FPSO FALCON TECHNICAL DESCRIPTION REPORT

Size: px
Start display at page:

Download "FPSO FALCON TECHNICAL DESCRIPTION REPORT"

Transcription

1 FPSO FALCON TECHNICAL DESCRIPTION REPORT FPSO Falcon FPSO Falcon Technical Description Rev C1 8/7/2009 Page 1

2 TABLE OF CONTENTS 1. INTRODUCTION FPSO GENERAL DESCRIPTION FPSO BASIS OF DESIGN Design Conditions Location and Environmental Data for the FPSO Design Operational limits Classification, Rules, Standards, Codes and Certificates Classification Class and Regulatory Body Rules Country of Registration TOPSIDES FACILITY Volume Improvement Project (VIP) Changes Topsides Processing Facilities Power Generation Capacity Oil Processing System Gas Processing Systems Water Injection System Utility Systems VESSEL Hull Accommodation Upper Deck Structures Lifting, Handling and Warehousing Corrosion Protection Refrigeration HVAC Systems Propulsion System Power Generation System Ballast System Sewage System Steam and Condensate System Fuel Systems Lubricating Oil System Compressed Air Systems Valve Hydraulic System Fresh Water System Sea Water Systems Bilge System Slop System Off Spec Oil Tank Inert gas System Fire Fighting, CO 2 and Foam Systems Safety and Life Saving Equipment Tank Gauging System Cargo and Crude Oil Washing System Offloading Of Stabilized Crude Tandem Mooring And Offloading Systems TURRET AND MOORING SYSTEMS...21 FPSO Falcon Technical Description Rev C1 8/7/2009 Page 2

3 Mooring System Riser System Swivel Stack...24 APPENDICES...25 I. FPSO Equipment Capacity Summary...25 II. Topsides...25 III. Vessel Particulars...25 IV. Turret and Tandem Mooring Data...25 V. FPSO FALCON History...25 FPSO Falcon Technical Description Rev C1 8/7/2009 Page 3

4 1. INTRODUCTION This Technical Description has been developed as a general narrative of the FPSO Falcon incorporating the FPSO s design and project history for the purposes of vessel redeployment in suitable future projects. The FPSO Falcon has been designed and built as a generic FPSO suited for deep water conditions, up to 2100 meters. The generic concept means that it has been designed to cope with a wide range of field properties, Metocean conditions, and water depths, for relocation between fields during its lifetime. The unit has been deployed on the Yoho field offshore Nigeria, for ExxonMobil. In addition to being suitable for West African Metocean conditions, studies have been performed to determine its suitability for use in other geographic regions such as Brazil. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 4

5 2. FPSO GENERAL DESCRIPTION The following is a general description of the topsides, vessel and turret of the FPSO Falcon. Further information with PFDs, GAs, and Equipment details is provided in Appendices section. Topsides The FPSO Topsides Modules have been fabricated in Singapore and UAE, and were installed and interconnected to form the complete oil, gas, and water processing facilities, in Singapore. There are a total of 17 Modules each weighing between 75 and 710 tonnes. The topsides was originally designed and constructed as a 3 stage separation system plus electrostatic treater, with a capacity of 90,000 bpd (later debottlenecked to 120,000 bpd). The Topsides were modified in 2004 as a part of a Volume Improvement Project (VIP) to increase the maximum oil production rate to 168,500 bopd. This upgrade involved converting the existing separation train into 2 x 50% trains, each having 2 stages (High Pressure and Low Pressure) of 3 phase separation, with a common electrostatic coalescer. The crude oil can be desalted in the Low Pressure separators if required. Treated oil from the electrostatic coalescer and/or final stage of separation flows to the cargo tanks for storage until it can be offloaded to a shuttle tanker. The Falcon is currently still configured in the high capacity 2 stage VIP mode, but can easily be converted back to the original 3 stage mode if required. The following sections describe the current VIP mode. Produced water from the separation equipment is processed to remove dissolved gas after which it flows to the FPSO slop water tanks for settling. The water is monitored for oil in water content prior to discharging overboard or further processing by hydrocyclones. Separated gas from the High Pressure Separator is compressed to high pressure to allow it to be re-injected. This avoids the need for flaring and in some cases may allow the reservoir pressure to be sustained. Some of the gas is used as fuel on the FPSO, both in the vessel s boilers and to fuel the dual fuel gas turbines which drive the power generators, water injection pumps and main gas compressors. Approximate fuel gas consumption of the unit is MMscfd. The Main Gas Compression consists of 2 x 50% gas compressor trains each complete with associated suction, interstage and discharge coolers and scrubbers. Gas from the Low Pressure Separator is compressed by 1 x 100% electric driven dry, screw compressor to a pressure where it can join the produced gas from the High Pressure Separator at the inlet to the Main Gas Compression. Gas is dehydrated in a Tri Ethylene Glycol (TEG) Dehydration System, located between the 2 nd and 3 rd stages of the Main Gas Compression. After dehydration the gas is routed to gas injection risers via the gas injection swivel in the turret. The utilities needed for operation of the FPSO, including electrical power, cooling medium and heating medium, are provided on the Topsides. The electrical power is provided by two dual fuel gas turbine driven generators, and distributed to users by switchgear located in the Local Equipment Room, also located on the Topsides. The heating and cooling medium systems are both closed loop system containing tempered, fresh water. The heating medium is heated by steam from the vessel s boilers, and the cooling medium cooled using seawater. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 5

6 Seawater for the cooling of the cooling medium system, and for supply to the gas turbine driven water injection pumps is provided by submerged lift pumps located in caissons in a water ballast wing tank. The seawater is filtered and deaerated in the water treatment system to meet the quality requirements for injection into the reservoir. Other ancillary systems for operation, such as testing laboratory, pigging pumps, and chemical injection are also provided on the topsides. Vessel Export quality crude oil, received from the Topsides is stored in the Vessel s cargo tanks until arrival of an offloading tanker, which will transport the oil to its chosen destination. There are 13 crude oil tanks with a total capacity of 2.1 million barrels of oil. The vessel also has two slop tanks for final cleanup of produced water and slops, and three water ballast tanks. Crude oil will be transferred to an offloading tanker, which will approach the FPSO and be moored by a hawser to the stern. A floating hose will be connected to the offloading tanker to allow the contents of the FPSO cargo tanks to be transferred to the offloading tanker, an operation that will take around 24 hours, typically a 1 MM bbls parcel size. The accommodation can house up to 100 persons, mainly in 1 and 2 bed cabins. As well as cabins the accommodation includes a large galley and mess, and three separate TV lounges and a gymnasium. The accommodation block also provides the normal working spaces, including the Central Control Room, Radio Room and offices. A hospital and sick room are located in the accommodation, and lifeboats for 200 people or double the maximum Persons on Board (POB). Extensive fire fighting and life saving appliances are located throughout the vessel to assist a trained crew to deal with all types of emergencies that could occur. Turret The FPSO Falcon has an external turret suitable for permanently mooring the unit on location. The turret chain table has slots for 15 risers and umbilicals, and is configured for 9 mooring lines in a 3 x 3 arrangement. A roller bearing system within the turret allows the central fixed part to remain geostationary, while the hull is allowed to freely weathervane around the turret in response to prevailing wind, wave, and current forces. Fluids, electrical power, and control/data signals are transferred between the turret and the topsides via SBM proprietary designed and supplied swivels. Yoho Field Production Data During her time on the Yoho field the FPSO Falcon achieved the following production data / year: Pre-VIP Production period (months) 28 Average Oil Production 116,637 bbls Average Oil Production Uptime 99.11% Average Gas Compressed and Treated MMscfd FPSO Falcon Technical Description Rev C1 8/7/2009 Page 6

7 Safety Record (Lost Time Accidents) 0 Post-VIP (June 2005) Production period (months) 8 Average Oil Production 145,135 bbls Average Oil Production Uptime 99.90% Average Gas Compressed and Treated MMscfd Safety Record (Lost Time Accidents) 0 FPSO Falcon Technical Description Rev C1 8/7/2009 Page 7

8 3. FPSO BASIS OF DESIGN The main particulars of the FPSO FALCON VESSEL are specified in the section below: HULL MAIN PARTICULARS Name: Year built: Year Converted: Class: Port of registration: Hull type: Accommodation: Tank heating: FPSO Falcon (ex T/T Esso Kawasaki, Amazon Falcon) 1975, Kawasaki HI, Japan Keppel Shipyard, Singapore American Bureau of Shipping Nassau, Bahamas Single sided, single bottom 100 persons in single and double berth cabins 1st & 2nd Stage Slop Tanks DIMENSIONS Length Overall: m Length between Perpendiculars: m Molded Breadth: m Molded Depth (at CL): m Design Full Load Draft (mld): m (summer) Deadweight: 298, mt Lightship Weight: 52, mt Full Load Displacement: 351, mt STORAGE CAPACITY Cargo capacity: 2,100,000 bbls Ballast capacity: 360,000 bbls 3.1. Design Conditions Location and Environmental Data for the FPSO Design The FPSO Falcon was designed for West-Africa Metocean conditions (Nigeria to Angola) and deployed at the Yoho field, offshore Nigeria, for ExxonMobil. Refer to the Appendix for information on mooring design criteria Operational limits The FPSO is designed to survive a storm when sailing in transit to site, up to the extreme oceanographic conditions at the voyage, defined as the 10 year return interval storm for the voyage around the Cape of Good Hope. The FPSO is designed to remain connected to the mooring system and complete systems of risers, up to the extreme oceanographic conditions at site, defined as the 100 year return interval storm in West Africa. The FPSO is designed to continue to offload the export parcel to a tandem moored VLCC, up to the extreme oceanographic conditions at site, defined as the 1 year return interval storm at site Classification, Rules, Standards, Codes and Certificates Classification The FPSO is designed and constructed under special survey of the American Bureau of Shipping, to obtain the following Class Notation: FPSO Falcon Technical Description Rev C1 8/7/2009 Page 8

9 A1 - Floating Production Storage and Offloading System Classification was obtained for uninterrupted service of the system, without the need for drydocking for 10 years, with on-site Class surveys only for Classification status maintenance Class and Regulatory Body Rules The conversion was executed in compliance with the following Class and International Regulatory Bodies rules, regulations and guides: Guide for Building and Classing Floating Production Storage Systems, 1996, American Bureau of Shipping. Offshore Facilities Guide, Third edition October 1998, American Bureau of Shipping. International Convention for the Safety of Life at Sea Consolidated Edition, 1997, IMO International Convention of the Prevention of Pollution from Ships (MARPOL) 1974/1978, Consolidated Edition, IMO, International Load Line Convention, 1966, Protocol 1988 amendments. Convention on the International Regulations To Prevent Collisions At Sea (COLREG) 1972, as changed by the following resolutions: A-464 (XII) Amendments To The International Regulation To Prevent Collisions At Sea, 1972 Convention on the International Maritime Satellite organization (INMARSAT) Radio Rules of the International Telecommunication Union, Geneva International convention of Tonnage Measurements of Ships, Civil Aviation Authority (CAA) Cap 437, A guide to criteria, recommended minimum standards and best practice for offshore helicopter landing areas. IMO resolutions A649 (16) Relevant OCIMF guidelines Country of Registration The vessel is currently registered in the Bahamas. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 9

10 3.3. TOPSIDES FACILITY Volume Improvement Project (VIP) Changes In order to achieve an increase in the oil production rate from 120 kbopd to 165 kbopd from the production trains with minimum number of modifications, the following process train changes were made under the FPSO Falcon VIP in 2004: The single train process system was modified to provide 2 x 50% process trains. Modification was achieved by changes to the piping systems on Modules 1 - HP/IP Separation, Module 2 - LP Separation, Module 6 - Gas Dehydration, and Module 19 - Methanol Storage and reconfiguration of the swivel. Modification also involved a number of changes to the DCS control system to protect and control the new arrangement, operating pressures and chemical injection systems. These VIP changes were designed to be reversible, and hence the vessel can easily be brought back to the original pre-vip capacity and specifications if required Topsides Processing Facilities Process trains: 2 Oil production rate: 165,800 bopd (original design pre-vip 120,000 bopd) Design total liquids handling: 165,800 blpd Gas compression: 118 MMscfd Produced water: 50,000 bwpd Water injection: 90,000 bwpd Gas injection/gas Lift: 95 MMscfd FPSO Falcon Technical Description Rev C1 8/7/2009 Page 10

11 Fuel Gas: 21 MMscfd Power Generation Capacity Topsides: Vessel: Essential: Emergency: 2 x Dual fuel gas turbine generators 6245 kva each 2 x Steam turbine alternators 2750 kva each 1 x Diesel generator set 1250 kva 1 x Diesel generator set 600 kva Oil Processing System The crude processing system consists of two separate processing trains. The main processing train comprises of the original HP Separator, LP Separator and Electrostatic Treater with interstage heating. The secondary processing train comprises of the original Test Separator (converted into a two-stage gas-liquid separator) and the IP Separator. The separators are designed for the following produced water carry-over (percentage of total liquid flow): Main Train (Train #1) HP separator 10 vol% LP separator 1 vol% Secondary Train (Train #2) Test separator 100 vol% IP separator 2 vol% The combined oil system is capable of handling 165,800 bpd of incoming well fluids. The main processing train will handle 85,100 bpd of incoming well fluids and 75 MMscfd incoming gas. The secondary process train is designed to handle 80,700 bpd of incoming well fluids and 65 MMscfd incoming gas. Offspec Crude For current VIP configuration, for crude that does not meet specification, a dedicated off-spec tank can be used for production which can be recycled over the oil separation train by means of the stripping pump. During this recycling, maximum production rate would be decreased; i.e. sum of off-spec crude and incoming crude should not exceed the rates mentioned in the section above. Operating Conditions The oil processing system was designed for the following operating conditions in the Separators: Main Train (Train #1) HP Separator Design operating pressure 19 bar(g) Operating temperature 37 C Slug capacity 250 bbls FPSO Falcon Technical Description Rev C1 8/7/2009 Page 11

12 LP Separator Design operating pressure 1 bar(g) Operating temperature 80 C Electrostatic Treater Design operating pressure 3 bar(g) Operating temperature 80 C Secondary Train (Train #2) Test Separator Design operating pressure 19 bar(g) Operating temperature 48 C Slug capacity 50 bbls IP Separator Design operating pressure 2 bar(g) Operating temperature 48 C Crude Oil Properties The FPSO Falcon is designed for API Gravity Crude Oil Shipping Specification The oil processing system is designed to achieve the following product specifications at offloading: Reid vapor pressure 10 psia Basic Sediment & Water (ASTM D4377/4007) 0.5 vol% Salt content (ASTM D3230) 35 ptb (lb/kstb) The most stringent specification of BS&W or salt content was governing. In order to meet these specifications at maximum production rates some treatment in the cargo tanks (e.g. water stripping, vapor boil-off) could be required before offloading. Produced Water Disposal Specification The maximum allowable oil-in-water content for the produced water will be monitored by the oil-inwater content meter and can be adjusted to meet the oil-in-water content specifications. The maximum allowable disposal temperature of produced water was 50 C. Slugging During start-up (i.e. low production capacity) and normal operation, hydrodynamic slugging could occur. In this case, slugging is handled by: FPSO Falcon Technical Description Rev C1 8/7/2009 Page 12

13 chokes in the turret, an ample slug volume in the receiving separators (250 bbls in HP separator and 50 bbls in Test Separator) and a sufficient margin between operational pressure and design pressure of the inlet system (HIPPS setting) Gas Processing Systems Total Gas Production Rates The processing system is capable of handling 188 MMscfd. This is comprised of 168 MMscfd of produced associated gas and 20 MMscfd of returned lift gas. The gas compression system is capable of compressing 95 MMscfd for lift gas and gas injection purposes, and 21 MMscfd for fuel gas. The difference between the gas compression capacity and the process capacity can be flared continuously in the HP & LP flare systems. The Flash Gas Compression (FGC) System is designed to handle 8 MMscfd for the first stage of compression. Gas Lift System The gas lift system is designed for the following peak capacity: Max. installed lift gas capacity 20 MMscfd Normal operating pressure (@ max. 60 C) 172 bar(g) Gas Injection The gas from the gas compression system or lift gas, not used as fuel gas, can be re-injected into the reservoir. The gas injection system was designed for the following peak capacity: Max. installed gas injection capacity 95 MMscfd Min. operating 60 C at injection riser 310 bar(g) Gas Dehydration System A TEG Gas Dehydration System is installed to prevent hydrate formation. In this system gas is dehydrated to a water content of 1.5 lbs H20/MMscf (i.e. dewpoint < bar(g)) A methanol injection system is installed to prevent hydrate formation during start-up/ shutdown and during short term upsets in the Gas Dehydration System. HP Fuel Gas System The key design parameters for the HP fuel gas system (for gas turbines) are as follows: Capacity 21 MMscfd (total fuel gas) Operating pressure HP fuel gas 30.0 bar(g) FPSO Falcon Technical Description Rev C1 8/7/2009 Page 13

14 The HP fuel gas is superheated to 20 C above the hydrocarbon dew point at the operating pressure. The HP fuel gas off-take is downstream of the gas compression 2 nd stage, downstream of the TEG dehydration system. If the compression system is shut down, dual fuel HP fuel gas consumers shall switch over automatically to MGO. LP Fuel Gas System The key design parameters for the LP fuel gas system (for the vessel boiler) are as follows: Capacity 7 MMscfd (included in HP total) Operating pressure 6 bar(g) The LP fuel gas is superheated to 10 C above the hydrocarbon and water dew points at the operating pressure. LP fuel gas will be taken from the HP fuel gas system. When no compression is available, e.g. for start-up, LP fuel gas is taken (via the HP fuel gas scrubber) directly from the HP separator to allow gas firing of the dual fuel boiler. LP fuel gas piping is traced/insulated to maintain superheat and avoid downstream condensation Water Injection System Injection Capacity The water injection system is designed for a maximum de-oxygenated seawater injection capacity of 90,000 bpd. Minimum capacity is 10,000 bpd. The water treatment facilities upstream of the water injection pumps are designed to produce 105,000 bpd of water, which is including 9000 bwpd to feed the fresh water generator for crude oil washing and approximately 6000 bwpd for firewater system flushing. Injection Water Specification The water injection system is designed to achieve the following injection water specification: Sea water supply conditions to the Water Injection system: Design pressure SW supply 15.0 bar(g) Normal supply pressure 2.5 bar(g) Solid content < 3 ppmv Injection water specifications / conditions: Injection pump discharge min. 303 bar(g) Design Turret 345 bar(g) Treated seawater quality: Removal of all solids > 100 microns Dissolved oxygen < 10 ppb O 2 Seawater can be treated with periodic shock doses of biocide to kill bacteria. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 14

15 Utility Systems Flare System The FPSO is equipped with two independent flare systems, i.e. a HP and an LP flare for the disposal streams. Under the VIP increased production conditions continuous flaring was expected: 50 MMscfd via the HP Flare and 19 MMscfd via the LP Flare. The HP flare system was originally designed for a peak flaring capacity of approximately 137 MMscfd, i.e. design associated gas production plus returning lift gas and allowance for simultaneous compression system blowdown, and a continuous flaring capacity of 93 MMscfd. Post VIP rates are 164 MMscfd peak flaring. The flare system was adequately designed to handle the increase in flow. Shielding was installed to limit the impact of radiation from the flare. The flare design capacity is adequate to allow depressurization of both production flowlines in 1 hour. Gas injection flowline depressurisation for hydrate prevention was not required. The original LP flare system is designed for a peak flaring capacity of approximately 93 MMscfd, based on the emergency case for gas blow-by from the HP Separator to the Produced Water Flash Vessel, and 7 MMscfd continuous production flaring. Post VIP rates are 19 MMscfd continuous flaring via the LP flare and 93 MMscfd peak flaring. Power Generation System The topsides power generation systems uses prime-mover dual fuel type (gas and liquid) turbine generator sets. Under normal conditions the power generation system, with one set in stand-by mode, shall be able to supply all unit consumers, and start the largest electrical motor. Topsides installed power generation will feed all Topsides FPSO consumers. Vessel consumers will be fed by vessel power generation facilities, comprising of 2 x steam turbine alternators. One diesel-driven emergency power generator and one diesel driven essential power generator is installed in the vessel. Chemical Injection System The system consists of storage and supply facilities for the following three subsystems: 1. Chemicals for Subsea 2. Chemicals for Topsides Process 3. Chemicals for Water Injection Chemicals include typically methanol, demulsifier, scale inhibitor, corrosion inhibitor, oxygen scavenger, biocides. For subsea, the following storage facilities are provided as a minimum: Methanol 1677 bbls Corrosion inhibitor 109 bbls Scale inhibitor 25 bbls Utility Stations FPSO Falcon Technical Description Rev C1 8/7/2009 Page 15

16 Utility stations are provided for modules that require to be serviced with e.g. service air, MGO and fresh water. The different locations of these facilities are to be determined based on the requirements of the modules. A utility line (fed from the existing vessel fire & general service pumps) is installed along the deck to supply seawater for general purposes as e.g. deck washing. During start-up the seawater lift pumps for topsides will not be operational. A dedicated start-up cooling water pump is provided to enable cooling of the power turbines in this case. Laboratory The laboratory is equipped with standardized ASTM test equipment. Metering Throughout the facilities, various streams can be monitored by metering as follows: Crude to cargo tanks +/- 10% Lift gas +/- 10% Injection gas +/- 10% Produced water +/- 10% Injection water +/- 10% Flare gas +/- 10% Fuel gas +/- 10% Crude to shuttle tankers fiscal Oil, water & gas from HP separator +/- 10% 3.4. VESSEL FPSO Falcon Technical Description Rev C1 8/7/2009 Page 16

17 Hull A comprehensive survey of the hull steel structure was carried out during the FPSO FALCON s original conversion to identify steel renewals necessary to meet the required 15 year service life and Class requirements. No high tensile steel was used in the vessel s original or conversion designs. Major modifications made to the hull itself during her conversion included the removal of her bulbous bow and the addition of an external turret Accommodation The current accommodation block accommodates a total of 100 Persons On Board (POB), i.e. a normal POB of up to 85 with additional capacity for a further 15 temporary personnel. A combination of one and two man cabins make up the 100 person capacity Upper Deck Structures Additional deck structures added during the vessel s conversion include a helicopter deck designed to accommodate the Sikorsky S-61N and S-92A helicopter types, a stern offloading platform, a process deck support structure, a flare boom, two inert gas vent masts, a deck crane pedestal and a stern tandem mooring arrangement Lifting, Handling and Warehousing To facilitate lifting and handling on topsides, a pipe rack mounted travelling crane and an upper deck pedestal type crane were installed. The travelling crane is installed on the vessel s centerline, and handles lifts within the topsides areas and for the entire length of the topsides. The pedestal crane is installed amidships on the starboard side, and handles lifts from the upper deck and topsides overboard, including the transfer of personnel. Also available is one (1) electro-hydraulic provisions store crane installed at the portside of the accommodation structure to handle goods and equipment on-board the FPSO and occasionally to/from supply boats in case of fairly smooth sea conditions. The crane load capacities (SWL) are as follows: Store crane: Deck crane: Pipe rack travelling crane: 5 tonnes 10 tonnes at 35 m outreach 15 tonnes at 23 m outreach 3 tonnes at 30 m outreach 10 tonnes at 25 m outreach A designated supply boat handling area (complete with Yokohama fenders) where attending services vessels come alongside is located on the starboard side next to the deck pedestal crane. Lifts that cannot be made by the two cranes on topsides are made using I-beams and A-frames that have been installed throughout the topsides in strategic locations Corrosion Protection Protection of the hull from corrosion is provided through the application of coatings, the installation of sacrificial anodes, and the utilization of an impressed current system. All sacrificial anodes are of the diver replaceable type. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 17

18 Refrigeration The original cold rooms and provisions refrigeration system was expanded and replaced during FPSO conversion work to accommodate the larger crew size of 100 POB men HVAC Systems Additional HVAC capacity was added to the vessel during the FPSO conversion work. This work included the expansion of the accommodation block HVAC, as well as the refurbishment and renewal of ventilation for all machinery spaces Propulsion System The original steam propulsion system is still intact and operable, and can be used for transit during mobilization to site. The steering system and all associated controls are also still functional Power Generation System The original steam driven T/A sets are still in place and operational during transit and on site after the FPSO is installed. As a back up, an Essential generator was installed along with an Emergency generator. Once installed, power required onboard the FPSO will be generated by the topsides power plant for topsides consumers, and by the Engine Room generating sets for vessel consumers. Capacities for the vessel installed generators are as follows:- Two (2) steam turbine driven alternator (T/A) sets of 2,200 kw, One (1) essential diesel driven generator set of 900 kw, One (1) diesel driven emergency generator set of 480 kw Ballast System The existing seawater segregated ballast system is comprised of a steam turbine driven Ballast Pump, ballast stripping eductors, piping and valves. The current configuration of tanks is two wing tanks (No 3 P&S) amidships, the Fore Peak and Aft Peak tanks Sewage System The existing sewage treatment plant is designed to accommodate a maximum complement of 100 Persons On Board (POB), i.e. a normal POB of 85 with additional capacity for a further 15 temporary personnel. This system, along with the accommodations was expanded during the original FPSO conversion work. As part of the waste management systems, an incinerator and garbage compactor was also installed Steam and Condensate System The existing two (2) boilers located in the Engine Room were overhauled and converted to firing on either liquid or gas fuel. These units are still intact, and are used to provide steam to all steam consumers on topsides and within the hull. During a transit voyage to site, steam from these boilers is used to drive the vessel s main propulsion and steam alternator turbines. Low pressure steam is also available through the existing steam plant, and is available for such systems as tank heating, topsides heating, fresh water generation etc Fuel Systems The existing fuel systems onboard the FPSO include an HFO, MGO, Fuel Gas, and helicopter refueling system. These systems are all designed to service the vessel, topsides and helicopter refueling operations. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 18

19 HFO handling and supply is dedicated to boiler operations in the Engine Room. MGO handling and transfer is provided for Engine Room and topsides consumers. Fuel gas handling and distribution is provided for Engine Room and topsides consumers, for the firing of boilers and gas turbines. Helicopter refueling equipment is dedicated to the refueling requirements of visiting helicopters Lubricating Oil System The original lubricating oil system in the Engine Room that stores, purifies and distributes lubricating oil was modified and retained, and is still operational Compressed Air Systems The original compressed air system was replaced during the FPSO s conversion. The current service air system is comprised of 4 x 50% oil free compressor sets and 4 x 50% adsorption air dryer and filter sets. This system services all service air consumers. Instrument air is supplied by 2 x 100% retro-fitted oil free air compressor sets and 4 x 50% adsorption air dryer and filter sets. This system services all instrument air consumers Valve Hydraulic System All submerged cargo and ballast valves (in-tank valves), together with all valves that are operated during routine cargo operations are hydraulically actuated. A retrofitted HPU and control system provides power to operate the system. Cargo tank valve isolation is double block Fresh Water System Additional Fresh Water generating capacity was added to the vessel during the FPSO conversion work. This work included the installation of a third water maker and associated transfer and distribution equipment to accommodate the expansion of the POB to 100 persons Sea Water Systems The original seawater service system was expanded to supply new equipment installed in the Engine Room during the FPSO conversion work, and is designed to support all vessel and FPSO operations. A Marine Growth Protection System (MGPS) is also installed. Three dedicated seawater lift pumps in caissons were installed during the FPSO conversion work, and are provided for the sea water supply to the topsides process cooling medium systems and other consumers Bilge System The existing Bilge system was retrofitted with a new Oily Water Separator as part of the FPSO conversion work Slop System There are two Slop tanks in the FPSO s cargo block. The tanks are arranged and piped as a 1 st and 2 nd stage separation system. The two Slop tanks are designated as Produced Water / Slop Tanks, both of which are provided with heating coils sized to maintain the Slop tank contents at a fixed temperature to facilitate the oil separation process and cargo tank washing operations Off Spec Oil Tank A single Off Spec Oil tank is provided, and is located at No. 1 Center in the cargo block. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 19

20 Inert gas System The existing Inert Gas (IG) generating system downstream of the two Main Boiler uptakes is a flue gas extraction system. IG piping on the Upper Deck to the cargo block is through two independent mains. One is an IG/Vent main, and the second is a Purge/Vent main. The two dedicated headers have branches connected to each individual cargo and slop tank Fire Fighting, CO 2 and Foam Systems During the FPSO conversion work new and expanded fire protection systems were installed throughout the FPSO. Currently there is a fire water system, an Upper Deck AFFF foam system, a dedicated helicopter fire water and foam system, and several fixed CO 2 fire suppression systems for various compartments and machinery spaces. Loose portable fire fighting equipment is distributed throughout the FPSO in designated fire fighting stations Safety and Life Saving Equipment There are three (3) existing Totally Enclosed Motor Propelled Survival Crafts (TEMPSC) currently installed on the FPSO. Two are rated for 50 men, and a third is sized for 100 men. One of the 50 man units is designated as a Life/Rescue Boat. A total of 10 liferafts are installed on the FPSO, eight aft by the accommodations, and two forward near the focsle. Safety equipment is stored and located throughout the FPSO at each of the safety stations and safety lockers Tank Gauging System The installed tank gauging system is of the radar type tank level gauging system, and is installed for all cargo, slop, ballast tanks as well as draft gauging. The tank level monitoring and draft measuring systems are connected to a tank gauging work station in the Central Control Room for monitoring the FPSO loading conditions in all operating conditions Cargo and Crude Oil Washing System The existing cargo piping system in the cargo tanks, slop tanks and pump room is connected to four (4) steam driven centrifugal cargo pumps, two (2) steam reciprocating stripping pumps and two (2) stripping eductors. This is all ship s original equipment. In tank piping consists of three bottom mains as well as valving and piping to facilitate all routine FPSO cargo operations. Crude Oil Washing (COW) machines are installed in all cargo, slop and Off specs tanks Offloading Of Stabilized Crude. Offloading of stabilized crude to Shuttle tankers will be through a fiscal metering skid and offloading station located on the port aft quarter of the FPSO. A discharge line is piped from the fwd Upper Deck from the metering skid to the aft station where the hard piping is connected to a floating hose. This system is designed to provide a nominal offloading rate of 1 million barrels in a 24 hour period Tandem Mooring And Offloading Systems. An offloading porch on the FPSO s port aft quarter, and a deck mounted mooring hawser QRH (Quick Release Hook) make up the FPSO s Tandem Offloading System. This system is designed to moor export tankers of up to 350,000 mt dwt during offloading operations. Provision for monitoring of the mooring hawser loads can be done locally or remotely in the CCR. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 20

21 3.5. TURRET AND MOORING SYSTEMS The FPSO Falcon had an external turret integrated into her bow during her conversion into an FPSO. The turret structure has five (5) decks including the chain table. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 21

22 Turret Structure General Arrangement The five main decks in the turret are the Gantry Deck, the Upper Deck, the Lower Deck, the Turntable deck, and the Chaintable. In addition to these five main decks, there are several other small access platforms throughout the turret structure. The Gantry Deck supports the lifting gantry that surrounds the swivel stack, drives the rotating parts of the swivels, and provides a laydown area for swivel and other maintenance operations. The Upper Deck contains manifold piping, valves as well as pig launchers and receivers. The Lower Deck supports the rigid piping from riser terminations, flow control and Emergency Shutdown valves (ESDs). All equipment associated with riser and anchor leg pull-in is also mounted on this deck. The Turntable Deck provides access from the rotating part of the turret to the stationary part, and is where the turret s main bearing is located. It is also through this deck that all loads are transferred from the turret to the vessel via the rigid arm. The Chaintable Deck contains all of the equipment and structure required to moor the FPSO and to terminate and hang subsea umbilicals and risers. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 22

23 Mooring System The mooring system for the turret is a 3 x 3 anchor leg arrangement. Lifting of anchor legs for hook-up and the tensioning of the mooring system is achieved through a permanently mounted winch in the fixed part of the turret Riser System A total of 15 slots for risers and subsea umbilicals are provided within the FPSO s chain table. Lifting of risers and umbilicals, as with anchor legs, is achieved through a permanently mounted winch located in the fixed part of the turret. Arrangement of Slots in Chaintable Riser pigging equipment is located on the Turret Upper Deck, and consists of the following equipment: Pig launcher/receiver for HP production Pig launcher/receiver for LP production Pigging pump (located on topsides) The pigging system is designed for round-trip pigging with dead crude through either flowline. During pigging, the HP production manifold is used for backflow of dead crude from the pigging pump to the pig launcher in the turret. The maximum launching pressure for pigs is 99 bar(g) (1440 psig). Provision is also made to supply the pigging pumps with MGO for initial flowline dewatering prior to first well start-up. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 23

24 Swivel Stack The swivel stack inside the FPSO s turret has six (6) fluid/gas swivels, a utility swivel, and an electrical power/signal swivel. Looking from the lowest swivel upwards, the swivel stack is comprised of:- 12 inch double entry/exit HP Production swivel 12 inch double entry/exit LP Production swivel 10 inch single entry/exit Water Injection swivel 6 inch single entry/exit Pigging swivel LP Utility swivel Electric / signal swivel HP Utility swivel 6 inch Gas Injection / Lift swivel A seal arrangement and leak recovery system between each of the fluid/gas swivel elements prevents leakage to atmosphere, and provides leak detection. A HIPPS (High Integrity Pressure Protection System) is also part of the design, and it protects the process system against overpressure in the incoming risers within the turret. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 24

25 APPENDICES Additional data on the FPSO is contained in the following appendices: I. FPSO Equipment Capacity Summary Table of Capacities (Topsides, Vessel, Turret) II. Topsides Gas Processing PFD 1 & 2 (post VIP configuration) Oil Processing PFD (post VIP configuration) Topsides General Arrangements Key One Line Diagrams III. Vessel Particulars FPSO General Arrangement FPSO Capacity Plan Cargo System PFD IV. Turret and Tandem Mooring Data Turret Elevation Turret Piping Production PFD (post VIP) Turret PDMS V. FPSO FALCON History An overview of the FPSO FALCONS history is as listed below: T/T ESSO KAWASAKI original construction, Kawasaki HI, Japan FPSO FALCON conversion, Keppel Shipyard, Singapore 2002 Installed on Yoho Field, Nigeria operating as an FPSO 2005 VIP modifications made to FPSO topsides on Site Nigeria 2006 Demobilized and put into layup alongside in Singapore The FPSO FALCON is currently still in her layup berth in Singapore, and is under continuous surveillance and periodic inspection and maintenance. FPSO Falcon Technical Description Rev C1 8/7/2009 Page 25

VESSEL CHARACTERISTIC FIELDS

VESSEL CHARACTERISTIC FIELDS VESSEL CHARACTERISTIC FIELDS ENTIFICATION Key fields normally used to identify the vessel and its attributes e.g. IMO NUMBER, VESSEL, CURRENT FLAG, VESSEL TYPE etc. IMO VESSEL YEAR OF BUILD FLAG CALL SIGN

More information

300 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge

300 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge z Eastern WB300 300 Berths in en-suite cabins 8 Point Mooring System Built 2012 300MT, Man Riding Main Crane 25MT, Auxiliary Crane 1,700 m 2 Open Deck Space 1,100 m 2 Covered Deck Space Helideck Fitted

More information

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS APPROACH

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS APPROACH PART II RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS TITLE 47 SUPPLY VESSELS SECTION 6 PIPING CHAPTERS A B C D E F G H T APPROACH MATERIALS AND MANUFACTURE - See

More information

M/V Pacific Intrepid

M/V Pacific Intrepid Clear Deck Space 1,200 m2 Deadweight 7,078-7,226 tonnes Crane Capacity 200 t @ 20 m radius Accommodation 372 Every endeavour has been made to ensure the accuracy of the information in this brochure. However,

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Ship s Power Plants

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Deck: Ship s Power Plants Page 1 of 8 Compiled by Approved by Chief Examiner Syllabus Committee: 26 February 2013 OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Deck: Page 2 of 8 KNOWLEDGE, UNDERSTANDING

More information

A Comparison Between Turret and Spread Moored F(P)SOs for Deepwater Field Developments

A Comparison Between Turret and Spread Moored F(P)SOs for Deepwater Field Developments A Comparison Between Turret and Spread Moored F(P)SOs for Deepwater Field Developments London T. England, FMC SOFEC Floating Systems, USA Arun S. Duggal, FMC SOFEC Floating Systems, USA L. Allen Queen,

More information

Offshore Floating Production Unit (FPU): Valves

Offshore Floating Production Unit (FPU): Valves Shtokman Development AG Offshore Floating Production Unit (FPU): Valves Technical meeting with Russian valve manufacturers Moscow 24th June 2010 Summary Offshore Project Description FPU presentation Valves

More information

OPERATIONAL INFORMATION. Licence P.220. Licensees (Joint Venture Partners) Platform Type. Platform Weight. Drilling. Wells. Nearest Installations

OPERATIONAL INFORMATION. Licence P.220. Licensees (Joint Venture Partners) Platform Type. Platform Weight. Drilling. Wells. Nearest Installations Last Updated: June 2013 The Piper field lies in block 15/17n of the United Kingdom Continental Shelf located 193km north east of in the Central North Sea. Located at co-ordinates 58 o 27 41 N, 00 o 15

More information

Outline Specification 60M -1500m 3 Live Fish Carrier

Outline Specification 60M -1500m 3 Live Fish Carrier 1 LOA - 60,5m LPP - 55,5m B -14m D MAIN DECK -6,Om D BOAT DECK -8,8m T MAX - ~5,3m Frame spacing - 0,6m Cargo tanks - 2x~825m3 (Net volume for fish -1500m3) Hull and superstructure of the vessel to be

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N POL 012 AMENDMENTS OF THE SUPPLEMENT (FORM A AND B) OF THE IOPP CERTIFICATE TO: SHIPOWNERS, SHIPS OPERATORS AND MANAGERS, MASTERS, RECOGNIZED

More information

Form of IOPP Certificate and Supplements * INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE

Form of IOPP Certificate and Supplements * INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE Appendix II Appendices to Annex I Form of IOPP Certificate and Supplements * Annex I INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATE (Note: This Certificate shall be supplemented by a Record of Construction

More information

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment. REV 1c

EQUATORIAL DRILLER : The cost effective solution for efficient deep water drilling in mild environment.  REV 1c : The cost effective solution for efficient deep water drilling in mild environment. REV 1c Concept The ED concept was born from the experiences of the Unocal 76 Deepwater Asia Team from 1997-2005. The

More information

IACS UR s and Panel Responsible

IACS UR s and Panel Responsible UR Ax (Mooring and Anchoring) A1 Equipment Hull A2 Shipboard fittings and supporting hull structures associated with towing and mooring on conventional vessels Hull UR Cx (Container) None to date UR Dx

More information

Outline Specification. Of a 5,500 tons. IMO II Chemical Tanker

Outline Specification. Of a 5,500 tons. IMO II Chemical Tanker Leissner Maritime Outline Specification Of a 5,500 tons IMO II Chemical Tanker Fitted with: Stainless steel cargo tanks LNG or Methanol fuelled Double hull / double deck Project: P.1557 Deadweight: 5,500

More information

HEAD OFFICE. Via Trieste Ravenna IT tel fax

HEAD OFFICE. Via Trieste Ravenna IT tel fax seminole 2016 OK_Layout 1 13/04/16 18:52 Pagina 1 HEAD OFFICE Via Trieste 279 48122 Ravenna IT tel +39 0544422252 fax +39 0544423767 info@micoperi.com www.micoperi.com All details are believed to be correct

More information

AZIMUTH STERN DRIVE 35/105 TERMINAL SUPPORT/ESCORT TUG

AZIMUTH STERN DRIVE 35/105 TERMINAL SUPPORT/ESCORT TUG AZIMUTH STERN DRIVE 35/105 TERMINAL SUPPORT/ESCORT TUG BRIEF DESCRIPTION This tug is a fully automated stern drive tug designed in response to a worldwide demand for highly efficient class of ship-assist/oil

More information

Accommodation vessel DP Gezina

Accommodation vessel DP Gezina Accommodation vessel DP Gezina PRINCIPAL Year Built: 2007 Major Conversion: 2012-2013 Builder: Remontowa Imo No: 9295103 Call sign: 9HA3317 MMSI: 229 417 000 Class: LR +100A1, +LMC, UMS, DP (AA), SPS,

More information

BOURBON LIBERTY 150 SERIES. Platform Supply vessels. DP2-1,701 t DWT

BOURBON LIBERTY 150 SERIES. Platform Supply vessels. DP2-1,701 t DWT BOURBON LIBERTY SERIES Platform Supply vessels DP -,7 t DWT BOURBON LIBERTY SERIES Class ABSXA, Offshore Support Vessel, Oil Recovery, Vessel Class (OSR- S), E, XAMS, XACCU, XDPS-, Fire-Fighting Vessel

More information

JU Operator And Service Provider For Offshore Works

JU Operator And Service Provider For Offshore Works JU633617 Operator And Service Provider For Offshore Works Key Features One Solution For various offshore work requirements; built with capacity of an accommodation barge, a crane vessel, a crewboat and

More information

ANNEX 32 RESOLUTION MEPC.139(53) Adopted on 22 July 2005

ANNEX 32 RESOLUTION MEPC.139(53) Adopted on 22 July 2005 RESOLUTION MEPC.139(53) Adopted on 22 July 2005 GUIDELINES FOR THE APPLICATION OF THE REVISED MARPOL ANNEX I REQUIREMENTS TO FLOATING PRODUCTION, STORAGE AND OFFLOADING FACILITIES (FPSOs) AND FLOATING

More information

file://c:\documents and Settings\mkallo\Local Settings\Temp\Helcion_Q88.htm

file://c:\documents and Settings\mkallo\Local Settings\Temp\Helcion_Q88.htm Page 1 of 5 INTERTANKO S STANDARD TANKER VOYAGE CHARTERING QUESTIONNAIRE 1988 (Version 2) (Metric system to be applied, HVPQ reference specified where applicable) GENERAL INFORMATION HVPQ Ref Date Updated:

More information

IHC Holland BV IHC WFSV Brief Specifications

IHC Holland BV IHC WFSV Brief Specifications IHC WFSV 18-80 Brief Specifications Contents 1 Vessel Particulars... 4 2 Rules & Regulations... 5 3 Power and propulsion... 6 4 Cranes... 7 5 Life on board... 8 6 Internal workflow... 9 7 Motion Compensated

More information

PACIFIC MARINE SERVICES

PACIFIC MARINE SERVICES Statutory manuals, plans and drawings required on shipboard Date :05-03-2017 No. 007/P.M.S/T.P/17 Technical Publications Page No ( 4 ) Notice to : Ship Owners / Manager / operators / Surveyors Dear Sirs,

More information

FPSOs in the Gulf of Mexico

FPSOs in the Gulf of Mexico FPSOs in the Gulf of Mexico Carlos Mastrangelo Kirk Barwick Lincoln Fernandes Erich Theisinger Petrobras America Inc. FPSO Introduction History Operational experience Summary Phased development concept

More information

M/V OCEAN SUPPLIER. Vestland Marine Sp. z o.o. Chwarznieńska str 87E, Gdynia, PL. ME 303 Anchor Handling Tug Supply Vessel (AHTS), DPS-1

M/V OCEAN SUPPLIER. Vestland Marine Sp. z o.o. Chwarznieńska str 87E, Gdynia, PL. ME 303 Anchor Handling Tug Supply Vessel (AHTS), DPS-1 ME 303 Anchor Handling Tug Supply Vessel (AHTS), DPS-1 Vestland Marine Sp. z o.o. Chwarznieńska str 87E, 81-602 Gdynia, PL Genera Anchor Handling Tug Supply Vessel; DPS-1 GENERAL SHIPS NAME CALL SIGN C6VL3

More information

1/28/2016. Prelude Turret Topsides The Hague, 25-Jan Disclaimer. Prelude Turret Mooring System (TMS)

1/28/2016. Prelude Turret Topsides The Hague, 25-Jan Disclaimer. Prelude Turret Mooring System (TMS) Prelude Turret Topsides The Hague, 25-Jan-2016 Prelude Turret Mooring System (TMS) Philippe LAVAGNA, Development Studies Manager Vincent MAZARGUIL, Prelude TMS EPM SBM Monaco SBM Offshore 2016. All rights

More information

KEY FEATURES. DP-3 250T Offshore Crane 1600m 2 Deck Space Moonpool High sea state capability ARIADNE

KEY FEATURES. DP-3 250T Offshore Crane 1600m 2 Deck Space Moonpool High sea state capability ARIADNE KEY FEATURES DP-3 250T Offshore Crane 1600m 2 Deck Space Moonpool High sea state capability ARIADNE VESSEL SPECIFICATIONS The Ariadne is a DP-3 Construction Support Vessel built for worldwide subsea operations,

More information

AIR LUBRICATION SYSTEM INSTALLATION

AIR LUBRICATION SYSTEM INSTALLATION Guide for Air Lubrication System Installation GUIDE FOR AIR LUBRICATION SYSTEM INSTALLATION OCTOBER 2018 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2018

More information

BOURBON LIBERTY 300 SERIES. Anchor Handling Tug Supply Vessel. DP2-85 t Bollard Pull

BOURBON LIBERTY 300 SERIES. Anchor Handling Tug Supply Vessel. DP2-85 t Bollard Pull BOURBON LIBERTY 00 SERIES Anchor Handling Tug Supply Vessel DP - 8 t Bollard Pull BOURBON LIBERTY 00 SERIES Class BV XHULLXMACH, Unrestricted Navigation, Tug / Supply Vessel, LHNS, Oil Product, Fi-Fi,

More information

MT HORIZON DIMITRA INTERTANKO'S STANDARD TANKER CHARTERING

MT HORIZON DIMITRA INTERTANKO'S STANDARD TANKER CHARTERING INTERTANKO'S STANDARD TANKER CHARTERING Version 1. VESSEL DESCRIPTION 1.1 Date updated: 1.2 Vessel's name: HORIZON DIMITRA 1.3 IMO number: 9314181 1.4 Vessel's previous name(s) and date(s) of change: Not

More information

T24C1 T24C m 3 Chemical & Product Tanker

T24C1 T24C m 3 Chemical & Product Tanker 20 000 m 3 Chemical & Product Tanker Brief description 20 000 m 3 Chemical & Product Tanker GENERAL The FKAB is a 20 000 m 3, TIER III oil product tanker for chemicals (IMO II and III) and oil products.

More information

Latest Ships built in Japan

Latest Ships built in Japan KOYO DOCKYARD CO., LTD. Latest Ships built in Japan Tanker/Aframax Bulk carrier/capesize EAGLE ATLANTA RAINBOW RIVER TACHIBANA NORD-KRAFT TANKERS / AFRAMAX EAGLE ATLANTA 107,160-dwt Crude Oil Tanker The

More information

GPA 670 PSV Series DP2 Diesel-Electric Platform Support Vessel Exceptional Maneuverability

GPA 670 PSV Series DP2 Diesel-Electric Platform Support Vessel Exceptional Maneuverability DP2 Diesel-Electric Platform Support Vessel Optional Special Products Tanks A Modern Diesel-Electric Platform Support Vessel Equipped with State-of-the-Art Technology. Fuel Savings Greater Cargo Capacity

More information

SEMINOLE DERRICK LAY VESSEL

SEMINOLE DERRICK LAY VESSEL MICOPERI_schede livelli separati:seminole 12-03-2013 19:40 Pagina 1 SEMINOLE DERRICK LAY VESSEL HEAD OFFICE Via Trieste 279 48122 Ravenna IT tel +39 0544422252 fax +39 0544423767 mail@micoperi.com All

More information

Y-fl'. MINISTRY OF TRANSPORT AND COMMUNICATIONS DEPARTMENT OF MARINE ADMINISTRATION

Y-fl'. MINISTRY OF TRANSPORT AND COMMUNICATIONS DEPARTMENT OF MARINE ADMINISTRATION MINISTRY OF TRANSPORT AND COMMUNICATIONS DEPARTMENT OF MARINE ADMINISTRATION No-363/421, Corner of Merchant & Theinbyu Road, Botataung Township, Yangon, Myanmar E-mail : d gdma.mm@ gmail.com; dma.myan@smail.com

More information

Switchgear Services Ltd DESIGN, MANUFACTURE, INSTALLATION AND SERVICE OF QUALITY ELECTRICAL SWITCHGEAR ENGINEERING

Switchgear Services Ltd DESIGN, MANUFACTURE, INSTALLATION AND SERVICE OF QUALITY ELECTRICAL SWITCHGEAR ENGINEERING Switchgear Services Ltd DESIGN, MANUFACTURE, INSTALLATION AND SERVICE OF QUALITY ELECTRICAL SWITCHGEAR ENGINEERING Switchgear House The Courtyard Green Lane Heywood Lancs OL10 2EX England Tel +44 (0)1706

More information

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors

KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors KEEL MARINE LTD Naval Architects, Marine Engineers and Surveyors Ridgeway Office Park, Unit 6 8 Bedford Road, Petersfield, GU32 3QF UNITED KINGDOM 18 m Wind Farm Support Vessel Outline Specification GENERAL

More information

Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Coordinación de Idiomas English VI. Maritime Engineering

Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Coordinación de Idiomas English VI. Maritime Engineering Universidad Nacional Experimental Marítima del Caribe Vicerrectorado Académico Coordinación de Idiomas English VI. Maritime Engineering Marine facilities Unit V. Auxiliary machinery Speaking and writing.

More information

Design: Aker OSCV 06L DSV Built: 2009 IMO No: Call sign: C6XW3 SKANDI ARCTIC DSV

Design: Aker OSCV 06L DSV Built: 2009 IMO No: Call sign: C6XW3 SKANDI ARCTIC DSV Design: Aker OSCV 06L DSV Built: 009 IMO No: 94138 Call sign: C6XW3 SKANDI ARCTIC DSV IMO No 94138 The vessel is designed as a vessel for world wide operations Low resistance hull lines designed for speed

More information

COMPRESSED GAS, EXPANDED OPPORTUNITIES.

COMPRESSED GAS, EXPANDED OPPORTUNITIES. COMPRESSED GAS, EXPANDED OPPORTUNITIES. THE NEW BENEFITS FROM COMPRESSED NATURAL GAS CNG32000 is a ship for the maritime transport of CNG (Compressed Natural Gas), designed by Fincantieri Offshore, which

More information

FPMC P GLORY Ship's address 1.20 Name of the Registered Owner FPMC GLORY MARINE CORP.

FPMC P GLORY Ship's  address 1.20 Name of the Registered Owner FPMC GLORY MARINE CORP. FPMC P GLORY GENERAL INFORMATION 1.3 IMO Number 9448164 1.8 Flag Liberia 1.9 Port of Registry MONROVIA 1.11 Call sign A8RE6 1.12 INMARSAT number 764945730(Bridge) 764945731 (CAPT/Rm) 1.13 Ship's fax number

More information

CLASS 245 LIFTBOAT SEACOR EAGLE SEACOR EAGLE CLASS 245 LIFTBOAT. LEG CAPACITIES ELECTRONIC AIDS & COMMUNICATIONS HULL

CLASS 245 LIFTBOAT SEACOR EAGLE SEACOR EAGLE CLASS 245 LIFTBOAT.  LEG CAPACITIES ELECTRONIC AIDS & COMMUNICATIONS HULL LEG NUMBER OF LEGS 3 LEG LENGTH 245 ft. 74.7 m LEG DIAMETER 72 in 1.8 m LEG WALL 1.5 in 3.8 cm LEG TOWER HEIGHT 20 ft. 6.1 m TRIANGLE 84 P/S x 107 AFT 25.6 m P/S x 32.6 m AFT HULL LENGTH 137.5 ft. 41.9

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE. Level 3 Assessment Chief and Second Engineer <3000kW

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE. Level 3 Assessment Chief and Second Engineer <3000kW Page 1 of 7 Compiled by Chief Examiner Approved by Executive Head: Centre of Seafarers OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE and Second Engineer Page 2 of 7 Content STCW 78 CHIEF AND SECOND ENGINEER

More information

Simple, safe and cylindrical

Simple, safe and cylindrical Simple, safe and cylindrical Designed as an alternative to conventional ship-shaped FPSOs, the Norwegian company Sevan Marine has designed, developed and is now successfully operating completely new floating

More information

M/V Paul Candies PERFORMANCE GENERAL HELIDECK MAIN ENGINES AND PROPULSION MAIN DIMENSIONS TONNAGE CAPABILITIES

M/V Paul Candies PERFORMANCE GENERAL HELIDECK MAIN ENGINES AND PROPULSION MAIN DIMENSIONS TONNAGE CAPABILITIES GENERAL IMO No..9679725 Owner/Manager...Otto Candies, LLC Classification and Flag U.S. Flagged Jones Act Compliant Vessel purpose. IMR Year built...2018 Place built....houma, Louisiana USA Builder... Candies

More information

BUILT: 2009 Dry Dock World Pertama FLAG: Panama CLASS: ABS + A1 + (E) + AMS + ACCU + ICE CO + DP3 + HE LIDECK + ES + FiFi 2

BUILT: 2009 Dry Dock World Pertama FLAG: Panama CLASS: ABS + A1 + (E) + AMS + ACCU + ICE CO + DP3 + HE LIDECK + ES + FiFi 2 GOLIATH The Goliath is one of the largest offshore construction vessels in the world. This multi-functional vessel is equipped with DPIII and a 1600mt crane, primarily for offshore installation. The Goliath

More information

LIST OF MANUALS,PLANS AND DRAWINGS REQUIRED ON BOARD. Class ARS. Leading Partner for New Horizons...

LIST OF MANUALS,PLANS AND DRAWINGS REQUIRED ON BOARD. Class ARS. Leading Partner for New Horizons... LIST OF MANUALS,PLANS AND DRAWINGS REQUIRED ON BOARD Leading Partner for New Horizons... www.classars.com This publication aims to assist ship Owners and Managers on the statutory manual, plans and drawings

More information

T24 T m3 Chemical and Oil Product Tanker

T24 T m3 Chemical and Oil Product Tanker T24 T24 21 500 m3 Chemical and Oil Product Tanker 1 Brief description T24 21 500 m 3 Chemical and Oil Product Tanker GENERAL The FKAB T24-series are 21 000 m 3 tankers for Chemicals (IMO II) and Oil Products,

More information

Designed for customers

Designed for customers Designed for customers operational excellence Bourbon Evolution 800 Multi-Purpose Supply Vessels RELIABLE, EFFICIENT AND INNOVATIVE A series of 10 multipurpose supply vessels focused on providing the highest

More information

Lightship: m 0 m Normal ballast: 21.5 m 0 m At loaded summer deadweight: m 0 m

Lightship: m 0 m Normal ballast: 21.5 m 0 m At loaded summer deadweight: m 0 m INTERTANKO'S STANDARD TANKER CHARTERING QUESTIONNAIRE 88 (Q88) Version 3 1. VESSEL DESCRIPTION 1.1 Date updated: Apr 11, 2013 1.2 Vessel's name: Orasila 1.3 IMO number: 9336725 1.4 Vessel's previous name(s)

More information

Report No.: Name of Ship: Plans referred during Initial Survey:

Report No.: Name of Ship: Plans referred during Initial Survey: Report on the Surveys Concerning International Oil Pollution Prevention Certificate Part 7 Survey of installation for discharges from cargo spaces Initial/ Annual/ Intermediate/ Renewal/ Change of Flag

More information

Formosa Sixteen If the flag has been changed, what was previous flag? Peoples Republic of China INMARSAT number ,

Formosa Sixteen If the flag has been changed, what was previous flag? Peoples Republic of China INMARSAT number , Formosa Sixteen GENERAL INFORMATION 1.3 IMO Number 9344100 1.8 Flag Liberia 1.9 Port of Registry MONROVIA 1.10 If the flag has been changed, what was previous flag? Peoples Republic of China 1.11 Call

More information

A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology.

A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology. A Modern and Versatile Diesel-Electric Anchor Handling Tug Supply Vessel Equipped with State-of-the-Art Technology. Anchor Handling and Towing 30% Greater Cargo Capacity Fuel Savings Exceptional Maneuverability

More information

IACS UR s and Panel Responsible

IACS UR s and Panel Responsible UR Ax (Mooring and Anchoring) A1 Anchoring Equipment A2 Shipboard fittings and supporting hull structures associated with towing and mooring on conventional ships A3 Anchor Windlass Design and Testing

More information

RESOLUTION MEPC.205(62) Adopted on 15 July GUIDELINES AND SPECIFICATIONS FOR ADD-ON EQUIPMENT FOR UPGRADING RESOLUTION

RESOLUTION MEPC.205(62) Adopted on 15 July GUIDELINES AND SPECIFICATIONS FOR ADD-ON EQUIPMENT FOR UPGRADING RESOLUTION MEPC.60(33)-COMPLIANT OIL FILTERING EQUIPMENT MEPC.60(33)-COMPLIANT OIL FILTERING EQUIPMENT MEPC 62/24/Add.1 Annex 24, page 1 ANNEX 24 RESOLUTION MEPC.205(62) 2011 GUIDELINES AND SPECIFICATIONS FOR ADD-ON

More information

CHAPTER II-1 C. Construction subdivision and stability, machinery and electrical installations

CHAPTER II-1 C. Construction subdivision and stability, machinery and electrical installations Only the Danish version is authentic Notice D II-1 C 1 October 2002 Technical regulation on the construction and equipment, etc. of passenger ships on domestic voyages CHAPTER II-1 C Construction subdivision

More information

OML INTERVENTION I. Diesel Electric/ Self-Propelled/ Self-Elevating/ DPS-2 Accommodation/ Maintenance Jack-Up Barge PRINCIPAL PARTICULARS

OML INTERVENTION I. Diesel Electric/ Self-Propelled/ Self-Elevating/ DPS-2 Accommodation/ Maintenance Jack-Up Barge PRINCIPAL PARTICULARS OML INTERVENTION I Diesel Electric/ Self-Propelled/ Self-Elevating/ DPS-2 Accommodation/ Maintenance Jack-Up Barge PRINCIPAL PARTICULARS Year Built 2017 GRT / NRT 8100 / 2430 Hull No DJHC8008 Flag PANAMA

More information

SEA ROYAL. Dimensions Length Overall : 60 m. Registration. Breadth Moulded : 16 m. Depth Moulded : 6 m

SEA ROYAL. Dimensions Length Overall : 60 m. Registration. Breadth Moulded : 16 m. Depth Moulded : 6 m Registration Year built/ Builder : 2009 / Fujian Crown Ocean Shipping Industry Co.Ltd, China Flag : Sierra Leone Dimensions Length Overall : 60 m Breadth Moulded : 16 m Depth Moulded : 6 m Class : RINA,

More information

NORDIC QUEEN. Vessel Specification

NORDIC QUEEN. Vessel Specification NORDIC QUEEN Vessel Specification Length 75.55 m Call Sign: 3EXE8 Breadth 19.20 m IMO: 9444778 Draught 6.50 m Class: Lloyds Register Depth to 1 st Deck 7.60 m 100A1 OSV ECO(TOC) Deck Space 680m 2 @ 10mt/m

More information

Section 03 Marine and Mooring Equipment - Sales Item

Section 03 Marine and Mooring Equipment - Sales Item Section 03 Marine and Mooring Equipment - Sales Item 03030512 SBM Standard Wheel and Rail CALM Buoy. 12.5m Diameter x 4.8m Deep Buoy, complete with 2 x 24 and 1 x 16 Inlet/outlets at 225psi DETAIL AS FOLLOWS:

More information

REGULATION- PM 10: Ships Ballast Water Management

REGULATION- PM 10: Ships Ballast Water Management REGULATION- PM 10: Ships Ballast Water Management 10.1. General Requirements 10.2 Ships Precaution for Loading Ballast 10.3 Ballast Water Management Plan 10.4 Reporting of Ballast water Reporting Form

More information

Fuel Oil Fill, Transfer, and Storage (CG-47): Components

Fuel Oil Fill, Transfer, and Storage (CG-47): Components Fuel Oil Fill, Transfer, and Storage (CG-47): Components Name of Component Function of Component 1 Stop valve, locked shut Isolates the defueling main from the rest of the system 2 Main fill valve Controls

More information

FAR FROM THE COASTS, CLOSE TO THE BEST CHOICE YOU EVER MADE

FAR FROM THE COASTS, CLOSE TO THE BEST CHOICE YOU EVER MADE FAR FROM THE COASTS, CLOSE TO THE BEST CHOICE YOU EVER MADE Absolute expertise, absolute accuracy, absolute reliability. Nothing else. M.E.P. Pellegrini Marine Equipments proposes a complete fshore crane

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N POL 021 MARPOL ANNEX VI REPORTING SYSTEM ESTABLISHED FOR THE PURPOSE OF ENERGY EFFICIENCY AND FUEL CONSUMPTION DATA COLLECTION TO: APPLICABLE

More information

M A R I T I M E E N G I N E E R S P T Y L TD A Member of James Fisher and Sons plc

M A R I T I M E E N G I N E E R S P T Y L TD A Member of James Fisher and Sons plc O C E A N T O W I N G C O N D I T I O N S C H E C K L I S T T U G : T O W : P A R T 1 : T O W E D V E S S E L R E Q U I R E M E N T S DOCUMENTATION REQUIRED (FROM BARGE/TOWED VESSEL OWNERS) Certificate

More information

L/B KAYD CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT OFFICIAL NUMBER CALL SIGN WDC7940

L/B KAYD CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT OFFICIAL NUMBER CALL SIGN WDC7940 L/B KAYD CLASS 245' SELF-ELEVATING VESSEL -- YEAR BUILT - 2005 OFFICIAL NUMBER 1176595 CALL SIGN WDC7940 DIMENSIONS: Length (Overall) Beam (Overall) Beam (Barge Only) Depth (Barge Only) Design Draft 137.5'

More information

Type of vessel: Oil / Chemical Tanker IMO 3

Type of vessel: Oil / Chemical Tanker IMO 3 INTERTANKO'S STANDARD TANKER CHARTERING QUESTIONNAIRE 88 (Q88) Version 3 1. VESSEL DESCRIPTION 1.1 Date updated: 1.2 Vessel's name: HORIZON ATHENA 1.3 IMO number: 9407378 1.4 Vessel's previous name(s)

More information

EXECUTIVE SUMMARY - TUGS ASD TUG 3213 APRIL 2017

EXECUTIVE SUMMARY - TUGS ASD TUG 3213 APRIL 2017 EXECUTIVE SUMMARY - TUGS ASD TUG 3213 APRIL 2017 CHARACTERISTICS Main dimensions: Length over all 32.44 m Breadth over all 13.29 m Depth at side 5.50 m Draught aft 6.30 m Full displacement 950 ton Power

More information

GPA 654 PSV Series D-P2 Diesel Electric Platform Support Vessel Low Emissions Crew Safety

GPA 654 PSV Series D-P2 Diesel Electric Platform Support Vessel Low Emissions Crew Safety A Modern Diesel-Electric Platform Support Vessel Equipped with State-of-the-Art Technology. Fuel Savings 30% Greater Cargo Capacity Reliability in Adverse Weather Conditions Main Systems Redundancy Exceptional

More information

ANNEX 23. RESOLUTION MEPC.187(59) Adopted on 17 July 2009

ANNEX 23. RESOLUTION MEPC.187(59) Adopted on 17 July 2009 RESOLUTION MEPC.187(59) Adopted on 17 July 2009 AMENDMENTS TO THE ANNEX OF THE PROTOCOL OF 1978 RELATING TO THE INTERNATIONAL CONVENTION FOR THE PREVENTION OF POLLUTION FROM SHIPS, 1973 (Amendments to

More information

25.65m Ex-DANISH COASTAL DEFENCE PATROL BOAT SPIRIT OF ROMO

25.65m Ex-DANISH COASTAL DEFENCE PATROL BOAT SPIRIT OF ROMO ! 25.65m Ex-DANISH COASTAL DEFENCE PATROL BOAT SPIRIT OF ROMO Sistership Sales Price: 175000 BUILDER: YEAR: REFIT YEAR: MODEL: FLAG: LYING: LENGTH: BEAM: DRAFT: SPEED RANGE: CREW: CONSTRUCTION Svendborg

More information

Accommodation, Crane Work Barge OCEAN MAINTAINER 1

Accommodation, Crane Work Barge OCEAN MAINTAINER 1 Specification of Accommodation, Crane Work Barge OCEAN MAINTAINER 1 Valentine Maritime (Gulf) LLC Y:\OM1\Specification\OM1 - Specification Rev18.doc Page 1 of 8 Accommodation, Crane Work Barge OCEAN MAINTAINER

More information

RULES FOR CLASSIFICATION Yachts. Part 4 Systems and components Chapter 6 Piping systems. Edition December 2015 DNV GL AS

RULES FOR CLASSIFICATION Yachts. Part 4 Systems and components Chapter 6 Piping systems. Edition December 2015 DNV GL AS RULES FOR CLASSIFICATION Yachts Edition December 2015 Part 4 Systems and components Chapter 6 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL").

More information

Technical Publication. Guidelines for the development of ship's Data Collection Plan (SEEMP Part II) /

Technical Publication. Guidelines for the development of ship's Data Collection Plan (SEEMP Part II) / Technical Publication Guidelines for the development of ship's Data Collection Plan (SEEMP Part II) / March 2018 Technical Publication content / Introduction Amendments to MARPOL Annex VI The timeline

More information

SIEM MARLIN - MT 6017 MK II

SIEM MARLIN - MT 6017 MK II SIEM MARLIN - MT 6017 MK II SIEM - MT 6017 SIEM MARLIN Marlin MT 6017 Mk MK II II General The vessel s main services/duties are: The vessel is a Multi-purpose field and ROV Support Vessel (MRSV) With its

More information

DMS Fortune 57m BHP - Anchor Handling Tug Supply Vessel. Vessel Specifications

DMS Fortune 57m BHP - Anchor Handling Tug Supply Vessel. Vessel Specifications DMS Fortune 57m - 4750 BHP - Anchor Handling Tug Supply Vessel Vessel Specifications Vessel Specifications Registration Year built / builder 2004 / Guangdong Yuexin Ocean Engineering Co. Ltd., China Flag

More information

USER INFORMATION, CURRENT RULE CHAPTERS AND INDEX

USER INFORMATION, CURRENT RULE CHAPTERS AND INDEX RULES FOR CLASSIFICATION OF Ships MAIN CHANGES JANUARY 2013 General A complete list of current rule chapters including revision dates is presented in Pt.0 Ch.1 Sec.2. The listing below contains only chapters

More information

AMENDMENTS TO MARPOL ANNEX I AND CHANGES TO THE OIL RECORD BOOK PARTS I AND II

AMENDMENTS TO MARPOL ANNEX I AND CHANGES TO THE OIL RECORD BOOK PARTS I AND II GUIDANCE NOTE 05/2010 AMENDMENTS TO MARPOL ANNEX I AND CHANGES TO THE OIL RECORD BOOK PARTS I AND II To: OWNERS, MANAGERS AND MASTERS OF CAYMAN ISLANDS SHIPS This Guidance Note was previously issued as

More information

UT 706 FAR SPIRIT. * PSV - Platform Supply Vessel

UT 706 FAR SPIRIT. * PSV - Platform Supply Vessel UT 706 FAR SPIRIT * PSV - Platform Supply Vessel UT 706 FAR SPIRIT IMO No. 8111001 Tank capacities Far Spirit - 08.04 M 3 SG Fuel Oil 0,830 Pot Water 1,000 Drill Water 1,000 Ballast Water 1,025 Liquid

More information

IMO REQUIREMENTS JULY 2018 TO MAY 2021

IMO REQUIREMENTS JULY 2018 TO MAY 2021 TECHNICAL AND REGULATORY NEWS No. 05/2019 Statutory IMO REQUIREMENTS JULY 2018 TO MAY 2021 Relevant for ship owners and managers, design offices, shipyards, suppliers, and flag states. March 2019 This

More information

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional vessels ships

Shipboard fittings and supporting hull structures associated with towing and mooring on conventional vessels ships (Jan 2004) (Corr.1 Feb 2004) Rev.1 July 2004) (Rev.2 Sept 2006) (Rev.3 July 2007) (Corr.1 Sept 2014) (Rev.4 Oct 2016) Shipboard fittings and supporting hull structures associated with towing and mooring

More information

THE SOCIALIST REPUBLIC OF VIETNAM QCVN 26: 2018/BGTVT NATIONAL TECHNICAL REGULATION ON MARINE POLLUTION PREVENTION SYSTEMS OF SHIPS

THE SOCIALIST REPUBLIC OF VIETNAM QCVN 26: 2018/BGTVT NATIONAL TECHNICAL REGULATION ON MARINE POLLUTION PREVENTION SYSTEMS OF SHIPS THE SOCIALIST REPUBLIC OF VIETNAM QCVN 26: 2018/BGTVT NATIONAL TECHNICAL REGULATION ON MARINE POLLUTION PREVENTION SYSTEMS OF SHIPS HANOI - 2018 NATIONAL TECHNICAL REGULATION Qcvn 26: 2018/BGTVT NATIONAL

More information

August Equipment A HEEREMA COMPANY

August Equipment A HEEREMA COMPANY August 2017 Equipment A HEEREMA COMPANY heerema marine contractors Heerema Marine Contractors (HMC) is proud to introduce her new semi-submersible crane vessel: Sleipnir. The vessel will be equipped with

More information

LIQUID MEASUREMENT STATION DESIGN Class No

LIQUID MEASUREMENT STATION DESIGN Class No LIQUID MEASUREMENT STATION DESIGN Class No. 2230.1 Michael Frey Systems Sales Manager Daniel Measurement & Control, Inc. 5650 Brittmoore Rd. Houston, Texas 77041 INTRODUCTION The industry continues to

More information

Seahorse Shuttling and Technology

Seahorse Shuttling and Technology Seahorse Shuttling and Technology Seahorse GoMAX 550 A New Venture in the U.S. Market Authors: Chuck Steube and Matthew Pritchard SPE Global FPSO Workshop 24 th & 25 th September, 2002 What s Important?

More information

ALTERNATE COMPLIANCE PROGRAM

ALTERNATE COMPLIANCE PROGRAM ALTERNATE COMPLIANCE PROGRAM Addendum to US Supplement Rev. 1.0, approved November 21 st 2003 For Passenger Catamaran Vessels certificated or to be certificated under 46 CFR Subchapter H Lloyd s Register

More information

BOĞAÇAY RAmparts 2400 SX 60/70/75 BUILDING FOR THE FUTURE

BOĞAÇAY RAmparts 2400 SX 60/70/75 BUILDING FOR THE FUTURE BUILDING FOR THE FUTURE The RAmparts 2400 SX tug is twin Z-drive, diesel powered tug designed for maximum efficiency in the performance of ship-handling duties for sea going ships. The hull form and layout

More information

YN TSHD MAIN FUNCTIONS

YN TSHD MAIN FUNCTIONS 000 - MAIN FUNCTIONS Loading hopper with SB trailing suction pipe Emptying hopper through bottom doors Emptying the hopper through shore discharge connection on the bow Emptying hopper through a rainbow

More information

Bunker Fuel Quality: 2020 Outlook North of England P&I Athens, November

Bunker Fuel Quality: 2020 Outlook North of England P&I Athens, November Bunker Fuel Quality: 2020 Outlook North of England P&I Athens, November 2018 24 Options for 2020 Compliance After 1 st of January 2020, a fuel with Sulphur content in excess of 0.50% will be regarded as

More information

Efficient and flexible solution

Efficient and flexible solution Efficient and flexible solution for the most demanding clients Bourbon PX 105 MACS Series of Large Platform Supply Vessels Bourbon Front - Bourbon Clear - Bourbon Calm - Bourbon Rainbow Bourbon PX 105

More information

INTERTANKO S STANDARD TANKER CHARTERING QUESTIONNAIRE 88 (Q88) Version

INTERTANKO S STANDARD TANKER CHARTERING QUESTIONNAIRE 88 (Q88) Version INTERTANKO S STANDARD TANKER CHARTERING QUESTIONIRE 88 (Q88) Version 3 1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 VESSEL DESCRIPTION Date updated: Vessel s name: IMO number: Vessel s previous name(s) and

More information

THE OFFSHORE Drilling Solution

THE OFFSHORE Drilling Solution THE OFFSHORE Drilling Solution ATLANTIC 7 RIG brings energy to the world as a global provider of offshore drilling services to the petroleum industry. www.rigatlantic7.com Technical Information General

More information

MULTI-PURPOSE FLOATING PLATFORMS

MULTI-PURPOSE FLOATING PLATFORMS MULTI-PURPOSE FLOATING PLATFORMS INDUSTRIAL APPLICATIONS Port Construction Port Expansion Offshore Storage Offshore Drilling Support Marine Offloading Facilities Breakwaters www.truenorthservicesllc.com

More information

QUESTIONNAIRE 88 (Version 2)

QUESTIONNAIRE 88 (Version 2) QUESTIONNAIRE 88 (Version 2) INTERTANKO S STANDARD TANKER VOYAGE CHARTERING QUESTIONNAIRE 1988 (Version 2) ( system to be applied, HVPQ reference specified where applicable) GENERAL INFORMATION HVPQ Ref

More information

BPQ5 USA Offshore Tug Date updated date 2 Tug Name text 3 Identification. 5 Build 1 Date delivered (built) 2 Builder (where rebuilt)

BPQ5 USA Offshore Tug Date updated date 2 Tug Name text 3 Identification. 5 Build 1 Date delivered (built) 2 Builder (where rebuilt) Chapter General Information Section General Information Date upd Tug Name 3 Identification IMO VIN 4 Vessel's previous name(s) Grid column Grid column Grid row Grid row Grid row 3 Grid row 4 5 Build Name

More information

Super Watt Wave Catcher Barge

Super Watt Wave Catcher Barge Super Watt Wave Catcher Barge Powers At Least Four Direct Drive Wind Turbine Type Generators Dry Enclosure Horizontal Mooring Legs Upper Section - Spiral Strand Wire Rope and Seabed Section Chain Vertical

More information

IMO. Submitted by the International Association of Drilling Contractors (IADC)

IMO. Submitted by the International Association of Drilling Contractors (IADC) INTERNATIONAL MARITIME ORGANIZATION E IMO INTERSESSIONAL MEETING OF THE GREENHOUSE GAS WORKING GROUP 1st session Agenda item 2 GHG-WG 1/2 23 May 2008 ENGLISH ONLY DEVELOPMENT OF A DESIGN INDEX FOR NEW

More information

Latest Ships built in Japan

Latest Ships built in Japan SUMITOMO HEAVY INDUSTRIES, LTD. Latest Ships built in Japan Ferry Tanker/Aframax Product carrier Bulk carrier/panamax PCC/PCTC Work vessel FERRY TOSHIMA BERGITTA MORNING EXPRESS WORLD RULE SIRIUS LEADER

More information

FOR GENERAL INFORMATION ONLY, PLEASE REFER TO MALAYSIA MARINE DEPARTMENT FOR FULL INFORMATION AND LATEST UPDATES.

FOR GENERAL INFORMATION ONLY, PLEASE REFER TO MALAYSIA MARINE DEPARTMENT FOR FULL INFORMATION AND LATEST UPDATES. FOR GENERAL INFORMATION ONLY, PLEASE REFER TO MALAYSIA MARINE DEPARTMENT FOR FULL INFORMATION AND LATEST UPDATES. EXTRACTS FROM MALAYSIA MARINE DEPARTMENT TERMS & CONDITIONS FOR STS OPERATIONS CONDITIONS

More information

EXECUTIVE SUMMARY - TUGS ASD TUG 2810 DECEMBER 2015

EXECUTIVE SUMMARY - TUGS ASD TUG 2810 DECEMBER 2015 EXECUTIVE SUMMARY - TUGS ASD TUG 2810 DECEMBER 2015 TUGS ASD TUG 2810 CHARACTERISTICS Main dimensions: Length over all 28.67 m Breadth over all 10.43 m Depth at side 4.60 m Draught aft 4.90 m Full displacement

More information