix DX Sensorless AC Vector Drive. 3 HP to 3500 HP

Phoenix DX Sensorless AC Vector Drive. 3 HP to 3500 HP Phoenix DX Sensorless AC Vector Drive 3 HP to 3500 HP Standard Features: * PRECISE CONTROL OF MOTOR SPEED AND TORQUE * BI-DIRECTIONAL FLYCATCHER (CATCH SPINNING MOTOR) * EASY TO USE, SIMPLE SETUP * POWER

More information

Installation, Maintenance and Service Manual Power Cord

Installation, Maintenance and Service Manual Power Cord Installation, Maintenance and Service Manual Power Cord 45-081, REV. 8/14 1 of 8 Table Of Contents Section 1 Installation Procedure... 3 1.1 General...3 1.2 Sheave installation...4 1.3 Anchor installation...4

More information

E-Series and EF-Series Systems

E-Series and EF-Series Systems E-Series and EF-Series Systems Site Preparation Guide NetApp, Inc. 495 East Java Drive Sunnyvale, CA 94089 U.S. Telephone: +1 (408) 822-6000 Fax: +1 (408) 822-4501 Support telephone: +1 (888) 463-8277

More information

1 TAMCO ALUMINUM CONTROL DAMPER Installation Guidelines For Series 1000, 1400, 1500, 9000, 9000 BF FOR TAMCO JACK SHAFTS REFER TO INSTRUCTIONS PROVIDED IN PARTS BOX. FOR TAMCO JUMPERS REFER TO INSTRUCTIONS

More information

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section "Operation and Maintenance Data," include the following:

D. Operation and Maintenance Data. In addition to items specified in Division 1 Section Operation and Maintenance Data, include the following: SECTION 16211 - ELECTRICITY METERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

NEMA Enclosures Installation Instructions

NEMA Enclosures Installation Instructions NEMA Enclosures Installation Instructions WeRackYourWorld.com 1-866-TRY-GLCC (879-4522) Instructions for the following Great Lakes Enclosures: GL840N12-2442-SA, GL840N12-2442-SB, GL840N12-2442-SS, GL840N12-3042-SA,

More information

Elvoron Home Elevator

Elvoron Home Elevator Creating An Accessible World Elvoron Home Elevator Design And Planning Guide www.garaventalift.com Please note: Dimensions provided in this Guide are for REFERENCE ONLY and should not be used for site

More information

A-dec 200 P RE-INSTALLATION GUIDE

A-dec 200 P RE-INSTALLATION GUIDE A-dec 200 P RE-INSTALLATION GUIDE This document contains technical specifications for installing the A-dec 200 equipment line. Contents Structural Requirements...................................................

More information

1 On Time Performance

1 On Time Performance MEMORANDUM: US 29 Travel Time & OTP To: From: Joana Conklin, Montgomery County DOT James A. Bunch, SWAI Subject: US 29 Travel Time and On Time Performance Analysis Date: This memorandum documents the US

More information

SECTION AXIAL HVAC FANS

SECTION AXIAL HVAC FANS SECTION 233413 - AXIAL HVAC FANS 1. PART 1 GENERAL 1.1. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CEILING MOUNTED WORK STATION STEEL BRIDGE CRANE

CEILING MOUNTED WORK STATION STEEL BRIDGE CRANE SECTION 14636 CEILING MOUNTED WORK STATION STEEL BRIDGE CRANE ***** Gorbel, Inc. manufactures a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work

More information

Nanometrics Solar Power System

Nanometrics Solar Power System Nanometrics Solar Power System Installation Guide Nanometrics Inc. Kanata, Ontario Canada 2003 Nanometrics Inc. All Rights Reserved. Installation Guide The information in this document has been carefully

More information

Installation Instructions Capacity 10,000 lbs. DP10 (200 Series Lift)

Installation Instructions Capacity 10,000 lbs. DP10 (200 Series Lift) Installation Instructions Capacity 10,000 lbs. DP10 (200 Series Lift) IMPORTANT Reference ANSI/ALI ALIS, Safety Requirements for Installation and Service of Automotive Lifts before installing lift. OPERATING

More information

Cent-R-Rail Systems. WARNING: Do NOT use as a walkway, ladder or support for personnel. Cent-R-Rail. Cable Tray Systems

Cent-R-Rail Systems. WARNING: Do NOT use as a walkway, ladder or support for personnel. Cent-R-Rail. Cable Tray Systems 114 How The Service Advisor Works Cooper B-Line knows that your time is important! That s why the color-coding system in this catalog is designed to help you select products that fit your service needs.

More information

Instruction Manual for the. E-SL 450 Series

Instruction Manual for the. E-SL 450 Series Instruction Manual for the E-SL 450 Series Estate Slide Summary of Functions The Estate Slide is only to be used for vehicular Slide gates in a Class I setting. Class I: A vehicular gate opener (or system)

More information

Titan Series Portable Vehicle Scale

Titan Series Portable Vehicle Scale FAIRBANKS s c a l e FAIRBANKS s c a l e Installation Manual Titan Series Portable Vehicle Scale 00 by Fairbanks Scales Inc. All rights reserved 0 Issue # 0/0 Amendment Record Titan Series Portable Vehicle

More information

FOR SIT-STAND WORKSTATION

FOR SIT-STAND WORKSTATION INSTALLATION MANUAL FOR SIT-STAND WORKSTATION Weight Capacity: 6.5-24.5 lbs. 6017180 Rev. B Contents Tools Required / Supplied Part Kits / Warnings/Disclaimers...2 Base Installation Clamp Mount Base Location...3

More information

Now you can get design flexibility and lasting performance from our complete family of AccuDrive Precision Products.

Now you can get design flexibility and lasting performance from our complete family of AccuDrive Precision Products. ACCUDRIVE PRECISION PRODUCTS Now you can get design flexibility and lasting performance from our complete family of AccuDrive Precision Products. Series W Precision Servo Gearhead Output torque up to 8,500

More information

Central Braking Castors

Central Braking Castors Central Braking Castors Congratulations for choosing Australia's famous Fallshaw castors Version 3 These instructions are in 4 sections... 1/ Configuration Preferred combinations of castor layout. 2/ Requirements

More information

MIATECH SOLUTIONS, A PIECE OF THE PUZZLE. Bio Turbo 300. Bio Turbo 1000

MIATECH SOLUTIONS, A PIECE OF THE PUZZLE. Bio Turbo 300. Bio Turbo 1000 MIATECH SOLUTIONS, A PIECE OF THE PUZZLE Four Stage Filtration Step 1: Air Filter. Bio Turbo 100 Bio Turbo 300 Bio Turbo 1000 Step 2: Cell Destruct Filter. Step 3: Generation destroys Ethylene and Airborne

More information

1 AMP CURRENT SOURCE

1 AMP CURRENT SOURCE 1 AMP CURRENT SOURCE CS-2000-U CS-2000-E USER MANUAL BC BIOMEDICAL CS-2000 SERIES TABLE OF CONTENTS WARNINGS, CAUTIONS, NOTICES... ii DESCRIPTION... 1 LAYOUT... 2 OPERATION... 4 TESTING... 6 MANUAL REVISIONS...

More information

Rack Mount Power Supplies

Rack Mount Power Supplies Rack Mount Power Supplies Installation Guide Models Include: Vertiline3D - 12VDC @ 8 amp - Eight (8) PTC protected outputs Vertiline6D - 24VDC @ 8 amp - Eight (8) PTC protected outputs Rev. 090710 More

More information

Operator s Manual. Fairbanks FH Series by Fairbanks Scales, Inc. All rights reserved. . Revision 1 06/2017

Operator s Manual. Fairbanks FH Series by Fairbanks Scales, Inc. All rights reserved. . Revision 1 06/2017 Operator s Manual Fairbanks FH Series 2017 by Fairbanks Scales, Inc. All rights reserved 51393. Revision 1 06/2017 Amendment Record Fairbanks FH Series Operator s Manual Operator s Manual Document 51393

More information

MANUAL TROLLEY TF2/TS2/PT/GT SERIES

MANUAL TROLLEY TF2/TS2/PT/GT SERIES EFFECTIVE: November 11, 2014 MANUAL TROLLEY TF2/TS2/PT/GT SERIES 1/2 Ton through 20 Ton Capacity Code, Lot and Serial Number This equipment should not be installed, operated or maintained by any person

More information

BS 2/K Transverse Conveyor

BS 2/K Transverse Conveyor Modular Transfer Systems BS 2/K Transverse Conveyor for TSplus Conveyors Installation and Maintenance Guide Publication Number: 8981 500 207 11/00 2 Table of Contents INTRODUCTION... 3 TECHNICAL DATA...

More information

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG CEG

Models: DC Electric Vibrators. Operating Instructions CEG CEG CEG CEG CEG CEG DC Electric Vibrators Operating Instructions Global External bin & hopper 12 & 24 Volt DC Electric Vibrators Models: CEG-400-12 CEG-800-12 CEG-1200-12 CEG-400-24 CEG-800-24 CEG-1200-24 Global Manufacturing

More information

3 Uninterruptible Power Systems

3 Uninterruptible Power Systems S4K2U and S4K2U-5 Industrial On-Line UPS The true on-line (double conversion) protection offered by the S4K2U Industrial UPS series eliminates a wider range of potential power problems (spikes, surges

More information

The Power of Reliability INSTRUCTION MANUAL

The Power of Reliability INSTRUCTION MANUAL The Power of Reliability INSTRUCTION MANUAL SAFETY & WARNINGS Read this manual carefully and understand all Warnings and Cautions before connections are made to the Inverter. If unsure about any aspects

More information

STREAMLINED SOLAR CHECKLIST Owner Name:

STREAMLINED SOLAR CHECKLIST Owner Name: STREAMLINED SOLAR CHECKLIST Owner Name: Address: DEPARTMENT OF PUBLIC WORKS AND PLANNING ALAN WEAVER, DIRECTOR This checklist must be completed by the contractor or an authorized agent of the contractor

More information

Abstract. Executive Summary. Emily Rogers Jean Wang ORF 467 Final Report-Middlesex County

Abstract. Executive Summary. Emily Rogers Jean Wang ORF 467 Final Report-Middlesex County Emily Rogers Jean Wang ORF 467 Final Report-Middlesex County Abstract The purpose of this investigation is to model the demand for an ataxi system in Middlesex County. Given transportation statistics for

More information

POWER DISTRIBUTION UNITS (PDUs)

POWER DISTRIBUTION UNITS (PDUs) P R O D U C T D ATA S H E E T POWER DISTRIBUTION UNITS (s) for CPI Rack and Cabinet Systems K E Y F E AT U R E S Distribute power to multiple devices from a single power connection NEMA, California Style

More information

T701 (240 VAC, 1-phase, 60 Hz)

T701 (240 VAC, 1-phase, 60 Hz) SWCC Summary Report Manufacturer: Wind Turbine: Certification Number: Pika Energy Inc. T701 (240 VAC, 1-phase, 60 Hz) SWCC-13-03 The above-identified Small Wind Turbine is certified by the Small Wind Certification

More information

A-dec 311 Dental Chair and Related Systems

A-dec 311 Dental Chair and Related Systems Pre-Installation Guide A-dec 311 Dental Chair and Related Systems A-dec 311 Dental Chair with 332 Radius -Style Delivery System and 572 Dental Light This document contains technical specifications for

More information

Accessories. Unit has 1-1/2"-11.5 NPT fitting for attachment of. extension column. Cathedral Ceiling Adapter: ACC556

Accessories. Unit has 1-1/2-11.5 NPT fitting for attachment of. extension column. Cathedral Ceiling Adapter: ACC556 Ceiling Plates Flat Panel Mounts Ceiling Plate: CMJ470(W), CMJ480(W), CMJ490(W) Internal Joist Mount: ACC120 Round Ceiling Plate: ACC570(S)(W), ACC571 Mounts to wood joists or structural concrete ceiling

More information

Installation and Operations Manual

Installation and Operations Manual Installation and Operations Manual SEI 150/48-SEL-XXX DC-UPS SEI Incorporated 5115 Pegasus Court, Suite Q Frederick, Md 21704 Phone 301-694-9601 Fax 301-694-9608 Email Info@seipower.com Web http://www.seipower.com

More information

PIPINGSOLUTIONS, INC.

PIPINGSOLUTIONS, INC. Piping Stress Analysis Where do I start? The following information will take you step-by-step through the logic of the data collection effort that should occur prior to beginning to model a piping system

More information

PFadvantage Metalfor Araus 1360

PFadvantage Metalfor Araus 1360 Metalfor Araus 1360 Note: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number Quantity Instruction Kit Metalfor Araus 2005300-14 1 Display Bracket 4000134

More information