Connecting Belgium and Germany using HVDC: A Preliminary Study

Size: px
Start display at page:

Download "Connecting Belgium and Germany using HVDC: A Preliminary Study"

Transcription

1 1 Connecting Belgium and Germany using HVDC: A Preliminary Study S. Cole, Member, IEEE, D. Van Hertem, Member, IEEE, R. Belmans, Fellow, IEEE Abstract Although Belgium and Germany are neighbouring countries, there is no direct high-voltage line between them. A study that assessed the opportunity of an ac high-voltage line between the two countries was performed at request of Belgian, German, and Luxembourgian governments. The result of the technical study was that no substantial import capacity can be achieved. In this paper, the conclusions of a new study are presented. This study considers the connection of Belgium and Germany via an HVDC link. It is shown that HVDC can increase import capacity significantly. It would be the first HVDC land cable connection in the UCTE grid. Index Terms--HVDC Transmission, VSC HVDC, Power transmission. T I. INTRODUCTION HE European electricity grid is highly meshed. In this meshed grid, the Belgian transmission system forms one of the most important electrical crossroads in Europe, with significant international power flows taking a large part of the available transmission capacity. The European community already identified the congestion problems on the France- Belgium-Netherlands-Germany borders to be one of the axes for priority projects [1]. The congestion limits the internal market operation within Belgium. In view of increasing import capacity, existing international connections are upgraded. Recently the second circuit of the Avelgem-Avelin connection with France was installed. A second connection with France, Aubange-Moulaine, will be upgraded in the future. International East-West connections are currently non-existent: although Germany and Belgium are neighbours, no direct connection exists between the two countries (Fig. 1). It is therefore requested by Belgian, German, and Luxembourgian governments to assess the opportunity of an interconnection between Belgium and Germany. From the point of view of the Belgian government, import Manuscript received March 9, The research performed at the KU Leuven is financially supported by the Belgian 'Fonds voor Wetenschappelijk Onderzoek (F.W.O.)-Vlaanderen'. Dirk Van Hertem is a doctoral research assistant of the F.W.O.-Vlaanderen. S. Cole ( stijn.cole@esat.kuleuven.be), D. Van Hertem ( dirk.vanhertem@esat.kuleuven.be), and R. Belmans ( ronnie.belmans@esat.kuleuven.be) are with the Electrical Engineering Department of University of Leuven, Kasteelpark Arenberg 10, 3001 Leuven, Belgium. R. Belmans is chairman of the board of directors of Elia, the Belgian TSO. capacity is of utmost importance. The Belgium government is interested whether the connection would substantially increase import capacity. This would also enhance competition in the Belgian market. II. PREVIOUS STUDY A joint study has been conducted by Elia, the Belgian transmission system operator, and RWE Transportnetz Strom, the German transmission system operator in the area adjacent to the Belgian grid, to assess the opportunity of the requested interconnection between Belgium and Germany. Only ac overhead 380 kv double circuits were considered in this study. Two trajectories were investigated. The first one from Brume (B) to Dalhem (D), 65 km, and the second one from Lixhe (B) to Oberzier (D), 60 km (Fig. 1). The result of the technical study was that no substantial import capacity can be achieved, regardless of the chosen trajectory. The capacity found was in the order of magnitude of 200 MW. Optimization of the flows by phase shifting transformers that will be installed elsewhere in the Belgian power system, was taken into account in the study. The reason for this very limited increase in import capacity is that the power in Europe primarily flows along North-South paths. Moreover, from environmental, planning and regulatory point of view, major difficulties can be expected. The variant Brume Dalhem crosses the national park "Hohes Venn-Eifel", as well as many cities and villages. The Lixhe Oberzier variant crosses the densely populated area around Aachen. For these reasons this investment was not considered beneficial, and was abandoned. Summarizing, it may be said that the construction of a connection Belgium Germany was rejected for three reasons: limited import capacity; high environmental impact, e.g. crossing a national park; expected permitting problems. Nevertheless, the connection as such is very important for the Belgian government. III. PRESENT STUDY Having the conclusions of the previous study in mind,

2 2 other means of connecting Belgium and Germany are discussed. At present, several alternatives to overhead lines exist. In [2], an overview of technical developments for the future transmission grid is given. The use of underground ac cable instead of overhead lines would reduce the environmental impact. Obtaining permits is considered easier, but can nevertheless take a lot of time. The major drawback of underground ac cables is their substantially higher cost. Although reducing the high environmental impact and thus the permitting problems, a connection by underground ac cable solves in no way the third problem: import capacity will not increase by using underground ac cable instead of overhead ac lines. A connection with underground ac cable would therefore not justify a new study. The use of a High Voltage DC (HVDC) connection however would warrant a new investigation as neither the technical problem nor the problem of obtaining permits exists to the same extent when using dc cable connections. The import level can be higher: while the flow through an ac line, underground or overhead, cannot be controlled, unless expensive power flow controlling devices are installed, the flow through a dc link can be fully controlled. IV. HVDC Power electronic ac-dc converters can be divided in two main categories: Current Source Converter (CSC) and Voltage Source Converter (VSC), related to the operation of the valves and the dc bus voltage or current. For HVDC applications, the CSC converter is most widely spread, using the thyristor as its fundamental switching device. Installations using this topology are usually referred to as Line Commutated Converter HVDC (LCC HVDC). VSC converter technology is known for quite a long time from the variable speed drive technology, however the first VSC HVDC was built in the end of the 1990s, after development of self-commutating power electronic components such as the GTO and the IGBT for sufficiently high power ratings, and the increasing computational power of digital signal processors (DSPs) [3]. The distinct advantages of VSC (Voltage Sourced Converter) over LCC (Line Commutated Converter) HVDC are not of particular importance in a connection between Germany and Belgium. Black start capability for instance is not an issue. On the other hand, as price differences between the two technologies are converging, choosing VSC HVDC is an option. Fig. 1. Belgian grid (source: UCTE) V. TECHNICAL ANALYSIS A. Scenarios The goal of this chapter is to describe the various scenarios used throughout the study and 2019 are selected as time horizons for the scenarios because data on these time horizons is available in the capacity plan [4] and the indicative program for generation [5]. For every time horizon, a network model was built and different load and generation patterns were selected, as well as offshore wind generation predictions. Combining the scenarios and retaining the most extreme ones resulted in four base scenarios (Table I). In each of the four scenarios, different import-export variants were tested. Only

3 3 the Belgian side of the grid was considered. TABLE I FOUR SCENARIOS Low gen, high load High gen, low load Low 2012 High Low 2019 High Increasing import capacity by a HVDC connection in the south of Belgium proved most difficult in the 2012 High and 2019 High cases. The structure of the Belgian grid is not suited for these scenarios. The 2019 High case is the worst as it is not N-1 secure for the base case. Therefore it is not considered in the remainder of the study. The network model used throughout the study consists of a reduced network of the neighbouring countries, France, The Netherlands, Germany, wherein a detailed Belgian network, comprising all 150, 220 and 380 kv network elements, is inserted. Planned upgrades are incorporated so as to represent the network as it is expected to be in 2012 and beyond. Three 380 kv nodes are selected for a possible HVDC connection with Germany: Reppel, Brume and Lixhe (Fig. 2). Although there is no 380 kv substation in Reppel, this node was retained due to the loss of generation in the neighbourhood that is expected in future. The other converter is placed in Oberzier, Germany. For each node it is calculated how much power can be imported and exported through the HVDC line in each of the scenarios without compromising N-1 and N-2 security in Belgium. security analysis as well as some elements in the neighbouring countries grids that have a large impact on the Belgian grid. It is not allowed to reduce the consequences of a single failure by switching operations. If, after a single failure, no element exceeds its limits, the network is considered N-1 secure. Every scenario is also checked on certain double failures. A double failure is defined as the loss of two generation units at the same time or the loss of a single generation unit combined with the loss of a network element at the same time. Elia does not considerer the simultaneous loss of two network elements because it is rare. In contrast to N-1 security analysis, one single switching operation is allowed when checking N-2 security. C. Results 1) Lixhe Lixhe is only connected to the rest of the 380 kv network by a single circuit line, Lixhe-Herderen (Fig. 3). In Lixhe, power is transformed down to 220 kv and 150 kv levels. When Lixhe-Herderen is not available, the power has to find its way through the weaker 220 kv lines between Lixhe and Rimière. The description makes it clear that the 220 kv network between Lixhe and Rimière is the weakest link. The worst case failure is a fault on Herderen-Lixhe when exporting to Germany. All other single failures would still allow importing or exporting 1.3 GW in the base case without repercussions on the safety of the grid. Fig. 2. Selected nodes B. Contingency analysis N-1 is a widely accepted criterion to provide an acceptable level of network security for a given cost. It is defined as follows: a single failure should not compromise network security. There are however numerous ways to implement this definition. This study uses the criteria as found in the capacity plan of Elia. A single failure is defined as the loss of a single generation unit or a single network element. The loss of a double-circuit overhead line is not regarded as a single failure because each circuit is considered as a single network element. All elements of the Belgian grid are included in the Fig. 3. The 220 kv network south of Lixhe A strengthening of the 220 kv network is obviously a solution but may be impractical. Extra transformers are needed in Lixhe, and also in Rimière when higher power exchange levels are envisaged. Another solution is building redundancy in the 380 kv paths by doubling the Herderen Lixhe circuit. In this way, a connection to the rest of the 380 kv network is guaranteed under N-1 and N-2 conditions, so that no high stress is placed on the 220 kv network and the transformers in Lixhe.

4 4 For all scenarios, it is assumed that the Herderen-Lixhe circuit is upgraded by adding the second circuit on the existing pylons, and that Aubange-Moulaine is upgraded as well, as this international connection to France is a limiting factor. Table II depicts the amount of power that can be imported to or exported from Lixhe under the different scenarios. The 2019 High scenario is not calculated because this scenario is not N-1 secure, even when no HVDC line is installed. TABLE II LIXHE Imp Exp Imp Exp 2012 L H L When selecting Lixhe as connection point for an HVDC connection, two upgrades have to be accomplished: Herderen- Lixhe and Aubange-Moulaine. Even with these two upgrades, there is limited possibility for import to Lixhe. There is more room for export. In the 2019 High case, additional grid investments would be needed, regardless of the installation of a HVDC cable. 2) Brume A connection from Brume to Germany would create a path from France to Germany via Moulaine-Aubange-Brume with a capacity of 1700 MW in the scenario provided, thereby alleviating other flow paths from France to Germany via Belgium. An upgrade of Aubange-Moulaine is very beneficial for import capacity. Other reinforcements of the 380 kv grid are not necessary. Attention has to be paid to the 1100 MW pumped storage plant of Coo, which is also connected to Brume. At all times, the worst case scenario is assumed. This means that generators at Coo are operating at maximum power when importing from Germany through the HVDC link and that the turbines are pumping at maximum power when exporting. It can be seen in Table III that a connection to Brume would allow a good import level, especially when south-north flows are not too high. TABLE III BRUME Imp Exp Imp Exp 2012 L H L Similar to the Lixhe case, Aubange-Moulaine has to be upgraded to allow import and export without problems. However, in the Brume case, more import is possible compared to the Lixhe case, and there is no need to upgrade Herderen-Lixhe. When abstracting from the 2012 High case, whose problems are explained, a reasonable import level can be achieved. 3) Reppel The rationale behind a connection to Reppel (figure 4) is the pending closure of the coal power plant in Mol. There is no other power plant that can supply power in the area. In that case the 150 kv line Beringen-Mol becomes overloaded, because generation has to be imported from other areas. The solution proposed by Elia is the construction of a substation in Reppel and a new 150 kv connection from Reppel to Overpelt. This new connection will relieve the Beringen-Mol connection by creating a second path to the region. Fig. 4. Reppel Besides these upgrades, additional measures have to be taken at the 70 kv level to prevent overloads in the 150 kv network. In the present study this could not be verified and therefore abstraction is made of all eventual local faults on 150 kv and below. Clearly this link will only be used for import as it has to replace a generation unit. Nevertheless under certain situations, limited export is possible, notably when northsouth flows are high. The results are depicted in table IV. TABLE IV REPPEL Import Export Import Export 2012 L H L As can be expected, export from Reppel would be nearly impossible, except when large imports from The Netherlands feed power to Reppel. Import would be beneficial. Note that the figures in this section and in table IV are only valid when no power is injected in Mol. A disadvantage is the location of Reppel: a cable to Germany would most likely have to cross Dutch territory. VI. CONCLUSIONS In this study, possibilities for HVDC connections from Belgium to Germany are investigated. In general, the volume of import or export that can be achieved depends on future demand and generation of electricity within the Belgian

5 5 control area. A scenario with high generation and low demand in Belgium causes high flows in the grid. In this situation, only export is possible. In the other scenarios, both export and import is possible. When connecting HVDC to Lixhe or Brume, the international connection Aubange-Moulaine has to be reinforced in order to assure import or export. For a connection to Lixhe, the connection Lixhe-Herderen has to be upgraded as well. In general, more power can be imported to Brume than to Lixhe and more power can be exported from Lixhe than from Brume. The closing of the Mol power plant would justify an HVDC connection to Reppel. However, this would require serious investments in the 150 kv and 70 kv network. A new 150 kv connection Beringen-Mol has to be erected. Which investments exactly are needed at lower voltage levels can not be examined with the available data. Exporting to Germany would not be possible, except when large north-south flows occur, or when generation in Belgium would rise drastically. Ronnie Belmans (S'77-M'84-SM'89-F'05) received the M.S. degree in electrical engineering in 1979 and the Ph.D. degree in 1984, both from the K.U.Leuven, Belgium, the Special Doctorate in 1989 and the Habilitierung in 1993, both from the RWTH, Aachen, Germany. Currently, he is a full professor with the K.U.Leuven, teaching electric power and energy systems. His research interests include technoeconomic aspects of power systems, power quality and distributed generation. He is also guest professor at Imperial College of Science, Medicine and Technology, London-UK. Since June 2002 he is chairman of the board of directors of ELIA, the Belgian transmission grid operator. VII. REFERENCES [1] European Commission: Trans-European Energy Networks: TEN-E Priority Projects, Available online: [2] Cole S., Van Hertem D., Meeus L., Belmans R.: Technical Developments for the Future Transmission Grid, International conference on future power systems, ISBN , Amsterdam, the Netherlands, November, 2005; 6 pages. [3] Van Hertem, D., Cole S., Belmans R.: High Voltage Direct Current (HVDC) Technology technical report, Available online: [4] Elia, Ontwikkelingsplan , (Available in Dutch and French). Available online: [5] CREG, Indicatief programma van de productiemiddelen voor elektriciteit , (Available in Dutch and French), Available online: VIII. BIOGRAPHIES Stijn Cole received the M.S. degree in electrical engineering in 2005 from the Katholieke Universiteit Leuven (K.U.Leuven), Belgium. Since 2005 he is working as a research assistant at K.U.Leuven. He is a member of ELECTA, the Electrical Energy research group, of the department of Electrical Engineering of the K.U.Leuven, where he is working towards a Ph.D. His fields of interest include power systems, grid of the future and HVDC. Dirk Van Hertem (S' 02) graduated as a master of engineering in 2001 from the K.H.K., Geel/Belgium and as a master of science in engineering from the K.U.Leuven/Belgium in From 2003 he has been working towards a Ph.D. in the ELECTA research group, department of Electrical Engineering of the K.U.L., Leuven/Belgium. From October 2004, he is a research assistant for the F.W.O.-Vl. In 2001, his masters thesis received the `VIK award' and in 2004, he received the `KBVE R&D award' for his second masters thesis. His special fields of interest include power system control and optimization and FACTS.

Cost Benefit Analysis of Faster Transmission System Protection Systems

Cost Benefit Analysis of Faster Transmission System Protection Systems Cost Benefit Analysis of Faster Transmission System Protection Systems Presented at the 71st Annual Conference for Protective Engineers Brian Ehsani, Black & Veatch Jason Hulme, Black & Veatch Abstract

More information

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design

A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design A Cost Benefit Analysis of Faster Transmission System Protection Schemes and Ground Grid Design Presented at the 2018 Transmission and Substation Design and Operation Symposium Revision presented at the

More information

Usefulness of DC Power Flow for Active Power Flow Analysis

Usefulness of DC Power Flow for Active Power Flow Analysis Usefulness of DC Power Flow for Active Power Flow Analysis Konrad Purchala, Student Member, IEEE, Leonardo Meeus, Daniel Van Dommelen, Senior Member, IEEE and Ronnie Belmans, Fellow, IEEE Abstract In recent

More information

Long distance bulk transmission

Long distance bulk transmission Long distance bulk transmission Dr. Yanny Fu, KEMA Consulting 6 October 2010 Experience you can trust. 2 Contents Transmission technologies AC and DC Overhead lines and underground/submarine cables Transmission

More information

Adaptive Power Flow Method for Distribution Systems With Dispersed Generation

Adaptive Power Flow Method for Distribution Systems With Dispersed Generation 822 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 17, NO. 3, JULY 2002 Adaptive Power Flow Method for Distribution Systems With Dispersed Generation Y. Zhu and K. Tomsovic Abstract Recently, there has been

More information

Transmission Grid Development & Investment Planning on EHV Level in Germany

Transmission Grid Development & Investment Planning on EHV Level in Germany Transmission Grid Development & Investment Planning on EHV Level in Germany February, 27th, 2018 Michael Jesberger 1 Kilometer (km) = 0,602 miles 1 Euro = 1,22 $ (Februry, 8th, 2018) March 2016 TenneT

More information

European Wind Integration Study (EWIS) Towards a Successful Integration of Wind Power into European Electricity Grids

European Wind Integration Study (EWIS) Towards a Successful Integration of Wind Power into European Electricity Grids European Wind Integration Study (EWIS) Towards a Successful Integration of Wind Power into European Electricity Grids EWIS Concluding Discussion 13th April 2010, Brussels Network Strengthening findings

More information

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI Executive Summary Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI-2003-2 Xcel Energy Transmission Planning January 2004 This Interconnection Feasibility

More information

Elia System and market overview 2010

Elia System and market overview 2010 Elia System and market overview 2010 Table of contents I. System and grid management and market data 01 I.1 Energy balance on the Elia grid in 2010 01 I.2 Consumption recovers in Elia control area in 2010

More information

POWER TRANSMISSION OF LOW FREQUENCY WIND FIRMS

POWER TRANSMISSION OF LOW FREQUENCY WIND FIRMS Available Online at www.ijcsmc.com International Journal of Computer Science and Mobile Computing A Monthly Journal of Computer Science and Information Technology IJCSMC, Vol. 3, Issue. 10, October 2014,

More information

The role of Transmission System Operator in Belgium and in Europe. Vlerick Alumni Event 26 January 2016

The role of Transmission System Operator in Belgium and in Europe. Vlerick Alumni Event 26 January 2016 The role of Transmission System Operator in Belgium and in Europe Vlerick Alumni Event 26 January 2016 Agenda Introduction Infrastructure management Controlling the system Developing the EU Market 1/25/2016

More information

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS Interconnection Feasibility Study Report GIP-023-FEAS-R1 Generator Interconnection Request # 23 100 MW Wind Generating Facility Inverness (L6549), NS February 16, 2006 Control Centre Operations Nova Scotia

More information

Power import, transboundary connections, Market Coupling. Grzegorz Onichimowski President of the Board, TGE S.A.

Power import, transboundary connections, Market Coupling. Grzegorz Onichimowski President of the Board, TGE S.A. Power import, transboundary connections, Market Coupling Grzegorz Onichimowski President of the Board, TGE S.A. Power import, transboundary connections, Market Coupling Conference Power Ring, December_2008

More information

Innovative technologies ready for the Supergrid

Innovative technologies ready for the Supergrid Innovative technologies ready for the Supergrid The Roadmap to the Supergrid Technologies EEF lunchtime discussion Feb 6, 2013 in Strasbourg Presented by Dr. Magnus Callavik, ABB (Convenor of WG 2 - Technology)

More information

Chapter 1. Overview of HVDC applications

Chapter 1. Overview of HVDC applications ELEC0445 - High Voltage Direct Current grids Part 1. Line Commutated Converters Chapter 1. Overview of HVDC applications Patricia Rousseaux t.vancutsem@ulg.ac.be Thierry Van Cutsem www.montefiore.ulg.ac.be/~vct

More information

TRANSMISSION PLANNING CRITERIA

TRANSMISSION PLANNING CRITERIA CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003-3502 Effective Date: TRANSMISSION PLANNING CRITERIA PURPOSE This specification describes Con Edison s Criteria for assessing

More information

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector

HVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector HVDC Innovative Technology for Smart Grids and Super Grids CEO Power Transmission Solutions, Siemens Energy Sector BritNed: Pre-launch Press Event Maasvlakte, March 31, 2011 Siemens AG 2011 Energy Sector

More information

DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK.

DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK. DISTRIBUTED GENERATION FROM SMALL HYDRO PLANTS. A CASE STUDY OF THE IMPACTS ON THE POWER DISTRIBUTION NETWORK. N. Lettas*, A. Dagoumas*, G. Papagiannis*, P. Dokopoulos*, A. Zafirakis**, S. Fachouridis**,

More information

OVERVIEW OF UNDERGROUND POWER CABLES AT HIGH/EXTRA HIGH VOLTAGE LEVELS

OVERVIEW OF UNDERGROUND POWER CABLES AT HIGH/EXTRA HIGH VOLTAGE LEVELS OVERVIEW OF UNDERGROUND POWER CABLES AT HIGH/EXTRA HIGH VOLTAGE LEVELS 2006 WWW.EUROPACABLE.COM Introduction to Europacable Europacable is The Association of European Cable Manufacturers including ABB,

More information

Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection

Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection Peter Lundberg, Global Product Manager, November 2016 ABB Power Systems Offshore wind connection Slide 1 Integrity, Health, Safety and Environment Always most important our core values Integrity Code of

More information

100 MW Wind Generation Project

100 MW Wind Generation Project A subsidiary of Pinnacle West Capital Corporation 100 MW Wind Generation Project CUSTOMER FINAL Feasibility Study Results By Transmission Planning, APS December 21, 2007 Executive Summary This Feasibility

More information

Offshore Wind Connections HVDC for Offshore Grids

Offshore Wind Connections HVDC for Offshore Grids Michael Bahrman P.E., Grid Systems, UWIG Technical Workshop, Maui, October 2011 Offshore Wind Connections HVDC for Offshore Grids October 18, 2011 Slide 1 HVDC for Offshore Grids Topics Offshore wind market

More information

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES

TABLE OF CONTENTS. Table of contents. Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF TABLES TABLE OF FIGURES Table of contents TABLE OF CONTENTS Page ABSTRACT ACKNOWLEDGEMENTS TABLE OF CONTENTS TABLE OF TABLES TABLE OF FIGURES INTRODUCTION I.1. Motivations I.2. Objectives I.3. Contents and structure I.4. Contributions

More information

Case study: Utility-scale battery for balancing power in Germany

Case study: Utility-scale battery for balancing power in Germany SA Energy Storage 2017 Case study: Utility-scale battery for balancing power in Germany Johannesburg, 28 November 2017 Dr. Tobias Bischof-Niemz Agenda Overview ENERTRAG Definition Primary Control Reserve

More information

The Role of Offshore Wind

The Role of Offshore Wind The Role of Offshore Wind Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Richard Proctor ENI

More information

A Method for Determining the Generators Share in a Consumer Load

A Method for Determining the Generators Share in a Consumer Load 1376 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 15, NO. 4, NOVEMBER 2000 A Method for Determining the Generators Share in a Consumer Load Ferdinand Gubina, Member, IEEE, David Grgič, Member, IEEE, and Ivo

More information

HVDC Solutions. for Integration of the Renewable Energy Resources. Marcus Haeusler HVDC Lead Engineer. siemens.com/energy/power-transmission

HVDC Solutions. for Integration of the Renewable Energy Resources. Marcus Haeusler HVDC Lead Engineer. siemens.com/energy/power-transmission HVDC Solutions for Integration of the Renewable Energy Resources Marcus Haeusler HVDC Lead Engineer siemens.com/energy/power-transmission Agenda Principles of HVDC operation HVDC converter types HVDC configurations

More information

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative

Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative ABB HVDC Slide 1 ABB Five global divisions Power Products Power Systems

More information

Geneva, 67th SC.2 Session October 2013 High Speed Trains Master Plan

Geneva, 67th SC.2 Session October 2013 High Speed Trains Master Plan Geneva, 67th SC.2 Session 23 25 October 2013 High Speed Trains Master Plan Work Package I Work Package II Work Package III Project Management Review of related Work Socio economic framework of the ECE

More information

Mini-Course on Future Electric Grids Part 2 of 2

Mini-Course on Future Electric Grids Part 2 of 2 Mini-Course on Future Electric Grids Part 2 of 2 Dirk Van Hertem Dirk.VanHertem@ieee.org Electric power systems EKC 2, Controllable power systems Electrical engineering department Royal Institute of Technology,

More information

The Development of Competitive Renewable Energy Zones in Texas

The Development of Competitive Renewable Energy Zones in Texas The Development of Competitive Renewable Energy Zones in Texas Warren Lasher Manager, System Assessment 4/23/2008 North American Electric Grids The ERCOT Region is one of 3 NERC grid interconnections.

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment For NPCC Governmental / Regulatory Affairs Advisory Group May 21 st, 2009 ON IT Executive Summary Engineers from Con

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Submission to Greater Cambridge City Deal

Submission to Greater Cambridge City Deal What Transport for Cambridge? 2 1 Submission to Greater Cambridge City Deal By Professor Marcial Echenique OBE ScD RIBA RTPI and Jonathan Barker Introduction Cambridge Futures was founded in 1997 as a

More information

Innovative Power Supply System for Regenerative Trains

Innovative Power Supply System for Regenerative Trains Innovative Power Supply System for Regenerative Trains Takafumi KOSEKI 1, Yuruki OKADA 2, Yuzuru YONEHATA 3, SatoruSONE 4 12 The University of Tokyo, Japan 3 Mitsubishi Electric Corp., Japan 4 Kogakuin

More information

Climate change drivers for a single and smart EU grid

Climate change drivers for a single and smart EU grid Climate change drivers for a single and smart EU grid Smart and Secure Transmission Grids to Realise US and EU Renewable Energy Potentials Keith Bell University of Strathclyde, Scotland Expected growth

More information

Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm

Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm Downloaded from orbit.dtu.dk on: Apr 07, 2019 Simulated Switching Transients in the External Grid of Walney Offshore Wind Farm Arana Aristi, Iván; Johnsen, D. T.; Soerensen, T.; Holbøll, Joachim Published

More information

Dr.-Ing. Ervin Spahi, Wadden Sea Forum, Bremerhaven Electric grid on and off-shore: current status, obstacles and new developments

Dr.-Ing. Ervin Spahi, Wadden Sea Forum, Bremerhaven Electric grid on and off-shore: current status, obstacles and new developments Dr.-Ing. Ervin Spahi, Wadden Sea Forum, Bremerhaven 26.11.09 Electric grid on and off-shore: current status, obstacles and new developments November 26, 2009 Slide 1 Transmission grid The challenges Optimal

More information

Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC

Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC Dr. Magnus Callavik, Power Systems HVDC, Aug 29, 2011 Developments in Multiterminal HVDC Drivers, Building Blocks (Cables, Offshore), EU and US Examples, Grid- Enabled HVDC, LCC-MTDC EPRI s High Voltage

More information

European Power Markets. Jukka Ruusunen President and CEO

European Power Markets. Jukka Ruusunen President and CEO European Power Markets President and CEO Fortum's Capital Markets Day Stockholm, Sweden 5-6 th 2 Driver for the development: European energy policy goals Energy future is: more sustainable - towards carbon

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

Tibin Joseph Marie Curie Early Stage Researcher Institute of Energy Cardiff University

Tibin Joseph Marie Curie Early Stage Researcher Institute of Energy Cardiff University Tibin Joseph Marie Curie Early Stage Researcher Institute of Energy Cardiff University Contents Introduction Planned Network Reinforcement for 2020 The Three Machine Generic Model Subsynchronous Resonance

More information

Management of Congestion in the Deregulated Energy Market

Management of Congestion in the Deregulated Energy Market International Journal of Scientific and Research Publications, Volume 6, Issue 7, July 2016 284 Management of Congestion in the Deregulated Energy Market Onwughalu, M.k Department of Electrical and Electronic

More information

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 61 CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 3.1 INTRODUCTION The modeling of the real time system with STATCOM using MiPower simulation software is presented in this

More information

Project #148. Generation Interconnection System Impact Study Report

Project #148. Generation Interconnection System Impact Study Report Project #148 Generation Interconnection System Impact Study Report June 05, 2012 Electric Transmission Planning Table of Contents Table of Contents... 2 Executive Summary... 3 Energy Resource Interconnection

More information

Click to edit title 18. Fachforum Netzbau und Betrieb

Click to edit title 18. Fachforum Netzbau und Betrieb The North Sea Off-Shore Grid a Vision to be Realised? Click to edit title 18. Fachforum Netzbau und Betrieb Köln, Click to 6.-7. edit Mai sub-title 2010 Dr. Matthias Luther transpower stromübertragungs

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Memorandum To: ISO Operations (MRTU) Committee From: Armando J. Perez, Director of Grid Planning cc: ISO Board of Governors ISO Officers Date: April 29, 2005 Re:

More information

Simulation of real and reactive power flow Assessment with UPFC connected to a Single/double transmission line

Simulation of real and reactive power flow Assessment with UPFC connected to a Single/double transmission line Simulation of real and reactive power flow Assessment with UPFC connected to a Single/double transmission line Nitin goel 1, Shilpa 2, Shashi yadav 3 Assistant Professor, Dept. of E.E, YMCA University

More information

Smart Grid 2.0: Moving Beyond Smart Meters

Smart Grid 2.0: Moving Beyond Smart Meters Smart Grid 2.0: Moving Beyond Smart Meters Clean Energy Speaker Series State of the Smart Grid February 23, 2011 Prof. Deepak Divan Associate Director, Strategic Energy Institute Director, Intelligent

More information

Impact Analysis of Fast Charging to Voltage Profile in PEA Distribution System by Monte Carlo Simulation

Impact Analysis of Fast Charging to Voltage Profile in PEA Distribution System by Monte Carlo Simulation 23 rd International Conference on Electricity Distribution Lyon, 15-18 June 215 Impact Analysis of Fast Charging to Voltage Profile in PEA Distribution System by Monte Carlo Simulation Bundit PEA-DA Provincial

More information

Elia Ancillary Services: Black-Start

Elia Ancillary Services: Black-Start Elia Ancillary Services: Black-Start 2018-2020 Bidding instructions and awarding criteria Table of contents 1 General information... 2 1.1 Minimal need of ELIA... 2 1.2 «Black-Start» Electrical zones...

More information

Full-Scale Medium-Voltage Converters for Wind Power Generators up to 7 MVA

Full-Scale Medium-Voltage Converters for Wind Power Generators up to 7 MVA Full-Scale Medium-Voltage Converters for Wind Power Generators up to 7 MVA Philippe Maibach, Alexander Faulstich, Markus Eichler, Stephen Dewar ABB Switzerland Ltd CH-5300 Turgi, Switzerland Phone: +41

More information

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM

WESTERN INTERCONNECTION TRANSMISSION TECHNOLGOY FORUM 1 1 The Latest in the MIT Future of Studies Recognizing the growing importance of energy issues and MIT s role as an honest broker, MIT faculty have undertaken a series of in-depth multidisciplinary studies.

More information

the power to be transmitted; the length of the connection; the characteristics and the accessibility of the route; environmental constraints.

the power to be transmitted; the length of the connection; the characteristics and the accessibility of the route; environmental constraints. 1 Introduction This note has been prepared by Europacable. Its purpose is to provide a high level overview of current developments in Extra High Voltage (EHV) Alternating Current (AC) and Direct Current

More information

City of Palo Alto (ID # 6416) City Council Staff Report

City of Palo Alto (ID # 6416) City Council Staff Report City of Palo Alto (ID # 6416) City Council Staff Report Report Type: Informational Report Meeting Date: 1/25/2016 Summary Title: Update on Second Transmission Line Title: Update on Progress Towards Building

More information

Evaluation of offshore HVDC grid configuration options

Evaluation of offshore HVDC grid configuration options Evaluation of offshore HVDC grid configuration options Keith Bell and Callum MacIver Dept. of Electronic and Electrical Engineering University of Strathclyde, UK This work has benefited from support by:

More information

Introduction CONTENT Future of offshore wind energy in Europe Offshore wind energy in Spain Alternatives to the transmission system to the grid Compar

Introduction CONTENT Future of offshore wind energy in Europe Offshore wind energy in Spain Alternatives to the transmission system to the grid Compar OFFSHORE WIND FARM CONNECTIONS TO THE GRID Energy to Quality S.L. Santiago Arnaltes Gómez Introduction CONTENT Future of offshore wind energy in Europe Offshore wind energy in Spain Alternatives to the

More information

URL (IET Digital Library):

URL (IET Digital Library): J. Beerten and R. Belmans, MatACDC - An Open Source Software Tool for Steady-State Analysis and Operation of HVDC Grids, Proc. IET International Conference on AC and DC Power Transmission ACDC 2015, 11th

More information

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Rong Cai, Mats Andersson, Hailian Xie Corporate Research, Power and Control ABB (China) Ltd. Beijing, China rong.cai@cn.abb.com,

More information

Regional Cooperation Infrastructure Development and Operation. EU Energy Governance. Olaf Ziemann Member of ENTSO-E s System Operations Committee

Regional Cooperation Infrastructure Development and Operation. EU Energy Governance. Olaf Ziemann Member of ENTSO-E s System Operations Committee Regional Cooperation Infrastructure Development and Operation EU Energy Governance 30 April 2014, Berlin Olaf Ziemann Member of ENTSO-E s System Operations Committee About ENTSO-E 41 TSOs from 34 countries

More information

MVDC link in a 33 kv distribution network

MVDC link in a 33 kv distribution network 24th International Conference & Exhibition on Electricity Distribution (CIRED) 12-15 June 2017 Session 3: Operation, control and protection MVDC link in a 33 kv distribution network Chao Long 1, Jianzhong

More information

DC Arc-Free Circuit Breaker for Utility-Grid Battery Storage System

DC Arc-Free Circuit Breaker for Utility-Grid Battery Storage System DC Arc-Free Circuit Breaker for Utility-Grid Battery Storage System Public Project Report Project RENE-005 University of Toronto 10 King s College Rd. Toronto, ON 2016 Shunt Current Mes. IGBTs MOV Short

More information

OPF for an HVDC feeder solution for railway power supply systems

OPF for an HVDC feeder solution for railway power supply systems Computers in Railways XIV 803 OPF for an HVDC feeder solution for railway power supply systems J. Laury, L. Abrahamsson & S. Östlund KTH, Royal Institute of Technology, Stockholm, Sweden Abstract With

More information

Elia Group. At the heart of the European electricity grid

Elia Group. At the heart of the European electricity grid Elia Group At the heart of the European electricity grid Elia Group, a unique location in the heart of Europe Scandinavia UK Denmark Poland Netherlands Germany Belgium Czech Republic Austria France Switzerland

More information

FEDIOL assessment of the practical implications of mandatory country of origin labelling options on the vegetable oils sector 1

FEDIOL assessment of the practical implications of mandatory country of origin labelling options on the vegetable oils sector 1 Ref. 14NUT011 FEDIOL assessment of the practical implications of mandatory country of origin labelling options on the vegetable oils sector 1 Introduction Article 26 of Regulation (EU) No 1169/2011 on

More information

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Abstract: G. Thrisandhya M.Tech Student, (Electrical Power systems), Electrical and Electronics Department,

More information

Offshore Wind: Grid Connection & Technology Options. Dietmar Retzmann Focus on. CO 2 Reduction Green Energy Megacities Security of Supply

Offshore Wind: Grid Connection & Technology Options. Dietmar Retzmann Focus on. CO 2 Reduction Green Energy Megacities Security of Supply Offshore Wind: Grid Connection & Technology Options Dietmar Retzmann 1 10-2011 E T PS S/Re Focus on CO 2 Reduction Green Energy Megacities Security of Supply 2 10-2011 E T PS S/Re 1 EWEA s 2030 Offshore

More information

An Alternative to Reduce Medium-Voltage Transient Recovery Voltage Peaks

An Alternative to Reduce Medium-Voltage Transient Recovery Voltage Peaks An Alternative to Reduce Medium-Voltage Transient Recovery Voltage Peaks D. M. Nobre W. L. A. Neves B. A. de Souza Departamento de Engenharia Elétrica - UFPB Av. Aprígio Veloso, 882 Bodocongó 58.109-970,

More information

2015 Grid of the Future Symposium

2015 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http ://www.cigre.org 2015 Grid of the Future Symposium Flexibility in Wind Power Interconnection Utilizing Scalable Power Flow Control P. JENNINGS,

More information

DC Voltage Droop Control Implementation in the AC/DC Power Flow Algorithm: Combinational Approach

DC Voltage Droop Control Implementation in the AC/DC Power Flow Algorithm: Combinational Approach DC Droop Control Implementation in the AC/DC Power Flow Algorithm: Combinational Approach F. Akhter 1, D.E. Macpherson 1, G.P. Harrison 1, W.A. Bukhsh 2 1 Institute for Energy System, School of Engineering

More information

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK 91 CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK CHAPTER CONTENTS: 5.1 INTRODUCTION 5.2 CONDUCTION OF VARIOUS POWER FLOW STUDIES ON THE MODEL 5.3 EXPERIMENTS CONDUCTED FOR VARIOUS POWER FLOW

More information

ECE 421 Project 1, Group 3 HVDC. Brian Beilstein, Robert Germick, James Haney, Alexander Joss, Matt Murphy, Shutang You

ECE 421 Project 1, Group 3 HVDC. Brian Beilstein, Robert Germick, James Haney, Alexander Joss, Matt Murphy, Shutang You ECE 421 Project 1, Group 3 HVDC Brian Beilstein, Robert Germick, James Haney, Alexander Joss, Matt Murphy, Shutang You History and Basic Theory First HVDC link in Sweden Mercury Arc Rectifiers Silicon

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

Elia group. At the heart of the European Electricity grid

Elia group. At the heart of the European Electricity grid Elia group At the heart of the European Electricity grid Elia Group, a unique positioning at the heart of Europe Scandinavia UK Netherlands France Denmark Poland Belgium Germany Czech Republic Austria

More information

Dual Power. Protection. Protection

Dual Power. Protection. Protection 54 Fault Clearing Systems by Damien Tholomier., AREVA T&D Automation, Canada Dual Power Single Battery What if it? Short circuits and other abnormal power system conditions are very rear, but may result

More information

The Grid Link Project. Summary of the Report for the Independent Expert Panel

The Grid Link Project. Summary of the Report for the Independent Expert Panel The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in

More information

North-South Interconnections in Central-East and South- East Europe

North-South Interconnections in Central-East and South- East Europe European Network of Transmission System Operators for Electricity North-South Interconnections in Central-East and South- East Europe Building power bridges between Eastern and Western Europe; relieving

More information

Introduction to transmission network characteristics - technical features. Slobodan Markovic EKC Athens,

Introduction to transmission network characteristics - technical features. Slobodan Markovic EKC Athens, Introduction to transmission network characteristics - technical features Slobodan Markovic EKC Athens, 06.03.2017 1 MAIN ISSUES The map shows the region that will be included in the network modelling

More information

Energy Storage Interconnection Initiative

Energy Storage Interconnection Initiative Energy Storage Interconnection Initiative Stakeholder Call November 25, 2014 Agenda Time Agenda Item Speaker 10:00-10:10 Introduction, Stakeholder Process Tom Cuccia 10:10-10:30 Applying the GIDAP to energy

More information

CMU Electricity Conference, 9th March 2011

CMU Electricity Conference, 9th March 2011 CMU Electricity Conference, 9th March 2011 Operation Challenges in Power Systems with Renewable Energy Sources Vaibhav Donde, PhD with Dr. Xiaoming Feng and Dr. Jiuping Pan ABB US Corporate Research March

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances

Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances Ukujima Photovoltaic Park 400 MW Stable Integration of a 400MW Photovoltaic Farm into the Japanese Power System Challenges and Chances 29 Juli 2014 Page 1 Characteristics of the Project Parameter Detail

More information

PUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY

PUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY PUBLICATION NEW TRENDS IN ELEVATORING SOLUTIONS FOR MEDIUM TO MEDIUM-HIGH BUILDINGS TO IMPROVE FLEXIBILITY Johannes de Jong E-mail: johannes.de.jong@kone.com Marja-Liisa Siikonen E-mail: marja-liisa.siikonen@kone.com

More information

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027)

The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) The 6 th Basic Plan for Long-term Electricity Supply and Demand (2013~2027) February 2013 Contents I. Introduction 1 II. Status of Electricity Supply and Demand 2 1. Electricity Demand 2 2. Electricity

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2.

CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO. Rexhep Shaqiri 1, Bogdanov Dimitar 2. CONNECTION OF NEW GENERATORS IN THE ELECTRICAL POWER SYSTEM OF KOSOVO Rexhep Shaqiri 1, Bogdanov Dimitar 2 1 Technical University - Sofia, E-mail: rexhep_shaqiri@hotmail.com). 2 Technical University -

More information

An Approach for Formation of Voltage Control Areas based on Voltage Stability Criterion

An Approach for Formation of Voltage Control Areas based on Voltage Stability Criterion 16th NATIONAL POWER SYSTEMS CONFERENCE, 15th-17th DECEMBER, 2010 636 An Approach for Formation of Voltage Control Areas d on Voltage Stability Criterion Dushyant Juneja, Student Member, IEEE, Manish Prasad,

More information

Renewables from a TSO Perspective. M.BENA, SmartGrids Director, RTE, French TSO Vienna, 18 May 2015

Renewables from a TSO Perspective. M.BENA, SmartGrids Director, RTE, French TSO Vienna, 18 May 2015 Renewables from a TSO Perspective M.BENA, SmartGrids Director, RTE, French TSO Vienna, 18 May 2015 RTE in Europe 8500 employees Owner and Operator of the Assets 100 000 km UHV and HV lines (400 kv -> 63

More information

CENELEC TC 8X/WG 06 System Aspects of HVDC Grids

CENELEC TC 8X/WG 06 System Aspects of HVDC Grids CENELEC TC 8X/WG 06 System Aspects of HVDC Grids Best Paths Dissemination Event Paris, 5 November 2015 Frank Schettler (Siemens, Convenor) Overview Introduction to CLC TC 8X/WG 06 Scope and present status

More information

HVDC Grid Protection Design Considerations

HVDC Grid Protection Design Considerations HVDC Grid Protection Design Considerations Willem Leterme CIGRE HVDC International Workshop March 30, 2017 PROMOTioN Progress on Meshed HVDC Offshore Transmission Networks This project has received funding

More information

Power Flow Control in Meshed DC Grids. 29_03_17 Dr Jun Liang Cardiff University

Power Flow Control in Meshed DC Grids. 29_03_17 Dr Jun Liang Cardiff University Power Flow Control in Meshed DC Grids 29_03_17 Dr Jun Liang Cardiff University Contents Challenges in DC Grid Development Inter-line DC Current Flow Controllers (CFCs) Recent Developments Experimental

More information

Analysis of Eclipse Drive Train for Wind Turbine Transmission System

Analysis of Eclipse Drive Train for Wind Turbine Transmission System ISSN 2395-1621 Analysis of Eclipse Drive Train for Wind Turbine Transmission System #1 P.A. Katre, #2 S.G. Ganiger 1 pankaj12345katre@gmail.com 2 somu.ganiger@gmail.com #1 Department of Mechanical Engineering,

More information

Age-dependent & multi-load reliability analysis in transmission systems

Age-dependent & multi-load reliability analysis in transmission systems CIGRE US National Committee 2013 Grid of the Future Symposium October 20-22, 2013 Boston, USA Age-dependent & multi-load reliability analysis in transmission systems Marco Fleckenstein, Prof. Dr. -Ing.

More information

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists 3,900 116,000 120M Open access books available International authors and editors Downloads Our

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System

Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System Raju Pandey, A. K. Kori Abstract FACTS devices can be added to power transmission and distribution systems at appropriate

More information

Study of Motoring Operation of In-wheel Switched Reluctance Motor Drives for Electric Vehicles

Study of Motoring Operation of In-wheel Switched Reluctance Motor Drives for Electric Vehicles Study of Motoring Operation of In-wheel Switched Reluctance Motor Drives for Electric Vehicles X. D. XUE 1, J. K. LIN 2, Z. ZHANG 3, T. W. NG 4, K. F. LUK 5, K. W. E. CHENG 6, and N. C. CHEUNG 7 Department

More information

Master Thesis Proposal: Real-time and off-line simulation of DC Grids

Master Thesis Proposal: Real-time and off-line simulation of DC Grids Master Thesis Proposal: Real-time and off-line simulation of DC Grids Background The revival of direct current (DC) for long-distance power transmission began in 1954 when ABB linked the island of Gotland

More information

The Electric Power System

The Electric Power System The Electric Power System - Sweden- Swedish Power System 1 2 Basic facts 2014 Area: 450 295 km 2 Population: 9.6 Million Number of electricity consumers: 5.3 Million Number of TSOs: 1 Number of DSOs: 170

More information