PERMIT APPLICATION REVIEW SUMMARY

Size: px
Start display at page:

Download "PERMIT APPLICATION REVIEW SUMMARY"

Transcription

1 PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH Phone: Fax: AFS #: Application #: Date: 10/02/09 Page 1 of 6 PROJECT DESCRIPTION Velcro USA Inc. (Velcro) has filed a minor permit amendment request on April 9, 2009, for its State Permit to Operate FP- S-0252, issued on October 14, 2004 (amended June 20, 2005, April 26, 2006, and April 11, 2008). This permit expires on October 31, Velcro would like to make changes to its monitoring and recordkeeping requirements for the two selective catalytic reduction (SCR) systems it operates on Engines #1 and #2 to accommodate changes in catalyst system design. Specifically, Velcro wants to change one monitoring requirement and add one additional recordkeeping requirement: Existing Condition IX. Air Pollution Control Equipment, Item E., page 9 The flue gas pressure drop across the SCR catalyst bed, as continuously measured by the differential pressure gauge installed on the SCR system, shall not exceed 5.0 inches of water. Proposed Condition IX. Air Pollution Control Equipment, Item E., page 9 The flue gas pressure drop across the SCR catalyst bed, as continuously measured by the differential pressure transmitter installed on the SCR system, shall be recorded once an hour while Engines #1 or #2 are in operation. This conflicts with the recordkeeping requirement in Condition XII. Recordkeeping Requirements, Item H.(2) which states: The owner or operator shall record the differential pressure once per day for each SCR system. Therefore, as a remedy for these conflicting requirements, DES is changing Condition IX., Item E. to read as follows: The flue gas pressure drop across the SCR catalyst bed shall be continuously monitored by a differential pressure transmitter installed on each SCR system while Engines #1 or #2 are in operation. The reason for changing this permit condition and removing the maximum differential pressure of 5.0 inches of water is because Velcro wants the flexibility in choosing catalyst bed materials, which may have different maximum differential pressure values for optimum operation and NOx removal efficiencies. Existing Condition XII. Recordkeeping Requirements, Item H.2., page 15 The owner or operator shall record the differential pressure once per day for each SCR system. On September 2, 2009, Velcro called and asked that permit condition H.2. remain the way it is, as they were afraid of a permit violation if the Energy Management System was down and failed to record data once an hour as it is currently set up to operate. Velcro asked for the addition of one more recordkeeping requirement for the SCR systems, Item H.4., page 15 The owner or operator shall follow manufacturer recommendations for operation and maintenance of SCR catalyst components. Scheduled and corrective maintenance activities for these components shall be recorded using the owner owned maintenance management system. DES has added this permit condition to the permit. CHANGES FROM PREVIOUS PERMIT Please read the project description section above for changes from the previous permit. By making these proposed changes to the operating permit, it gives Velcro flexibility in changing its SCR system design, including using different types of catalyst materials, while still requiring the same NOx reduction of 80% or more of the inlet NOx to the SCR system, requiring the weekly NOx analysis by the hand-held portable NOx analyzer on any of the Engines or Combustion Turbine operated greater than 10 hours in a week, and keeping the same ammonia slip stream emissions limit of 20 ppmvd at 15% oxygen from each SCR system/engine exhaust. DES asked Velcro for a copy of the SCR catalyst management plan and got a copy of it via on September 2, 2009.

2 AFS #: Application #: Date: 10/02/09 Page 2 of 6 FACILITY DESCRIPTION The VELCRO USA Inc. (Velcro) facility is principally engaged in production of a unique fastener system used in a variety of applications. In support of operations at the facility, Velcro owns and operates a steam and electrical generation plant. The steam and electrical generation plant includes four internal combustion engines, each rated at 11.5 MMBtu/hr, firing No. 2 fuel oil or diesel fuel, with various dates of installation from 1990 to Co-Gen Unit No. 2 had an SCR installed in Co- Gen Unit No. 1 had an SCR installed in 2002 as part of a consent decree dated July 11, Also, there are two Boilers rated at 14.7 MMBtu/hr, installed in 1967, which can burn natural gas or No. 2 fuel oil. The facility installed a Combustion Turbine rated at MMBtu/hr which burns natural gas, with a heat recovery steam generator (no auxiliary fuel firing) in late In addition, Velcro has an Emergency Lighting Generator, a 55 kw propane-fired engine generator which provides power to emergency lighting during power outages. Velcro has replaced this Emergency Lighting Generator with a new Emergency Generator in the summer of 2004, which is a Model 3456 DITA, rated at 4.0 MMBtu/hr, fired with low sulfur diesel fuel with a sulfur content less than 0.05% sulfur, by weight. At the Velcro Electrical and Steam Generation Plant, steam is generated to supply process and space heating needs by extracting heat from the combustion turbine exhaust gas in a heat recovery boiler. There is no supplementary firing in the duct leading to the heat recovery steam generator (boiler) from the combustion turbine. All steam and electricity generated by the combustion turbine is used on site. Exhaust gas is vented to the atmosphere from the heat recovery steam generator via a new, dedicated stack. In the event that steam requirements are low or if there is a boiler malfunction, the combustion turbine exhaust gas may be directed to a by-pass duct connected to the same stack. It should be noted that Engine Generator Units #1 through 4 and Boilers #1 and 2 shall remain as a collective redundant system for periods when the combustion turbine/heat recovery boiler/electrical generator system is down, and for periods when facility electrical load exceeds the available capacity of the gas turbine. (Ambient conditions in summer reduce the turbine s capacity and Velcro s peak loads are in the summer.) Velcro operates the following devices or process units that are primarily sources of VOC emissions, with some RTAPs or HAPs: Coating Lines 1 & 2 Pressure sensitive adhesive coatings applied to webs of hook & loop fastener material and cured in steam and infrared heated ovens. Coating Lines 7 & 8 Water-based binder coatings applied to webs of hook & loop fastener material and cured in steam and infrared heated ovens. Wet Slasher Nylon or polyester yarn is roll-coated with a water-based starch product (sizing) then cured in an electric oven. As a final step, the yarn is roll-coated with a yarn lubricant. Hot Melt Coating Lines 5, 6, & 14 Applications of hot melt adhesives to PET release liner and roll-laminated to the back of hook & loop materials. (Adding Line 14 in April 2004, which is being relocated from another Velcro facility.) Dye House Operations Dyeing of various woven or knit fabrics in closed pressurized vessels. Procedyne A small electrically heated fluidized bed to burn off plastic residue from various tooling and dies. Wide Hot Melt Applications of hot melt adhesives to PET release liner and roll-laminated to the back of the hook & loop materials. High Tech Hook (HTH) Lines 1 through 14 Plastic resins (beads/pellets) heated to melt temperatures and extruded through dies. (Adding a new HTH Line #14 in April There is no HTH Line 2, hence there are a total of 13 HTH Lines.) Pelletizer Reprocessing of plastic resins into pellets by heating, extruding, cooling, and cutting. PEEK Process Proposed. Woven fiberglass hook & loop product passes through an oven at high temperatures for a short duration to burn off yarn coatings and to heat-set the product. Two Maintenance Spray Booths Various canned spray paints applied as needed to maintain facility equipment. Paint usage is for facility maintenance purposes only, no process use.

3 AFS #: Application #: Date: 10/02/09 Page 3 of 6 PERMIT HISTORY Application Permit Permit Permit Status # Number Issued Expires Facility Wide FP-S-0252 TBD TBD Renewal application for State Permit to Operate FP-S-0252, received 07/28/ SCR on Engine #1 & SCR on Engine FP-S-0252 TBD 10/31/09 Changes to SCR monitoring and recordkeeping requirements # Facility Wide FP-S /11/08 10/31/09 Admin. Amend. to correct typo in Condition VIII.B.1. (Process changes) Change from The process change does result in an exceedance to The process change does not result in an FY & FY exceedance Facility Wide FP-S /26/06 10/31/09 Minor Amendments Use of the new Testo 350 M/XL hand-held analyzer in place of the Land hand-held analyzer for NOx analyses of Engines and CT; and change from 3 60 minute test runs at 100% load to 3 30 minute test runs at 100% load for NOx testing in Condition XI.E.1. FY Facility Wide FP-S /20/05 10/31/09 Like-kind replacement of CT, removal of Velstick and Profile Process Lines and removal of Hot Melt Line 13 in Feb FY Facility Wide FP-S /14/04 10/31/09 Renewal of State Permit to Operate PROCESS/DEVICE DESCRIPTION Combustion Turbine Engine #1 Engine #2 Manufacturer, Model No., Serial No. Solar Centaur 50-T5900S CG99N B 8RM B 8RM00110 Fuel Burning s Install Date Nameplate Rating in MMBtu/hr and Permitted Fuel Type MMBtu/hr Natural gas - equivalent to 55,380 scf/hr (SCR installed in 2002) 1995 (SCR installed in 1998) MMBtu/hr Diesel fuel or No. 2 fuel oil equivalent to 84.0 gal/hr MMBtu/hr Diesel fuel or No. 2 fuel oil equivalent to 84.0 gal/hr 1 The hourly fuel rates presented in are set assuming a heating value of 1,025 Btu/scf for natural gas. 2 The hourly fuel rates for Engines #1 through #4 are set assuming a heating value of 137,000 Btu/gal for No. 2 fuel oil or diesel fuel.

4 AFS #: Application #: Date: 10/02/09 Page 4 of 6 Engine #3 Engine #4 Boiler #1 Boiler #2 Emergency Generator Manufacturer, Model No., Serial No. 3512A 24Z A 24Z03024 Cleaver Brooks CB Cleaver Brooks CB DITA TBD Fuel Burning s Install Date Nameplate Rating in MMBtu/hr and Permitted Fuel Type MMBtu/hr Diesel fuel or No. 2 fuel oil equivalent to 84.0 gal/hr MMBtu/hr Diesel fuel or No. 2 fuel oil equivalent to 84.0 gal/hr MMBtu/hr Natural gas equivalent to 14, 290 scf/hr or No. 2 fuel oil as alternate fuel equivalent to gal/hr MMBtu/hr Natural gas equivalent to 14, 290 scf/hr or No. 2 fuel oil as alternate fuel equivalent to gal/hr MMBtu/hr Low Sulfur Diesel Fuel equivalent to 29.2 gal/hr 3 Coating Lines 1 & 2 Coating Lines 7 & 8 Wet Slasher Hot Melt Coating Lines 5, 6, & 14 Dyehouse Operations Procedyne Wide Hot Melt High Tech Hook (HTH) Lines 1 through 14 (There is no HTH Line 2, hence a total of 13 HTH lines.) Pelletizer Hook/Loop Fastener System Production Equipment (Sources of VOCs) Description Pressure sensitive adhesive coatings applied to webs of hook & loop fastener material and cured in steam and infrared heated ovens. Binder coatings applied to webs of hook & loop fastener material and cured in steam and infrared heated ovens. Nylon or polyester yarn is roll-coated with a water-based starch product (sizing) then cured in an electric oven. Final step, the yarn is roll-coated with a yarn lubricant. Applications of hot melt adhesives to PET release liner and roll-laminated to the back of hook & loop materials. Dyeing of various woven or knit fabrics in closed pressurized vessels. A small electrically heated fluidized bed to burn off plastic residue from various tooling and dies. Applications of hot melt adhesives to PET release liner and roll-laminated to the back of the hook & loop materials. Plastic resins (beads/pellets) heated to melt temperatures and extruded through dies. Reprocessing of plastic resins into pellets by heating, extruding, cooling, and cutting. 3 The hourly fuel rate for the Emergency Generator is set assuming a heating value of 137,000 Btu/gal for low sulfur diesel oil.

5 AFS #: Application #: Date: 10/02/09 Page 5 of 6 PEEK Process Maintenance Spray Booths (Two) LIST OF INSIGNIFICANT ACTIVITIES Not applicable POLLUTION CONTROL EQUIPMENT Hook/Loop Fastener System Production Equipment (Sources of VOCs) Description Woven fiberglass hook & loop product passes through an oven at high temperatures for a short duration to burn off yarn coatings and to heat-set the product. Various canned spray paints applied as needed to maintain facility equipment. Paint usage is for facility maintenance purposes only, no process use. Selective Catalytic Reduction (SCR) System on Engine #1 and SCR System on Engine #2 are used for control of nitrogen oxide (NOx) emissions. Engines 1 & 2 are required to be operated at all times in conjunction with their corresponding SCR system, with the exception of the initial startup of the engine. Upon startup, the SCR system catalyst temperature needs to reach 550 degrees F (the minimum operating temperature required for efficient operation of the SCR system) before ammonia can be injected and then engine exhaust gases can be brought into the SCR for NOx removal. Velcro is required to monitor the combustion air temperature entering the intake air manifold and is required to keep it below 200 degrees F, to help prevent NOx formation/generation. Each engine has cooling water flow monitored and automatically controlled to keep the combustion air temperature entering the intake air manifold below 200 degrees F. In addition, Engines 1 & 2 have electronic ignition timing that automatically adjusts the ignition timing of each Engine to the most optimum degree of ignition retard for the minimization of NOx emissions without exceeding permitted opacity limits. Velcro is required to operate and maintain the SCR systems so as to maintain a minimum 80% removal efficiency of NOx emissions from Engines 1 & 2. The SCR catalyst ammonia (27.9% by weight, ammonia in aqueous solution) consumption rate shall not exceed 4.0 gal/hr, as continuously measured by the ammonia flow meter installed on the SCR system. Velcro is required to record ammonia flow electronically by the Energy Management System at least once an hour and when the value is outside of the normal indicator range. Maximum ammonia slip emissions from the SCR systems shall not exceed 20 ppmvd, corrected to 15% oxygen, dry basis. Velcro is required to perform ammonia slip testing once every three years with its required NOx RACT testing of the Engines. The SCR catalyst temperature operating range shall be limited to a minimum of 550 degrees F, as continuously measured by the thermocouple installed in the catalyst bed area of the SCR systems. NOx removal efficiency is reduced at temperatures below 550 degrees F. The flue gas pressure drop across the SCR catalyst bed shall be continuously monitored by a differential pressure transmitter installed on each SCR system while Engines #1 or #2 are in operation. The SCR ammonia to fuel ratio, as measured by both the ammonia flow meter and the fuel flow metering devices on Engines 1 and 2 shall be maintained such that a NOx reduction of 80% is achieved while minimizing ammonia slip emissions. When Engines 1 and 2 are in operation, Velcro shall use a hand-held analyzer approved by DES to check NOx emissions and make appropriate adjustments to the ammonia to fuel ratio to achieve the 80% NOx reduction requirement. The Energy Management System shall record the SCR catalyst bed temperature at least once per hour and when the value is outside of the normal indicator range (less than 550 degrees F).

6 AFS #: Application #: Date: 10/02/09 Page 6 of 6 The owner or operator shall record the differential pressure once per day for each SCR system. The ammonia to fuel ratio for each SCR system shall be recorded once per 8 hour period, electronically by the Energy Management System. The owner or operator shall follow manufacturer recommendations for operation and maintenance of SCR catalyst components. Scheduled and corrective maintenance activities for these components shall be recorded using owner owned maintenance management system. EMISSION CALCULATIONS Please refer to permit application FY for detailed emissions calculations information. This permit application was the basis for this current State Permit to Operate. There are no changes in emissions. MODELING No modeling is required for a minor permit amendment, in that there is no change in emissions. EMISSION TESTING NOx RACT testing is required once every three years for the Combustion Turbine and each of the four engines. COMPLIANCE STATUS Emission Testing Engines 1 and 2 were last tested on August 3, 2006 for NOx, CO, and ammonia. Test results were within all permit limits. This was a retest of Engine 2, due to catalyst problems that caused an exceedance of the ammonia slip limit when the first round of testing of Engine 2 was completed on April 13, The Combustion Turbine was tested on April 11, 2006 and found to meet all permit limits. Engine 1 was tested on April 12, 2006 and was in compliance with all permit conditions. Engine 3 was tested on April 14, 2006 and found to be in compliance with all permit conditions. Inspections The facility was last inspected on-site on March 20, No deficiencies were found as a result of the inspection. In the closing meeting the inspector informed the facility that it should document the periodic review of its air toxics compliance determination. During the inspection, the inspector did see some evidence of work in progress with respect to this issue. Reports On April 14, 2009 DES received the annual emissions report, NOx Emissions Statement, and VOC Emissions Statement. Fees The annual emission-based fees for calendar year 2008 were received by DES on April 14, REVIEW OF REGULATIONS State Regulations Env-A 600 Permitting Applicable Minor Permit Amendments: Temporary Permits and State Permits to Operate - The facility filed a minor permit amendment request for a proposed change to an existing permit condition which will not result in an increase in the amount of a specific air pollutant currently emitted by the source or device and will not result in the emission of any regulated air pollutant or regulated toxic air pollutant currently not emitted by the source or device and submitted the required information in Env-A (b). Federal Regulations No changes.

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

FINAL PERMIT APPLICATION REVIEW SUMMARY

FINAL PERMIT APPLICATION REVIEW SUMMARY FINAL PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION SIC Code: 4911 (Energy Production) DATE: 06/17/2005 Page 1 of 6 DATE APPLICATION RECEIVED: March 31, 2004 (Application # FY04-0427) FACILITY DESCRIPTION Pinetree-Bethlehem (the Permittee) operates a 17.1

More information

Engineering Analysis

Engineering Analysis Wentworth-Douglass Hospital 789 Central Avenue Facility ID No. 3301700037 Mark Acerra 603-740-2471 Richard Bowen (Denise Daigle) Dover, NH 03820 FY03-0098 Rec. 10/23/02 Revised 4/16/03 Introduction: Engineering

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION Page 1 of 6 DATE APPLICATION RECEIVED July 01, 1996; Application # FY96-TV045 FACILITY DESCRIPTION Venture-Seabrook ( Venture ), located at 700 Lafayette Road in Seabrook, New Hampshire, manufactures painted

More information

Full Compliance Evaluation Report Off-Site Report

Full Compliance Evaluation Report Off-Site Report STATE OF NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES AIR RESOURCES DIVISION Full Compliance Evaluation Report Off-Site Report CONCORD STEAM CORPORATION 105 ½ PLEASANT STREET CONCORD, NH 03302-1377

More information

Engineering Summary New NGC, Inc.

Engineering Summary New NGC, Inc. 1 Engineering Summary New NGC, Inc. Application #: FY04-0335 AFS #: 3301500045 County: Rockingham Engineer: Laughton Date: March 2004 Permitting Background/History New NGC, Inc. (NGC), formerly known as

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

PERMIT APPLICATION REVIEW SUMMARY FOR FLARE NOS. 1, 5 & 6

PERMIT APPLICATION REVIEW SUMMARY FOR FLARE NOS. 1, 5 & 6 AFS #: 3301700003 Application #: FY05-0210 Date: 7-17-06 Page 1 of 5 APPLICATION & OTHER COMMUNICATION Date Brief Description November 23, 2005 Permit Application for Flares 5 and 6 December 2, 2005 E-mail

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year. 1 of 11 8/21/2012 10:19 AM SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1146 - EMISSIONS OF OXIDES OF NITROGEN FROM INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

RICE NESHAP Frequently Asked Questions (FAQ)

RICE NESHAP Frequently Asked Questions (FAQ) RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants.

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

Prepared for: BP-Husky Refining LLC 4001 Cedar Point Road Oregon, Ohio Prepared by:

Prepared for: BP-Husky Refining LLC 4001 Cedar Point Road Oregon, Ohio Prepared by: BP-HUSKY REFINING LLC REVISION TO FCCU WET GAS COMPRESSOR RECONSTRUCTION PERMIT TO INSTALL (04-01482) TO INCORPORATE FINAL FCCU NO X EMISSIONS LIMITS Prepared for: BP-Husky Refining LLC 4001 Cedar Point

More information

State of the Art (SOTA) Manual for Internal Combustion Engines

State of the Art (SOTA) Manual for Internal Combustion Engines State of the Art (SOTA) Manual for Internal Combustion Engines July 1997 State of New Jersey Department of Environmental Protection Air Quality Permitting Program State of the Art (SOTA) Manual for Internal

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.34 NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) A. Purpose and Applicability The purpose of this rule is to reduce emissions of oxides

More information

State of New Jersey. Department of Environmental Protection Division of Air Quality

State of New Jersey. Department of Environmental Protection Division of Air Quality GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 Facility:

More information

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines NSPS Subpart JJJJ New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines 60.4230 NSPS is a federal rule Applies to all states Is NOT regional State rules cannot be less

More information

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 RULE 425.2 Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 I. Purpose The purpose of this Rule is to limit oxides of nitrogen (NOx) emissions

More information

(Adopted December 5, 2008)(Amended September 9, 2011)(Amended July 7, 2017) NOx REDUCTIONS FROM MISCELLANEOUS SOURCES

(Adopted December 5, 2008)(Amended September 9, 2011)(Amended July 7, 2017) NOx REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted December 5, 2008)(Amended September 9, 2011)(Amended July 7, 2017) RULE 1147 NOx REDUCTIONS FROM MISCELLANEOUS SOURCES (a) (b) Purpose and Applicability The purpose of this rule is to reduce nitrogen

More information

~ SWCAA. ~awfxm~ Paul T. Mairose Chief Engineer

~ SWCAA. ~awfxm~ Paul T. Mairose Chief Engineer ~ SWCAA Southwest Clean Air Agency 11815 NE 99th Street, Suite 1294 Vancouver, WA 98682 (360) 574-3058 www.swcleanair.org December 22, 2017 AJ Panter Vancouver School District No. 37 6014 NW Fruit Valley

More information

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS RULE 1146.1. EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (a) Definitions 1. ANNUAL HEAT INPUT means the actual amount

More information

Regulatory Impacts of Biogas-fired Internal Combustion Engines

Regulatory Impacts of Biogas-fired Internal Combustion Engines Regulatory Impacts of Biogas-fired Internal Combustion Engines Kit Liang, PE, Malcolm Pirnie Air, Water & Energy: Sustainability for Wastewater Treatment Plants California Water Environment Association

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10

More information

DEP7007CC Compliance Certification

DEP7007CC Compliance Certification Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit

More information

Overview of Revisions to the Proposed GP-5A and GP-5 and Emissions Discussion

Overview of Revisions to the Proposed GP-5A and GP-5 and Emissions Discussion Overview of Revisions to the Proposed GP-5A and GP-5 and Emissions Discussion Oil and Gas Technical Advisory Board February 14, 2018 Tom Wolf, Governor Patrick McDonnell, Secretary Background All air pollution

More information

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater 11/21/2016 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-007) Boiler or Heater Greater than or equal to 1 MMBTU/hr and less than 5 MMBTU/hr

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) RULE 69.3 STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) (a) APPLICABILITY This rule shall apply to any stationary

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY AFS #: 3300190214 Application #: FY07-0196 Date: 9/5/2008 Page 1 of 5 APPLICATION & OTHER COMMUNICATION: Date Description 6/11/2007 Compliance Referral by Christie Peshka. 8/6/2007 LOD #07-018 issued to

More information

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,

More information

C C A. Combustion Components Associates, Inc.

C C A. Combustion Components Associates, Inc. C C A Combustion Components Associates, Inc. www.cca-inc.net About CCA CCA is a global provider of combustion control technologies to reduce NOx, particulate matter (PM), unburned carbon and CO emissions

More information

Emission Control Technology for Stationary Diesel Engines

Emission Control Technology for Stationary Diesel Engines Emission Control Technology for Stationary Diesel Engines Rasto Brezny September 13, 2013 Manufacturers of Emission Controls Association www.meca.org www.dieselretrofit.org Outline Compliance Challenges

More information

A&WMA, CA SCAQMD, Diamond Bar, CA. Challenges for Meeting New Lower Air Emissions

A&WMA, CA SCAQMD, Diamond Bar, CA. Challenges for Meeting New Lower Air Emissions A&WMA, CA SCAQMD, Diamond Bar, CA. Challenges for Meeting New Lower Air Emissions September 21, 2017 Wayne Jones, Business Development Manager wsj@topsoe.com AGENDA New Products Dual functions SCR/CO/VOC

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM June 17, 2004 SUBJECT: Review of Application Title V Operating Permit Bellefield Boiler Plant Boundary Street Pittsburgh, PA 15213 RE: Operating Permit

More information

Internal Combustion Engines Air Updates 2010

Internal Combustion Engines Air Updates 2010 Internal Combustion Engines Air Updates 2010 Stationary Source or Non-road Engine? o Regulated stationary source: 1. At point of use for > 12 months or full operating season (3-12 months) Point of use

More information

RULES PUBLICATION NO. 98/P

RULES PUBLICATION NO. 98/P RULES PUBLICATION NO. 98/P GUIDELINES REGARDING THE REQUIREMENTS FOR MARINE DIESEL ENGINES FITTED WITH NO X SELECTIVE CATALYTIC REDUCTION (SCR) SYSTEMS 2018 January Publications P (Additional Rule Requirements)

More information

2017Compliance Table with methods.xlsx

2017Compliance Table with methods.xlsx University of Michigan Renewable Operating Permit Annual Monitoring/Recordkeeping Compliance Table January 1, 2017 through December 31, 2017 Permit Condition Emission Unit: EU-B0260-06 Boiler 6 at Central

More information

Oxidation Technologies for Stationary Rich and Lean Burn Engines

Oxidation Technologies for Stationary Rich and Lean Burn Engines Oxidation Technologies for Stationary Rich and Lean Burn Engines Advances in Emission Control and Monitoring Technology for Industrial Sources Exton, PA July 9-10, 2008 1 Oxidation Catalyst Technology

More information

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business. Major/Area Source Boiler MACT Rule Speaker: Eric Swisher 23rd Virginia Environmental Symposium April 11, 2012 Your environmental compliance is clearly our business. Overview Ground Rules Regulatory Framework

More information

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE? OVERVIEW Compliance Webinar Reciprocating Internal Combustion Engines RICE September 16, 2013 Jesse Zahn, CHMM Jesse.zahn@hrpassociates.com HRP Associates, Inc. Clifton Park, NY 12065 What is RICE Unit

More information

The State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES. Thomas S. Burack, Commissioner. April 10, 2013

The State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES. Thomas S. Burack, Commissioner. April 10, 2013 The State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES Thomas S. Burack, Commissioner April 10, 2013 Russell Dowd Plant Manager Pinetree Power Tamworth, Inc. PO Box 233 West Ossipee, NH 03890

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM August 26, 2014 SUBJECT: Veterans Affairs Medical Center Oakland Facility University Drive C Pittsburgh, PA 15240 Allegheny County Synthetic Minor

More information

COST EFFECTIVENESS EVALUATION. A. Selective Catalytic Reduction System

COST EFFECTIVENESS EVALUATION. A. Selective Catalytic Reduction System was installed with a Selective Catalytic Reduction (SCR) and is able to comply with a NOx emission limit of 9 ppmv when operating with natural gas and 13 ppmv when operating under diesel fuel. In addition,

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This

More information

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68. RULE 69.4. STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted 9/27/94; Rev. Effective11/15/00; Rev. Effective 7/30/03) (a) APPLICABILITY (1) Except

More information

SWCAA. Southwest Clean Air Agency. October 10, Troy Lomax Longview School District h A venue Longview, WA 98632

SWCAA. Southwest Clean Air Agency. October 10, Troy Lomax Longview School District h A venue Longview, WA 98632 A SWCAA Southwest Clean Air Agency 85 NE 99th Street, Suite 294 Vancouver, WA 98682 (360) 5743058 www.swcleanair.org October 0, 208 Troy Lomax Longview School District 2080 3 8 h A venue Longview, WA 98632

More information

August 23,

August 23, RULE 411, NO X FROM BOILERS, PROCESS HEATERS AND STEAM GENERATORS Adopted 02-02-95 (Amended 11/7/96, 01/09/97, 7/22/99, 10/27/05, 8/23/07) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION

More information

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890

Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: Application #: 40890 Facility Name: Georgia-Pacific Consumer Products LP Savannah River Mill City: Rincon County: Effingham AIRS #: 04-13-103-00007 Application #: 40890 Date SIP Application Received: March 7, 2016 Date Title

More information

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788 Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application

More information

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton Graphic Air Compliance Issues and Solutions Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton Agenda Permitting NJDEP - New General Permits for Emergency Generators NJDEP -

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 118-18 Page 1 of 23 PERMIT TO INSTALL Table of Contents COMMON ACRONYMS... 2 POLLUTANT / MEASUREMENT ABBREVIATIONS... 3 GENERAL CONDITIONS... 4 EMISSION UNIT SPECIAL CONDITIONS... 6 EMISSION

More information

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant

Air Quality Permit File SOOP # Lindy Paving, Inc. I Homer City Plant OffiCIAL FILE COPY SOUTHWEST REGIONAL OFFICE MEMO TO FROM THROUGH DATE Air Quality Permit File SOOP # 32-00311 Lindy Paving, Inc. I Homer City Plant Sheila A. Shaffer~ Air Quality Engineering S~ecialist

More information

402 LOSS OF EXEMPTION LOW FUEL USAGE 4032 SOURCE TESTING FREQUENCY 4043 SOURCE TESTING PROTOCOL

402 LOSS OF EXEMPTION LOW FUEL USAGE 4032 SOURCE TESTING FREQUENCY 4043 SOURCE TESTING PROTOCOL Attachment 6: Proposed Rule 419, Underline/Strikeout Version RULE 419 NOx FROM MISCELLANEOUS COMBUSTION UNITS Adopted 07-26-18 (Amended XX-XX-18) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 103 SEVERABILITY

More information

ICI Boiler NOx & SO 2

ICI Boiler NOx & SO 2 ICI Boiler NOx & SO 2 Control Cost Estimates Andrew M. Bodnarik NH Department of Environmental Services OTC Committee Meeting Modeling/Stationary & Area/Mobile Sources Niagara Falls, NY September 3, 2009

More information

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. Thomas S. Burack, Commissioner

DEPARTMENT OF ENVIRONMENTAL SERVICES. Thomas S. Burack, Commissioner '\- NH D ES The State of New Hampshire DEPARTMENT OF ENVIRONMENTAL SERVICES Thomas S. Burack, Commissioner Mr. Douglas W. York Plant Manager DG Whitefield LLC 260 Airport Road Whitefield, NH 03598 July

More information

New Federal Regulations for Internal Combustion Engines. Doug Parce

New Federal Regulations for Internal Combustion Engines. Doug Parce New Federal Regulations for Internal Combustion Engines Doug Parce Pertinent Federal Regulations National Emission Standards for Hazardous Air Pollutants for Stationary Reciprocating Internal Combustion

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

Title V Operating Permit

Title V Operating Permit STATE OF NEW HAMPSHIRE Department of Environmental Services Air Resources Division Permit No: TV-0032 Date Issued: October 23, 2009 This certifies that: Wheelabrator Concord Company, L.P. 11 Whitney Road

More information

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert PA RACT 2 Reasonably Available Control Technology Presented by Suzanne Dibert Affected Facilities Facilities with potential emissions that exceed 100 tons per year (tpy) for NOx (nitrogen oxide) and 50

More information

Monitoring Air Emissions on Ships. Restricted Siemens AG 2014 All rights reserved.

Monitoring Air Emissions on Ships. Restricted Siemens AG 2014 All rights reserved. Monitoring Air Emissions on Ships siemens.com/answers Why emission monitoring in the marine industry? Main drivers: Meeting regulations: NOx and SOx reduction Energy optimization; CO 2 reduction Resolution

More information

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines

A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines A high level overview of the federal NSPS and NESHAP rules as they apply to owner/operators of internal combustion engines Presented by: Brandon Guillory & Andy Goldberg AWMA October 29, 2009 1 New Source

More information

Emergency Generators & Fire Pump

Emergency Generators & Fire Pump Emergency Generators & Fire Pump Facility ID No.: 3301500025 Telephone No.: 773-6881 Table 1 Emission Factors lbs/1000 gallons Fuel/Sulfur Emission Factor Source Size Diesel 0.4% S AP-42, Chaper 3.3-1,

More information

DIVISION OF AIR QUALITY AIR QUALITY, ENERGY, AND SUSTAINABILITY

DIVISION OF AIR QUALITY AIR QUALITY, ENERGY, AND SUSTAINABILITY DIVISION OF AIR QUALITY AIR QUALITY, ENERGY, AND SUSTAINABILITY Air Quality Energy Sustainability Danny Wong, Rules & Policy RULEMAKING Rule Proposed (Publication) Adoption Effective (Publication) Operative

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services

More information

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES MAY 15, 2012 FOR MORE INFORMATION CONTACT NEGIB HARFOUCHE, PH.D. NJDEP DIVISION OF AIR QUALITY (609) 292-2137 nharfouc@dep.state.nj.us

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-017A) For

State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-017A) For State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-017A) For Boiler(s) and/or Heater(s) Each Less Than 5 MMBTU/hr This general permit allows for the construction,

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

Multi-Sector Air Pollutants Regulations (MSAPR) May 2017

Multi-Sector Air Pollutants Regulations (MSAPR) May 2017 Multi-Sector Air Pollutants Regulations (MSAPR) May 2017 Purpose The Multi-Sector Air Pollutants Regulations (MSAPR) came into force on June 17, 2016 This presentation will provide an overview of: MSAPR

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,