State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-017A) For

Size: px
Start display at page:

Download "State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-017A) For"

Transcription

1 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-017A) For Boiler(s) and/or Heater(s) Each Less Than 5 MMBTU/hr This general permit allows for the construction, installation, reconstruction, modification and operation of: A single boiler and/or heater with a maximum rated heat input to the burning chamber of less than 5 million BTU/hr; OR Multiple boilers and/or heaters with a maximum rated heat input to the burning chamber of less than 5 million BTU/hr each. The potential-to-emit (PTE) for the equipment covered under this general permit is established using USEPA AP-42 emission factors based on the maximum rated heat input of each boiler or heater, or the maximum total fuel consumption of all boiler(s) and/or heater(s). Each facility may possess only one GP-017A at any time. If a facility wants to make an option change in their existing general permit or wants to add a new source, replace or make changes to an existing source that s already registered under GP-017A, then, a new general permit registration is required. The new general permit registration will supersede the existing general permit. This general permit is applicable to boiler(s) and/or heater(s) burning the following commercial fuels: natural gas, propane, kerosene, and/or No. 2 fuel oil (Note: No. 2 fuel oil can be a blend of up to 5% by volume biodiesel fuel). Page 1 of 38

2 I. DEFINITIONS The terms used in this general permit shall have the same definitions in N.J.A.C. 7:27 et seq. or as defined below: Area Source of HAPS means any stationary source of hazardous air pollutants that is not a major source as defined in 40 CFR Biodiesel Fuel means a commercial fuel that meets American Society for Testing and Materials (ASTM) 6751 Specification. Boiler means fuel burning equipment used to produce hot water or steam. Commercial Boiler means a boiler used in commercial establishments such as hotels, restaurants, and laundries to provide electricity, steam, and/or hot water. De-Rated Boiler means any physical change or de-rate methods for limiting fuel and/or air flow (including, but not limited to, orifice plate restrictions, control valve limiting mechanisms, and reduction of fan impellers) used to lower the manufacture maximum design heat input rating. Direct-Fired Process Heater" means any process heater in which the combustion gases mix with and exhaust to the atmosphere from the same stack(s), vent(s), etc. with gases originating with the process or material being processed. Fuel Totalizer means a dedicated measuring and/or monitoring device that totalizes, or sums up, the amount of fuel consumed in a time period. Note: Other combustion sources (including insignificant sources) may be included on a fuel totalizer, but will count towards the amount of fuel consumed and/or any fuel limits a facility may have. Gaseous fuel means natural gas and/or propane Gas-fired boiler includes any boiler that burns gaseous fuels not combined with any solid fuels and burns liquid fuel only during periods of gas curtailment, gas supply interruption, startups, or for periodic testing, maintenance, or operator training on liquid fuel. Periodic testing, maintenance, or operator training on liquid fuel shall not exceed a combined total of 48 hours during any calendar year. Hazardous Air Pollutants or HAP means an air contaminant listed in or pursuant to 42 U.S.C. 7412(b). Heater means a space heater and/or indirect fired process heater with a maximum rated heat input to the burning chamber of less than 5 MMBTU/hr. Page 2 of 38

3 ICI means Industrial, Commercial, or Institutional boiler. Indirect-Fired Process Heater" means any process heater in which the combustion gases is not mixed with and exhaust to the atmosphere from the same stack(s), vent(s), etc. with gases originating with the process or material being processed. Industrial Boiler means a boiler used in manufacturing, processing, mining, and refining or any other industry to provide steam, hot water, and/or electricity. Insignificant Source means any equipment or source operation that does not need a permit and certificate under N.J.A.C. 7: Institutional Boiler means a boiler used in institutional establishments such as, but not limited to, medical centers, nursing homes, research centers, institutions of higher education, elementary and secondary schools, libraries, religious establishments, and governmental buildings to provide electricity, steam, and/or hot water. Internal Combustion Engine means either a reciprocating engine or a combustion turbine in which power, produced by heat and/or pressure from combustion is converted to mechanical work. Limited-use Boiler means any boiler that burns any amount of solid or liquid fuels and has a federally enforceable average annual capacity factor of no more than 10 percent. Liquid Fuel Oil means number two fuel oil and/or kerosene. "Major Hazardous Air Pollutant (HAP) Facility" means a major facility, or part thereof, which emits or has the potential to emit: 1. Ten (10) tons or more per year of any HAP; 2. Twenty five (25) tons or more per year of any combination of HAPs; or 3. Such lesser quantity, or different criterion, as the EPA may establish by rule. MMBTU/hr (HHV) means a unit of measure of heat input rate expressed as Millions of British Thermal Units per hour, based on the higher heating value of the fuel. Maximum Rated Heat Input means the maximum design capacity for the amount of fuel a combustion source is able to burn in a given period based on the manufacturer s specifications. This term is expressed in MMBTU/hr, based on the higher heating value of the fuel. National Emission Standards for Hazardous Air Pollutants (also known as Maximum Achievable Control Technology, MACT) Subpart JJJJJJ means the federal National Emission Standards for Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers Area Sources (NESHAP), Subpart JJJJJJ codified at 40 CFR seq. Page 3 of 38

4 Residential boiler means a boiler used to provide heat and/or hot water and/or as part of a residential combined heat and power system. This definition includes boilers located at an institutional facility (e.g., university campus, military base, church grounds) or commercial/industrial facility (e.g., farm) used primarily to provide heat and/or hot water for: (1) A dwelling containing four or fewer families, or (2) A single unit residence dwelling that has since been converted or subdivided into condominiums or apartments. Seasonal boiler means a boiler that undergoes a shutdown for a period of at least 7 consecutive months (or 210 consecutive days) each 12-month period due to seasonal conditions, except for periodic testing. Periodic testing shall not exceed a combined total of 15 days during the 7-month shutdown. This definition only applies to boilers that would otherwise be included in the biomass subcategory or the oil subcategory. Space Heater means a heating appliance used for warming the air of a designated area. USEPA AP-42 Emission Factors means a compilation of air pollutant emissions factors by source category as the primary compilation of EPA s emission factors information. II. AUTHORITY This general permit is issued under the authority of N.J.S.A. 26:2C-9.2. This general permit shall allow for inspections and evaluations to assure conformance with all provisions of N.J.A.C. 7:27 et seq. An opportunity for public comment was provided on July 06, III. APPLICABILITY This general permit allows for the construction, installation, reconstruction, modification and operation of: A single boiler and/or heater with a maximum rated heat input to the burning chamber of less than 5 million BTU/hr; OR Multiple boilers and/or heaters with a maximum rated heat input to the burning chamber of less than 5 million BTU/hr each. Page 4 of 38

5 The potential-to-emit (PTE) for the equipment covered under this general permit is established using USEPA AP-42 emission factors based on the maximum rated heat input of each boiler or heater, or the maximum total fuel consumption of all boiler(s) and/or heater(s). Each facility may possess only one GP-017A at any time. If a facility wants to make an option change in their existing general permit or wants to add a new source, replace or make changes to an existing source that s already registered under GP-017A, then, a new general permit registration is required. The new general permit registration will supersede the existing general permit. This general permit is applicable to boiler(s) and/or heater(s) burning the following commercial fuels: natural gas, propane, kerosene, and/or No. 2 fuel oil (Note: No. 2 fuel oil can be a blend of up to 5% by volume biodiesel fuel). IV. EXCLUSIONS This general permit cannot be used to register the following equipment: 1. Boiler or heater whose maximum rated heat input to the burning chamber is 5 MMBTU/hr or greater; 2. Emergency generators, fire pumps, or any other internal combustion engines; 3. Boiler or heater burning fuel other than natural gas, No. 2 fuel oil, propane and/or kerosene; 4. Direct-fired process heater with the following exception(s): A process heater used to dry or cure coatings in a surface coating operation (such as auto body shops) as long as the quantity of coating material used in any one hour is less than one half gallon of liquid (N.J.A.C.7:27-8.2(c)12); 5. De-rated boiler or heater; 6. Boiler or heater sharing the same emission point(s) and/or control device(s) with other source(s) that are not registered under this general permit; 7. Seasonal and limited-use Boilers. 8. Boilers serving electric generating units V. EQUIPMENT SPECIFICATIONS Each boiler or heater registered under this general permit shall have a design maximum rated heat input of less than 5 MMBTU/hr based on manufacturer s specifications. The Permittee shall retain on site the following records for each boiler: 1. The maximum rated heat input of the boiler and/or heater, in millions of BTU per hour (HHV), per manufacturer s specifications, and 2. Written manufacturer s specifications or written standard operating procedures prepared by the owner or operator. Page 5 of 38

6 VI. POTENTIAL TO - EMIT OPTIONS When registering for this general permit, permittee may select only one of the following PTE Option Numbers. Annual PTE for all permitting options are calculated using USEPA AP-42 Emission Factors. BH17A-1: Boiler(s) and/or heater(s) burning natural gas, propane, No. 2 fuel oil and/or kerosene at 8760 hours per year. o The total combined heat input rate for all boilers and/or heaters shall not exceed 30 MMBTU/hr. o The annual PTE is calculated by specifying the design maximum rated heat input for each boiler or heater registered under this general permit. NOTE: Boiler(s) registered under option BH17A-1, burning No.2 fuel oil as the primary fuel are subject to the federal MACT rule 40 CFR 63 Subpart JJJJJJ. BH17A-2: Boiler(s) and/or heater(s) burning natural gas based on an annual fuel limit (no. 2 fuel oil during natural gas curtailment only). o The total combined maximum natural gas limit for all boilers and/or heaters shall not exceed 250 MMSCF/yr. o The annual PTE is calculated by specifying a maximum annual natural gas limit for all boilers and/or heaters registered under this general permit. BH17A-3: Boiler(s) and/or heater(s) burning propane based on annual propane limit. o The total combined maximum propane limit for all boilers and/or heaters shall not exceed 1.92 MMgal/yr. o The annual PTE is calculated by specifying the maximum propane limit for all boilers and/or heaters registered under this general permit. BH-17A-4: Boiler(s) and/or heater(s) burning No. 2 fuel oil and/or kerosene based on annual fuel limit. o The total combined maximum liquid fuel limit for all boilers and/or heaters shall not exceed 1.25 MMgal/yr. o The annual PTE is calculated by specifying a maximum annual No. 2 fuel oil limit and/or kerosene limit for all boilers and/or heaters registered under this general permit. NOTE: Boiler(s) registered under option BH-17A-4, are subject to the federal MACT rule 40 CFR 63 Subpart JJJJJJ. Page 6 of 38

7 VII. SUBMITTAL / CONTACT INFORMATION: For assistance or contact information please go to one of the following resources: 1. Regional Air Compliance and Enforcement at: 2. Small Business Assistance Program at: 3. Bureau of Air Permits at: 4. USEPA Region 2 Director, Division of Enforcement & Compliance Assistance 290 Broadway New York, New York Link to 40 CFR 63, Subpart JJJJJJ: (Title 40, Protection of Environment; Browse Parts: , Subpart JJJJJJ ) VIII. COMPLIANCE PLAN The equipment covered by this general permit is subject to the applicable requirements listed on the following pages. Page 7 of 38

8 COMPLIANCE PLAN: Boiler(s) and/or Heater(s) less than 5 MMBTU/hr: Option BH17A-1: Boiler(s) and/or heater(s) burning natural gas, propane, No. 2 fuel oil and/or kerosene at 8760 hours per year. Item No Applicable Requirement Monitoring Requirement Record keeping Requirement Submittal/ Action 1. In addition to this Compliance Plan, all conditions contained in the document General Procedures for General Permits posted at the web page address htm, are enforceable. [N.J.A.C. 7: (a)] 2. Each Boiler and/or Heater is subject to Item No. 3 through Item No. 6. [N.J.A.C. 7: (a)] 3. The Permittee shall ensure combustion equipment included in this General Permit is easily identifiable by clear and conspicuous labeling, including manufacturer name, model number, serial number, and maximum gross heat input rate to the burning chamber. [N.J.A.C. 7: (a)] 4. This equipment shall not cause any air contaminant, including an air contaminant detectable by the sense of smell, to be present in the outdoor atmosphere in such quantity and Any operation of the equipment which may cause a release of air contaminants in a quantity or concentration which poses a Page 8 of 38

9 duration which is, or tends to be, injurious to human health or welfare, animal or plant life or property, or would unreasonably interfere with the enjoyment of life or property, except in areas over which the Permittee has exclusive use or occupancy. [N.J.A.C. 7:27-5] potential threat to public health, welfare, or the environment or which might reasonably result in citizen complaints shall be reported by the Permittee as required by the Air Pollution Control Act. The Permittee shall immediately notify the Department of any noncompliance by calling the Environmental Action Hotline at (877) Maximum No. of Billable Compliance Inspections <= 2 inspections. The equipment covered by this permit will be subject to inspection fees for the maximum periodic compliance inspections (as defined in N.J.A.C. 7:27-8.1) over the life of the Certificate, after it receives final approval for a five year duration. The Permittee will be invoiced for a service fee per inspection pursuant to N.J.A.C. 7: after the periodic compliance inspection is conducted. [N.J.S.A. 26:2C-19(e)] [N.J.A.C. 7: (e)] 6. Compliance with the annual emission limit for each air contaminant shall be based on operation of the boiler(s) and/or heater(s) at a maximum of 8760 hours per year for the size(s) registered. [N.J.A.C. 7: (h)] Page 9 of 38

10 7. Each Boiler and/or Heater burning gaseous fuels (natural gas or propane) and no.2 fuel oil as specified below in Item No.9 is subject to Item No. 8 through Item No. 11. [N.J.A.C. 7: (a)] 8. Permittee shall not use the equipment in a manner which will cause visible emissions, exclusive of visible condensed water vapor, except for a period no more than 3 minutes in any consecutive 30-minute period. [N.J.A.C. 7:27-3.2(a) & (c)] If visible emissions are observed, refer to operator manual for corrective action. If corrective action fail to correct visible emissions within 24 hours of observation, the Permittee shall immediately report the incident to the Department by calling the Environmental Action Hotline at (877) [N.J.A.C. 7: (d)] 9. The Permittee is allowed to use No. 2 fuel oil if all the following requirements are met: 1) the Permittee is not practicably able to obtain a sufficient supply of natural gas; 2) the Permittee's inability to obtain natural gas is due to circumstances beyond the control of the Permittee, such as a natural gas The Permittee that is combusting No. 2 fuel oil in place of natural gas shall keep the following records: the date the fuel oil was used; the reason for use (i.e. natural gas curtailment); and Page 10 of 38

11 curtailment; and 3) the Permittee shall stop using fuel oil and resume using natural gas as soon as sufficient supply of natural gas becomes practicably available. [N.J.A.C. 7: (a)] the number of hours such fuel oil has been combusted. All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C. 7: (d) 10. The Permittee may periodically fire no. 2 fuel oil for periodic testing, maintenance, or operator training events if the following requirements are met: Permittee shall not exceed 48 hours per calendar year for periodic testing, maintenance, or operator training per boiler. However, Permitee shall not fire fuel oil for normal testing and maintenance on the days when the Department forecasts air quality anywhere in New Jersey to be unhealthy for sensitive groups, unhealthy, or very unhealthy as shown at the Department s air quality permitting web site at pp/aqforecast For testing and maintenance periods, record the date and number of hours that No. 2 fuel oil has been combusted. All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C7: (d)] None [N.J.A.C.7: (a)] 11. The maximum allowable sulfur content in No. 2 fuel oil shall be <= 15 ppmw (parts per million by Sulfur Content in Fuel: Monitored by review of fuel delivery records per delivery showing fuel sulfur content. Sulfur Content in Fuel: Recordkeeping by invoices / bills of lading / certificate of Page 11 of 38

12 weight) (0.0015%). Each Permittee may use any existing No. 2 fuel oil contained in the fuel oil storage tank until it is depleted as long as the Permittee can document the following: a) At the time of purchase, the fuel s sulfur content was consistent and in compliance with N.J.A.7:27-9; and b) It can be verified by the Department that the existing No. 2 fuel was contained in the fuel oil storage tank before obtaining this GP-017A. [N.J.A.C. 7: (d)] analysis per delivery showing fuel sulfur content. [N.J.A.C.7: (d)3] [N.J.A.C. 7:27-9.2(b)] 12. Each Boiler and/or Heater burning liquid fuels (No.2 fuel oil or Kerosene) is subject to Item No. 13 through Item No. 20. [N.J.A.C. 7: (a)] 13. Permittee shall not use the equipment in a manner which will cause visible emissions, exclusive of visible condensed water vapor, except for a period no more than 3 minutes in any consecutive 30-minute period. [N.J.A.C. 7:27-3.2(a) & (c)] Monitored by visual determination each month during operation, based on an instantaneous determination. The Permittee shall conduct visual opacity inspections during daylight hours (certified opacity reader not necessary). Visual inspections shall consist of a visual survey to identify if the stack has visible emissions other than condensed water vapor. If visible emissions are observed, the Permittee shall: 1. Verify that the equipment and/or control device causing the emission is The Permittee shall maintain each month the following records: (1) Date and time of inspection; (2) Emission point number; (3) Operational status of equipment; (4) Observed results and conclusions; (5) Description of corrective actions taken if necessary; (6) Date and time opacity problem was solved, if applicable; (7) N.J.A.C. 7:27B-2 results if conducted; If visible emissions are observed, refer to the operator manual for corrective action. If measures fail to correct visible emissions within 24 hours of observation, the Permittee shall immediately report the incident to the Department by calling the Environmental Action Hotline at (877) Page 12 of 38

13 operating according to manufacturer specifications and the operating permit compliance plan and take corrective action(s). The Permittee must report any permit violations to NJDEP pursuant to N.J.A.C. 7: If the corrective actions taken do not correct the visible emissions within 24 hours, the Permittee shall perform daily visual surveys using a certified opacity reader, in accordance with N.J.A.C. 7:27B-2, until visible emissions are within permit limits. and (8) Name of person(s) conducting inspection. All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C. 7: (d)] [N.J.A.C. 7: (d)] 14. The maximum allowable sulfur content in liquid fuel oil shall be <= 15 ppmw (parts per million by weight) (0.0015%). [N.J.A.C. 7: (d)] Sulfur Content in Fuel: Monitored by review of fuel delivery records per delivery showing fuel sulfur content. [N.J.A.C. 7: (d)] Sulfur Content in Fuel: Recordkeeping by invoices / bills of lading / certificate of analysis per delivery showing fuel sulfur content. Each Permittee may use any existing liquid fuel oil contained in the fuel oil storage tank until it is depleted as long as the Permittee can document the following: a) At the time of purchase, the fuel s sulfur content was consistent and in compliance with N.J.A.7:27-9; and b) It can be verifiable by the Department that the existing liquid fuel was contained in the fuel oil storage tank before obtaining this GP-017A. [N.J.A.C.7: (d)3] [N.J.A.C. 7:27-9.2(b)] Page 13 of 38

14 15. MACT, Subpart JJJJJJ For each boiler, the owner or operator at all times must operate and maintain an affected boiler, including associated air pollution control equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. [40 CFR (a)] The owner or operator shall keep records of the following: The occurrence and duration of each malfunction of the boiler, or of the associated air pollution control and monitoring equipment. Actions taken during periods of malfunction to minimize emissions in accordance with the general duty to minimize emissions in 40 CFR (a), including corrective actions to restore the malfunctioning boiler, air pollution control, or monitoring equipment to its normal or usual manner of operation. All records must be in a form suitable and readily available for expeditious review. You must keep each record for 5 years following the date of each recorded action. You must keep each record on-site or be accessible from a central location by computer or other means that instantly provide access at the site for at least 2 years after the date of each recorded action. Page 14 of 38

15 You may keep the records off site for the remaining 3 years. [40 CFR (c)] and [40 CFR (d)] 16. MACT, Subpart JJJJJJ For each boiler, the owner or operator must submit the Initial Notification of Applicability: 1. If constructed on or before June 4, 2010, submit no later than January 20, 2014; or 2. If constructed after June 4, 2010, submit within 120 days after startup of new source. [40 CFR (a)(2)] 17. MACT, Subpart JJJJJJ For boilers constructed on or before June 4, 2010 Conduct a tune up: initially and once every 5 years. The owner or operator shall conduct the initial tune-up no later than March 21, Subsequent tune-ups must be Periodic Emission Monitoring initially and once every 5 years. The owner or operator shall measure the concentrations in the effluent stream of carbon monoxide (CO) in parts per million, by volume, and oxygen in volume percent, before and after the adjustments are made (measurements may be either on a Page 15 of 38 Recordkeeping by manual logging of parameter or storing data in a computer data system once initially. Maintain a copy of the Initial Notification and all supporting documentation for a period of 5 years. [40 CFR (c)] and. [40 CFR (d)] Recordkeeping: Initially and once every 5 years. The owner or operator shall keep the following records for a period of 5 years following the date of each recorded action. Submit notification: Once initially by January 20, 2014 if constructed on or before June 4, 2010, or within 120 days after startup of a new source if constructed after June 4, 2010, to the Administrator, EPA Region 2, certified by the responsible official. The Initial Notification shall also be submitted to NJDEP, per 40 CFR The owner or operator may use the instructions and the forms provided on the EPA website nary sources airpollution/complianceindustrial commercial andinstitutional area source [40 CFR ] Submit Notification: Once Initially. Submit a Notification of Compliance Status by July 19, 2014 electronically using the Compliance and Emissions Data Reporting Interface (CEDRI) that is

16 conducted every five years, no more than 61 months after the previous tune-up. The tune-ups shall be conducted as required in Table 2 to 40 CFR Part 63, Subpart JJJJJJ, and in accordance with 40 CFR (b) as follows: (1) As applicable, inspect the burner, and clean or replace any components of the burner as necessary. The burner inspection may be delayed until the next scheduled unit shutdown, but at least once every 72 months. (2) Inspect flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications. (3) Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly. The inspection may be delayed until the next scheduled unit shutdown, but at least once every 72 months. (4) Optimize total emissions of CO. This optimization should be consistent with the manufacturer's specifications, if available, and with any Nitrogen Oxide requirement to which the unit is subject. As per 40 CFR (b)(7), if the unit is not operating on the required date for a tune-up, the tune-up must be conducted within dry or wet basis, as long as it is the same basis before and after the adjustments are made) once initially and every five years. Measurements may be taken using a portable CO analyzer. [40 CFR (b)5] Per 40 CFR (c)(2)(i), keep records: identifying each boiler, the date of tune-up, the procedures followed for tune-ups, and the manufacturer's specifications to which the boiler was tuned. Per 40 CFR (b)(6), the owner or operator must maintain a report containing the following information on site: (i) The concentrations of CO in the effluent stream in parts per million, by volume, and oxygen in volume percent, measured at high fire or typical operating load, before and after the tune-up of the boiler. (ii) A description of any corrective actions taken as a part of the tune-up of the boiler. (iii) The type and amount of fuel used over the 12 months prior to the tune-up of the boiler, but only if the unit accessed through EPA's Central Data Exchange (CDX) ( [40 CFR (a)4] Page 16 of 38

17 30 days of startup. [40 CFR (b)] and [40 CFR (e)] was physically and legally capable of using more than one type of fuel during that period. Units sharing a fuel meter may estimate the fuel use by each unit. [40 CFR (c)2] 18. MACT, Subpart JJJJJJ For boilers constructed after June 4, 2010 Conduct a tune-up: once every 5 years. The owner or operator shall conduct a tune-up once every 5 years. The first tune-up should be conducted no later than 61 months after the boiler s initial startup. Subsequent tune-ups must be conducted every five years, no more than 61 months after the previous tune-up. The tune-ups shall be conducted, as required in Table 2 to 40 CFR Part 63, Subpart JJJJJJ, and in accordance with 40 CFR (b) as follows: (1) As applicable, inspect the burner, and clean or replace any components of the burner as necessary. The burner inspection may be delayed until the next scheduled unit shutdown, but at least once every 72 months. Periodic Emission Monitoring once every 5 years. Measure the concentrations in the effluent stream of carbon monoxide (CO) in parts per million, by volume, and oxygen in volume percent, before and after the adjustments are made (measurements may be either on a dry or wet basis, as long as it is the same basis before and after the adjustments are made). Measurements may be taken using a portable CO analyzer. [40 CFR (b)5] Recordkeeping: Once every 5 years. The owner or operator shall keep the following records for a period of 5 years following the date of each recorded action. Per 40 CFR (c)(2)(i), keep records: identifying each boiler, the date of tune-up, the procedures followed for tune-ups, and the manufacturer s specifications to which the boiler was tuned. Per 40 CFR (b)(6), the owner or operator must maintain a report containing the following information on site: Page 17 of 38

18 (2) Inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer's specifications, if available. (3) Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly. The inspection may be delayed until the next scheduled unit shutdown, but at least once every 72 months. (4) Optimize total emissions of CO. This optimization should be consistent with the manufacturer's specifications, if available, and with any NO requirement to which the unit is subject. As per 40 CFR (b)(7), if the unit is not operating on the required date for a tune-up, the tune-up must be conducted within 30 days of startup. [40 CFR (b)] and [40 CFR (e)] (i) The concentrations of CO in the effluent stream in parts per million, by volume, and oxygen in volume percent, measured at high fire or typical operating load, before and after the tuneup of the boiler. (ii) A description of any corrective actions taken as a part of the tune-up of the boiler. (iii) The type and amount of fuel used over the 12 months prior to the tune-up of the boiler, but only if the unit was physically and legally capable of using more than one type of fuel during that period. Units sharing a fuel meter may estimate the fuel use by each unit. [40 CFR (c)2] 19. MACT, Subpart JJJJJJ Prepare a 5-year compliance certification report by March 1st of each applicable year in which a tune up is conducted and, upon request, submit it to the delegated authority. The compliance certification report shall contain the following information: 1) Company name and address. (2) Statement by responsible official, with the official's name, title, phone number, Page 18 of 38 The owner or operator shall keep the records. All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [40 CFR (b)]

19 address, and signature, certifying the truth, accuracy and completeness of the notification and statement of whether the source has complied with all the relevant standards and other requirements of 40 CFR Part 63, Subpart JJJJJJ. The notification must include the following certification(s) of compliance and signed by a responsible official: (i) "This facility complies with the requirements in 40 CFR to conduct a biennial or 5-year tune-up, as applicable, of each boiler." (ii) For units that do not qualify for a statutory exemption as provided in section 129(g)(1) of the CAA: "No secondary materials that are solid waste were combusted in any affected unit." [40 CFR (b)] 20. MACT, Subpart JJJJJJ For each boiler, the owner or operator must provide notice of the date upon which the owner or operator switched fuels, made the physical change, or took a permit limit that may result in the applicability of a different subcategory or switch out of 40 CFR Part 63, Subpart JJJJJJ due to a fuel change that results in the boiler meeting the definition of gas-fired boiler as defined in 40 CFR , or taking a permit limit. The notice must be provided within 30 days of the change. [40 CFR (g)] Submit a written notification to the Administrator, EPA Region 2. The notification must identify: ( 1 ) The name of the owner or operator of the affected source, the location of the source, the boiler(s) that have switched fuels, were physically changed, or took a permit limit, and the date of the notice. ( 2 ) The date upon which the fuel switch, physical change, or permit limit occurred. [40 CFR (g)] Page 19 of 38

20 Item No COMPLIANCE PLAN: Boiler(s) and/or Heater(s) less than 5 MMBTU/hr: Option BH17A-2: Boiler(s) and/or Heater(s) burning Natural Gas based on annual fuel limit (no.2 Fuel oil during gas curtailment only) Applicable Requirement Monitoring Requirement Record keeping Requirement Submittal/ Action 1. In addition to this Compliance Plan, all conditions contained in the document General Procedures for General Permits posted at the web page at, htm, are enforceable. [N.J.A.C. 7: (h)] 2. The Permittee shall ensure combustion equipment included in this General Permit is easily identifiable by clear and conspicuous labeling, including manufacturer name, model number, serial number, and maximum gross heat input rate to the burning chamber. [N.J.A.C. 7: (a)] 3. This equipment shall not cause any air contaminant, including an air contaminant detectable by the sense of smell, to be present in the outdoor atmosphere in such quantity and duration which is, or tends to be, injurious to human health or welfare, animal or plant life or property, or would unreasonably interfere with the enjoyment of life or property, except in areas over which the Permittee has exclusive use or Any operation of the equipment which may cause a release of air contaminants in a quantity or concentration which poses a potential threat to public health, welfare, or the environment or which might reasonably result in citizen complaints shall be reported by the Permittee as required by the Air Pollution Control Page 20 of 38

21 occupancy. [N.J.A.C. 7:27-5] Act. The Permittee shall immediately notify the Department of any noncompliance by calling the Environmental Action Hotline at (877) [N.J.S.A. 26:2C-19(e)] 4. Maximum No. of Billable Compliance Inspections <= 2 inspections. The equipment covered by this permit will be subject to inspection fees for the maximum periodic compliance inspections (as defined in N.J.A.C. 7:27-8.1) over the life of the Certificate, after it receives final approval for a five-year duration. The Permittee will be invoiced for a service fee per inspection pursuant to N.J.A.C. 7: after the periodic compliance inspection is conducted. [N.J.A.C. 7: (e)] 5. Permittee shall not use the equipment in a manner which will cause visible emissions, exclusive of visible condensed water vapor, except for a period no more than 3 minutes in any consecutive 30-minute period. [N.J.A.C. 7:27-3.2(a) & (c)] If visible emissions are observed, refer to operator manual for corrective action. If corrective action fail to correct visible emissions within 24 hours of observation, the Permittee shall immediately report the incident to the Department by calling the Environmental Action Hotline at (877) [N.J.A.C. 7: (d)] Page 21 of 38

22 6. Compliance with the annual emission limit for each air contaminant shall be based on the maximum annual fuel consumption. Permittee shall comply with the fuel limit entered in the registration form. Permittee shall install and operate fuel totalizer(s) to monitor the total amount of fuel burned each 12 consecutive month period, based on a rolling 1-month basis. [N.J.A.C. 7: (d)] Each month during operation the Permittee shall record: 1. Fuel type. 2. Current reading from the fuel totalizer(s). 3. Monthly fuel usage. [N.J.A.C. 7: (h)] 4. Sum and record the current monthly fuel usage with the previous eleven (11) month fuel usage totals to determine the consecutive twelve (12) month total. All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C. 7: (d)] 7. The Permittee is allowed to use No. 2 fuel oil if all the following requirements are met: 1) the Permittee is not practicably able to obtain a sufficient supply of natural gas; The Permittee that is combusting No. 2 fuel oil in place of natural gas shall keep the following records of: the date the fuel oil was used; 2) the Permittee's inability to obtain natural gas is due to circumstances beyond the control of the Permittee, such as a natural gas curtailment; and the reason for use (i.e. natural gas curtailment); and the number of hours such fuel oil has been combusted. Page 22 of 38

23 3) the Permittee shall stop using fuel oil in place of natural gas and resumes using natural gas as soon as sufficient supply of natural gas becomes practicably available. [N.J.A.C. 7: (a)] All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C. 7: (d) 8. The Permittee may periodically fire no. 2 fuel oil for periodic testing, maintenance, or operator training events if the following requirements are met: Permittee shall not exceed 48 hours per calendar year for periodic testing, maintenance, or operator training per boiler. However, Permitee shall not fire fuel oil for normal testing and maintenance on the days when the Department forecasts air quality anywhere in New Jersey to be unhealthy for sensitive groups, unhealthy, or very unhealthy as shown at the Department s air quality permitting web site at pp/aqforecast [N.J.A.C.7: (a)] For testing and maintenance periods, record the date and number of hours that No. 2 fuel oil has been combusted. All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C7: (d)] None Page 23 of 38

24 9. The maximum allowable sulfur content in No. 2 fuel oil shall be <= 15 ppmw (parts per million by weight) (0.0015%). Each Permittee may use any existing No. 2 fuel oil contained in the fuel oil storage tank until it is depleted as long as the Permittee can document the following: a) At the time of purchase, the fuel s sulfur content was consistent and in compliance with N.J.A.7:27-9; and b) It can be verified by the Department that the existing liquid fuel was contained in the fuel oil storage tank before obtaining this GP-017A. Sulfur Content in Fuel: Monitored by review of fuel delivery records per delivery showing fuel sulfur content. [N.J.A.C. 7: (d)] Sulfur Content in Fuel: Recordkeeping by invoices / bills of lading / certificate of analysis per delivery showing fuel sulfur content. [N.J.A.C.7: (d)3] [N.J.A.C. 7:27-9.2(b)] Page 24 of 38

25 COMPLIANCE PLAN: Boiler(s) and/or Heater(s) less than 5 MMBTU/hr: Option BH17A-3: Boiler(s) and/or Heater(s) based on annual propane limit Item No Applicable Requirement Monitoring Requirement Record keeping Requirement Submittal/ Action 1. In addition to this Compliance Plan, all conditions contained in the document General Procedures for General Permits posted at the web page at, htm, are enforceable. [N.J.A.C. 7: (h)] 2. The Permittee shall ensure combustion equipment included in this General Permit is easily identifiable by clear and conspicuous labeling, including manufacturer name, model number, serial number, and maximum gross heat input rate to the burning chamber. [N.J.A.C. 7: (a)] 3. This equipment shall not cause any air contaminant, including an air contaminant detectable by the sense of smell, to be present in the outdoor atmosphere in such quantity and duration which is, or tends to be, injurious to human health or welfare, animal or plant life or property, or would unreasonably interfere with the Any operation of the equipment which may cause a release of air contaminants in a quantity or concentration which poses a potential threat to public health, welfare, or the environment or which might reasonably result in citizen complaints shall be reported Page 25 of 38

26 enjoyment of life or property, except in areas over which the Permittee has exclusive use or occupancy. [N.J.A.C. 7:27-5] by the Permittee as required by the Air Pollution Control Act. The Permittee shall immediately notify the Department of any noncompliance by calling the Environmental Action Hotline at (877) Maximum No. of Billable Compliance Inspections <= 2 inspections. The equipment covered by this permit will be subject to inspection fees for the maximum periodic compliance inspections (as defined in N.J.A.C. 7:27-8.1) over the life of the Certificate, after it receives final approval for a five year duration. The Permittee will be invoiced for a service fee per inspection pursuant to N.J.A.C. 7: after the periodic compliance inspection is conducted. [N.J.A.C. 7: (e)] 5. Permittee shall not use the equipment in a manner which will cause visible emissions, exclusive of visible condensed water vapor, except for a period no more than 3 minutes in any consecutive 30- minute period. [N.J.A.C. 7:27-3.2(a) & (c)] [N.J.S.A. 26:2C-19(e)] If visible emissions are observed, refer to operator manual for corrective action. If corrective action fail to correct visible emissions within 24 hours of observation, the Permittee shall immediately report the incident to the Department by calling the Environmental Action Hotline at (877) [N.J.A.C. 7: (d)] Page 26 of 38

27 6. Compliance with the annual emission limit for each air contaminant shall be based on the maximum annual fuel consumption. Permittee shall comply with the fuel limit entered in the registration form. Permittee shall install and operate fuel totalizer(s) to monitor the total amount of fuel burned each 12 consecutive month period, based on a rolling 1-month basis. [N.J.A.C. 7: (d)] Each month during operation the Permittee shall record: 1. Fuel type. 2. Current reading from the fuel totalizer(s). 3. Monthly fuel usage. [N.J.A.C. 7: (h)] 4. Sum and record the current monthly fuel usage with the previous eleven (11) month fuel usage totals to determine the consecutive twelve (12) month total. All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C. 7: (d)] Page 27 of 38

28 COMPLIANCE PLAN: Boiler(s) and/or Heater(s) less than 5 MMBTU/hr Option BH17A-4: Boiler(s) and/or Heater(s) burning No.2 Fuel oil and/or Kerosene based on annual fuel limit Item No Applicable Requirement Monitoring Requirement Record keeping Requirement Submittal/ Action 1. In addition to this Compliance Plan, all conditions contained in the document General Procedures for General Permits posted at the web page at, m, are enforceable. [N.J.A.C. 7: (h)] 2. The Permittee shall ensure combustion equipment included in this General Permit is easily identifiable by clear and conspicuous labeling, including manufacturer name, model number, serial number, and maximum gross heat input rate to the burning chamber. [N.J.A.C. 7: (a)] 3. This equipment shall not cause any air contaminant, including an air contaminant detectable by the sense of smell, to be present in the outdoor atmosphere in such quantity and duration which is, or tends to be, injurious to human health or welfare, animal or plant life or property, or would unreasonably interfere with the Any operation of the equipment which may cause a release of air contaminants in a quantity or concentration which poses a potential threat to public health, welfare, or the environment or which might reasonably result in citizen complaints shall be reported Page 28 of 38

29 enjoyment of life or property, except in areas over which the Permittee has exclusive use or occupancy. [N.J.A.C. 7:27-5] by the Permittee as required by the Air Pollution Control Act. The Permittee shall immediately notify the Department of any noncompliance by calling the Environmental Action Hotline at (877) Maximum No. of Billable Compliance Inspections <= 2 inspections. The equipment covered by this permit will be subject to inspection fees for the maximum periodic compliance inspections (as defined in N.J.A.C. 7:27-8.1) over the life of the Certificate, after it receives final approval for a five-year duration. The Permittee will be invoiced for a service fee per inspection pursuant to N.J.A.C. 7: after the periodic compliance inspection is conducted. [N.J.S.A. 26:2C-19(e)] [N.J.A.C. 7: (e)] 5. Permittee shall not use the equipment in a manner which will cause visible emissions, exclusive of visible condensed water vapor, except for a period no more than 3 minutes in any consecutive 30- minute period. [N.J.A.C. 7:27-3.2(a) & (c)] Monitored by visual determination each month during operation, based on an instantaneous determination. The Permittee shall conduct visual opacity inspections during daylight hours (certified opacity reader not necessary). Visual inspections shall consist of a visual survey to identify if the stack has visible emissions other than condensed water vapor. If visible emissions are observed, the Permittee shall: The Permittee shall maintain each month the following records: (1) Date and time of inspection; (2) Emission point number; (3) Operational status of equipment; (4) Observed results and conclusions; (5) Description of corrective actions taken if necessary; (6) Date and time opacity problem was solved, if If visible emissions are observed, refer to operator manual for corrective action. If corrective action fail to correct visible emissions within 24 hours of observation, the Permittee shall immediately report the incident to the Department by calling the Environmental Page 29 of 38

30 1. Verify that the equipment and/or control device causing the emission is operating according to manufacturer specifications and the operating permit compliance plan and take corrective action(s). The Permittee must report any permit violations to NJDEP pursuant to N.J.A.C If the corrective actions taken do not correct the visible emissions within 24 hours, the Permittee shall perform daily visual surveys using a certified opacity reader, in accordance with N.J.A.C. 7:27B-2, until visible emissions are within permit limits. applicable; (7) N.J.A.C. 7:27B-2 results if conducted; and (8) Name of person(s) conducting inspection. All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C. 7: (d)] Action Hotline at (877) [N.J.A.C. 7: (d)] [N.J.A.C. 7: (d)] 6. Compliance with the annual emission limit for each air contaminant shall be based on the maximum annual fuel consumption. Permittee shall comply with the fuel limit entered in the registration form. Permittee shall install and operate fuel totalizer(s) to monitor the total amount of fuel burned each 12 consecutive month period, based on a rolling 1-month basis. [N.J.A.C. 7: (d)] Each month during operation the Permittee shall record: 1. Fuel type. 2. Current reading from the fuel totalizer(s). 3. Monthly fuel usage. [N.J.A.C. 7: (h)] 4. Sum and record the current monthly fuel usage with the previous eleven (11) month fuel usage totals to determine the consecutive twelve (12) month total. Page 30 of 38 All records shall be maintained on site for a period of no less than five years and made readily accessible to the Department upon request. [N.J.A.C. 7: (d)]

31 7. The maximum allowable sulfur content in liquid fuel oil shall be <= 15 ppmw (parts per million by weight) (0.0015%). Sulfur Content in Fuel: Monitored by review of fuel delivery records per delivery showing fuel sulfur content. [N.J.A.C. 7: (d)] Sulfur Content in Fuel: Recordkeeping by invoices / bills of lading / certificate of analysis per delivery showing fuel sulfur content. Each Permittee may use any existing liquid fuel oil contained in the fuel oil storage tank until it is depleted as long as the Permittee can document the following: a) At the time of purchase, the fuel s sulfur content was consistent and in compliance with N.J.A.7:27-9; and b) It can be verified by the Department that the existing liquid fuel was contained in the fuel oil storage tank before obtaining this GP-017A. [N.J.A.C.7: (d)3] [N.J.A.C. 7:27-9.2(b)] Page 31 of 38

32 8. MACT, Subpart JJJJJJ For each boiler, the owner or operator at all times must operate and maintain an affected boiler, including associated air pollution control equipment, in a manner consistent with safety and good air pollution control practices for minimizing emissions. [40 CFR (a)] The owner or operator shall keep records of the following: The occurrence and duration of each malfunction of the boiler, or of the associated air pollution control and monitoring equipment. Actions taken during periods of malfunction to minimize emissions in accordance with the general duty to minimize emissions in 40 CFR (a), including corrective actions to restore the malfunctioning boiler, air pollution control, or monitoring equipment to its normal or usual manner of operation. All records must be in a form suitable and readily available for expeditious review. You must keep each record for 5 years following the date of each recorded action. You must keep each record on-site or be accessible from a central location by computer or other means that instantly provide access at the site for at least 2 years after the date of each recorded action. Page 32 of 38

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater

State of New Jersey Department of Environmental Protection Division of Air Quality. General Operating Permit (GOP-007) Boiler or Heater 11/21/2016 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-007) Boiler or Heater Greater than or equal to 1 MMBTU/hr and less than 5 MMBTU/hr

More information

State of New Jersey. General Permit (GP-009A)

State of New Jersey. General Permit (GP-009A) 03/21/2013 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-009A) For Boiler(s) and Indirect Fired Process Heater(s) Each Greater Than or Equal to 10

More information

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels

General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels GP-005B State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (005B) for Emergency Generator(s) burning Gaseous Fuels This general permit allows for the construction,

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting GP021 State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP 021) Combined Heat and Power Combustion Turbine(s) less than or equal to 65 MMBTU per hour This

More information

State of New Jersey. Department of Environmental Protection Division of Air Quality

State of New Jersey. Department of Environmental Protection Division of Air Quality GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County)

AIR QUALITY PERMIT. 7 Foundation Drive Savannah, Georgia (Chatham County) AIR QUALITY PERMIT Permit No. Effective Date April 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers. Tune-up Information National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers 40 CFR Part 63 Subpart JJJJJJ Who must conduct a tune-up

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-004A) For FUEL DISPENSING FACILITIES

State of New Jersey. Department of Environmental Protection Air Quality Permitting. General Permit (GP-004A) For FUEL DISPENSING FACILITIES State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-004A) For FUEL DISPENSING FACILITIES This General Permit allows for the construction, installation,

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1

RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1 RICE NESHAP Requirements for Stationary Engines at Area Sources of Hazardous Air Pollutants 1 This document provides guidance on the requirements for stationary engines at area sources of hazardous air

More information

State of New Jersey Department of Environmental Protection Air Quality Permitting

State of New Jersey Department of Environmental Protection Air Quality Permitting State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-019) For This General Permit (GP-019) allows for the construction, installation, reconstruction, modification

More information

State of New Jersey. Department of Environmental Protection Air Quality Permitting

State of New Jersey. Department of Environmental Protection Air Quality Permitting State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-004B) for Fuel Dispensing Facility Equipped with a Phase I Vapor Recovery Control System This General

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year. 1 of 11 8/21/2012 10:19 AM SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1146 - EMISSIONS OF OXIDES OF NITROGEN FROM INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business.

Major/Area Source. Speaker: Eric Swisher. 23rd Virginia Environmental Symposium April 11, Your environmental compliance is clearly our business. Major/Area Source Boiler MACT Rule Speaker: Eric Swisher 23rd Virginia Environmental Symposium April 11, 2012 Your environmental compliance is clearly our business. Overview Ground Rules Regulatory Framework

More information

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS RULE 1146.1. EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (a) Definitions 1. ANNUAL HEAT INPUT means the actual amount

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton

Graphic. Air Compliance Issues and Solutions. Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton Graphic Air Compliance Issues and Solutions Sunita Dhar, PhD Senior Scientist First Environment 91 Fulton Street, Boonton Agenda Permitting NJDEP - New General Permits for Emergency Generators NJDEP -

More information

DEP7007CC Compliance Certification

DEP7007CC Compliance Certification Commonwealth of Kentucky Natural Resources & Environmental Protection Cabinet Department for Environmental Protection DIVISION FOR AIR QUALITY DEP7007CC Compliance Certification Division Use Only ID# Permit

More information

RICE NESHAP RECORD KEEPING Stationary Engines

RICE NESHAP RECORD KEEPING Stationary Engines RICE NESHAP RECORD KEEPING Stationary Engines POWER PLANT COMPLIANCE Donna Oehm Some of the RICE NESHAP ZZZZ reporting requirements are like a $2 bill... *Relatively not in high demand *Legal obligation

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Spark Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction of the

More information

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015

AIR QUALITY PERMIT. Permit No S Effective Date May 26, 2015 AIR QUALITY PERMIT Permit No. Effective Date May 26, 2015 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.34 NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) A. Purpose and Applicability The purpose of this rule is to reduce emissions of oxides

More information

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,

More information

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 RULE 425.2 Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 I. Purpose The purpose of this Rule is to limit oxides of nitrogen (NOx) emissions

More information

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68. RULE 69.4. STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted 9/27/94; Rev. Effective11/15/00; Rev. Effective 7/30/03) (a) APPLICABILITY (1) Except

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. Northern States Power Co a Minnesota Corporation AIR EMISSION PERMIT NO. 04900030-006 Total Facility Operating Permit - Reissuance IS ISSUED TO Northern States Power Co a Minnesota Corporation XCEL ENERGY - PRAIRIE ISLAND NUCLEAR PLANT 1717 Wakonade

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services

More information

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010

RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 RICE NESHAP ZZZZ (>500 hp Non-Emergency CI Engines) Altorfer Meeting June 15, 2010 Discussion Topics Background Important Terms Applicability Compliance Deadlines Emission/Operating Limits Performance/Compliance

More information

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the

1996, or for which modification is commenced on or before March 16, 1998, shall not exceed the 15A NCAC 02D.1206 HOSPITAL, MEDICAL, AND INFECTIOUS WASTE INCINERATORS (a) Applicability. This Rule applies to any hospital, medical, and infectious waste incinerator (HMIWI), except: (1) any HMIWI required

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301

AIR EMISSION PERMIT NO IS ISSUED TO. St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 AIR EMISSION PERMIT NO. 14500026-001 IS ISSUED TO St Cloud State University 720 South Fourth Avenue St Cloud, Stearns County, Minnesota 56301 The emission units, control equipment and emission stacks at

More information

Industrial, Commercial and Institutional Boilers Maximum Achievable Control Technology ( IB-MACT) 5/28/15 Katie Cunningham

Industrial, Commercial and Institutional Boilers Maximum Achievable Control Technology ( IB-MACT) 5/28/15 Katie Cunningham Industrial, Commercial and Institutional Boilers Maximum Achievable Control Technology ( IB-MACT) 5/28/15 Katie Cunningham Consumers Energy and Michigan Provides electric and natural gas service to 6.5

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS

GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY GENERAL PLAN APPROVAL AND GENERAL OPERATING PERMIT BAQ-GPA/GP 2 STORAGE TANKS FOR VOLATILE ORGANIC LIQUIDS GENERAL

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 10500001-007 Permittee: Facility name: Swift Pork Co - Worthington Swift Pork Co - Worthington 1700 Highway 60 NE Worthington, MN 56187 Nobles County Expiration

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

Area Source NESHAPS and Air Permits

Area Source NESHAPS and Air Permits Area Source NESHAPS and Air Permits 40 CFR 63 Subpart ZZZZ 40 CFR 63 Subpart JJJJJJ Richard Nelson Senior Air Quality Specialist (704) 336-6865 Richard.Nelson@MecklenburgCountyNC.gov Combustion Area Sources

More information

RICE NESHAP Frequently Asked Questions (FAQ)

RICE NESHAP Frequently Asked Questions (FAQ) RICE NESHAP Frequently Asked Questions (FAQ) What does RICE NESHAP mean? RICE NESHAP is an acronym for Reciprocating Internal Combustion Engines National Emission Standards for Hazardous Air Pollutants.

More information

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Air Permitting of Sources at Natural gas Production, Compression and Processing Facilities MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Tom Wolf, Governor John Quigley, Secretary Overview

More information

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788

Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: Application #: 22788 Facility Name: BASF Corporation Attapulgus Operations City: Attapulgus County: Decatur AIRS #: 04-13-08700037 Application #: 22788 Date SIP Application Received: August 11, 2014 Date Title V Application

More information

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source

More information

SWCAA. Southwest Clean Air Agency. October 10, Troy Lomax Longview School District h A venue Longview, WA 98632

SWCAA. Southwest Clean Air Agency. October 10, Troy Lomax Longview School District h A venue Longview, WA 98632 A SWCAA Southwest Clean Air Agency 85 NE 99th Street, Suite 294 Vancouver, WA 98682 (360) 5743058 www.swcleanair.org October 0, 208 Troy Lomax Longview School District 2080 3 8 h A venue Longview, WA 98632

More information

PART 70 OPERATING PERMIT FACT SHEET U.S. ARMY GARRISON AT FORT DETRICK 201 BEASLEY DRIVE, FREDERICK, MD PART 70 PERMIT NO.

PART 70 OPERATING PERMIT FACT SHEET U.S. ARMY GARRISON AT FORT DETRICK 201 BEASLEY DRIVE, FREDERICK, MD PART 70 PERMIT NO. PART 70 OPERATING PERMIT FACT SHEET U.S. ARMY GARRISON AT FORT DETRICK PART 70 PERMIT NO. 24-021-00131 BACKGROUND Fort Detrick is a Federal military installation located within the city limits of Frederick,

More information

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota

TABLE B: SUBMITTALS. Fiscal Services 520 Lafayette Road North, St. Paul, Minnesota TABLE B: SUBMITTALS Table B lists most of the submittals you must provide. Table B is divided into three sections; one-time submittals or notifications, intermittent submittals or notifications and recurring

More information

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC

Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC 2011 Summaries for Gasoline Distribution Facilities and Gasoline Dispensing Facilities 40 CFR 63 subpart BBBBBB and 40 CFR 63 subpart CCCCCC Ohio EPA, Division of Air Pollution Control 1/1/2011 Page 2

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

~ SWCAA. ~awfxm~ Paul T. Mairose Chief Engineer

~ SWCAA. ~awfxm~ Paul T. Mairose Chief Engineer ~ SWCAA Southwest Clean Air Agency 11815 NE 99th Street, Suite 1294 Vancouver, WA 98682 (360) 574-3058 www.swcleanair.org December 22, 2017 AJ Panter Vancouver School District No. 37 6014 NW Fruit Valley

More information

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

Air Pollution Control Operating Permit Significant Modification

Air Pollution Control Operating Permit Significant Modification Department of Environmental Protection PHILIP D. MURPHY Air Quality, Energy and Sustainability Division of Air Quality CATHERINE R. MCCABE Governor Bureau of Stationary Sources Commissioner 401 E. State

More information

Air Pollution Control Operating Permit Significant Modification

Air Pollution Control Operating Permit Significant Modification W,/>/W DhZW,z W Y ^ Y d,z/ez D ' ^ ^ ddd ^ ^ d & W K ddd D ddd dd ^,/>z K>/sZ d E:deedd dddd > ' Air Pollution Control Operating Permit Significant Modification Permit Activity Number: Program Interest

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR AIR POLLUTION CONTROL DISTRICT COUNTY OF SAN DIEGO FEDERAL SUBPART ZZZZ NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES WORKSHOP REPORT

More information

State of California AIR RESOURCES BOARD EXECUTIVE ORDER DE

State of California AIR RESOURCES BOARD EXECUTIVE ORDER DE State of California AIR RESOURCES BOARD EXECUTIVE ORDER DE-09-005-05 The diesel emission control strategy described herein qualifies as a potential compliance option for the Air Resources Board's (ARB)

More information

August 23,

August 23, RULE 411, NO X FROM BOILERS, PROCESS HEATERS AND STEAM GENERATORS Adopted 02-02-95 (Amended 11/7/96, 01/09/97, 7/22/99, 10/27/05, 8/23/07) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12, 6/23/15)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12, 6/23/15) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12, 6/23/15) A. Applicability The provisions

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Permit Amendment No.: 2436-211-0013-V-03-1 Effective Date: July 25, 2014 Facility Name: Facility Address: Mailing Address: Parent/Holding Company: Georgia-Pacific Wood

More information

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

2017Compliance Table with methods.xlsx

2017Compliance Table with methods.xlsx University of Michigan Renewable Operating Permit Annual Monitoring/Recordkeeping Compliance Table January 1, 2017 through December 31, 2017 Permit Condition Emission Unit: EU-B0260-06 Boiler 6 at Central

More information

South District. Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS. Carter B. Endsley, P.E. Air Resource Permitting

South District. Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS. Carter B. Endsley, P.E. Air Resource Permitting South District Reciprocating Internal Combustion Engines EPA S RICE NESHAP and NSPS Carter B. Endsley, P.E. Air Resource Permitting December 7, 2016 Content RICE Engines NESHAP and NSPS RICE Rules Emergency

More information

Applicable Requirements - NSPS Subpart JJJJ

Applicable Requirements - NSPS Subpart JJJJ Facility Name: CO Station 3 Combustion Type: 4SRB Facility HAP Status: Area Fuel Type: Natural gas RICE Owner: RICE Operator: S2C Gathering Co Acme Operating Inc. Use Type: Max. Runtime: Non-emergency

More information

MAJOR SOURCE OPERATING PERMIT

MAJOR SOURCE OPERATING PERMIT MAJOR SOURCE OPERATING PERMIT Permitee: Facility Name: Facility No.: Location: INTERNATIONAL PAPER CO. INTERNATIONAL PAPER RIVERDALE MILL 104-0003 SELMA, ALABAMA In accordance with and subject to the provisions

More information

Permit Holder. Permitted Equipment

Permit Holder. Permitted Equipment Air Quality Registration Stationary Compression Ignition Internal Combustion Engine (Less than 400 Brake Horsepower) Permit No. Project No. Description Date Testing No Plant Number: Under the Direction

More information

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE?

9/17/2013 OVERVIEW WHAT RICE UNITS ARE IMPACTED? WHAT IS A RICE UNIT? EXAMPLES OF RICE UNITS WHY IS THE EPA REGULATING RICE? OVERVIEW Compliance Webinar Reciprocating Internal Combustion Engines RICE September 16, 2013 Jesse Zahn, CHMM Jesse.zahn@hrpassociates.com HRP Associates, Inc. Clifton Park, NY 12065 What is RICE Unit

More information

Electrical Power Generator Use and Procurement Guidance

Electrical Power Generator Use and Procurement Guidance Electrical Power Generator Use and Procurement Guidance For compliance with applicable air emission control regulations December 2016 Prepared by: Syracuse University Environmental Health & Safety Services

More information

Draft Air Individual Permit Part 70 Reissuance

Draft Air Individual Permit Part 70 Reissuance Draft Air Individual Permit Part 70 Reissuance 15300004-101 Permittee: Co-permittee name: Facility name: Viking Gas Transmission - Cushing ONEOK Partners, L.P. Viking Gas Transmission - Cushing 31888 400th

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc.

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Hoffman Enclosures, Inc. DRAFT/PROPOSED AIR EMISSION PERMIT NO. 00300155 002 Major Amendment IS ISSUED TO Hoffman Enclosures, Inc. Hoffman Enclosure Inc/Pentair Equipment Protection 2100 Hoffman Way Anoka, Anoka County, MN 55303

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 11PB859 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL Modification

More information

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR

Air Individual Permit Major Amendment Permit characteristics: State; Limits to avoid Part 70/ True minor for NSR; True Minor for NSR Air Individual Permit Major Amendment 13100058-101 Permittee: Facility name: Northern Natural Gas Co - Faribault Northern Natural Gas Co - Faribault 21903 Canby Ave Faribault, MN 55021 Rice County Operating

More information

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units:

REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (1) This rule applies to the following emission units: RULE 12. REGISTRATION OF SPECIFIED EQUIPMENT (Adopted 5/21/97; Rev. Effective 11/15/00) (a) APPLICABILITY (1) This rule applies to the following emission units: Existing internal combustion emergency standby

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

VALMET IBMACT & Utility MATS. Boiler Tune-ups

VALMET IBMACT & Utility MATS. Boiler Tune-ups VALMET IBMACT & Utility MATS Boiler Tune-ups Boiler Tune-Ups required by the EPA A boiler tune-up refers to many aspects of improving boiler operations. From an emissions perspective, the term boiler tune-up

More information

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES MAY 15, 2012 FOR MORE INFORMATION CONTACT NEGIB HARFOUCHE, PH.D. NJDEP DIVISION OF AIR QUALITY (609) 292-2137 nharfouc@dep.state.nj.us

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS:

Public Service Company of Colorado THE SOURCE TO WHICH THIS PERMIT APPLIES IS DESCRIBED AND LOCATED AS FOLLOWS: COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT AIR POLLUTION CONTROL DIVISION TELEPHONE: (303) 692-3150 CONSTRUCTION PERMIT PERMIT NO: 04PB1019 DATE ISSUED: JULY 5, 2005 INITIAL APPROVAL ISSUED TO:

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

Air Pollution Control Operating Permit Significant Modification

Air Pollution Control Operating Permit Significant Modification W,/>/W DhZW,z W Y ^ Y d,z/ez D ' ^ ^ ddd ^ ^ d & W K ddd D ddd dd ^,/>z K>/sZ d E:deedd dddd > ' Air Pollution Control Operating Permit Significant Modification Permit Activity Number: Program Interest

More information

COMMONWEALTH OF VIRGINIA STATE AIR POLLUTION CONTROL BOARD 9VAC5 CHAPTER 540. EMERGENCY GENERATOR GENERAL PERMIT

COMMONWEALTH OF VIRGINIA STATE AIR POLLUTION CONTROL BOARD 9VAC5 CHAPTER 540. EMERGENCY GENERATOR GENERAL PERMIT COMMONWEALTH OF VIRGINIA STATE AIR POLLUTION CONTROL BOARD 9VAC5 CHAPTER 540. EMERGENCY GENERATOR GENERAL PERMIT Part I Definitions. 9VAC5-540-10. 9VAC5-540-20. General. Terms defined. Part II General

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: S-7658-1-0 ISSUANCE DATE: 10/30/2009 LEGAL OWNER OR OPERATOR: ABEC BIDART-STOCKDALE LLC MAILING ADDRESS: C/O CALIFORNIA BIOENERGY LLC 2828 ROUTH STREET SUITE 500 DALLAS,

More information

402 LOSS OF EXEMPTION LOW FUEL USAGE 4032 SOURCE TESTING FREQUENCY 4043 SOURCE TESTING PROTOCOL

402 LOSS OF EXEMPTION LOW FUEL USAGE 4032 SOURCE TESTING FREQUENCY 4043 SOURCE TESTING PROTOCOL Attachment 6: Proposed Rule 419, Underline/Strikeout Version RULE 419 NOx FROM MISCELLANEOUS COMBUSTION UNITS Adopted 07-26-18 (Amended XX-XX-18) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 103 SEVERABILITY

More information

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075

Air Individual Permit State Permit Hardman Ave S South St. Paul, MN 55075 Air Individual Permit State Permit 03700070-007 Permittee: Facility name: Sanimax USA LLC Sanimax USA LLC 505 Hardman Ave S South St. Paul, MN 55075 Expiration date: Non-expiring Permit * All Title I Conditions

More information

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) RULE 69.3 STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) (a) APPLICABILITY This rule shall apply to any stationary

More information

Air Pollution Control Operating Permit Significant Modification

Air Pollution Control Operating Permit Significant Modification W,/>/W DhZW,z W Y ^ Y d,z/ez D ' ^ ^ ddd ^ ^ d & W K ddd D ddd dd ^,/>z K>/sZ d E:deedd dddd > ' Air Pollution Control Operating Permit Significant Modification Permit Activity Number: Program Interest

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Hutchinson Utilities Commission DRAFT/PROPOSED AIR EMISSION PERMIT NO. 08500034 002 Total Facility Operating Permit Reissuance IS ISSUED TO Hutchinson Utilities Commission Hutchinson Utilities Commission Plant 2 1100 Industrial Boulevard

More information

AIR QUALITY PERMIT. Vulcan Construction Materials, LLC-Gainesville RM

AIR QUALITY PERMIT. Vulcan Construction Materials, LLC-Gainesville RM AIR QUALITY PERMIT Permit No. Effective Date January 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

DRAFT AUTHORITY TO CONSTRUCT

DRAFT AUTHORITY TO CONSTRUCT A/C NO.: 25780 ISSUED BY: DATE ISSUED: TBD JORGE DEGUZMAN DATE EXPIRES: ISSUED TO: TBD PRIME DATA CENTERS DBA SVO BUILDING ONE LLC LOCATION: 2407 AK ST., MCCLELLAN PARK, CA 95652 DESCRIPTION: IC ENGINE

More information