CASE STUDY: COOKHOUSE 140MW WIND PLANT INTEGRATION

Size: px
Start display at page:

Download "CASE STUDY: COOKHOUSE 140MW WIND PLANT INTEGRATION"

Transcription

1 Insert image here CASE STUDY: COOKHOUSE 140MW WIND PLANT INTEGRATION Compiled by D. Hadebe (Tx Planning) Acknowledgement: R. Palackal (System Operator) T. Gcabashe (Dx Planning)

2 Contents Project background & Regional long-term plan Developer s design layout Network Layout and Results (Before WEF) Studies Performed and Results (After WEF) Technical solution & Summary

3 Aggeneis Project Background Aries Kronos 8 applications received for REBID 1 = 700MW ). Sizing: phase 1 is 132kV (N-0) 140MW (2.1MW to 3MW turbines, 315kVA Perseus construction and 500kVA auxiliary Future phases up to 400MW or 600MW (on 220kV or 400kV Beta Milestones: Advanced EIA (RoD issued in May 2010 for up to 200 turbines). Key Planned connection date: REBID 1 IPP & network connection timeline (2 nd half of 2013) 400kV substation Van der Kloof Hydro-Electric station Helios Hydra Gariep Pumped storage scheme Gas turbine station Juno Nuclear station Droerivier 400kV line Aurora Poseidon 765kV line Koeberg Acacia Muldersvlei Bacchus Proteus Grassridge Line from a power station Philippi Palmiet Acacia 180MW other IPPs

4 Regional Long-Term Plan

5 Developer s Design Layout SVC: C=200Sw, 50Fx, L=200

6 Network Layout and Results: Before Firm upstream network

7 Studies Performed 5 scenarios using DFIG and Fully Rated gen models: Base: HL, no RE gen (ToSP) HL, HG LL, HG test effect of Q compensation in area HL, LG not critical (part of TDP) LL,LG not critical (part of TDP) Monitored thermal loadings, voltage levels for system healthy and relevant N-1 contingencies, fault levels before and after gen integration. LL and HL with gen rejection (v-rise test) Studies based on grid code compliant gen model (DFIG) Default planning methodology is unity power factor, if it fails to check voltage control. Excluded: Dynamic studies and QoS studies.

8 Results: After (high load) POC PCC

9 Results: Fault Currents (max only) Before After S/gear kv/ka 1-ph 3-ph 1-ph 3-ph Min. Posdn Posdn Psdn Cookh Cookh ph contribution Psdn1: Cookh1=1.4kA 3-ph contribution Psdn1: Cookh1=2.6kA C-factor = 1.1, Gen Xsource=X_subtrans=0.2 (0.33 for Fully Rated) Trfr taps ratios and phase shift angles unchanged FACTS devices blocked

10 Technical Solution & Summary Equipping of either spare 132kV feeder 2 or 3 at Poseidon Tx scope is 100% shallow, no deep scope of work Project status: Budget quote in progress, 1 st site meeting held in Feb 2012 (to identify type of protection, telecommunication requirements, metering specifications, Self-build option for 132kV line or not, capital costs, Tx timeframe of months from acceptance of budget quote, etc.) Proposed 140MW generator meets the tested planning criteria based on unity power factor control. Note: Developer stated that a type 2 generator plus STATCOM will be installed to ensure compliance with the SAGC requirements (eg. LVRT).

11 THANK YOU

12 Results: After (DFIG, high load)

13 Zoomed in at Cookhouse PCC POC

14 Results: DFIG with Psdn2_1 N-1

15 Results: DFIG with Psdn4_2 N-1

16 Results: DFIG rejection < 1% V change at Poseidon busbars, Cookhouse 132kV and 33kV resp

17 Results: After (DFIG, low load)

18 Results: DFIG with Psdn2_1 N-1Low Load <1% V change at each bus

19 Results: DFIG with Psdn4_2 N-1Low Load <1% V change at each bus

20 Results: DFIG rejection Low Load <1% V change at each bus

21 Results: Fault Currents (max only) Before After S/gear kv/ka 1-ph 3-ph 1-ph 3-ph Min. Posdn Posdn Psdn Cookh Cookh ph contribution Psdn1: Cookh1=1.4kA 3-ph contribution Psdn1: Cookh1=2.6kA C-factor = 1.1, Gen Xsource=X_subtrans=0.2 (0.33 for Fully Rated) Trfr taps ratios and phase shift angles unchanged FACTS devices blocked

22 Technical Solution Equipping of either spare 132kV feeder 2 or 3 at Poseidon Tx scope is 100% shallow, no deep scope of work Project status: Budget quote in progress, 1 st site meeting held last week. Eskom team to be in contact regards: - Type of protection - Telecommunication requirements - Metering specifications - Self-build option for 132kV line or not - Tx timeframe of months from acceptance of budget quote

23 Summary Generator impact on Poseidon network is minimal (adequately compensated area so possible voltage concerns manageable & gen relatively close to MTS). Poseidon switchgear ratings adequate to clear busbar faults (max I f ). Dynamic study at project level and LVRT to be conducted for completeness purposes: dyn. justified at system level once final turbine size known (influences gen model chosen) and LVRT done by generator. Proposed 140MW generator meets the tested planning criteria based on unity power factor control. Question: Eskom would like to know how the developer will comply with the SAGC requirements (eg. LVRT) since a type 2 generator does not have this capability?

24 Poseidon SLD

Grid code Compliance and Renewable Energy Projects. Mick Barlow, Business Development Director, S&C Electric, United Kingdom

Grid code Compliance and Renewable Energy Projects. Mick Barlow, Business Development Director, S&C Electric, United Kingdom Grid code Compliance and Renewable Energy Projects Mick Barlow, Business Development Director, S&C Electric, United Kingdom Why Grid Codes? Permit the development of and operation of an efficient and economical

More information

GENERATION CONNECTION CAPACITY ASSESSMENT OF THE 2016 TRANSMISSION NETWORK (GCCA-2016) REVISION 2 June 2014

GENERATION CONNECTION CAPACITY ASSESSMENT OF THE 2016 TRANSMISSION NETWORK (GCCA-2016) REVISION 2 June 2014 GENERATION CONNECTION CAPACITY ASSESSMENT OF THE TRANSMISSION NETWORK (GCCA) REVISION 2 June 2014 GCCA June 2014 DISCLAIMER The publication of the eration Connection Capacity Assessment of Transmission

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

Experience on Technical Solutions for Grid Integration of Offshore Windfarms Experience on Technical Solutions for Grid Integration of Offshore Windfarms Liangzhong Yao Programme Manager AREVA T&D Technology Centre 18 June 2007, DTI Conference Centre, London Agenda The 90MW Barrow

More information

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation CONNECTION ASSESSMENT & APPROVAL PROCESS ASSESSMENT SUMMARY Applicant: Project: Cardinal Substation Modification of 115kV Substation CAA ID: 2002 EX071 Long Term Forecasts & Assessments Department\ Consistent

More information

SAIREC Panel Discussion

SAIREC Panel Discussion Text SAIREC Panel Discussion Cape Town 04-Oct-2015 Unlocking Grid Capacity for the Energy Mix Proposed in the IRP Cape Town International Convention Centre Sunday, 04 October 2015, 11:30 for 13:00 Highlights

More information

TRANSMISSION SYSTEM OPERATOR

TRANSMISSION SYSTEM OPERATOR TRANSMISSION SYSTEM OPERATOR Ancillary Services Technical Requirements for 2013/14 2017/18. 0 REF. NO.: 342-89 LJvR/Draft-Comments 16.08.12/Signature 31.08.12/Published 05.09.12 PAGE 2 OF 37 TABLE OF CONTENTS

More information

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation Prepared by: Entergy Services, Inc. T & D Planning L-ENT-17A 639 Loyola Avenue New Orleans, LA 70113 Rev Issue Date

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative ABB HVDC Slide 1 ABB Five global divisions Power Products Power Systems

More information

Energy from Waste Grid Connections

Energy from Waste Grid Connections Energy from Waste Grid Connections Catherine Cleary Grid Connection Lead TNEI Services catherine.cleary@tnei.co.uk 0161 233 4839 Overview Introduction to the UK Electricity Network Key Grid Connection

More information

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 106 CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 5.1 INTRODUCTION Inherent characteristics of renewable energy resources cause technical issues not encountered with conventional thermal,

More information

University of Cape Town

University of Cape Town Investigation into Transient Stability of a Nuclear Power Plant using DIgSILENT Prepared by: Paul Emmanuel EMMPAU001 Department of Electrical Engineering University of Cape Town Prepared for: Komla Folly

More information

Reactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018

Reactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018 1 Reactive Power Compensation for Solar Power Plants Andy Leon IEEE PES Chicago Chapter December 12 th, 2018 2 Objectives Refresh the basics of reactive power from a generator s perspective Regulatory

More information

SYSTEM OPERATOR TRANSMISSION

SYSTEM OPERATOR TRANSMISSION SYSTEM OPERATOR TRANSMISSION Ancillary Services Technical Requirements for 2014/15 2018/19. 0 REF. NO.: 342-201 LJvR/Published 23.07.13 PAGE 2 OF 45 TABLE OF CONTENTS 1. INTRODUCTION... 5 2. RESERVES...

More information

SYSTEM OPERATOR. Ancillary Services Technical Requirements for 2018/ /23 REFERENCE NO. :

SYSTEM OPERATOR. Ancillary Services Technical Requirements for 2018/ /23 REFERENCE NO. : SYSTEM OPERATOR REFERENCE NO. : 342-466 PAGE 2 OF 25 TABLE OF CONTENTS 1. INTRODUCTION... 5 2. METHODOLOGY... 5 3. RESERVES... 6 3.1 INTRODUCTION... 6 3.2 INSTANTANEOUS RESERVE... 6 3.2.1 Description...

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

Supplemental Report on the NCTPC Collaborative Transmission Plan

Supplemental Report on the NCTPC Collaborative Transmission Plan Supplemental Report on the NCTPC 2007-2017 Collaborative Transmission Plan May 16, 2008 1 Table of Contents I. Executive Summary...1 II. Richmond-Fort Bragg Woodruff Street 230 kv Line...2 II.A. Need for

More information

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description

Final Draft Report. Assessment Summary. Hydro One Networks Inc. Longlac TS: Refurbish 115/44 kv, 25/33/ General Description Final Draft Report Assessment Summary Hydro One Networks Inc. : Refurbish 115/44 kv, 25/33/42 MVA DESN Station CAA ID Number: 2007-EX360 1.0 General Description Hydro One is proposing to replace the existing

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Compliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa

Compliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa Compliance of Solar PV Installation with the New Renewables SA Grid Code Jimmy Goulding, Electrical Technologist, Aurecon, South Africa Content Introduction Overview of Categories for Grid Connection of

More information

Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations

Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations Grid Integration Costs: Impact of The IRP Capacity Mix on System Operations Presenter: Bernard Magoro, System Operator, Transmission Division, Eskom SOC Holdings Date: 05 October 2018 Contents 1. Background

More information

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION Summary Abhay Kumar Mata Prasad R C Maheshwari Asea Brown Boveri Ltd. 4th Floor, 71 Nehru Place, New Delhi

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

Review paper on Fault analysis and its Limiting Techniques.

Review paper on Fault analysis and its Limiting Techniques. Review paper on Fault analysis and its Limiting Techniques. Milap Akbari 1, Hemal Chavda 2, Jay Chitroda 3, Neha Kothadiya 4 Guided by: - Mr.Gaurang Patel 5 ( 1234 Parul Institute of Engineering &Technology,

More information

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems Ben Huckaba, P.E. President & Principal Engineer 317-273-9841 benh@alphaeng.us Indiana University Bloomington,

More information

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood Prepared for: SCE&G Fossil/Hydro June 30, 2008 Prepared by: SCE&G Transmission Planning Table of Contents

More information

Electrical grid stability with high wind energy penetration

Electrical grid stability with high wind energy penetration ECOWAS Regional Workshop on WIND ENERGY Praia, Cape Verde. November 4 5, 2013 Electrical grid stability with high wind energy penetration Fernando CASTELLANO HERNÁNDEZ Head of Wind Energy Section Renewable

More information

Alstom in South Africa

Alstom in South Africa Alstom s Presence Medupi Kusile Kriel Johannesburg Transport Gibela Factory Koeberg Key Data: Provided major equipment for 12 out of 13 South Africa s coal-fired power plants and for the only nuclear power

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

Seabrook Substation Reliability Improvement Project

Seabrook Substation Reliability Improvement Project New England Division Seabrook Substation Reliability Improvement Project 1. Project Summary Description Seabrook Substation is critical to ISO-New England as a Pool Transmission Facility, to grid availability

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Generation Connections Industry Workshop 2017

Generation Connections Industry Workshop 2017 Generation Connections Industry Workshop 2017 1 Introduction- Topics to be covered Background: SONI & NIE Networks Generation Connections Guide Renewable Generation Update Phase 1 Review UR Connections

More information

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER

Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER 1 Hawai'i Island Planning and Operations MEASURES TO IMPROVE RELIABILITY WITH HIGH DER Lisa Dangelmaier Hawaii Electric Light lisa.dangelmaier@hawaiielectriclight.com Hawai'i Electric Light System Overview

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

CUSTOMER/ TWIN ARROWS PROJECT

CUSTOMER/ TWIN ARROWS PROJECT A subsidiary of Pinnacle West Capital Corporation CUSTOMER/ TWIN ARROWS PROJECT V1 Facility Study Report APS Contract 52149 Prepared by: Arizona Public Service Company Transmission & Distribution Asset

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study PJM Generator Interconnection R81 Emilie (Fords Mill) 100.9 MW Impact Study Re-Study August 2008 DMS # 498781 General Queue R81 Emilie (Fords Mills) is a Fairless Energy, LLC request to obtain an additional

More information

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation Feasibility Study Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection J.E.D. Solid Waste Management Facility Holopaw Substation September 2013 1 of 12 Table of Contents GENERAL... 3 SHORT

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

ABB Wind Power Solution

ABB Wind Power Solution Feng Li, Wind ISI, CNABB, November, 2016 ABB Wind Power Solution November 13, 2016 Slide 1 ABB deliveries from A to Z into the wind industry Wind power generation, transmission and integration, control

More information

ABB in Wind &Integration of renewables

ABB in Wind &Integration of renewables TEIJO KÄRNÄ, RM/ DEC 20 2017 ABB in Wind &Integration of renewables Making renewable energy real Wind Landscape Generation-Transmission-Distribution-Control January 12, 2018 Slide 2 Challenges of renewable

More information

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006

Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 Manitoba Hydro Generation Interconnection Exploratory Study Notice September 28, 2006 As per the Manitoba Hydro Open Access Interconnection Tariff, the Transmission Owner has contracted TransGrid Solutions

More information

STEADY STATE ELECTRICAL DESIGN, POWER PERFORMANCE AND ECONOMIC MODELING OF OFFSHORE WIND FARMS

STEADY STATE ELECTRICAL DESIGN, POWER PERFORMANCE AND ECONOMIC MODELING OF OFFSHORE WIND FARMS STEADY STATE ELECTRICAL DESIGN, POWER PERFORMANCE AND ECONOMIC MODELING OF OFFSHORE WIND FARMS J.T.G. Pierik 1, M.E.C. Damen 2, P. Bauer 2, S.W.H. de Haan 2 1 Energy research Centre of the Netherlands

More information

MILESTONE SUMMARY REPORT Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund

MILESTONE SUMMARY REPORT Project funding provided by customers of Xcel Energy through a grant from the Renewable Development Fund Project Title: Sodium Sulfur Battery Energy Storage Contract Number: RD3-1 Milestone Number: 1 Report Date: May 0, 009 Reporting Period: September 007 April 008 Milestone Description: Milestone 1 - Specifications

More information

Toshiba s Smart Grid technologies and solutions for MV/LV grid

Toshiba s Smart Grid technologies and solutions for MV/LV grid Toshiba s Smart Grid technologies and solutions for MV/LV grid Copyright 2012, Toshiba Corporation Dr. Katsutoshi Toda, Technology Executive Social Infrastructure Systems Company, Toshiba Corporation Threat

More information

Electricity industry structure and key players

Electricity industry structure and key players Electricity industry structure and key players Growth in capacity, production and consumption, 2006 2017 Expected demand and addition to generation capacity, 2018 2027 Growth in transmission network and

More information

Workshop on Grid Integration of Variable Renewable Energy: Part 1

Workshop on Grid Integration of Variable Renewable Energy: Part 1 Workshop on Grid Integration of Variable Renewable Energy: Part 1 System Impact Studies March 13, 2018 Agenda Introduction Methodology Introduction to Generators 2 Introduction All new generators have

More information

Substation LV AC Supplies. Document Number: 1-11-FR-04

Substation LV AC Supplies. Document Number: 1-11-FR-04 Substation LV AC Supplies Document Number: 1-11-FR-04 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-04 LV AC Supplies Asset Class Strategy Intellectual

More information

Transmission Development Plan (TDP )

Transmission Development Plan (TDP ) Insert image here Transmission Development Plan (TDP 2012 2021) Public Presentation 6 October 2011 Overview and Purpose The Objective of the presentation is to: Plan for the South African Integrated Power

More information

Laboratory Scale Microgrid Test-Bed Hardware Implementation

Laboratory Scale Microgrid Test-Bed Hardware Implementation Laboratory Scale Microgrid Test-Bed Hardware Implementation Joyer Benedict Lobo Ameya Chandrayan Peter Idowu, Ph.D. In Partnership with: Outline Features of a Microgrid Microgrid Test Bed at Penn State

More information

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS

EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS EL PASO ELECTRIC COMPANY (EPE) FACILITIES STUDY FOR PROPOSED HVDC TERMINAL INTERCONNECTION AT NEW ARTESIA 345 KV BUS El Paso Electric Company System Operations Department System Planning Section May 2004

More information

Standard Battery Energy Storage System (BESS) Connection Arrangements

Standard Battery Energy Storage System (BESS) Connection Arrangements Standard Battery Energy Storage System (BESS) Connection Arrangements Introduction A battery energy storage system (BESS) can be operated in a number of different ways to provide benefit to a customer.

More information

Interconnection Feasibility Study Report GIP-157-FEAS-R2

Interconnection Feasibility Study Report GIP-157-FEAS-R2 Interconnection Feasibility Study Report GIP-157-FEAS-R2 System Interconnection Request #157 100.5 MW Wind Generating Facility Guysborough County (L-6515) 2009 09 14 Control Centre Operations Nova Scotia

More information

Wind Turbine Grid Integration Challenge

Wind Turbine Grid Integration Challenge AWEA Windpower 2011 Wind Turbine Grid Integration Challenge ABB Inc. June 6, 2011 Slide 1 In booth theater presentations Wind Turbine Grid Integration Challenge Speaker name: Slavomir Seman Speaker title:

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd Embedded Generation - Technical Access Standards Embedded Generation - 5 MW or Greater ELE SP 0003 Public 1 October 2014 TABLE OF CONTENTS TABLE OF CONTENTS Abbreviations...

More information

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2.

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2. CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO Rexhep Shaqiri 1, Bogdanov Dimitar 2 1 Technical University - Sofia, E-mail: rexhep_shaqiri@hotmail.com). 2 Technical University -

More information

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims

Research Brief. Impact of higher 25kV fault currents. T873 - October Background. Aims Research Brief Impact of higher 25kV fault currents Background Increasing the maximum fault levels at traction feeder stations has the potential to reduce the costs of electrification schemes. The potential

More information

DG Integration Key to Smart Grid

DG Integration Key to Smart Grid Presentation to The Ontario Smart Grid Forum DG Integration Key to Smart Grid Ravi Seethapathy Manager- Distr. Gen & Advance Grid Development System Investment, Hydro One Networks September 22, 2008 Smart

More information

DFO STATEMENT OF NEED REPORT

DFO STATEMENT OF NEED REPORT APPENDIX E DFO STATEMENT OF NEED REPORT Table of Contents 1.0 Executive Summary... 1 2.0 Description of the Area... 2 2.1 Geographic Study Area... 2 2.2 2016 System Configuration... 2 3.0 Area Loading

More information

Use of High-Power Thyristor Technology for Short-Circuit Current Limitation in High Voltage Systems

Use of High-Power Thyristor Technology for Short-Circuit Current Limitation in High Voltage Systems Advanced Power Transmission Solutions Power Transmission and Distribution Use of High-Power Thyristor Technology for Short-Circuit Current Limitation in Systems s Development of Power Markets Increasing

More information

Interconnection Feasibility Study Report GIP-222-FEAS-R3

Interconnection Feasibility Study Report GIP-222-FEAS-R3 Interconnection Feasibility Study Report GIP-222-FEAS-R3 System Interconnection Request #222 48 MW Steam Generating Facility Pictou County (53N) 2010 07 30 Control Centre Operations Nova Scotia Power Inc.

More information

Design and Hardware Implementation of a Supervisory Controller for a Wind Power Turbine

Design and Hardware Implementation of a Supervisory Controller for a Wind Power Turbine ECE 4600 Group Design Project Proposal Group 09 Design and Hardware Implementation of a Supervisory Controller for a Wind Power Turbine Supervisors Annakkage, Udaya D., P.Eng McNeill, Dean, P.Eng Bagen

More information

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Connection Engineering Study Report for AUC Application: AESO Project # 1674 APPENDIX A CONNECTION ASSESSMENT Connection Engineering Study Report for AUC Application: AESO Project # 1674 Executive Summary Project Overview FortisAlberta Inc. (FortisAlberta) submitted a System

More information

National Research Council

National Research Council National Research Council The Initial Sources of Power February 28, 2013, Washington DC, USA. M. M. Adibi IRD Corporation Potomac, Maryland, USA madibird@aol.com (c) IRD 2013 1 The impact of a blackout

More information

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study

Dunvegan Hydroelectric Project. For Glacier Power Limited. Preliminary Interconnection Study ` Dunvegan Hydroelectric Project For Glacier Power Limited Preliminary Interconnection Study Prepared by Pung Toy, P. Eng. and Ata Rehman, P. Eng. September 24, 2004 Table of Contents Table of Contents...

More information

Grid Stability Analysis for High Penetration Solar Photovoltaics

Grid Stability Analysis for High Penetration Solar Photovoltaics Grid Stability Analysis for High Penetration Solar Photovoltaics Ajit Kumar K Asst. Manager Solar Business Unit Larsen & Toubro Construction, Chennai Co Authors Dr. M. P. Selvan Asst. Professor Department

More information

Impact of Islanding and Resynchroniza?on on Distribu?on Systems

Impact of Islanding and Resynchroniza?on on Distribu?on Systems 1 Impact of Islanding and Resynchroniza?on on Distribu?on Systems Authors: Dr. Vijay Sood Damanjot Singh Kush Duggal 2 Contents Introduction System Description Rural Radial Distribution System Urban Meshed

More information

Grid Operations & Planning R&D Area Overview

Grid Operations & Planning R&D Area Overview Grid Operations & Planning R&D Area Overview Daniel Brooks Speaker s Job Title Sept 2016 Advisory Committee 2016 Sept 19: Hollywood, FL Grid Operations & Planning R&D Area at a Glance Grid Operations Advanced

More information

Equipment Strategy for Stand By Diesel Generators Strategy

Equipment Strategy for Stand By Diesel Generators Strategy Equipment Strategy for Stand By Diesel Generators Strategy Current version: 26/06/2018 EXTERNAL USE Page 1 of 6 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 Defined terms...

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

CMP260: TNUoS Demand charges for 2016/17 during the implementation of P272 following approval of P322 and CMP247 Justification of Urgent Status

CMP260: TNUoS Demand charges for 2016/17 during the implementation of P272 following approval of P322 and CMP247 Justification of Urgent Status CMP260: TNUoS Demand charges for 2016/17 during the implementation of P272 following approval of P322 and CMP247 Justification of Urgent Status Nicky White - 29 th January 2016 1 CMP260 Background CMP241

More information

The Grid Link Project. Summary of the Report for the Independent Expert Panel

The Grid Link Project. Summary of the Report for the Independent Expert Panel The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in

More information

Interconnection Feasibility Study

Interconnection Feasibility Study Interconnection Feasibility Study Mount Mabel Wind Energy Project Report No: T&S Planning 2015-054 December 2015 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority 2015.

More information

ADVISE DESIGN IMPLEMENT FOR ELECTROTECHNICAL EXCELLENCE

ADVISE DESIGN IMPLEMENT FOR ELECTROTECHNICAL EXCELLENCE ADVISE DESIGN FOR ELECTROTECHNICAL EXCELLENCE IMPLEMENT ADVISE DESIGN FOR ELECTROTECHNICAL EXCELLENCE Gemitech was founded in 1990 and, in just a few short years, grew to be recognized as medium and IMPLEMENT

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Essential Reliability Services Engineering the Changing Grid

Essential Reliability Services Engineering the Changing Grid Essential Reliability Services Engineering the Changing Grid Robert W. Cummings Senior Director Engineering and Reliability Initiatives i-pcgrid March 39, 2016 Change is Coming Characteristics and behavior

More information

Interconnection Feasibility Study Report GIP-084-FEAS-R2

Interconnection Feasibility Study Report GIP-084-FEAS-R2 Interconnection Feasibility Study Report GIP-084-FEAS-R2 System Interconnection Request #84 50 MW Wind Generating Facility Pictou County (L-7004) August 17, 2007 Control Centre Operations Nova Scotia Power

More information

400/230 Volt 60Hz UPS Power

400/230 Volt 60Hz UPS Power olt 60Hz Power Using ual Voltage standby generation and in one Nothing protects quite like Piller www.piller.com Contents 1 Abstract...3 2 Introduction...4 3 Alternative Power istribution...6 4 Integrating

More information

CIGRE US National Committee 2013 Grid of the Future Symposium. Facilitating Bulk Wind Power Integration Using LCC HVDC

CIGRE US National Committee 2013 Grid of the Future Symposium. Facilitating Bulk Wind Power Integration Using LCC HVDC CIGRE US National Committee 2013 Grid of the Future Symposium Facilitating Bulk Wind Power Integration Using LCC HVDC Introduction Many states in US need to meet their renewable energy mandate Wind energy

More information

Diversifying into Marine Energy. ABB March 2015

Diversifying into Marine Energy. ABB March 2015 Diversifying into Marine Energy ABB March 2015 Structure Integrity, Construction and Manufacturing Solutions for the Process & Marine markets Process & Equipment Marine & Logistics Equipment Manufacturing

More information

Introduction CONTENT Future of offshore wind energy in Europe Offshore wind energy in Spain Alternatives to the transmission system to the grid Compar

Introduction CONTENT Future of offshore wind energy in Europe Offshore wind energy in Spain Alternatives to the transmission system to the grid Compar OFFSHORE WIND FARM CONNECTIONS TO THE GRID Energy to Quality S.L. Santiago Arnaltes Gómez Introduction CONTENT Future of offshore wind energy in Europe Offshore wind energy in Spain Alternatives to the

More information

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202

Transmission and Distribution Substation Projects. Operating Company: Entergy Gulf States - Texas. Customer: PID # 202 Transmission and Distribution Substation Projects Operating Company: Entergy Gulf States - Texas Customer: PID # 202 Funding Project Number: F4PPGS0386 Facility Study for PID # 202: Study for 146 MW Revision

More information

White Paper. Application of Resistive/Reactive Load Banks for kva Testing

White Paper. Application of Resistive/Reactive Load Banks for kva Testing White Paper Application of Resistive/Reactive Load Banks for kva Testing Application of Resistive/Reactive Load Banks for kva Testing Resistive load banks are the most commonly used load banks for the

More information

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project

Procurement Plan. Eskom Holdings SOC Limited. Eskom Investment Support Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized General. Project information Country: Borrower: Loan number: Project Implementation Agency

More information

Large Scale Solar Integration

Large Scale Solar Integration Large Scale Solar Integration Experiences and Coming Changes in Distributed Energy Resource Interconnections October 26 th, 2017 Overview Background on Xcel Energy Expansion of Solar in Minnesota Changes

More information

Sunmine Solar Project. Interconnection System Impact Study

Sunmine Solar Project. Interconnection System Impact Study XXXX Sunmine Solar Project Interconnection System Impact Study Report No: T&S Planning 2013-012 May 2013 Revision 0 British Columbia Hydro and Power Authority British Columbia Hydro and Power Authority

More information

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY

DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY DUKE ENERGY PROGRESS TRANSMISSION SYSTEM PLANNING SUMMARY Transmission Department Transmission Planning Duke Energy Progress TABLE OF CONTENTS I. SCOPE 3 II. TRANSMISSION PLANNING OBJECTIVES 3 III. TRANSMISSION

More information

Falcon-Midway 115 kv Line Uprate Project Report

Falcon-Midway 115 kv Line Uprate Project Report Falcon-Midway 115 kv Line Uprate Project Report 12/1/2008 1 Background The function of this project is to uprate the 26.7 miles of Tri-State s 115 kv line between Midway and Falcon substations from 50

More information

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew. Guide Department: Interconnection Services Document No: GD-1401 v1.0 Title: WIND ISLANDING Issue Date: 11-24-2014 Previous Date: N/A Contents 1 PURPOSE... 2 2 SCOPE AND APPLICABILITY... 2 3 ROLES AND RESPONSIBILITIES...

More information

The Energy Queensland Group Notice of no non-network options

The Energy Queensland Group Notice of no non-network options The Energy Queensland Group Notice of no non-network options 24 September 2018 MCE Mount Crosby East Establish new substation to replace Mount Crosby Substation (SSMTC) Page 1 of 1 DISCLAIMER While care

More information

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012

POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 UNIT ON 9 FEBRUARY 2012 POWER SYSTEM OPERATING INCIDENT REPORT SIMULTANEOUS TRIP OF 5A6 MT PIPER BANNABY 500 KV LINE AND MT PIPER NO. 2 PREPARED BY: Electricity System Operations Planning and Performance DATE: 5 June 2012 FINAL

More information

Integration of Large Wind Farms into Electric Grids

Integration of Large Wind Farms into Electric Grids Integration of Large Wind Farms into Electric Grids Dr Mohammad AlZoubi Introduction Development WHAT IS NEXT!! Over the next 12 years, Europe must build new power capacity equal to half the current total.

More information

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC

Emera Maine Representative: Jeffrey Fenn, P.E., SGC Engineering LLC OCTOBER 22, 2014 Emera Maine s Local System Plan Bangor Hydro District Needs Assessment/Potential Solutions Local Planning Advisory Committee Meeting E M i R t ti Emera Maine Representative: Jeffrey Fenn,

More information

EIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE

EIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE EIPC HIGH LEVEL TRANSMISSION COST ESTIMATION TASK #5: DOE PROJECT NO. DE-OE0000343 Background: To support the SSC in assessing the results of the macroeconomic analysis and reaching consensus on the three

More information

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Interconnection Feasibility Study Report GIP-IR373-FEAS-R1 Generator Interconnection Request 373 109.5 MW Wind Generating Facility South Canoe Lake, NS Mar. 2, 2012 Control Centre Operations Nova Scotia

More information

Implementation Plan PRC Transmission Relay Loadability Project Phase II Relay Loadability

Implementation Plan PRC Transmission Relay Loadability Project Phase II Relay Loadability Implementation Plan PRC-023-3 Transmission Relay Loadability Project 2010-13.2 Phase II Relay Loadability Requested Approvals PRC-023-3 Transmission Relay Loadability Requested Retirements PRC-023-2 Transmission

More information