COST EFFECTIVENESS EVALUATION. A. Selective Catalytic Reduction System

Size: px
Start display at page:

Download "COST EFFECTIVENESS EVALUATION. A. Selective Catalytic Reduction System"

Transcription

1

2 was installed with a Selective Catalytic Reduction (SCR) and is able to comply with a NOx emission limit of 9 ppmv when operating with natural gas and 13 ppmv when operating under diesel fuel. In addition, in 2008, the IID, Niland Generation Station, installed two stationary gas turbines. These units are equipped with SCR and are able to comply with a NOx emission limit of 2.5 ppmv. These turbines are only authorized to burn natural gas. Without the installation of additional technology, these emission units are currently in compliance with Rule emission limits. Therefore, no substantial change in the emissions inventory for these facilities due to implementation of this rule is anticipated. The IID, Brawley Generation Station, operates two turbines that were installed in 1962 and do not have installed NOx emission control equipment. These units will be exempted from compliance with Rule NOx emissions limits by restricting operation to no more than 400 hours per calendar year. The IID, Rockwood Generation Station, operates two turbines that were installed in 1979 and have installed water injection for NOx emission control. These units are able to comply with Rule NOx emissions limits of 42 ppmv for natural gas and 65 ppmv for diesel fuel. An analysis will be conducted in this Appendix to evaluate cost effectiveness for installation of SCR equipment to further reduce NOx emissions to 9 ppmv for natural gas and 15 ppmv for diesel fuel on these units. There is no federal policy that establishes maximum cost effectiveness values for NOx RACT. The San Joaquin Valley Air Pollution Control District (SJVAPCD) uses a BARCT threshold of $9, (California Air Resources Board, Report to the Legislature, Implications of Future Oxides of Nitrogen Controls from Seasonal Sources in the San Joaquin Valley, January 2002, Table 9, Comparison of BARCT Cost Effectiveness Thresholds). Therefore, for the purpose of this evaluation, the APCD will use a RACT cost effectiveness value of $8,000-$10,000/ton of NOx. The cost of control equipment is highly dependent on the size of the unit and the type of control selected. The total initial cost (capital cost and installation) for retrofitting the Rockwood turbines with a SCR system is approximately $4,400,000. In addition, the estimated annual operating cost for each turbine is $276,803. Therefore, the estimated cost effectiveness for Unit 1 when burning natural gas is $61,731 per ton of NOx reduced, while the estimated cost effectiveness for both units when burning diesel fuel is $44,839 per ton of NOx reduced. This evaluation indicates that the cost effectiveness to retrofit the Rockwood turbines with a SCR system is way higher than the recommended RACT cost effectiveness value of $8,000-$10,000/ton of NOx. Therefore, these units will not be required to install more efficient technology to reduce NOx emission. II. COST EFFECTIVENESS EVALUATION A. Selective Catalytic Reduction System The cost effectiveness analysis contained in this report was based upon cost estimates and methodology contained in the staff report for the SJVAPCD Rule 4703, Stationary Gas Turbines, Appendix C, as proposed August, 16, January 26, 2010

3 The cost of retrofitting units to comply with the proposed rule varies with the size of the unit and the type of controls used. ICAPCD staff analyzed the cost effectiveness of Rule which was based on the installation and operation of a SCR system on Rockwood Unit 1 and Unit 2 gas turbines. The Unit 1 and Unit 2 turbines currently have installed water injection as NOx controls and both turbines are restricted to operate a maximum of 1000 hours per calendar year (Authority to Construct and Title V permit conditions). Unit 1 has the capability to burn natural gas and diesel and Unit 2 has the capability to burn diesel only. Both turbines are identical with a 22MW capacity, MMBtu/hr when burning natural gas and MMBtu/hr when burning diesel fuel. 1. Estimated Annual NOx Emissions Reduction Equations The estimated Current and Potential Annual NOx Emissions were calculated using the following equation and assumptions: NOx = LF x MMBtu/hr x HR x EF / 2,000 lb/ton Where: NOx Emissions LF MMBtu/hr HR EF = Current Annual NOx Emissions or Potential Annual NOx = turbine load factor = heat input rating = annual hours of operation = NOx emission factor in pounds per MMBtu Estimated Annual NOx Emissions Reduction = Current Annual NOx Emissions Potential Annual NOx Emissions a) Unit 1 Estimated Potential Annual NOx Emissions when burning Natural Gas. A. Current Annual NOx Emissions 42 ppm Unit 1- Parameters: LF MMBtu/hr HR EF = 0.75 capacity factor = MMBtu/hr Natural Gas = 1,000 hour of operation per year = NOx emission Factor in ppm x lb/mmbtu per ppm NOx NOx = 0.75 x MMBtu/hr x 1,000 hr x (42 ppm x lb/mmbtu/ppm) / 2000 lb/ton NOx = tons B. Potential Annual NOx Emissions 9 ppm NOx = 0.75 x MMBtu/hr x 1,000 hr x (9 ppm x lb/mmbtu/ppm) / 2000 lb/ton 3 January 26, 2010

4 NOx = 3.75 tons C. Estimated Annual NOx Emissions Reductions The estimated Annual NOx Emissions Reduction was calculated using the following equation: NOx Emissions Reduction = Current Annual NOx Emissions Potential Annual NOx Emissions. NOx Emissions Reduction = = tons b) Unit 1 and Unit 2 Estimated Potential Annual NOx Emissions when burning Diesel. A. Current Annual NOx Emissions 65 ppm Units 1 and 2 - Parameters: LF MMBtu/hr HR EF = 0.75 capacity factor = MMBtu/hr Diesel = 1,000 hour of operation per year = NOx emission Factor in ppm x lb/mmbtu per ppm NOx NOx = 0.75 x MMBtu/hr x 1,000 hr x (65 ppm x lb/mmbtu/ppm) / 2000 lb/ton NOx = tons B. Potential Annual NOx Emissions 15 ppm NOx = 0.75 x MMBtu/hr x 1,000 hr x (15 ppm x lb/mmbtu/ppm) / 2000 lb/ton NOx = 5.68 tons C. Estimated Annual NOx Emissions Reductions The estimated Annual NOx Emissions Reduction was calculated using the following equation: NOx Emissions Reduction = Current Annual NOx Emissions Potential Annual NOx Emissions. NOx Emissions Reduction = = tons 4 January 26, 2010

5 2. Calculation of SCR Annual Costs As stated earlier, to estimate cost effectiveness, ICAPCD staff used cost information contained in the staff report for the SJVAPCD Rule 4703, Stationary Gas Turbines, Appendix C. The ICAPCD staff estimated the cost of retrofitting for the installation and operation of a SCR system of the Rockwood turbines. As per SJVAPCD report, a low cost estimate of $200/KW for retrofitting was assumed. This method also assumes a 10% interest rate and a useful life for the control equipment of 15 years. Table 2 provides a summary of cost to control NOx emissions, including direct capital cost and direct and indirect costs for operation. Table 2. SCR Annual Cost ITEM SOURCE COST Turbine Rating 22 MW SCR Cost/KW- Retrofitting $200.00/KW Operating Hours 1000 Direct Capital Cost Total Capital Investment (TCI) $4,400,000 Direct Annual Cost Operating Costs Operator 0.5 hr/shift, $25.00/hr OAQPS $16,859 Supervisor 15% of Operator $ 2,859 Maintenance Cost Labor 0.5 hr/shift, $25.00/hr OAQPS $16,859 Material 100% of labor cost OAQPS $16,859 Utility Cost Electricity Cost Variable $5,747 Cat. Replacement MHIA $5,621 Cat. Disposal OAQPS $ 211 Ammonia Variable $1,008 NH3 Inject Skid MHIA $2,916 Indirect Annual Cost Overhead 60% of O and M OAQPS $31,864 Administrative 0.02xTCI OAQPS $88,000 Insurance 0.01xTCI OAQPS $44,000 Property Tax 0.01xTCI OAQPS $44,000 Total Annual Costs $276,803 5 January 26, 2010

6 Table 3 summarizes the results of the cost effectiveness calculations for retrofitting of the Rockwood turbines. Cost effectiveness. The analysis includes two scenarios, the first analyzes cost effectiveness for Unit 1 while operating under natural gas, and a second includes an analysis for Units 1 and 2 while operating under diesel fuel. Table 3 Cost Effectiveness for Retrofitting Rockwood Turbines Item Unit 1 Natural Gas Units 1 and 2 Diesel MW MMBtu/hr NOx Reductions (tons/year) SCR Cost/MW $200 $200 Cost Installed Control $4,400,000 $4,400,000 Equipment Annualized $572,000 $572,000 Equipment Cost Annual Operation $276,803 $276,803 Cost Total Annual Cost $848,803 $848,803 Cost Effectiveness ($/ton) $61,731 $44,839 6 January 26, 2010

ICAPCD RULE APPENDIX C

ICAPCD RULE APPENDIX C There is not a federal policy that establishes maximum cost effectiveness values for NOx RACT. The San Joaquin Valley APCD uses a BARCT threshold of $9,700.00 (California Air Resources Board (CARB), Report

More information

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX

RULE STATIONARY GAS TURBINES Adopted (Amended , ) INDEX RULE 413 - STATIONARY GAS TURBINES Adopted 04-06-95 (Amended 05-01-97, 03-24-05) INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION - EMERGENCY STANDBY UNITS 111 EXEMPTION - REMOVAL FROM SERVICE

More information

ICI Boiler NOx & SO 2

ICI Boiler NOx & SO 2 ICI Boiler NOx & SO 2 Control Cost Estimates Andrew M. Bodnarik NH Department of Environmental Services OTC Committee Meeting Modeling/Stationary & Area/Mobile Sources Niagara Falls, NY September 3, 2009

More information

California s Success in Controlling Large Industrial Sources

California s Success in Controlling Large Industrial Sources California s Success in Controlling Large Industrial Sources Endicott House 2006 Symposium Mike Scheible Deputy Executive Officer California Air Resources Board California Environmental Protection Agency

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM April 18, 2014 SUBJECT: Cellco Partnership, dba Verizon Wireless 18 Abele Road Bridgeville, PA 15017 Allegheny County Operating Permit No. 0867 TO:

More information

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98)

STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) RULE 69.3 STATIONARY GAS TURBINE ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted & Effective 9/27/94) (Rev. Adopted & Effective 12/16/98) (a) APPLICABILITY This rule shall apply to any stationary

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT AUTHORITY TO CONSTRUCT PERMIT NO: N-6311-9-1 ISSUANCE DATE: 12/17/2008 LEGAL OWNER OR OPERATOR: FISCALINI FARMS & FISCALINI DAIRY MAILING ADDRESS: 7231 COVERT RD MODESTO, CA 95358 LOCATION: 4848 JACKSON

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT DATE: 3/1/10, updated 5/5/10 TO: Interested Parties SUBJECT: Frequently asked questions regarding compliance with Rule 4320, Advanced Emission Reduction

More information

Appendix K. Final DOC Conditions

Appendix K. Final DOC Conditions Appendix K Final DOC Conditions Puente Power Project 262 MW (net nominal) GE 7HA.01 Combustion Turbine Generator (CTG) The CTG is simultaneously subject to the emission limits, monitoring requirements,

More information

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68.

(2) An engine subject to this rule or specifically exempt by Subsection (b)(1) of this rule shall not be subject to Rule 68. RULE 69.4. STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES - REASONABLY AVAILABLE CONTROL TECHNOLOGY (Adopted 9/27/94; Rev. Effective11/15/00; Rev. Effective 7/30/03) (a) APPLICABILITY (1) Except

More information

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95)

ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) RULE 69. ELECTRICAL GENERATING STEAM BOILERS, REPLACEMENT UNITS AND NEW UNITS (Adopted 1/18/94; Rev. Adopted & Effective 12/12/95) (a) APPLICABILITY (1) Except as provided in Section (b) or otherwise specified

More information

Streamlining Multiple Applicable Requirements

Streamlining Multiple Applicable Requirements Streamlining Multiple Applicable Requirements What is Streamlining? 1. Streamlining is the process of determining one set of requirements to be incorporated into the Title V permit from among multiple

More information

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX

RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted INDEX RULE 412 STATIONARY INTERNAL COMBUSTION ENGINES LOCATED AT MAJOR STATIONARY SOURCES OF NO X Adopted 06-01-95 INDEX 100 GENERAL 101 PURPOSE 102 APPLICABILITY 110 EXEMPTION, EMERGENCY STANDBY 111 EXEMPTION,

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR

WORKSHOP REPORT. No, the RICE NESHAP applies only to stationary engines as defined in 40 CFR AIR POLLUTION CONTROL DISTRICT COUNTY OF SAN DIEGO FEDERAL SUBPART ZZZZ NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR STATIONARY RECIPROCATING INTERNAL COMBUSTION ENGINES WORKSHOP REPORT

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT ELECTRIC MOTOR NEW PURCHASE OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San

More information

Appendix K. DOC Conditions

Appendix K. DOC Conditions Appendix K DOC Conditions Mission Rock Energy Center Five (5) GE LM6000-PG-Sprint Combustion Turbine Generators (CTGs) Total = 275 MW Nominal Each CTG is simultaneously subject to the emission limits,

More information

Regulatory and Permitting Requirements of Stationary Generators In Delaware

Regulatory and Permitting Requirements of Stationary Generators In Delaware Regulatory and Permitting Requirements of Stationary Generators In Delaware Delaware - DNREC Air Quality Management February 7, 2006 Mark A. Prettyman and Guadalupe J. Reynolds Outline Regulation No. 1144

More information

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT

APPENDIX D. REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT APPENDIX D APPENDIX D REGULATIONS (excerpts) ON 24-HOUR EMISSION LIMITS: MARYLAND DEPARTMENT OF THE ENVIRONMENT DELAWARE DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL NEW JERSEY STATE DEPARTMENT

More information

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION

BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION 777 12th Street, Third Floor Sacramento, CA 95814 BEST AVAILABLE CONTROL TECHNOLOGY DETERMINATION Category/General Equip Description: Equipment Specific Description: Equipment Size/Rating: DETERMINATION

More information

February 28, Definition of Engines Covered Under the Rule

February 28, Definition of Engines Covered Under the Rule WRITTEN STATEMENT OF THE MANUFACTURERS OF EMISSION CONTROLS ASSOCIATION TO THE OZONE TRANSPORT COMMISSION S SECOND DRAFT MODEL RULE TO CONTROL NOX FROM NATURAL GAS COMPRESSOR FUEL-FIRED PRIME MOVERS February

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

Electrical Power Generator Use and Procurement Guidance

Electrical Power Generator Use and Procurement Guidance Electrical Power Generator Use and Procurement Guidance For compliance with applicable air emission control regulations December 2016 Prepared by: Syracuse University Environmental Health & Safety Services

More information

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97

Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 RULE 425.2 Boilers, Steam Generators, and Process Heaters (Oxides of Nitrogen) - Adopted 10/13/94, Amended 4/6/95, 7/10/97 I. Purpose The purpose of this Rule is to limit oxides of nitrogen (NOx) emissions

More information

Air Individual Permit Permit Limits to Avoid NSR

Air Individual Permit Permit Limits to Avoid NSR Air Individual Permit Permit Limits to Avoid NSR 13900128-001 Permittee: Facility name: Shakopee Distributed Generation Shakopee Distributed Generation Vierling Drive E Shakopee, Minnesota 55379 Scott

More information

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013)

STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) RULE 9610 STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted June 20, 2013) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM February 2, 2012 SUBJECT: Superior Appalachian Pipeline, LLC Kissick Lane Frazer Township, PA 15084 Allegheny County Installation Permit No. 0837-I001

More information

Air Quality Impacts of Advance Transit s Fixed Route Bus Service

Air Quality Impacts of Advance Transit s Fixed Route Bus Service Air Quality Impacts of Advance Transit s Fixed Route Bus Service Final Report Prepared by: Upper Valley Lake Sunapee Regional Planning Commission 10 Water Street, Suite 225 Lebanon, NH 03766 Prepared for:

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

A214396F78F5E4B92DB85A8D15EFBBC #2.ECT0223b.xls

A214396F78F5E4B92DB85A8D15EFBBC #2.ECT0223b.xls From: To: Cc: Bcc: Subject: Date: Attachments: Aiken, Sam Larua Fanelli Fitzsimmons, Casey McHugh, Sean

More information

WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation

WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation WRAP Oil & Gas: 2002/2005 and 2018 Area Source Controls Evaluation WRAP SSJF Oil and Gas Work Group Members and Other Interested Parties May 30, 2007 1 WRAP Phase II Project Overview Project is focused

More information

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3.

3. Operation of any applicable boiler on any amount of fuel oil shall be prohibited, except as provided in Subsection C.3. VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 59 - ELECTRICAL POWER GENERATING EQUIPMENT - OXIDES OF NITROGEN EMISSIONS (Adopted 10/6/69, Revised 5/23/72, 7/18/72, 10/31/72, 8/14/79, 12/7/82, 6/4/91,

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT OFF-ROAD FORKLIFT COMPONENT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT OFF-ROAD FORKLIFT COMPONENT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM OFF-ROAD FORKLIFT COMPONENT ELECTRIC FORKLIFT NEW PURCHASE OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San Joaquin

More information

FINAL PERMIT APPLICATION REVIEW SUMMARY

FINAL PERMIT APPLICATION REVIEW SUMMARY FINAL PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053

More information

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach

Review of the SMAQMD s Construction Mitigation Program Enhanced Exhaust Control Practices February 28, 2018, DRAFT for Outreach ABSTRACT The California Environmental Quality Act (CEQA) review process requires projects to mitigate their significant impacts. The Sacramento Metropolitan Air Quality Management District (SMAQMD or District)

More information

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016)

RULE NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.34 NOX REDUCTIONS FROM MISCELLANEOUS SOURCES (Adopted 12/13/2016) A. Purpose and Applicability The purpose of this rule is to reduce emissions of oxides

More information

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706

The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 DRAFT Permit: APC-2004/0721-CONSTRUCTION (NSPS) Two Package Boilers The Premcor Refining Group, Inc. Delaware City Refinery 4550 Wrangle Hill Rd. EXHIBIT A Delaware City, DE 19706 ATTENTION: Andrew Kenner

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT ELECTRIC MOTOR NEW PURCHASE OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San

More information

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015

NARRATIVE. Dika Kuoh Alaa-Eldin A. Afifi DATE: December 14, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM August 26, 2014 SUBJECT: Veterans Affairs Medical Center Oakland Facility University Drive C Pittsburgh, PA 15240 Allegheny County Synthetic Minor

More information

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008)

RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) RULE 4306 BOILERS, STEAM GENERATORS, AND PROCESS HEATERS PHASE 3 (Adopted September 18, 2003; Amended March 17, 2005; Amended October 16, 2008) 1.0 Purpose The purpose of this rule is to limit emissions

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT AGRICULTURAL PUMP ENGINE COMPONENT SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT DIESEL TO DIESEL ENGINE REPOWER OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The

More information

Metro and you, building together.

Metro and you, building together. metro.net Metro and you, building together. Compliance Guide to Construction Vehicles and Equipment Off-Road off-road equipment Idling effective June 15, 2008 requirement ARB s regulation, Title 13, CCR,

More information

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT. Appendix A: Comments and Responses June 22, 2011 APPENDIX A

SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT. Appendix A: Comments and Responses June 22, 2011 APPENDIX A APPENDIX A Summary of Written Comments on Draft Rule 4702 and District Responses June 22, 2011 A - 1 This page intentionally blank. A - 2 SUMMARY OF SIGNIFICANT COMMENTS FOR DRAFT RULE 4702 DATED SEPTEMBER

More information

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary

Industrial, Commercial and Institutional Boilers at Area Source Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Industrial, Commercial and Institutional Boilers at Area Facilities (Boiler GACT) Final Reconsidered Rule Requirements Summary Federal Regulation NESHAP, 40 CFR 63, Subpart JJJJJJ Proposed rule published

More information

AUTHORITY TO CONSTRUCT

AUTHORITY TO CONSTRUCT ISSUED BY: DATE ISSUED: TBD JORGE DeGUZMAN DATE EXPIRES: TBD ISSUED TO: SACRAMENTO MUNICIPAL UTILITY DISTRICT FINANCING AUTHORITY (SFA) COSUMNES POWER PLANT LOCATION: 14295A CLAY EAST RD., HERALD, CA 95638

More information

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants.

This rule shall apply to any stationary source which is a major source of regulated air pollutants or of hazardous air pollutants. RULE 2530 FEDERALLY ENFORCEABLE POTENTIAL TO EMIT (Adopted June 15, 1995; Amended April 25, 2002; Amended December 18, 2008, but not in effect until June 10, 2010) 1.0 Purpose The purpose of this rule

More information

BACT Determination Information

BACT Determination Information DRAFT - ASSIGNED TO S SMAQMD CLEARINGHOUSE CATEGORY: IC ENGINE SPARK - PRIME Size: Small Emitter (PTE < 10 lb/day) DEGASSING - IC ENGINE Determination Number: 173 Determination Date: 3/7/2018 Equipment

More information

2011 Air Emissions Inventory

2011 Air Emissions Inventory SECTION 3 HARBOR CRAFT This section presents emissions estimates for the commercial harbor craft source category, including source description (3.1), geographical delineation (3.2), data and information

More information

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS

ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS ATTACHMENT C.1 EXXONMOBIL INTERIM TRUCKING FOR SYU PHASED RESTART AIR QUALITY ANALYSIS Revision 2 Page 1 of 7 January 2018 ExxonMobil Production Company, a division of Exxon Mobil Corporation (ExxonMobil

More information

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by

Huntington Power Plant. Notice of Intent. Submitted to the Utah Division of Air Quality And Prepared by Huntington Power Plant Notice of Intent Submitted to the Utah Division of Air Quality And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 April 11, 2008 1.0 Introduction PacifiCorp Energy

More information

ON-ROAD HEAVY-DUTY TRUCK APPLICATION

ON-ROAD HEAVY-DUTY TRUCK APPLICATION CARL MOYER MEMORIAL AIR QUALITY STANDARDS ATTAINMENT PROGRAM ON-ROAD HEAVY-DUTY TRUCK APPLICATION Revised 08/2016 1 of 11 CARL MOYER RURAL ASSISTANCE PROGRAM Instruction Sheet The California Air Pollution

More information

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources

City of Washington, Kansas Electric Department. Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Ordinance No. 743 Exhibit A City of Washington, Kansas Electric Department Net Metering Policy & Procedure For Customer-Owned Renewable Energy Resources Page 1 of 7 1. INTRODUCTION The provisions of this

More information

For NOx RACT 25+ MMBTU

For NOx RACT 25+ MMBTU For NOx RACT 25+ MMBTU 1 - boilers and indirect heat exchangers Today s Presentation feel free to ask questions anytime - 25MMBTU/hr + (burner size) - any fuel - any size facility - non-refinery - without

More information

DRAFT MEMORANDUM. Introduction. January 9, 2018

DRAFT MEMORANDUM. Introduction. January 9, 2018 January 9, 2018 DRAFT MEMORANDUM To: Environmental Defense Fund and Diesel Technology Forum From: Ramboll Subject: Emission reductions and cost effectiveness for marine and locomotive projects - Update

More information

Engineering Analysis

Engineering Analysis Wentworth-Douglass Hospital 789 Central Avenue Facility ID No. 3301700037 Mark Acerra 603-740-2471 Richard Bowen (Denise Daigle) Dover, NH 03820 FY03-0098 Rec. 10/23/02 Revised 4/16/03 Introduction: Engineering

More information

DIESEL TO DIESEL ENGINE REPOWER OPTION

DIESEL TO DIESEL ENGINE REPOWER OPTION SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT Off-Road Engine Component AG PUMP ENGINE REPOWER PROGRAM DIESEL TO DIESEL ENGINE REPOWER OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San

More information

EPA Tier 4 and the Electric Power Industry

EPA Tier 4 and the Electric Power Industry EPA Tier 4 and the Electric Power Industry The initiative to lower diesel engine emissions started with on-highway engines in 1973 and now extends to non-road mobile equipment, marine and locomotive engines,

More information

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert

PA RACT 2. Reasonably Available Control Technology. Presented by Suzanne Dibert PA RACT 2 Reasonably Available Control Technology Presented by Suzanne Dibert Affected Facilities Facilities with potential emissions that exceed 100 tons per year (tpy) for NOx (nitrogen oxide) and 50

More information

TIER 3 MOTOR VEHICLE FUEL STANDARDS FOR DENATURED FUEL ETHANOL

TIER 3 MOTOR VEHICLE FUEL STANDARDS FOR DENATURED FUEL ETHANOL 2016 TIER 3 MOTOR VEHICLE FUEL STANDARDS FOR DENATURED FUEL ETHANOL This document was prepared by the Renewable Fuels Association (RFA). The information, though believed to be accurate at the time of publication,

More information

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations?

6/1/2011. NSPS and MACT Standards for Combustion Sources at Utility Authorities What happens when a permit has both federal and state regulations? Presented by Richard M. Cestone, PE, CHMM Birdsall Services Group For NJEWA Conference May 9, 2011 What happens when a permit has both federal and state regulations? 1 Facilities get confused with Federal

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Appendix B: Rule Consistency Analysis August 20, 2009 APPENDIX B. Rule Consistency Analysis

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Appendix B: Rule Consistency Analysis August 20, 2009 APPENDIX B. Rule Consistency Analysis APPENDIX B Rule Consistency Analysis For Proposed Amendments to Rule 4602 August 20, 2009 B-1 Final Draft Staff Report with Appendices This page intentionally blank. B-2 Final Draft Staff Report with Appendices

More information

Full Compliance Evaluation Report Off-Site Report

Full Compliance Evaluation Report Off-Site Report STATE OF NEW HAMPSHIRE DEPARTMENT OF ENVIRONMENTAL SERVICES AIR RESOURCES DIVISION Full Compliance Evaluation Report Off-Site Report CONCORD STEAM CORPORATION 105 ½ PLEASANT STREET CONCORD, NH 03302-1377

More information

San Joaquin Valley NOx Emissions

San Joaquin Valley NOx Emissions San Joaquin Valley NOx Emissions San Joaquin Valley NOx Emissions Mobile Source NOx Emissions 342 Total Tons Per Day 492 Total Tons Per Day 2% Stationary 3 28% Mobile Sources 2 70% Equipment 6 8% 9% Trucks

More information

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines

New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines NSPS Subpart JJJJ New Source Performance Standards for Stationary Spark Ignited Internal Combustion Engines 60.4230 NSPS is a federal rule Applies to all states Is NOT regional State rules cannot be less

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

California s Emission Reduction Plan for Ports and International Goods Movement

California s Emission Reduction Plan for Ports and International Goods Movement California s Emission Reduction Plan for Ports and International Goods Movement Alternative Maritime Power Conference Los Angeles Harbor Hotel April 24, 2006 California Environmental Protection Agency

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 118-18 Page 1 of 23 PERMIT TO INSTALL Table of Contents COMMON ACRONYMS... 2 POLLUTANT / MEASUREMENT ABBREVIATIONS... 3 GENERAL CONDITIONS... 4 EMISSION UNIT SPECIAL CONDITIONS... 6 EMISSION

More information

EPA TIER 4 AND THE ELECTRIC POWER INDUSTRY. Tim Cresswell Tier 4 Product Definition Manager Electric Power Division

EPA TIER 4 AND THE ELECTRIC POWER INDUSTRY. Tim Cresswell Tier 4 Product Definition Manager Electric Power Division EPA TIER 4 AND THE ELECTRIC POWER INDUSTRY Tim Cresswell Tier 4 Product Definition Manager Electric Power Division March 2014 INTRODUCTION The initiative to lower diesel engine emissions started with on-highway

More information

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number

STATEMENT OF BASIS. Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number STATEMENT OF BASIS Cherokee Nitrogen LLC Cherokee, Alabama Colbert County Facility Number 701-0013 Introduction On June 30, 2017, the Department received an application to renew the Title V Major Source

More information

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS

RULE EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS RULE 1146.1. EMISSIONS OF OXIDES OF NITROGEN FROM SMALL INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (a) Definitions 1. ANNUAL HEAT INPUT means the actual amount

More information

STATE OF NEW JERSEY. ASSEMBLY, No th LEGISLATURE

STATE OF NEW JERSEY. ASSEMBLY, No th LEGISLATURE ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED MAY, 0 Sponsored by: Assemblywoman ELIANA PINTOR MARIN District (Essex) Assemblyman NICHOLAS CHIARAVALLOTI District (Hudson) SYNOPSIS Directs

More information

SECTION.1400 NITROGEN OXIDES

SECTION.1400 NITROGEN OXIDES SECTION.1400 NITROGEN OXIDES 15A NCAC 02D.1401 DEFINITIONS (a) For the purpose of this Section, the definitions at G.S 143-212 and G.S. 143-213, and 15A NCAC 02D.0101 shall apply, and in addition the following

More information

HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT ELECTRIC MOTOR NEW PURCHASE OPTION

HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT ELECTRIC MOTOR NEW PURCHASE OPTION SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT APPLICATION HEAVY-DUTY ENGINE PROGRAM AGRICULTURAL PUMP ENGINE COMPONENT ELECTRIC MOTOR NEW PURCHASE OPTION SECTION 1 - APPLICANT INFORMATION (PLEASE PRINT

More information

This rule applies to any internal combustion engine rated at 25 brake horsepower or greater.

This rule applies to any internal combustion engine rated at 25 brake horsepower or greater. RULE 4702 INTERNAL COMBUSTION ENGINES (Adopted August 21, 2003; Amended June 16, 2005; Amended April 20, 2006; Amended January 18, 2007; Amended August 18, 2011; Amended November 14, 2013) 1.0 Purpose

More information

GREAT BASIN UNIFIED AIR POLLUTION CONTROL DISTRICT FORKLIFT COMPONENT

GREAT BASIN UNIFIED AIR POLLUTION CONTROL DISTRICT FORKLIFT COMPONENT GREAT BASIN UNIFIED AIR POLLUTION CONTROL DISTRICT HEAVY-DUTY ENGINE PROGRAM FORKLIFT COMPONENT ELECTRIC FORKLIFT NEW PURCHASE OPTION ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San Joaquin Valley

More information

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year.

(2) ANNUAL HEAT INPUT means the actual amount of heat released by fuels burned in a unit during a calendar year. 1 of 11 8/21/2012 10:19 AM SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT RULE 1146 - EMISSIONS OF OXIDES OF NITROGEN FROM INDUSTRIAL, INSTITUTIONAL, AND COMMERCIAL BOILERS, STEAM GENERATORS, AND PROCESS

More information

ELECTRIFIED DAIRY FEED MIXING PROGRAM

ELECTRIFIED DAIRY FEED MIXING PROGRAM SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT ELECTRIFIED DAIRY FEED MIXING PROGRAM ELIGIBILITY CRITERIA AND APPLICATION GUIDELINES The San Joaquin Valley Air Pollution Control District (SJVAPCD) is

More information

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015

NARRATIVE. Dika Kuoh Steve Allison DATE: August 5, 2015 Georgia Department of Natural Resources Environmental Protection Division Air Protection Branch 4244 International Parkway Suite 120 Atlanta Georgia 30354 404/363-7000 Fax: 404/363-7100 Judson H. Turner,

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. May 1, 2015 PERMIT TO INSTALL 4-13B. ISSUED TO Zoetis LLC MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION May 1, 2015 PERMIT TO INSTALL 4-13B ISSUED TO Zoetis LLC LOCATED AT 306 Pitcher Street Kalamazoo, Michigan IN THE COUNTY OF Kalamazoo STATE

More information

Off-Road Large Spark-Ignition (LSI) Equipment Regulation Proposed Amendments Public Workshop

Off-Road Large Spark-Ignition (LSI) Equipment Regulation Proposed Amendments Public Workshop Off-Road Large Spark-Ignition (LSI) Equipment Regulation Proposed Amendments Public Workshop Date and Time June 8, 2015 10:00 am 12:00 pm PDT June 10, 2015 10:00 am 12:00 pm PDT Location Air Resources

More information

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12)

RULE BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.15.1 - BOILERS, STEAM GENERATORS, AND PROCESS HEATERS (Adopted 5/11/93, Revised 6/13/95, 6/13/00, 9/11/12) A. Applicability The provisions of this

More information

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION

ENGINEERING CALCULATION SHEET AIR RESOURCES DIVISION SIC Code: 4911 (Energy Production) DATE: 06/17/2005 Page 1 of 6 DATE APPLICATION RECEIVED: March 31, 2004 (Application # FY04-0427) FACILITY DESCRIPTION Pinetree-Bethlehem (the Permittee) operates a 17.1

More information

DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD

DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD ENVIRON International Corporation Draft Report DIESEL PARTICULATE MATTER MITIGATION PLAN FOR THE BNSF RAILROAD SAN DIEGO RAIL YARD Prepared for BNSF Railway 2650 Lou Menk Drive Fort Worth, TX 76131-2830

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern Natural Gas Company AIR EMISSION PERMIT NO. 16300110-001 IS ISSUED TO Northern Natural Gas Company NORTHERN NATURAL GAS - HUGO No Street Address Hugo, Washington County, Minnesota 55038 The emission units and emission stacks

More information

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

This is a new permit condition titled, 2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP) This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)" Note to Permit Writer: This condition is for existing engines (commenced

More information

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date])

DRAFT April 9, STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date]) RULE 9610 STATE IMPLEMENTATION PLAN CREDIT FOR EMISSION REDUCTIONS GENERATED THROUGH INCENTIVE PROGRAMS (Adopted [adoption date]) 1.0 Purpose The purpose of this rule is to provide an administrative mechanism

More information

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA

MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Air Permitting of Sources at Natural gas Production, Compression and Processing Facilities MARAMA 2015 SCIENCE MEETING JULY 29-30, 2015 RICHMOND, VIRGINIA Tom Wolf, Governor John Quigley, Secretary Overview

More information

Questions/Comments During Workshop

Questions/Comments During Workshop Potential Changes to the PERP Regulation and Portable Engine ATCM September 13, 2016 Fresno California Environmental Protection Agency Air Resources Board Questions/Comments During Workshop We want as

More information

RULES PUBLICATION NO. 98/P

RULES PUBLICATION NO. 98/P RULES PUBLICATION NO. 98/P GUIDELINES REGARDING THE REQUIREMENTS FOR MARINE DIESEL ENGINES FITTED WITH NO X SELECTIVE CATALYTIC REDUCTION (SCR) SYSTEMS 2016 January Publications P (Additional Rule Requirements)

More information

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES

AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES AIR PERMITTING REQUIREMENTS FOR ON-SITE STATIONARY POWER GENERATING ENGINES MAY 15, 2012 FOR MORE INFORMATION CONTACT NEGIB HARFOUCHE, PH.D. NJDEP DIVISION OF AIR QUALITY (609) 292-2137 nharfouc@dep.state.nj.us

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 206-14 Page 1 of 27 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

MARINE VESSEL REPOWER APPLICATION

MARINE VESSEL REPOWER APPLICATION CARL MOYER MEMORIAL AIR QUALITY STANDARDS ATTAINMENT PROGRAM MARINE VESSEL REPOWER APPLICATION Revised 08/2016 1 of 10 CARL MOYER RURAL ASSISTANCE PROGRAM Instruction Sheet The California Air Pollution

More information

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT. Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT Guideline for Expedited Application Review (GEAR) Oil Field Sump Replacement Tanks Approved By: Signed Seyed Sadredin Director of Permit Services

More information

DRAFT Electric Generating Unit Emissions Inventory Analyses Executive Summary

DRAFT Electric Generating Unit Emissions Inventory Analyses Executive Summary March 2014 DRAFT Electric Generating Unit Emissions Inventory Analyses Executive Summary Introduction The Ozone Transport Commission (OTC) Stationary and Area Source Committee (SAS) was directed to identify

More information

Final Draft Ozone Transport Commission Electric Generating Unit Emission Inventory Analysis September 18, 2014

Final Draft Ozone Transport Commission Electric Generating Unit Emission Inventory Analysis September 18, 2014 Final Draft Ozone Transport Commission Electric Generating Unit Emission Inventory Analysis September 18, 2014 Executive Summary OTC Largest Contributor EGU Subgroup Introduction The Ozone Transport Commission

More information

State of New Jersey. Department of Environmental Protection Division of Air Quality

State of New Jersey. Department of Environmental Protection Division of Air Quality GOP-006 State of New Jersey Department of Environmental Protection Division of Air Quality General Operating Permit (GOP-006) Combined Heat and Power Stationary Spark Ignition Reciprocating Engine(s) less

More information

Questions & Answers. Vermont Clean Diesel Grant Program. Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm

Questions & Answers. Vermont Clean Diesel Grant Program. Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm Questions & Answers Vermont Clean Diesel Grant Program Release Date: July 14, 2017 Proposals Due: August 14, 2017 at 4:00 pm Q & A/ In Person Meeting: July 25, 2017 10:00 am - 12:00 pm National Life Building

More information

RULE 210 AND RULE 213 FEES FOR FISCAL YEAR July 1, 2017

RULE 210 AND RULE 213 FEES FOR FISCAL YEAR July 1, 2017 RULE 210 AND RULE 213 FEES FOR FISCAL YEAR 2017-2018 July 1, 2017 In accordance with the provisions of Santa Barbara County Air Pollution Control District Rule 210.V.C and Rule 213.C, the Air Pollution

More information

Alternative Fuels Can Significantly Reduce Costs

Alternative Fuels Can Significantly Reduce Costs 2006 Forum on Energy: Immediate Solutions, Emerging Technologies May 15-17 Appleton, WI Alternative Fuels Can Significantly Reduce Costs Three Case Studies Presented by: David F. Seitz, P.E. Project Director

More information